NITIN SHINGANE HUL NASIK ICD FactoryJan 2014 TO July 2015
NETWORKING - PROJECT
Key statistics
General
81244 Square Meter , 20% Built up area
Rs. 170 Cr GBV
2014 Expected t/o of Rs 500 Cr
Manpower
8 Managers, 27 Executives, 8 Office Asst, 499 Workmen
Manufacturing
3 Production units, 3 Categories Served ( Ice cream, Spread &
Savory ), 550 tons of Weekly Production
9 Processing Lines , 14 Packing Machines
5.8 MVA Connected Load, 2 Boilers (4 TPH), 3 Air Compressors (Total @ 800 CFM)
2 HVAC Systems on R-134 (Total @ 300 TR) 1 VAM for ICD (150 TR)
2 DG Sets (Total @ 2250 KVA), and 1 Water Treatment Plant (60 m3/hr)
800 TR Refrigeration Capacity
1 Effluent Treatment Plants (Total Capacity @ 420TPD)
Logistics
110 SKUs, 300 RM/PM , 2 Outside job-work location
10-20 trucks/day for Inbound Material movements
10-15 trucks/day for F.G. Despatch across depots
Shashank JainFactory Manager
Mfg Manager ICD
Chaitra
Quality Manager
Himadri Maiti
Mfg Manager CPD/Savory
Manoj Yadav
Commercial Manager
Saurabh Mittal
HR Manager Radhika
Manufacturing EngineeringManufacturing Commercial HR Quality
Nasik Management Team
Factory Engineer
Ashish Bajpai
Safety
Safety Manager
Manish Patel
OLD LAN STRACTURE QA SWITCH RACKWESTAGE LAN
CONNECTION
ADMIN LOCATIONSECURITY GATE SWITCH
Before
Networking
condition