OVERVIEW OF INDONESIA
GAS DEMAND
Jakarta, August 1st 2018
20
18
© S
KK
Mig
as –
All
righ
ts r
eser
ved
Catatan:*) Data realisasi rata-rata bulan Mei tahun 2018
4,397 4,416
4,202 4,008
3,820 3,775 3,681
4,336
4,078
3,631
3,402 3,237
3,090 2,860
2,736 2,670
1,480 1,466 1,513
2,341 2,527
2,913
3,323 3,379 3,267
3,550
3,774 3,632
3,882 3,997 3,875
3,987
-
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
4,500
5,000
2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018
BB
TUD
Ekspor Domestik
INDONESIA DOMESTIC GAS DEMAND IS GROWING
• Since 2013 Domestic Gas Supply is higher than Export• 60% of gas is supplied to Domestic in 2018
20
18
© S
KK
Mig
as –
All
righ
ts r
eser
ved
Major Upstream ProjectDominated by Gas and LNG Project
SULAWESI SELATAN
SUMATERA UTARA
JAWA TIMUR
MALUKU
PAPUA BARAT
ACEH
SULAWESI TENGAH
KALIMANTAN TIMUR
SUMATERA SELATAN
LAMPUNG
JAWA BARAT
KEP. RIAU
POD APPROVEDPeak Prod : 391 MMScfd*)
BANGKA : 80 MMscfd, 2200 bcpd
GENDALO-GEHEM: Pre FEED POD 1 Revision finished. POD 1 Revision being discussed.
Gendalo Hub: (Q4-2022)
Gehem Hub : (Q2-2023)
Pre FEEDPOD 1 Revision to be submitted in Nov 2018
Pre FEEDOn going POD II 155 MMscfd
CONSTRUCTIONProd (Q2-2020):3,8 MTPA (700 MMscfd), 3200 bopd ***)
EPC TENDERProd (Q1-2021) : 25000 bopd
CONSTRUCTIONProd (2020)190 MMscfd (Netto Gas)
CONSTRUCTIONProd (Q2-2019): 175 MMscfd**)
FEED TENDER PREPProd (Q2-2022):108 MMscfd, 3300 bopd
FEEDProd (Q2-2021)60 MMscfd
FEED TENDERProd (Q3-2020):60 MMscfd, 3000 bopdCONSTRUCTION
Prod (Q3-2019):BISON: 45 MMscfd,IGUANA: 45 MMscfdGAJAH PUTERI: 73 MMscfd
POD I APPROVEDPlateau Prod : 170 MMScfd, 737 bcpd
IDD
BADIK & WEST BADIKMERAKES
SENORO
TANGGUH TRAIN-3
ASAP MERAH KIDO
ABADIMDA & MBHJAMBARAN TIUNG BIRU
POFD L-PARIGI
ANDE ANDE LUMUTBISON-IGUANA-GAJAH PUTERI
JAMBU AYE UTARA
FEEDProd (Q4-2020):70 MMscfd
WASAMBO
*) Addition to Jangkrik MuaraBakau 600 MMscfd
**) Addition to MBD 100 MMscfd***) Addition to 7.6 MTPA Tangguh 1 & 2
20
18
© S
KK
Mig
as –
All
righ
ts r
eser
ved
SOUTH SULAWESI
NORTH SUMATERA
EAST JAWA
MALUKU
WEST PAPUA
ACEH
CENTRAL SULAWESI
EAST KALIMANTAN
CENTRAL SUMATERA
SOUTH SUMATERA
LAMPUNG
WEST JAWA
RIAU ISLANDS
Challenges in Meeting Gas Demand
431*149**
1.2691.886
2.4551.001 1.295
863
9081.940 870
+/-1.900
1.190
Demand - Supply
New Major Project
450
Infrastructures is the Key in meeting Indonesia gas DemandOption:- Bring the gas or LNG to gas demand- Build Demand near gas supply
* Demand (MMSCFD)** Suppy (MMSCFD)***2018 Demand & Supply based on Necara Gas Bumi Indonesia 2016-2035**** Supply is incremental from new project only
137425
2531.131
597530
TRAIN-3 + AMK
ABADI
MERAKES + BADIK
IDD + Wasambo
Infrastructure
Gas Price
Energy MixDemand
Supply
Transporter (Pipeline Gas, CNG
truck, LNG ship, LNG truck, etc)
Presidential or Ministerial Decree
etc
Crude Oil and Natural Gas,
Coal, Renewables, etc
Crude Oil Lifting, Fertilizer & Petrochem,
Industry, Electricity, Gas Network, BBG,
etc
Gas Producer, Seller,
Agregator, Integrator, etc
Upstream to Downstream Integration to Meet Gas Supply and Demand
INDONESIA: Liquefaction and regasification facilities
Regasification terminalsLiquefaction plants
Existing Under construction Proposed Decommissioned
INDONESIA(SUMATRA)
INDONESIA(JAVA)
INDONESIA(KALIMANTAN) INDONESIA
(SULAWESI)INDONESIA
(PAPUA)
MALAYSIA
MALAYSIA
CAMBODIA
VIETNAM
MYANMAR
PHILIPPINES
MALAYSIABRUNEI
THAILAND
PAPUA NEW GUINEA
AUSTRALIA
1
23
5
6
7
8
9
10
11
12*
1314
16
15
17
4
18
1 - Arun2 - Lampung (FSRU)3 - Nusantara (FSRU)4 - Tanjung Benoa LNG (FRU/FSU)5 - Makassar LNG6 - Cilacap (FSRU)7 - Jawa 1 (FSRU)8 - Bojonegara (Banten)9 - Bontang10 - Donggi Senoro
11 - Sengkang12 - Abadi LNG*13 - Tangguh T314 - Tangguh T1-215 - Porong LNG (FSRU)16 - Nunukan LNG17 - East Dara FLNG18 - Probolinggo LNG19 - Batam20 - Gorontalo LNG21 – Bantaeng
Source: IHS Markit, 2018
Note: * Location of Abadi LNG has not been confirmed. Small-scale (<0.3 MMtpa) are not included.
19
20
21
20
18
© S
KK
Mig
as –
All
righ
ts r
eser
ved
PLTMG Saumlaki 10 MWPLTMG Merauke 20 MW
PLTMG Dobo 10 MW
PLTMG Langgur 20 MW
MPP Papua (Jayapura) 50 MWPLTMG Jayapura Peaker 40 MW
PLTMG Timika Peaker 10 MW
PLTMG Fak-Fak 10 MW
MPP Papua Barat (Manokwari) 20 MW
PLTMG Biak 15 MW
PLTMG Serui 10 MWPLTMG Bintuni 10 MW
PLTMG Nabire 20 MW
PLTMG Seram Peaker 20 MW
PLTMG Ambon Peaker 30 MW
MPP Maluku (Ambon) 70 MW
PLTMG Namlea 10 MW
Gas Salawati
Gas Bintuni
144.4 MMSCFD
78.6 MMSCFD
15 MMSCFD
HUB
7Source: Ministry of Energy and Mineral Resources, 2017
Scattered
Demand,
Small
Scale,
Mini LNG is
an option
Virtual Pipeline For Gas Power Plant in Eastern Part of Indonesia
TERIMA KASIH
www.pln.co.id |DIVSIS
Gas To Power in Papua
Source LNG :Tangguh
LNG Carrier Route:Tangguh SorongManokwariNabire Jayapura Biak Tangguh
: LNG Carrier (27.500-30.000) m3 (JV Perusda Papua Barat)
: Onshore / floating LNG storage 4.000-15.000 m3 &Regasification unit 3-39 mmscfd (PLN)
PLTG Sorong 30 MW (2018)PLTG Sorong 20 MW (2019)PLTMG Sorong 50 MW (2025)
MPP Manokwari 20 MW (2018)PLTMG Manokwari 20 MW (2019)PLTMG Manokwari 20 MW (2024))
MPP Nabire 20 MW (2017)PLTG/MG 10 MW (2018)PLTMG 10 MW (2019)
PLTMG Biak 35 MW (2018)
MPP Jayapura 50 MW (2017)PLTMG Jayapura Peaker 40 MW (2018)PLTMG Jayapura 50 MW (2019)
30k
Demand : 46,7 BBTUD
Source : PLN, 2018