MaxEva workshop
How to use the database MaxEva for- planning, - data sampling,- benchmarking of MM project
Pernilla Hyllenius, Trivector Traffictogether with Hanna Wennberg and Paulina Eriksson
Today we will…- have an introduction of MaxSumo- have an introduction of MaxEva- have a real case application (Bromley Travel Plan) where you learn how to:
- register a project
- enter data
- have an overview of obtained results
- use MaxEva for benchmarking
2
A long history…- 2002: MOST-MET
- 2004: SUMO Swedish standard evaluation tool for MM- 2008: SARA Swedish database built on SUMO- 2009: MaxSumo European standard evaluation tool for MM
MaxEva European database built on MaxSumo
3
MaxSumoA tool that gives guidance on how to plan, monitor and evaluate an MM-project
With focus on assessment of:
- The awareness of the project
- The change in attitudes towards a mobility shift
- The change in mobility behaviour
4
Mobility Management
System impact
MaxSumo
5
Mobility Management
Mobility Management
services
New mobility options
System impacts System impacts
Assessment Levels
A
Project activities and outputs
B Awareness of mobility services provided
C Usage of mobility services provided
Assessm
ent of services
provided
D Satisfaction with mobility services provided
E Acceptance of mobility option offered
F Take up of mobility option offered
Assessm
ent of m
obility
option
s offered
G Satisfaction with the mobility option offered
H Long-term attitudes and behaviour
Overall
effects I System impacts
Example: Test Traveller / Job ticket projectFramework conditions
Person-rel. factors Travel behaviour before: 5 % PT, 95 % car
Assessm
ent o
f services p
rovid
ed
MM project details: 10 posters, Intra net info, 4 meetings, 10000 E
Awareness: 48 % (480 employees)
Usage: 28 % (280 employees) particip. in info-meet.
Satisfaction: 80 % satisfied with info and test concept
Mo
bility o
ptio
n o
ffered
Acceptance: 6 % (54 people) signed a contract
Take up: During test month: 85 % PT, 15 % car
Satisfaction: 90 % of TT satisfied with commuting by PT
Effects
Long-term att & beh: After 12 months: 40 % PT, 60 % car
System impacts: Car traffic: 110.000 km, CO2: 20 tonnes
7
• Interactive database with input and output modules• Based on MaxSumo and SARA• Repository for results from MM projects using MaxSumo • Precursor of a predictive tool
• Single measures• Plans or programs
MaxEva web-based database
• Overview of needed data for an evaluation
• Easy and quick overview of your obtained results • Help to calculate the environmental effects (CO2)
• Overview of results from other projects• Possibility to benchmark your results with other´s
MaxEva gives you
MaxEva input• Measure• Measure description (goal, target group, services and option
offered)• Measure settings (where, type of PT/bicycle supply etc)• Data on:
- External factors
- Stage position
- Travel behaviour
- MaxSumo level A: Performed activities
- MaxSumo level B-H: Awareness, Usage, Satisfaction, Acceptance, Take up
You find MaxEva and MaxSumo at
www.epomm.org
11
1. MaxExplorer
2. MaxQ
3. MaxSem
4. MaxSumo
5. MaxEva
6. MaxTag
7. MaxLupo
Let´s practice!Start
1. Start MaxEva via www.epomm.org
Register a project2. Select “Register a new project”
3. Fill in “Project description”
4. Fill in “Monitoring data”
5. Have a look at “Results”
6. Approve your data
Benchmark7. Select “Benchmarking”