N E W S L E T T E R
J U L Y 2 0 1 9 I S S U E
RIVERBANKAPARTMENTS
CASCADIAAPARTMENTS
EARTHWORKS COMPLETED
WE HAVE BROKEN GROUND
MILE S T O NESOF THE MONTH
R i v e r b a n k A p a r t m e n t s cons i s t s of h igh end 1,2 and 3 bedroom with DSQ res ident ia l un i t s located within Two Rivers.
T h e a p a r t m e n t s o f f e r stunning views of the dam and are a few minutes walk to the major zones in Two Rivers :
• Hospitality
• Retail
• Commercial and
• Entertainment Zones
July Project Milestones1. Earthworks Completed
2. Contractor Awarded : Seyani Brothers CO. Kenya LTD (www.seyanibrosk.com)
Seyani Brothers CO. Kenya LTD is a top-rated contractor who has completed numerous projects since its inception in 1978.
T h e c o n t r a c t o r w a s a l s o appointed to construct the Sabis International School, a p r o j e c t b y C e n t u m Investment Plc.
RIVERBANK APARTMENTS
Visit our pristine 2-bedroom showhouse at the 1st floor of the Two Rivers Mall, near theTwo Rivers Mall management office.
CONSTRUCTION UPDATE Construction of phase 1 of the Riverbank Apartments commenced in May 2019.
Earthworks are completed. Substructure is ongoing.
AUGUST TARGETS
• Site establishment
• Progress substantially on sub-structure.
Showhouse completed
Earthworks completed
Contractor awarded
S
MILESTONE/ACTIVITYPROGRESSCOMPLETION COMPLETION DATE STATUS/DETAIL
Earthworks 100% July 2019 Earthworks completed
Contractor Award 100% July 2019 Main Contractor Awarded.– Seyani Brothers Co.
Contractor Mobilizationand Schedule of Works
0% Sep 2019 Contractor Awardedand program to be issued.
Handover ToCustomer 0% 5-May-2021
Riverbank Milestone/Activity Schedule
WE SHAPE OUR BUILDINGS THEREAFTER THEY SHAPE US~ Winston Churchil l
July Project Milestones1. Mobilization has commenced
2. Contractor Awarded Roko Construction LTD (www.roko.com)
Roko Construction LTD is a top rated contractor who has completed projects in Uganda, Rwanda and East Africa at large. The contractor is also constructing Pearl Marina Estates another Centum Real Estate project based in Entebbe, Uganda.
3. Construction commenced
CASCADIA APARTMENTSSCHEDULE FOR AUGUST1. Site clearance
2. Site establishment
3. Site hoarding
CASCADIASHOW-HOUSE PROGRESS
CONSTRUCTION COMPLETE
2019SCHEDULED COMPLETION
The Cascadia showhouse, a 3 bedroom duplex, is located at the Two Rivers Northern Bypass entry.
Cascadia Milestone/Activity Schedule
9th Floor, South Tower, Two RiversP.O. Box 10518-00100 Nairobi, Kenya
+254 709 902 900+254 742 342 724 +254 742 342 722
WEBSITES [email protected]
cascadiaapartments.co.ke riverbankapartments.co.ke
centumre.co.ke
@CentumRe @CentumRe Centum Real Estate