ASCP – EDD & ECC
summary
• These slides are try to illustrate below points:– basic Set up for a running a capacity constrained
ASCP plan– Critical components– the different behavior for EDD & ECC
Item/BOM
• TLA_01 – TOP LEVEL ASSEMBLY• SA1 – SUBASSEMBLY 1• SA2 - SUBASSEMBLY 1• RM – Raw material
resource
• PL01
Resource calendar
This means the availability is 8 hrs / day
Department /resource assignment
Routing
This means it’s with 100 ea / hour
Routing
BOM
Critical Component
Demand - forecast
ASCP plan option – critical component
ASCP plan option – ECC plan enabled
Only critical component appearing in output
Plan output with ECC
Plan output with ECC – exceoption
Plan output with ECC - capacity plan
ASCP Plan – EDD without resource constrarints
Plan output with EDD without resource constraints
Plan output with EDD without resource constraints - exception
Plan output with EDD without resource constraints – capacity load
Plan output with EDD and resource constraints
Plan output with EDD and resource constraints - exception
Plan output with EDD and resource constraints – capacity load