2012 2013 2014 2015 2016
Liquid Bulk
Petroleum, LNG, molasses, etc. 26.5 25.9 22.1 24.4 25.1
Dry Bulk
Potash, recycled Metals, petcoke, etc. 0.873 1.16 1.377 1.357 0.747
Break Bulk
Forest products & project cargo 0.065 0.059 0.018 0.017 0.006
Containerized
Miscellaneous dry & refrigerated cargo 0.312 0.497 0.565 0.611 0.573
Total 26.96 27.6 24.0 26.4 26.4
2012 2013 2014 2015 2016
TEUs 50,672 76,269 89,615 97,465 90,262
Port Statistics Total Port traffic (in millions of metric
tonnes)
Container TEUs
Project Status
• Final financial approval for the modernization project, along with two signed contribution agreement completed
• RFP for detailed engineering awarded and work has commenced
• RFP issued for long term operations of the container terminal
• DP World was the successful proponent of the bid and a long term contract was successfully negotiated
Dry Bulk
Potash Corp – Barrack Point
Open Area Available for Development
Break Bulk/Project Cargo
Lower Cove
Cruise
Marco Polo
Cruise & Open Area for Light Development
Break Bulk/Project Cargo
Long Wharf
Containers, Dry Bulk, Break Bulk, & Project Cargo
DP World Cargo Terminal
Crosby’s Molasses Atlantic Towing
Land available for development
Lower West
Open Area for Development
Pugsley A Liquid Bulk
Irving Oil & Canaport
Dry Bulk
American Iron & Metal (AIM)
Cruise
Diamond Jubilee Cruise Terminal
Modular Fabrication
Building
Costs (over 8 fiscal years)
Wharf & Terminal
Construction $167 M
Main Channel Deepening $38 M
Total $205 M
Benefits (over 8 fiscal years)
Boost to Provincial GDP $152 M
Boost to labour income $109.6 M
Generation of tax revenue $35,4 M
Generate consumer spending $84 M
Total Benefits $381 M
Further Detail on Employment Benefits
• Creation of 2,245 person years’ worth of employment over the seven-year construction period
• Creation of 1,093 direct & indirect jobs over the life of the terminal once project completes
Modernization Costs & Benefits
Marine Terminal Operator
• Jan 2017 –PSJ container terminal operator with 30 year lease
• 4th largest terminal operator in the world
• Operates 77 terminals globally
• Global experience in operating reefer warehouses
• Committed to investing in equipment at PSJ
• Invested in two Post Panamax cranes at PSJ
Land Available for Development
LOWER COVE
Berth Space - 225 m (738 ft) Water Depth – 10.7 m (35ft) Dock Apron – Open Total Area – 18.2 Acres
LONG WHARF
Berth Space - 285 m (935 ft) Water Depth – 10.7 m (35ft) Dock Apron – Open Total Area – 19.6 Acres
Land Available for Development
Mod Fabrication Building Size: 80 ft x 300 ft Year of Construction: 2016
Breezeway Size: 30 ft x 50 ft Year of Construction: 2016
Shed D Size: 300 ft x 400 ft Year of Construction: 1997
Business Development Contact
Shannon Blanchard Manager, Cargo Development
Cell: 506-647-9544
Email: [email protected]
PortSaintJohn CruiseSaintJohn @PortSaintJohn PortSaintJohn
PortSaintJohn
sjport.com
Get Social With Us!