7/31/2019 Manufacturing of Turbo Genrators
1/27
A Presentation on
Presented by:Akshay Dhaka
B-Tech, Final Year(ECE)
www.powerpointpresentationon.blogspot.com
7/31/2019 Manufacturing of Turbo Genrators
2/27
7/31/2019 Manufacturing of Turbo Genrators
3/27
So, what is special about the holy cityHaridwar:-The City Of Gateway To
GODPlaces of interests in Haridwar: Chandi devi Mansa devi Maya devi Har-ki-pauri
Daksh mahadevtemple
Bharat mata mandir
Sati kund Sapt rishi ashram
7/31/2019 Manufacturing of Turbo Genrators
4/27
BHELAn Overview
In 1950s: At Bhopal with British collaboration30MW &120MW hydrogen cooled.
In 1960s: At Haridwar with Russiancollaboration
100MW & 200MW hydrogen cooled. In1970s: At Hyderabad with Germany
collaboration60MW air cooled.
7/31/2019 Manufacturing of Turbo Genrators
5/27
7/31/2019 Manufacturing of Turbo Genrators
6/27
Complex is situated atthe foot hills of Shivalikrange Haridwar districtof Uttaranchal state.
7/31/2019 Manufacturing of Turbo Genrators
7/27
7/31/2019 Manufacturing of Turbo Genrators
8/27
7/31/2019 Manufacturing of Turbo Genrators
9/27
Principle ofoperation:The a.c
generators workson the principle
ofELECTROMAGNETIC
INDUCTION.
7/31/2019 Manufacturing of Turbo Genrators
10/27
Stator is the stationary,outer part of generatorwhich is used for housingthe rotor.
Rotor is the rotating partof the generator whichrotates in b/w themagnetic field provided bystator.
7/31/2019 Manufacturing of Turbo Genrators
11/27
End Plates (2 nos per generator) End Packets Ventilation stampings Insulating stampings ( b/w the core) Insulating studs ( b/w the sheets) Core bas Baskets (3 nos) Compressing rings
Hydraulic press Heating units.
7/31/2019 Manufacturing of Turbo Genrators
12/27
Stator
Stator frameIt is made up of steel iron with weldingprocess.
Stator core Silicon steel laminations are used. Ventilation is used in b/w the packets.
In a typical 350 MW generator-116packets
are used (55,47,36 Si sheets in each
packets)
7/31/2019 Manufacturing of Turbo Genrators
13/27
Copper bar VPI windings are used. Two types of bars are used in
stator.1. Upper
2. lower
Upper and lower bars are further divided into3 categories:
a) Normal bar b) Mid-phase bar c) Phase bar
7/31/2019 Manufacturing of Turbo Genrators
14/27
With 3 types of bars we get total 6 terminals, whichare connected in star to get 3 phases and a neutralpoint.
These bars are connected according to
SLOT-PITCH.
Finally upper and lowerbars are connected through
BRAZING.
7/31/2019 Manufacturing of Turbo Genrators
15/27
These rotor shaft are brought from theGermany.
Slots are made over it.
For a typical 500MW generator:- 2 groups of 14 main slots are cut.(diametrically opposite )
Damper slots are then made over it. Finally cross pole slots are made over theshaft.
7/31/2019 Manufacturing of Turbo Genrators
16/27
Main slots 38 degrees from centre line, then each
slots are at 8 degrees apart. Between two slots, distances are:
a) 50.9mm at front.b) 36.7mm at rear.c) 196.5mm depth.
Damper slots 22 deg. from centre line.Cross pole slots Breadth 10.5mm, Depth 110mm.
7/31/2019 Manufacturing of Turbo Genrators
17/27
2 pole, 3000rpm, 50Hz. Total slots=(14+14=28). 11 conductors in each slot. F type insulation is used in b/w two coils of 2mm
thickness. Diametrically opp. slots are connected in series. Holes are provided for passing hydrogen. Liners are placed over the slot portion wdg. To keep
them intact at one position. Returning rings are provided in the overhead portionfor keeping the wdg. intact at one position.
7/31/2019 Manufacturing of Turbo Genrators
18/27
7/31/2019 Manufacturing of Turbo Genrators
19/27
After the manufacturing of both the stator androtor, these are assembled together at theassembly bed.
7/31/2019 Manufacturing of Turbo Genrators
20/27
It is the process by which theelectrical conductivity of any materialincreases at around 100 times.
7/31/2019 Manufacturing of Turbo Genrators
21/27
Uses VPI technology.( Vapour pressure impregnation)
Uses resins in the tank.
Explosion proof software controlled
oven with rotator facility.
7/31/2019 Manufacturing of Turbo Genrators
22/27
Rotor withdrawal during initial inspectionnot required.
Possibility of loosening and fastening ofcore eliminated.
Big savings in spares' cost.
Additional revenue of approx 3750 lakhs.
7/31/2019 Manufacturing of Turbo Genrators
23/27
Improved Heat transfer during operation.
Manufacturing cycle time reduces by 4-5months.
Mechanically firm binding b/w core and
winding components, better suitedagainst thermal stress.
7/31/2019 Manufacturing of Turbo Genrators
24/27
Electrical tests. Open circuit test. Short circuit test. Milivolt test.
Partial discharge test.Mechanical tests. Vibration test. Temperature test.
tan test ( Software operated ).
7/31/2019 Manufacturing of Turbo Genrators
25/27
Atlast, after all the manufacturingprocesses and testings, the journey of theGenerator starting from Germany to the
BHEL has come to an end.
Now its time for the generator to say Bye-Bye to BHEL(HARIDWAR)
7/31/2019 Manufacturing of Turbo Genrators
26/27
7/31/2019 Manufacturing of Turbo Genrators
27/27