October 2007October 2007October 2007October 2007
FY08-FY12 Dredging ScheduleFY08-FY12 Dredging ScheduleNew York DistrictNew York District
1st Qtr
FY08FY08
2nd Qtr
3rd Qtr
4th Qtr
1st Qtr
2nd Qtr
3rd Qtr
4th Qtr
FY09FY09 FY10FY10
1st Qtr
2nd Qtr
3rd Qtr
4th Qtr
1st Qtr
2nd Qtr
3rd Qtr
4th Qtr
1st Qtr
2nd Qtr
3rd Qtr
4th Qtr
FY11FY11 FY12FY12
Newark Bay, NJ
Raritan River, NJ
NY & NJ Channels-Arthur Kill &Raritan Bay
Pla
cem
ent
Sit
e
Dre
dg
e +
Qu
anti
ty(C
Y)
Mechanical50K
Upland
UplandMechanical30K
Mechanical50-60K &
250K
Upland &
HARS
MaintenanceDredging
Bronx River, NY Mechanical~40K
Upland
East ChesterCreek, NY
Mechanical~40K
Upland
Flushing Bay& Creek, NY
Mechanical~45K
Upland
New YorkHarbor
HARSMechanical~250K
East River, NY HARSMechanical~260K
FY08-FY12 Dredging ScheduleFY08-FY12 Dredging ScheduleNew York DistrictNew York District
1st Qtr
FY08FY08
2nd Qtr
3rd Qtr
4th Qtr
1st Qtr
2nd Qtr
3rd Qtr
4th Qtr
FY09FY09 FY10FY10
1st Qtr
2nd Qtr
3rd Qtr
4th Qtr
1st Qtr
2nd Qtr
3rd Qtr
4th Qtr
1st Qtr
2nd Qtr
3rd Qtr
4th Qtr
FY11FY11 FY12FY12
Pla
cem
ent
Sit
e
Dre
dg
e +
Qu
anti
ty(C
Y)Maintenance
Dredging
Bay Ridge &Red Hook , NY
Hopper~100K
Upland &
HARS
Hudson River-Albany, NY
Hopper55K
Upland
ButtermilkChannel, NY
Hopper~80K
HARS
Port ChesterHarbor, NY
Mechanical~50K
HARS
WestchesterCreek, NY
UplandMechanical~60K
Jamaica Bay, NY Hopper240K
Beach
EastRockaway, NY
Hydraulic~280K (2yr)~140K (1yr)
Beach
Fire IslandTo Jones, NY
BeachHydraulic
500K
FY08-FY12 Dredging ScheduleFY08-FY12 Dredging ScheduleNew York DistrictNew York District
1st Qtr
FY08FY08
2nd Qtr
3rd Qtr
4th Qtr
1st Qtr
2nd Qtr
3rd Qtr
4th Qtr
FY09FY09 FY10FY10
1st Qtr
2nd Qtr
3rd Qtr
4th Qtr
1st Qtr
2nd Qtr
3rd Qtr
4th Qtr
1st Qtr
2nd Qtr
3rd Qtr
4th Qtr
FY11FY11 FY12FY12
Pla
cem
ent
Sit
e
Dre
dg
e +
Qu
anti
ty(C
Y)
ShewsburyRiver, NJ
MaintenanceDredging
Great South Bay,Patchogue River,
NY
Long IslandIntracoastal
Waterway, NY
Hydraulic~120K Upland
Hydraulic~40K
Beach
Hydraulic~120K
Upland
Great Kills Harbor, NY
Hydraulic~100K
Beach
Jones Inlet, NY Hydraulic700K
Beach
Moriches Inlet, NY Hydraulic280K
Beach
Sandy Hook Bay@ Leonardo,
NJ
Hydraulic~40K
Beach
ShinnecockInlet, NY
BeachHydraulic
~300K
FY08-FY12 Dredging ScheduleFY08-FY12 Dredging ScheduleNew York DistrictNew York District
1st Qtr
FY08FY08
2nd Qtr
3rd Qtr
4th Qtr
1st Qtr
2nd Qtr
3rd Qtr
4th Qtr
FY09FY09 FY10FY10
1st Qtr
2nd Qtr
3rd Qtr
4th Qtr
1st Qtr
2nd Qtr
3rd Qtr
4th Qtr
1st Qtr
2nd Qtr
3rd Qtr
4th Qtr
FY11FY11 FY12FY12
Pla
cem
ent
Sit
e
Dre
dg
e +
Qu
anti
ty(C
Y)Maintenance
Dredging
Shoal Harbor &Compton Creek,
NJUplandHydraulic
~70K
Sandy Hook Channel, NJ
HARSHopper~60K
FY08-FY12 Dredging ScheduleFY08-FY12 Dredging ScheduleNew York DistrictNew York District
1st Qtr
FY08FY08
2nd Qtr
3rd Qtr
4th Qtr
1st Qtr
2nd Qtr
3rd Qtr
4th Qtr
FY09FY09 FY10FY10
1st Qtr
2nd Qtr
3rd Qtr
4th Qtr
1st Qtr
2nd Qtr
3rd Qtr
4th Qtr
1st Qtr
2nd Qtr
3rd Qtr
4th Qtr
FY11FY11 FY12FY12
AmbroseContract 2
S-Am-2
AnchorageContract 1a
S-An-1a
Kill Van KullContract 1
S-KVK-1
Pla
cem
ent
Sit
e
Dre
dg
e +
Qu
anti
ty(C
Y)
AnchorageContract 1b
S-An-1b
AnchorageContract 2
S-An-2
Port JerseyContract 3
PJ-3
Port JerseyContract 4
PJ-4
Newark BayContract 1
S-NB-1
Harbor Deepening
Hopper5.6 Mil
HARS
Mechanical Upland
Mechanical2.9 Mil Upland
Mechanical1.22 Mil
TBD
Mechanical3.6 Mil
Upland&
HARS
MechanicalUpland
&HARS
Mechanical2.25 Mil HARS
Mechanical2.2 Mil
HARSUplandReef
FY08-FY12 Dredging ScheduleFY08-FY12 Dredging ScheduleNew York DistrictNew York District
1st Qtr
FY08FY08
2nd Qtr
3rd Qtr
4th Qtr
1st Qtr
2nd Qtr
3rd Qtr
4th Qtr
FY09FY09 FY10FY10
1st Qtr
2nd Qtr
3rd Qtr
4th Qtr
1st Qtr
2nd Qtr
3rd Qtr
4th Qtr
1st Qtr
2nd Qtr
3rd Qtr
4th Qtr
FY11FY11 FY12FY12
Newark BayContract 2
S-NB-2
Pt. ElizabethS-E-1
Pla
cem
ent
Sit
e
Dre
dg
e +
Qu
anti
ty(c
y)
Arthur KillContract 1
S-AK-1
Arthur KillContract 2
S-AK-2
Mechanical620 K TBD
Mechanical600 K TBD
MechanicalUpland
&HARS
Mechanical3.3 Mil TBD
Harbor Deepening
QUANTITY TO BE DREDGED: 50,000 CY (Award 4th Quarter FY08)
CONTRACT DEPTH: 40 ft & 45 ft
TYPE OF DREDGED MATERIAL: Silt & Clay
LAST DREDGED: 2006-2007
EQUIPMENT USED: Mechanical Dredge
PLACEMENT SITES: Upland Disposal Site to be provided by contractor
ISSUES: Selected areas have a No-Dredge Window of 01 February through 31 May
Mechanical DredgeMaintenance Dredging
Newark Bay, NJ
Select Shoals within the
port channels
New
ark
Bay
Newark Bay, NJ
Raritan River, NJ
QUANTITY TO BE DREDGED:40,000 CY (Award July ‘08)
CONTRACT DEPTH: 25 ft (+ 1 ft over depth)
TYPE OF DREDGED MATERIAL: Silt & Clay
LAST DREDGED: 2000
EQUIPMENT USED: Mechanical Dredge
PLACEMENT SITE: Upland Disposal Site to be
provided by contractor
ISSUES: Seasonal environmental window 15 November through 30 June
Mechanical DredgeMaintenance Dredging
DREDGEAREAS
Select Shoals within
Mile 0.0 – 4.0
NY & NJ Channels Arthur Kill & Raritan Bay
ReachesQUANTITY TO BE DREDGED: Arthur Kill: 50,000-60,000 CY Raritan Bay: 250,000 CY (Award July ’08)
CONTRACT DEPTH: 35 ft (+ 2 ft over depth)
TYPE OF DREDGED MATERIAL: Sand, Silt, & Clay
LAST DREDGED: Arthur Kill: 2007 Raritan Bay:
2004
EQUIPMENT USED: Mechanical Dredge
PLACEMENT SITES: Arthur Kill: Upland Disposal Raritan Bay: HARS
ISSUES:
Mechanical DredgeMaintenance Dredging
Dredge Area Arthur Kill
Reach
Dredge Areas Raritan Bay
Reach
Arthur Kill: Seasonal No-Dredge Window 1 February to 31 May for Winter Flounder. Additional location-specific windows: 1 April to 31 July around Pralls and Meadow Islands for Shorebirds, and within a quarter mile of the Outerbridge Crossing from 1 March to 31 July for Peregrine Falcons. Raritan Bay: Seasonal No-Dredge Window 15 November to 31 May for Winter Flounder and 1 June to 15 July for Shell Fish.
Hopper DredgeMaintenance Dredging
Hudson River, NY Coeymans and Kingston
ReachesQUANTITY TO BE DREDGED: 55,000 C.Y.
CONTRACT DEPTH: 32 ft (+1 ft over depth)
TYPE OF DREDGED MATERIAL: Sand, Silt & Clay
LAST DREDGED: 2003 - Castleton to Hudson Reaches 1965 - Kingston Reaches
EQUIPMENT USED: Hopper Dredge
PLACEMENT SITE: Houghtaling Island (Federally owned site). New York State is providing all lands and easements in support of access to the Federally owned placement site.
ISSUES: No dredging allowed 1 Feb – 15 Aug due to endangered species (Shortnose Sturgeon). Contract has two discontinuous areas (Coeymans area and Kingston area) - long travel distances to placement site. Hudson River ices over from early December to mid March precluding dredging. A sole source 8a contract was awarded to Coleman Construction Company, Inc. on 17 August 2007.
Dredge Area
Placement Site
Jamaica Bay, NY
QUANTITY TO BE DREDGED:
240,000 CY (Award November ‘07)
CONTRACT DEPTH: 20 ft (+ 1 ft over depth)
TYPE OF DREDGED MATERIAL:
Sand
LAST DREDGED: 2004
EQUIPMENT USED: Hopper Dredge
PLACEMENT SITE: Riis Beach, Gateway National Recreation Area
ISSUES: Endangered species – Shore Birds. Seasonal no-dredge window 1 April through 15 September
Dredge Area
Hopper DredgeMaintenance Dredging
Placement Site
Jones Inlet, NYQUANTITY TO BE DREDGED:
700,000 CY (Award December ‘07)
CONTRACT DEPTH: 14 ft (+ 2 ft over depth)
TYPE OF DREDGED MATERIAL:
Sand
LAST DREDGED: 1995
EQUIPMENT USED: Hydraulic Dredge
PLACEMENT SITE: Point Lookout Beach (west of inlet)
ISSUES:
Hydraulic PipelineMaintenance Dredging
Dredge Areas
Placement Site
Seasonal no-dredge window 1 June to 30 September to protect spawning shellfish and/or finfish; no-dredge window 1 April to 31 August to protect nesting shorebirds.
New York and New Jersey Harbor, NY & NJ
(50 foot Project)(50 foot Project)
Hopper and Mechanical DredgeHarbor Deepening
ISSUES:Blasting Required. Contract is designed around environmental windows. Cost-shared with the Port Authority NY & NJ. Port Jersey -Seasonal no-dredge window in outer channel - 1 Feb through 31 May (Winter Flounder) Cost-shared with the State of NJ
DESCRIPTION: Channel deepening from 40-45 ft. to 50 ft.
STATUS: New Contracts:
Ambrose Contract 2 (S-Am-2)
- Award Apr ’08 (5.6 Million CY)
Anchorage Contract 1b (S-An-1b)
- Award May ’08 (2.9 Million CY)
Port Jersey – Contract 3 (PJ-3)
–Award Oct ’08 (3.6 Million CY)
Kill Van Kull Contract 1 (S-KvK-1)
– Award Feb ‘07 (2.25 Million CY)
Port Elizabeth (S-E-1)
– Solicitation Sept ’08
DREDGE MATERIAL: Sand, Silt, Clay,
Glacial Till, and Rock
EQUPMENT USED: Mechanical & Hopper
PLACEMENT SITE: HARS, Upland, & Reef Site
Port ElizabethDredge Area
AnchorageContract 1b
Dredge Area
KvK Contract Dredge Area
Port JerseyContract 3
Dredge Area
AmbroseContract 2
Dredge Area
Any Questions ?Any Questions ?