Drawing and applying poverty mapsThe Hungarian case
Open Society FoundationsMaking the Most of EU Funds for Roma initiative
15 Dec 2011
Settlement (LAU2, NUTS5) or sub-settlement
Micro-region (LAU1, NUTS4)
3.200 settlements in HU; average population besides Bp 2.500; sub-settlement level for those over 2.000
174 settlements in HU; population besides Bp 20-70.000
aim: classification of segregated areas;share of people without more than primary education and without employment over 50%
aim: classification of all areas;80 more developed,47 less developed (below average),14 least developed (bottom 15%),33 least developed with integrated programme (bottom 10%)
2 social indicators 31 social, economic and infrastructural indicators
used for integrated urban development strategies, etc.
used for the integrated programme of the less developed micro-regions, etc.
Mapping at 2 levels
Indicators• Settlement level:
• 2 social: education (primary school), employment• Micro-region level:
• 14 social:• 6 income, property, demography, etc.: income, flat, car, migration, mortality,
urbanisation• 5 poverty, etc.: education (secondary school), unemployed households, social
assistance, child protection assistance, aging index• 3 employment: unemployment, long term unemployment, activity
• 8 economic: number and change in number of enterprises, agriculture, services, tourism, retail, research, tax income
• 9 infrastructural: piped water, sewage, gas, waste collection, road and motorway accessibility, phone, cable TV, broadband internet
• Foreseen change: smaller number of indicators, more focus on social indicators
Indicators – *census data• Settlement level:
• 2 social: education (primary school)*, employment• Micro-region level:
• 14 social:• 6 income, property, demography, etc.: income, flat, car, migration, mortality,
urbanisation• 5 poverty, etc.: education (secondary school)*, unemployed households*,
social assistance, child protection assistance, aging index• 3 employment: unemployment, long term unemployment, activity*
• 8 economic: number and change in number of enterprises, agriculture*, services*, tourism, retail, research, tax income
• 9 infrastructural: piped water, sewage, gas, waste collection, road and motorway accessibility, phone, cable TV, broadband internet
• Foreseen change: smaller number of indicators, more focus on social indicators
Area Population People without more than primary education and without employment
Ózd 38.405 26%
Segregated area no 10 1.655 61%
Segregated area no 8 1.120 59%
Segregated area no 3 711 53%
Segregated area no 7 638 75%
Ózd, Hungary
Segregated area no 7, Ózd, Hungary
0 20 40 60 80 100 120 140 1601
1.5
2
2.5
3
3.5
4
4.5
5
10% least dev. 15% least dev. less dev. more dev.
Ranking micro-regions
dark green: least developed micro-regions with integrated programme (33)medium green: least developed micro-regions (14)light green: less developed micro-regions (47)
striped: micro-regions with high rate of Roma, census data (44)
Territorial targeting of funds• Funding
– 300 meur, 1% of NSRF– From 8 OPs
• Directly: 4 Regional OPs (ERDF), Social infra OP (ERDF), Social renewal OP (ESF)• Indirectly: State reform OP (ESF), Implementation OP (CF)
– Allocation to each micro-region, 5-15 meur (based on No of population and settlements) – difference compared to comprehensive approach
• Coordination– No formal power– Informal organisational and personal power, coordination unit as all OP MAs in
National Development Agency – difference compared to comprehensive approach
• Challenges– Lack of support from OP MAs (allocation, specific conditions)– Time
Per capita funding of least developed micro-regions
Per capita funding of least developed micro-regions
Per capita funding of least developed micro-regions
Equal opportunities guarantees• Tools
– Planning, project generation• Roma inclusion among main objectives of the programme• Involvement of local Roma leaders• Involvement of equal opportunities experts, commissioned by the coordination unit• Mapping of segregated areas, preparation of equal opportunities analysis and plans
– Initial project selection• Equal opportunities among main criteria of assessment of plans and project ideas• Involvement of equal opportunities experts• 2 weakest plans sent back for revision• A number of projects selected from reserve list
– Project preparation• Initial project selection with draft project ideas (3 pages each)• Specific conditions for project selection• Cooperation with MtM in project preparation
• Results– Intervention does not increase internal differences in any micro-region,
decreases internal differences in 1/3 of the micro-regions– Around 40 meur, 13% with direct Roma inclusion or equal opportunities impact
Thanks for your attention
http://mtm.osi.huWhere the Paved Road Ends