Environmental Engineering Standards
Issue 1Operative from 1 July 2010
Whangarei District Council | Phone 09 430 4200 | www.wdc.govt.nz
Acknowledgements
We acknowledge the following councils for allowing us to use parts of their Standards/Codes of Practice in compiling this document:
Christchurch City Council
Waimakariri District Council
Whangarei District Council welcomes users of this document to copy parts of it for their own use, providing that appropriate acknowledgement of the source is made.
Enquiries regarding the document may be directed to the group manager Infrastructure and Services or the senior environmental engineering officer.
Amendments
No. Date Description
1. 20/7/2010 Correct 4.11.1: 2% to 5%: correct hyperlinks in 1.4.1.3
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
Table of Contents
Section 1 Referenced Documents, Glossary and Abbreviations ................................................. 1
1.1 Referenced Documents ................................................................................................. 1
1.2 Glossary – Definitions. See Whangarei District Plan Definitions ............................................ 5
1.3 Abbreviations ............................................................................................................. 12
1.4 General Requirements and Procedures ........................................................................... 13
1.4.1 General Requirements ................................................................................................. 13
1.4.1.1 General ..................................................................................................................... 13
1.4.1.2 Statutory Requirements ............................................................................................... 13
1.4.1.3 Developer's Representative ........................................................................................... 14
1.4.1.4 Fees and Charges ....................................................................................................... 14
1.4.1.5 Cost of the Work and Council Contributions ..................................................................... 14
1.4.1.6 Insurance .................................................................................................................. 15
1.5 General Investigation, Design, Certification and Role of the IQP ......................................... 16
1.5.1 Investigation .............................................................................................................. 16
1.5.2 Design ...................................................................................................................... 16
1.5.2.1 Design Life................................................................................................................. 16
1.5.3 Certification ............................................................................................................... 16
1.5.3.1 Design Stage .............................................................................................................. 17
1.5.3.2 Post Construction ........................................................................................................ 17
1.5.4 The Role of the IQP ..................................................................................................... 17
Table 1.1 Specialist Aspects that Require an Independent Qualified Person (IQP) for Investigation, Calculations, Design, Supervision and Certification ........................................................... 18
1.6 Resource Consent Applications ...................................................................................... 19
1.6.1 Initial Application Stage (Subdivisions and Land Use Consents) .......................................... 19
1.6.2 Post Consent Approval Stage (Subdivisions) .................................................................... 20
1.6.2.1 Engineering Plan Approvals for Construction .................................................................... 20
1.6.2.2 Approval by Council ..................................................................................................... 20
1.6.2.3 Supporting Information and Calculations ......................................................................... 20
1.6.2.4 Assessments/Reviews of Reports and/or Designs ............................................................. 21
1.7 Drafting Standards ...................................................................................................... 22
1.7.1 General ..................................................................................................................... 22
1.7.2 Survey Co-ordinates and Levels ..................................................................................... 22
1.7.2.1 Asset Data/Levels ....................................................................................................... 22
1.7.2.2 Subdivision Survey Parcel Boundary Elements .................................................................. 22
1.7.3 Plan General .............................................................................................................. 22
1.7.4 Title Blocks ................................................................................................................ 23
1.7.5 Scales ....................................................................................................................... 23
Table 1.2 Preferred Scales ......................................................................................................... 23
1.7.6 Hard Copy Format ....................................................................................................... 23
1.7.7 Electronic Formats ...................................................................................................... 24
1.8 Content of Plans ......................................................................................................... 25
1.8.1 Geotechnical See Section 2 .......................................................................................... 25
1.8.2 Earthworks ................................................................................................................ 25
1.8.3 Roads and Access See Section 3 ................................................................................... 25
1.8.4 General Services ......................................................................................................... 25
1.8.5 Stormwater See Section 4 ........................................................................................... 25
1.8.6 Wastewater See Section 5 ........................................................................................... 26
1.8.6.1 Reticulated Systems .................................................................................................... 26
1.8.6.2 On-site Systems .......................................................................................................... 26
1.8.7 Water Supply See Section 6 ......................................................................................... 26
1.8.8 Fire Fighting See Section 6 .......................................................................................... 26
1.8.8.1 Reticulated Areas ........................................................................................................ 26
1.8.8.2 Non-reticulated Areas .................................................................................................. 26
1.8.9 Reserves and Landscaping See Section 7 ....................................................................... 27
1.8.10 Electricity, Telecommunications and Gas See Section 8 .................................................... 27
1.8.11 Lighting ..................................................................................................................... 27
1.9 Construction Management Plan ..................................................................................... 28
1.10 Construction Works – Site Inspections and Approvals ....................................................... 29
1.10.1 Health and Safety ....................................................................................................... 29
10/4746
1.10.2 Commencement of Work .............................................................................................. 29
1.10.3 Noise and Hours of Work .............................................................................................. 29
1.10.4 Registered contractors and Licensed contractors .............................................................. 30
1.10.5 Site Inspections .......................................................................................................... 30
1.10.6 Testing ...................................................................................................................... 30
1.10.7 Colour of Pipes and Ducts ............................................................................................ 31
Table 1.3 Pipe Colours ............................................................................................................... 31
1.10.8 Connection to Existing Services ..................................................................................... 31
1.10.9 Protection of Existing Trees, Services, and Roads ............................................................. 32
1.10.10 Soil Disturbance and Dust Control .................................................................................. 32
1.10.11 Emergency Procedure .................................................................................................. 32
1.10.12 Variations to Approved Engineering Documentation .......................................................... 32
1.11 Post-Construction – s224(c) .......................................................................................... 33
1.11.1 As-Built Plans, RAMM Data and other Information ............................................................ 33
1.11.1.1 General ..................................................................................................................... 33
1.11.1.2 As-Built Plans, Asset Information Schedules, Operation and Maintenance Manuals ................. 33
1.11.1.3 As-Built Plans ............................................................................................................. 33
1.11.1.4 RAMM Data Requirements ............................................................................................ 34
1.11.1.4a Resource Consents ...................................................................................................... 34
1.11.1.4b Whangarei District Council Contracts .............................................................................. 34
1.11.1.5 Defects Liability Period ................................................................................................ 35
1.11.1.6 Bonds ....................................................................................................................... 35
1.11.1.7 Uncompleted Works Bond ............................................................................................. 36
1.11.1.8 Defects/Maintenance Bonds .......................................................................................... 36
1.11.2 Requirements for Final Completion ................................................................................ 36
1.11.2.1 Vesting and Easements ................................................................................................ 37
1.11.2.2 Operation and Maintenance Manuals .............................................................................. 37
1.11.2.3 Asset Information Schedule .......................................................................................... 37
Section 2 Site Suitability (Geotechnical, Hazards Etc) and Earthworks ................................... 39
2.1 General Requirements ................................................................................................. 39
2.1.1 General ..................................................................................................................... 39
2.1.2 Referenced Documents ................................................................................................ 39
2.2 Technical Requirements ............................................................................................... 39
2.2.1 Preliminary Site Evaluation ........................................................................................... 39
2.2.2 Coastal Areas ............................................................................................................. 39
2.2.3 Geotechnical Assessment Report ................................................................................... 39
2.2.3.1 Low Stability Hazard .................................................................................................... 40
2.2.3.2 Moderate Stability Hazard............................................................................................. 40
2.2.3.3 High Stability Hazard ................................................................................................... 41
2.2.4 Stabilisation Works ...................................................................................................... 42
2.2.5 Restrictions on Development ......................................................................................... 42
2.2.6 Specific Building site(s) and Effluent Disposal site(s) ........................................................ 42
2.3 Landform ................................................................................................................... 42
2.4 Compaction of Fill Material ........................................................................................... 42
2.5 Erosion, Sediment, Dust, and Odour Control .................................................................... 42
2.6 Topsoil ...................................................................................................................... 43
2.7 Report on Completion of Construction ............................................................................ 43
Section 3 Roads and Access ................................................................................................... 45
3.1 Scope........................................................................................................................ 45
3.2 General ..................................................................................................................... 45
3.2.1 Objective ................................................................................................................... 45
3.2.2 Referenced Documents ................................................................................................ 45
3.2.3 Road Design ............................................................................................................... 45
3.3 Design Process ........................................................................................................... 45
3.3.1 Designer Responsibilities .............................................................................................. 45
3.3.2 Information to be Submitted ......................................................................................... 46
3.3.3 Design Approval.......................................................................................................... 46
3.3.4 Safety Audit ............................................................................................................... 46
3.4 Design Requirements ................................................................................................... 46
3.4.1 Design Life................................................................................................................. 46
3.4.2 Road Width Requirements ............................................................................................ 47
Table 3.1 Minimum Width Requirements – Living 1 & 2 and all Business Environments ........................ 47
Table 3.2 Minimum Width Requirements – Rural Roads (Living 3, Countryside and Coastal Countryside Environments) ............................................................................................................ 47
3.4.3 Geometric Design Requirements .................................................................................... 48
3.4.3.1 Design Parameters ...................................................................................................... 48
Table 3.3 Geometric Design Requirements .................................................................................... 49
Table 3.4 Recommended Widening on Curves for Rural Roads ......................................................... 49
3.4.3.2 Horizontal Alignment ................................................................................................... 49
3.4.3.3 Vertical Alignment ....................................................................................................... 50
3.4.3.4 Superelevation and Crossfall ......................................................................................... 50
3.4.3.5 Sight Distances ........................................................................................................... 50
3.4.4 Existing Roads ............................................................................................................ 50
3.4.5 Pavement Structural Design .......................................................................................... 51
3.4.5.1 General ..................................................................................................................... 51
3.4.5.2 Design & Subgrade Testing ........................................................................................... 51
3.4.6 Intersection Design ..................................................................................................... 51
3.4.6.1 General ..................................................................................................................... 51
3.4.6.2 Design Criteria............................................................................................................ 52
3.4.7 Cul-de-sac Heads ........................................................................................................ 52
3.4.8 Footpaths, Accessways and Cycleways ........................................................................... 53
3.4.8.1 Urban Footpaths ......................................................................................................... 53
3.4.8.2 Rural Footpaths .......................................................................................................... 53
3.4.8.3 Pedestrian Accessways and Cycleways ............................................................................ 53
3.4.9 Berms and Landscaping ............................................................................................... 54
3.4.9.1 Urban Berms .............................................................................................................. 54
3.4.9.2 Rural Berms ............................................................................................................... 54
3.4.9.3 Landscaping ............................................................................................................... 54
3.4.10 Vehicle Entrances ........................................................................................................ 54
3.4.10.1 General ..................................................................................................................... 54
Table 3.5 Maximum Number of Vehicle Crossings per Proposed Allotment .......................................... 55
Table 3.6 Minimum Distance of Vehicle Crossing from Intersections .................................................. 55
3.4.10.2 Urban Crossings .......................................................................................................... 56
3.4.10.3 Rural Crossings ........................................................................................................... 56
Figure 1 Criteria for Vehicle Entrance Types (Rural) ...................................................................... 57
3.4.10.4 Commercial Crossings onto Sealed Roads ........................................................................ 57
3.4.11 Private Accessways ..................................................................................................... 57
3.4.11.1 General ..................................................................................................................... 57
Table 3.7 Minimum Width Requirements – Private Accessways ......................................................... 58
3.4.11.2 Urban Private Accessways ............................................................................................ 59
3.4.11.3 Rural Private Accessways ............................................................................................. 59
3.4.12 Traffic Control, Signage & Roadmarking, Traffic Calming ................................................... 60
Table 3.8 Road Marking - Residential and Commercial/Industrial Roads (Living 1 & 2 and all Business Environments) ............................................................................................................ 60
Table 3.9 Road Marking: Rural Roads (Living 3 Countryside and Coastal Countryside Environments) ...... 60
3.4.13 Road Names and Signs ................................................................................................ 61
3.4.14 Street Lighting ............................................................................................................ 61
3.4.15 Road Drainage ............................................................................................................ 62
3.4.15.1 General ..................................................................................................................... 62
3.4.15.2 Subsurface Drainage ................................................................................................... 62
3.4.15.3 Surface Drainage ........................................................................................................ 62
3.4.15.4 Side Drains, Water Tables ............................................................................................ 62
3.4.15.5 Kerb and Channel ....................................................................................................... 63
3.4.15.6 Sumps ....................................................................................................................... 63
3.4.15.7 Swales and Bio Filtration Devices ................................................................................... 63
3.4.16 Bridges, Culverts and Retaining Walls ............................................................................. 63
3.4.16.1 General ..................................................................................................................... 63
3.4.16.2 Waterway Design ........................................................................................................ 64
3.4.16.3 Bridges on Public Roads ............................................................................................... 64
3.4.16.4 Bridges on Private Accessways ...................................................................................... 64
3.4.16.5 Retaining Walls ........................................................................................................... 65
3.4.17 State Highways & Railways ........................................................................................... 65
3.4.18 Car parking & Manoeuvring .......................................................................................... 65
3.4.19 Queuing Space Lengths ................................................................................................ 65
Table 3.10 Queue space Lengths .................................................................................................. 66
3.5 Construction ............................................................................................................... 66
3.5.1 Pavement .................................................................................................................. 66
3.5.1.1 General ..................................................................................................................... 66
3.5.1.2 Subgrade ................................................................................................................... 66
3.5.1.3 Sub-base Material ........................................................................................................ 66
3.5.1.4 Basecourse Material ..................................................................................................... 67
Table 3.11 Material Standards (Suitable for Lime Stabilised Pavements) .............................................. 67
Table 3.12 Grading Limits (when delivered or following compaction) .................................................. 67
3.5.1.5 Testing Prior to Sealing ................................................................................................ 67
Table 3.13 Pavement Test Requirements ........................................................................................ 68
Table 3.14 Benkelman Beam Standards .......................................................................................... 68
3.5.2 Surfacing ................................................................................................................... 68
3.5.2.1 Unsealed Roads/Privateways ......................................................................................... 68
3.5.2.2 Sealed Roads, Carparks and Privateways ......................................................................... 68
3.5.2.2.1 General ..................................................................................................................... 68
3.5.2.2.2 Application & Limitations .............................................................................................. 69
3.5.2.2.3 Asphaltic Concrete (AC) ............................................................................................... 69
3.5.2.2.4 Chip Seal ................................................................................................................... 69
3.5.2.2.5 Concrete Block Pavers ................................................................................................. 70
3.5.2.2.6 Concrete .................................................................................................................... 70
3.5.2.2.7 Permeable Pavers ....................................................................................................... 70
3.5.2.3 Surface Tolerances and Finishing ................................................................................... 70
3.5.3 Kerb and Channel ....................................................................................................... 71
3.5.4 Footpaths and Cycleways ............................................................................................. 71
3.5.4.1 Concrete Footpaths ..................................................................................................... 71
3.5.4.2 Asphaltic Concrete Footpaths ........................................................................................ 71
3.5.4.3 Concrete Paver Footpaths ............................................................................................. 71
3.5.5 Berms and Landscaping ............................................................................................... 71
3.5.6 General ..................................................................................................................... 71
3.5.7 Road Opening Notice and Traffic Management Plan .......................................................... 72
3.6 As-Built Information .................................................................................................... 72
3.6.1 As-Built Drawings and Schedule of Asset Information ....................................................... 72
3.6.2 RAMM Data ................................................................................................................ 72
3.7 Defects Liability Period ................................................................................................ 72
3.8 Standard Drawings ...................................................................................................... 72
Section 4 Stormwater Drainage .............................................................................................. 73
4.1 Introduction ............................................................................................................... 73
4.2 Referenced Documents ................................................................................................ 73
4.2.1 Definitions ................................................................................................................. 73
4.3 Content of Technical Submission ................................................................................... 73
4.3.1 Supporting Information ................................................................................................ 73
4.3.2 Design Drawings and Specifications ............................................................................... 73
4.3.3 Approval of Design ...................................................................................................... 74
4.4 General Requirements and Policy ................................................................................... 74
4.4.1 Capacity and Future System Expansion ........................................................................... 74
4.4.2 Changes to Existing Development .................................................................................. 75
4.4.3 Compliance ................................................................................................................ 75
4.4.4 Regional Plans ............................................................................................................ 75
4.4.5 Stability ..................................................................................................................... 75
4.5 Catchment Management Plans....................................................................................... 75
4.5.1 Hikurangi Swamp Major Scheme .................................................................................... 76
4.6 Hydrology .................................................................................................................. 76
4.6.1 Rainfall Input ............................................................................................................. 76
4.6.2 Storm Analysis ............................................................................................................ 76
4.6.3 Climate Change .......................................................................................................... 77
4.6.4 Site Considerations ...................................................................................................... 77
4.6.4.1 Frequency Effect ......................................................................................................... 77
4.6.4.3 CN Numbers/Run-off Coefficients ................................................................................... 78
Table 4.1 Curve Numbers and C Values ........................................................................................ 78
4.7 Collection .................................................................................................................. 79
4.7.1 Low Impact Design...................................................................................................... 79
4.7.2 Subsoil Drains ............................................................................................................ 79
4.8 Conveyance (Primary Systems) ..................................................................................... 79
4.8.1 Reticulation (Layout) ................................................................................................... 79
4.8.1.1 Pipes ......................................................................................................................... 79
4.8.1.1.1 Gravity Pipelines ......................................................................................................... 79
4.8.1.1.2 Curved Pipelines ......................................................................................................... 80
4.8.1.1.3 Joints ........................................................................................................................ 80
4.8.1.1.4 Pipeline Connections .................................................................................................... 80
4.8.1.1.5 Maintenance Structures ................................................................................................ 80
4.8.1.1.6 Minimum Pipe Sizes ..................................................................................................... 80
4.8.1.1.7 Separation from other Services ..................................................................................... 80
4.8.1.1.8 Stormwater near Trees and Existing Reticulation .............................................................. 80
4.8.1.1.9 Pipe Cover ................................................................................................................. 81
4.8.1.1.10 Bulkheads on Pipes (Anti Seepage Collar) ....................................................................... 81
Table 4.2 Bulkhead Spacing ........................................................................................................ 81
4.8.1.2 Manholes ................................................................................................................... 81
4.8.1.2.1 General ..................................................................................................................... 81
4.8.1.2.2 Spacing ..................................................................................................................... 81
4.8.1.2.3 Details ...................................................................................................................... 81
4.8.1.3 Sumps ....................................................................................................................... 81
4.8.1.4 Inlet and Outlet Structures ........................................................................................... 81
4.8.1.5 Lot Connections .......................................................................................................... 82
4.8.2 System Components (Specification) ............................................................................... 82
4.8.2.1 Design Life ................................................................................................................. 82
4.8.2.2 Private System Components .......................................................................................... 82
4.8.2.3 Private Sumps ............................................................................................................. 82
4.8.2.4 Public System Components ........................................................................................... 82
4.8.2.4.1 Pipes......................................................................................................................... 82
4.8.2.4.1a Materials and Class ..................................................................................................... 82
Table 4.3 Pipe Material and Class ................................................................................................ 83
4.8.2.4.1b Structural Strength of Pipes and Bedding ........................................................................ 83
4.8.2.4.1c Soft Ground Conditions ................................................................................................ 83
4.8.2.4.1d Pipeline Construction ................................................................................................... 83
4.8.2.4.2 Joints ........................................................................................................................ 84
4.8.2.4.3 Culverts ..................................................................................................................... 84
4.8.2.4.4 Manholes ................................................................................................................... 84
4.8.2.4.5 Connections ............................................................................................................... 85
4.8.2.4.6 Sumps ....................................................................................................................... 85
4.8.2.4.7 Inlet/Outlet Structures ................................................................................................. 85
4.8.2.4.8 Subsoil Drains ............................................................................................................ 85
4.8.2.5 Inspection and Testing ................................................................................................. 86
4.8.2.5.1 Pipeline Pressure Test .................................................................................................. 86
4.8.2.5.2 CCTV Inspection ......................................................................................................... 86
4.8.2.5.3 Manholes ................................................................................................................... 86
4.8.2.5.4 Marking of Connections ................................................................................................ 86
4.9 Overland Flow - Secondary Systems ............................................................................... 86
4.9.1 Waterways ................................................................................................................. 86
4.9.1.1 Constructed Waterways ................................................................................................ 86
4.9.1.2 Natural Waterways ...................................................................................................... 86
4.9.2 Flooding Related Issues ............................................................................................... 86
4.9.2.1 Freeboard .................................................................................................................. 86
4.9.2.2 Secondary Overland Flow Paths ..................................................................................... 87
4.9.2.3 Tidal Areas ................................................................................................................. 87
4.10 Treatment.................................................................................................................. 87
4.10.1 Stormwater Quality Control........................................................................................... 87
4.10.2 Treatment Ponds and Wetlands ..................................................................................... 88
4.10.3 Proprietary Treatment Systems ..................................................................................... 88
4.11 Attenuation ................................................................................................................ 88
4.11.1 Residential ................................................................................................................. 88
4.11.2 Non Residential .......................................................................................................... 89
4.11.3 Stormwater Detention Areas ......................................................................................... 89
4.12 Disposal .................................................................................................................... 89
4.12.1 Discharge to Ground (Soakaway) ................................................................................... 89
4.12.2 Discharge to Land ....................................................................................................... 90
4.12.3 Re-Use ...................................................................................................................... 90
Table 4.4 Percentage Reduction of Required Attenuation Volume ..................................................... 90
4.12.4 Discharge to Water Body .............................................................................................. 91
4.12.5 Discharge to Natural Stream and River ........................................................................... 91
4.12.6 Discharge to Marine Environment .................................................................................. 91
4.12.7 Erosion Protection ....................................................................................................... 91
4.13 Hydraulic Design ......................................................................................................... 91
4.13.1 Council Design Input ................................................................................................... 91
4.13.1.1 Design Methods .......................................................................................................... 92
4.13.1.2 Design Storms ............................................................................................................ 92
4.13.1.3 Duration .................................................................................................................... 92
4.13.2 Outlet and Backflow Effect ........................................................................................... 93
4.13.3 Piped Networks ........................................................................................................... 93
4.13.3.1 Gradients and Acceptable Flow Velocities ........................................................................ 93
4.13.4 Hydraulic Flow in Manholes........................................................................................... 93
4.13.5 Open Channel Flows .................................................................................................... 93
Table 4.5 Manning’s Values ........................................................................................................ 93
Table 4.6 Max Flows in Channels ................................................................................................. 94
4.13.6 Culverts ..................................................................................................................... 94
4.13.7 Outlet Structures ........................................................................................................ 94
Section 5 Wastewater ............................................................................................................ 95
5.1 General Requirements ................................................................................................. 95
5.2 Referenced Documents ................................................................................................ 95
5.3 Submission of Application ............................................................................................. 95
5.3.1 Supporting Information and Calculations ......................................................................... 95
5.3.2 Design Drawings and Specifications ............................................................................... 95
5.3.3 Approval of Design ...................................................................................................... 95
5.3.4 Consents ................................................................................................................... 95
5.4 Connections and Disconnections .................................................................................... 96
5.4.1 Connection to Existing Wastewater Scheme ..................................................................... 96
5.4.2 Disconnections ........................................................................................................... 96
5.5 Wastewater Treatment and Disposal .............................................................................. 96
5.5.1 Individual On-Site Treatment and Disposal ...................................................................... 96
5.5.2. Communal On-Site Treatment and Disposal ..................................................................... 96
5.5.3 Pressure Wastewater Collection (PWC) ........................................................................... 97
5.5.4 Recycled Water ........................................................................................................... 98
5.6 Level of Service .......................................................................................................... 98
5.6.1 Design Life................................................................................................................. 98
5.6.2 Capacity and Future System Expansion ........................................................................... 98
5.6.3 Infiltration Minimisation ............................................................................................... 98
5.6.4 Council Design Input ................................................................................................... 98
5.7 Pipe Selection ............................................................................................................. 98
5.7.1 Pipe Materials and Class ............................................................................................... 98
Table 5.1 Pipe Material and Class for Gravity Reticulation ................................................................ 99
Table 5.2 Minimum Pipe Sizes for Gravity Wastewater Reticulation and Property Connections ............... 99
5.8 Design Parameters .................................................................................................... 100
5.8.1 Residential flows ....................................................................................................... 100
Table 5.3 Design Inflows for Residential Type Activities – for reticulated sewers only. For on-site waste water systems refer to AS/NZS 1547 for flows ............................................................... 100
5.8.2 Industrial/commercial Flows ....................................................................................... 100
Table 5.4 Design dry Weather Wastewater Flow Rates for Industrial/ Commercial flows (includes Business 1-4, Marsden Point Port and Airport Environments) ........................................................ 101
5.8.3 Hydraulic design ....................................................................................................... 101
Table 5.5 Coefficients for Gravity Lines ...................................................................................... 101
5.8.4 Limitation on Pipe Size Reduction ................................................................................ 101
5.8.5 Minimum Grades for Self-cleaning ................................................................................ 101
Table 5.6 Minimum Grades for Wastewater Pipes ......................................................................... 101
5.8.6 Maximum Velocity ..................................................................................................... 102
5.9 Reticulation Layout and Location ................................................................................. 102
5.9.1 Gravity Pipelines ....................................................................................................... 102
5.9.2 Maintenance Structures .............................................................................................. 102
5.9.3 Pump Stations .......................................................................................................... 102
5.9.4 Pressure Pipelines (Rising Mains) ................................................................................. 103
5.9.5 Separation from other Services ................................................................................... 103
Table 5.7 Minimum Separation Distances to other Services ............................................................ 103
5.9.6 Wastewater Mains near Trees ..................................................................................... 103
5.9.7 Easements ............................................................................................................... 103
5.10 Reticulation Components ............................................................................................ 104
5.10.1 Connections ............................................................................................................. 104
5.10.2 Pipe Bridges and Bridge Crossings ............................................................................... 104
5.10.3 Maintenance Structures .............................................................................................. 104
5.10.3.1 General ................................................................................................................... 104
Table 5.8 Maintenance Structure Requirements ........................................................................... 105
5.10.3.2 Spacing and Marking .................................................................................................. 105
5.10.3.3 Manholes (MH) ......................................................................................................... 105
5.10.3.3.1 Manhole Design ........................................................................................................ 105
Table 5.9 Fall Through Manholes ............................................................................................... 105
5.10.3.3.2 Manhole Construction ................................................................................................ 106
5.10.3.4 Maintenance Shafts (MS) ............................................................................................ 106
5.10.3.5 Terminal Maintenance Shafts (TMS) ............................................................................. 107
5.10.4 Pipelines .................................................................................................................. 107
5.10.4.1 Construction ............................................................................................................. 107
5.10.4.2 Cover ...................................................................................................................... 107
5.10.4.3 Marking ................................................................................................................... 107
5.10.4.4 Building Over/Near Pipelines ....................................................................................... 107
5.10.5 Pump Stations .......................................................................................................... 108
5.10.5.1 General Requirements ................................................................................................ 108
5.10.5.2 Compliance with the NRC Regional Water and Soil Plan for Northland ................................ 110
5.10.5.3 Hydraulic Design ....................................................................................................... 110
5.10.5.4 Flow Monitoring ........................................................................................................ 110
5.10.5.5 Electrical and Control ................................................................................................. 110
5.10.5.6 Telemetry ................................................................................................................ 111
5.10.5.7 Water Supply ............................................................................................................ 111
5.10.5.8 Private Pump Stations ................................................................................................ 111
5.10.5.9 Odour Control ........................................................................................................... 111
5.11 Rising Main Design .................................................................................................... 111
5.11.1 Maximum Operating Pressure ...................................................................................... 111
5.11.2 Pressure Surges ........................................................................................................ 112
5.11.3 Minimum Pipe Sizes ................................................................................................... 112
5.11.4 Velocity ................................................................................................................... 112
5.11.5 Gradients ................................................................................................................. 112
5.11.6 Cover over Pipes ....................................................................................................... 113
5.11.7 Joints ...................................................................................................................... 113
5.11.8 Flanges ................................................................................................................... 113
5.11.9 Sluice Valves ............................................................................................................ 113
5.11.10 Scour Valves ............................................................................................................ 113
5.11.11 Air Valves ................................................................................................................ 113
5.12 Contractor Qualifications ............................................................................................ 114
5.13 Inspection and Testing .............................................................................................. 114
5.13.1 Gravity Reticulation ................................................................................................... 114
5.13.2 Rising Mains ............................................................................................................. 114
5.13.3 Manholes ................................................................................................................. 114
5.13.4 CCTV Inspection ....................................................................................................... 115
5.14 Completion .............................................................................................................. 115
5.14.1 As-Built Drawings and Schedule of Asset Information ..................................................... 115
5.14.2 Operation and Maintenance Manuals ............................................................................ 115
5.15 Defects Liability ........................................................................................................ 115
5.16 Drawings ................................................................................................................. 115
Section 6 Water Supply and Reticulation .............................................................................. 117
6.1 General Requirements ............................................................................................... 117
6.2 Referenced Documents .............................................................................................. 117
6.3 Submission of Application ........................................................................................... 117
6.3.1 Supporting Information and Calculations ....................................................................... 117
6.3.2 Design Drawings and Specifications ............................................................................. 117
6.3.3 Approval of Design .................................................................................................... 117
6.3.4 Disconnections ......................................................................................................... 117
6.4 Level of Service ........................................................................................................ 118
6.4.1 Design Life............................................................................................................... 118
6.4.2 Design Tolerance ...................................................................................................... 118
6.4.3 Service Requirements ................................................................................................ 118
6.4.4 Capacity and Future System Expansion ......................................................................... 118
6.4.5 Private Water Supply Systems ..................................................................................... 118
6.4.6 Council Design Input ................................................................................................. 119
6.5 Scope of Design ........................................................................................................ 119
6.6 Pipe Selection ........................................................................................................... 119
6.6.1 Sizing of Mains ......................................................................................................... 119
6.6.2 Standard Pipe Sizes ................................................................................................... 119
6.6.3 Minimum Pipe Sizes ................................................................................................... 119
Table 6.1 Minimum Water Supply Pipe Sizes ................................................................................ 120
6.6.4 Pipe Class ................................................................................................................ 120
Table 6.2 Pipe Classes ............................................................................................................. 120
6.6.5 Pipe Materials ........................................................................................................... 120
6.6.6 Pipe Bridges and Bridge Crossings ............................................................................... 120
6.7 Flow Capacity ........................................................................................................... 121
6.7.1 Domestic Demand ..................................................................................................... 121
6.7.2 Peak Flows ............................................................................................................... 121
6.7.3 Minimum Flows ......................................................................................................... 121
6.7.4 Pressure Fluctuations ................................................................................................. 121
6.7.5 Flow Velocities.......................................................................................................... 121
6.7.6 Operating Pressures .................................................................................................. 121
6.7.7 Fire Risk Classification ............................................................................................... 122
6.7.8 Fire Fighting Water Requirements ................................................................................ 122
Table 6.3 Simplified Method for Determining Fire Fighting Supplies ................................................. 122
6.7.9 Dedicated Sprinkler and Fire Fighting Water Mains ......................................................... 122
6.7.10 Domestic ................................................................................................................. 123
6.7.11 Empirical Guide for Sizing of Mains .............................................................................. 123
6.8 Layout of Reticulation ................................................................................................ 123
6.8.1 General ................................................................................................................... 123
6.8.2 Separation from other Services ................................................................................... 123
Table 6.4 Minimum Separation Distances to Other Services .......................................................... 124
6.8.3 Separation from Structures ......................................................................................... 124
Table 6.5 Clearances from Structures ......................................................................................... 125
6.8.4 Water Mains near Trees and Existing Reticulation ........................................................... 125
6.8.5 Pipe Cover ............................................................................................................... 125
6.8.6 Work on Existing Water Mains ..................................................................................... 125
6.8.7 Thrust and Anchor Blocks ........................................................................................... 125
6.9 Valves and Fittings .................................................................................................... 126
6.9.1 General ................................................................................................................... 126
6.9.2 Sluice Valves and Peet Valves ..................................................................................... 126
6.9.2.1 Type ....................................................................................................................... 126
6.9.2.2 Location................................................................................................................... 126
Table 6.7 Valve Spacing ........................................................................................................... 127
6.9.3 Air Release and Scour Valves ...................................................................................... 127
6.9.4 Pressure Reducing Valves ........................................................................................... 127
6.10 Valve Marking ........................................................................................................... 127
6.11 Hydrants ................................................................................................................. 127
6.11.1 General ................................................................................................................... 127
6.11.2 Type ....................................................................................................................... 127
6.11.3 Position ................................................................................................................... 127
6.11.4 Marking ................................................................................................................... 128
6.12 Surface Boxes .......................................................................................................... 128
6.13 Bulk Water Meters ..................................................................................................... 128
6.14 Service Connections .................................................................................................. 129
6.14.1 General ................................................................................................................... 129
6.14.2 Meters..................................................................................................................... 129
6.14.3 Connection to Water Main .......................................................................................... 129
6.14.4 Backflow Prevention .................................................................................................. 130
6.14.5 Existing Connections.................................................................................................. 130
6.15 Pump Stations and Reservoirs ..................................................................................... 130
6.16 Contractor Qualifications ............................................................................................ 130
6.17 Pipeline Construction ................................................................................................. 131
6.17.1 Jointing ................................................................................................................... 131
Table 6.8 Thickness of Backing Rings on PE Water Pipe Joints ....................................................... 131
6.17.2 Water Main Installation .............................................................................................. 132
6.17.3 Detection Tape ......................................................................................................... 132
6.17.4 Special Measures in Aggressive Ground Conditions ......................................................... 132
6.18 Disinfection and Testing ............................................................................................. 132
6.18.1 Pressure Testing ....................................................................................................... 132
6.18.2 Disinfection .............................................................................................................. 133
6.18.3 Hydrant Flow Test ..................................................................................................... 134
6.19 Completion .............................................................................................................. 134
6.19.1 As-Built Drawings and Schedule of Asset Information ..................................................... 134
6.19.2 Operation and Maintenance Manuals ............................................................................ 135
6.20 Defects Liability ........................................................................................................ 135
6.21 Drawings ................................................................................................................. 135
Section 7 Parks .................................................................................................................... 137
7.1 General Requirements ............................................................................................... 137
7.1.1 Reserve Provision ...................................................................................................... 137
7.1.2 Design ..................................................................................................................... 138
7.1.2.1 Design Drawings and Specifications .............................................................................. 138
7.1.2.2 Compatibility with Engineering Design .......................................................................... 139
7.1.2.3 Long-term Public Benefit ............................................................................................ 139
7.1.2.4 Location in Relation to Piped Services ........................................................................... 139
7.1.2.5 Sight Lines ............................................................................................................... 139
7.1.2.6 Stormwater Treatment or Detention Ponds .................................................................... 140
7.1.2.7 Linkages .................................................................................................................. 140
7.1.2.8 Services and Structures within Reserves ....................................................................... 140
7.1.2.9 Fencing ................................................................................................................... 140
7.1.2.10 Species Selection ...................................................................................................... 140
7.1.2.11 Quality Control .......................................................................................................... 140
7.1.2.12 Tree/Plant Size ......................................................................................................... 141
7.1.2.13 Landscaping Structures .............................................................................................. 141
7.1.2.14 Irrigation Provision .................................................................................................... 141
7.1.2.15 Natural Areas ........................................................................................................... 141
7.1.2.16 Variations to Part 8 NZS 4404:2004 .............................................................................. 141
7.1.2.17 Approval of Design .................................................................................................... 143
7.1.3 Construction ............................................................................................................. 143
7.1.3.1 Earthworks ............................................................................................................... 143
7.1.3.2 Stormwater Drainage ................................................................................................. 143
7.2 Completion .............................................................................................................. 143
7.2.1 As-Built Drawings and Schedule of Asset Information ..................................................... 143
7.2.2 Operation and Maintenance Manuals ............................................................................ 144
7.2.3 Defects liability ......................................................................................................... 144
7.3 Maintenance............................................................................................................. 144
Section 8 Electricity, Telecommunications and Gas .............................................................. 145
8.1 General Requirements ............................................................................................... 145
8.2 Design Drawings ....................................................................................................... 145
8.3 Electricity ................................................................................................................ 145
8.4 Gas ......................................................................................................................... 145
8.5 Service Location ....................................................................................................... 145
8.6 As-Built Plans ........................................................................................................... 146
Section 9 Drawings .............................................................................................................. 147
Sheet 1 Standard Symbols ..................................................................................................... 148
Sheet 2 Urban Road and Service Lane Details ........................................................................... 149
Sheet 3 Rural Road Details .................................................................................................... 150
Sheet 4 Traffic Sightlines for Non-Signalised Intersections and Vehicle Entrances ........................... 151
Sheet 5 Scala Penetrometer Chart ........................................................................................... 152
Sheet 6 Design Charts for Flexible Pavements ........................................................................... 153
Sheet 7 Urban Privateway Details ........................................................................................... 154
Sheet 8 Urban Privateway Details - Notes ................................................................................. 155
Sheet 9 Rural Privateway Details............................................................................................. 156
Sheet 10 Rural Privateway Details - Notes .................................................................................. 157
Sheet 11 Cul-de-sac Details ..................................................................................................... 158
Sheet 12 Footpath and Stormwater Kerb Connection Details ......................................................... 159
Sheet 13 Kerb and Channel Details ........................................................................................... 160
Sheet 14 Typical Subsoil Drainage Details .................................................................................. 161
Sheet 15 Standard Road Swale Details ...................................................................................... 162
Sheet 16 Standard Road Swale Details (Cont) ............................................................................. 163
Sheet 17 Accessible Crossing Details ......................................................................................... 164
Sheet 18 Vehicle Crossing - Residential ..................................................................................... 165
Sheet 19 Vehicle Crossing – Commercial/Industrial ...................................................................... 166
Sheet 20 Alternative Vehicle Crossing ........................................................................................ 167
Sheet 21 Vehicle Crossing - Rural ............................................................................................. 168
Sheet 22 Vehicle Crossing Notes ............................................................................................... 169
Sheet 23 Vehicle Crossing – Max Graded Profiles For Urban/Rural .................................................. 170
Sheet 24 Street Sign for Public Roads........................................................................................ 171
Sheet 25 Street Sign for Private Roads ...................................................................................... 172
Sheet 26 Vehicle Tracking Curves – Standard Car ........................................................................ 173
Sheet 27 Heavy Goods Vehicle Tracking Curves – Medium Rigid Truck ............................................ 174
Sheet 28 Heavy Goods Vehicle Tracking Curves – Large Rigid Truck ............................................... 175
Sheet 29 Layout of Services ..................................................................................................... 176
Sheet 30 Minimum Clearance Between Services .......................................................................... 177
Sheet 31 Pipe Bedding and Backfill ........................................................................................... 178
Sheet 32 Pipe Protection and Bulkhead Details ........................................................................... 179
Sheet 33 Pipe Class and Cover ................................................................................................. 180
Sheet 34 Sump Details ............................................................................................................ 181
Sheet 35 Inlet and Outfall Structures ........................................................................................ 182
Sheet 36 Stormwater and Sewer Connections ............................................................................. 183
Sheet 37 Standard Precast Manhole .......................................................................................... 184
Sheet 38 Sewer Maintenance Shaft Details ................................................................................. 185
Sheet 39 Sewer Maintenance Shaft Bend Details ......................................................................... 186
Sheet 40 Terminal Maintenance Shaft and Connection Details ....................................................... 187
Sheet 41 Satellite Manhole Details ............................................................................................ 188
Sheet 42 Sewer Pump Station Typical Requirements .................................................................... 189
Sheet 43 Sewer Pump Station Metal Works ................................................................................ 190
Sheet 44 RPZ Water Connection ............................................................................................... 191
Sheet 45 Water Pipeline Details ................................................................................................ 192
Sheet 46 Single Meter Box Connection ....................................................................................... 193
Sheet 47 Multiple Water Connections and Back Flow Preventers .................................................... 194
Sheet 48 Valve and Hydrant Markers ......................................................................................... 195
Sheet 49: Anchor Block and Valve Installation Details ................................................................... 196
Sheet 50 Anchor Block Details .................................................................................................. 197
Sheet 51 Air Valve Details ....................................................................................................... 198
Sheet 52 Magflow and Flow Control Valve Installation .................................................................. 199
Sheet 53 Water Supply Pump Station Details .............................................................................. 200
Sheet 54 Fence Types ............................................................................................................. 201
Appendix A Designing for Surge and Fatigue .................................................................................. 205
Table 1 Critical number of surges in pipe lifetime ...................................................................... 206
Appendix B Form EES-SEW1 ........................................................................................................ 209
Appendix C Form EES-PS1 .......................................................................................................... 215
Appendix D Form EES-PS4 .......................................................................................................... 217
Appendix E Form EES-PO1 .......................................................................................................... 219
Appendix F Form EES-W1 ........................................................................................................... 221
Appendix G IDF Curves ............................................................................................................... 223
Appendix H Orifice Diameter Selection Chart .................................................................................. 229
Appendix I Permeability Test Sheets ............................................................................................ 231
Appendix J Worksheet - Simplified Storage Assessment (Rational) .................................................... 235
Page 1 of 248
Section 1 Referenced Documents, Glossary and Abbreviations
1.1 Referenced Documents
Where conflict exists between any referenced document and the WDC Environmental Engineering Standards (EES), the WDC EES shall take preference, except where there is conflict between the
Whangarei District Plan and the EES, in this case the District Plan shall take preference.
Note The most up-to-date of any publication/standard shall supersede any conflicting requirements of older documents
Auckland Regional Council
Erosion and Sediment Control Guidelines for Land Disturbing Activities (TP 90). http://www.arc.govt.nz/plans/technical-publications/technical-publications/technical-publications-51-100.cfm
Building Act 2004 and amendments
Building Industry Authority (BIA) New Zealand Building Code www.dbh.govt.nz/bcl -get-a-copy-
of-building-code
Coastal Management Plan for Northland
Coastal Management Strategy
Electricity Act 1992 and amendments
Fencing Act (1978)
Guide for Safety with Underground Services – Occupational Health and Safety
Health and Safety in Employment Act 1992 and amendments
Health and Safety in Employment (Pipelines) Regulations 1999 (SR 1999/350) (as at
3 September 2007)
Land Transfer Act 1952 and amendments
Local Government Act 1974 and amendments
Long Term Council Community Plan (LTCCP)
NZ Coastal Policy Statement
Plumbers, Gasfitters and Drainlayers Act 1976 and amendments
Public Works Act 1981 and amendments
Regional Coastal Plan for Northland
Regional Water and Soil Plan for Northland
Resource Management Act 1991 and amendments
Telecommunications Act 2001 and amendments
Water Supplies Protection Regulations 1961 and amendments
Whangarei District Plan.
NZS, AS, AS/NZS, SNZ Standards
SNZ/PAS 4509: 2008 New Zealand Fire Service Fire Fighting Water Supplies Code of
Practice (Fire Service Code of Practice)
NZS/BS 750: 1984 Specification for underground fire hydrants and surface box
frames and covers
NZS 3604: 1999 Timber framed buildings
NZS 3910: 2003 Conditions of contract for building and civil engineering
construction
NZS 4121: 2001 Design for Access and Mobility: Buildings and Associated Facilities
NZS 4229: 1999 Concrete masonry buildings not requiring specific engineering design
http://www.arc.govt.nz/plans/technical-publications/technical-publications/technical-publications-51-100.cfmhttp://www.arc.govt.nz/plans/technical-publications/technical-publications/technical-publications-51-100.cfm
Page 2 of 248
NZS 4275: 1995 Methods of Test for underground Marking Tape – series
NZS 4404: 2004 Land development and subdivision engineering
NZS 4431: 1989 Code of practice for earthfill for residential purposes
NZS 4442: 1988 Welded steel pipes and fittings for water, sewage and medium
pressure gas
NZS 4501: 1972 Code of practice for marking of fire hydrants
NZS 5828: 2004 Playground equipment and surfacing
NZS 6701: 1983 Code of practice for road lighting
NZS 7643: 1979 Code of practice for the installation of unplasticized PVC pipe systems
AS/NZS 1100: Technical drawing – series
AS/NZS 1158: Lighting for roads and public spaces – series
AS/NZS 1546.1: 1998 On-site domestic wastewater treatment units – Septic tanks
AS/NZS 1547: 2000 On-site domestic wastewater management
AS/NZS 2280: 2004 Ductile iron and fittings
AS/NZS 2566.1: 1998 Buried flexible pipelines structural design (including supplement 1)
AS/NZS 2845.1: 1998 Water supply – Backflow prevention devices
AS/NZS 2865: 2001 Safe working in a confined space
AS/NZS 2890.1: 2004 Parking Facilities, Part 1: Off-street Car parking
AS/NZS 4020: 2002 Testing of products for use in contact with drinking water
AS/NZS 4130: 2003 Polyethylene (PE) pipes for pressure applications
AS/NZS 4158: 2003 Thermal-bonded polymeric coatings on valves and fittings for
water industry purposes
AS/NZS 60598.1: 2003 Luminaries – General requirements and tests
NZS/AS 1657: 1992 Fixed platforms, walkways, stairways and ladders. Desig