BID ADDENDUM NO. 1
BID ADDENDUM NO. 1 - Page 1 FIVEPOINT 12106.006 ARTIST REPLACEMENT SPACE
THE SHIPYARD HUNTERS POINT
IBI GROUP ARCHITECTURE PLANNING 160 West Santa Clara Street – Suite 800 San Jose CA 95113 USA tel 408 924 0811 fax 408 924 0844 ibigroup.com
FIVEPOINT ARTIST REPLACEMENT SPACE
ADDENDUM NO. ONE DATE: July 11, 2017
CLIENT / PROJECT: Fivepoint Hunters Point Artist Replacement Space
BID SUBMITTAL LOCATION: BCCI Construction Company 1160 Battery Street, Suite 250 San Francisco, CA 94111
ARCHITECT’S PROJECT NO.
12106.006 BID DATE: August 3, 2017
ARCHITECT: IBI Group Architecture Planning 160 W. Santa Clara St., Suite 800 San Jose, CA 95113
BID TIME: 2 pm
D.B.I. APPLICATION NO. 2014-0630-9976 S1/S2/S3
NOTICE TO ALL CONTRACTORS SUBMITTING BIDS FOR THIS WORK AND TO ALL PLAN HOLDERS:
You are hereby notified of the following CHANGES, clarifications or modifications to the original Contract Documents, Project Manual, Drawings, Specifications and subsequent Addenda. This Addendum shall supersede the original Contract Documents and previous Addenda wherein it contradicts the same and shall take precedence over anything to the contrary therein. All other conditions remain UNCHANGED.
0. PRE-BID RFI QUESTIONS Item ( 1) Refer Pre-Bid Questions dated Tuesday June 20, 2017. A. Response to Pre-Bid Questions dated Monday July 10, 2017, SEE ATTACHED. Item ( 2) Refer Pre-Bid Questions dated Tuesday June 20, 2017. A. Response to Pre-Bid Questions dated Monday July 10, 2017, SEE ATTACHED. A. CHANGES AND/OR CLARIFICATIONS TO THE PROJECT MANUAL, CONTRACT DOCUMENTS AND SPECIFICATIONS: Item ( 3) Refer to the Project Manual: A. ADD Section 08 87 00 Window Film in its entirety, SEE ATTACHED. Item ( 4) Refer to Section 09 06 00 Colors and Finishes, paragraph 3.1.A, Section 09 06 00 - Painting.
A. REVISE Interior paint colors as follows: IP-1 Typical field paint, U.O.N. IP-2 Accent Paint called out on elevations as “ACCENT COLOR A” IP-3 Accent Paint called out on elevations as “ACCENT COLOR B”
BID ADDENDUM NO. 1 - Page 2 FIVEPOINT 12106.006 ARTIST REPLACEMENT SPACE THE SHIPYARD HUNTERS POINT
2
IP-4 Accent Paint called out on elevations as “ACCENT COLOR C” IP-5 Accent Paint called out on elevations as “ACCENT COLOR D” IP-6 Accent Paint called out on elevations as “ACCENT COLOR E” Item ( 5) Refer to Section 06 20 00 Finish Carpentry:
A. REVISE paragraph 2.2.A.1 and 2.2.A.2 to read: “1. Species: White Maple 2. Grade: WI Custom Grade, with WI system 9 transparent finish, Premium Grade (UV Curable, Acrylated Epoxy, Polyester, or Urethane), stain sheen, clear finish (no stain).”
B. CHANGES AND/OR CLARIFICATIONS TO THE DRAWINGS:
Item ( 6) Refer to sheets A2.11 through A2.52:
A. OMIT from 200-GENERAL NOTES, Note #13 in its’ entirety. B. OMIT from the LEGEND, “traffic coating deck (tenant access)” in its’ entirety.
Item ( 7) Refer to sheet A2.11 Floor Plan – Level 1:
A. REVISE floor plan as shown on B-AD1-A01 & B-AD1-A02, SEE ATTACHED.
Item ( 8) Refer to sheets A5.11 & A5.12 Room Finish Schedule: A. REVISE ABBREVIATIONS, Finish Designations to read:
“ST-# - Polished Stain (# indicates color)”.
Item ( 9) Refer to sheets A5.21 & A5.22 Door Schedule: A. REVISE DOOR AND WINDOW – GENERAL NOTES, note #14 to read:
14. Glazing Designations: IG-1 Clear heat-strengthened low-e glass (non-tempered), typical, U.O.N. IG-2 Clear tempered low-e glass TG Clear tempered single glazing glass FR Fire rated glass (single-glazed) (@ Door No. 102A) L Laminated Fire-Rated Glass (at Acoustical door and sidelight –
@ Door No.112A) B. ADD to note #4 in DOOR SCHEDULE REMARKS to read “Sidelight glazing is
TYPE “L”” C. ADD to note #5 in DOOR SCHEDULE REMARKS to read “Sidelight glazing is
TYPE “FR”” D. ADD Remark #4 to Door No. 112A under Door Schedule – Level 1. E. ADD Remark #5 to Door No. 102A under Door Schedule – Level 1. F. REVISE Door No. 102A frame type to AA4 G. ADD glazing designations to DOOR TYPES legend as shown on B-AD1-A03, SEE
ATTACHED. H. ADD frame AA4 and glazing designations to FRAME TYPES legend as shown on
B-AD1-A04, SEE ATTACHED.
Item (10) Refer to sheet A5.31 Window Types: A. REVISE DOOR AND WINDOW – GENERAL NOTES, note #14 to read:
14. Glazing Designations: IG-1 Clear heat-strengthened low-e glass (non-tempered), typical, U.O.N. IG-2 Clear tempered low-e glass TG Clear tempered single glazing glass
BID ADDENDUM NO. 1 - Page 3 FIVEPOINT 12106.006 ARTIST REPLACEMENT SPACE THE SHIPYARD HUNTERS POINT
3
FR Fire rated glass (single-glazed) (@ Door No. 102A) L Laminated Fire-Rated Glass (at Acoustical door and sidelight –
@ Door No.112A) B. REVISE WINDOW TYPE legend as shown on B-AD1-A05 through B-AD1-A08,
SEE ATTACHED.
Item (11) Refer to sheets A6.11 through A6.14 Exterior Elevations and A6.21 through A6.24 Enlarged Exterior Elevations: A. ADD Color/Finish Designation as shown in B-AD1-A09, SEE ATTACHED. B. REVISE LEGEND as shown on B-AD1-A09, SEE ATTACHED.
Item (12) Refer to sheet A6.13 Exterior Elevations:
A. REVISE elevation 3 as shown on B-AD1-A10, SEE ATTACHED.
Item (13) Refer to sheet A6.14 Exterior Elevations: A. REVISE elevation 4 as shown on B-AD1-A11, SEE ATTACHED.
Item (14) Refer to sheets A9.11 through A9.28 Interior Elevations:
A. ADD to LEGEND, Cement Plaster pattern to be painted EP-4, typical. Item (15) Refer to sheets A9.17, A9.18, A9.21, A9.22, A9.24, A9.25, A9.26, and A9.27 Interior
Elevations: A. REVISE Keynote 936 to read “DISPLAY RAIL, TYP. PER DETAIL B-AD1-A17”. B. REVISE Keynote 943 to read “COUNTERTOP AND BACHSPLASH, TYP. (3)
SIDES”
Item (16) Refer to sheet A10.30 Interior Plan Details: A. REVISE detail 3 to show gridline 8 in lieu of gridline 9. B. REVISE details 4 and 9 as shown on B-AD1-A12, SEE ATTACHED. C. REVISE detail 25 as shown on B-AD1-A13, SEE ATTACHED. Acoustical outlet
backer pad to be model – Kinetics IsoBacker Acoustical Outlet Baker Pad (Fire Rated)
D. REVISE details 3, 4, 5, 6, and 9 to replace calls out of 1/2 GBWR to read “1/2” CEMENTITIOUS BACKER UNIT, TYPICAL”.
Item (17) Refer to sheet A10.55 Wall Types:
A. REVISE detail A as shown on B-AD1-A14, SEE ATTACHED. B. REVISE detail G to replace calls out of 1/2” GBWR O/ 1/2" GYP. BD to read “(2)
LAYERS 1/2” CEMENTITIOUS BACKER UNIT”. C. REVISE details B, C, F, J, and K to replace calls out of 1/2 GBWR to read “1/2”
CEMENTITIOUS BACKER UNIT, TYPICAL”. D. REMOVE at details B, C, F, G, J, and K the “NOTE: GBWR SHALL BE
CEMENTITIOUS BACKER BOARD, TYP.” in its’ entirety. E. REVISE detail M to replace calls out of 5/8” GBWR to read “1/2” GYP. BD.”. F. REVISE at details K and M, GA file No. WP 1070 to read “WP 1072”. G. ADD clarification note to Detail L : “NOTE: GA FILE No WP 5006 IS 1-HR RATED” H. REVISE detail JJ as shown on B-AD1-A15, SEE ATTACHED.
Item (18) Refer to sheet A10.56 Wall Types:
A. REVISE details N, O, and P to replace calls out of 5/8” GBWR to read “1/2” CEMENTITIOUS BACKER UNIT, TYPICAL”.
BID ADDENDUM NO. 1 - Page 4 FIVEPOINT 12106.006 ARTIST REPLACEMENT SPACE THE SHIPYARD HUNTERS POINT
4
B. REMOVE at details N, O and P the “NOTE: GBWR SHALL BE CEMENTITIOUS BACKER BOARD, TYP.” in its’ entirety.
C. REVISE at details N and O, GA file No. WP 1070 to read “WP 1072”. D. ADD Display Rail detail 15 to sheet as shown on B-AD1-A16, SEE ATTACHED.
Item (19) Refer to sheet A10.60 Exterior Details:
A. REVISE detail 20 to call out the following: a. “DECORATIVE METAL SWING GATE” in lieu of “WROUGHT IRON
SWING GATE.” b. DECORATIVE METAL FENCE” in lieu of “WROUGHT IRON FENCE
PICKET/PANEL.” B. ADD note to detail 26 to read as follows:
a. “NOTE: REFER TO DETAIL 20/A10.60 FOR PLAN OF DECORATIVE METAL FENCE AND GATE”
Item (20) Refer to sheet A10.90 Interior Details:
A. REVISE details 6, 11, 16, 17 to replace calls out GYPSUM BOARD/GYP. BD to read “CEMENTITIOUS BACKER UNIT”.
Item (21) Refer to Shoring Permit Submission set: FOR REFERENCE ONLY
A. Refer to sheets SH-G0.0, SH-A1.1, SH-A2.1, SH-A2.2, SH1, SH2, SH2.1, SH2.2, SH3 and SH4 for information only and coordination with work. SEE ATTACHED.
Item (22) Refer to Foundation Permit – R1.1 Submittal set: A. REVISE sheets S2.1, S2.2, S2.2B, S5.2 for noted revisions, SEE ATTACHED.
Note: Revisions under review at Department of Building Inspection, pending approval.
Item (23) Refer to Superstructure Permit – R2.1 Submittal set:
A. REVISE sheets S2.2, S2.3, S2.5, S2.6, S7.4 for noted revisions, SEE ATTACHED. Note: Revisions under review at Department of Building Inspection, pending approval.
Item (24) Refer to Building Permit – R3.1 Submittal set:
A. REVISE sheets A1.11, A1.12, A2.11, A2.12, A10.51, A10.60, A10.71 for noted revisions, SEE ATTACHED. Note: Revisions under review at Department of Building Inspection, pending approval.
Item (25) Refer to Cathodic Protection drawings: A. ADD sheets CP1.0, CP2.0, CP3.0 and CP4.0 in their entirety to the documents,
SEE ATTACHED. Note: Added sheets under review at Department of Building Inspection, pending approval.
BID ADDENDUM NO. 1 - Page 5 FIVEPOINT 12106.006 ARTIST REPLACEMENT SPACE THE SHIPYARD HUNTERS POINT
5
CONFORMANCE WITH CONTRACT DOCUMENTS, PROJECT MANUAL, DRAWINGS AND SPECIFICATIONS All addenda work shall be in strict conformance with the Contract Documents, Project Manual, Drawings and Specifications as they pertain to work of a similar nature. IBI Group Architecture Planning
BY: PATRICIA LOCK, AIA C-18268
BCCI Pre-Bid RFI Questions - Artists Replacement Project 102 Horne AvenueSan Francisco, CA 94124
RFI No. Phase Question/Comment Submitted by Date Submitted Response Target Response
DateResponse By Response Date
17-001 electrical
Can MC Cable be attached directly to the ceiling in lieu of exposed conduit? Please confirm if the ceiling where Conduit or MC cable will be installed is going to be painted?
BCCI /Alli Ripley 6/16/2017
The project is considered to be an MC Cable project. Yes MC Cable is acceptable. Painting is not required . Design Electric 6/19/2017
17-002 electricalCurrently there are no requirements for under cabinet lighting? Is this design build or will more information be provided?Please advise.
BCCI /Alli Ripley 6/16/2017
There was no undercabinet lighting in the BOD. Design Electric 6/19/2017
17-003 electrical Plans do not show if a DAS Emergency responder system is required? Please advise if one it required or not at this time?
BCCI /Alli Ripley 6/16/2017 Not at this time. Design Electric 6/19/2017
17-004 electrical
Are there any special requirments for the spray room? Is this considered a classified area? Do the fixtures in this area need to be Vapor Proof(i.e. gasketed).Please confirm. BCCI /
Alli Ripley 6/16/2017
The spray booth is a class 1 div 1 location. The fixtures within the booth are provided by the booth installer and will be considered so. The fixtures in the direct visinity will need to be rated the same.
Design Electric 6/19/2017
17-005 electrical Are there any acousical requirements for the individual studios?Please confirm.
BCCI /Alli Ripley 6/16/2017 See A2.11 for wall types w/ STC
ratings at acoustical conditions. IBI Group 6/19/2017
17-006 electrical Will " in-use" lights be used for the recording studios? Please confirm.
BCCI /Alli Ripley 6/16/2017 Not at this time. Design Electric 6/19/2017
17-007 electrical
Can the fire pump room be moved to the 1st floor from the 2nd floor? If so then the feeder cable can be ran underground and will achieve the required 2 hour rating without having to construct chases and or encase the conduit?
BCCI /Alli Ripley 6/16/2017
At this time there is no fire pump. If one is determined to be needed, moving to the first floor could be an option.
Design Electric 6/19/2017
17-008 electrical What are the power requirements for the Fire Smoke Dampers? The drawings do not show requirements.
BCCI /Alli Ripley 6/16/2017 120 Volt Design Electric 6/19/2017
17-009 electrical
On plan page M2.11 , Fire Smoke Dampers are shown in Non-Rated walls (type D) inside rooms 123A, 124, 125 and 126. Please advise if they are required in these walls? BCCI /
Alli Ripley 6/16/2017
Walls are 1-hr. rated. Type D should be Type E. Type D1 should be Type E1. Type B should be Type P. Type B1 should be Type P1.
IBI Group 7/7/2017
17-010 electricalAre there any requirements for concrete encasement for site conduits?Please clarify. BCCI /
Alli Ripley 6/16/2017No requirement.
Design Electric 6/19/2017
17-011 electrical
Are there any equipment connections outside of the BOD outline, that will require Emergency Power? If so please advise if additional connection are needed and their location.Please clarify.
BCCI /Alli Ripley 6/16/2017
None aware of from BOD at this time. Design Electric 6/19/2017
17-012 Finish Carpentry
Plans show a display rail on interior elevations, keynote 936. Please clarify if this is a display rail or a chair rail? Please provide details and the type of attachment? Please clarify.
BCCI /Alli Ripley 6/16/2017
This is a display rail. Detail forthcoming. IBI Group 6/19/2017
Monday, July 10, 2017
7/10/2017
BCCI Pre-Bid RFI Questions - Artists Replacement Project 102 Horne AvenueSan Francisco, CA 94124
RFI No. Phase Question/Comment Submitted by Date Submitted Response Target Response
DateResponse By Response Date
Monday, July 10, 2017
7/10/2017
BCCI Pre-Bid RFI Questions - Artists Replacement Project 102 Horne AvenueSan Francisco, CA 94124
RFI No. Phase Question/Comment Submitted by Date Submitted Response Target Response
DateResponse By Response Date
17-012 Finish Carpentry
Plans show a display rail on interior elevations, keynote 936. Please clarify if this is a display rail or a chair rail? Please provide details and the type of attachment? Please clarify.
BCCI /Alli Ripley 6/16/2017
Added Detail 16/A10.56.
IBI Group 7/7/2017
Above previously submitted…
Monday, July 10, 2017
7/10/2017
BCCI Pre-Bid RFI Questions - Artists Replacement Project 102 Horne AvenueSan Francisco, CA 94124
RFI No. Phase Question/Comment Submitted by Date Submitted Response Target Response
DateResponse By Response Date
Monday, July 10, 2017
17-013 Concrete Topping
The plans call out for a "Light Weight" topping over the new plywood subflooring but with no finished surface to cover it to protect it. If this topping is to be gypcrete it will need a floor finish to protect, it cannot just be sealed and expected to take the wear and tear that it will receive.On the other hand, if we were to use a light weight concrete, which would need to be 2" thick, it can sealed and left exposed and it will be able to endure the typical wear and tear this type of tenant will subject this floor too. Of course baring any major impacts or point load impacts other than small tools and pedestrian traffic. Please provide direction on how you would like to proceed. It is suggested the 2" light weight concrete topping which would be sealed is the far better product for the end user in this building.Please provide direction on which system to use for this round of bidding.
BCCI /Alli Ripley 6/23/2017
See S1.0 , Concrete section, item O. for concrete topping requirements. See A5.11 and A5.12 for floor finishes.
IBI Group /Patty Lock 6/23/2017
17-014 Cathodic Protection
Previously it was determined that there was no Cathodic Protection in our scope of work Please confirm this is still the conclusion that was determined previously.Please provide direction if this is included or not.
BCCI /Alli Ripley 6/23/2017
Cathodic Protection is part of scope of work, see Cathodic Protection dwgs.
BKF/Telemon 7/7/2017
17-015 Metal Joist Framing
Clarification 5 replaced addendum 3 plan sheet A10.70 , and now most of the wall section details are showing the Framer wrapping the steel beams with two layers of drywall in a parallel condition. Is this correct going forward? if so please provide details of the in-fill framing and how you would like the web of the steel beam covered in both parallel and perpendicular conditions. Please clarify with updated details.
BCCI /Alli Ripley 6/23/2017
See approved Permit Set for Sheet A10.70 as the condition at the steel beams.
IBI Group /Patty Lock 6/23/2017
17-016 Fireprotection
Clarification 5 added new fire protection drawings "FP" , a total of 16 pages. Are these going to be included into this current approved permitted set of plans going forward?Please clarify if they will be included or not?
BCCI /Alli Ripley 6/23/2017
See G0.01, Automatic Fire Sprinkler is a deferred submittal item. FP drawings are not included in this permit set.
IBI Group /Patty Lock 6/23/2017
7/10/2017
FivePoint 12106.000 Section 08 87 00 – Page 1 Artist’s Replacement Building Window Film Hunters Point Shipyard
SECTION 08 87 00
WINDOW FILM
PART 1 GENERAL
1.1 SUMMARY
A. This Section includes:
1. Window film adhered to interior glazing.
1.2 RELATED SECTIONS
A. Section 00 32 13 “Sliding Glass Doors” sliding glass doors to receive architectural window film
B. Section 08 42 10 “Glazed Operable Entrance System” panel entrance to receive architectural window film.
C. Section 08 81 00 “Glass Glazing” general glazing applications to receive architectural window film.
1.3 REFERENCES
A. ASHRAE - American Society for Heating, Refrigeration, and Air Conditioning Engineers; Handbook of Fundamentals.
B. ASTM International (ASTM): 1. ASTM D 882 - Standard Test Method for Tensile Properties of Thin Plastic
Sheeting. 2. ASTM D 412 - Standard Test Methods for Vulcanized Rubber and
Thermoplastic Elastomers -- Tension. 3. ASTM D 624 - Standard Test Method for Tear Strength of Conventional
Vulcanized Rubber and Thermoplastic Elastomers 4. ASTM D 1004 - Standard Test Method for Tear Resistance (Graves Tear) of
Plastic Film and Sheeting. 5. ASTM D 1044 - Standard Method of Test for Resistance of Transparent
Plastics to Surface Abrasion (Taber Abrader Test). 6. ASTM D 2240 - Standard Method for Rubber Property - Durometer Hardness. 7. ASTM D 2582 - Standard Test Method for Puncture-Propagation Tear
Resistance of Plastic Film and Thin Sheeting. 8. ASTM D 5895 - Standard Test Methods for Evaluating Drying or Curing
During Film Formation of Organic Coatings Using Mechanical Recorders. 9. ASTM E 84 - Standard Method of Test for Surface Burning Characteristics of
Building Materials. 10. ASTM E 308 - Standard Recommended Practice for Spectophotometry and
Description of Color in CIE 1931 System. 11. ASTM E 903 - Standard Methods of Test for Solar Absorbance, Reflectance
and Transmittance of Materials Using Integrating Spheres.
FivePoint 12106.000 Section 08 87 00 – Page 2 Artist’s Replacement Building Window Film Hunters Point Shipyard
C. Window 5.2 - A Computer Tool for Analyzing Window Thermal Performance; Lawrence Berkeley Laboratory.
D. ANSI Z97.1 - American National Standard for Safety Glazing Materials Used in Buildings - Safety Performance Specifications and Methods of Test.
E. Consumer Products Safety Commission 16 CFR, Part 1201 - Safety Standard for Architectural Glazing Materials.
F. GSA-TS01 - Standard Test for Glazing and Glazing Systems Subject to Airblast Loadings.
G. ISO 16933, International Standard for Glass in Building: Explosion-resistant security glazing - Test and classification for arena air-blast testing.
H. Underwriters Laboratories Inc. (UL): UL 972 - Burglary Resisting Glazing Material.
1.4 PERFORMANCE REQUIREMENTS
A. Fire Performance: Surface burning characteristics when tested in accordance ASTM E 84: 1. Flame Spread: 25, maximum. 2. Smoke Developed: 450, maximum.
1.5 SUBMITTALS
A. Submit under provisions of Section 01 33 00.
B. Product Data: Manufacturer's data sheets on each product to be used, including: 1. Preparation instructions and recommendations. 2. Storage and handling requirements and recommendations. 3. Installation methods.
C. Selection Samples: For each film specified, submit two complete sets of color chips representing manufacturer's full range of available colors and patterns.
D. Verification Samples: For each film specified, two samples representing actual film color and pattern.
1.6 QUALITY ASSURANCE
A. Manufacturer Qualifications: All primary products specified in this section will be supplied by a single manufacturer with a minimum of ten years experience.
B. Installer Qualifications: All products listed in this section are to be installed by a single installer with a minimum of five years demonstrated experience in installing products of the same type and scope as specified.
C. Mock-Up: Provide a mock-up for evaluation of surface preparation techniques and application workmanship. 1. Finish areas designated by Architect. 2. Do not proceed with remaining work until workmanship, color, and sheen are
approved by Architect. 3. Refinish mock-up area as required to produce acceptable work.
1.7 DELIVERY, STORAGE, AND HANDLING
A. Store products in manufacturer's unopened packaging until ready for installation.
FivePoint 12106.000 Section 08 87 00 – Page 3 Artist’s Replacement Building Window Film Hunters Point Shipyard
B. Store and dispose of hazardous materials, and materials contaminated by hazardous materials, in accordance with requirements of local authorities having jurisdiction.
1.8 PROJECT CONDITIONS
A. Maintain environmental conditions (temperature, humidity, and ventilation) within limits recommended by manufacturer for optimum results. Do not install products under environmental conditions outside manufacturer's recommended limits.
1.9 WARRANTY
A. At project closeout, provide to Owner or Owners Representative an executed current copy of the manufacturer's standard limited warranty against manufacturing defect, outlining its terms, conditions, and exclusions from coverage.
PART 2 PRODUCTS
2.1 MANUFACTURERS
A. Acceptable Manufacturer: 3M Window Film , which is located at: 3M Center Bldg. 0235-02-S-27 ; St. Paul, MN 55144-1000; Toll Free Tel: 800-480-1704; Tel: 651-733-2222; Fax: 651-737-3446; Email: [email protected]; Web: www.3m.com/windowfilm
B. Requests for substitutions will be considered in accordance with provisions of Section 01 60 00.
C. Window Film: As specified in Section 09 06 00 “Colors and Finishes” for WF-1 and WF-2 as noted on the Drawings.
PART 3 EXECUTION
3.1 EXAMINATION
A. Film Examination: 1. If preparation of glass surfaces is the responsibility of another installer, notify
Architect in writing of deviations from manufacturer's recommended installation tolerances and conditions. a. Glass surfaces receiving new film should first be examined to verify
that they are free from defects and imperfections, which will affect the final appearance.
2. Do not proceed with installation until glass surfaces have been properly prepared and deviations from manufacturer's recommended tolerances are corrected. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result under the project conditions.
3. Commencement of installation constitutes acceptance of conditions.
B. Impact Protection Adhesive Examination: 1. If application of window film is/was the responsibility of another installer,
notification in writing shall be made of deviations from manufacturer's recommended installation tolerances and conditions.
2. Filmed glass surfaces receiving new attachment should first be examined to verify that they are free from defects and imperfections, and that the film edges extend sufficiently to the frame edges.
3. Do not proceed with installation until film and frame surfaces have been properly prepared and deviations from manufacturer's recommended tolerances are corrected. Prepare surfaces using the methods recommended
FivePoint 12106.000 Section 08 87 00 – Page 4 Artist’s Replacement Building Window Film Hunters Point Shipyard
by the manufacturer for achieving the best result under the project conditions. 4. Upon the customer's request, an adhesion test to the frame surface may be
conducted by applying a 4 - 6 inch long bead, approximately 0.5 - 1 inch in width, masking one side of the frame surface underneath the strip with tape. Allow the Impact Protection Adhesive to cure for 7 days and test adhesion by pulling up on the masked end and a 90 degree angle. If cohesive failure is observed (adhesive residue left behind on the frame surface), adhesion is acceptable; if adhesive failure is observed (clean peel from the frame), adhesion is unacceptable and product is not recommended.
C. Impact Protection Profile Examination: 1. If application of window film is/was the responsibility of another installer,
notification in writing shall be made of deviations from manufacturer's recommended installation tolerances and conditions.
2. Windows and frames must be examined to ensure that they are fit to receive the Impact Protection Profile in a manner such that the two profile adhesive strips will be perpendicularly opposed to each other and that they will not contact glazing stops or frame gaskets without stretching the profile.
3. Filmed glass surfaces receiving new attachment should first be examined to verify that they are free from defects and imperfections, and that the film edges extend sufficiently to the frame edges.
4. Do not proceed with installation until film and frame surfaces have been properly prepared and deviations from manufacturer's recommended tolerances are corrected. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result under the project conditions.
5. Upon the customer's request, an adhesion test to the frame surface may be conducted by applying a 4 - 6 inch long strip on the frame surface, using the sufficient pressure to achieve good adhesive wet-out. Allow the Impact Protection Profile to cure for 1-2 days and test adhesion by removing the test strip. If cohesive failure is observed (adhesive residue left behind on the frame surface), adhesion is acceptable; if adhesive failure is observed (clean peel from the frame), adhesion is unacceptable and product is either not recommended, or an adhesion promoter, such as 3M Primer 94, must be used.
3.2 PREPARATION
A. Clean surfaces thoroughly prior to installation.
B. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions.
C. Refer to Manufacturer's installation instructions for methods of preparation for Impact Protection Adhesive or Impact Protection Profile film attachment systems.
3.3 INSTALLATION
A. Film Installation: 1. Install in accordance with manufacturer's instructions. 2. Cut film edges neatly and square at a uniform distance of 1/8 inch (3 mm) to
1/16 inch (1.5 mm) of window sealant. Use new blade tips after 3 to 4 cuts. 3. Spray the slip solution, composed of one capful of baby shampoo or
dishwashing liquid to 1 gallon of water, on window glass and adhesive to facilitate proper positioning of film.
4. Apply film to glass and lightly spray film with slip solution. 5. Squeegee from top to bottom of window. Spray slip solution to film and
squeegee a second time.
FivePoint 12106.000 Section 08 87 00 – Page 5 Artist’s Replacement Building Window Film Hunters Point Shipyard
6. Bump film edge with lint-free towel wrapped around edge of a 5-way tool. 7. Upon completion of film application, allow 30 days for moisture from film
installation to dry thoroughly, and to allow film to dry flat with no moisture dimples when viewed under normal viewing conditions.
B. Impact Protection Adhesive Installation: 1. The film attachment system shall be applied according to the specifications of
the Manufacturer by an Authorized Dealer/Applicator. Refer to 3M publication, 70-0709-0322-7, 3M Impact Protection Adhesive Attachment System Installation Instructions. a. For blast mitigation: minimum 1/2 inch bead overlap on both frame and
film (excluding glazing stops or compression gaskets). b. For windborne debris protection: minimum 3/8 inch bead overlap on
both frame and film (excluding glazing stops or compression gaskets). 2. To ensure a straight and consistent bead width is achieved, masking tape
may be applied to film and frame surfaces prior to application. 3. With prior approval of the building owner or property manager, existing
compression gaskets may be partially removed or trimmed to allow for a thinner bead and stronger anchorage. If removing the gaskets, sections shall be trimmed approximately 3 inches in length and inserted with appropriate spacing along all sides of the window to help secure the glazing during application and curing of the Impact Protection Adhesive.
4. The Impact Protection Adhesive shall be dispensed with a caulk gun with nozzle opening diameter sized to match the approximate size of the desired bead width.
5. A plastic putty knife or other tool with a clean straight edge shall be used to trowel and smooth out the adhesive. The completed adhesive bead shall be relatively triangular in shape.
6. Any masking tape used shall be carefully removed within 10 minutes after applying the wet glaze.
C. Impact Protection Profile Installation: 1. The film attachment system shall be applied according to the specifications of
the Manufacturer by an Authorized Dealer/Applicator trained to install 3M Impact Protection Profile. Refer to 3M publication, 70-0709-0323-5, 3M Impact Protection Profile Attachment System Installation Instructions.
2. Each profile piece must span continuously to both sides of the window, within 1/8 inch to the frame edge. Splicing the profile between frame edges is prohibited.
3. Profile must be aligned and applied by 3M recommended or approved methods and tools to ensure a quality installation.
4. Corner joints must be fabricated by 3M recommended and approved methods. No part of the profile adhesive shall make contact with an adjacent profile.
5. Sufficient pressure must be evenly applied along the entire length of the profile to ensure full adhesion from both adhesive strips. A roller tool is required to minimize entrapment of air in the adhesive.
3.4 CLEANING AND PROTECTION
A. Remove left over material and debris from Work area. Use necessary means to protect film before, during, and after installation.
B. Touch-up, repair or replace damaged products before Substantial Completion.
C. After application of film, wash film using common window cleaning solutions, including ammonia solutions, 30 days after application. Do not use abrasive type
FivePoint 12106.000 Section 08 87 00 – Page 6 Artist’s Replacement Building Window Film Hunters Point Shipyard
cleaning agents and bristle brushes to avoid scratching film. Use synthetic sponges or soft cloths.
END OF SECTION 08 87 00
FE
C
FEC
98765
A
C
D
B
STORAGE
125STORAGE
124
SHOWER
122SHOWER
121
WOMEN
120
JANITOR
119
STUDIO 1-01(WOOD SHOP)
101STUDIO 1-03
103
STUDIO 1-04(WOOD SHOP)
104
A9.11
101-1
101-
2
101-3
101-
4
A9.11
103-3
103-
4
103-1
103-
2
A9.16
128-3
128-
4128-1
128-
2
A9.16
127-3
127-
2
127-1
127-
4
A9.16
126-1
126-
2
126-3
126-
4
A9.15
124-1
124-
2
124-3
124-
4
A9.16
125-1
125-
2
125-3
125-
4
A9.16
129-1
129-
4
129-
2
129-3
101A 103A 104A
105B
104B103B102A
119A121A122A124B125A
126A-A
127A
129A
128A
(F.F. +107.25)
STUDIO 1-02
102
124A
CORRIDOR
130
101B
A9.11
102-1
102-
2
102-3
102-
4
B
0"
C.1
201
201201
201
202
205
206
207
208
209
209
218218
A AAA1
AI
AI AI
AA BBBB
DD1JJ DD1
DD DD
E1
E1
L
L
L
L
E1E1
E1
D1
D1
E1
D
E1
E
202
P1
P1
P
E
D
C
B
D P1
P
D B
JJ
E1
AI
204
REF 0'-0"
D1
A6.121D
TYP. @ EXTERIOR U.O.N.
L
EJ
EJ
A10.202A10.20
1
SIM
FD
241
DD6
JJ1JJ1
P
FF
GG
G
G
123A
FE
FE
FE
FE
126A
D1
120A
D
D
229
114.84 T.O.WALL
TYP.
107.13 T.O.C
A9.16
126A-1
126A
-2
126A-3
126A
-4
107.21 T.O.C107.21 T.O.C107.21 T.O.C
254
255
254
18" x 7'SIDE LIGHT
SIM
PATRI
REN
. 6/1
9N
o. C
1826
8
CIA
LO
CK
C
A
AL
IFO
RNI
F
STAT
O
L
E
T
ICEN
SE
DA
RC
HIT
EC
160
W. S
ant a
Cla
ra S
t., S
uite
800
San
Jos
e, C
alifo
rnia
951
1340
8.92
4.08
1 1 fa
x: 4
08.9
24.0
844
San
Jo s
e
AR
CH
ITE
CTU
RE
PLA
NN
I NG
PR
OJE
CT
NO
.
DAT
E
REF
EREN
CE
SHEE
T N
O.
AR
TIS
TS
RE
PL
AC
EM
EN
T S
PA
CE
FL
OO
R P
LA
N -
LE
VE
L 1
1210
6.00
0
B-A
D1-A
01
7/10
/17
A2.
11
FEC
FE
C
139
C D E F
12
B
11
WO
ME
N
120
ME
N
118
JA
NIT
OR
119
EL
EC
T
116
ST
UD
IO 1
-07
107
ST
AIR
1-1
115A
A9.
11
105-
3
105-4
105-2
A9.
12107-2
107-
3
107-4
107-
1
A9.
13
113-
1
113-2
113-
3
113-4
A9.
14
114-
1
114-2
114-
3
114-4
A9.
17
130-
3
130-2
130-4
ST
UD
IO 1
-12
(MU
SIC
IAN
)
112
112A
107A
108A
113A
114A
110A
115A
116A
106B
105B
104B
118A
119A
107B
ST
UD
IO 1
-08
108
CO
RR
IDO
R
131
OPE
N T
O A
BOVE
108B 10
9B
107C
130-
1
10
A9.
12
108-
1
108-2
108-
3
108-4
A9.
12
109-
1
109-2
109-
3
109-4
A9.
13
111-
1
111-2
111-4
A9.
13
112-
1
112-2
112-
3
112-4
A9.
18
133-
1
133-2
133-
3
133-4
A9.
17
131-4
131-2
131-
3
EN
TR
Y L
OB
BY
133
C A AB
C.1
201
201
201
20120
5
207
208
210
242
213
213
214
214
218
218
ST
OR
AG
E
115B
131-
1
A9.
14
114-2a
114-4a
A
A AI
AI
AI
AA
1
DD
2
DD
DD
1
DD
235
A10
.30
27
A10
.30
28
AI
B
DP
1D
P B
JJ
E1
T
TT
T1
H E1
E1
P1
EE
E
E1
E1
E1
P
PEE
E
PP
E1
Q
L
LL
VE
1
E1
A10
.30
26
111A
133A
T
218
218
231 20
9
209
251
T
L
132A
AI
FD
242
WD
D6
E1
T1
A10
.30
19
FE
FE
FE
120A
107.
20
AI
A10
.30
15
A10
.30
21
251
FD
SIM
254
254
254
JJ JJ
E
PATRI
REN
. 6/1
9N
o. C
1826
8
CIA
LO
CK
C
A
AL
IFO
RNI
F
STAT
O
L
E
T
ICEN
SE
DA
RC
HIT
EC
160
W. S
ant a
Cla
ra S
t., S
uite
800
San
Jos
e, C
alifo
rnia
951
1340
8.92
4.08
1 1 fa
x: 4
08.9
24.0
844
San
Jo s
e
AR
CH
ITE
CTU
RE
PLA
NN
I NG
PR
OJE
CT
NO
.
DAT
E
REF
EREN
CE
SHEE
T N
O.
AR
TIS
TS
RE
PL
AC
EM
EN
T S
PA
CE
FL
OO
R P
LA
N -
LE
VE
L 1
1210
6.00
0
B-A
D1-A
02
7/10
/17
A2.
11
PATRI
REN
. 6/1
9N
o. C
1826
8
CIA
LO
CK
C
A
AL
IFO
RNI
F
STAT
O
L
E
T
ICEN
SE
DA
RC
HIT
EC
160
W. S
ant a
Cla
ra S
t., S
uite
800
San
Jos
e, C
alifo
rnia
951
1340
8.92
4.08
1 1 fa
x: 4
08.9
24.0
844
San
Jo s
e
AR
CH
ITE
CTU
RE
PLA
NN
I NG
PR
OJE
CT
NO
.
DAT
E
REF
EREN
CE
SHEE
T N
O.
AR
TIS
TS
RE
PL
AC
EM
EN
T S
PA
CE
DO
OR
TY
PE
S
1210
6.00
0
B-A
D1-A
03
A5.
21 &
A5.
22
A B C
D
SEE
SC
HED
ULE
SEE SCHEDULE
DOUBLE DOOR
SEE SCHEDULE AT
DOUBLE DOOR
SEE SCHEDULE AT
SEE SCHEDULE
SEE
SC
HED
ULE
SEE
SC
HED
ULE
SEE SCHEDULE
A1 B1DOUBLE DOUBLE
E
SEE
SC
HED
ULE
SEE SCHEDULE
SEE
SC
HED
ULE
SEE SCHEDULE
F
SEE
SC
HED
ULE
SEE SCHEDULE
G
SEE
SC
HED
ULE
SEE SCHEDULE
TGTG TG TG
IG-2
DOOR TYPES
7/10
/17
PATRI
REN
. 6/1
9N
o. C
1826
8
CIA
LO
CK
C
A
AL
IFO
RNI
F
STAT
O
L
E
T
ICEN
SE
DA
RC
HIT
EC
160
W. S
ant a
Cla
ra S
t., S
uite
800
San
Jos
e, C
alifo
rnia
951
1340
8.92
4.08
1 1 fa
x: 4
08.9
24.0
844
San
Jo s
e
AR
CH
ITE
CTU
RE
PLA
NN
I NG
PR
OJE
CT
NO
.
DAT
E
REF
EREN
CE
SHEE
T N
O.
AR
TIS
TS
RE
PL
AC
EM
EN
T S
PA
CE
FR
AM
E T
YP
ES
1210
6.00
0
B-A
D1-A
04
A5.
21 &
A5.
22
AA
SEE
SC
HED
ULE
SEE SCH
AA1 PAIR
2' -
0"2'
- 0"
2' -
0"2'
- 2"
SEE
SC
HED
ULE
7' - 0" F.V.
SEE SCHEDULE
CC
AA2 SINGLE ACOUS
1' - 6" @ TYPE AA4
3' - 4" @ TYPE AA3
AA3 SINGLE ACOUS W/ SIDELIGHT
2' -
6"
SINGLE
AA4 SINGLE W/ SIDELIGHT
IG-2
IG-2
IG-2
IG-2
10' - 0" F.V.
SEE SCHEDULE
SEE
SC
HED
ULE
IG-2
IG-2
IG-2
FRAME TYPES
BB
7/10
/17
PATRI
REN
. 6/1
9N
o. C
1826
8
CIA
LO
CK
C
A
AL
IFO
RNI
F
STAT
O
L
E
T
ICEN
SE
DA
RC
HIT
EC
160
W. S
ant a
Cla
ra S
t., S
uite
800
San
Jos
e, C
alifo
rnia
951
1340
8.92
4.08
1 1 fa
x: 4
08.9
24.0
844
San
Jo s
e
AR
CH
ITE
CTU
RE
PLA
NN
I NG
PR
OJE
CT
NO
.
DAT
E
REF
EREN
CE
SHEE
T N
O.
AR
TIS
TS
RE
PL
AC
EM
EN
T S
PA
CE
WIN
DO
W T
YP
ES
1210
6.00
0
B-A
D1-A
05
A5.
31
Leve
l 436
' - 0
"
Leve
l 547
' - 0
"
Leve
l 325
' - 0
"
7/8"
PLA
STER
CEM
ENT
SYST
EM O
/W
EATH
ER B
ARR
IER
,TY
P.
8' -
4" V
.I.F.
4 EQ. SPACES, TYP.
IG-2
SE
E 'V
' FO
RTY
PIC
AL
DE
TAIL
S30
A10.
71
21
A10.
52
22
A10.
51
13
A10.
71
9' - 6"9' - 9" 1' - 6" 9' - 6"1' - 6"
EQEQ
IG-2
24
A10.
71
28
A10.
71
SF
-1
IG-2
IG-2
IG-2
IG-2
WIN
DO
W F
ILM
, TYP
.SE
E EX
TER
IOR
ELEV
ATIO
NS
FOR
WIN
DO
W F
ILM
LOC
ATIO
N
Leve
l 214
' - 0
"
Leve
l 436
' - 0
"
Leve
l 547
' - 0
"
Leve
l 325
' - 0
"
EQ.
EQ.
7/8"
PLA
STSY
STEM
OBA
RR
IER
,
17
A10.
51
24
A10.
71
4 EQ. SPACES, TYP.
22
A10.
52
21
A10.
52
13
A10.
71
SIM
8' -
4" V
.I.F.
1' - 6" 9' - 6"1' - 6" 9' - 6"9' - 9" 1' - 6" 9' - 6"
IG-2
IG-2
28
A10.
71
SF
-1
IG-2
IG-2
IG-2
IG-2
IG-2
IG-2
WIN
DO
W
SEE
EXTE
ELEV
ATIO
WIN
DO
W F
LOC
ATIO
N
20
WV V1
SF
-1 S
EE
EX
T. E
LE
V.
7/10
/17
PATRI
REN
. 6/1
9N
o. C
1826
8
CIA
LO
CK
C
A
AL
IFO
RNI
F
STAT
O
L
E
T
ICEN
SE
DA
RC
HIT
EC
160
W. S
ant a
Cla
ra S
t., S
uite
800
San
Jos
e, C
alifo
rnia
951
1340
8.92
4.08
1 1 fa
x: 4
08.9
24.0
844
San
Jo s
e
AR
CH
ITE
CTU
RE
PLA
NN
I NG
PR
OJE
CT
NO
.
DAT
E
REF
EREN
CE
SHEE
T N
O.
AR
TIS
TS
RE
PL
AC
EM
EN
T S
PA
CE
WIN
DO
W T
YP
ES
1210
6.00
0
B-A
D1-A
06
A5.
31
CEM
ENT
EATH
ER
TYP
.R O
R
Leve
l 214
' - 0
"
Leve
l 436
' - 0
"
Leve
l 547
' - 0
"
Leve
l 325
' - 0
"
4' -
0" V
.I.F.
5
A10.
20
8
A10.
52
SIM
IG-2
28
A10.
71
1' - 6" 9' - 6"1' - 6" 9' - 6"1' - 6" 9' - 6"9' - 9"
4 EQ. SPACES, TYP.
17
A10.
50
SF
-1
IG-2
IG-2
IG-2
WIN
DO
W F
ILM
, TYP
.SE
E EX
TER
IOR
ELEV
ATIO
NS
FOR
WIN
DO
W F
ILM
LOC
ATIO
N
WIN
DO
W T
YPES
U
Leve
l 214
' - 0
"
Leve
l 1 0"IG
-2
IG-2
IG-2
IG-2
IG-2
IG-2
SF
-1
A10.
7115
A10.
7121
A10.
7117
26
A10.
71
17
A10.
51
BEAM
BEYO
ND
SHO
WN
DAR
K
4 EQUAL SPACES
PER
DO
OR
SC
HED
ULE
EQ EQEQ EQ
TYP.
TYP.
9
A10.
51
T
7/10
/17
PATRI
REN
. 6/1
9N
o. C
1826
8
CIA
LO
CK
C
A
AL
IFO
RNI
F
STAT
O
L
E
T
ICEN
SE
DA
RC
HIT
EC
160
W. S
ant a
Cla
ra S
t., S
uite
800
San
Jos
e, C
alifo
rnia
951
1340
8.92
4.08
1 1 fa
x: 4
08.9
24.0
844
San
Jo s
e
AR
CH
ITE
CTU
RE
PLA
NN
I NG
PR
OJE
CT
NO
.
DAT
E
REF
EREN
CE
SHEE
T N
O.
AR
TIS
TS
RE
PL
AC
EM
EN
T S
PA
CE
WIN
DO
W T
YP
ES
1210
6.00
0
B-A
D1-A
07
A5.
31
3' - 0"
10' - 4"
16' - 8" V.I.F.
4' - 3" 4' - 2"
2' -
2"5'
- 2"
EQEQ
14
A10.52
AFF
29
A10.70
18
A10.70
7
A10.52
7
A10.52
AFF
IG-2
8' - 0"
6' - 0"
2' - 0"
2' -
0"
1
A10.52
13
A10.52
AFF
7
A10.52
13' - 1"
4' - 0"
12' - 5" V.I.F.
8' - 3"
F.V
3' -
3"
EQEQ
.
9' -
1"
20
A10.70
9
A10.52
15
A10.52 TYP.
TYP.
AFF
8
A10.52
AFF
IG-2
IG-2
F.V
3' -
3"
13' - 1"
4' - 0"
16' - 8" V.I.F.
4' - 3"4' - 2"8' - 3"
EQEQ 9' -
1"
9
A10.52
14
A10.52
AFF
20
A10.70
8
A10.52
15
A10.52
AFF
IG-2
8' - 4"
EQ EQ
5' -
2"2'
- 2"
EQEQ
15
A10.52
17
A10.70
F G
BA
F.F.
F.F.
H
- MIRROR IMAGEA1
- MIRROR IMAGEF1
7/10
/17
PATRI
REN
. 6/1
9N
o. C
1826
8
CIA
LO
CK
C
A
AL
IFO
RNI
F
STAT
O
L
E
T
ICEN
SE
DA
RC
HIT
EC
160
W. S
ant a
Cla
ra S
t., S
uite
800
San
Jos
e, C
alifo
rnia
951
1340
8.92
4.08
1 1 fa
x: 4
08.9
24.0
844
San
Jo s
e
AR
CH
ITE
CTU
RE
PLA
NN
I NG
PR
OJE
CT
NO
.
DAT
E
REF
EREN
CE
SHEE
T N
O.
AR
TIS
TS
RE
PL
AC
EM
EN
T S
PA
CE
WIN
DO
W T
YP
ES
1210
6.00
0
B-A
D1-A
08
A5.
31
9' - 9"
SEE SCHED.
DOOR OPNG.
SEE
SC
HED
ULE
DO
OR
OPE
NIN
G
13
A10.51
10
A10.52
AFF
1
A10.72
1
A10.72
3' - 0"
13
A10.51
1"4' - 2"4' - 2"4' - 2"4' - 2"4' - 2"4' - 2"
28' - 11" V.I.F.
IG-2
AFF
IG-2
IG-2
9' - 9"
EQEQ
EQ
SEE SCHEDULE
DOOR OPENING
SEE
SC
HED
ULE
DO
OR
OPE
NIN
G
IG-2 IG-2
IG-2
SIM.
EQ EQ
25
A10.52
SF-1
AFF
26
A10.52
2' -
2 1/
2"
8
A10.51
2
A10.529
A10.51
2
A10.51
2 1/
2"
IG-2
IG-2 IG-2
A
N
P
11 10
7/10
/17
PATRI
REN
. 6/1
9N
o. C
1826
8
CIA
LO
CK
C
A
AL
IFO
RNI
F
STAT
O
L
E
T
ICEN
SE
DA
RC
HIT
EC
160
W. S
ant a
Cla
ra S
t., S
uite
800
San
Jos
e, C
alifo
rnia
951
1340
8.92
4.08
1 1 fa
x: 4
08.9
24.0
844
San
Jo s
e
AR
CH
ITE
CTU
RE
PLA
NN
I NG
PR
OJE
CT
NO
.
DAT
E
REF
EREN
CE
SHEE
T N
O.
AR
TIS
TS
RE
PL
AC
EM
EN
T S
PA
CE
LE
GE
ND
/ M
AT
ER
IAL
& F
INIS
H D
ES
IGN
AT
ION
1210
6.00
0
B-A
D1-A
09
A6.
11 -
A6.
24
NOTE: ALL SYMBOLS AND PATTERNS MAY NOT NECESSARILY OCCUR ON THIS SHEET.
EXTERIOR CEMENTPLASTER ASSEMBLY CORRUGATED
METAL WALLPANEL
WIRE MESH METAL WALLPANEL
2
CTYP.
2
A
TYP.U.O.N.
2
BTYP.
EXTERIOR LIGHTFIXTURE, SEDTYP.
2
D
TYP.BETWEENLVL 1 UPTO LVL 2
NOTE: REFER TO SPECIFICATION SECTION 09 06 00 COLORS & FINISHES
MATERIAL DESIGNATION
COLOR / FINISH DESIGNATION
1. METAL PANEL2. EXTERIOR CEMENT PLASTER, WITH INTEGRAL COLOR3. METAL ROOFING4. SECTIONAL DOOR5. PARAPET CAP (SHOULD MATCH ADJACENT COLOR, TYP.)6. ALUMINUM WINDOW FRAME7. HOLLOW METAL DOOR AND DOOR FRAME8. CMU BLOCK9. STRUCTURAL STEEL10. STOREFRONT FRAME11. GUTTERS / DOWNSPOUTS12. FASCIA13. STOREFRONT PANEL
A. PLASTER COLOR (EP-1) NEUTRALB. PLASTER COLOR (EP-2) YELLOWC. PLASTER COLOR (EP-3) BLUED. PLASTER COLOR (EP-4) DARKER NEUTRAL
MATERIAL DESIGNATION
COLOR / FINISH DESIGNATION
LEGENDMATERIAL & FINISH DESIGNATION
7/10
/17
PATRI
REN
. 6/1
9N
o. C
1826
8
CIA
LO
CK
C
A
AL
IFO
RNI
F
STAT
O
L
E
T
ICEN
SE
DA
RC
HIT
EC
160
W. S
ant a
Cla
ra S
t., S
uite
800
San
Jos
e, C
alifo
rnia
951
1340
8.92
4.08
1 1 fa
x: 4
08.9
24.0
844
San
Jo s
e
AR
CH
ITE
CTU
RE
PLA
NN
I NG
PR
OJE
CT
NO
.
DAT
E
REF
EREN
CE
SHEE
T N
O.
AR
TIS
TS
RE
PL
AC
EM
EN
T S
PA
CE
3 S
OU
TH
EL
EV
AT
ION
AT
PL
AZ
A
1210
6.00
0
B-A
D1-A
10
A6.
13
21
2A7.12
601601
603603
LEVEL 2PLAZA
621
623
9
A10.72
1
9
2A7.11
1110
609609
9.4
ALIGN
601
8' -
0"
A10.6117
A
0 4' 16'8'3SOUTH ELEVATION AT PLAZA
7/10
/17
PATRI
REN
. 6/1
9N
o. C
1826
8
CIA
LO
CK
C
A
AL
IFO
RNI
F
STAT
O
L
E
T
ICEN
SE
DA
RC
HIT
EC
160
W. S
ant a
Cla
ra S
t., S
uite
800
San
Jos
e, C
alifo
rnia
951
1340
8.92
4.08
1 1 fa
x: 4
08.9
24.0
844
San
Jo s
e
AR
CH
ITE
CTU
RE
PLA
NN
I NG
PR
OJE
CT
NO
.
DAT
E
REF
EREN
CE
SHEE
T N
O.
AR
TIS
TS
RE
PL
AC
EM
EN
T S
PA
CE
4 W
ES
T E
LE
VA
TIO
N A
T P
LA
ZA
1210
6.00
0
B-A
D1-A
11
A6.
14
0 4' 16'8'
C
1A7.11
B
1A7.14
C.8
616
601
A6.244
618
29
A10.71
606
Level 214' - 0"
Level 436' - 0"
Level 547' - 0"
Level 6 TOS58' - 0"
Parapet62' - 0"
G H
Level 325' - 0"
3A7.12
Penthouse TOS67' - 2 1/2"
9
A10.72
1
4WEST ELEVATION AT PLAZA
7/10
/17
PATRI
REN
. 6/1
9N
o. C
1826
8
CIA
LO
CK
C
A
AL
IFO
RNI
F
STAT
O
L
E
T
ICEN
SE
DA
RC
HIT
EC
160
W. S
ant a
Cla
ra S
t., S
uite
800
San
Jos
e, C
alifo
rnia
951
1340
8.92
4.08
1 1 fa
x: 4
08.9
24.0
844
San
Jo s
e
AR
CH
ITE
CTU
RE
PLA
NN
I NG
PR
OJE
CT
NO
.
DAT
E
REF
EREN
CE
SHEE
T N
O.
AR
TIS
TS
RE
PL
AC
EM
EN
T S
PA
CE
INT
ER
IOR
PL
AN
DE
TA
ILS
1210
6.00
0
B-A
D1-A
12
7/10
/17
A10
.30
(2) LAYERSCEMENTITIOUSBACKER UNIT O/ 6"MTL. STUD WALL,SEE WALL TYPES
CONC.WALL
4" MTL. STUD WALL.SEE WALL TYPES
D
CONC. WALL
SHOWERCOMPARTMENT
WP, SEE A7 SERIES
7/8"
NOTE:1. TCNA W244 SHALL APPLY2. SEE DETFOR SIZE, SPACING OF MISCFASTENERS, CONNECTORS
30 A10.20
1 1/2" = 1'-0"4 PLAN @ SHOWER"
(2) LAYERS CEMENTITIOUSBACKER UNIT, TYP.
CONC.SLAB
4" MTL. STUD WALL.SEE WALL TYPES
SHOWER FINISHWALL PANEL
RECESSED SHOWERPAN SET IN MORTARBED
1 1/
2".
SHOWER DRAIN
LIP OF SHOWERFLUSH WITHFINISH FLOOR
SHOWERPAN
NOTE: TCNA W244 SHALL APPLY
" 1 1/2" = 1'-0"9 SHOWER SILL
ARCHITECTURE PLANNING
Los Angeles315 W 9th St #600,Los Angeles, CA 90015213.769.0011 fax: 213.769.0016
PA
TR I
REN. 6/19No. C18268
C I A LOCK
C
A
ALIFO
RN
I
F
ST
AT
O
L
E
TICE
NSED ARCHITEC
PROJECT NO.
DATE
REFERENCE SHEET NO.
FACILITY ID NO.
OSHPD APP. NO.
ARTISTS REPLACEMENT SPACE
INTERIOR PLAN DETAILS
12106.000
B-AD1-A13
7/10/17
A10.30
METAL STUDSTAGGERED
2 LAYERS 1/2"GYP. BD.
SEAL OUTLETBOX, CONT. &AIRTIGHT WITHACOUSTICALOUTLETBACKER PAD(CAULKING),TYP.
SEE PLAN FOR WALL TYPE CONSTRUCTION
ACOUSTICAL WALL
CONT. ACOUST.SEALANT, TYP.
OU
TLET
S O
N O
PP. S
IDE
OF
WAL
L
24" M
IN. S
EPA
RAT
ION
BTW
N
FACE PLATE
OUTLET BOX ORPANEL INACOUSTICALRATEDCONSTRUCTION
2"
S
3" = 1'-0"25 OUTLET-ACOUS. WALL
ARCHITECTURE PLANNING
Los Angeles315 W 9th St #600,Los Angeles, CA 90015213.769.0011 fax: 213.769.0016
PA
TR I
REN. 6/19No. C18268
C I A LOCK
C
A
ALIFO
RN
I
F
ST
AT
O
L
E
TICE
NSED ARCHITEC
PROJECT NO.
DATE
REFERENCE SHEET NO.
FACILITY ID NO.
OSHPD APP. NO.
ARTISTS REPLACEMENT SPACE
WALL TYPES
12106.000
B-AD1-A15
7/10/17
A10.55
FINISH FLOOR ASSCHEDULED
CONCRETE WALL
UNDERSIDE OFFLOOR SLAB
SECTION 1/2" = 1' - 0" PLAN 1-1/2" = 1' - 0"
CONCRETE WALL
2-COAT CEMENTPLASTER SYSTEM
2-COAT CEMENTPLASTER SYSTEM
1" REVEAL, SEEINTERIOR ELEVATIONFOR LAYOUT
1/2" = 1'-0"A INTERIOR WALL (2HR)
B-AD1-A14
ARCHITECTURE PLANNING
Los Angeles315 W 9th St #600,Los Angeles, CA 90015213.769.0011 fax: 213.769.0016
PA
TR I
REN. 6/19No. C18268
C I A LOCK
C
A
ALIFO
RN
I
F
ST
AT
O
L
E
TICE
NSED ARCHITEC
PROJECT NO.
DATE
REFERENCE SHEET NO.
FACILITY ID NO.
OSHPD APP. NO.
ARTISTS REPLACEMENT SPACE
WALL TYPES
12106.000
B-AD1-A16
7/10/17
A10.55
FINISH FLOOR ASSCHEDULED
THERMAL BATTINSULATION
UNDERSIDE OFROOF / FLOORSTRUCTURE
SECTION 1/2" = 1' - 0" PLAN 1-1/2" = 1' - 0"
CEM. PLAS. ASSEMBLY O/ 5/8"TYPE X GLASS-MAT GYP.SHTG, TYP.
CEM. PLAS.ASSEMBLY O/ 5/8"TYPE X GLASS-MATGYP. SHTG
METAL STUDSTHERMAL BATTINSULATION
6" METAL STUDS @16" O.C.
5/8" TYPE X GYP. BD.5/8" TYPE X GYP. BD.
SOFFIT HTSEE RCP
EXTERIOR
INTERIOR
NOTE:WALL TYPE JJ1: PROVIDE 8" METAL STUDS@ 16" O.C.WALL TYPE JJ SIM: NON-RATED WALLPROVIDE 5/8" GYP BD. & 5/8" GLASS-MATGYP. SHTG IN LIEU OF TYPE X
FRAMEDEXT.SOFFIT,SEE RCP
1 HR WALL - GA FILE No WP 8006PROPRIETARY: NGC
1/2" = 1'-0"JJ EXTERIOR WALL (1HR) K
B-AD1-A15
WALL TYPE
SEE PLAN FOR1/2"
3"
1 1/
4"2
1/4"
..
.
SEE INTERIORELEVATION
3/4" SOLID MAPLE, CLEAR STAINFIRE CAULK ALL AROUNDANGLE PENETRATION
2 - 3/16" x 5/8" RHWS @ EACHSUPPORTSECTION
B
SECTION B ANGLE IN WALL4'-0" O.C.
3/4" 3/4"
1/4"
1 1/4" x 1 1/4" x 1/4" ANGLESUPPORTS AT 4'-0" O.C. MAX
5"10
"4"
3/8" DIA MACHINE BOLTS WITHWASHERS EACH SIDE, TYP
(2) 3/8" DIAMACHINE BOLT& NUT
1/2" 3"
1 1/
4"2
1/4"
..
.
SEE INTERIORELEVATION
3/4" SOLID MAPLE, CLEAR STAIN
2 - 3/16" x 5/8" RHWS @ EACHSUPPORTSECTION
A
EQ EQ
1/4"
1 1/4" x 1/4" THK METAL BARSUPPORTS AT 4'-0" O.C. MAX
5"10
"4" 3/8" DIA. EXP. ANCHOR,
2 1/2" MIN. EMBEDMENT, TYP.
SECTION A 1 1/4" x 1/4" THKMETAL BAR
3/8" DIAMACHINE BOLT& NUT
DISPLAY RAIL @ CONC. WALL DISPLAY RAIL @ WALL FRAMING
NOTE: PAINT ALL EXPOSEDMETAL & FASTENERS
1 1/4" x 1 1/4" x 1/4" ANGLE,WELD TO METAL BAR
MITER WITH CJP WELD
3 1/
2"
3 1/
2"
WELD ANGLE TOMETAL BAR
PATRI
REN
. 6/1
9N
o. C
1826
8
CIA
LO
CK
C
A
AL
IFO
RNI
F
STAT
O
L
E
T
ICEN
SE
DA
RC
HIT
EC
160
W. S
ant a
Cla
ra S
t., S
uite
800
San
Jos
e, C
alifo
rnia
951
1340
8.92
4.08
1 1 fa
x: 4
08.9
24.0
844
San
Jo s
e
AR
CH
ITE
CTU
RE
PLA
NN
I NG
PR
OJE
CT
NO
.
DAT
E
REF
EREN
CE
SHEE
T N
O.
AR
TIS
TS
RE
PL
AC
EM
EN
T S
PA
CE
DIS
PL
AY
RA
IL D
ET
AIL
1210
6.00
0
B-A
D1-A
16
7/10
/17
A
3" = 1'-0"15 DISPLAY RAIL
10.5
6
A10.902 DETAIL NUMBER
SHEET NUMBER
A7.112 SECTION NUMBER
SHEET NUMBER
A9.11
101-1 INTERIOR ELEVATION NUMBERCLOCKWISE SEQUENCE
SHEET NUMBER
A9.11
AUXILIARY INTERIORELEVATION NUMBER
SHEET NUMBER
101A DOOR NUMBER
101-5
101 KEYNOTE REFERENCE OR COLOR DESIGNATION
101A WINDOW NUMBER
ROOM NUMBER
ROOM AREA101
--- S.F.
ROOM NAME
A WALL TYPE
10 ACCESSORY TAG
CEILING HEIGHT TAG8'-0"
101-3
101-
4
101-
2
SHEET NUMBER
EXTERIOR ELEVATIONNUMBER
A6.112
CENTER LINE OF STUD
FACE OF STUD
160 W. Santa Clara St.,Suite 800San Jose, CA 95113408.924.0811 fax: 408.924.0844
San Jose
ARCHITECTURE PLANNING
PA
TR I
REN. 6/19No. C18268
C I A LOCK
C
A
ALIFO
RN
I
F
ST
AT
O
L
E
TICE
NSED ARCHITEC
ISSUE DATE:
PRIME CONSULTANT
SEAL
SHEET TITLE
SHEET NUMBER
COPYRIGHT 2013 IBI GROUP
CHK'D BY:
DRAWN BY:
COPYRIGHT:
Any reproduction or distribution for any purpose other than authorizedby IBI Group is forbidden.
CONSULTANT
APPROVALS
PLO
T D
ATE:
DEVELOPER
ONE SANSOME STREET, SUITE 3200SAN FRANCISCO, CA 94104
PHONE: (415) 995-1772 FAX: (415) 995-1778www.lennarurban.com
PROJECT
THE SHIPYARDHUNTERS POINT
ADDENDUMDATE
SUBMITTED DESCRIPTION
REVISIONS
DATEAPPROVED
SH
OR
ING
PE
RM
IT S
UB
MIS
SIO
N
-
06/08/2017
6/9/
2017
6:1
3:03
PM
C:\U
sers
\Phu
m.S
riton
gsoo
k\D
ocum
ents
\ATW
bld-
a_P
hum
.Srit
ongs
ook.
rvt
SH-G0.0
TITLE SHEET
PL
PS
12106.000
ARTISTSREPLACEMENT
SPACE
102 HORNE AVENUESAN FRANCISCO, CALIFORNIA, 94124
ARTISTS REPLACEMENT SPACE
102 HORNE AVENUE
SAN FRANCISCO, CALIFORNIA, 94124
SHORING PERMIT SUBMISSION
THE SHIPYARD HUNTERS POINT
ARCHITECT:IBI GROUP ARCHITECTURE PLANNING160 WEST SANTA CLARA STREET, SUITE 800SAN JOSE, CA 95113-2600PHONE: (408) 924-0811FAX: (408) 924-0844
CONTACT: PATRICIA LOCK, AIAPRINCIPAL ARCHITECT
OWNER:CP DEVELOPMENT CO, LPC/O LENNAR URBANONE SANSOME STREET, SUITE 3200SAN FRANCISCO, CA 94104PHONE: (415) 995-1772FAX: (415) 995-1778
CONTACT: MICHAEL HOCHSTOEGER, DEV. MGR.DANNY COOKE, EXEC. VICE-PRESIDENT
STRUCTURAL ENGINEER:HOHBACH-LEWIN STRUCTURAL ENGINEERS260 SHERIDAN AVENUE, SUITE 150PALO ALTO, CA. 94306PHONE: (650) 617-5930FAX: (650) 617-5932
CONTACT: MICHAEL RESCH, SESENIOR ASSOCIATE
PROJECT DIRECTORY
A - ACCESSIBLEAB - ANCHOR BOLTAC - ASPHALT CONCRETEA/C - AIR CONDITIONINGACOUS - ACOUSTICALAD - AREA DRAINADD - ADDENDUMADJ - ADJUSTABLE or
ADJACENTAGG - AGGREGATEALT - ALTERNATEALUM - ALUMINUMAPP - APPROVEDAPPROX - APPROXIMATEARCH - ARCHITECT (URAL)
BD - BOARDBEL - BELOWBLDG - BUILDINGBLKG - BLOCKINGBM - BEAMBOT - BOTTOMBRG - BEARINGBRK - BRICKBRZ - BRONZEBUR - BUILT UP ROOFING
C - CARPETCAB - CABINETCB - CATCH BASINCEM - CEMENTCF - CUBIC FOOTCFL - COUNTERFLASHINGCHAM - CHAMFERCJ - CONTROL JOINTCL - CHAINLINKCLG - CEILINGCLR - CLEARCT - CERAMIC MOSAIC (TILE)CMU - CONCRETE MASONRY
UNITCO - CLEAN OUTCOL - COLUMNCONC - CONCRETECONT - CONTINUOUS or
CONTINUECONST - CONSTRUCTIONCOTF - CLEAN OUT THRU
FLOORCOTG - CLEAN OUT TO GRADECOTW - CLEAN OUT THRU WALLCSK - COUNTERSINKCSMT - CASEMENTCSWS - COMPOSITE SHEARWALL SHEATHINGCTSK - COUNTERSUNK SCREWCW - COLD WATER
DET - DETAILDF - DRINKING FOUNTAINDIA - DIAMETERDIAG - DIAGONALDIM - DIMENSIONDIV - DIVISIONDR - DOORDS - DOWNSPOUTDWG - DRAWINGDWR - DRAWER
E - ENAMEL(E) - EXISTINGEA - EACHEB - EXPANSION BOLTEIFS - EXTERIOR INSULATION
FINISHING SYSTEMEJ - EXPANSION JOINTELEV - ELEVATIONELECT - ELECTRICALEMER - EMERGENCYENCL - ENCLOSURE (URE)EQ - EQUALEQPT - EQUIPMENTEXH - EXHAUSTEXP - EXPOSEDEXT - EXTERIOR
(F) - FUTUREFAC - FACTORYFBO - FURNISHED BY OTHERSFD - FLOOR DRAINFDC - FIRE DEPARTMENT
CONNECTIONFE - FIRE EXTINGUISHER
WALL-MOUNTEDFEC - FIRE EXTINGUISHERFF - FINISHED FLOORFHMS - FLAT HEAD MACHINE
SCREW
FIN - FINISHFJ - FLOOR JOISTFLR - FLOORFLUOR - FLUORESCENTFND - FOUNDATIONFO - FACE OFFOC - FACE OF CONCRETE
or COLUMNFOF - FACE OF FINISHFOP - FACE OF PLYWOOD
SHEATHINGFOS - FACE OF STUDFR - FRAME (D), (ING)FRP - FIBERGLASS
REINFORCED PLASTIC PANELS
FTG - FOOTINGFURR - FURRED (ING)
GA - GAUGEGB - GYPSUM BOARDGBWR - GYPSUM BOARD WATER
RESISTANTGI - GALVANIZED IRONGKT - GASKET (ED)GL - GLASS or GLAZINGGLV - GALVANIZEDGSM - GALVANIZED SHEET
METALGYP - GYPSUM
HB - HOSE BIBBHC - HOLLOW COREHDW - HARDWOODHEX - HEXAGONALHM - HOLLOW METAL (STEEL)HOR - HORIZONTALHT - HEIGHTHVAC - HEATING VENTILATING
AIR CONDITIONINGHW - HOT WATER
ID - INSIDE DIAMETERINCL - INCLUDE (D), (ING)INSTR - INSTRUCTION (S)INSUL - INSULATE (D), (ION)INT - INTERIORINV - INVERT
JST - JOISTJT - JOINT
KO - KNOCKOUT
LAM - LAMINATE (D)LAV - LAVATORYLB - LAG BOLTLVR - LOUVERLCP - LAY-IN CEILING PANEL
MAS - MASONRYMATL - MATERIALMAX - MAXIMUMMB - MACHINE BOLTMECH - MECHANICALMED - MEDIUMMFG - MANUFACTURINGMFR - MANUFACTURERMIN - MINIMUMMIR - MIRRORMISC - MISCELLANEOUSMO - MASONRY OPENINGMNT - MOUNT (ED), (ING)MTL - METALMUL - MULLION
(N) - NEWNIC - NOT IN CONTRACTNO - NUMBERNOM - NOMINALNPS - NOMINAL PIPE SIZENTS - NOT TO SCALE
O/ - OVEROC - ON CENTEROD - OUTSIDE DIAMETEROFD - OVERFLOW DRAINOFCI - OWNER FURNISHED,
CONTRACTOR INSTALLED
OFOI - OWNER FURNISHED, OWNER INSTALLED
OH - OVERHEADOPNG - OPENINGOPP - OPPOSITEOPT - OPTIONAL
P - PAINTPAF - POWDER ACTUATED
FASTENERPERIM - PERIMETERPERF - PERFORATEDPL - PROPERTY LINEPLAM - PLASTIC LAMINATEPLAS - PLASTERPLT - PLATEPLWD - PLYWOODPNL - PANELPOC - POINT OF CONNECTIONPT - POINTPTDF - PRESERVATIVE
TREATED DOUGLAS FIRPTN - PARTITIONPSL - PARALLEL STRAND
LUMBERPVC - POLYVINYL CHLORIDE
R - RISERRC - RELATIVE COMPACTIONRD - ROOF DRAINREF - REFERENCEREFR - REFRIGERATORREM - REMOVEREQ'D - REQUIREDRES - RESILIENTREV - REVISIONRFL - REFLECTRHWS - ROUND HEAD WOOD
SCREWRDWD - REDWOODRWL - RAIN WATER LEADER
SAD - SEE ARCHITECTURAL DWGS
SAFF - SELF-ADHERING FLEXIBLE FLASHING
SASM - SELF-ADHERING SHEET MEMBRANE
SCD - SEE CIVIL DWGSSCH - SCHEDULESD - STORM DRAINSEC - SECTIONSED - SEE ELECTRICAL DWGSSF - SQUARE FEETSHLF - SHELFSHLV - SHELVINGSHT - SHEETSHTG - SHEATHINGSIM - SIMILARSLD - SEE LANDSCAPE DWGSSMD - SEE MECHANICAL DWGSSPD - SEE PLUMBING DWGSSPEC - SPECIFICATIONSSQ - SQUARESS - STAINLESS STEELSSD - SEE STRUCTURAL DWGSSTN - STAINSTD - STANDARDSTL - STEELSTSMS - SELF TAPPING SHEET
METAL SCREW
T - TREADT&B - TOP AND BOTTOMTELE - TELEPHONETEMP - TEMPEREDT&G - TONGUE-AND-GROOVETHRU - THROUGHTJ - TOOL JOINTTOC - TOP OF CURB, CRICKET,
or CONCRETETOP - TOP OF PARAPETTOS - TOP OF SLAB,
SHEATHING, or STEELTPTN - TOILET PARTITIONTS - TOP OF SHEATHINGTSB - TOP SET BASETV - TELEVISIONTYP - TYPICALTWS - TACKABLE WALL
SYSTEM
UON - UNLESS OTHERWISE NOTED
VAR - VARIESVB - VAPOR BARRIERVCT - VINYL COMPOSITION
TILEVCTB - VINYL COVERED
TACKBOARDVERT - VERTICALVFY - VERIFYVG - VERTICAL GRAINVIF - VERIFY IN FIELDVO - VENT OVER or OFFSETVR - VENT RISERVTR - VENT THROUGH ROOFVWC - VINYL WALL COVERING
W/ - WITHWD - WOODWF - WIDE FLANGEWI - WOODWORK INSTITUTEWIN - WINDOWW/O - WITH OUTWO - WHERE OCCURSWP - WATER PROOFINGWRB - WEATHER-RESISTIVE
BARRIERWS - WOOD SCREWWSCT - WAINSCOT
@ - ATø - DIAMETER± - PLUS/MINUS
LC - CENTER LINE° - DEGREES
ABBREVIATIONS SYMBOLS
SHEET INDEX
GENERALSH-G0.0 TITLE SHEET
ARCHITECTURALSH-A1.1 SITE PLAN (FOR REFERENCE ONLY)SH-A2.1 FLOOR PLAN - LEVEL 1 RETAINING WALLSH-A2.2 DETAILS & SPECIFICATIONS
STRUCTURALSH1 GENERAL SHORING NOTESSH2 TEMPORARY SHORING DETAILSSH2.1 PERMANENT SHORING DETAILSSH2.2 TYPICAL FOUNDATION DETAILSSH3 SHORING PLANSH4 SHORING ELEVATIONS
VICINITY MAPAPPLICABLE CODESCALIFORNIA CODE OF REGULATIONS, TITLE 24 - BUILDING STANDARDS
2016 CALIFORNIA ADMINISTRATIVE CODE (CAC) (Title 24, Part 1, CCR)2016 CALIFORNIA BUILDING CODE (CBC), Volumes 1 & 2 ( Title 24, Part 2, CCR)
(2015 International Building Code with 2016 California amendments)2016 CALIFORNIA REFERENCE STANDARDS CODE, (Title 24, Part 12, CCR)
2010 ADA STANDARDS FOR ACCESSIBILITY DESIGN, U.S. Department of Justice
NOTE: SOME CODES MAY NOT APPLY IF WORK REGULATED BY SUCH CODES ISNOT WITHIN THE SCOPE OF THIS PROJECT.
VICINITY MAP
N
ARTISTSREPLACEMENTSPACE
SAN FRANCISCO
THESE DRAWINGS AND/OR SPECIFICATIONS FOR THE ITEMS LISTED BELOW HAVE BEENPREPARED BY OTHER DESIGN PROFESSIONALS OR CONSULTANTS WHO ARE LICENSEDAND/OR AUTHORIZED TO PREPARE SUCH DRAWINGS IN THIS STATE. THESE DOCUMENTSHAVE BEEN EXAMINED BY ME FOR DESIGN INTENT AND HAVE BEEN FOUND TO MEETTHE APPROPRIATE REQUIREMENTS OF TITLE 24, CALIFORNIA CODE OF REGULATIONSAND THE PROJECT SPECIFICATIONS PREPARED BY ME.
THE ITEMS LISTED BELOW ARE ACCEPTABLE FOR INCORPORATION INTO THECONSTRUCTION OF THIS PROJECT FOR WHICH I AM THE INDIVIDUAL DESIGNATED TO BEIN GENERAL RESPONSIBLE CHARGE.
SIGNATURE
SIGNATURE OF ARCHITECT INRESPONSIBLE CHARGE
DATE
ARCHITECT NAME LICENSE No / EXPIRATION
STATEMENT OF GENERAL CONFORMANCE
PATRICIA LOCK, AIA, LEED AP C18268 - REN. 06/19
FOR INFORMATION ONLY
DN
DROP-OFF ONLY
NO PARKING
UP
5T5
C3
D3
C3D3
T3
13
A
12
(E) BUILDING 101
HORNE AVENUE
RO
BIN
SON
STR
EET
NEW COMMERCIALKITCHEN
(UNDER SEPARATEBLDG. PERMIT)
GAL
VEZ
AVEN
UE
PROPERTY LIN
E
PARKING
FISCHER STREET
PLAZA
PARK ARTIST REPLACEMENTBUILDING
A1.121
TYPR 150' -
0"
20' -
6"
20' -
0"
ASSUMED PL
PROPERTY LINE
PR
OP
ER
TY
LIN
E
20' - 0"
ASS
UM
ED
PL
10' - 0"
PR
OP
ER
TY
LIN
E
PROPERTY LINE
50 TOTAL PARKING SPACES48 STANDARD SPACES2 ACCESSIBLE SPACES (1 VAN ACCESSIBLE)
123456789101112131415161718192021222324252627
293031323334353637383940414243444546
ASSUMED PL
DWFW
RW
G
G
FUTURE TRANSIT STOP
SS SS SS
SS
11' - 0"
10' -
11"
RW
SEE LANDSCAPE DRAWINGSSEE CIVIL DRAWINGS
DW
47484950
FW
115 130
110110
115
140
140
140
115
161
140
140
140
139
141141
142
142
149
161
ASSUMED PLOCII PARCEL
ASSUMED PL NAVYPARCEL UC-2
TRANSFER MID-JUNE 2015
ASSUMEDPL
PARCEL DTRANSFERMID-JUNE
2015
ASSUMED PLPARCEL C
ASSUMED PLPARCEL B
112
112
28
51
LIMIT OF HOSE LENGTH FROM F.H.
FIRE DEPARTMENT ACCESS. WIDTH 20'-0"
PROPERTY LINE ACCESSIBLE BUILDING ENTRANCE
BUILDINGASSUMED PROPERTY LINE
ACCESSIBLE PATH OF TRAVEL (P.O.T.) AS INDICATED,IS A COMMON, BARRIER-FREE, FIRM AND SMOOTHACCESS ROUTE WITHOUT ANY ABRUPT VERTICALCHANGES EXCEEDING 1/2" BEVELED AT 1:2 MAXIMUMSLOPE. PASSING SPACES AT LEAST 60" X 60" ARELOCATED NOT MORE THAN 200' APART. PARTS OFP.O.T. WITH CONTINUOUS GRADIENTS HAVE 60" LEVELAREAS NOT MORE THAN 400' APART. THE CROSS-SLOPE DOES NOT EXCEED 2% AND SLOPE IN THEDIRECTION OF TRAVEL AND IS LESS THAN 5% UNLESSOTHERWISE INDICATED. (P.O.T.) SHALL BEMAINTAINED FREE OF OVERHANGING OBSTRUCTIONSTO 80" MINIMUM AND PROTRUDING OBJECTS GREATERTHAN 4" PROJECTION FROM WALL AND ABOVE 27"AND LESS THAN 80".
PA
TR I
REN. 6/17No. C18268
C I A LOCK
C
A
ALIFO
RN
I
F
ST
AT
O
L
E
TICE
NSED ARCHITEC
160 W. Santa Clara St.,Suite 800San Jose, CA 95113408.924.0811 fax: 408.924.0844
San Jose
ARCHITECTURE PLANNING
ISSUE DATE:
PRIME CONSULTANT
SEAL
SHEET TITLE
SHEET NUMBER
COPYRIGHT 2013 IBI GROUP
CHK'D BY:
DRAWN BY:
PROJECT NO:
COPYRIGHT:
Any reproduction or distribution for any purpose other than authorizedby IBI Group is forbidden.
CONSULTANT
APPROVALS
PLO
T D
ATE:
DEVELOPER
ONE SANSOME STREET, SUITE 3200SAN FRANCISCO, CA 94104
PHONE: (415) 995-1772 FAX: (415) 995-1778www.lennarurban.com
PROJECT
THE SHIPYARDHUNTERS POINT
ADDENDUMDATE
SUBMITTED DESCRIPTION
REVISIONS
DATEAPPROVED
BU
ILD
ING
PE
RM
IT
S2 4/20/2015 SUPERSTRUCTUREPERMIT SUBMISSION
N/A 6/26/2014 SITE PERMIT SUBMISSION
S1 4/20/2015 FOUNDATION PERMITSUBMISSION
12/1/2014 DBI COMMENTS13/13/2015 OCII COMMENTS2
-
S3 BUILDING PERMITSUBMISSION
3/31/2015
7/9/2015
8/24/2016
APPROVED4/21/2015
10/7/2015 DBI COMMENTSS1.110/7/2015 APPROVED
10/7/2015 DBI COMMENTSS2.112/4/2015 APPROVED
REPLACEMENT SHEETSDBI COMMENTSAPPROVED
S3.1S3.2
9/3/2015
6/9/
2017
4:2
4:36
PM
C:\U
sers
\Phu
m.S
riton
gsoo
k\D
ocum
ents
\ATW
site
_Phu
m.S
riton
gsoo
k.rv
t
A1.11
OVERALL SITE PLAN
PL
PS
12106.000
ARTISTSREPLACEMENT
SPACE
102 HORNE AVENUESAN FRANCISCO, CALIFORNIA, 94124
OVERALL SITE PLAN
0 15' 60'30'
N
RE
F.
NO
RT
H
LEGEND
110 LANDSCAPE PLANTING AREA, SLD112 FIRE DEPARTMENT CONNECTION AT BUILDING WALL, SEE DEFFERED
APPROVAL FP DWGS115 FIRE HYDRANT LOCATION, SEE OFF-SITE STREET IMPROVEMENT PLANS
UNDER SEPARATE PERMIT130139 TRASH ENCLOSURE140 LEVEL OF EXIT DISCHARGE141 ARTIST CAR/FORKLIFT ACCESS142 (E) FIRE HYDRANT149 ROBINSON STREET MAIN ENTRANCE161 FIRE HYDRANT, SCD FOR ADDITIONAL INFORMATION, TYP.
1
1
1
1
1
1
1
1
1
1
100-GENERAL NOTES
1. REFER TO CIVIL, PLUMBING, AND ELECTRICAL DRAWINGS FORUNDERGROUND UTILITIES.
2. PRIOR TO ANY UNDERGROUND SITE WORK, VERIFY LOCATION OF ALLEXISTING UTILITIES WITH UNDERGROUND SERVICE ALERT (U.S.A.).
3. SEE A2.11 FOR BIKE RACK AT MAIN ENTRY, ROBINSON STREET
4. SEE C- DRAWINGS FOR ALL FINISH GRADES AND CROSS-SLOPES,SHOWN HERE FOR COORDINATION ONLY.
5. SEE CL- DRAWINGS FOR PAVEMENT EXPANSION AND CONTROL JOINTS, TYP.
6. SEE ELECTRICAL DRAWINGS FOR SITE LIGHTING, TYP.
7. SEE G0.06 PRE-APPLICATION PLAN REVIEW LETTER FOR REQUIREMENTSOF G1, A1 THROUGH A3, F1 THROUGH F8, AND DBI PLAN QUESTIONS 1THROUGH 4. CONTRACTOR TO COMPLY WITH REQUIREMENTS WHERENOTED AND COORDINATE WITH ARCHITECT, TYPICAL.
KEYNOTES
S3.2
S3.1
2
2
2
2
2
S3.1
S3.1
S3.1
S3.1
S3.2
S3.2
FOR INFORMATION ONLY
160 W. Santa Clara St.,Suite 800San Jose, CA 95113408.924.0811 fax: 408.924.0844
San Jose
ARCHITECTURE PLANNING
PA
TR I
REN. 6/19No. C18268
C I A LOCK
C
A
ALIFO
RN
I
F
ST
AT
O
L
E
TICE
NSED ARCHITEC
ISSUE DATE:
PRIME CONSULTANT
SEAL
SHEET TITLE
SHEET NUMBER
COPYRIGHT 2013 IBI GROUP
CHK'D BY:
DRAWN BY:
COPYRIGHT:
Any reproduction or distribution for any purpose other than authorizedby IBI Group is forbidden.
CONSULTANT
APPROVALS
PLO
T D
ATE:
DEVELOPER
ONE SANSOME STREET, SUITE 3200SAN FRANCISCO, CA 94104
PHONE: (415) 995-1772 FAX: (415) 995-1778www.lennarurban.com
PROJECT
THE SHIPYARDHUNTERS POINT
ADDENDUMDATE
SUBMITTED DESCRIPTION
REVISIONS
DATEAPPROVED
SH
OR
ING
PE
RM
IT S
UB
MIS
SIO
N
-
06/08/2017
6/9/
2017
4:2
5:48
PM
C:\U
sers
\Phu
m.S
riton
gsoo
k\D
ocum
ents
\ATW
bld-
a_P
hum
.Srit
ongs
ook.
rvt
SH-A1.1
OVERALL SITE PLAN
Checker
Author
12106.000
ARTISTSREPLACEMENT
SPACE
102 HORNE AVENUESAN FRANCISCO, CALIFORNIA, 94124
PROPERTY LINE
AREA OF WORK
ALL OTHER WORK SHOWN,PART OF S3 ADDENDUMPERMIT #201406309976
ALL OTHER WORK SHOWN,PART OF S3 ADDENDUMPERMIT #201406309976
FOR INFORMATION ONLY
1398765
A
121110
FDC
107.21' T.O.C.
PROPERTY LINE
PR
OPE
RTY
LIN
E
PROPERTY LINE
107.21' T.O.C.107.21' T.O.C.107.21' T.O.C.107.21' T.O.C.107.21' T.O.C.
107.21 T.O.C 107.15' T.O.C.
8' - 8" 50' - 0" 10' - 10" 14' - 2" 25' - 0" 10' - 0" 15' - 0" 10"
1"3' -
0"
107.21' T.O.C.
107.11' T.O.C.107.11 T.O.C.107.13' T.O.C.107.13' T.O.C.
105.83' B.O.T.D.107.13' T.O.C.
105.67' B.O.T.D. 105.83' B.O.T.D. 105.83 B.O.T.D.106.15' B.O.T.D.
107.15' T.O.C.
201
95' - 1"
201201
202
204204203
11SH-A2.2
23SH-A2.2
205
1398765
A
121110
FDC
PROPERTY LINE
PR
OPE
RTY
LIN
E
PROPERTY LINE
107.78' T.O.W.
114.84' T.O.W.
114.84' T.O.W.
1"3'
- 0"
112.08' T.O.W.
201201201
20620620611
SH-A2.2 23SH-A2.2
NOTE: ALL SYMBOLS AND PATTERNS MAY NOT NECESSARILY OCCUR ON THIS SHEET.
REINFORCED CONCRETEWALL, SEE SH-DWGS
XX.XX' T.O.C.
ELEVATIONVALUE AND POINTOF ELEVATION
T.O.C. = TOP OF CONCRETEB.O.T.D. = BOTTOM OF TRENCH DRAINT.O.W. = TOP OF WALL
N
RE
F.
NO
RT
H
1 13
AA
D
9
H
AREA OF WORK
160 W. Santa Clara St.,Suite 800San Jose, CA 95113408.924.0811 fax: 408.924.0844
San Jose
ARCHITECTURE PLANNING
PA
TR I
REN. 6/19No. C18268
C I A LOCK
C
A
ALIFO
RN
I
F
ST
AT
O
L
E
TICE
NSED ARCHITEC
ISSUE DATE:
PRIME CONSULTANT
SEAL
SHEET TITLE
SHEET NUMBER
COPYRIGHT 2013 IBI GROUP
CHK'D BY:
DRAWN BY:
COPYRIGHT:
Any reproduction or distribution for any purpose other than authorizedby IBI Group is forbidden.
CONSULTANT
APPROVALS
PLO
T D
ATE:
DEVELOPER
ONE SANSOME STREET, SUITE 3200SAN FRANCISCO, CA 94104
PHONE: (415) 995-1772 FAX: (415) 995-1778www.lennarurban.com
PROJECT
THE SHIPYARDHUNTERS POINT
ADDENDUMDATE
SUBMITTED DESCRIPTION
REVISIONS
DATEAPPROVED
SH
OR
ING
PE
RM
IT S
UB
MIS
SIO
N
-
06/08/2017
6/9/
2017
6:0
0:58
PM
C:\U
sers
\Phu
m.S
riton
gsoo
k\D
ocum
ents
\ATW
bld-
a_P
hum
.Srit
ongs
ook.
rvt
SH-A2.1
FLOOR PLAN -LEVEL 1 RETAININGWALL
PL
PS
12106.000
ARTISTSREPLACEMENT
SPACE
102 HORNE AVENUESAN FRANCISCO, CALIFORNIA, 94124
FLOOR PLAN - LEVEL 1 RETAINING WALL
LEGENDKEYNOTES KEY PLAN
N
RE
F.
NO
RT
H
0 4' 16'8'
FLOOR PLAN - LEVEL 1 TOP OF RETAINING WALL
1. ALL WALL DIMENSIONS ARE TO: FACE OF STUD OR COLUMNS,
CENTERLINE OF STUDS OR COLUMNS,SCHEDULED OPENINGS AND OTHER GRID POINTS, U.O.N.
2. REFER TO STRUCTURAL (SH) DRAWINGS FOR WORK NOT SHOWN HERE.
GENERAL NOTES
N
RE
F.
NO
RT
H
0 4' 16'8'
201 SEE SHEET SH3 SHORING PLAN FOR RETAINING WALLINFORMATION
202 STORM DRAIN, N.I.C. - PART OF SEPARATE PERMIT203 BUILDING - PART OF S3 ADDENDUM PERMIT #201406309976204 CONCRETE PAVEMENT AND TRENCH DRAIN - PART OF S3
ADDENDUM PERMIT #201406309976205 SOLDIER PILE, TYP. SEE SH DRAWINGS206 METAL RAILING - PART OF S3 ADDENDUM PERMIT
#201406309976
FOR INFORMATION ONLY
PR
OPE
RTY
LIN
E
12" MAX
1"
6" T
YP. M
AX.
T.O. SIDEWALK
DRAIN BOARD
RETAINING WALL, SEE SH DWGS.
TOP OF WALL ELEVATION SEESH-A2.1
T.O.WALL VARIESSEE SH-A2.1
PR
OPE
RTY
LIN
E
T.O.C.SEE SH-A2.1
SIDEWALK, N.I.C.PART OFSEPARATEPERMIT
SLOPE
1' -
0"
TRENCH DRAIN,PART OF S3ADDENDUM PERMIT#201406309976
CONC. WALK W/ THICKENED SLABEDGE, PART OF S3 ADDENDUMPERMIT #201406309976
RAILING, PART OF S3ADDENDUM PERMIT #201406309976
F.O
. CO
NC
.
FOOTING, SEE SH DWGS
PR
OPE
RTY
LIN
E
12" MAX
6" T
YP. M
AX.
1" 3' - 0"
T.O. SIDEWALK
DRAIN BOARD TRENCH DRAIN,PART OF S3ADDENDUM PERMIT#201406309976
RETAINING WALL, SEE SH DWGS.
CONC. WALK W/ THICKENED SLABEDGE, PART OF S3 ADDENDUMPERMIT #201406309976
FOOTING, SEE SH DWGS
SIDEWALK, N.I.C.PART OFSEPARATEPERMIT
RAILING, PART OF S3ADDENDUM PERMIT #201406309976
T.O.WALL VARIESSEE SH-A2.1
T.O.C.SEE SH-A2.1
SLOPE
5"
1' -
0"
F.O
. CO
NC
.
160 W. Santa Clara St.,Suite 800San Jose, CA 95113408.924.0811 fax: 408.924.0844
San Jose
ARCHITECTURE PLANNING
PA
TR I
REN. 6/19No. C18268
C I A LOCK
C
A
ALIFO
RN
I
F
ST
AT
O
L
E
TICE
NSED ARCHITEC
ISSUE DATE:
PRIME CONSULTANT
SEAL
SHEET TITLE
SHEET NUMBER
COPYRIGHT 2013 IBI GROUP
CHK'D BY:
DRAWN BY:
COPYRIGHT:
Any reproduction or distribution for any purpose other than authorizedby IBI Group is forbidden.
CONSULTANT
APPROVALS
PLO
T D
ATE:
DEVELOPER
ONE SANSOME STREET, SUITE 3200SAN FRANCISCO, CA 94104
PHONE: (415) 995-1772 FAX: (415) 995-1778www.lennarurban.com
PROJECT
THE SHIPYARDHUNTERS POINT
ADDENDUMDATE
SUBMITTED DESCRIPTION
REVISIONS
DATEAPPROVED
SH
OR
ING
PE
RM
IT S
UB
MIS
SIO
N
-
06/08/2017
6/9/
2017
6:1
1:41
PM
C:\U
sers
\Phu
m.S
riton
gsoo
k\D
ocum
ents
\ATW
bld-
a_P
hum
.Srit
ongs
ook.
rvt
SH-A2.2
DETAILS &SPECIFICATIONS
PL
PS
12106.000
ARTISTSREPLACEMENT
SPACE
102 HORNE AVENUESAN FRANCISCO, CALIFORNIA, 94124 3/4" = 1'-0"23 SECTION AT RETAINING WALL
3/4" = 1'-0"11 SECTION AT RETAINING WALL
SPECIFICATIONS
FOR INFORMATION ONLY