HOJA DE METRADOS DE MOBILIARIO ESCOLAR
OBRA : CONSTRUCCION DELNIVEL SECUNDARIO DE LA INSTITUCIONCION VILLA SAN CRISTOBAL
Dpto. : Ayacucho Dist. : Nazarenas
Prov.: Huamanga Lugar : Villa San Cristobal
PART. DESCRIPCION N° VEC. LARGO ANCHO ALTO PARCIAL TOTAL UND
01.00.00 MOVILIARIO ESCOLAR
01.01.00 ESCRITORIO PERSONAL 5 5.00 5.00 UND
01.02.00 CARPETA UNIPERSONAL 175 130.00 130.00 UND
HOJA DE METRADOS DE AULAS
OBRA : CONSTRUCCION DELNIVEL SECUNDARIO DE LA INSTITUCIONCION VILLA SAN CRISTOBAL
Dpto. : Ayacucho Dist. : Nazarenas
Prov.: Huamanga Lugar : Villa San Cristobal
PART. DESCRIPCION N° VEC. LARGO ANCHO ALTO PARCIAL TOTAL UND
01.00.00 OBRAS PROVISIONALES
01,01,00 ALQUILER DE ALMACÉN 5 5 5.00 MES
01.02.00 CARTEL DE OBRA 3,60 X 2,40 M 1 1 1.00 GLB
02.00.00 TRABAJOS PRELIMINARES
01.01.00 LIMPIEZA DE TERRENO MANUAL 1 70 50 3500 3500.00 M2
02,02,00 TRAZO Y REPLANTEO 511.44 M2
AULAS 1 52.3 6.65 347.795
VEREDAS (EJES 1-13 ENTRE EJES A-A) 1 52.3 0.9 47.07
VEREDAS (EJES 1-1 Y 13-13 ENTRE EJES A-C) 1 13.3 0.9 11.97
PASADISO (EJES 1-13 ENTRE EJES C-C) 1 52.3 2 104.6
03.00.00 MOVIMIENTO DE TIERRAS
03.01.00 CORTE DE MATERIALSUELTO 3143.90 M3
MOVIMIENTO DE TIERRAS DE AULAS, SS.HH, DIRECCION y LOZA AREA
EXCAVACIÓN DE EJE 1 SECCION 0+000 1 5 1.81 9.05
EXCAVACIÓN DE EJE 1 SECCION 0+010 1 10 3.51 26.6
EXCAVACIÓN DE EJE 1 SECCION 0+020 1 10 57.64 305.75
EXCAVACIÓN DE EJE 1 SECCION 0+030 1 10 66.78 622.1
EXCAVACIÓN DE EJE 1 SECCION 0+040 1 10 71.18 689.8
EXCAVACIÓN DE EJE 1 SECCION 0+050 1 10 73.44 723.1
EXCAVACIÓN DE EJE 1 SECCION 0+060 1 10 80.06 767.5
03.02.00 PERFILADO Y COMPACTADO EN ZONA DE CORTE 2112.00 M2
PERFILADO DE EJE 1 SECCION 0+000 1 10 5.6 56
PERFILADO DE EJE 1 SECCION 0+010 1 10 17.5 175
PERFILADO DE EJE 1 SECCION 0+020 1 10 37.16 371.6
PERFILADO DE EJE 1 SECCION 0+030 1 10 37.39 373.9
PERFILADO DE EJE 1 SECCION 0+040 1 10 36.99 369.9
PERFILADO DE EJE 1 SECCION 0+050 1 10 37.46 374.6
PERFILADO DE EJE 1 SECCION 0+060 1 10 37.82 378.2
MURO DE CONTENCION 4 1.7 0.4 2.72
4 6.3 0.4 10.08
03.03.00 EXCAVACION PARA CIMIENTOS HASTA 1 MT 77.86 M2
EXCAVACION DE CIMIENTOS DE AULAS
EJE 1-13 ENTRE EJES A-A , C-C 2 33.26 0.6 1.1 43.9032
EJE A-C ENTRE EJES 1-1 , 3-3 , 5-5, 7-7,7´-7´, 9-9, 11-11, 13-13 8 3.8 0.6 1.1 20.064
EXCAVACION PARA ZANJA DE CORONACIÓN
ZANJA DE CORONACIÓN N 01 1 59.85 0.375 0.3 6.733125
ZANJA DE CORONACIÓN N 02 1 63.65 0.375 0.3 7.160625
03.04.00 EXCAVACION DE ZANJAS - ZAPATA Y CIMENTACION 103.84 M3
EXCAVACION DE ZAPATAS DE AULAS
Z-1 EJE 1-13 ENTRE EJE A-A 14 1.4 1.4 1.5 41.16
Z-1 EJE 1-13 ENTRE EJE C-C 14 1.4 1.4 1.5 41.16
Z-2 EJE 1-13ENTRE EJE B-B 7 1.2 1.2 1.5 15.12
PERFILADO Y COMPACTADO EN ZONA DE CORTE 2 1.7 0.4 1.36
2 6.3 0.4 5.04
HOJA DE METRADOS DE AULAS
OBRA : CONSTRUCCION DELNIVEL SECUNDARIO DE LA INSTITUCIONCION VILLA SAN CRISTOBAL
Dpto. : Ayacucho Dist. : Nazarenas
Prov.: Huamanga Lugar : Villa San Cristobal
PART. DESCRIPCION N° VEC. LARGO ANCHO ALTO PARCIAL TOTAL UND
03.05.00 RELLENO CON MATERIAL PROPIO AREA 508.05 M3
RELLENO DE EJE 1 SECCION 0+000 1 5 0.74 3.70
RELLENO DE EJE 1 SECCION 0+010 1 10 0 3.70
RELLENO DE EJE 1 SECCION 0+020 1 10 0.2 1.00
RELLENO DE EJE 1 SECCION 0+030 1 10 15.38 77.90
RELLENO DE EJE 1 SECCION 0+040 1 10 17.27 163.25
RELLENO DE EJE 1 SECCION 0+050 1 10 17.1 171.85
RELLENO DE EJE 1 SECCION 0+060 1 10 0.23 86.65
03.06.00 ELIMINACION DE MATERIAL EXCEDENTE Volum. 3294.81 M3
ELIMINACIÓN (25% COEFIC. DE ESPONJAMIENTO) 1,25 COEFIC. 1.25 2635.85 3294.8125
03.07.00 AFIRMADO DE 3" AULAS Y VEREDAS 495.53 M2
1 55.46 9.54 529.0884
-1 4.025 1.75 -7.04375
Area de muro Perpendiculares -8 6.14 0.25 -12.28
Area de muro Longitudinales -2 47.44 0.15 -14.232
04,00,00 CONCRETO SIMPLE
04.01.00 CONCRETO SIMPLE EN AULAS Y VEREDAS
04,01,01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA 80.94 M3
EN AULAS
CIMIENTO CORRIDO EJE A-C ENTRE EJES 1-1 , 3-3 , 5-5, 7-7,7´-7´, 9-9, 11-11, 13-13 16 2.82 0.6 1.05 28.4256
CIMIENTO CORRIDO EJE A y C ÷ 1-2 , 6-7, 7´-8 Y 12-13 8 3.32 0.6 1.05 16.7328
CIMIENTO CORRIDO EJE A y C ÷ 2-3, 3-4, 4-5 ,5-6, 8-9, 9-10, 10-11, 11-12 16 3.55 0.6 1.05 35.784
04.01.04 SOLADO PARA ZAPATAS DE 3" MEZCLA 1:12 CEMENTO - HORMIGON 66.40 M2
ZAPATA TIPO 1 DE EJE A y C ÷ 1-13 28 1.4 1.4 54.88
ZAPATA TIPO 2 DE EJE B ÷ 1-13 8 1.2 1.2 11.52
04,01,07 CONCRETO 1:8+25% P.M. PARA VEREDAS 255.17 M3
1 125.62 16.25 0.125 255.17
HOJA DE METRADOS DE AULAS
OBRA : CONSTRUCCION DELNIVEL SECUNDARIO DE LA INSTITUCIONCION VILLA SAN CRISTOBAL
Dpto. : Ayacucho Dist. : Nazarenas
Prov.: Huamanga Lugar : Villa San Cristobal
PART. DESCRIPCION N° VEC. LARGO ANCHO ALTO PARCIAL TOTAL UND
04.03.00 FALSO PISO
04.03.01 FALSO PISO DE 4 " DE CONCRETO 1:10 314.33 M3
AULA 1 1 8.25 6.35 52.3875
AULA 2 1 8.25 6.35 52.3875
AULA 3 1 8.25 6.35 52.3875
AULA 4 1 8.25 6.35 52.3875
AULA 5 1 8.25 6.35 52.3875
AULA 6 1 8.25 6.35 52.3875
05.00.00 OBRAS DE CONCRETO ARMADO
05.01.00 ZAPATAS
05.01.01 CONCRETO PARA ZAPATAS Fc =210 KG/CM2 39.84 M3
EN AULAS
ZAPATA TIPO 1 DE EJE A y C ÷ 1-13 28 1.4 1.4 0.6 32.928
ZAPATA TIPO 2 DE EJE B ÷ 1-13 8 1.2 1.2 0.6 6.912
05.01.02 ACERO PARA ZAPATAS Fy = 4200 KG/CM2 (VER HOJA DE METRADOS DE ACERO) 635.76 KG
05.02.00 VIGAS DE CIMENTACION
05.02.01 CONCRETO PARA VIGAS Fc =210 KG/CM2 10.17 M3
EN AULAS
VC-1 (0.25 x 0.50) EJE A-C ENTRE EJES 2-2, 4-4, 6-6, 8-8, 10-10, 12-12 6 5.84 0.25 0.5 4.38
VC-2 (0.15 x 0.30) EJE A y C ÷ 1-2 , 6-7, 7´-8 Y 12-13 8 3.32 0.15 0.3 1.1952
VC-2 (0.15 x 0.30) EJE A y C ÷ 2-3, 3-4, 4-5 ,5-6, 8-9, 9-10, 10-11, 11-12 16 3.55 0.15 0.3 2.556
VC-3 (0.25 x 0.30) EJE A-C ENTRE EJES 1-1 , 3-3 , 5-5, 7-7,7´-7´, 9-9, 11-11, 13-13 16 2.83 0.15 0.3 2.0376
05,02,02 ENCOFRADO Y DESENCOFRADO VIGA DE CIMENTACION 85.06 M2
VC-1 (0.25 x 0.50) EJE A-C ENTRE EJES 2-2, 4-4, 6-6, 8-8, 10-10, 12-12 12 5.84 0.5 35.04
VC-2 (0.15 x 0.30) EJE A-C ENTRE EJES 1-2 , 6-7, 7´-8 Y 12-13 16 3.32 0.3 15.936
VC-2 (0.15 x 0.30) EJE A-C ENTRE EJE 2-3, 3-4, 4-5 ,5-6, 8-9, 9-10, 10-11, 11-12 32 3.55 0.3 34.08
VC-3 (0.25 x 0.30) EJE A-C ENTRE EJES 1-1 , 3-3 , 5-5, 7-7,7´-7´, 9-9, 11-11, 13-13 32 2.82 0.3 27.072
05.02.03 ACERO PARA VIGA DE CIMENTACION Fy = 4200 KG/CM2 (VER HOJA DE METRADOS DE ACERO) 1770.06 KG
HOJA DE METRADOS DE AULAS
OBRA : CONSTRUCCION DELNIVEL SECUNDARIO DE LA INSTITUCIONCION VILLA SAN CRISTOBAL
Dpto. : Ayacucho Dist. : Nazarenas
Prov.: Huamanga Lugar : Villa San Cristobal
PART. DESCRIPCION N° VEC. LARGO ANCHO ALTO PARCIAL TOTAL UND
05.03.00 COLUMNAS
05.03.01 CONCRETO EN COLUMNAS Fc =210 KG/CM2 36.96 M3
EN AULAS
COLUMNA C-1 DE EJE A y C ÷ 1-13 16 0.7 0.25 4.2 11.76
COLUMNA C-2 DE EJE A y C ÷ 1-13 64 0.25 0.15 4.2 10.08
COLUMNA C-2 DE EJE B ÷ 1-13 16 0.25 0.15 5.4 3.24
COLUMNA C-3 DE EJE A y C 12 0.6 0.25 4.2 7.56
COLUMNA C-4 DE EJE 1,3,5, 7,7´,9,11 y 13 8 0.4 0.25 5.4 4.32
05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS 421.92 M2
EN AULAS
COLUMNA C-1 DE EJE A y C ÷ 1-13 16 1.9 4.2 127.68
COLUMNA C-2 DE EJE A y C ÷ 1-13 64 0.5 4.2 134.4
COLUMNA C-2 DE EJE B ÷ 1-13 16 0.5 5.4 43.2
COLUMNA C-3 DE EJE A y C 12 1.2 4.2 60.48
COLUMNA C-4 DE EJE 1,3,5, 7,7´,9,11 y 13 8 1.3 5.4 56.16
05.03.03 ACERO EN COLUMAS Fy = 4200 KG/CM2 (VER HOJA DE METRADOS DE ACERO) 4744.80 KG
05.04.00 VIGAS
05,04,01 CONCRETO EN VIGAS F'C= 210 KG/CM2. EN AULAS 41.64 M3
05,04,02 ENCOFRADO Y DESENCOFRADO EN VIGAS 367.15 M2
05,04,03 ACERO Fy=4200kg/cm² 4794.89 KG
VIGAS PRINCIPALES
CONCRETO EN VIGAS F'C= 210 KG/CM2. EN AULAS 24.10 M3
Viga principal 101(CANTIDAD 8) 8 4.56 0.25 0.5 4.56
8 0.25 0.18 0.5 0.18
8 4.65 0.25 0.5 4.65
8 0.4 0.25 0.5 0.4
8 0.465 0.25 0.5 0.465
Viga principal 102 (CANTIDAD6)
6 6.8 0.25 0.5 5.1
6 2 0.25 0.2 0.6
6 2 0.25 0.15 0.45
6 4.56 0.25 0.5 3.42
6 0.25 0.18 0.5 0.135
6 4.65 0.25 0.5 3.4875
6 0.4 0.25 0.5 0.3
6 0.465 0.25 0.5 0.34875
HOJA DE METRADOS DE AULAS
OBRA : CONSTRUCCION DELNIVEL SECUNDARIO DE LA INSTITUCIONCION VILLA SAN CRISTOBAL
Dpto. : Ayacucho Dist. : Nazarenas
Prov.: Huamanga Lugar : Villa San Cristobal
PART. DESCRIPCION N° VEC. LARGO ANCHO ALTO PARCIAL TOTAL UND
ENCOFRADO Y DESENCOFRADO EN VIGAS 154.78 M2
8
2 4.56 0.5 36.48
1 4.56 0.25 9.12
2 0.18 0.18 0.5184
2 4.7 0.5 37.6
1 0.81 0.5 3.24
1 0.93 0.2 1.488
6
2 4.56 0.5 27.36
1 4.56 0.25 6.84
2 0.18 0.18 0.3888
2 4.7 0.5 28.2
1 0.81 0.5 2.43
1 0.93 0.2 1.116
ACERO Fy=4200kg/cm² (VER HOJA DE METRADOS DE ACERO) 2455.28 KG
3 VIGAS SOLERA EN AULAS
CONCRETO F'C= 210 KG/CM2. EN AULAS 2.24 M3
Eje 1-1, 3-3, 5-5, 7-7, 7´-7´, 9-9, 11-11 y 13-13 8 5.6 0.25 0.2 2.24
ENCOFRADO Y DESENCOFRADO 29.12 M2
Eje 1-1, 3-3, 5-5, 7-7, 7´-7´, 9-9, 11-11 y 13-13 8 5.6 0.25 11.2
16 5.6 0.2 17.92
ACERO EN VIGAS DE CIMENTACION Fy=4200kg/cm² EN AULAS (VER HOJA DE METRADOS DE ACERO) 412.88 KG
4 VIGAS DE AMARRE EN AULAS
CONCRETO F'C= 210 KG/CM2. 7.62 M3
Eje A-A y C-C entre ejes 1-7 2 19.06 0.25 0.4 3.812
Eje A-A y C-C entre ejes 7' - 13 2 19.06 0.25 0.4 3.812
ENCOFRADO Y DESENCOFRADO 80.05 M2
Eje A-A y C-C entre ejes 1-7 2 19.06 0.25 9.53
4 19.06 0.4 30.496
Eje A-A y C-C entre ejes 7' - 13 2 19.06 0.25 9.53
4 19.06 0.4 30.496
ACERO Fy=4200kg/cm² (VER HOJA DE METRADOS DE ACERO) 1063.30 KG
5 VIGAS DE AMARRE CENTRAL
CONCRETO F'C= 210 KG/CM2. 4.80 M3
Eje B-B entre ejes 1-7 1 24 0.25 0.4 2.4
Eje B-B entre ejes 7' - 13 1 24 0.25 0.4 2.4
ENCOFRADO Y DESENCOFRADO 50.40 M2
Eje B-B entre ejes 1-7 1 24 0.25 6
2 24 0.4 19.2
Eje B-B entre ejes 7' - 13 1 24 0.25 6
2 24 0.4 19.2
ACERO Fy=4200kg/cm² (VER HOJA DE METRADOS DE ACERO) 531.65 KG
Viga principal 101 CANTIDAD DE VIGAS = =
Viga principal 102 CANTIDAD DE VIGAS = =
HOJA DE METRADOS DE AULAS
OBRA : CONSTRUCCION DELNIVEL SECUNDARIO DE LA INSTITUCIONCION VILLA SAN CRISTOBAL
Dpto. : Ayacucho Dist. : Nazarenas
Prov.: Huamanga Lugar : Villa San Cristobal
PART. DESCRIPCION N° VEC. LARGO ANCHO ALTO PARCIAL TOTAL UND
6 VIGAS DE AMARRE EN ALEROS
CONCRETO F'C= 210 KG/CM2. 2.88 M3
Eje A-A y C-C entre jes 1-7 2 24 0.15 0.2 1.44
Eje A-A y C-C entre ejes 7'-13 2 24 0.15 0.2 1.44
ENCOFRADO Y DESENCOFRADO 52.80 M2
Eje A-A y C-C entre jes 1-7 2 24 0.15 7.2
4 24 0.2 19.2
Eje A-A y C-C entre ejes 7'-13 2 24 0.15 7.2
4 24 0.2 19.2
ACERO Fy=4200kg/cm² (VER HOJA DE METRADOS DE ACERO) 331.78 KG
05.05.00 LOSAS ALIGERADAS
05.05.01 CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2 39.10 M3
Concreto de vigueta en 1 m2 2.5 1 0.4 0.05 0.05
2.5 1 0.1 0.15 0.0375
TOTAL 0.0875
AREA DE LOSA ALIGERADA 446.88 M2
AULA 01, 02, 03, 04 , 05 Y 06 + VOLADOS 6 8 9.31 446.88
05.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS 446.88 M2
AULA 01, 02, 03, 04 , 05 Y 06 + VOLADOS 6 8 9.31 446.88
HOJA DE METRADOS DE AULAS
OBRA : CONSTRUCCION DELNIVEL SECUNDARIO DE LA INSTITUCIONCION VILLA SAN CRISTOBAL
Dpto. : Ayacucho Dist. : Nazarenas
Prov.: Huamanga Lugar : Villa San Cristobal
PART. DESCRIPCION N° VEC. LARGO ANCHO ALTO PARCIAL TOTAL UND
05.05.03 ACERO EN LOSAS ALIGERADAS Fy = 4200 KG/CM2 (VER HOJA DE METRADOS DE ACERO) 1739.61 KG
ACERO DE TEMPERATURA 112.58
ACERO DE VIGUETA 1627.03
05.05.04 LADRILLO HUECO DE ARCILLA 15X30X30 CM 3722.51 UND
PARA TECHO ALIGERADO 8.33 AREA DE TECHO 446.88 3722.5104
05.08.00 JUNTA DE CONSTRUCCION
05.08.01 JUNTA DE CONSTRUCCION CON TEKNOPORT 40.34 M2
EJE 7 2 0.6 8.12 9.744
40 0.15 4.2 25.2
4 0.25 5.4 5.4
06.00.00 ARQUITECTURA
06.01.00 MUROS Y TABIQUE DE ALBAÑILERIA
06.01.01 MURO DE CABEZA CEMENTO-ARENA 183.68 M2
AULA 01, 02, 03, 04 , 05 Y 06
EJE 1-1 ENTRE EJE A-C 2 3.5 2.87 20.09
1 1 2.87 2.87
EJE 3-3 ENTRE EJE A-C 2 3.5 2.87 20.09
1 1 2.87 2.87
EJE 5-5 ENTRE EJE A-C 2 3.5 2.87 20.09
1 1 2.87 2.87
EJE 7-7 ENTRE EJE A-C 2 3.5 2.87 20.09
1 1 2.87 2.87
EJE 7´-7´ ENTRE EJE A-C 2 3.5 2.87 20.09
1 1 2.87 2.87
EJE 9-9 ENTRE EJE A-C 2 3.5 2.87 20.09
1 1 2.87 2.87
EJE 11-11 ENTRE EJE A-C 2 3.5 2.87 20.09
1 1 2.87 2.87
EJE 13-13 ENTRE EJE A-C 2 3.5 2.87 20.09
1 1 2.87 2.87
06.01.02 MURO DE SOGA LADR. CEMENTO--ARENA 170.21 M2
AULAS 01, 02, 03, 04 , 05 Y 06
EJE 1-12 ENTRE EJE A-A 1 41.99 3 79.885
EJE 1-12 ENTRE EJE C-C 1 41.99 3 90.3275
06.02.00 REBOQUE ENLUCIDOS Y MOLDEDURAS
06.02.01 TARRAJEO DE SUPERFICIE DE VIGAS CON CENMENTO Y ARENA 170.56 M2
EN AULAS
VIGA VP-101 EN EJE 1, 3, 5, 7, 7´, 9 ,11 y 13 8 6 0.8 38.4
VIGA VP-101 EN EJE 1, 3, 5, 7, 7´, 9 ,11 y 13 (Alero Frontal) 8 2 0.9 14.4
VIGA VP-101 EN EJE 1, 3, 5, 7, 7´, 9 ,11 y 13 ( Alero Posterior) 8 0.95 1.05 7.98
VIGA VP-101 EN EJE 2, 4, 6, 8, 10, y 12 6 6 0.85 30.6
VIGA VP-101 EN EJE 2, 4, 6, 8, 10, y 12 ( Alero Frontal) 6 2 0.75 9
VIGA VP-101 EN EJE 2, 4, 6, 8, 10, y 12 (Alero Posterior) 6 0.95 1.05 5.985
VIGA VA-101 EN EJE A y C 2 11.28 0.85 19.176
VIGA VA-101 EN EJE A y C 2 26.48 0.85 45.016
HOJA DE METRADOS DE AULAS
OBRA : CONSTRUCCION DELNIVEL SECUNDARIO DE LA INSTITUCIONCION VILLA SAN CRISTOBAL
Dpto. : Ayacucho Dist. : Nazarenas
Prov.: Huamanga Lugar : Villa San Cristobal
PART. DESCRIPCION N° VEC. LARGO ANCHO ALTO PARCIAL TOTAL UND
06.02.02 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CENMENTO Y ARENA 429.03 M2
EN AULAS
COLUMNA C-1 DE EJE A Y C ÷ 1 - 12 16 1.4 4.18 93.632
COLUMNA C-2 DE EJE A Y C ÷ 1 - 12 64 0.5 4.18 133.76
COLUMNA C-2 DE EJE B ÷ 1 - 12 16 0.8 5.34 68.352
COLUMNA C-3 DE EJE A Y C ÷ 1 - 12 12 1.55 4.18 77.748
COLUMNA C-4 DE EJE B ÷ 1 - 12 8 1.3 5.34 55.536
06.02.03 TARRAJEO EN INTERORES ACABADO CON CENMENTO Y ARENA 392.68 M2
AREA(M2) AREA(M2)
EN AULAS 6 78.99 13.544 392.676
06.02.04 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO Y ARENA 457.21
10 2.9 0.72 20.88
10 4 0.25 10
10 4 1.35 54
10 2.9 0.45 13.05
10 2.9 0.45 13.05
10 3.05 1.35 41.175
10 3.05 0.25 7.625
10 2.9 0.5 14.5
10 4.83 0.73 35.259
10 2.77 2.09 57.893
10 2.77 1.45 40.165
10 4.83 0.45 21.735
10 4.83 0.45 21.735
10 3.05 1.45 44.225
10 3.05 2.03 61.915
06.02.05 VESTIDURA DE DERRAME S EN PUERTAS , VENTANAS Y VANOS 377.20 M
EN AULAS
P-1 6 5.4 2 64.8
V-1 7 8.7 2 121.8
V-2 5 8.24 2 82.4
V-3 5 6.94 2 69.4
V-4 7 7.4 2 103.6
HOJA DE METRADOS DE AULAS
OBRA : CONSTRUCCION DELNIVEL SECUNDARIO DE LA INSTITUCIONCION VILLA SAN CRISTOBAL
Dpto. : Ayacucho Dist. : Nazarenas
Prov.: Huamanga Lugar : Villa San Cristobal
PART. DESCRIPCION N° VEC. LARGO ANCHO ALTO PARCIAL TOTAL UND
06.02.06 EJECUCION DE BRUÑAS 928.88 ML
VEREDAS
4 54 216
4 9.87 39.48
2 64.3 128.6
2 12 24
SALONES
SALON 1 1 48.3 48.3
SALON 2 1 48.3 48.3
SALON 3 1 48.3 48.3
SALON 4 1 48.3 48.3
SALON 5 1 48.3 48.3
SALON 6 1 48.3 48.3
PAREDES
SALON 1 14 2.75 38.5
SALON 2 14 2.75 38.5
SALON 3 14 2.75 38.5
SALON 4 14 2.75 38.5
SALON 5 14 2.75 38.5
SALON 6 14 2.75 38.5
06.03.00 CIELO RAZO 446.88 M2
06.03.01 CIELO RAZO CON MEZCLA DE CEMENTO
AULA 01, 02, 03, 04 ,05 Y 06 6 8 9.31 446.88
HOJA DE METRADOS DE AULAS
OBRA : CONSTRUCCION DELNIVEL SECUNDARIO DE LA INSTITUCIONCION VILLA SAN CRISTOBAL
Dpto. : Ayacucho Dist. : Nazarenas
Prov.: Huamanga Lugar : Villa San Cristobal
PART. DESCRIPCION N° VEC. LARGO ANCHO ALTO PARCIAL TOTAL UND
06.04.00 PISOS Y PAVIMENTOS
06.04.01 CONTRAPISO DE 25 MM 303.93 M2
AULA 01, 02, 03, 04 , 05 Y 06 6 8.25 6.14 303.93
06.04.02 VEREDA RIGIDA DE CONCRETO FC = 140 KG/CM2 E =10 Cm, PASTA 1:2 195.72 M2
VEREDA FRONTAL 1 54 2 108.00
VEREDA POSTERIOR 1 54 1.2 64.80
VEREDA LARERAL 2 9.55 1.2 22.92
06.04.03 JUNTAS ASFALTICAS 71.60 M
VEREDA FRONTAL 1 54 54.00
-5 6.3 -31.50
16 2 32.00
VEREDA POSTERIOR 16 0.9 14.4
VEREDA LARERAL 3 0.9 2.7
06.05.00 CONTRAZOCALOS
06.05.01 CONTRAZOCALO DE CEMENTO S/COLOREAR H = 30 Cm 109.30 M
FRONTAL Y POSTERIOR 2 51.6 103.2
LATERALES 2 6.65 13.3
PUERTAS -6 1.2 -7.2
06.05.02 CONTRAZOCALO DE CEMENTO S/COLOREAR H = 10 Cm 173.88 M
SALON 1 1 28.98 28.98
SALON 2 1 28.98 28.98
SALON 3 1 28.98 28.98
SALON 4 1 28.98 28.98
SALON 5 1 28.98 28.98
SALON 5 1 28.98 28.98
HOJA DE METRADOS DE AULAS
OBRA : CONSTRUCCION DELNIVEL SECUNDARIO DE LA INSTITUCIONCION VILLA SAN CRISTOBAL
Dpto. : Ayacucho Dist. : Nazarenas
Prov.: Huamanga Lugar : Villa San Cristobal
PART. DESCRIPCION N° VEC. LARGO ANCHO ALTO PARCIAL TOTAL UND
06.07.00 CARPINTERIA DE MADERA
06.07.01 PUERTA MACHIMBRADA DE TORNILLO INCLUYE MARCO DE 2 x 3" 15.12 M2
EN AULAS
P-1 (MACHIMBRADO) 6 1.2 2.1 15.12
06.07.02 VENTANA DE MADERA TORNILLO 69.13 M2
V-1 7 3.05 1.3 27.755
V-2 5 2.82 1.3 18.33
V-3 5 2.82 0.65 9.165
V-4 7 3.05 0.65 13.8775
06.08.00 CERRAJERIA
06.08.01 BISAGRA CAPUCHINA DE 3 1/2 " X 3 1/2" 36.00 PZA
AULAS 6 3 18
4 3 12
06.08.02 CERRADURA PARA PUERTA DE DOS GOLPES 12.00 PZA
AULAS 6 1 2 12
4 1 2 8
06.09.00 VIDRIO, CRISTALES Y SIMILARES
06.09.01 VIDRIO SEMI DOBLE PROVISION Y COLOCACION EN VENTANAS 1486.61 P2
EN AULAS
V-1 7 2 3.05 1.3 55.51
V-2 5 2 2.82 1.3 36.66
V-3 5 2 2.82 0.65 18.33
V-4 7 2 3.05 0.65 27.755
06.10.00 PINTURA
06.10.01 PINTURA LATEX 2 MANOS EN CIELO RAZO Y VIGAS 843.20 M2
AREA DE LOSA ALIGERADA
AULA 01, 02, 03, 04 , 05 Y 06+ VOLADOS 6 8 9.31 446.88
HOJA DE METRADOS DE AULAS
OBRA : CONSTRUCCION DELNIVEL SECUNDARIO DE LA INSTITUCIONCION VILLA SAN CRISTOBAL
Dpto. : Ayacucho Dist. : Nazarenas
Prov.: Huamanga Lugar : Villa San Cristobal
PART. DESCRIPCION N° VEC. LARGO ANCHO ALTO PARCIAL TOTAL UND
VIGAS
VIGAS PRINCIPALES
Viga principal 101(CANTIDAD 8)
2 4.75 0.5 38
1 4.75 0.25 9.5
2 5.68 0.5 45.44
1 5.68 0.25 11.36
Viga principal 102 (CANTIDAD 6)
2 4.75 0.5 28.5
1 4.75 0.25 7.125
2 5.68 0.5 34.08
VIGAS SOLERA EN AULAS
Eje 1-1, 3-3, 5-5, 7-7, 7´-7´, 9-9 , 11-11,13-13 8 5.6 0.25 11.2
16 5.6 0.2 17.92
VIGAS DE AMARRE AULAS
Eje A-A y C-C entre ejes 1-7 2 19.06 0.25 9.53
4 19.06 0.4 30.496
Eje A-A y C-C entre ejes 7' - 13 2 19.06 0.25 9.53
4 19.06 0.4 30.496
HOJA DE METRADOS DE AULAS
OBRA : CONSTRUCCION DELNIVEL SECUNDARIO DE LA INSTITUCIONCION VILLA SAN CRISTOBAL
Dpto. : Ayacucho Dist. : Nazarenas
Prov.: Huamanga Lugar : Villa San Cristobal
PART. DESCRIPCION N° VEC. LARGO ANCHO ALTO PARCIAL TOTAL UND
VIGAS DE AMARRE CENTRAL
Eje B-B entre ejes 1-7 1 24 0.25 6
2 24 0.4 19.2
Eje B-B entre ejes 7' - 13 1 24 0.25 6
2 24 0.4 19.2
VIGAS DE AMARRE EN ALEROS
Eje A-A y C-C entre jes 1-7 2 24 0.15 7.2
4 24 0.2 19.2
Eje A-A y C-C entre ejes 7'-13 2 24 0.15 7.2
4 24 0.2 19.2
1 5.68 0.25 9.94
06.10.02 PINTURA LATEX 2 MANOS EN MUROS EXTERIORES INCLUIDO COLUMNAS 671.73 M2
06.10.03 PINTURA LATEX 2 MANOS EN MUROS INTERIORES INCLUIDO COLUMNAS 607.20 M2
06.10.04 PINTURA DE CONTRAZOCALO C/ESMALTE ECONOMICO 287.28 ML
CONTRAZOCALO DE CEMENTO S/COLOREAR H = 30 Cm
FRONTAL Y POSTERIOR 2 50 100
LATERALES 4 6.65 26.6
PUERTAS -11 1.2 -13.2
CONTRAZOCALO DE CEMENTO S/COLOREAR H = 10 Cm
SALON 1 1 28.98 28.98
SALON 2 1 28.98 28.98
SALON 3 1 28.98 28.98
SALON 4 1 28.98 28.98
SALON 5 1 28.98 28.98
SALON 5 1 28.98 28.98
06.10.05 PINTURA DE PUERTAS DE MADERA CON VARNIZ DOS MANOS 15.12 M2
SALON 1 P-1 1 2.1 1.2 2.52
SALON 2 P-1 1 2.1 1.2 2.52
SALON 3 P-1 1 2.1 1.2 2.52
SALON 4 P-1 1 2.1 1.2 2.52
SALON 5 P-1 1 2.1 1.2 2.52
SALON 6 P-1 1 2.1 1.2 2.52
06.10.06 PINTADO DE VENTANAS CON BARNIZ (2 MANOS CON ESMALTE) 69.13 M2
V-1 7 3.05 1.3 27.755
V-2 5 2.82 1.3 18.33
V-3 5 2.82 0.65 9.165
V-4 7 3.05 0.65 13.8775
06.11.00 COBERTURA
COBERTURA CON TEJA ARTESANAL 523.74 M2
1 10.15 51.6 523.74
CUMBRERA CON TEJA ARTESANAL 51.60 M
1 51.6 51.6
HOJA DE METRADOS DE AULAS
OBRA : CONSTRUCCION DELNIVEL SECUNDARIO DE LA INSTITUCIONCION VILLA SAN CRISTOBAL
Dpto. : Ayacucho Dist. : Nazarenas
Prov.: Huamanga Lugar : Villa San Cristobal
PART. DESCRIPCION N° VEC. LARGO ANCHO ALTO PARCIAL TOTAL UND
07.00.0 INSTALACIONES ELECTRICAS
07.01.00 SALIDAS ELECTRICAS
07.01.01 SALIDA DE TECHO (CENTRO DE LUZ) CANT. 59.00 PTO
AULAS 6 8.00 48.00
PASILLO 1 11.00 11.00
07.01.02 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC 24.00 PTO
AULAS 6 4.00 24.00
07.02.00 TABLEROS Y CUCHILLAS (LLAVES)
07.02.01 TABLERO GENERAL 1.00 GLB
LLAVE TERMICA DE 3x200A 1 1.00 UND
LLAVE TERMICA DE 3x100A 2 2.00 UND
LLAVE TERMICA DE 2x60A 1 1.00 UND
ALIMENTADOR CAB/ENERG. 4-85.1MM² TW-AWG/MCM 1 120.00 120.00 M
TUBERIA PVC SAP 2" 1 73.00 73.00 M
07.02.02 TABLERO DE DISTRIBUCION TD-1 1.00 GLB
LLAVE TERMICA DE 3x200A 1 1.00 UND
LLAVE TERMICA DE 2x20A 2 2.00 UND
LLAVE TERMICA DE 2x30A 4 4.00 UND
ALIMENTADOR CAB/ENERG. 4-85.1MM² TW-AWG/MCM 1 65.00 65.00 M
TUBERIA PVC SAP 2" 1 65.00 65.00 M
07.02.03 TABLERO DE DISTRIBUCION TD-2 1.00 GLB
LLAVE TERMICA DE 2x60A 1 1.00 UND
LLAVE TERMICA DE 2x30A 2 2.00 UND
ALIMENTADOR CAB/ENERG. 2-85.1MM² TW-AWG/MCM 1 15.00 15.00 M
TUBERIA PVC SAP 2" 1 15.00 15.00 M
07.02.04 TABLERO DE DISTRIBUCION TD-5 1.00 GLB
LLAVE TERMICA DE 3x100A2 1 1.00 UND
LLAVE TERMICA DE 2x20A 2 2.00 UND
LLAVE TERMICA DE 2x50A 1 1.00 UND
LLAVE TERMICA DE 2x30A 3 3.00 UND
ALIMENTADOR CAB/ENERG. 4-85.1MM² TW-AWG/MCM 1 10.00 10.00 M
ALIMENTADOR CAB/ENERG. 1-6MM² TW 1 10.00 10.00 M
TUBERIA PVC SAP 2" 1 10.00 10.00 M
TUBERIA PVC SAP 1" 1 10.00 10.00 M
07.03.00 ARTEFACTOS
07.03.01 LAMPARAS FLUORESCENTE RECTO 2 UND.40 W INCLUYENDO EQUIPO Y PANTALL 59.00 UND
07.04.00 POZO DE TIERRA
07.04.01 POZO DE TIERRA 1 1.00 1.00 GLB
07.05.00 PARARRAYO
07.05.01 PARARRAYO INCLUYE COLOCACION E INSUMOS 1 1.00 1.00 GLB
HOJA DE METRADOS DE ACERO DE COLEGIO
OBRA : CONSTRUCCION DEL NIVEL PRIMARIO DE LA INSTITUCION EDUCATIVA DE PICHARI
Dpto. : CUZCO Dist. : PICHARI
Prov.: LA CONVENCION Lugar : PICHARI
PART. D E S C R I P C I O N
DIAM. Longitud en mts. parc.
(") N° VEC. No PZ. 1/4" 3/8" 1/2" 5/8" 3/4" (ml) parc. (kg) PARC. (kg)
5.01.02 ACERO EN ZAPATAS
EN AULAS
ZAPATA TIPO 1 DE EJE A y C ÷ 1-13 1/2" 28 14 1.35 529.2 526.02
ZAPATA TIPO 2 DE EJE B ÷ 1-13 1/2" 8 12 1.15 110.4 109.74
TOTAL ACERO(KG.) 635.76
PART. D E S C R I P C I O N
DIAM. Longitud en mts. parc.
(") N° VEC. No PZ. 1/4" 3/8" 1/2" 5/8" 3/4" (ml) parc. (kg) PARC. (kg)
05.02.03 ACERO EN V. DE CIMENTACION
EJE A - C ENTRE EJE 1-1 1/2 2 4 3.1 24.8 24.65
EJE A - C ENTRE EJE 3 - 3 1/2 2 4 3.1 24.8 24.65
EJE A - C ENTRE EJE 5 - 5 1/2 2 4 3.1 24.8 24.65
EJE A - C ENTRE EJE 7 - 7 1/2 2 4 3.1 24.8 24.65
EJE A - C ENTRE EJE 7´ - 7´ 1/2 2 4 3.1 24.8 24.65
EJE A - C ENTRE EJE 9 - 9 1/2 2 4 3.1 24.8 24.65
EJE A - C ENTRE EJE 11 - 11 1/2 2 4 3.1 24.8 24.65
EJE A - C ENTRE EJE 13 - 13 1/2 2 4 3.1 24.8 24.65
EJE 1 - 2 ENTRE EJE C-C 1/2 1 4 4.1 16.4 16.30
EJE 1 - 2 ENTRE EJE A - A 1/2 1 4 4.1 16.4 16.30
EJE 2 - 3 ENTRE EJE C - C 1/2 1 4 4.25 17 16.90
EJE 2 - 3 ENTRE EJE A - A 1/2 1 4 4.25 17 16.90
EJE 3 - 4 ENTRE EJE C - C 1/2 1 4 4.25 17 16.90
EJE 3 - 4 ENTRE EJE A - A 1/2 1 4 4.25 17 16.90
EJE 4 - 5 ENTRE EJE A - A 1/2 1 4 4.25 17 16.90
EJE 4 - 5 ENTRE EJE C - C 1/2 1 4 4.25 17 16.90
EJE 5 - 6 ENTRE EJE A - A 1/2 1 4 4.25 17 16.90
EJE 5 - 6 ENTRE EJE C - C 1/2 1 4 4.25 17 16.90
EJE 6 - 7 ENTRE EJE A - A 1/2 1 4 4.37 17.48 17.38
EJE 6 - 7 ENTRE EJE C - C 1/2 1 4 4.37 17.48 17.38
EJE 7´ - 8 ENTRE EJE A - A 1/2 1 4 4.37 17.48 17.38
EJE 7´ - 8 ENTRE EJE C - C 1/2 1 4 4.37 17.48 17.38
EJE 8 - 9 ENTRE EJE A - A 1/2 1 4 4.25 17 16.90
EJE 8 - 9 ENTRE EJE C - C 1/2 1 4 4.25 17 16.90
EJE 9 - 10 ENTRE EJE A - A 1/2 1 4 4.25 17 16.90
EJE 9 - 10 ENTRE EJE A - A 1/2 1 4 4.25 17 16.90
EJE 10 - 11 ENTRE EJE C - C 1/2 1 4 4.25 17 16.90
EJE 10 - 11 ENTRE EJE A - A 1/2 1 4 4.25 17 16.90
EJE 11 - 12 ENTRE EJE C - C 1/2 1 4 4.25 17 16.90
EJE 11 - 12 ENTRE EJE A - A 1/2 1 4 4.25 17 16.90
EJE 12 - 13 ENTRE EJE A - A 1/2 1 4 4.25 17 16.90
EJE 12 - 13 ENTRE EJE A - A 1/2 1 4 4.25 17 16.90
EJE 2 - 2 ENTRE EJE A - C 5/8 1 5 6.64 33.2 51.46
EJE 4 - 4 ENTRE EJE A - C 5/8 1 5 6.64 33.2 51.46
EJE 6 - 6 ENTRE EJE A -C 5/8 1 5 6.64 33.2 51.46
EJE 8 - 8 ENTRE EJE A - A 5/8 1 5 6.64 33.2 51.46
EJE 10 - 10 ENTRE EJE A - A 5/8 1 5 6.64 33.2 51.46
EJE 12 - 12 ENTRE EJE A - A 5/8 1 5 6.64 33.2 51.46
Estribo
EJE A - C ENTRE EJE 1-1 1/4 2 30 1.05 63 15.75
EJE A - C ENTRE EJE 3 - 3 1/4 2 30 1.05 63 15.75
EJE A - C ENTRE EJE 5 - 5 1/4 2 30 1.05 63 15.75
EJE A - C ENTRE EJE 7 - 7 1/4 2 30 1.05 63 15.75
EJE A - C ENTRE EJE 7´ - 7´ 1/4 2 30 1.05 63 15.75
EJE A - C ENTRE EJE 9 - 9 1/4 2 30 1.05 63 15.75
EJE A - C ENTRE EJE 11 - 11 1/4 2 30 1.05 63 15.75
EJE A - C ENTRE EJE 13 - 13 1/4 2 30 1.05 63 15.75
EJE 1 - 2 ENTRE EJE C-C 1/4 1 33 0.8 26.4 6.60
EJE 1 - 2 ENTRE EJE A - C 1/4 1 33 0.8 26.4 6.60
EJE 2 - 3 ENTRE EJE C - C 3/8 1 32 0.8 25.6 14.34
EJE 2 - 3 ENTRE EJE A - A 1/4 1 32 0.8 25.6 6.40
EJE 3 - 4 ENTRE EJE C - C 1/4 1 31 0.8 24.8 6.20
EJE 3 - 4 ENTRE EJE A - A 3/8 1 31 0.8 24.8 13.89
EJE 4 - 5 ENTRE EJE A - A 1/4 1 34 0.8 27.2 6.80
EJE 4 - 5 ENTRE EJE C - C 1/4 1 34 0.8 27.2 6.80
EJE 5 - 6 ENTRE EJE A - A 3/8 1 34 0.8 27.2 15.23
EJE 5 - 6 ENTRE EJE C - C 1/4 1 34 0.8 27.2 6.80
EJE 6 - 7 ENTRE EJE A - A 1/4 1 34 0.8 27.2 6.80
EJE 6 - 7 ENTRE EJE C - C 1/4 1 34 0.8 27.2 6.80
EJE 7´ - 8 ENTRE EJE A - A 1/4 1 34 0.8 27.2 6.80
EJE 7´ - 8 ENTRE EJE C - C 1/4 1 34 0.8 27.2 6.80
EJE 8 - 9 ENTRE EJE A - A 3/8 1 34 0.8 27.2 15.23
EJE 8 - 9 ENTRE EJE C - C 1/4 1 34 0.8 27.2 6.80
EJE 9 - 10 ENTRE EJE A - A 1/4 1 34 0.8 27.2 6.80
EJE 9 - 10 ENTRE EJE A - A 1/4 1 34 0.8 27.2 6.80
EJE 10 - 11 ENTRE EJE C - C 3/8 1 34 0.8 27.2 15.23
EJE 10 - 11 ENTRE EJE A - A 1/4 1 34 0.8 27.2 6.80
EJE 11 - 12 ENTRE EJE C - C 1/4 1 34 0.8 27.2 6.80
EJE 11 - 12 ENTRE EJE A - A 1/4 1 34 0.8 27.2 6.80
EJE 12 - 13 ENTRE EJE A - A 1/4 1 34 0.8 27.2 6.80
EJE 12 - 13 ENTRE EJE A - A 1/4 1 34 0.8 27.2 6.80
EJE 2 - 2 ENTRE EJE A - C 5/8 1 30 1.9 57 88.35
EJE 4 - 4 ENTRE EJE A - C 5/8 1 30 1.9 57 88.35
EJE 6 - 6 ENTRE EJE A -C 5/8 1 30 1.9 57 88.35
EJE 8 - 8 ENTRE EJE A - A 5/8 1 30 1.9 57 88.35
EJE 10 - 10 ENTRE EJE A - A 5/8 1 30 1.9 57 88.35
EJE 12 - 12 ENTRE EJE A - A 5/8 1 30 1.9 57 88.35
TOTAL ACERO(KG.) 1770.06
PART. D E S C R I P C I O N
DIAM. Longitud en mts. parc.
(") N° VEC. No PZ. 1/4" 3/8" 1/2" 5/8" 3/4" (ml) parc. (kg) PARC. (kg)
05.03.03 ACERO EN COLUMNASCOLUMNA C-1 DE EJE A y C ÷ 1-14 1542.40
Acero principal 5/8" 16 8 5.2 665.6 1031.68
estribos 3/8" 16 30 1.9 912 510.72
COLUMNA C-2 DE EJE A y C ÷ 1-14 965.12
Acero principal 3/8" 64 4 4.5 1152 645.12
estribos 1/4" 64 25 0.8 1280 320.00
COLUMNA C-2 DE EJE B ÷ 1-12 295.04
Acero principal 3/8" 16 4 6 384 215.04
estribos 1/4" 16 25 0.8 320 80.00
COLUMNA C-3 DE EJE A y C 1350.24
Acero principal 5/8" 12 10 5.2 624 967.20
estribos 3/8" 12 30 1.9 684 383.04
COLUMNA C-4 DE EJE 1,3,5, 7,810,12,12' y 14 592.00
Acero principal 5/8" 8 6 6 288 446.40
estribos 3/8" 8 25 1.3 260 145.60
TOTAL ACERO(KG.) 4744.80
PART. D E S C R I P C I O N
DIAM. Longitud en mts. parc.
(") N° VEC. No PZ. 1/4" 3/8" 1/2" 5/8" 3/4" (ml) parc. (kg) PARC. (kg)
05.04.03 Aceros VIGAS PRINCIPALES
Viga principal 101(cantidad =8) 1360.64
VIGA PRINCIPAL 101 ( 1 - 1 ) (25 x 50)
Acero superior 5/8 8.00 2.00 5.4 86.40 134.09
Acero medio 1/2 8.00 2.00 5.35 85.60 85.09
Acero inferior 5/8 8.00 2.00 6 96.00 148.99
ESTRIBO PARA VIGA 201 corte ( 1-1 ) 3/8 8.00 34.00 1.74 473.28 265.04
VIGA PRINCIPAL 101 ( 1 - 1 ) (25 x 50)
Acero superior 5/8 8.00 2.00 6 96.00 148.99
Acero medio 1/2 8.00 2.00 5.4 86.40 85.88
Acero inferior 5/8 8.00 2.00 6.6 105.60 163.89
VIGA PRINCIPAL 101 ( 2 - 2) (25 x 50)
Acero superior 1/2 8.00 1.00 3.1 24.80 24.65
VIGA PRINCIPAL 101 ( 3 - 3) (25 x 50) el acero probiene de la viga de 201 del corte 2-2 y 1-1
Acero superior cubierto
Acero medio cubierto
Acero inferior cubierto
Estribo para viga 101 corte (1-1) y ( 2-2) , (3-3) 3/8 8.00 39 1.74 542.88 304.01
Viga principal 102 (cantidad = 6) 1094.65
VIGA PRINCIPAL 102 (1-1) (25 x 50)
Acero superior 5/8 6.00 2.00 5.4 64.80 100.57
Acero medio 1/2 6.00 2.00 5.35 64.20 63.81
Acero inferior 5/8 6.00 2.00 5.6 67.20 104.29
VIGA PRINCIPAL102 ( 4 - 4 ) (25 x 50) Alero
Acero superior 5/8 6.00 1.00 1.7 10.20 15.83
ESTRIBO PARA corte (1-1) ( 4 -4 ) 3/8" 3/8 6.00 34.00 1.74 354.96 198.78
VIGA PRINCIPAL 102 (1-1) (25 x 50)
Acero superior 5/8 6.00 2.00 6.25 75.00 116.40
Acero medio 1/2 6.00 2.00 5.7 68.40 67.99
Acero inferior 5/8 6.00 2.00 6.75 81.00 125.71
VIGA PRINCIPAL 102 ( 2 - 2 ) (25 x 50)
Acero superior 1/2 6.00 2.00 1.65 19.80 19.68
Acero inferior 1/2 6.00 1.00 1.6 9.60 9.54
VIGA PRINCIPAL 102 (3 -3) (25 x 50) ( alero )
Acero superior 1/2 6.00 1.00 1.5 9.00 8.95
Acero medio cubierto
Acero inferior cubierto
ESTRIBO PARA corte (1-1) ; ( 2-2) ;(3-3) 3/8" 3/8 6.00 45.00 1.74 469.80 263.09
TOTAL ACERO(KG.) 2455.28
PART. D E S C R I P C I O N
DIAM. Longitud en mts. parc.
(") N° VEC. No PZ. 1/4" 3/8" 1/2" 5/8" 3/4" (ml) parc. (kg) PARC. (kg)
05.04.03 ACERO EN VIGAS SOLERA
acero en aulas
Eje 1-1, 3-3, 5-5, 7-7, 7´-7´, 9-9, 11-11 y 13-13 412.88
Acero principal 1/2" 8 4 7.2 230.4 229.02
estribos 3/8" 8 36 1.14 328.32 183.86
TOTAL ACERO(KG.) 412.88
PART. D E S C R I P C I O N
DIAM. Longitud en mts. parc.
(") N° VEC. No PZ. 1/4" 3/8" 1/2" 5/8" 3/4" (ml) parc. (kg) PARC. (kg)
05.04.03 ACERO EN VIGAS DE AMARRE
acero en aulas segundo piso
Eje A-A y C-C entre ejes 1-7 531.65
Acero principal 5/8" 2 4 27.4 219.2 340.20
estribos 3/8" 2 111 1.54 341.88 191.45
Eje A-A y C-C entre ejes 7' - 13 531.65
Acero principal 5/8" 2 4 27.4 219.2 340.20
estribos 3/8" 2 111 1.54 341.88 191.45
TOTAL ACERO(KG.) 1063.30
PART. D E S C R I P C I O N
DIAM. Longitud en mts. parc.
(") N° VEC. No PZ. 1/4" 3/8" 1/2" 5/8" 3/4" (ml) parc. (kg) PARC. (kg)
05.04.03 ACERO EN VIGAS DE AMARRE CENTRAL
acero en eje central aulas segundo piso
Eje B-B entre ejes 1-7 265.83
Acero principal 5/8" 1 4 27.4 109.6 170.10
estribos 3/8" 1 111 1.54 170.94 95.73
Eje B-B entre ejes 7' - 13 265.83
Acero principal 5/8" 1 4 27.4 109.6 170.10
estribos 3/8" 1 111 1.54 170.94 95.73
TOTAL ACERO(KG.) 531.65
PART. D E S C R I P C I O N
DIAM. Longitud en mts. parc.
(") N° VEC. No PZ. 1/4" 3/8" 1/2" 5/8" 3/4" (ml) parc. (kg) PARC. (kg)
05.04.03 VIGAS DE AMARRE EN ALEROS
Eje A-A y C-C entre jes 1-7 169.50
Acero principal 3/8" 2 4 27.4 219.2 122.75
estribos 1/4" 2 110 0.85 187 46.75
Eje A-A y C-C entre ejes 7'-13 162.28
Acero principal 3/8" 2 4 27.4 219.2 122.75
estribos 1/4" 2 93 0.85 158.1 39.53
TOTAL ACERO(KG.) 331.78
PART. D E S C R I P C I O N
DIAM. Longitud en mts. parc.
(") N° VEC. No PZ. 1/4" 3/8" 1/2" 5/8" 3/4" (ml) parc. (kg) PARC. (kg)
05.05.03 ACERO DE TEMPERATURA (espaceado a 0.25 m ) 112.58
ACERO DE TEMPERATURA (techo de dos aguas)
Ancho 1/4 ancho 4.8 4.7 Largo 43.3 207.84 51.96
Ancho 1/4 ancho 5.6 5.7 Largo 43.3 242.48 60.62
TOTAL ACERO(KG.) 112.58
PART. D E S C R I P C I O N
DIAM. Longitud en mts. parc.
(") N° VEC. No PZ. 1/4" 3/8" 1/2" 5/8" 3/4" (ml) parc. (kg) PARC. (kg)05.05.03 ACERO DE VIGUETA ( AREA DE LOSA = 454.68 )
ACERO DE VIGUETA
1/2 Longitud por m2 = 3.6 1627.026912
TOTAL ACERO(KG.) 1627.03
HOJA DE METRADOS DE SS.HH
OBRA : CONSTRUCCION DELNIVEL SECUNDARIO DE LA INSTITUCION VILLA SAN CRISTOBAL
Dpto. : Ayacucho Dist. : Nazarenas
Prov.: Huamanga Lugar : Villa San Cristobal
PART. DESCRIPCION N° VEC. LARGO ANCHO ALTO PARCIAL TOTAL UND
01.00.00 TRABAJOS PRELIMINARES
01.01.00 LIMPIEZA DE TERRENO MANUAL DE COLEGIO 1 10.1 5.1 51.51 51.51 M2
01.02.00 TRAZO NIVELACION Y REPLANTEO 51.51 M2
SERVIOS HIGIENICOS 1 10.1 5.1 51.51
02.00.00 MOVIMIENTO DE TIERRAS
02.01.00 EXCAVACION DE PARA CIMIENTO Y VEREDAS 21.83 M3
EXCAVACION DE DE SS.HH
EJE 1-2 ENTRE EJE A-A 1 8 0.5 0.95 3.8
EJE 1-2 ENTRE EJE C - C 1 8 0.5 0.95 3.8
EJE 1-2 ENTRE EJE A - C 1 3.9 0.6 0.95 2.223
EJE 1-1 ENTRE EJE A - C 1 3.9 0.6 0.95 2.223
EJE 2-2 ENTRE EJE A-A 1 3.9 0.6 0.95 2.223
EJE 3 -3 ENTRE EJE A-A 1 3.9 0.6 0.95 2.223
EXCAVACION PARA MURO 2 2.6 0.4 0.6 1.248
6 1.15 0.4 0.6 1.656
EXCAVACION PARA VEREDA 1 2.38 1.2 0.2 0.5712
1 3 0.78 0.2 0.468
1 3.238 1.2 0.2 0.77712
1 7.75 0.4 0.2 0.62
02.02.00 ELIMINACION DE MATERIAL EXCEDENTE Volum. 27.2904 M3
02.02.02 ELIMINACIÓN (25% COEFIC. DE ESPONJAMIENTO) 1,25 COEFIC. 1.25 21.8323 27.2904
02.02.03 AFIRMADO DE 4" 9.3 M2
1 7.75 1.2 9.3
03,00,00 CONCRETO SIMPLE
03.01.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA 17.3904 M3
CIMIENTO CORRIDO EJE A y C ÷ 1-3 2 8 0.5 0.8 6.4
CIMIENTO CORRIDO ENTRE EJE A y B 4 1.15 0.4 0.6 1.104
CIMIENTO CORRIDO EJE B ÷ 1-3 2 3.25 0.5 0.8 2.6
CIMIENTO CORRIDO EJE 1, 2 y 3 ÷ A-C 3 3.9 0.6 0.8 5.616
CIMIENTO CORRIDO EJE 1 y 3 ÷ A-C 2 3.48 0.4 0.6 1.6704
03,01,02 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS 1.96575 M3
SOBRECIMIENTO EJE A ÷ 1-3 2 2.95 0.15 0.35 0.30975
SOBRECIMIENTO EJE B ÷ 1-3 2 3.2 0.15 0.35 0.336
SOBRECIMIENTO EJE C ÷ 1-3 2 1.7 0.15 0.35 0.1785
SOBRECIMIENTO EJE A y B 4 1.8 0.1 0.2 0.144
SOBRECIMIENTO EJE 1,2 y 3 ÷ A y C 3 3.8 0.25 0.35 0.9975
03,01.03 ENCOFRADO Y DEDESENCOFRADO DE SOBRECIMIENTO AULAS 21.85 M2
EN SSHH
SOBRECIMIENTO EJE A ÷ 1-3 4 2.95 0.35 4.13
SOBRECIMIENTO EJE B ÷ 1-3 4 3.2 0.35 4.48
SOBRECIMIENTO EJE C ÷ 1-3 4 1.7 0.35 2.38
SOBRECIMIENTO EJE A y B 8 1.8 0.2 2.88
SOBRECIMIENTO EJE 1,2 y 3 ÷ A y C 6 3.8 0.35 7.98
03.02.00 FALSO PISO
03.02.01 FALSO PISO DE 4 " DE CONCRETO 1:10 30.8 M2
SSHH DE VARONES, MUJERES Y DOCENTES 2 4.4 3.5 30.8
04.00.00 OBRAS DE CONCRETO ARMADO
04.01.00 COLUMNAS
04.01.01 CONCRETO EN COLUMNAS Fc =210 KG/CM2 1.61 M3
C -2 6 0.7 0.25 3.6 1.05
C-6 9 0.25 0.25 3.6 0.5625
HOJA DE METRADOS DE SS.HH
OBRA : CONSTRUCCION DELNIVEL SECUNDARIO DE LA INSTITUCION VILLA SAN CRISTOBAL
Dpto. : Ayacucho Dist. : Nazarenas
Prov.: Huamanga Lugar : Villa San Cristobal
PART. DESCRIPCION N° VEC. LARGO ANCHO ALTO PARCIAL TOTAL UND
04.01.02 ENCOFRADO 53.04 M3
C -2 (6 COLUMNAS) 2 0.7 2.6 21.84
2 0.25 2.6 7.8
C-6 ( 9 COLUMNAS) 2 0.25 2.6 11.7
2 0.25 2.6 11.7
04.01.03 ACERO PARA COLUMNAS Fy = 4200 KG/CM2 (VER HOJA DE METRADOS DE ACERO) 210.3
04.02.00 VIGAS
04.02.01 CONCRETO 7.16 M3
VA - 103 2 3.75 0.2 0.25 0.375
VA - 103 2 3.5 0.2 0.25 0.35
VS - 102 2 2.95 0.5 0.25 0.7375
VP - D - 101 1 2.6 0.5 0.25 2.6
VP - D - 102 1 3.1 0.5 0.25 3.1
04.02.02 ENCOFRADO 14.30 M3
VA - 103 4 3.75 0.2 3
VA - 103 4 3.5 0.2 2.8
VS - 102 4 2.95 0.5 5.9
VP - D - 101 2 2.6 0.5 2.6
04.02.03 ACERO PARA VIGAS Fy = 4200 KG/CM2 (VER HOJA DE METRADOS DE ACERO) 344.80
04.03.00 LOSA ALIGERADA
04.03.01 CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2(AREA DE TECHO 72 M2) 3.15 M3
Concreto de vigueta en 1 m2 2.5 1 0.4 0.05 0.05
2.5 1 0.1 0.15 0.0375
TOTAL 0.0875
AREA SSHH VARONES Y MUJERES 36.05
2 3.5 4.05 28.35
2 3.5 1.10 7.7
04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS 36.05 M2
AREA SSHH VARONES Y MUJERES
2 3.5 4.05 28.35
2 3.5 1.10 7.7
04.03.03 ACERO EN LOSAS ALIGERADAS Fy = 4200 KG/CM2 (VER HOJA DE METRADOS DE ACERO) 182.32 KG
ACERO DE TEMPERATURA
ACERO DE VIGUETA
04.03.04 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO 8.333 AREA DE TECHO 36.05 300.40 UND
05.00.00 ARQUITECTURA
05.01.00 MUROS Y TABIQUE DE ALBAÑILERIA
05.01.01 MURO DE CABEZA LADR. SILI-CALC KK AMARRE CON CEMENTO-CAL-ARENA 31.356 M2
EJE 1- 1 ENTRE EJE A-C 1 4.02 2.6 10.452 10.452EJE 2- 2 ENTRE EJE A-C 1 4.02 2.6 10.452 10.452EJE 3- 3 ENTRE EJE A-C 1 4.02 2.6 10.452 10.452
05.01.02 MURO DE SOGA LADR. SILI-CALC KK AMARRE CON CEMENTO-CAL-ARENA 37.83 M2
EJE 1- 3 ENTRE EJE A-A 1 6.15 2.6 15.99
EJE C- C ENTRE EJE 1-3 1 3.4 2.6 8.84
MURO DE DIVISION 1 5 2.6 13
05.01.03 MURO DE CANTO LADR. SILI-CALC KK AMARRE CON CEMENTO-CAL-ARENA 22.88 M2
4 2.6 1.9 19.76
2 2.6 0.4 2.08
2 2.6 0.2 1.04
HOJA DE METRADOS DE SS.HH
OBRA : CONSTRUCCION DELNIVEL SECUNDARIO DE LA INSTITUCION VILLA SAN CRISTOBAL
Dpto. : Ayacucho Dist. : Nazarenas
Prov.: Huamanga Lugar : Villa San Cristobal
PART. DESCRIPCION N° VEC. LARGO ANCHO ALTO PARCIAL TOTAL UND
05.02.00 REBOQUE ENLUCIDOS Y MOLDEDURAS
05.02.01 TARRAJEO DE SUPERFICIE DE VIGAS CON CENMENTO Y ARENA 17.4 M2
VA - 103 4 3.75 0.2 3
VA - 103 4 3.5 0.2 2.8
VS - 102 4 2.95 0.5 5.9
VP - D - 101 2 2.6 0.5 2.6
VP - D - 102 2 3.1 0.5 3.1
05.02.02 TARRAJEO EN COLUMNAS 25.35 M2
COLUMNA C-2 DE EJE A ÷ 1 - 3 4 0.5 3.25 6.5
COLUMNA C-6 DE EJE A ÷ 1 - 3 3 0.5 3.25 4.875
COLUMNA C-6 DE EJE B ÷ 1 - 3 3 0.5 3.25 4.875
COLUMNA C-2 DE EJE C ÷ 1 - 3 2 0.65 3.25 4.225
COLUMNA C-6 DE EJE C ÷ 1 - 3 3 0.5 3.25 4.875
05.02.03 TARRAJEO EN INTERIORES CON CEMENTO-ARENA 27.2 M2
SS.HH (VARONES Y MUJERES) 5 4.1 1 20.5
BOTADERO 1 4.1 1 4.1
SS.HH. DOCENTE 1 1 1 1
SS.HH. DIRECCION 2 1 0.8 1.6
05.02.04 TARRAJEO DE EXTERIORES CON CEMENTO-ARENA 8.18 M2
FRONTAL 2 2.6 2.48
2 1 0.5
ESPALDA 1 7.75 2.6
LATERAL 2 5.7 2.6
05.02.05 TARRAJEO PRIMARIO CON RAYADO CON CEMENTO-ARENA 43.37 M2
6 3.85 0.8 18.48
2 5.15 1 10.3
2 5.15 0.8 8.24
1 3 1 3
1 1.75 1 1.75
1 4 0.4 1.6
05.02.06 VESTIDURAS DE DERRAMES PUERTAS VENTANAS Y VANOS 135.20
P-1 (MACHIEMBRADA) 2 5.2 2 20.8
P-1 (MACHIEMBRADA) 2 5 2 20
P-1 (MACHIEMBRADA) 6 4.2 2 50.4
V-1 (MADERA ) 2 6.6 2 26.4
V-2 (MADERA ) 2 4.4 2 17.6
05.03.00 CIELO RAZO 36.05 M2
05.02.01 CIELO RAZO CON MEZCLA DE CEMENTO
2 3.5 4.05 28.35
2 3.5 1.10 7.7
05.04.00 PISOS Y PAVIMENTOS
05.04.01 PISO CERAMICO CLARO DE 30x30 CM 30.80 M2
SSHH DE VARONES, MUJERES Y DOCENTES 2 4.4 3.5 30.8
05,04,02 VEREDA RIGIDA DE CONCRETO FC=140 KG/CM2 E=10 CM, PASTA 1:2 9.30
VEREDA FRONTAL 1 7.75 1.2 9.3
05.04.03 JUNTAS ASFALTICAS 10.15 M
VEREDA FRONTAL 1 7.75 7.75
2 1.2 2.4
05.05.00 ZOCALOS Y CONTRAZOCALOS
05.05.01 ZOCALO DE MAYOLICA DE 15 X 15 1 43.37
6 3.85 0.8 18.48
2 5.15 1 10.3
2 5.15 0.8 8.24
1 3 1 3
1 1.75 1 1.75
1 4 0.4 1.6
05,05,02 CONTRAZOCALO CERAMICO H = 10 CM 37.45 M
INTERIOR 2 11.85 23.7
2.5 3.7 9.25
2 2.25 4.5
HOJA DE METRADOS DE SS.HH
OBRA : CONSTRUCCION DELNIVEL SECUNDARIO DE LA INSTITUCION VILLA SAN CRISTOBAL
Dpto. : Ayacucho Dist. : Nazarenas
Prov.: Huamanga Lugar : Villa San Cristobal
PART. DESCRIPCION N° VEC. LARGO ANCHO ALTO PARCIAL TOTAL UND
05.05.02 CONTRAZOCALO DE CEMENTO S/COLOREAR H = 30 Cm 1 12.3 12.3 12.3 ML
05.06.00 CARPINTERIA DE MADERA
05.06.01 PUERTA MACHIMBRADA DE TORNILLO INCLUYE MARCO DE 2 x 3" 7.56 M2
P1 2 1 2.1 4.2P2 2 0.8 2.1 3.36
05.06.02 PUERTA CONTRAPLACADA 35 MM. CON MARCO TORNILLO 2X3" 6.48 M2
P3 6 0.6 1.8 6.48
05.06.03 VENTANA DE MADERA TORNILLO 4.5 M2
V-1 2 2.8 0.5 2.8
V-2 2 1.7 0.5 1.7
05.07.00 CERRAJERIA
05.07.01 BISAGRA CAPUCHINA DE 3 1/2 " X 3 1/2" CANTIDAD 30 PZA
P1 2 3 6
P2 2 3 6
P3 6 3 18
05.07.02 CERRADURA PARA PUERTA 02 GOLPES CANTIDAD 4 PZA
P1 2 1 2
P2 2 1 2
05.07.02 CERRADURA PARA PUERTAINTERIOR TIPO PERILLA CANTIDAD 6 PZA
P3 6 1 6
05.08.00 VIDRIO, CRISTALES Y SIMILARES
05.08.01 VIDRIO SEMI DOBLE PROVISION Y COLOCACION EN VENTANAS 48.3871 P2
V-1 2 2.8 0.5 2.8
V-2 2 1.7 0.5 1.7
05.09.00 PINTURA 50.35 M2
05.09.01 PINTURA LATEX 2 MANOS EN CIELO RAZO Y VIGAS
CIELO RASO 2 3.5 4.05 28.35
2 3.5 1.10 7.7
VA - 103 4 3.75 0.2 3
VA - 103 4 3.5 0.2 2.8
VS - 102 4 2.95 0.5 5.9
VP - D - 101 2 2.6 0.5 2.6
05.09.02 PINTURA LATEX 2 MANOS EN MUROS EXTERIORES INCLUIDO COLUMNAS 29.5165 M2
EJE 1- 1 ENTRE EJE A-C 1 4.02 2.6 10.452
EJE 3- 3 ENTRE EJE A-C 1 4.02 2.6 10.452
COLUMNA C-2 DE EJE A ÷ 1 - 3 1 0.5 3.25 1.625
COLUMNA C-6 DE EJE A ÷ 1 - 3 1 0.5 3.25 1.625
COLUMNA C-6 DE EJE B ÷ 1 - 3 1 0.5 3.25 1.625
COLUMNA C-2 DE EJE C ÷ 1 - 3 1 0.65 3.25 2.1125
COLUMNA C-6 DE EJE C ÷ 1 - 3 1 0.5 3.25 1.625
05.09.03 PINTURA LATEX 2 MANOS EN MUROS INTERIORES INCLUIDO COLUMNAS 50.4205 M2
EJE 1- 1 ENTRE EJE A-C 1 4.02 2.6 10.452
EJE 2- 2 ENTRE EJE A-C 2 4.02 2.6 20.904
EJE 3- 3 ENTRE EJE A-C 1 4.02 2.6 10.452
PAREDES DE BAÑO 6 0.75 1
COLUMNA C-2 DE EJE A ÷ 1 - 3 1 0.5 3.25 1.625
COLUMNA C-6 DE EJE A ÷ 1 - 3 1 0.5 3.25 1.625
COLUMNA C-6 DE EJE B ÷ 1 - 3 1 0.5 3.25 1.625
COLUMNA C-2 DE EJE C ÷ 1 - 3 1 0.65 3.25 2.1125
COLUMNA C-6 DE EJE C ÷ 1 - 3 1 0.5 3.25 1.625
05.09.04 PINTURA DE CONTRAZOCALO C/ESMALTE ECONOMICO 12.3 ML
CONTRAZOCALO DE CEMENTO S/COLOREAR H = 30 Cm 1 12.3 12.3
05.09.05 PINTADO DE PUERTAS DE MADERA C/ BARNIZ 2 MANOS 14.04 M2
P1 2 1 2.1 4.2P2 2 0.8 2.1 3.36P3 6 0.6 1.8 6.48
05.09.06 PINTADO DE VENTANAS DE MADERA C/ BARNIZ 2 MANOS 4.5 M2
V-1 2 2.8 0.5 2.8
V-2 2 1.7 0.5 1.7
HOJA DE METRADOS DE SS.HH
OBRA : CONSTRUCCION DELNIVEL SECUNDARIO DE LA INSTITUCION VILLA SAN CRISTOBAL
Dpto. : Ayacucho Dist. : Nazarenas
Prov.: Huamanga Lugar : Villa San Cristobal
PART. DESCRIPCION N° VEC. LARGO ANCHO ALTO PARCIAL TOTAL UND
06,00,00 INSTALACIONES SANITARIAS
06,01,00 SALIDA DE DESAGUE EN PVC 21 21.00 21.00 PTO
06,02,00 SUMIDERO DE BRONCE DE 2" 7 7.00 7.00 PTO
06,03,00 REGISTRO DE BRONCE DE 4" 4 4.00 4.00 PTO
06,04,00 REDES DE DISTRIBUCION
06,04,01 TUBERIA PVC SAL DE 4" 1 33.35 33.35 33.35 M
06,04,02 TUBERIA PVC SAL DE 2" 1 10.35 10.35 10.35 M
06,05,00 APARATOS Y ACCESORIOS SANITARIOS
06,05,01 INODORO TANQUE BAJO COLOR 7 7.00 7.00 PZA
06,05,02 LAVATORIO DE PARED DE COLOR 1 LLAVE 2 2.00 2.00 PZA
06,05,03 PAPELERA DE CERAMICA 2 2.00 2.00 UND
06,05,04 COLOCACION DE APARATOS SANITARIOS 9.00 PZA
INODORO TANQUE 7 7.00 7.00
LAVATORIO DE PARED 2 2.00 2.00
06,05,05 COLOCACION DE ACCESORIOS 2.00 UND
PAPELERA DE CERAMICA 2 2.00
06,05,06 CAJA DE REGISTRO DE DESAGUE 12" X 24" 3 3.00 3.00 PZA
06.06.00 SISTEMA DE AGUA FRÍA
06.06.01 SALIDA DE AGUA FRÍA 18 18.00 18.00 PTO
06.06.02 TUBERIA PVC CLASE 10 - 1" 1 53.06 53.06 53.06 M
06.06.03 TUBERIA PVC CLASE 10 - 1/2" 1 24.20 24.20 24.20 M
06.06.04 VALVULA COMPUERTA DE BRONCE DE UNION ROSCADA DE 1/2" 8 8.00 8.00 UND
06,07,00 SISTEMA DE DRENAJE PLUVIAL
06,07,01 CANALETA SEMICIRCULAR DE 6" PARA LLUVIA DE PLANCHA ALUMINIZADA 1 7.75 1.00 1.00 M
06,07,02 TUBERIA DE BAJADA PVC SAP 4" 2 2.00 2.00 UND
06.08.00 CANALETA DE CONCRETO
06.08.01 CONCRETO F`c=140 Kg/cm2 1 8.55 0.08 0.750 0.48 0.48 M3
06.08.02 ENCOFRADO 2 8.55 0.25 4.28 4.28 M2
07.00..0 INSTALACIONES ELECTRICAS
07.01.00 SALIDAS ELECTRICAS
07.01.01 SALIDA DE TECHO (CENTRO DE LUZ) 1 8.00 8.00 PTO
07.01.02 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC 1 4.00 4.00 PTO
07.02.00 TABLEROS Y CUCHILLAS (LLAVES)
07.02.01 TABLERO DE DISTRIBUCION TD-4 1.00 GLB
LLAVE TERMICA DE 2x50A 1 1.00 UND
LLAVE TERMICA DE 2x20A 2 2.00 UND
ALIMENTADOR CAB/ENERG. 2-85.1MM² TW-AWG/MCM 1 58.00
TUBERIA PVC SAP 1" 1 58.00
07.03.00 ARTEFACTOS
07.03.01 02 LAMPARAS FLUORESCENTE RECTO 40 W INC. EQUIPO Y PANTALL 1 2.00 2.00 UND
07.03.02 01 LAMPARA FLUORESCENTE CIRCULAR 32W INC. EQUIPO Y PANTALLA 1 4.00 4.00 UND
07.03.03 SOCKETE REFLECTOR CON LAMPARA AHORRADORA 18W 1 2.00 2.00 UND
HOJA DE METRADOS DE ACERO SS.HH
OBRA : CONSTRUCCION DELNIVEL SECUNDARIO DE LA INSTITUCION VILLA SAN CRISTOBALDpto. : Ayacucho Dist. : NazarenasProv.: Huamanga Lugar : Villa San Cristobal
PART. D E S C R I P C I O N
DIAM. Longitud en mts. parc.
(") N° VEC. No PZ. 1/4" 3/8" 1/2" 5/8" 3/4" (ml) parc. (kg) PARC. (kg)
04.01.03 COLUMNAS
C-2 3/8 6.00 4.00 3.6 86.40 48.38
1/4 6.00 30.00 0.94 169.20 42.30
C-6 3/8 9.00 4.00 3.6 129.60 72.58
ESTRIBO PARA VIGA PRINCIPAL ( 2-2 ) 3/8 3.00 25.00 1.12 84.00 47.04
TOTAL ACERO(KG.) 210.30
PART. D E S C R I P C I O N
DIAM. Longitud en mts. parc.
(") N° VEC. No PZ. 1/4" 3/8" 1/2" 5/8" 3/4" (ml) parc. (kg) PARC. (kg)
04.02.03
ACERO VIGAS PRINCIPALES(S.S.H.H)
Viga principal 102
VIGA SECUNDARIA 102 0.25X20 (1-1)
Acero superior 5/8 3.00 2.00 6 36.00 55.87
Acero inferior 1/2 3.00 2.00 3.15 18.90 18.79
VIGA PRINCIPAL 102 (2 - 2) (25 x 50)
Acero superior 5/8 3.00 2.00 3.6 21.60 33.52
Acero inferior 5/8 3.00 2.00 3.2 19.20 29.80
1/4 3.00 27.00 1.12 90.72 22.68
ESTRIBO PARA VIGA PRINCIPAL ( 2-2 ) 3/8 3.00 25.00 1.74 130.50 73.08
TOTAL ACERO(KG.) 233.74
PART. D E S C R I P C I O N
DIAM. Longitud en mts. parc.
(") N° VEC. No PZ. 1/4" 3/8" 1/2" 5/8" 3/4" (ml) parc. (kg) PARC. (kg)
04.02.03
ACERO EN VIGAS DE AMARRE
84.80
Acero principal 1/2" 2 4 8.15 65.2 64.81
estribos 1/4" 2 38 1.052 79.952 19.99
26.33
Acero principal 3/8" 1 4 8.15 32.6 18.26
estribos 1/4" 1 38 0.85 32.3 8.08
TOTAL ACERO(KG.) 111.13
PART. D E S C R I P C I O N
DIAM. Longitud en mts. parc.
(") N° VEC. No PZ. 1/4" 3/8" 1/2" 5/8" 3/4" (ml) parc. (kg) PARC. (kg)
04.03.03 ACERO EN LOSA ALIGERADA
ACERO DE TEMPERATURA (espaceado a 0.25m) 1/4" 29 1 5.4 156.6 39.15
TOTAL ACERO(KG.)
ACERO DE VIGUETA EN SS.HH .
Acero Negativo 1/2" 13 1 8.15 105.95 105.31
Acero Positivo 3/8" 13 1 5.20 67.6 37.86
TOTAL ACERO(KG.) 182.32
ESTRIBO PARA VIGA SECUNDARIA ( 1-1 )
ESTRIBO PARA VIGA SECUNDARIA ( 1-1 )
Eje 1-3 entre jes A-A , C-C VA- 103 ( 0.25 x 0.20 )
Eje 1-3 entre ejes C'-C' VA- 102 ( 0.15 x 0.20 )
HOJA DE METRADOS DE CERCO DE COLEGIO
OBRA : CONSTRUCCION DELNIVEL SECUNDARIO DE LA INSTITUCION VILLA SAN CRISTOBAL
Dpto. : Ayacucho Dist. : Nazarenas
Prov.: Huamanga Lugar : Villa San Cristobal
PART. DESCRIPCION N° VEC LARGO ANCHO ALTO PARCIAL TOTAL UND
01.00.00 OBRAS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL 1.00 6.00 6.00 36.00 36.00 M2
02,00,00 MOVIMIENTO DE TIERRAS
02.01.00 EXCAVACIÓN DE ZAPATAS Y ZANJAS DE CIMENTACIÓN 8.47 M3
C-7 (CANTIDAD 4) 2.00 AREA 1.33 0.80 2.13
2.00 AREA 1.33 0.40 1.06
Z-4 2.00 1.00 1.00 1.60 3.20
EXCAVACION PARA ESACALERA 1.00 AREA 1.33 1.50 2.00
EXCAVACION PARA UÑAS 1.00 AREA 1.12 0.07 0.08
02.02.00 ELIMINACION MATERIAL EXCEDENTE 10.6 M3
ELIMINACIÓN (25% COEFIC. DE ESPONJAMIENTO) 1,25 COE% Esponj. = 1.25 Volum. 8.47
03.00.00 CONCRETO SIMPLE
03.01.00 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA 5.33
CIMIENTO CORRIODO 2.00 AREA 1.33 0.80 2.13
2.00 1.00 1.00 1.60 3.20
03.02.00 SOLADO DE ZAPATA
SOLADO PARA ZAPATAS DE 3" MEZCLA 1:12 CEMENTO - HORMIGON 0.15 M3
2.00 1.00 1.00 0.08 0.15
03.03.00 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS 0.30 M3
2.00 1.74 0.25 0.35 0.30
03.04.00 ENCOFRADO Y DEDESENCOFRADO SOBRECIMIENTO HASTA 0.30 MT 1.22 M2
2.00 1.74 0.35 1.22
03.05.00 FALSO PISO DE 4" DE CONCRETO 1:10 2.88 M3
DESCANSO 1 1.00 3.00 1.20 0.10 0.36
DESCANSO 2 1.00 1.50 1.20 0.10 0.18
PELDAÑO 13.00 1.50 1.20 0.10 2.34
03.06.00 NIVELACION INT.Y APISONADO 4.62 M2
Z-4 2.00 1.00 1.00 2.00
ZANJAS DE CIMENTACION 1.00 2.60 0.50 1.30
1.00 2.63 0.50 1.32
HOJA DE METRADOS DE CERCO DE COLEGIO
OBRA : CONSTRUCCION DELNIVEL SECUNDARIO DE LA INSTITUCION VILLA SAN CRISTOBAL
Dpto. : Ayacucho Dist. : Nazarenas
Prov.: Huamanga Lugar : Villa San Cristobal
PART. DESCRIPCION N° VEC LARGO ANCHO ALTO PARCIAL TOTAL UND
03.07.00 AFIRMADO DE 3" PARA PATIOS Y VEREDAS 27.00 M2
DERSCANSO 1 1.00 2.90 1.20 3.48
DERSCANSO 2 1.00 1.40 1.20 1.68
PELDAÑO 13.00 1.40 1.20 21.84
4,00,00 CONCRETO ARMADO
4,01,00 ZAPATAS
4.01.01 CONCRETO EN ZAPATAS F'C=210 KG/CM2 1.20 M3
Z-4 2.00 1.00 1.00 0.60 1.20
4.01.02 ACERO DE ZAPATA Fy = 4200 KG/CM2 (VER HOJA DE METRADOS DE ACERO) 62.62 KG
04.02.00 COLUMNAS
04.02.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 1.71 M3
C-7 1.00 AREA 0.095 3.90 0.37
C-7 2.00 AREA 0.095 3.30 0.63
C-7 1.00 AREA 0.095 2.80 0.27
C-6 2.00 0.25 0.25 3.60 0.45
04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS 23.69 M2
C-7 1.00 1.24 3.90 4.84
C-7 2.00 1.24 3.30 8.18
C-7 1.00 1.24 2.80 3.47
C-6 2.00 1.00 3.60 7.20
4.02.03 ACERO DE COLUMNA Fy = 4200 KG/CM2 (VER HOJA DE METRADOS DE ACERO) 193.40 KG
04.03.00 VIGAS
04.03.01 CONCRETO F'C= 210 KG/CM2. EN AULAS 0.58 M3
1.00 2.75 0.25 0.20 0.14
1.00 3.61 0.25 0.20 0.18
1.00 3.55 0.25 0.30 0.27
HOJA DE METRADOS DE CERCO DE COLEGIO
OBRA : CONSTRUCCION DELNIVEL SECUNDARIO DE LA INSTITUCION VILLA SAN CRISTOBAL
Dpto. : Ayacucho Dist. : Nazarenas
Prov.: Huamanga Lugar : Villa San Cristobal
PART. DESCRIPCION N° VEC LARGO ANCHO ALTO PARCIAL TOTAL UND
04.03.02 ENCOFRADO Y DESENCOFRADO 7.15 M2
1.00 2.75 0.65 1.79
1.00 3.61 0.65 2.35
1.00 3.55 0.85 3.02
04.03.03 ACERO EN VIGAS DE CIMENTACION Fy=4200kg/cm² EN A (VER HOJA DE METRADOS DE ACERO) 71.74 KG
05.00.00 ARQUITECTURA
05.01.00 MUROS Y TABIQUES DE ALBAÑILERÍA
05.01.01 MURO DE LADRILLO CORRIENTE DE CABEZA CEMT-AREN 8.23
1.00 2.91 1.96 5.70
1.00 2.30 1.10 2.53
05.02.00 REVOQUES ENLUCIDOS Y MOLDURAS
05.02.01 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA 2.66
4.00 1.77 0.25 1.77
2.00 1.77 0.25 0.89
05.02.02 EJECUCION DE BRUÑAS 28.82 ML
05.02.03 2.00 9.91 19.82
9.00 1.00 9.00
05.03.00 CONTRAZOCALO
CONTRAZOCALO CEMENTO S/C0LORAR H =30 CM
17.60 ML
2.00 8.80 17.60
05.04.01 CERRAJERIA
05.04.02 PUERTAS METALICAS CON MARCOS Y REFUERZOS INCLUYE COLOCACION 15.60 M2
P-9 2.00 3.00 2.20 13.20
R-1 1.00 2.00 1.20 2.40
05.04.03 CHAPA TIPO FORTE 40mm.CON DOS GOLPES(LLAVE EXT. E INTERIOR ) 2.00 PZA
1.00 2.00
05.05.00 PINTURA
05.05.01 PINTURA LATEX 2 MANOS EN MUROS EXTERIORES INCLUIDO COLUMNAS 12.21 M2
1.00 2.91 1.96 5.70
1.00 2.30 1.10 2.53
4.00 1.77 0.25 1.77
5.00 1.77 0.25 2.21
05.05.02 PINTURA DE PUERTAS DE CON ESMALTE EN CIELO RAZO Y VIGAS 16.56
4.00 2.40 1.25 12.00
2.00 1.90 1.20 4.56
05.05.03 PINTURA DE CONTRAZOCALO C/ESMALTE ECONOMICO 17.60 ML
2.00 8.80 17.60
HOJA DE METRADOS DE ACERO DE CERCO DE COLEGIO
OBRA : CONSTRUCCION DELNIVEL SECUNDARIO DE LA INSTITUCION VILLA SAN CRISTOBAL
Dpto. : Ayacucho Dist. : Nazarenas
Prov.: Huamanga Lugar : Villa San Cristobal
PARTIDAD E S C R I P C I O N
DIAM. Longitud en mts. parc. parc.
(") N° VEC. No PZ. 1/4" 3/8" 1/2" 5/8" (ml) (kg) TOTALC. (kg)
4.01.02ZAPATA
1/2 2.00 10.00 3.15 63.00 62.62
TOTAL ACERO(KG.) 62.62
PARTIDAD E S C R I P C I O N DIAM. Longitud en mts. parc.
(") N° VEC. No PZ. 1/4" 3/8" 1/2" 5/8" (ml) parc. (kg) TOTALC. (kg)
ACERO COLUMNA
5.03.00 C-7 1/2 1.00 6.00 3.90 23.40 23.26
C-7 1/2 2.00 6.00 3.30 39.60 39.36
C-7 1/2 1.00 6.00 2.80 16.80 16.70
C-6 1/2 2.00 4.00 3.60 28.80 44.64
ESTRIBO C-7 1/4 4.00 28.00 2 224.00 56.00
ESTRIBO C-6 1/4 2.00 28.00 0.96 53.76 13.44
TOTAL ACERO(KG.) 193.40
PARTIDAD E S C R I P C I O N
DIAM. Longitud en mts. parc.
(") N° VEC. No PZ. 1/4" 3/8" 1/2" 5/8" (ml) parc. (kg) TOTALC. (kg)
6.03.000 ACERO VIGA DE AMARRE
va -104 1/2 2.00 2.00 3 12.00 11.93
va -103 1/2 1.00 2.00 1.96 3.92 3.90
va -103 1/2 1.00 2.00 1.18 2.36 2.35
va -103 1/2 1.00 2.00 1.14 2.28 2.27
1/4 3.00 76.00 0.9 205.20 51.30
TOTAL ACERO(KG.) 71.74
ESTRIBO