Jasper Avenue New VisionA major catalyst project identified in the Capital City Downtown Plan
J O I N T V E N T U R E
Public Event
Today
11:30 a.m. – 1:30 p.m.
4:30 p.m. – 8:00 p.m.
Jasper Avenue New VisionA major catalyst project identified in the Capital City Downtown Plan
J O I N T V E N T U R E
Public EventJanuary 18, 201811:30 a.m. - 1:30 p.m.4:30 p.m. - 8:00 p.m.
Today you can:• Learn about the Jasper Avenue New
Vision project (92 Street to 109 Street)• Ask questions of our project team• Share your ideas and comments to help
shape the streetscape design
Jasper Avenue New VisionA major catalyst project identified in the Capital City Downtown Plan
J O I N T V E N T U R E
WhereJasper Avenue between 92 Street and 109 Street.
WhatMaking Jasper Avenue more pedestrian friendly by widening existing sidewalks, installing street furniture, replacing street light and signal poles and evaluating parking along the corridor to feature a high-quality pedestrian experience that will support area businesses and attract visitors.
WhyTo re-establish Jasper Avenue as a main street, a place all Edmontonians can be proud of, and a symbol of the vitality of the downtown and Edmonton as a whole.
When• Construction between 100 Street and 102 Street took place in
2013• Planning and design is underway for the remainder of the study
area• Construction between 96 Street and 100 Street is planned
for 2019 and 2020 to coincide with Shaw Conference Centre rehabilitation under Jasper Avenue
• Construction timelines for other areas have not yet been determined
107 ST.
106 ST.
103 ST.
102 ST.
101 ST.
104 ST.
105 ST.
101A AVE.
JASPER AVE.
JASP
ER A
VE.
100 ST.
99 ST.
97 ST.
THORNTON CT.
94A ST.
102A AVE.
94 ST.
95 ST.
96 ST.
(102 AVE.)108 ST.
109 ST.
110 ST.
111 ST.
92 ST.
93 ST.
91 ST.
Jasper Avenue New VisionA major catalyst project identified in the Capital City Downtown Plan
J O I N T V E N T U R E
BackgroundJasper Avenue is a main street. With downtown development on the rise, now is the time for transformation.
Published in 2011, the Toward a New Vision for Jasper Avenue report contained the new vision for Jasper Avenue’s streetscape and city-building initiatives that will surround it.
The underlying principle is the revitalization of Jasper Avenue’s streetscape so it can serve as a catalyst for private sector reinvestment, continued renewal, and positive change throughout the corridor. The development of the report included consultation with businesses and other stakeholders.
Jasper Avenue New Vision is the next step of redevelopment.
Working from the vision, with consideration for the City’s Main Streets Guideline (2016), the City is undertaking concept planning for the avenue.
The Shaw Conference Centre requires rehabilitation work under Jasper Avenue. Preliminary design is being prioritized for Jasper Avenue between 96 Street and 100 Street so construction can coincide with rehabilitation work required for the Shaw Conference Centre.
A parallel study called Imagine Jasper Avenue is progressing redevelopment of Jasper Avenue from 109 Street to 124 Street.
Jasper Avenue New VisionA major catalyst project identified in the Capital City Downtown Plan
J O I N T V E N T U R E
Jasper Avenue New Vision and Imagine Jasper Avenue
97 ST
95 ST
101
ST109
ST
104 AVE
87 AVE
WHYTE (82) AVE
118 AVE
116
ST
82 S
T
KINGSWAY
124
ST
98 AVE
ROWLAND RD
105
ST
107 AVE
100 AVE
97 AVE
111 AVE
IMAGINE JASPER NEW VISION
N
Two related projects are underway on Jasper Avenue: • Jasper Avenue New Vision (92 Street to 109 Street)• Imagine Jasper Avenue (109 Street to 124 Street)
Both projects are intended to create a cohesive streetscape along the entire avenue from 92 Street to 124 Street. Specific design aspects will reflect the demographics and built form along each project area.
The goals of both studies are to:• Improve the pedestrian space on Jasper Avenue.• Create a main street destination while maintaining the
commuter corridor as a key transportation link.
The project teams are working together to ensure continuity along the avenue.
Jasper Avenue New VisionA major catalyst project identified in the Capital City Downtown Plan
J O I N T V E N T U R E
Design Elements • Wider sidewalks to increase pedestrian space• Narrowed roadway that maintains same number of travel lanes• Increased greenery (trees, plants) and improved landscaping• Street furniture (seating, trash receptacles, bike racks)• Street and pedestrian lighting• Surface treatment (paving stones, concrete, etc.)• Wayfinding (directional signage)
The images below illustrate some examples of existing and potential options for design elements along Jasper Avenue.
Jasper Avenue New VisionA major catalyst project identified in the Capital City Downtown Plan
J O I N T V E N T U R E
Main Streets GuidelineJasper Avenue was designated a Main Street in 2016.
Main streets are both important places and important transportation links.
The City of Edmonton’s Main Streets Guidelines focus on improving the pedestrian experience, providing additional space for street furniture and landscaping, buffering pedestrians from traffic, and encouraging people to linger by widening sidewalks.
The images below illustrate where the zones are located within an example main street.
The Main Streets Guideline defines key spaces in the roadway and streetscape:• Traveled Way – space for travel by automobiles and transit to
move people and goods• Ancillary Zone – flexible space for vehicle parking and loading
zones, transit stops, parios, parklets• Furnishing Zone – space for light and signal poles, signs, trees,
benches, bike racks, newspaper boxes• Pedestrian Through Zone – clear unobstructed open space for
pedestrians of all ages and abilities• Frontage Zone – space for retail, café seating, temporary
signage, lineup areas
Jasper Avenue New VisionA major catalyst project identified in the Capital City Downtown Plan
J O I N T V E N T U R E
EXISTING STREETSCAPES
PROJECT AREA / STREETSCAPE EXTENT
DOWNTOWN BIKE NETWORK
EXISTING HERITAGE TRAIL
PROPOSED HERITAGE TRAIL CONNECTION
FUNICULAR
FUTURE LRT ABOVE GROUND
FUTURE LRT UNDERGROUND
EXISTING LRT UNDERGROUND
N
107 ST.
106 ST.
103 ST.
102 ST.
101 ST.
104 ST.
105 ST.
101A AVE.
JASPER AVE.
JASP
ER A
VE.
100 ST.
99 ST.
97 ST.
THORNTON CT.
94A ST.
102A AVE.
94 ST.
95 ST.
96 ST.
102 AVE.108 ST.
109 ST.
110 ST.
111 ST.
92 ST.
93 ST.
91 ST.
Influencing FactorsIn developing the design for the future Jasper Avenue, the following are being considered:• People and goods movement:
◦ Pedestrians ◦ Bicycle network connections and bike parking ◦ Universal Accessibility ◦ Connection to funicular ◦ Bus routes, bus stops, and DATS ◦ Taxi and rideshare ◦ Traffic congestion and flow ◦ Parking and loading zones
• Nearby streetscapes: ◦ The Armature (96 Street) ◦ Rice Howard Way ◦ 104 Street ◦ Capital Boulevard (108 Street)
• Concurrent studies: ◦ Imagine Jasper Avenue (109 Street to 124 Street) ◦ Transit Strategy ◦ Centre LRT Study ◦ Downtown Streetscape Typology Study ◦ Downtown Wayfinding Strategy ◦ Downtown Public Places Plan
• Nearby construction: ◦ Valley Line LRT Construction ◦ Shaw Conference Centre rehabilitation under Jasper
Avenue ◦ Private land developments
• Festivals and Downtown Events• Adjacent buildings and businesses• Safety for all users
EXISTING STREETSCAPES
PROJECT AREA / STREETSCAPE EXTENT
DOWNTOWN BIKE NETWORK
EXISTING HERITAGE TRAIL
PROPOSED HERITAGE TRAIL CONNECTION
FUNICULAR
FUTURE LRT ABOVE GROUND
FUTURE LRT UNDERGROUND
EXISTING LRT UNDERGROUND
N
107 ST.
106 ST.
103 ST.
102 ST.
101 ST.
104 ST.
105 ST.
101A AVE.
JASPER AVE.
JASP
ER A
VE.
100 ST.
99 ST.
97 ST.
THORNTON CT.
94A ST.
102A AVE.
94 ST.
95 ST.
96 ST.
102 AVE.108 ST.
109 ST.
110 ST.
111 ST.
92 ST.
93 ST.
91 ST.
Jasper Avenue New VisionA major catalyst project identified in the Capital City Downtown Plan
J O I N T V E N T U R E
Study Area and Staging
107 ST.
106 ST.
103 ST.
102 ST.
101 ST.
104 ST.
105 ST.
101A AVE.
JASPER AVE.
JASP
ER A
VE.
100 ST.
99 ST.
97 ST.
THORNTON CT.
94A ST.
102A AVE.
94 ST.
95 ST.
96 ST.
(102 AVE.)108 ST.
109 ST.
110 ST.
111 ST.
92 ST.
93 ST.91 ST.
96 STREET – 100 STREETCONSTRUCTION PLANNED 2019-2020
100 STREET – 102 STREET CONSTRUCTED IN 2013
92 STREET – 96 STREET AND 102 STREET – 109 STREETCONCEPT PLANNING FOR FUTURE CONSTRUCTION
N
107 ST.
106 ST.
103 ST.
102 ST.
101 ST.
104 ST.
105 ST.
101A AVE.
JASPER AVE.
JASP
ER A
VE.
100 ST.
99 ST.
97 ST.
THORNTON CT.
94A ST.
102A AVE.
94 ST.
95 ST.
96 ST.
(102 AVE.)108 ST.
109 ST.
110 ST.
111 ST.
92 ST.
93 ST.
91 ST.
96 STREET – 100 STREETCONSTRUCTION PLANNED 2019-2020
100 STREET – 102 STREET CONSTRUCTED IN 2013
92 STREET – 96 STREET AND 102 STREET – 109 STREETCONCEPT PLANNING FOR FUTURE CONSTRUCTION
N
Jasper Avenue New VisionA major catalyst project identified in the Capital City Downtown Plan
J O I N T V E N T U R E
Share your Voice. Shape our City.We are seeking input to help shape the streetscape design for the entire project area.
Today we are also presenting a draft concept plan for Jasper Avenue between 96 Street and 100 Street. The City intends to prioritize this section of Jasper Avenue for construction beginning in 2019.
Talk to the project staff. Leave your comments directly on the maps and draft designs of Jasper Avenue, and complete our survey.
Jasper Avenue New VisionA major catalyst project identified in the Capital City Downtown Plan
J O I N T V E N T U R E
Draft Concept Plan: 96 Street to 100 StreetShare your voice: leave your comments on sticky notes on the draft concept on the table.
3.0m
3.0m
3.55m
3.3m
3.3m
3.55m
±3.1m
3.0m
3.55m
3.3m
3.3m
3.55m
3.4m
3.0m
3.0m
3.55m
3.3m
3.3m
3.3m
2.5m
3.0m
±1.0m
3.0m
±3.7m
3.55m
3.3m
2.5m±2.0m
3.0m
3.55m
3.55m
±1.5m3.0m
3.0m
±2.5m
3.55m
3.3m
3.3m
3.3m
3.55m
1.8m
3.0m
3.0m
3.0m
3.3m
3.8m
3.0m2.6m
3.5m
3.6m
3.9m
3.6m
3.4m2.3m
3.0m1.7m
3.55m3.3m
3.3m
3.3m
3.55m
3.0m
3.0m
3.0m
2.7m
2.5m
3.3m
3.3m
3.3m
3.3m
3.55m
3.0m
3.55m
3.7m
3.0m
3.3m
3.3m
3.3m
3.55m
2.2m
3.0m
1.7m
3.0m
2.5m
3.0m
1.6m2.5m
3.3m
3.3m
3.3m
3.3m
3.55m
1.9m
3.0m
2.0m
1.8m
3.25
m3.
1m
3.25
m1.
0m3.
1m3.
0m3.
35m
3.6m
3.55
m
3.4m
3.55
m1.
2m3.
55m
3.3m
3.55
m
4.5m
2.6m
4.5m
3.0m
2.5m
2.5m
6.5m
6.5m
6.5m
3.55m
3.3m
3.55m
3.0m
2.5m
2.35m
4.5m
2.35m
3.35
m2.
75m
5.0m
1.5m
1.6m
2.5m
3.0m1.3m
2.5m
3.3m
3.3m
3.55
m1.
6m3.
0m
0.6m
0.5m
1.4m
3.55
m
3.5m
3.3m
3.55
m1.
7m
3.55
m
3.55
m
3.5m 3.55m
3.3m
3.3m
3.3m2.5m
3.0m
1.0m
3.0m
1.15m
3.0m3.
0m1.0m
4.45
m
4.45
m
3.8m 2.
5m
3.0m
6.75m
1.0m
1.0m
FUTURE - ALLDRITT TOWER
MOUNTABLEISLAND
FUTURE ACCESS TOALLDRITT TOWER
0 20m5 10 15
SCALE 1:500
MOUNTABLEISLAND
A
BC
Jasper Avenue New VisionA major catalyst project identified in the Capital City Downtown Plan
J O I N T V E N T U R E
LANE
ANCILLARY
FURN LANE LANE LANE
PEDESTRIAN
PEDESTRIAN
FURN
SECTION C-CSCALE 1:200
BRIGHTONBLOCK
0 5 10 20 30
LANELANELANE LANE LANE
PEDESTRIAN
PEDESTRIAN
BIKE
FURN
FURN
SECTION A-ASCALE 1:200
MACDONALD ESTATES
IMPARK LOT
0 5 10 20 30
PEDESTRIAN
SHAW CONFERENCE CENTRE ROOF STRUCTURE UNDER JASPER
MEDIANLANELANE LANE LANE FURNFURNLOADIN
G
FRONTAGE
FURN
ANCILLARY
PEDESTRIAN
SECTION B-BSCALE 1:200
CANADAPLACE
SHAWCONFERENCECENTRE
0 5 10 20 30
Draft Roadway Cross-Sections: 96 Street to 100 StreetCross-Sections from three locations between 96 Street and 100 Street show the approximate layout of Jasper Avenue (looking east) based on the draft concept plan.Share your voice: leave your comments on sticky notes on the draft cross-sections on the table.
LANE
ANCILLARY
FURN LANE LANE LANE
PEDESTRIAN
PEDESTRIAN
FURN
SECTION C-CSCALE 1:200
BRIGHTONBLOCK
0 5 10 20 30
LANELANELANE LANE LANE
PEDESTRIAN
PEDESTRIAN
BIKE
FURN
FURN
SECTION A-ASCALE 1:200
MACDONALD ESTATES
IMPARK LOT
0 5 10 20 30
PEDESTRIAN
SHAW CONFERENCE CENTRE ROOF STRUCTURE UNDER JASPER
MEDIANLANELANE LANE LANE FURNFURN
LOADING
FRONTAGE
FURN
ANCILLARY
PEDESTRIAN
SECTION B-BSCALE 1:200
CANADAPLACE
SHAWCONFERENCECENTRE
0 5 10 20 30
LANE
ANCILLARY
FURN LANE LANE LANE
PEDESTRIAN
PEDESTRIAN
FURN
SECTION C-CSCALE 1:200
BRIGHTONBLOCK
0 5 10 20 30
LANELANELANE LANE LANEPEDESTRIAN
PEDESTRIAN
BIKE
FURN
FURN
SECTION A-ASCALE 1:200
MACDONALD ESTATES
IMPARK LOT
0 5 10 20 30
PEDESTRIAN
SHAW CONFERENCE CENTRE ROOF STRUCTURE UNDER JASPER
MEDIANLANELANE LANE LANE FURNFURN
LOADING
FRONTAGE
FURN
ANCILLARY
PEDESTRIAN
SECTION B-BSCALE 1:200
CANADAPLACE
SHAWCONFERENCECENTRE
0 5 10 20 30
P
LANE LANE LANELANEPARK LANE
PEDESTRIAN
PEDESTRIAN
LAY-BY
FURN
SECTION A-ASCALE 1:200
MACDONALD ESTATES
IMPARK LOT
0 5 10 20 30
PEDESTRIAN
SHAW CONFERENCE CENTRE ROOF STRUCTURE UNDER JASPER
MEDIANLANELANE LANE LANE FURN
LOADING
FRONTAGE
FURN
ANCILLARY
PEDESTRIAN
SECTION B-BSCALE 1:200
CANADAPLACE
SHAWCONFERENCECENTRE
0 5 10 20 30
LANELANE MEDIAN LANE LANE
PEDESTRIAN
PEDESTRIAN
P
PARK
P
PARK
SECTION C-CSCALE 1:200
BRIGHTONBLOCK
0 5 10 20 30
P
LANE LANE LANELANEPARK LANE
PEDESTRIAN
PEDESTRIAN
LAY-BY
FURN
SECTION A-ASCALE 1:200
MACDONALD ESTATES
IMPARK LOT
0 5 10 20 30
PEDESTRIAN
SHAW CONFERENCE CENTRE ROOF STRUCTURE UNDER JASPER
MEDIANLANELANE LANE LANE FURN
LOADING
FRONTAGE
FURN
ANCILLARY
PEDESTRIAN
SECTION B-BSCALE 1:200
CANADAPLACE
SHAWCONFERENCECENTRE
0 5 10 20 30
LANELANE MEDIAN LANE LANE
PEDESTRIAN
PEDESTRIAN
P
PARK
P
PARK
SECTION C-CSCALE 1:200
BRIGHTONBLOCK
0 5 10 20 30
P
LANE LANE LANELANEPARK LANE
PEDESTRIAN
PEDESTRIAN
LAY-BY
FURN
SECTION A-ASCALE 1:200
MACDONALD ESTATES
IMPARK LOT
0 5 10 20 30
PEDESTRIANSHAW CONFERENCE CENTRE ROOF STRUCTURE UNDER JASPER
MEDIANLANELANE LANE LANE FURN
LOADING
FRONTAGE
FURN
ANCILLARY
PEDESTRIAN
SECTION B-BSCALE 1:200
CANADAPLACE
SHAWCONFERENCECENTRE
0 5 10 20 30
LANELANE MEDIAN LANE LANE
PEDESTRIAN
PEDESTRIAN
P
PARK
P
PARK
SECTION C-CSCALE 1:200
BRIGHTONBLOCK
0 5 10 20 30
West of 99 Street (Section A) West of 97 Street (Section B) West of 96 Street (Section C)
Existing
Existing
Existing
ProposedProposed
Proposed
Jasper Avenue New VisionA major catalyst project identified in the Capital City Downtown Plan
J O I N T V E N T U R E
Concept Plan Development: 92 Street to 96 Street and 102 Street to 109 StreetShare your voice: leave your comments on sticky notes on the plan on the table.
105 ST.
101 ST.
107 ST.
106 ST.
103 ST.
BELL
AMY
102 ST.
102 AVE.
100 AVE.
JASPER AVE.
MACDONALD DR.
104 ST.
HILL
101A AVE. JASPER AVE.
(99 ST.)
McDOUGALL HILL
SHOCTOR ALLEY
GRIERSO
N HILL
RD.
McDOUGALL
101 AVE.
100 ST.
100A ST.
THO
RN
TON
CT.
RU
E. HU
LL
MACDONALD DR.
101A AVE.102 AVE.
HARBIN RD. (102 AVE.)
97 ST.
96 ST.
102A AVE.
101 AVE.
94A ST.
95A ST.
RD
.
JASP
ER A
VE.
101A AVE.
ROWLAND RD.
TAYLOR
ALEX
ROW
LAND
RD.
94 ST.
103 AVE.
103A AVE.95 ST.
93 ST.
92 ST.
92 ST.
95 ST. 101A AVE.
89 ST.
100 AVE.
109 ST.
110 ST.
102 AVE.
JASPER AVE.
111 ST.
108 ST.
92 ST.
93 ST.
91 ST.
104 AVE.
90 ST.
87 ST.
98 AVE.
101A AVE.
102 AVE.
101 AVE.
100B AVE.
100A AVE.
CAMERON AVE.
105 ST.
101 ST.
107 ST.
106 ST.
103 ST.
102 ST.
104 ST.
109 ST.
111 ST.
108 ST.
110 ST.
97 ST.
98 ST.100 ST.
96 ST.
95 ST.
103 AVE.
104 AVE.
106 AVE.
103 AVE.
104 AVE.
106 AVE.
105 AVE.
103 AVE.
103A AVE.
105A AVE.
106 AVE.
HILL
LOW LEVEL BRIDGE
105 ST.
107 ST.
106 ST.
103 ST.
102 ST.
JASPER AVE.
MACDONALD DR.
104 ST.
109 ST.
JASPER AVE.
108 ST.
JASPER AVE.101 AVE.
101A AVE.
HARBIN RD. (102 AVE.)
96 ST. 101 AVE.
94A ST.
95A ST.
RD
.
JASP
ER A
VE.
101A AVE.
ROWLAND RD.
TAYLOR
ALEX
ROW
LAND
RD.
94 ST.
103 AVE.
103A AVE.95 ST.
93 ST.
92 ST.
92 ST.
95 ST. 101A AVE.
92 ST.
93 ST.
91 ST.
104 AVE.
102 AVE.
CAMERON AVE.
95 ST.
Jasper Avenue New VisionA major catalyst project identified in the Capital City Downtown Plan
J O I N T V E N T U R E
Thank you for your attendancePlease leave your comments on the maps tonight.
Leave your survey with us today or complete it online at edmonton.ca/jasperavenuenewvision before February 2, 2018.
Your comments will be considered in the development of more detailed designs of Jasper Avenue that will be shared in spring 2018 for your feedback.
We will ask for input again in spring 2018 when we present:• Final concept plan for 96 Street to 100 Street• Draft concept plans for 92 Street to 96 Street and
102 Street to 109 StreetVisit edmonton.ca/jasperavenuenewvision for more information.