Lean 6S TrainingLean 6S TrainingMercy Medical CenterMercy Medical Center
5046 LDLEAN6S - Version 8/20/2009
22
What are the 8 Forms of Waste?What are the 8 Forms of Waste?
What is 6S?What is 6S?
How do I conduct a 6S?How do I conduct a 6S?
Examples of Mercy 6S resultsExamples of Mercy 6S results
33
8 Forms of Waste8 Forms of Waste
1.1. WASTED HUMAN TALENTWASTED HUMAN TALENT
2.2. DEFECTSDEFECTS
3.3. INVENTORYINVENTORY
4.4. OVERPRODUCTIONOVERPRODUCTION
5.5. WAITING TIMEWAITING TIME
6.6. MOTIONMOTION
7.7. TRANSPORTATIONTRANSPORTATION
8.8. PROCESSING WASTEPROCESSING WASTE
44
Not asking the staff that works the process how to improve it
1. Wasted Human Talent1. Wasted Human Talent
I’ve made a few changes to the
process.
StaffStaff
StaffStaff
StaffStaff
ManagerManager
I wish someone would ask OUR
opinion…!
StaffStaff
StaffStaff
55
@*&#!!
A negative outcome from process failureA negative outcome from process failure
2. Defects2. Defects
Another defect!!
66
Items in greater quantities than can be immediately Items in greater quantities than can be immediately processed or used.processed or used.
3. Inventory3. Inventory
Did I really order this much??
77
Generating more work than is really requiredGenerating more work than is really required
4. Over Production4. Over Production
StaffStaff
Hey…are these multiple orders for the same thing? @#$&*!!
I didn’t get my order yet… I’ll send another
fax.
PharmacistPharmacist
88
People waiting for items (patients, supplies, People waiting for items (patients, supplies, specimens, etc.) to processspecimens, etc.) to process
5. Waiting5. Waiting
99
Unnecessary human movementUnnecessary human movement
6. Motion6. MotionWhy can’t I get anything done?
1010
Unnecessary movement or relocation of itemsUnnecessary movement or relocation of items
7. Transportation7. Transportation
I have orders to run some tests.I’ll bring the
patient right over.
Waiting Area
Sigh…..!!
1111
8. Over Processing8. Over Processing
Please approve.
Please approve.
Please approve.
Please approve.
Please approve.
Please approve.
1212
8. Over Processing8. Over Processing
I’m the final approval.
The final approval?!!
Applying effort to activities that are not required Applying effort to activities that are not required in the processin the process
Please approve.
+
???
1313
1.1. SortSort
2.2. StraightenStraighten
3.3. ScrubScrub
4.4. StandardizeStandardize
5.5. SustainSustain
What is 6S?What is 6S?
6.6. SafetySafety
1414
Step 1: SortStep 1: Sort
Separate the needed from the not neededSeparate the needed from the not needed
Before After
1515
Step 2: StraightenStep 2: Straighten
A place for everything & everything in its place!
BEFOREBEFORE AFTERAFTER
1616
Step 3: Scrub (inspect)Step 3: Scrub (inspect)
Regularly “scrub” to ensure everything is in Regularly “scrub” to ensure everything is in perfect working conditionperfect working condition
“Scrub” and inspect equipment to ensure it is in perfect working condition...
Add inspecting equipment into your work routine.
1717
Step 4: StandardizeStep 4: Standardize
Standard Work requires determining the best method then following that method every time.
Note: Blue taped outlines and labels ensure equipment is quickly found and returned to the same spot every time.
1818
Visual Controls ensure that Visual Controls ensure that anyoneanyone can find what they can find what they need in a matter of moments.need in a matter of moments.
Note labels and Note labels and instructionsinstructions
Step 4: StandardizeStep 4: Standardize
1919
Step 5: SustainStep 5: Sustain
Develop a method for sustaining your gainsDevelop a method for sustaining your gains
2020
Step 6: SafetyStep 6: Safety
Safety is a top priority in all that you do!Safety is a top priority in all that you do!
Safety first when determining where items Safety first when determining where items are to be located:are to be located: Keep fire hydrants clearKeep fire hydrants clear
Electrical a safe distance from plumbing Electrical a safe distance from plumbing
All items accessible - Not too high, not too lowAll items accessible - Not too high, not too low
Uncluttered traffic areas - no tripping hazardsUncluttered traffic areas - no tripping hazards
Emergency phone numbers and procedures Emergency phone numbers and procedures prominently postedprominently posted
2121
How do I Conduct a 6S?How do I Conduct a 6S?
2222
Preparation Preparation
Observe the process first hand (Gemba Observe the process first hand (Gemba walk)walk)
Create a spaghetti diagram - Create a spaghetti diagram - a hand a hand drawn map of your process including:drawn map of your process including: Tasks in the sequence they are done Tasks in the sequence they are done Location of supplies and equipmentLocation of supplies and equipment Measure distance traveled and time spent Measure distance traveled and time spent
searching or waitingsearching or waiting
Good preparation is the key to successful results!Good preparation is the key to successful results!
2323What forms of “Waste” can you identify?
AncillaryTesting
Supply Room
ChartRack
TubeStation
Printer
Patient’s Room
Nurse’s Station
Med Room
ReportRoom
200 feet
100 feet
150 feet
250 feet
200 feet
150 feet
200 feet
300 feet
1,550 Feet
Time & Distance Traveled - Before
Spaghetti DiagramSpaghetti Diagram
Dedicated Staff
108 min
16 min
16 min
11 min
21 min
11 min
1 min
31 min
1 min
15 min – searching
For supplies
15 min – searching
for meds
20 min – searchingFor printer paper
10 min – waiting for
meds tube system
10 min – searching
for PT chart
2424
What would you do to improve?What would you do to improve?
Sort out the need from the not neededSort out the need from the not needed
Have a place for everything so there is no searchingHave a place for everything so there is no searching
Move supplies or equipment closer to where they are Move supplies or equipment closer to where they are neededneeded
Co-locate tasks or peopleCo-locate tasks or people
Change the sequence in which tasks are doneChange the sequence in which tasks are done
Be creative with your solutions – you, after all, are Be creative with your solutions – you, after all, are the expert!the expert!
How Can We Improve?How Can We Improve?
Applying 6S eliminates waste!
2525
Spaghetti DiagramSpaghetti Diagram
No Searching or Waiting - AfterNo Searching or Waiting - After
Reduced travel by 1150 ft & search time by 68 min.Reduced travel by 1150 ft & search time by 68 min.
Chart Rack
AncillaryTesting Printer
TubeStation
Nurse’sStation
Patient’sRoom
Med Room
Supply Room
ReportRoom
30 sec – 6S on
supply room
60 sec – 6S on
Med room
Dedicated Staff
I’ve found my “dream” job!
40 min
1.5 min
2 min
1.5 min
1.5 min
1.5 min
1 min
30 min
1 min
30 sec –
6S on
chart r
ack
30 sec – Paper checked
@ end of each shift
30 sec – Indicator light
installed on tube system
400 ft
50 feet
50 feet
50 feet
50 feet
50 feet
50 feet
50 feet
50 feet
2626
Suggest you insert some before and after Suggest you insert some before and after pictures/examples of 6S results in the next pictures/examples of 6S results in the next few slides.few slides.
2727
Simulation – Round 1Simulation – Round 1
2828
Instructions to the ClassInstructions to the ClassWorkerWorker Gather White, Yellow and Blue sheets of paperGather White, Yellow and Blue sheets of paper Paper clip the sheets together Paper clip the sheets together Place in a folderPlace in a folder Place post-it on the outside of the folderPlace post-it on the outside of the folder Place folder and contents on the chair (to be picked up by Place folder and contents on the chair (to be picked up by
a delivery person)a delivery person)
ManagerManager Create a spaghetti diagram:Create a spaghetti diagram: Draw the room layout, identifying the location of the Draw the room layout, identifying the location of the
supplies used in the simulationsupplies used in the simulation As Participant #1 walks the process, trace his/her As Participant #1 walks the process, trace his/her
footsteps on the spaghetti diagramfootsteps on the spaghetti diagram
2929
Instructions to the ClassInstructions to the Class
Efficiency Expert #1Efficiency Expert #1 Count the number of steps Person #1 travels from beginning to Count the number of steps Person #1 travels from beginning to
end in the process.end in the process.
Efficiency Expert #2 Efficiency Expert #2 Track how much time Participant #1 takes to do the entire Track how much time Participant #1 takes to do the entire
processprocess Track how much time is wasted waiting and/or searchingTrack how much time is wasted waiting and/or searching
CustomerCustomer Do a quality inspection on the finished product against the Do a quality inspection on the finished product against the
sample provided to you by the Instructorsample provided to you by the Instructor
Co-workers (Rest of Class)Co-workers (Rest of Class) Identify the 8 Forms of Waste in our processIdentify the 8 Forms of Waste in our process Identify possible ideas for improvementIdentify possible ideas for improvement
3030
Quantifying the ResultsQuantifying the Results
Capture the Results from Round 1
3131
What Are the Results?What Are the Results? Manager Manager
What does the spaghetti diagram show us?What does the spaghetti diagram show us?
Efficiency Expert #1Efficiency Expert #1 How many steps did it take for the worker to do the process?How many steps did it take for the worker to do the process?
Efficiency Expert #2Efficiency Expert #2 How much time did the entire process take?How much time did the entire process take? How much time was wasted waiting and/or searching?How much time was wasted waiting and/or searching?
CustomerCustomer Was the customer happy with the service provided (quality Was the customer happy with the service provided (quality
inspection)?inspection)?
Rest of ClassRest of Class Identify forms of waste in the processIdentify forms of waste in the process Include possible ideas for improvementInclude possible ideas for improvement
3232
What Waste Did You Observe?What Waste Did You Observe?
1.1. Wasted Human TalentWasted Human Talent
2.2. DefectsDefects
3.3. InventoryInventory
4.4. Over ProducingOver Producing
5.5. WaitingWaiting
6.6. MotionMotion
7.7. TransportationTransportation
8.8. Over ProcessingOver Processing
3333
How Can We Use 6S to Improve?How Can We Use 6S to Improve?
1.1. SortSort – – Separate the needed from the not neededSeparate the needed from the not needed
2.2. StraightenStraighten – – A place for everything and A place for everything and everything in its placeeverything in its place
3.3. ScrubScrub – – Ensure everything is in perfect working Ensure everything is in perfect working conditioncondition
4.4. Standardize – Standardize – Determine the best method – Determine the best method – visual queues, labeling, etc.visual queues, labeling, etc.
5.5. Sustain – Sustain – Develop Standard WorkDevelop Standard Work
6.6. Safety – Safety – Safety first at all timesSafety first at all times
3434
Simulation – Round 2Simulation – Round 2
3535
Instructions to the ClassInstructions to the Class
Now that you have identified the waste and the Now that you have identified the waste and the opportunities for improvement in the processopportunities for improvement in the process
Put your recommended improvements in placePut your recommended improvements in place
We’ll run the simulation a second time We’ll run the simulation a second time
Then we’ll measure the results…Then we’ll measure the results…
……..and celebrate our success!!and celebrate our success!!
3636
Quantifying the ResultsQuantifying the Results
Capture the Results from Round 2