HULLEY & KIRKWOOD CONSULTING ENGINEERS LIMITED
BIM PROJECT EXECUTION PLAN
FOR
[PROJECT TITLE]
Date
Project Title
Date
Hulley & Kirkwood Consulting Engineers Ltd Head Office
Watermark Business Park
305 Govan Road
Glasgow
G51 2SE
(t): 0141 332 5466
(f): 0870 928 1028
(e): [email protected]
(w): www.hulley.co.uk
Prepared By:
Authorised By:
Revision:
Date:
File Location:
Hulley & Kirkwood Consulting Engineers Ltd …Making Buildings WorkPage 2
Project Title
Date
HULLEY & KIRKWOOD CONSULTING ENGINEERS LIMITED
BIM PROJECT EXECUTION PLAN
FOR
[PROJECT TITLE]
Date
REV DESCRIPTION PREPARED BY DATE
Issue No. 1 First issue XXXXX XXXXX
Hulley & Kirkwood Consulting Engineers Ltd …Making Buildings WorkPage 3
Project Title
Date
TABLE OF CONTENTS:
SECTION A: BIM PROJECT EXECUTION PLANNING GUIDE OVERVIEW ......................... 5
SECTION B: PROJECT INFORMATION ................................................................................. 6
SECTION C: KEY PROJECT CONTACTS .............................................................................. 7
SECTION D: PROJECT GOALS / BIM OBJECTIVES ............................................................ 8
SECTION E: ORGANIZATIONAL ROLES / STAFFING ........................................................ 13
SECTION F: BIM PROCESS DESIGN ................................................................................... 14
SECTION G: BIM INFORMATION EXCHANGE WORKSHEET ........................................... 16
SECTION H: BIM AND FACILITY DATA REQUIREMENTS ................................................. 16
SECTION I: COLLABORATION PROCEDURES .................................................................. 18
SECTION J: QUALITY CONTROL ......................................................................................... 19
SECTION K: TECHNOLOGICAL INFRASTRUCTURE NEEDS ........................................... 20
SECTION L: MODEL ORGANIZATION ................................................................................. 22
SECTION M: PROJECT DELIVERABLES ............................................................................ 23
Hulley & Kirkwood Consulting Engineers Ltd …Making Buildings WorkPage 4
Project Title
Date
SECTION A: BIM PROJECT EXECUTION PLANNING GUIDE OVERVIEW To successfully implement Building Information Modelling (BIM) on a project, Hulley & Kirkwood has developed this detailed BIM Project Execution Plan. The BIM Project Execution Plan defines uses for BIM on the project (e.g. design authoring, design reviews, 3D coordination, and as built record modelling), along with a detailed process for executing BIM on this project. The enclosed document is only intended to relate to the Hulley & Kirkwood/MEP element of the project. A comprehensive Project Execution Plan (PEP) will require to be created for the project that encompasses all participants in the project. Who the lead is in creating the comprehensive PEP needs to be discussed and agreed but it is unlikely to be Hulley & Kirkwood. However, the enclosed document will enable our element to be readily incorporated into the overall PEP as well as identifying the level and amount of information that will be incorporated in our BIM model. The document is a living document and will require to be reviewed and updated as changes to the project occur or additional parties come on board as the project progresses. To assist in the completion of this document reference should be made to the “BIM PEP Guidance” document which can be found on the Hulley & Kirkwood Knowledge Management system. This document should be read either in conjunction with or in advance of completing the enclosed PEP document
Hulley & Kirkwood Consulting Engineers Ltd …Making Buildings WorkPage 5
Project Title
Date
SECTION B: PROJECT INFORMATION (to be completed by H&K)
1. CLIENT:
2. PROJECT NAME:
3. PROJECT NUMBER:
4. CONTRACT TYPE:
5. BRIEF PROJECT DESCRIPTION:
6. ADDITIONAL PROJECT INFORMATION:
7. HULLEY & KIRKWOOD ROLE/DUTIES:
8. SUMMARY OF HIGH LEVEL BIM INPUT/DELIVERABLES EXPECTED FROM HULLEY & KIRKWOOD (e.g. extent of modelling, amount of imbedded information)
Hulley & Kirkwood Consulting Engineers Ltd …Making Buildings WorkPage 6
Project Title
Date
SECTION C: KEY PROJECT CONTACTS (to be completed by H&K) The following is a list of the lead BIM contacts for each organization on the project.
ROLE ORGANIZATION NAME EMAIL PHONE
Client
Project Manager
Architect
Structural/Civil
Quantity Surveyor
CDM Coordinator
BREEAM
Quantity Surveyor
Main Contractor
Mechanical Sub-Contractor
Electrical Sub-Contractor
Hulley & Kirkwood Consulting Engineers Ltd …Making Buildings WorkPage 7
Project Title
Date
SECTION D: PROJECT GOALS / BIM OBJECTIVES (to be completed in conjunction with Design Team and Client)
1. MAJOR BIM GOALS / OBJECTIVES:
State BIM Goals / Objectives
Priority (1‐3) Goal Description Potential BIM Uses
1‐ Most Important Value added objectives
Hulley & Kirkwood Consulting Engineers Ltd …Making Buildings WorkPage 8
Project Title
Date
2. BIM USES: (to be completed in conjunction with Design Team and Client)
The elements that are to be included in the BIM model should be identified in the table below
OPERATE X CONSTRUCT X DESIGN X PLAN XBUILDING
MAINTENANCE SCHEDULING
SITE UTILIZATION PLANNING DESIGN AUTHORING X PROGRAMMING
BUILDING SYSTEM ANALYSIS CONSTRUCTION
SYSTEM DESIGN DESIGN REVIEWS X SITE ANALYSIS
ASSET MANAGEMENT 3D COORDINATION X 3D COORDINATION X
SPACE MANAGEMENT / TRACKING DIGITAL FABRICATION
DISASTER PLANNING 3D CONTROL AND PLANNING LIGHTING ANALYSIS
RECORD MODELLING RECORD MODELLING X ENERGY ANALYSIS
MECHANICAL ANALYSIS
OTHER ENG. ANALYSIS
BREEAM EVALUATION
CODE VALIDATION
4D MODELLING 4D MODELLING 4D MODELLING 4D MODELLING
COST ESTIMATION COST ESTIMATION COST ESTIMATION COST ESTIMATION
EXISTING CONDITIONS MODELLING EXISTING CONDITIONS
MODELLING EXISTING CONDITIONS MODELLING EXISTING CONDITIONS
MODELLING
Folllowing on from the table above, an assessment of the capability of the team as a whole to provide the elements above and the value of providing that element on the project can be created using the matrix below
BIM Use* Value to Project
Responsible Party
Value to Resp
Party
Capability Rating
ACo
High / Med
/ Low
High / Med / Low
Scale 1-3 (1 = Low)
Res
ourc
es
Com
pete
ncy
Exp
erie
nce
Maintenance Scheduling Building Systems Analysis
Hulley & Kirkwood Consulting Engineers Ltd …Making Buildings WorkPage 9
Project Title
Date
Record Modeling Cost Estimation 4D Modeling Site Utilization Planning Layout Control & Planning 3D Coordination (Construction) Engineering Analysis Site Analysis Design Reviews 3D Coordination (Design) Existing Conditions Modeling
Hulley & Kirkwood Consulting Engineers Ltd …Making Buildings WorkPage 10
Project Title
Date
Design Authoring Programming
* Additional BIM Uses as well as information on each Use can be BIM MODEL COMPLEXITY (to be completed by H&K) The below establishes the extent to which the model is being taken. The enclosed states which areas are being modelled to what level of complexity
BIM MODEL EXCLUSIONS (to be completed by H&K) The list below identifies what elements of the final installation will be excluded from the BIM Model being produced by Hulley & Kirkwood but which will need consideration as part of the installation model to be created by the contractor/sub-contractor
Exclusions from BIM Model Mechanical Pipe Coupling and Bends Insulation Ductwork Access Hatches Anchors Expansion Pieces Brackets Electrical Conduit Individual Cables Earthing and Cross Bonding Gas Extinguishing Pipework Brackets Containment Couplings and Bends
Hulley & Kirkwood Consulting Engineers Ltd …Making Buildings WorkPage 11
Project Title
Date
Specialist Design
Sprinklers (notional space only)
BMS Containment (notional space only) Pneumatic Tube (notional space only) Gas Extinguishing (notional space only)
Hulley & Kirkwood Consulting Engineers Ltd …Making Buildings WorkPage 12
Project Title
Date
SECTION E: ORGANIZATIONAL ROLES / STAFFING (to be completed by H&K) The list below lists those individuals from each organisation who are involved in the delivery of the uses identified in Section D. This should include all contributing organisations to any one identified Use.
BIM USE ORGANIZATION LEAD CONTACT
Hulley & Kirkwood Consulting Engineers Ltd …Making Buildings WorkPage 13
Project Title
Date
SECTION F: BIM PROCESS DESIGN (to be completed in conjunction with Design Team and Client)
1. OVERALL BIM OVERVIEW MAP
A typical BIM overview map is included in Appendix 2 of the “PEP Guidance Document”. The map can be used as a template and should be adapted to suit the project as necessary.
2. DETAIL LEVEL BIM USE PROCESS MAP(S
a. Existing Conditions Modelling b. Cost Estimation c. Design Reviews d. Design Authoring e. Energy Analysis f. Lighting Analysis g. 3D Coordination h. Record Modelling i. Maintenance Scheduling j. Building System Analysis
Typical detail level process map templates exist in Appendix 2 of the Hulley & Kirkwood “PEP Guidance Document”. The maps can be used as a template and should be adapted to suit the project as necessary. Delete unused or add additional process maps from the list
Hulley & Kirkwood Consulting Engineers Ltd …Making Buildings WorkPage 14
Project Title
Date
Hulley & Kirkwood Consulting Engineers Ltd …Making Buildings WorkPage 15
Project Title
Date
SECTION G: BIM INFORMATION EXCHANGE WORKSHEET (to be completed in conjunction with Design Team and Client) 1. LIST OF INFORMATION EXCHANGE WORKSHEET(S
a. Existing Conditions Modelling b. Cost Estimation c. Design Reviews d. Design Authoring e. Energy Analysis f. Lighting Analysis g. 3D Coordination h. Record Modelling i. Maintenance Scheduling j. Building System Analysis
A sample information exchange worksheet is included in Appendix 3 of the Hulley & Kirkwood “PEP Guidance Document”. The worksheet can be used as a template and should be adapted to suit the project as necessary. Delete unused or add additional worksheets from the list
Hulley & Kirkwood Consulting Engineers Ltd …Making Buildings WorkPage 16
Project Title
Date
SECTION H: FACILITY DATA REQUIREMENTS (to be completed in conjunction with Client) In the event of there being pre-determined or specific handover information required as part of the BIM model this should be documented in the Facility Data Worksheet. A copy of a typical worksheet is included in the Hulley & Kirkwood” BIM PEP Guidance” document.
Hulley & Kirkwood Consulting Engineers Ltd …Making Buildings WorkPage 17
Project Title
Date
SECTION I: COLLABORATION PROCEDURES (to be completed in conjunction with Design Team and Client) 1. COLLABORATION STRATEGY:
Describe how the project team will collaborate. Include items such as communication methods, document management and transfer, and record storage, etc.
2. MEETING PROCEDURES:
The following are examples of meetings that should be considered.
MEETING TYPE REQUIRED
PER CONTRACT
PROJECT STAGE FREQUENCY PARTICIPANTS LOCATION
BIM REQUIREMENTS
KICK-OFF
BIM EXECUTION PLAN
DEMONSTRATION
DESIGN COORDINATION
CONSTRUCTION OVER-THE-SHOULDER PROGRESS REVIEWS
ANY OTHER BIM MEETINGS THAT OCCURS WITH
MULTIPLE PARTIES
Hulley & Kirkwood Consulting Engineers Ltd …Making Buildings WorkPage 18
Project Title
Date
SECTION J: QUALITY CONTROL (to be completed in conjunction with Design Team and Client) 1. OVERALL STRATEGY FOR QUALITY CONTROL
Describe the strategy to control the quality of the model. 2. QUALITY CONTROL CHECKS
The following checks should be performed to assure quality.
CHECKS DEFINITION RESPONSIBLE PARTY
SOFTWARE PROGRAM(S) FREQUENCY
VISUAL CHECK
Ensure there are no unintended model components and the design intent has been followed
INTERFERENCE CHECK
Detect problems in the model where two building components are clashing including soft and hard
STANDARDS CHECK
Ensure that the BIM Standard has been followed (fonts, dimensions, line styles, levels/layers, etc)
MODEL INTEGRITY CHECKS
Describe the QA validation process used to ensure that the Project Facility Data set has no undefined, incorrectly defined or duplicated elements and the reporting process on non-compliant elements and corrective action plans
Hulley & Kirkwood Consulting Engineers Ltd …Making Buildings WorkPage 19
Project Title
Date
SECTION K: TECHNOLOGICAL INFRASTRUCTURE NEEDS (to be completed in conjunction with Design Team and Client) 1. SOFTWARE:
List software used to deliver BIM. Remove software that is not applicable.
BIM USE USER SOFTWARE VERSION
DESIGN MECHANICAL/ELECTRICAL
DESIGN ARCHITECT
DESIGN STRUCTURAL/CIVIL
DESIGN
DESIGN
DESIGN
DESIGN
COST ESTIMATION
EXISTING CONDITIONS MODELLING
DIGITAL FABRICATION
3D COORDINATION
DESIGN REVIEWS
LIGHTING ANALYSIS
ENERGY ANALYSIS
BREEAM EVALUATION
Hulley & Kirkwood Consulting Engineers Ltd …Making Buildings WorkPage 20
Project Title
Date
2. BIM AND CAD STANDARDS: (to be completed by H&K)
STANDARD VERSION
Hulley & Kirkwood Consulting Engineers Ltd …Making Buildings WorkPage 21
Project Title
Date
SECTION L: MODEL ORGANISATION (to be completed by H&K) 1. FILE NAMING STANDARD:
Refer to the Hulley & Kirkwood “PEP Guidance Document”. 2. MODEL STRUCTURE:
Describe and diagram how the Model is divided up. For example, by building, by floors, by zone, by areas, and/or discipline. 3. COORDINATE SYSTEMS:
Describe the coordinate system used.
Hulley & Kirkwood Consulting Engineers Ltd …Making Buildings WorkPage 22
Project Title
Date
SECTION M: PROJECT DELIVERABLES (to be completed by H&K)
BIM SUBMITTAL ITEM STAGE FORMAT NOTES
Hulley & Kirkwood Consulting Engineers Ltd …Making Buildings WorkPage 23
Project Title
Hulley & Kirkwood Consulting Engineers Ltd …Making Buildings WorkPage 24
Date