REFERENCE PACKAGE 1
MECHANICAL ROOM001B
PACKAGE 2 SCOPE OF WORK
40x18
58x1
4
22x16
14x12
46x1
8
46x1
8
58x14 UP
24x20 UP
20x18 UP18x10 UP
46x18 UP
46x18 UP
5" CHWR5" CHWS4" HWR4" HWS
3" HWR3" HWS
03
EF
3
AHU
3
EF
1
AHU
(E)
(E)
(E)
1
CU
2
CU
(E)
(E)
1
EF
1
SF
2
EF
2
SF
(E)
(E)
(E)
(E)
5
CC
5
SU(E)
(E)
1
2
TU
NN
EL
1
HP
5
EF
(E)
15x8
15x8
20x1
028
x10
35x1
0
9x8
24x1
024
x10
12x12
8x10
10x10
18x1
0
2" CHWR2" CHWS
3" HWR3" HWS1 1/4" HWR1 1/4" HWS
5" CHWR
5" CHWS4" HWR
4" HWS2 1/2" HWR2 1/2" HWS1" HWS1" HWR
2" CHWS2" CHWR2" HWS
2" HWR
(E)
(E)
DEMOLISH PIPING IN TUNNEL
DE
MO
LIS
H P
IPIN
G IN
TU
NN
EL
3
CAP
T
T
T
T
T
T
4
5
6
HX
(E)
7
2" HWR2" HWS
1 1/2" CHWR UP
1 1/2" CHWS UP
(1970's)
(1960's)
MECHANICAL ROOM046B
(BAT CAVE)
MECHANICAL ROOM038
CU
1(E)
8
8
1 1/2" HWS
1 1/2" HWR
3/4" HWS
3/4" HWR
1/2" HWS
1 1/4" HWS
1 1/2" HWR
(RADIATOR LOOP)
(COIL LOOP)
(RADIANT FLOOR LOOP)
22x20
44x14 UP28x12 UP
42x14 UP28x1226x20
26x14
14x10
12x8
DEMOLISHHEATING COILANDTHROTTLINGDAMPER
(E) (E)VAV
02
VAV
01
3" HWS UP3" HWR UP4" CHWS UP4" CHWR UP1 1/4" HWS UP1 1/4" HWR UP
engineers for a sustainable futureTM
www.glumac.com
Job. No.:
Contact:
ISSUE DATE:
PROJECT NO.:
CHECKED BY:
REVISIONS
The
se d
raw
ings
and
thei
r co
nten
t are
the
prop
erty
of S
ER
A A
rchi
tect
s In
c. a
nd a
re to
be
utili
zed
on th
is p
roje
ct. R
epro
duct
ion
of a
ny p
art o
f thi
s m
ater
ial,
with
out t
he e
xpre
ss w
ritte
n pe
rmis
sion
of S
ER
A A
rchi
tect
s In
c. is
pro
hibi
ted.
SE
RA
AR
CH
ITE
CT
S C
OP
YR
IGH
T 2
012
900 SW Fifth Ave., Suite 1600
Portland, OR 97204
T. 503.227.5280 F. 503.274.7674
02.13.00545
JOSH CHECKIS
ER
B M
EM
OR
I AL
UN
ION
- R
EN
OV
AT
ION
& A
DD
ITI O
N
PA
CK
AG
E 4
100%
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
2014.08.01
7/3
0/2
014 4
:10:5
0 P
M
DM100
11045
DEMO PLAN -GROUND LEVELFLOOR PLAN -HVAC
UN
IVE
RS
ITY
OF
OR
EG
ON
13T
H A
VE
NU
E &
UN
IVE
RS
ITY
ST
RE
ET
SCALE: 1/16" = 1'-0"1DEMO PLAN - GROUND LEVEL FLOOR PLAN - HVAC
SHEET NOTES
#KEYED NOTES
A DEMOLITION SCOPE OF EQUIPMENT, DUCTWORK,PIPING, ETC IN EXISTING BUILDING IS SHOWN FORREFERENCE AND IS DEVELOPED THROUGHREFERENCE OF EXISTING BUILDING AS-BUILTDOCUMENTATION AND SITE WALKS. WHEREPROJECT INVOLVES INTERFACE WITH EXISTINGBUILDING AND SITE SYSTEMS, EVERY EFFORT HASBEEN MADE TO NOTE EXISTING UTILITIES ANDSERVICES. HOWEVER, THE CONTRACTOR SHOULDTHOROUGHLY FAMILIARIZE THEMSELVES WITHEXISTING CONDITIONS AND BE AWARE THAT INSOME CASES INFORMATION IS NOT AVAILABLE FORCONCEALED CONDITIONS, WHICH EXIST INPORTIONS OF THE EXISTING BUILDING AFFECTEDBY THIS WORK. NOTIFY OWNER, ARCHITECT, ANDENGINEER OF EXISTING CONDITIONS DISCOVEREDDURING THE DEMOLITION PHASE.
B THE CONTRACTOR SHALL REFER TO THEARCHITECTURAL INTERIOR DETAILS, FLOOR PLANS,ELEVATIONS, AND THE STRUCTURAL AND OTHERCONTRACT DRAWINGS AND SHALL COORDINATEWORK WITH THAT OF THE OTHER TRADES TOAVOID INTERFERENCE. THE PLANS AREDIAGRAMMATIC AND SHOW GENERALLY THELOCATIONS OF THE FIXTURES, EQUIPMENT, ANDPIPES AND ARE NOT TO BE SCALED; ALLDIMENSIONS AND EXISTING CONDITIONS SHALL BECHECKED IN THE FIELD.
C REFERENCE DM600 SERIES DRAWINGS FOR ONELINE DOCUMENTION OF SYSTEM DEMOLITIONREQUIREMENTS.
D THE ENTIRE 1970'S ADDITION AND ASSOCIATEDSERVICES SHALL BE DEMOLISHED. REFER TONOTES FOR SELECTED AREAS WHERE SYSTEMS INTHE 1970'S BUILDING ARE REQUIRED TO MAINTAINTHE SERVICES OF THE EXISTING BUILDING TOREMAIN. COORDINATE WITH OWER FOREQUIPMENT, VALVES, ETC THAT MUST BERETURNED TO OWNER FOR REUSE.
E THE ENTIRE 1960'S ADDITION HVAC SERVICESSHALL BE DEMOLISHED EXCEPT WHERE NOTED.
F EXISTING THERMOSTATS ARE ONLY PARITIALLYSHOWN ON THESE DRAWINGS. CONTROLSCONTRACTOR SHALL LOCATE ALL (E)THERMOSTATS AND SENSORS IN (E) BUILDING TODETERMINE FINAL SENSOR REPLACEMENT SCOPEOF WORK AS PART OF THE DESIGN BUILDCONTROLS SCOPE. REPLACE ALL SENSORS IN (E)AREAS WITH (N) SENSORS AS PART OF DESIGN.
1 COORDINATE CAMPUS UTILITY SHUTDOWN WITHUNIVERSITY. INSTALL 4" SHUT OFF VALVES INCAMPUS CHILLED WATER SUPPLY/RETURN BRANCHPIPING SERVING THE 1970 ADDITION. DEMOCHILLED WATER PIPING DOWNSTREAM OF VALVESTO THE 1970 ADDTION.
2 COORDINATE CAMPUS UTILITY SHUTDOWN WITHUNIVERSITY. INSTALL A 4" SHUT OFF VALVE INCAMPUS STEAM BRANCH PIPING SERVING THE 1970ADDITION. DEMO STEAM PIPING DOWNSTREAM OFVALVE TO THE 1970 ADDTION. DEMO CONDENSATEPIPE BACK TO THE LOCATION OF THE STEAM SHUTOFF VALVE PROVIDE TEMPORARY CAP FOR FUTURECONDENSATE CONNECTION.
3 PACKAGE 2 SCOPE: DEMOLISH 1 1/4" CHWS/R TOTHIS POINT IN BASEMENT. PROVIDE (N) 1 1/2"CHILLED WATER PIPING UP TO AHU-2. SEE M600SERIES FOR MORE DETAILS
4 DEMOLISH ALL MECHANICAL DUCTWORK, PIPINGAND EQUIPMENT IN THIS ROOM. DEMOLISHSTEAM/CONDENSATE & CHILLED WATER PIPINGBACK TO BUILDING ENTRY. SCOPE INCLUDESSUPPLY FANS, EXHAUST FANS, HEAT EXCHANGER,HEATING PUMPS, EXPANSION TANK, CONDENSATEPUMPS. SEE PLUMBING DRAWINGS ADDITIONALDEMO SCOPE AND EXISTING EQUIPMENT TOREMAIN.
5 CHILLED WATER BUILDING ENTRY LOCATION
6 STREAM & CONDENSATE BUILDING ENTRYLOCATION
7 STACKED HEATING PUMPS
8 RAISE (E) HYDRONIC PIPING TO ROUTE ABOVE "OLOUNGE" CEILING HEIGHT. COORDINATE HEIGHTWITH (E) HYDRONIC MAIN RISER LOCATION & (N)DUCTWORK RISERS INSTALLED IN PACKAGE 4ABOVE (N) TELECOM ROOM.
0 32 48 6416
1/16"-1'-0"
UP
DN
21.6
A B C D E F G H
17.0
16.2
15.5
11.5
10
9
8
7
6
5
4
3
2
0.5
19.7
17.9
17.5
20.5
L M N P Q R S T W
22
18
17
15
13
12
V
11
21
19
1
9.5
12.5
14
16
14.2
12.7
12.2
20
16.5
U
DEMO
PACKAGE 2 SCOPE OF WORK
30x7
16x8
16x6
34x10
22x12
18x8
18x8
18x8
18x8
18x8
18x8
18x8
18x12
12x9
10x6
24x1
218
x12
12x1
216
x5
10x8
44x14 UP42x14 UP
22x36 UP
20x24 UP
20x18 UP
10x18 UP
40x26 UP
12x18 UP 12x18 UP
18x18 UP
24Ø UP
14x14 DN
28x12 DN
16Ø UP
16Ø UP
10
SF
10
RF
(E)
(E)
12x30 UP12x30 UP12x30 UP30x8 UP18x18 UP27x24 UP
4x8
14x6
28x8
20x8
30x8
1"
1 1/4"
1
2
1/2" HWR
1/2" HWS
1/2" HWR
1/2" HWS
1/2"
1/2"
T
T
T
T
T
T
T
T
T
1 1/2" CHWR UP & DN
1 1/2" CHWS UP & DN
1 1/2" HWS UP & DN
1" HWR UP & DN
1 1/2" HWR UP & DN
3/4" HWS DN
8x6
6x6
8x8 UP
FCU
1(E)
3
EF
1(E)
(E) RADIANT SLAB
(E) RADIANT SLAB
(E) RADIANT SLAB
4
28x1
2
3" HWS UP/DN3" HWR UP/DN4" CHWS UP/DN4" CHWR UP/DN1 1/4" HWS UP/DN1 1/4" HWR UP/DN
engineers for a sustainable futureTM
www.glumac.com
Job. No.:
Contact:
ISSUE DATE:
PROJECT NO.:
CHECKED BY:
REVISIONS
The
se d
raw
ings
and
thei
r co
nten
t are
the
prop
erty
of S
ER
A A
rchi
tect
s In
c. a
nd a
re to
be
utili
zed
on th
is p
roje
ct. R
epro
duct
ion
of a
ny p
art o
f thi
s m
ater
ial,
with
out t
he e
xpre
ss w
ritte
n pe
rmis
sion
of S
ER
A A
rchi
tect
s In
c. is
pro
hibi
ted.
SE
RA
AR
CH
ITE
CT
S C
OP
YR
IGH
T 2
012
900 SW Fifth Ave., Suite 1600
Portland, OR 97204
T. 503.227.5280 F. 503.274.7674
02.13.00545
JOSH CHECKIS
ER
B M
EM
OR
I AL
UN
ION
- R
EN
OV
AT
ION
& A
DD
ITI O
N
PA
CK
AG
E 4
100%
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
2014.08.01
7/3
0/2
014 4
:10:5
8 P
M
DM101
11045
DEMO PLAN -LEVEL 1 FLOORPLAN - HVAC
UN
IVE
RS
ITY
OF
OR
EG
ON
13T
H A
VE
NU
E &
UN
IVE
RS
ITY
ST
RE
ET
SCALE: 1/16" = 1'-0"1DEMO PLAN - LEVEL 1 FLOOR PLAN - HVAC
SHEET NOTES
#KEYED NOTES
A DEMOLITION SCOPE OF EQUIPMENT, DUCTWORK,PIPING, ETC IN EXISTING BUILDING IS SHOWN FORREFERENCE AND IS DEVELOPED THROUGHREFERENCE OF EXISTING BUILDING AS-BUILTDOCUMENTATION AND SITE WALKS. WHEREPROJECT INVOLVES INTERFACE WITH EXISTINGBUILDING AND SITE SYSTEMS, EVERY EFFORT HASBEEN MADE TO NOTE EXISTING UTILITIES ANDSERVICES. HOWEVER, THE CONTRACTOR SHOULDTHOROUGHLY FAMILIARIZE THEMSELVES WITHEXISTING CONDITIONS AND BE AWARE THAT INSOME CASES INFORMATION IS NOT AVAILABLE FORCONCEALED CONDITIONS, WHICH EXIST INPORTIONS OF THE EXISTING BUILDING AFFECTEDBY THIS WORK. NOTIFY OWNER, ARCHITECT, ANDENGINEER OF EXISTING CONDITIONS DISCOVEREDDURING THE DEMOLITION PHASE.
B THE CONTRACTOR SHALL REFER TO THEARCHITECTURAL INTERIOR DETAILS, FLOOR PLANS,ELEVATIONS, AND THE STRUCTURAL AND OTHERCONTRACT DRAWINGS AND SHALL COORDINATEWORK WITH THAT OF THE OTHER TRADES TOAVOID INTERFERENCE. THE PLANS AREDIAGRAMMATIC AND SHOW GENERALLY THELOCATIONS OF THE FIXTURES, EQUIPMENT, ANDPIPES AND ARE NOT TO BE SCALED; ALLDIMENSIONS AND EXISTING CONDITIONS SHALL BECHECKED IN THE FIELD.
C REFERENCE DM600 SERIES DRAWINGS FOR ONELINE DOCUMENTION OF SYSTEM DEMOLITIONREQUIREMENTS.
D THE ENTIRE 1970'S ADDITION AND ASSOCIATEDSERVICES SHALL BE DEMOLISHED. REFER TONOTES FOR SELECTED AREAS WHERE SYSTEMS INTHE 1970'S BUILDING ARE REQUIRED TO MAINTAINTHE SERVICES OF THE EXISTING BUILDING TOREMAIN. COORDINATE WITH OWER FOREQUIPMENT, VALVES, ETC THAT MUST BERETURNED TO OWNER FOR REUSE.
E THE ENTIRE 1960'S ADDITION HVAC SERVICESSHALL BE DEMOLISHED EXCEPT WHERE NOTED.
F EXISTING THERMOSTATS ARE ONLY PARITIALLYSHOWN ON THESE DRAWINGS. CONTROLSCONTRACTOR SHALL LOCATE ALL (E)THERMOSTATS AND SENSORS IN (E) BUILDING TODETERMINE FINAL SENSOR REPLACEMENT SCOPEOF WORK AS PART OF THE DESIGN BUILDCONTROLS SCOPE. REPLACE ALL SENSORS IN (E)AREAS WITH (N) SENSORS AS PART OF DESIGN.
1 DEMOLISH ALL HOT WATER HEATER PIPING ANDRADIATORS IN THIS FIRST FLOOR NORTH AREA.
2 DEMOLISH HOT WATER PIPING BACK TO SHAFTAND CAP.
3 DEMOLISH PIPING BACK TO MAIN.
4 REMOVE (E) HOOD & CAP DUCTWORK UP AT SLABPENETRATION. REPAIR (E) HORIZONTAL DUCT TOAVOID FUTURE GREASE ACCUMULATION.
0 32 48 6416
1/16"-1'-0"
21.6
A B C D E F G H
17.0
16.2
15.5
11.5
10
9
8
7
6
5
4
3
2
0.5
19.7
17.9
17.5
20.5
L M N P Q R S T W
22
18
17
15
13
12
V
11
21
19
1
9.5
12.5
14
16
14.2
12.7
12.2
20
16.5
U
DEMO
MECHANICAL ROOM142D
PACKAGE 2 SCOPE OF WORK
54x16
26x12
16x12
39x17
44x19
54x14
54x14
20x1
0
20x1
422
x14
11x1011x88x8
14x1
2
14x1
2
16x18
10x18
15x18
REFERENCE PACKAGE 1
40x36 22x24
20x16
16x16
16x12
16x7
54x16 UP
20x18 UP
22x36 UP
30x18 UP
20x20 UP
20x20 UP
28x16 UP
12x16 UP
18x16 UP
10x10 UP
12x10 UP
28x26 UP
28x28 DN
28x28 DN
18x18 DN
40Ø
22Ø
22Ø
40Ø UP01
EF
(E)
1
SU
2
SU
3
SU
4
SU
2
EF
4
EF
1
EF
5
EF
3
EF
(E)
(E)
(E)
(E)
(E)
(E)
(E) (E) (E)
02
MUA
(E)
03
KEF
(E)
12x6
12x6
19x1
212
x12
24x20 UP
22x2
412
x24
10x8
40x2
6
1 1/4" HWS
1 1/4" HWR
1/2" HWS1/2" HWR
1 1/2" HWS UP & DN
1" HWR UP & DN1 1/2" HWR UP & DN
14x14
18x17
21x12
106x24
90x2
4
6x6
(E)04
KEF
0 2
EF(E)
16x1
2
16x1
2
16x12
15x8
14x6
18x1
4
1 1/4" HWR DN
3/4" HWR UP & DN3/4" HWS UP & DN
1" HWS1" HWR
1 1/2" HWR DN1 1/2" HWS DN
T
14x6 MIXINGDAMPERS
9x15 MIXINGDAMPERS
10x15 MIXINGDAMPERS
10x15 MIXINGDAMPERS
10x15 MIXINGDAMPERS
9x15 MIXINGDAMPERS
7x6 MIXINGDAMPERS
2
1
1
1
1
1
1
1
44x14 UP & DN
42x14 UP & DN1 1/2" CHWR UP & DN1 1/2" CHWS UP & DN
T T
T
T
T
3
3
3
24x14
4400CFM
5
5
5
DN
CAP
CAP
CAP
H.C.
3" HWS UP/DN3" HWR UP/DN4" CHWS UP/DN4" CHWR UP/DN1 1/4" HWS UP/DN1 1/4" HWR UP/DN
engineers for a sustainable futureTM
www.glumac.com
Job. No.:
Contact:
ISSUE DATE:
PROJECT NO.:
CHECKED BY:
REVISIONS
The
se d
raw
ings
and
thei
r co
nten
t are
the
prop
erty
of S
ER
A A
rchi
tect
s In
c. a
nd a
re to
be
utili
zed
on th
is p
roje
ct. R
epro
duct
ion
of a
ny p
art o
f thi
s m
ater
ial,
with
out t
he e
xpre
ss w
ritte
n pe
rmis
sion
of S
ER
A A
rchi
tect
s In
c. is
pro
hibi
ted.
SE
RA
AR
CH
ITE
CT
S C
OP
YR
IGH
T 2
012
900 SW Fifth Ave., Suite 1600
Portland, OR 97204
T. 503.227.5280 F. 503.274.7674
02.13.00545
JOSH CHECKIS
ER
B M
EM
OR
I AL
UN
ION
- R
EN
OV
AT
ION
& A
DD
ITI O
N
PA
CK
AG
E 4
100%
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
2014.08.01
7/3
0/2
014 4
:11:0
5 P
M
DM101m
11045
DEMO PLAN -MEZZANINELEVEL PLAN -HVAC
UN
IVE
RS
ITY
OF
OR
EG
ON
13T
H A
VE
NU
E &
UN
IVE
RS
ITY
ST
RE
ET
SCALE: 1/16" = 1'-0"1DEMO PLAN - MEZZANINE LEVEL PLAN - HVAC
SHEET NOTES
#KEYED NOTES
A DEMOLITION SCOPE OF EQUIPMENT, DUCTWORK,PIPING, ETC IN EXISTING BUILDING IS SHOWN FORREFERENCE AND IS DEVELOPED THROUGHREFERENCE OF EXISTING BUILDING AS-BUILTDOCUMENTATION AND SITE WALKS. WHEREPROJECT INVOLVES INTERFACE WITH EXISTINGBUILDING AND SITE SYSTEMS, EVERY EFFORT HASBEEN MADE TO NOTE EXISTING UTILITIES ANDSERVICES. HOWEVER, THE CONTRACTOR SHOULDTHOROUGHLY FAMILIARIZE THEMSELVES WITHEXISTING CONDITIONS AND BE AWARE THAT INSOME CASES INFORMATION IS NOT AVAILABLE FORCONCEALED CONDITIONS, WHICH EXIST INPORTIONS OF THE EXISTING BUILDING AFFECTEDBY THIS WORK. NOTIFY OWNER, ARCHITECT, ANDENGINEER OF EXISTING CONDITIONS DISCOVEREDDURING THE DEMOLITION PHASE.
B THE CONTRACTOR SHALL REFER TO THEARCHITECTURAL INTERIOR DETAILS, FLOOR PLANS,ELEVATIONS, AND THE STRUCTURAL AND OTHERCONTRACT DRAWINGS AND SHALL COORDINATEWORK WITH THAT OF THE OTHER TRADES TOAVOID INTERFERENCE. THE PLANS AREDIAGRAMMATIC AND SHOW GENERALLY THELOCATIONS OF THE FIXTURES, EQUIPMENT, ANDPIPES AND ARE NOT TO BE SCALED; ALLDIMENSIONS AND EXISTING CONDITIONS SHALL BECHECKED IN THE FIELD.
C REFERENCE DM600 SERIES DRAWINGS FOR ONELINE DOCUMENTION OF SYSTEM DEMOLITIONREQUIREMENTS.
D THE ENTIRE 1970'S ADDITION AND ASSOCIATEDSERVICES SHALL BE DEMOLISHED. REFER TONOTES FOR SELECTED AREAS WHERE SYSTEMS INTHE 1970'S BUILDING ARE REQUIRED TO MAINTAINTHE SERVICES OF THE EXISTING BUILDING TOREMAIN. COORDINATE WITH OWER FOREQUIPMENT, VALVES, ETC THAT MUST BERETURNED TO OWNER FOR REUSE.
E THE ENTIRE 1960'S ADDITION HVAC SERVICESSHALL BE DEMOLISHED EXCEPT WHERE NOTED.
F EXISTING THERMOSTATS ARE ONLY PARITIALLYSHOWN ON THESE DRAWINGS. CONTROLSCONTRACTOR SHALL LOCATE ALL (E)THERMOSTATS AND SENSORS IN (E) BUILDING TODETERMINE FINAL SENSOR REPLACEMENT SCOPEOF WORK AS PART OF THE DESIGN BUILDCONTROLS SCOPE. REPLACE ALL SENSORS IN (E)AREAS WITH (N) SENSORS AS PART OF DESIGN.
1 DEMOLISH (E) DAMPERS AND CONTROLS.
2 KEEP EXHAUST FAN FOR (N) DESIGN. CONTROLPER BMS PER SPECIFICATIONS.
3 DEMOLISH (E) RADIATORS ALONG ENTIREPERIMETER SOUTH & EAST WALLS. DEMOLISHVALVES & CAP PIPING BEHIND WALL.
4 PROVIDE ACCESS PANELS IN ENCLOSURE & DUCTFOR GREASE CLEANOUT. TYPICAL EVERY 20'
5 DEMOLISH GRILLE & CAP DUCTWORK. DUCTWORKTO REMAIN FOR (F).
0 32 48 6416
1/16"-1'-0"
21.6
A B C D E F G H
17.0
16.2
15.5
11.5
10
9
8
7
6
5
4
3
2
0.5
19.7
17.9
17.5
20.5
L M N P Q R S T W
22
18
17
15
13
12
V
11
21
19
1
9.5
12.5
14
16
14.2
12.7
12.2
20
16.5
U
DEMO
PACKAGE 2 SCOPE OF WORK
7x8 17x8 20x12 16x12 17x8 7x8
12x818x1222x12
28x12
12x8
32x12
13x12
20x10
40x20
40x20
7x10
10x1
014
x10
18x1
022
x10
14x7
20x7
20x7
17x7
7x7
26x14
13x14
38x9
22x9 38x9
28x15
23x15
15x15
15x10
40x20 UP
13x14 UP
18x48 UP
26x14 UP
18x14 UP
19x15 UP
21x15 UP
20x15 UP
20x20 UP20x20 UP15x22 UP
21x14 UP
38x22 UP
20x20 UP
20x20 UP
28x16 DN
20x20 DN20x20 DN30x30 DN
40Ø UP & DN
3
TU
4
TU
1
TU
2
TU
5
TU
6
TU(E)
(E)
(E)
(E)(E)
(E)
02
KEF
01
MUA
(E)
(E)
6x14
ø8
ø8
14x6 UP
6x14 UP
14x6
18x16 UP
24x12 UP
15x10 UP
15x10 DN
3/4" HWR DN3/4" HWS DN1 1/4" HWR DN
3/4" HWR1 1/2" HWS
1" HWS
3/4" HWR
28x1430x16
12x1
0
20x8
28Ø14Ø
12Ø
9Ø
9Ø
10x10
12Ø8Ø
20Ø
14x7
7x7
26x732
x822
x10
18x1
014
x10
10x1
07x
10
25x4
13x15
12x1
27x
12
21x1
4
20x15
28x1528x15
1
T
T
T
T
12x10 M.D.
15x10 M.D.
12x10 M.D.
24x10 M.D.
12x10 M.D.
2
PNEUMATIC SHUT-OFF DAMPER
T
TT
1 1/2" CHWS1 1/2" CHWR
1 1/2" CHWS DN
1 1/2" CHWR DN
4
1 1/2" CHWR1 1/2" CHWS
DISHWASHER LOCATION
3
3
3
3
3
3
12x10
19x10
12x10
12x10
9x9
9x9
9x9
9x9
9x9
9x9
23x15
15x15
T
CAP
FCU
2(E)
5
-
KEF(E)
CU
-(E)
28x26 UP & DN
28x26 UP
(E) RADIANT SLAB
CAP
3" HWS UP/DN3" HWR UP/DN4" CHWS UP/DN4" CHWR UP/DN1 1/4" HWS UP/DN1 1/4" HWR UP/DN
engineers for a sustainable futureTM
www.glumac.com
Job. No.:
Contact:
ISSUE DATE:
PROJECT NO.:
CHECKED BY:
REVISIONS
The
se d
raw
ings
and
thei
r co
nten
t are
the
prop
erty
of S
ER
A A
rchi
tect
s In
c. a
nd a
re to
be
utili
zed
on th
is p
roje
ct. R
epro
duct
ion
of a
ny p
art o
f thi
s m
ater
ial,
with
out t
he e
xpre
ss w
ritte
n pe
rmis
sion
of S
ER
A A
rchi
tect
s In
c. is
pro
hibi
ted.
SE
RA
AR
CH
ITE
CT
S C
OP
YR
IGH
T 2
012
900 SW Fifth Ave., Suite 1600
Portland, OR 97204
T. 503.227.5280 F. 503.274.7674
02.13.00545
JOSH CHECKIS
ER
B M
EM
OR
I AL
UN
ION
- R
EN
OV
AT
ION
& A
DD
ITI O
N
PA
CK
AG
E 4
100%
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
2014.08.01
7/3
0/2
014 4
:11:1
4 P
M
DM102
11045
DEMO PLAN -LEVEL 2 FLOORPLAN - HVAC
UN
IVE
RS
ITY
OF
OR
EG
ON
13T
H A
VE
NU
E &
UN
IVE
RS
ITY
ST
RE
ET
SCALE: 1/16" = 1'-0"1DEMO PLAN - LEVEL 2 FLOOR PLAN - HVAC
SHEET NOTES
#KEYED NOTES
A DEMOLITION SCOPE OF EQUIPMENT, DUCTWORK,PIPING, ETC IN EXISTING BUILDING IS SHOWN FORREFERENCE AND IS DEVELOPED THROUGHREFERENCE OF EXISTING BUILDING AS-BUILTDOCUMENTATION AND SITE WALKS. WHEREPROJECT INVOLVES INTERFACE WITH EXISTINGBUILDING AND SITE SYSTEMS, EVERY EFFORT HASBEEN MADE TO NOTE EXISTING UTILITIES ANDSERVICES. HOWEVER, THE CONTRACTOR SHOULDTHOROUGHLY FAMILIARIZE THEMSELVES WITHEXISTING CONDITIONS AND BE AWARE THAT INSOME CASES INFORMATION IS NOT AVAILABLE FORCONCEALED CONDITIONS, WHICH EXIST INPORTIONS OF THE EXISTING BUILDING AFFECTEDBY THIS WORK. NOTIFY OWNER, ARCHITECT, ANDENGINEER OF EXISTING CONDITIONS DISCOVEREDDURING THE DEMOLITION PHASE.
B THE CONTRACTOR SHALL REFER TO THEARCHITECTURAL INTERIOR DETAILS, FLOOR PLANS,ELEVATIONS, AND THE STRUCTURAL AND OTHERCONTRACT DRAWINGS AND SHALL COORDINATEWORK WITH THAT OF THE OTHER TRADES TOAVOID INTERFERENCE. THE PLANS AREDIAGRAMMATIC AND SHOW GENERALLY THELOCATIONS OF THE FIXTURES, EQUIPMENT, ANDPIPES AND ARE NOT TO BE SCALED; ALLDIMENSIONS AND EXISTING CONDITIONS SHALL BECHECKED IN THE FIELD.
C REFERENCE DM600 SERIES DRAWINGS FOR ONELINE DOCUMENTION OF SYSTEM DEMOLITIONREQUIREMENTS.
D THE ENTIRE 1970'S ADDITION AND ASSOCIATEDSERVICES SHALL BE DEMOLISHED. REFER TONOTES FOR SELECTED AREAS WHERE SYSTEMS INTHE 1970'S BUILDING ARE REQUIRED TO MAINTAINTHE SERVICES OF THE EXISTING BUILDING TOREMAIN. COORDINATE WITH OWER FOREQUIPMENT, VALVES, ETC THAT MUST BERETURNED TO OWNER FOR REUSE.
E THE ENTIRE 1960'S ADDITION HVAC SERVICESSHALL BE DEMOLISHED EXCEPT WHERE NOTED.
F EXISTING THERMOSTATS ARE ONLY PARITIALLYSHOWN ON THESE DRAWINGS. CONTROLSCONTRACTOR SHALL LOCATE ALL (E)THERMOSTATS AND SENSORS IN (E) BUILDING TODETERMINE FINAL SENSOR REPLACEMENT SCOPEOF WORK AS PART OF THE DESIGN BUILDCONTROLS SCOPE. REPLACE ALL SENSORS IN (E)AREAS WITH (N) SENSORS AS PART OF DESIGN.
1 ABANDON HEATER IN PLACE AND CAP PIPING.
2 PNEUMATIC SHUT-OFF DAMPERS CONTROL SWITCHIN RM 219.
3 DEMOLISH DAMPER, ACTUATOR & PNEUMATICS.CAP DUCT TAP FROM REMOVED MAIN.
4 LOCATION OF (E) PUMP ASSEMBLY SERVING AHU - 2CHILLED WATER COIL
5 DEMOLISH PIPING BACK TO MAIN
0 32 48 6416
1/16"-1'-0"
21.6
A B C D E F G H
17.0
16.2
15.5
11.5
10
9
8
7
6
5
4
3
2
0.5
19.7
17.9
17.5
20.5
L M N P Q R S T W
22
18
17
15
13
12
V
11
21
19
1
9.5
12.5
14
16
14.2
12.7
12.2
20
16.5
U
DEMO
PACKAGE 2 SCOPE OF WORK
-
AC
-
AC
-
AC
-
AC
-
AC
-
AC
-
AC
-
AC
-
AC
-
AC
03
MUA
1
FC
60x30 UP
20x15 UP
21x14 UP
20x20 UP
12x16 UP
15x8 UP
21x40 UP
20x20 UP
20x20 UP
15x22 UP
14x8 UP
25x29 UP
25x25 UP
36x22 UP
54x36 UP
10x7 UP
20x20 DN
38x22 DN
20x20 DN
21x14 DN
36x22
15x8
15x8
28x1
6
42x24
42x24
36x14
36x4
636
x32
36x16
36x56
36x26
(E)
(E)
(E)
(E) (E)
(E)
(E) (E)
(E)(E)
(E)
(E)
(E)
1
24x1
4
24x2
4
14x6
ø12 ø12
ø10
ø8
ø8
14x6
26x26
26x26
20x10 20x10
48x2
4
48x2
4
10x6
14Ø
6x6
24x24 UP
14x6 DN14x6 DN
10x1
0
10x10
15x10 UP
3" HWS DN
4" CHWS DN4" CHWR DN
3" HWR DN
2
3
T
T
T
T
-
AC
(E)
8x8
12x8
MECHANICAL ROOM
4 4
4
4
4
2
AHU
engineers for a sustainable futureTM
www.glumac.com
Job. No.:
Contact:
ISSUE DATE:
PROJECT NO.:
CHECKED BY:
REVISIONS
The
se d
raw
ings
and
thei
r co
nten
t are
the
prop
erty
of S
ER
A A
rchi
tect
s In
c. a
nd a
re to
be
utili
zed
on th
is p
roje
ct. R
epro
duct
ion
of a
ny p
art o
f thi
s m
ater
ial,
with
out t
he e
xpre
ss w
ritte
n pe
rmis
sion
of S
ER
A A
rchi
tect
s In
c. is
pro
hibi
ted.
SE
RA
AR
CH
ITE
CT
S C
OP
YR
IGH
T 2
012
900 SW Fifth Ave., Suite 1600
Portland, OR 97204
T. 503.227.5280 F. 503.274.7674
02.13.00545
JOSH CHECKIS
ER
B M
EM
OR
I AL
UN
ION
- R
EN
OV
AT
ION
& A
DD
ITI O
N
PA
CK
AG
E 4
100%
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
2014.08.01
7/3
0/2
014 4
:11:2
1 P
M
DM103
11045
DEMO PLAN -LEVEL 3 FLOORPLAN - HVAC
UN
IVE
RS
ITY
OF
OR
EG
ON
13T
H A
VE
NU
E &
UN
IVE
RS
ITY
ST
RE
ET
SCALE: 1/16" = 1'-0"1DEMO PLAN - LEVEL 3 FLOOR PLAN - HVAC
SHEET NOTES
#KEYED NOTES
A DEMOLITION SCOPE OF EQUIPMENT, DUCTWORK,PIPING, ETC IN EXISTING BUILDING IS SHOWN FORREFERENCE AND IS DEVELOPED THROUGHREFERENCE OF EXISTING BUILDING AS-BUILTDOCUMENTATION AND SITE WALKS. WHEREPROJECT INVOLVES INTERFACE WITH EXISTINGBUILDING AND SITE SYSTEMS, EVERY EFFORT HASBEEN MADE TO NOTE EXISTING UTILITIES ANDSERVICES. HOWEVER, THE CONTRACTOR SHOULDTHOROUGHLY FAMILIARIZE THEMSELVES WITHEXISTING CONDITIONS AND BE AWARE THAT INSOME CASES INFORMATION IS NOT AVAILABLE FORCONCEALED CONDITIONS, WHICH EXIST INPORTIONS OF THE EXISTING BUILDING AFFECTEDBY THIS WORK. NOTIFY OWNER, ARCHITECT, ANDENGINEER OF EXISTING CONDITIONS DISCOVEREDDURING THE DEMOLITION PHASE.
B THE CONTRACTOR SHALL REFER TO THEARCHITECTURAL INTERIOR DETAILS, FLOOR PLANS,ELEVATIONS, AND THE STRUCTURAL AND OTHERCONTRACT DRAWINGS AND SHALL COORDINATEWORK WITH THAT OF THE OTHER TRADES TOAVOID INTERFERENCE. THE PLANS AREDIAGRAMMATIC AND SHOW GENERALLY THELOCATIONS OF THE FIXTURES, EQUIPMENT, ANDPIPES AND ARE NOT TO BE SCALED; ALLDIMENSIONS AND EXISTING CONDITIONS SHALL BECHECKED IN THE FIELD.
C REFERENCE DM600 SERIES DRAWINGS FOR ONELINE DOCUMENTION OF SYSTEM DEMOLITIONREQUIREMENTS.
D THE ENTIRE 1970'S ADDITION AND ASSOCIATEDSERVICES SHALL BE DEMOLISHED. REFER TONOTES FOR SELECTED AREAS WHERE SYSTEMS INTHE 1970'S BUILDING ARE REQUIRED TO MAINTAINTHE SERVICES OF THE EXISTING BUILDING TOREMAIN. COORDINATE WITH OWER FOREQUIPMENT, VALVES, ETC THAT MUST BERETURNED TO OWNER FOR REUSE.
E THE ENTIRE 1960'S ADDITION HVAC SERVICESSHALL BE DEMOLISHED EXCEPT WHERE NOTED.
F EXISTING THERMOSTATS ARE ONLY PARITIALLYSHOWN ON THESE DRAWINGS. CONTROLSCONTRACTOR SHALL LOCATE ALL (E)THERMOSTATS AND SENSORS IN (E) BUILDING TODETERMINE FINAL SENSOR REPLACEMENT SCOPEOF WORK AS PART OF THE DESIGN BUILDCONTROLS SCOPE. REPLACE ALL SENSORS IN (E)AREAS WITH (N) SENSORS AS PART OF DESIGN.
1 PACKAGE 2 SCOPE: AHU IS SERVED BY CHILLEDWATER PIPING FROM THE 1970 ADDITION.DEMOLISH PIPING AS SHOWN ON DM603 ANDDM604. ROUTE (N) PIPING TO AHU FROM CHILLEDWATER MAIN IN BASEMENT OF 50S BUILDING.REBALANCE PUMP FOR NEW HEAD LOSSCONDITIONS TO MAINTAIN (E) PRE-TAB REPORTPERFORMANCE.
2 DEMOLISH ALL MECHANICAL EQUIPMENT INMECH ROOM. BEFORE WORK BEGINSCOORDINATE WITH UO FACILITIES WHATEQUIPMENT SHOULD BE RETURNED TO OWNERFOR REUSE.
3 DEMOLISH ALL WINDOW AC UNITS IN THIS AREA.DEMOLISH (E) RADIATORS IN THIS AREA.DEMOLISH VALVES & CAP PIPING BEHIND WALL.SEE 600 SERIES FOR COUNTS.
4 DEMOLISH (E) RADIATORS ALONG ENTIREPERIMETER WALLS. DEMOLISH VALVES & CAPPIPING BEHIND WALL. SEE 600 SERIES FORCOUNTS.
0 32 48 6416
1/16"-1'-0"
21.6
A B C D E F G H
17.0
16.2
15.5
11.5
10
9
8
7
6
5
4
3
2
0.5
19.7
17.9
17.5
20.5
L M N P Q R S T W
22
18
17
15
13
12
V
11
21
19
1
9.5
12.5
14
16
14.2
12.7
12.2
20
16.5
U
PENTHOUSE400
1
9
SF
(E)
9
EF
(E)
2
RTU
1
RTU
(E)
(E)
(E)
5
SF
5
EF
6
SF6
EF
(E)
(E)
(E)
(E)
40Ø DN
40Ø DN
03
MUA(E)
01
MUA
02
KEF
(E)
(E)
(E)
04
KEF(E)
2
(E)
(E)
(E)
(E)
SF
1
RTU
-
EF
-
EF
-
-
KEF(E)
KEF
01
1
FC(E)
2
AHU
CU
-(E)
EF
-
engineers for a sustainable futureTM
www.glumac.com
Job. No.:
Contact:
ISSUE DATE:
PROJECT NO.:
CHECKED BY:
REVISIONS
The
se d
raw
ings
and
thei
r co
nten
t are
the
prop
erty
of S
ER
A A
rchi
tect
s In
c. a
nd a
re to
be
utili
zed
on th
is p
roje
ct. R
epro
duct
ion
of a
ny p
art o
f thi
s m
ater
ial,
with
out t
he e
xpre
ss w
ritte
n pe
rmis
sion
of S
ER
A A
rchi
tect
s In
c. is
pro
hibi
ted.
SE
RA
AR
CH
ITE
CT
S C
OP
YR
IGH
T 2
012
900 SW Fifth Ave., Suite 1600
Portland, OR 97204
T. 503.227.5280 F. 503.274.7674
02.13.00545
JOSH CHECKIS
ER
B M
EM
OR
I AL
UN
ION
- R
EN
OV
AT
ION
& A
DD
ITI O
N
PA
CK
AG
E 4
100%
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
2014.08.01
7/3
0/2
014 4
:11:2
8 P
M
DM110
11045
DEMO PLAN -ROOF PLAN -HVAC
UN
IVE
RS
ITY
OF
OR
EG
ON
13T
H A
VE
NU
E &
UN
IVE
RS
ITY
ST
RE
ET
SCALE: 1/16" = 1'-0"1DEMO PLAN - ROOF PLAN - HVAC
SHEET NOTES
#KEYED NOTES
A DEMOLITION SCOPE OF EQUIPMENT, DUCTWORK,PIPING, ETC IN EXISTING BUILDING IS SHOWN FORREFERENCE AND IS DEVELOPED THROUGHREFERENCE OF EXISTING BUILDING AS-BUILTDOCUMENTATION AND SITE WALKS. WHEREPROJECT INVOLVES INTERFACE WITH EXISTINGBUILDING AND SITE SYSTEMS, EVERY EFFORT HASBEEN MADE TO NOTE EXISTING UTILITIES ANDSERVICES. HOWEVER, THE CONTRACTOR SHOULDTHOROUGHLY FAMILIARIZE THEMSELVES WITHEXISTING CONDITIONS AND BE AWARE THAT INSOME CASES INFORMATION IS NOT AVAILABLE FORCONCEALED CONDITIONS, WHICH EXIST INPORTIONS OF THE EXISTING BUILDING AFFECTEDBY THIS WORK. NOTIFY OWNER, ARCHITECT, ANDENGINEER OF EXISTING CONDITIONS DISCOVEREDDURING THE DEMOLITION PHASE.
B THE CONTRACTOR SHALL REFER TO THEARCHITECTURAL INTERIOR DETAILS, FLOOR PLANS,ELEVATIONS, AND THE STRUCTURAL AND OTHERCONTRACT DRAWINGS AND SHALL COORDINATEWORK WITH THAT OF THE OTHER TRADES TOAVOID INTERFERENCE. THE PLANS AREDIAGRAMMATIC AND SHOW GENERALLY THELOCATIONS OF THE FIXTURES, EQUIPMENT, ANDPIPES AND ARE NOT TO BE SCALED; ALLDIMENSIONS AND EXISTING CONDITIONS SHALL BECHECKED IN THE FIELD.
C REFERENCE DM600 SERIES DRAWINGS FOR ONELINE DOCUMENTION OF SYSTEM DEMOLITIONREQUIREMENTS.
D THE ENTIRE 1970'S ADDITION AND ASSOCIATEDSERVICES SHALL BE DEMOLISHED. REFER TONOTES FOR SELECTED AREAS WHERE SYSTEMS INTHE 1970'S BUILDING ARE REQUIRED TO MAINTAINTHE SERVICES OF THE EXISTING BUILDING TOREMAIN. COORDINATE WITH OWER FOREQUIPMENT, VALVES, ETC THAT MUST BERETURNED TO OWNER FOR REUSE.
E THE ENTIRE 1960'S ADDITION HVAC SERVICESSHALL BE DEMOLISHED EXCEPT WHERE NOTED.
F EXISTING THERMOSTATS ARE ONLY PARITIALLYSHOWN ON THESE DRAWINGS. CONTROLSCONTRACTOR SHALL LOCATE ALL (E)THERMOSTATS AND SENSORS IN (E) BUILDING TODETERMINE FINAL SENSOR REPLACEMENT SCOPEOF WORK AS PART OF THE DESIGN BUILDCONTROLS SCOPE. REPLACE ALL SENSORS IN (E)AREAS WITH (N) SENSORS AS PART OF DESIGN.
1 DEMOLISH MECHANICAL UNITS, DUCTWORK, PIPING, ETCIN PENTHOUSE.
2 (E) ELEVATOR OVERRUN & EQUIPMENT TO REMAIN.
0 32 48 6416
1/16"-1'-0"
EXISTING AIRSIDE DEMO SCHEMATIC 1948 BUILDING2
EXISTING AIRSIDE DEMO SCHEMATIC 1961 ADDITION1
EXISTING AIRSIDESCHEMATIC
DM601
ISSUE DATE:PROJECT NO.:
CHECKED BY:
REVISIONS
Thes
e dra
wing
s and
their
conte
nt ar
e the
prop
erty
of SE
RA A
rchite
cts In
c. an
d are
to be
utiliz
ed on
this
proje
ct. R
epro
ducti
on of
any p
art o
f this
mater
ial, w
ithou
t the e
xpre
ss w
ritten
perm
ission
of S
ERA
Arch
itects
Inc.
is pr
ohibi
ted.
SE
RA
AR
CH
ITE
CTS
CO
PY
RIG
HT
2012
ERB
MEM
OR
IAL
UN
ION
- R
ENO
VATI
ON
& A
DD
ITIO
NPA
CK
AG
E 4
2014.08.01
100%
CO
NS
TRU
CTI
ON
DO
CU
ME
NTS
9/19
/201
3 7:
54:2
6 A
M
11045
UN
IVE
RS
ITY
OF
OR
EG
ON
13TH
AV
EN
UE
& U
NIV
ER
SIT
Y S
TRE
ET
ISSUE DATE:PROJECT NO.:
CHECKED BY:
REVISIONS
Thes
e dra
wing
s and
their
conte
nt ar
e the
prop
erty
of SE
RA A
rchite
cts In
c. an
d are
to be
utiliz
ed on
this
proje
ct. R
epro
ducti
on of
any p
art o
f this
mater
ial, w
ithou
t the e
xpre
ss w
ritten
perm
ission
of S
ERA
Arch
itects
Inc.
is pr
ohibi
ted.
SE
RA
AR
CH
ITE
CTS
CO
PY
RIG
HT
2012
ERB
MEM
OR
IAL
UN
ION
- R
ENO
VATI
ON
& A
DD
ITIO
NPA
CK
AG
E 4
2014.08.01
100%
CO
NS
TRU
CTI
ON
DO
CU
ME
NTS
9/19
/201
3 7:
54:2
6 A
M
11045
UN
IVE
RS
ITY
OF
OR
EG
ON
13TH
AV
EN
UE
& U
NIV
ER
SIT
Y S
TRE
ET
SHEET NOTES
EXISTING AIRSIDESCHEMATIC
DM602
ISSUE DATE:PROJECT NO.:
CHECKED BY:
REVISIONS
Thes
e dra
wing
s and
their
conte
nt ar
e the
prop
erty
of SE
RA A
rchite
cts In
c. an
d are
to be
utiliz
ed on
this
proje
ct. R
epro
ducti
on of
any p
art o
f this
mater
ial, w
ithou
t the e
xpre
ss w
ritten
perm
ission
of S
ERA
Arch
itects
Inc.
is pr
ohibi
ted.
SE
RA
AR
CH
ITE
CTS
CO
PY
RIG
HT
2012
ERB
MEM
OR
IAL
UN
ION
- R
ENO
VATI
ON
& A
DD
ITIO
NPA
CK
AG
E 4
2014.08.01
100%
CO
NS
TRU
CTI
ON
DO
CU
ME
NTS
9/19
/201
3 7:
54:2
6 A
M
11045
UN
IVE
RS
ITY
OF
OR
EG
ON
13TH
AV
EN
UE
& U
NIV
ER
SIT
Y S
TRE
ET
EXISTING AIRSIDE DEMO SCHEMATIC 1972 ADDITION1
SHEET NOTES
EXISTING CHILLED WATER SCHEMATIC 1961 ADDITION1
EXISTING CHILLEDWATERSCHEMATIC
DM603
ISSUE DATE:PROJECT NO.:
CHECKED BY:
REVISIONS
Thes
e dra
wing
s and
their
conte
nt ar
e the
prop
erty
of SE
RA A
rchite
cts In
c. an
d are
to be
utiliz
ed on
this
proje
ct. R
epro
ducti
on of
any p
art o
f this
mater
ial, w
ithou
t the e
xpre
ss w
ritten
perm
ission
of S
ERA
Arch
itects
Inc.
is pr
ohibi
ted.
SE
RA
AR
CH
ITE
CTS
CO
PY
RIG
HT
2012
ERB
MEM
OR
IAL
UN
ION
- R
ENO
VATI
ON
& A
DD
ITIO
NPA
CK
AG
E 4
2014.08.01
100%
CO
NS
TRU
CTI
ON
DO
CU
ME
NTS
9/19
/201
3 7:
54:2
6 A
M
11045
UN
IVE
RS
ITY
OF
OR
EG
ON
13TH
AV
EN
UE
& U
NIV
ER
SIT
Y S
TRE
ET
EXISTING CHILLED WATER SCHEMATIC 1970'S ADDITION2
SHEET NOTES
KEYED NOTES
EXISTING CHILLED WATER SCHEMATIC 1948 BUILDING1EXISTING CHILLEDWATERSCHEMATIC
DM604
ISSUE DATE:PROJECT NO.:
CHECKED BY:
REVISIONS
Thes
e dra
wing
s and
their
conte
nt ar
e the
prop
erty
of SE
RA A
rchite
cts In
c. an
d are
to be
utiliz
ed on
this
proje
ct. R
epro
ducti
on of
any p
art o
f this
mater
ial, w
ithou
t the e
xpre
ss w
ritten
perm
ission
of S
ERA
Arch
itects
Inc.
is pr
ohibi
ted.
SE
RA
AR
CH
ITE
CTS
CO
PY
RIG
HT
2012
ERB
MEM
OR
IAL
UN
ION
- R
ENO
VATI
ON
& A
DD
ITIO
NPA
CK
AG
E 4
2014.08.01
100%
CO
NS
TRU
CTI
ON
DO
CU
ME
NTS
9/19
/201
3 7:
54:2
6 A
M
11045
UN
IVE
RS
ITY
OF
OR
EG
ON
13TH
AV
EN
UE
& U
NIV
ER
SIT
Y S
TRE
ET
SHEET NOTES
KEYED NOTES
EXISTING HEATING WATER DEMO SCHEMATIC 1961 ADDITION1
EXISTING HEATINGWATERSCHEMATIC
DM605
ISSUE DATE:PROJECT NO.:
CHECKED BY:
REVISIONS
Thes
e dra
wing
s and
their
conte
nt ar
e the
prop
erty
of SE
RA A
rchite
cts In
c. an
d are
to be
utiliz
ed on
this
proje
ct. R
epro
ducti
on of
any p
art o
f this
mater
ial, w
ithou
t the e
xpre
ss w
ritten
perm
ission
of S
ERA
Arch
itects
Inc.
is pr
ohibi
ted.
SE
RA
AR
CH
ITE
CTS
CO
PY
RIG
HT
2012
ERB
MEM
OR
IAL
UN
ION
- R
ENO
VATI
ON
& A
DD
ITIO
NPA
CK
AG
E 4
2014.08.01
100%
CO
NS
TRU
CTI
ON
DO
CU
ME
NTS
9/19
/201
3 7:
54:2
6 A
M
11045
UN
IVE
RS
ITY
OF
OR
EG
ON
13TH
AV
EN
UE
& U
NIV
ER
SIT
Y S
TRE
ET
SHEET NOTES
KEYED NOTES
ISSUE DATE:PROJECT NO.:
CHECKED BY:
REVISIONS
Thes
e dra
wing
s and
their
conte
nt ar
e the
prop
erty
of SE
RA A
rchite
cts In
c. an
d are
to be
utiliz
ed on
this
proje
ct. R
epro
ducti
on of
any p
art o
f this
mater
ial, w
ithou
t the e
xpre
ss w
ritten
perm
ission
of S
ERA
Arch
itects
Inc.
is pr
ohibi
ted.
SE
RA
AR
CH
ITE
CTS
CO
PY
RIG
HT
2012
ERB
MEM
OR
IAL
UN
ION
- R
ENO
VATI
ON
& A
DD
ITIO
NPA
CK
AG
E 4
2014.08.01
100%
CO
NS
TRU
CTI
ON
DO
CU
ME
NTS
9/19
/201
3 7:
54:2
6 A
M
11045
UN
IVE
RS
ITY
OF
OR
EG
ON
13TH
AV
EN
UE
& U
NIV
ER
SIT
Y S
TRE
ET
EXISTING HEATING WATER DEMO SCHEMATIC 1948 BUILDING1
EXISTING HEATINGWATERSCHEMATIC
DM606
SHEET NOTES KEYED NOTES
EXISTING HEATING WATER DEMO SCHEMATIC 1972 ADDITION1
EXISTING HEATINGWATERSCHEMATIC
DM607
ISSUE DATE:PROJECT NO.:
CHECKED BY:
REVISIONS
Thes
e dra
wing
s and
their
conte
nt ar
e the
prop
erty
of SE
RA A
rchite
cts In
c. an
d are
to be
utiliz
ed on
this
proje
ct. R
epro
ducti
on of
any p
art o
f this
mater
ial, w
ithou
t the e
xpre
ss w
ritten
perm
ission
of S
ERA
Arch
itects
Inc.
is pr
ohibi
ted.
SE
RA
AR
CH
ITE
CTS
CO
PY
RIG
HT
2012
ERB
MEM
OR
IAL
UN
ION
- R
ENO
VATI
ON
& A
DD
ITIO
NPA
CK
AG
E 4
2014.08.01
100%
CO
NS
TRU
CTI
ON
DO
CU
ME
NTS
9/19
/201
3 7:
54:2
6 A
M
11045
UN
IVE
RS
ITY
OF
OR
EG
ON
13TH
AV
EN
UE
& U
NIV
ER
SIT
Y S
TRE
ET
SHEET NOTES