DE LA SIDERURGICA LA ECOSID
Septembrie, 2013ECOSID –INVESTIGAȚII ON-SITE 2100 AC ---------------------1400-------------------1800------------------------1950 ----------------------------1980 -----------------------------2000 ---------------------------------------2011
INVESTIGATII
Septembrie, 2013ECOSID –INVESTIGAȚII ON-SITE 3
INVESTIGATII
2011 2012 2013
WP Activities J-M A-J J-S O-D J-M A-J J-S O-D J-M
WP 2 Decision structures and local culture (UFZ)
WP 4
Existing data collection, analysis and interpretation (UTCB)
Phytoscreening and data analysis (DTU),
Direct – Push investigation and data processing (GL)
Soil and gas sampling and data processing (SG)
Soil sampling and data processing (UFC)
Chemical laboratory analysis (UTCB – Wessling)
Groundwater level measurement and sampling (UTCB)
Geodetic measurement and hydrological measurements (UTCB)
Granulometry measurements (UTCB)
Geological model of the test site (UTCB)
Flow and transport conceptual model (UTCB)
WP 5 Construction debris sampling and analysis (GE).
WP 6 GIS project (UTCB, TUB)
WP 7 Stakeholders Timbre workshop (timbre partners)
Analysis and interpretation Field work Laboratory, analysis and interpretation Dissemination
INVESTIGATII
Septembrie, 2013ECOSID –INVESTIGAȚII ON-SITE 5
Tipuri de date
Date geodezice
Descriere geologica
Parametrii hidrogeologici
Contaminare (sol, apa
subterana, vegetatie, moloz)
Foste cladiri si structuri
DIRECT PUSH
Septembrie, 2013ECOSID –INVESTIGAȚII ON-SITE 6
Direct Push este o metodă de investigare subterană cu actionare hidraulică unde atât forțastatică cât și percuția sunt folosite pentru a avansa în prelevarea de probe și de logare ainstrumentelor în subteran.
Nu sunt necesare rotații pentru a avansa și nu exisă nici resturi de foraj la suprafață(deșeuri).
Aplicate în zona nesaturata / saturata şi sunt deosebit de eficiente la argilele neconsolidate,
depozite de nisip şi pietriş.
DIRECT PUSH
Septembrie, 2013ECOSID –INVESTIGAȚII ON-SITE 7
Ușurința în folosire: Maşini mici şi unelte de diametru mic;
Rapid: Rate de penetrare într-o serie de metri pe minut;
Mobil: Deplasarea între locaţii este rapidă şi economică.
DIRECT PUSH
Septembrie, 2013ECOSID –INVESTIGAȚII ON-SITE 8
DIRECT PUSH
Septembrie, 2013ECOSID –INVESTIGAȚII ON-SITE 9
DIRECT PUSH
Septembrie, 2013ECOSID –INVESTIGAȚII ON-SITE 10
PHYTOSCREENING
Septembrie, 2013ECOSID –INVESTIGAȚII ON-SITE 11
Principiul: recoltarea, cu un burghiu/carotier special, de probe din vegetație (carote din trunchiul copacului) și analizarea acestora ca indicatori pentru contaminarea subterană.
PHYTOSCREENING
Septembrie, 2013ECOSID –INVESTIGAȚII ON-SITE 12
Schița principiului de măsurare:
Rădăcinile copacilor sunt în apă
Copacii transportă apa ascensional
Lemnul adsoarbe și retine componentele chimice
PHYTOSCREENING
Septembrie, 2013ECOSID –INVESTIGAȚII ON-SITE 13
EXPERIMET REMEDIERE SOL
Septembrie, 2013ECOSID –INVESTIGAȚII ON-SITE 14
Septembrie, 2013ECOSID –INVESTIGAȚII ON-SITE 15
MODEL CONCEPTUAL
Septembrie, 2013ECOSID –INVESTIGAȚII ON-SITE 16
MODEL CONCEPTUAL
-20
0
20
40
60
80
100
-10
0
10
20
30
40
50
Jan
uary
Feb
ru
ary
Marc
h
Ap
ril
May
Jun
e
July
Au
gu
st
Sep
tem
ber
Octo
mb
er
No
vem
ber
No
vem
ber
Pre
cip
itati
on
mm
Tem
pera
ture
0C
Temparature Precipitation
Valori medii multianuale
Luna T (0C) PP (mm)
Ianuarie -1.14 22.23
Februarie 0.63 20.98
Martie 4.79 28.40
Aprilie 11.16 38.81
Mai 15.62 61.49
Iunie 18.61 67.48
Iulie 20.21 63.58
August 20.39 54.81
Septembrie 15.51 33.44
Octombrie 10.14 29.30
Noiembrie 4.70 25.09
Decembrie 4.70 25.09
Anual 10.65 470.69
Septembrie, 2013ECOSID –INVESTIGAȚII ON-SITE 17
MODEL CONCEPTUAL
Septembrie, 2013ECOSID –INVESTIGAȚII ON-SITE 18
MODEL CONCEPTUAL
Septembrie, 2013ECOSID –INVESTIGAȚII ON-SITE 19
MODEL CONCEPTUAL
Septembrie, 2013ECOSID –INVESTIGAȚII ON-SITE 20
MODEL CONCEPTUAL
Septembrie, 2013ECOSID –INVESTIGAȚII ON-SITE 21
MODEL CONCEPTUAL
Septembrie, 2013ECOSID –INVESTIGAȚII ON-SITE 22
MODEL CONCEPTUAL
Septembrie, 2013ECOSID –INVESTIGAȚII ON-SITE 23
MODEL CONCEPTUAL – MODEL NUMERIC
y = 1.0003xR² = 0.8959
223
224
225
226
227
228
229
230
231
223 224 225 226 227 228 229 230 231
calc
ula
t
observat
Septembrie, 2013ECOSID –INVESTIGAȚII ON-SITE 24
NIVEL DE CONTAMINARE - ARSEN
-16
-14
-12
-10
-8
-6
-4
-2
0
0.00 0.01 0.10 1.00 10.00 100.00
dep
th (
m)
mg/kg BENZENE
Septembrie, 2013ECOSID –INVESTIGAȚII ON-SITE 25
NIVEL DE CONTAMINARE - ARSEN
Septembrie, 2013ECOSID –INVESTIGAȚII ON-SITE 26
NIVEL DE CONTAMINARE - ARSEN
474000
474500
475000
475500
476000
476500
477000
477500
334500 335000 335500 336000 336500 337000 337500
SAMPLE/POINT X Y Depth Value (ppm)
4688 - S8 335501.341 475607.433 0 -1 980
4687 - S7 335480.558 475638.867 0 - 1 516.69
4686 - S2 335694.933 475571.42 0 - 1 231
SG_06 336121.658 475523.074 0.0 -0.2 181
SG_21 336377.232 476115.446 0.0 -0.2 176.9
SG_18 336469.658 476177.862 0.0 -0.2 129
SG_17 336500.911 476297.479 0.0 - 0.2 101
SG_16 336552.008 476432.015 0.0 - 0.2 80.4
SG_22b 336826.645 476273.461 0.0 -0.2 79.97
SG_08P 336189.969 475981.418 0.0 -0.2 66.1
SG_03P 336191.68 475882.549 0-0.2 59.42
SG_03B 335614.518 475555.021 0.0 -0.2 59.3
SG_01B 335590.723 475635.946 0.0 -0.2 54.6
SG_29 336587.775 475902.984 0.0 -0.2 52.2
SG_30 336677.834 476039.583 0.0 -0.2 52.1
SG_24 336629.166 476161.306 0.0 -0.2 50.9
SG_04 336047.798 475182.23 0.0 -0.2 47.8
SG_05 336154.833 475306.021 0.0 - 0.2 47.5
SG_11 336778.091 476481.65 0.0 - 0.2 42.1
SG_12 336703.067 476505.242 1.0 - 2.0 41.9
SG_10 336875.981 476423.486 0.0 -0.2 39.6
SG_13 336646.415 476651.881 0.0 - 2.0 38.8
SG_07P 336288.839 475960.278 0.0-0.2 37.3
SG_06P 336301.555 475950.678 0.0 - 0.2 32.1
SG_05P 336253.138 475917.985 0.0-2.0 31.57
SG_02P 336178.394 475870.547 0-0.2 29.8
Septembrie, 2013ECOSID –INVESTIGAȚII ON-SITE 27
NIVEL DE CONTAMINARE - PLUMB
474000
474500
475000
475500
476000
476500
477000
477500
334500 335000 335500 336000 336500 337000 337500
SAMPLE/POINT X Y Depth Value (ppm)
SG_30 336677.834 476039.583 0.0 -0.2 2982
SG_10 336875.981 476423.486 0.0 -0.2 2957
RKB_B08 335417.5207 475597.9261 0.3-0.8 2672
SG_29 336587.775 475902.984 0.0 -0.2 1626
SG_05 336154.833 475306.021 0.0 - 0.2 1273
SG_18 336469.658 476177.862 0.0 -0.2 1059.01
SG_24 336629.166 476161.306 0.0 -0.2 828
RKB_B02 335657.2263 475368.9409 0.7-0.9 743
4687 - S7 335480.558 475638.867 0 - 1 705
SG_14 336613.576 476553.922 0.0 - 0.2 657.64
SG_17 336500.911 476297.479 0.0 - 0.2 524.99
4688 - S8 335501.341 475607.433 0 -1 522
4686 - S2 335694.933 475571.42 0 - 1 479
HD1 335730.721 475616.796 0-0.5 391
SG_16 336552.008 476432.015 0.0 - 0.2 279.04
SG_09 336386.545 475321.523 0.0 -0.2 268.28
RKB_B03 335686.8143 475457.7048 0.2-0.4 258
SG_15 336573.923 476607.467 0.0 - 0.2 256.14
HD3 336111.189 475863.057 0-0.5 254
SG_25 336506.546 476019.39 0.0 -0.2 251.22
SG_23 336766.588 476126.806 0.0 -0.2 249.61
HUN6 335701.8038 475418.1809 2 245
SG_26 336452.754 475946.69 0.0-0.2 238.01
SG_06P 336301.555 475950.678 0.0 - 0.2 237
SG_11 336778.091 476481.65 0.0 - 0.2 232
RKB_B1 335632.1408 475626.8709 0.6-0.7 226
SG_08 336317.911 475178.186 0.0 -0.2 162.56
SG_22b 336826.645 476273.461 0.0 -0.2 160.11
RKB_B09 335932.0462 475420.6049 0.7-1.3 160
Septembrie, 2013ECOSID –INVESTIGAȚII ON-SITE 28
NIVEL DE CONTAMINARE - NAFTALINA
474000
474500
475000
475500
476000
476500
477000
477500
334500 335000 335500 336000 336500 337000 337500
SAMPLE/POINT X Y Depth Value (ppm)
RKB_B04 335724.1208 475574.1271 0.5-0.8 162
4688 - S8 335501.341 475607.433 0 -1 99.9
HUN6 335701.8038 475418.1809 2 37.5
RKB_B1 335632.1408 475626.8709 0.6-0.7 18.6
HD1 335730.721 475616.796 0-0.5 13
RKB_B03 335686.8143 475457.7048 0.2-0.4 8.01
HD2 336101.809 475508.157 0-0.5 7.07
S10 335539.7293 475191.1459 0 - 1 7.06
4686 - S2 335694.933 475571.42 0 - 1 2.35
4687 - S7 335480.558 475638.867 0 - 1 2.12
SG_06P 336301.555 475950.678 0.0 - 0.2 1.26
SG_01P 336158.709 475861.802 0-1.5 1.09
S2 335446.8338 474993.0904 0 - 1 0.864
S7 335420.7395 475297.3495 0 - 1 0.832
S9 335539.9903 475178.3597 0 - 1 0.78
S12 335546.2529 475222.7199 0 - 1 0.745
SG_02P 336178.394 475870.547 0-0.2 0.732
S6 335403.2563 475270.7334 0 - 1 0.716
RKB_B05 335600.6232 475511.735 0.0-1.3 0.708
S11 335555.9078 475167.661 0 - 1 0.705
S17 335494.5863 475081.8109 0 - 1 0.688
S5 335430.6553 475237.5937 0 - 1 0.668
S8 335428.8287 475320.0515 0 - 1 0.639
SG_12 336703.067 476505.242 1.0 - 2.0 0.596
SG_07P 336288.839 475960.278 0.0-0.2 0.541
S4 335417.8691 475211.7603 0 - 1 0.522
S13 335539.4684 475276.996 0 - 1 0.516
E1 335496.6738 474953.4271 0 - 1 0.497
F3 335540.7731 475283.2586 0 -1 0.495
F5 335584.8724 474951.6005 0 - 1 0.489
E2 335496.1519 474978.7385 0 - 1 0.451
Septembrie, 2013ECOSID –INVESTIGAȚII ON-SITE 29
NIVEL DE CONTAMINARE - BTEX
Septembrie, 2013ECOSID –INVESTIGAȚII ON-SITE 30
NIVEL DE CONTAMINARE - MOLOZ
INVESTIGATII
• 20 de probe de moloz
• 96.000 m³ beton
• 14.000 m³ caramizi
• Analize chimice conform LAGA (Germania)
REZULTATE
• 11.500 m³ resturi din beton amestacate cu azbest (turnurile de
racire)
• 1.000 m³ moloz poluat cu gudron, fenol, BTEX (zona tratare ape
fenolice)
• 83.500 m³ moloz din ciment potential reutilizabil
• 14.000 m³ moloz din caramizi potential reutilizabil
OPTIUNI DE REUTILIZARE
• Constructii de drumuri Road construction (on site and off site)
• Modelarea terenului (on site)
VA MULTUMESC !!!