MCP Magic Box
OBJECTIVES1. Talk about the implementation of a more
Bottom up culture 2. Leading your team in the moment of
final sprint | planning your term in a bottom up culture (elects)
BOTTOM UP CULTURE
Planning your Bottom Up Culture
Leading your TEAM for this Culture
Leading your LCPs for this Culture
Leading your NETWORK for this Culture
BOTTOM UP CULTURE
Planning your Bottom Up Culture
Leading your TEAM for this Culture
Leading your LCPs for this Culture
Leading your NETWORK for this Culture
1. Send a survey or make some calls with your LCPs: what is the kind of culture they see in the organization now?
2. Start the discussion with your MC about the current and desire state until the end of the year for your entity ( we are in 2015, time to think further than your term)
3. If you are elect, start this discussion already with your elect MC team and already make a survey with your network before even start your transition (this way you will have a lot of insights already for your planning)
4. Start planning!
Current State
Desired State
Action Target Frequency Date
• Empowerment • Team Orienta0on • Capability Development
• Core Values • Agreement • Coordina0on & Integra0on
• Learning • Change • Customer
• Strategic Direc0on and Intent
• Goal and Objec0ve • Vision
Mission Adaptability
Involvement Consistency
• Goal Setting MC and LCs• MC Vision and Team Stand• MC & LCs Planning &
Projects
• Openness to inputs from customers – NPS Usage
• Flexibility to change – Implementation
• Communicating Values and Ethics and applying them in decision making
• Bigger Picture within LC and Entity
• Governance – Compendium• Reward & Recognition
• Authority, Ownership and Responsibility of work
• Structure• Team goals and
accountability• Spaces to learn - Local and
National Learning cycles• Constructive discussion of
conflicting ideas
BOTTOM UP CULTURE
Planning your Bottom Up Culture
Leading your TEAM for this Culture
Leading your LCPs for this Culture
Leading your NETWORK for this Culture
1. Make the right questions: bring this topic for discussion in your team
2. LEAD can be a powerful tool: use it for growth of your MC members
3. Revise with them the Support system they have been giving and how you can involve the network much more in the strategies creation
4. Make sure you are giving the trust your MC members need to make things happen
5. Make sure all your MC is on the same page: goals and objectives
BOTTOM UP CULTURE
Planning your Bottom Up Culture
Leading your TEAM for this Culture
Leading your LCPs for this Culture
Leading your NETWORK for this Culture
1. Use the internal comm channels to understand your LCPs better: weekly newsletter, webnairs and calls
2. Stories inspire: make sure you are also sharing your xp with them
3. Have your support group: using Steering team can be a good way to get constant inputs and feedbacks
4. Remember your LCPs are working to become better leaders: provide the space they need to learn it (LEAD, Summits and talks)
BOTTOM UP CULTURE
Planning your Bottom Up Culture
Leading your TEAM for this Culture
Leading your LCPs for this Culture
Leading your NETWORK for this Culture
1. Not all the strategies need to come from the MC: use your best LCVPs to build the strategies with you – they will feel more empowered too
2. Again, stories inspire: make sure you have a constant channel for communication
3. Recognition: recognize those entities that are bringing GCPs and growing – they will feel also empowered and will want to do more
4. Guarantee that you have a good educational cycle that your members can constant learn from the MC and the network