II--215/I215/I--515 Interchange515 Interchange
February 2003515
INTERSTATE
215INTERSTATE
Lake Mead Drive/ILake Mead Drive/I--515 Pre515 Pre--ConstructionConstruction
I-515
Lake
Mea
d Dr
ive
N
SW
E
QWE
Stage 1 ConstructionStage 1 Construction
Legend
Construction - Ultimate
Construction - Temporary Pavement
Built (Ultimate)
Temporary Pavement in Use
Step
hani
e R
oad
Gib
son
Roa
d
I-515
Lake Mead Drive
Res
erve
B
lvd.
FiestaArcadia
Park
N
S
W E
NE
QWE
Construct bicycle and pedestrian detourConstruct GS1-GS4 Ramp DetourConstruct PTIS, GS-W, and Pittman Railroad ChannelConstruct temporary pavement for Lake Mead DriveReconstruct Gibson RoadBegin construction of I-515 “NE” ramp
Stage 1 ConstructionStage 1 Construction
QWE
Bicycle/Pedestrian Detour Bicycle/Pedestrian Detour Construct Soil Nail Walls at the I-515/UPRR Bridge
Lake Mead Drive
Res
erve
Blv
d.
I-515
Las Palmas Entrada
Add Bicycle Lanes to Reserve Boulevard
Construct Bicycle PathG
ibso
n R
oad
Fiesta
ArcadiaPark
Bicycle/Pedestrian Legend
Construct bicycle path
On street bicycle lanes
Soil Nail Walls at I515/UPRR
Bridge
Bicycle Path
Bicycle Lanes
N
S
W E
QWE
Pedestrian Bike PathQWE
Widening Reserve Blvd.
QWESoil Nail Wall
QWE GS1-GS4 Detour
GSW Box CulvertQWE
PTIS Box CulvertQWE
Reconstruct Gibson RoadQWE
Stage 2 DetourQWE
Stage 2 ConstructionStage 2 Construction
Start construction of “SW”, “SE”, “WN”, and “WS” ramps off-lineContinue construction of “NE” ramp Construct Tie-Back WallStart construction of “EN” rampConstruct “NW” ramp complete Construct I-215/Lake Mead Drive
QWE
Columns for SW, EN, & NW RampQWE
Wall 108QWE
G-1465 StructuresQWE
EN Ramp Steel ErectionQWE
PCCP on I-215 MainlineQWE
Construct tie-back wall along Lake Mead Drive at the I-515 bridge
Stage 2Stage 2II--515 Interchange 515 Interchange ConstructionConstruction
Lake Mead Drive
Res
erve
Blv
d.
I-515
Las Palmas Entrada
Fiesta
Legend
Construction - Ultimate
Construction - Temporary Pavement
Built (Ultimate)
Temporary Pavement in Use
ArcadiaPark
Tie-back wall
N
S
W E
NE
QWE
Tie-Back WallQWE
Widen I-515 bridge
Construct tie-back wall along Lake Mead Drive at the I-515 bridge
Stage 2Stage 2II--515 Interchange 515 Interchange ConstructionConstruction
Lake Mead Drive
Res
erve
Blv
d.
I-515
Las Palmas Entrada
FiestaArcadiaPark
Legend
Construction - Ultimate
Construction - Temporary Pavement
Built (Ultimate)
Temporary Pavement in Use
N
S
W E
NE
QWE
I-1464 BridgeQWE
NW Ramp CompleteQWE
Finish construction of the “EN” rampStart construction of the “ES” rampFinish construction of I-215/Lake Mead DriveConstruct Gibson ramps 2 and 3
Stage 3 ConstructionStage 3 Construction
QWE
NW Ramp / G-1958 BridgeQWE
ES Frame 2QWE
Finish construction of the “SE” and “ES” rampsComplete “WS”, “SW” and “WN” ramps
Stage 4 ConstructionStage 4 Construction
QWE
End of PresentationEnd of PresentationThank You!Thank You!