2015 CONSTRUCTION PROGRAM
***Dates in the 2015 Program are subject to change without notice
DISTRICT 3
JOHN R. KASICH, OHIO GOVERNOR | JERRY WRAY, ODOT DIRECTOR | ALLEN C. BIEHL, DISTRICT DEPUTY DIRECTOR
SERVING ASHLAND, CRAWFORD, ERIE, HURON, LORAIN, MEDINA, RICHLAND AND WAYNE COUNTIES
2015 DISTRICT 3 CONSTRUCTION PROGRAM
ASHLAND COUNTY 1
Ashland County Projects
PID
Number
Route &
Section Work Type Location
Sale Date
Est. Start
&
Est. End
Est. Cost
&
Contactor
Maintenance of Traffic
81932 ASD-89-10.32 Bridge Deck
Replacement
At its bridge over Interstate 71
7/24/14
2/23/15
7/31/15
$1,690,547
Ruhlin
Construction
150-day detour
92897 ASD-96-6.26 Signal
Improvements
At various intersections, including
Holbrook Road, Lee Ave; and US 250
in the City of Ashland
10/2/14
12/3/14
5/22/15
$295,718.90
Perram Electric
Maintained at all times
88811 ASD-511-14.07 Resurface
Resurfacing from SR 60 to the Lorain
County line, including its
overlap with SR 302
3/5/15
5/1/15
9/30/15
$2,288.925.18
Kokosing
Maintained with flaggers or
temporary signal, except for
45-day detour for bridge
work
88739 ASD-42-7.75 Bridge
Replacement
Interchange improvement & bridge
replacement on US 42 at US 250/SR96 4/9/15
5/26/15
11/13/15
$8,100,000
Unknown
90-day detour
86699 ASD-604-0.00 Chip Seal On State Route 604 in Ashland and
Wayne Counties 6/18/15
8/1/15
11/1/15
$1,500,000
Unknown
Maintained with flaggers
93118 RIC-39-24.93 Resurface From SR 603 in Richland County to
the Holmes County line
6/18/15
8/1/15
11/30/15
$3,370,000
Unknown
Maintained with flaggers and
temporary signalized lane
closures for bridge work
2015 DISTRICT 3 CONSTRUCTION PROGRAM
ASHLAND COUNTY 2
Resurfacing
Reactive/Preventive Maintenance
Bridge/Culvert
Continued Construction from 2014
New Construction in 2015
2015 DISTRICT 3 CONSTRUCTION PROGRAM
CRAWFORD COUNTY 3
Crawford County Projects
PID
Number
Route &
Section Work Type Location
Sale Date
Est. Start
&
Est. End
Est. Cost
&
Contactor
Maintenance of Traffic
93108 CRA-98-19.3 Resurface From Dickson Road to State Route 61 in
Richland County 11/13/14
6/1/15
9/30/15
$1,946,696.61
Shelly & Sands
Maintained with flaggers
97539 CRA-TR-50-6.10 Bridge
Replacement Scott Road over Nogle ditch 1/15/15
4/1/15
8/31/15
$427,340.00
R & I
Construction
45-day detour
94383 CRA-98-0.00 Resurface Marion County line to State Route 4; and
on SR 4 from SR 98 to Charles Street 7/2/15
8/1/15
10/31/15
$2,500,000
Unknown
Maintained with flaggers
2015 DISTRICT 3 CONSTRUCTION PROGRAM
CRAWFORD COUNTY 4
Resurfacing
Reactive/Preventive Maintenance
Bridge/Culvert
Continued Construction from 2014
New Construction in 2015
2015 DISTRICT 3 CONSTRUCTION PROGRAM
ERIE COUNTY 5
Erie County Projects
PID
Number
Route &
Section Work Type Location
Sale Date
Est. Start
&
Est. End
Est. Cost
&
Contactor
Maintenance of Traffic
79851 ERI-2-0.14 Preventative
Maintenance From the Edison Bridge to US Route 6 6/26/14
7/28/14
6/30/15
$3,592,664
Strawser
One lane maintained in
each direction
77440 ERI-2-30.41 Preventative
Maintenance
From just west of the Lorain County
line to east of Baumhart Road;
includes US 20 in Lorain County from
Middle Avenue to State Route 57
8/21/14
4/1/15
6/30/15
$2,654,065
Burton Scot
One lane maintained in
each direction
84556 ERI-250-1.14 Intersection
Improvement US 250 and Perkins Ave 11/26/14
4/1/15
10/15/15
$3,074,920.43
SET, Inc.
Maintained at all times
94898 ERI-250-9.78 Culvert
Replacement Just south of Strecker Road 11/13/14
4/13/15
7/17/15
$191,387.25
Underground
Utilities
Shoulder closures as
necessary
88764 ERI-6-11.25 Resurface
Between the City of Sandusky and
City of Huron, and on SR 547 in the
village of Monroeville
11/26/14
4/1/15
6/30/15
$993,853.65
Erie Blacktop
Maintained with flaggers
88407 ERI-250-0.00 Corridor
Improvement From US Route 6 to Bogart Road 3/5/15
5/4/15
9/15/16
$14,228,715.75
Miller Brothers
Maintained at all times
86697 ERI-6-19.25 Preventative
Maintenance
The City of Huron and the City of
Vermilion, and in Lorain County on
SR 82 from SR 57 to the Cuyahoga
County line
6/18/15
8/1/15
11/1/15
$1,500,000
Unknown
Maintained with flaggers
2015 DISTRICT 3 CONSTRUCTION PROGRAM
ERIE COUNTY 6
Resurfacing
Reactive/Preventive Maintenance
Bridge/Culvert
Continued Construction from 2014
New Construction in 2015
2015 DISTRICT 3 CONSTRUCTION PROGRAM
HURON COUNTY 7
Huron County Projects
PID
Number
Route &
Section Work Type Location
Sale Date
Est. Start
&
Est. End
Est. Cost
&
Contactor
Maintenance of Traffic
89367 HUR-13-6.90 Slide Repair Just south of Rundel Street 1/9/14
2/215
7/1/15
$473,531.00
BBR Drilling
90-day detour
86692 D03 SMOOTH
FY2015
Preventive
Maintenance
On SR 60 from the City of Vermilion
to the village of New London 6/26/14
9/2/14
6/30/15
$2,301,352
Erie Blacktop
Maintained with flaggers
97548 HUR-TR-48-0.55 Bridge
Replacement
Lovers Lane
1/15/15
4/1/15
8/31/15
$623,800.00
Mosser
Construction
60-day detour
91657 HUR-224-6.16 Rehabilitation From just east of SR 99 to the eastern
corporation limit of Willard 3/26/15
5/1/15
12/15/15
$1,328,000
Unknown
Maintained at all times;
truck traffic will be
detoured
90362 HUR-61-15.93 Culvert
Rehabilitations
On SR 61, one-quarter mile south of
Johnson Road and on SR 162, one-
half-mile east of Lyon Road
4/9/15
6/1/15
8/15/15
$250,000
Unknown
Maintained with flaggers
SR-61: Signalized lane
closure for bridge work
and CR-128 will be
closed for 14 days
SR-162: 24-day detour
2015 DISTRICT 3 CONSTRUCTION PROGRAM
HURON COUNTY 8
Resurfacing
Reactive/Preventive Maintenance
Bridge/Culvert
Continued Construction from 2014
New Construction in 2015
2015 DISTRICT 3 CONSTRUCTION PROGRAM
LORAIN COUNTY 9
Lorain County Projects
PID
Number
Route &
Section Work Type Location
Sale Date
Est. Start
&
Est. End
Est. Cost
&
Contactor
Maintenance of Traffic
23104 LOR-58-7.36 Railroad Grade
Separation
0.14 mile north of State Route 18 in
the Village of Wellington 1/17/13
4/1/13
10/15/15
$12,324,028.86
Beaver Exc.
35-day detour near
project completion
25732 LOR-2-10.46 Bridge Deck
Replacement
At bridges over the railroad and
Murray Ridge Road
1/23/14
3/3/14
10/31/16
$10,124,197.97
JD Williamson
I-90: Two lanes in each
direction at all times
82645 LOR-57-19.42 Major
Rehabilitation
Between the I-90 interchange with
SR 57 and Ohio Turnpike 4/10/14
5/1/14
7/15/16
$20,538,253.95
Karvo Paving
SR 57: Two lanes of
traffic in each direction.
Midway Mall Blvd &
Griswold Rd: One lane in
each direction
83793 LOR-254-0.01 Intersection
Improvement
State Route 254 & West River Road in
the City of Elyria 6/26/14
2/12/15
8/15/15
$3,720,359
Karvo Paving
90-day detour
88825 LOR-18-12.29 Bridge Repair Between Indian Hollow Road and
Foster Road 10/2/14
4/1/15
5/30/15
$607,000
Ohio Bridge
45-day detour
81078 LOR-90-
OVERLAYS
Bridge
Maintenance
At I-90 bridges over SR 57, US 20 and
the CSX railroad tracks 10/16/14
4/15/15
8/31/15
$256,643.60
Karvo Paving
One lane maintained at all
times in both directions at
night/PETERS
81933 LOR-90-17.53 Bridge Deck
Replacement French Creek Road over I-90 10/30/14
4/6/15
10/2/15
$1,759,893.80
Mosser
Construction
180-day detour
96999 LOR-20-22.19 Demolition
Various structures in North Ridgeville 10/30/14
12/8/14
6/5/15
$969,747.00
All Aspects
Contracting, Inc
Maintained at all times
2015 DISTRICT 3 CONSTRUCTION PROGRAM
LORAIN COUNTY 10
Resurfacing
Reactive/Preventive Maintenance
Bridge/Culvert
Continued Construction from 2014
New Construction in 2015
2015 DISTRICT 3 CONSTRUCTION PROGRAM
LORAIN COUNTY 11
Lorain County Projects (continued)
PID
Number
Route &
Section Work Type Location
Sale Date
Est. Start
&
Est. End
Est. Cost
&
Contactor
Maintenance of Traffic
82262 LOR-90-SYSSIGN
FY2015
Sign
Replacements Various locations on SR 10 & US 20 11/26/14
2/1/15
1/30/16
$134,438.50
MP Dory
Maintained at all times
88767 LOR-511-13.41 Resurface From US Route 20 to the
City of Oberlin 11/26/14
6/15/15
8/31/15
$982,928.84
Kokosing
One lane of traffic
maintained at all times
with flaggers
80123 LOR-162-5.77 Bridge
Replacement
Nearly one-half-mile west of SR 58
3/26/15
6/1/15
8/15/15
$330,000
Unknown
30-day detour
86272 LOR-58-23.79 Resurfacing Urban Paving on SR 58 in Amherst 3/26/15
6/1/15
10/31/15
$710,000
Unknown
One lane maintained in each
direction; paving at night
94900 LOR-10-1.13 Culvert
Construction
at three locations along SR 10 and one
culvert on US 20 4/23/15
06/01/15
12/31/15
$400,000
Unknown
One lane maintained in
each direction at all times
97551 LOR-TR-15 & TR-
129 and MED-CR-44
Bridge
Replacement
Parsons Road over Black River; Snell Road
and State Road in Medina County 5/7/15
6/15/15
9/15/15
$2,200,000
Unknown 60 days each structure
91303 LOR-252-2.30 Slide Repair 0.36 miles south of SR 82 6/4/15
8/3/15
10/30/15
$550,000
Unknown
90-day detour
92009 LOR-611-3.44 Bridge Repair Henderson Drive bridge over Black River in
City of Lorain 6/4/15
8/1/15
5/2/16
$5,300,000
Unknown
One lane in each direction
at all times
93709 LOR CULVERTS
FY2015
Culvert
Replacements
On US 20 just west of Baird Road; on SR
252 north of River Glen Drive; and on
SR 303 just east of West Road
6/4/15
8/3/15
11/1/15
$400,000
Unknown
21-day detour for each
culvert replacement
92836 LOR-82-8.99 Intersection
Improvement At intersection with Boone Road 9/24/15
4/4/16
9/2/16
$1,500,000
Unknown
Boone Rd: 60-day detour
on each approach; SR 82:
Maintained
2015 DISTRICT 3 CONSTRUCTION PROGRAM
LORAIN COUNTY 12
Resurfacing
Reactive/Preventive Maintenance
Bridge/Culvert
Continued Construction from 2014
New Construction in 2015
2015 DISTRICT 3 CONSTRUCTION PROGRAM
MEDINA COUNTY 13
Medina County Projects
PID
Number
Route &
Section Work Type Location
Sale Date
Est. Start
&
Est. End
Est. Cost
&
Contactor
Maintenance of Traffic
79760 MED-18-15.15 Preventative
Maintenance
From just east of Nettleton Road to
Windfall Road 6/24/14
8/8/14
6/26/15
$704,278.11
Karvo Paving
Mostly night work
86731 MED-94-18.74 Resurface
From SR 303 to the Cuyahoga County
line; on SR 303 from the Lorain
County line to City of Brunswick
10/16/14
6/15/15
9/30/15
$2,250,576.81
Karvo Paving
Maintained at all times
with flaggers
92691 MED-57-17.67 Roundabout
Construction
State Route 57, Speith Road, and State
Route 252 intersection 10/30/14
6/15/15
8/31/15
$1,645,870.05
Karvo Paving
60-day detour
93116 MED-301-0.00 Resurface From the Wayne County line to the
Village of Spencer 11/13/14
5/1/15
8/31/15
$1,787,357.45
Chagrin Valley
Maintained at all times
with flaggers
93113 MED-57-3.24 Resurface
On SR 57 from the City of Wadsworth
to the City of Medina & on SR 94
from SR 18 to SR 3
11/26/14
5/1/15
10/15/15
$2,481,506.16
Karvo Paving
Maintained at all times
with flaggers
96567 MED-94-14.61 Signals Signal installation at SR 94 and I-271
South interchange 12/11/14
2/2/15
9/30/15
$88,248.43
Greenwich
Electric
Maintained at all times
97549 MED-TR-33-3.23
MED-CR-4-7.19
Bridge
Replacement
TR 33, over Mallet Creek, and on
West Smith Road over Black River 1/29/15
4/1/15
9/1/15
$861,173.50
Reitschlin
TR-33: 90-day detour
CR-4: 45-day detour
86756 MED-3-9.53 Signals New traffic signal on SR 3 at
Highpoint/Lexington Ridge Drive 4/9/15
6/1/15
10/16/15
$150,000
Unknown
Maintained at all times
86893 MED-42-18.98 Intersection
Improvement At Fenn Road 4/9/15
6/1/15
10/16/15
$3,700,000
Unknown
One lane in each direction
on US 42 and Fenn Rd
2015 DISTRICT 3 CONSTRUCTION PROGRAM
MEDINA COUNTY 14
Resurfacing
Reactive/Preventive Maintenance
Bridge/Culvert
Continued Construction from 2013
New Construction in 2014
Sale in 2014; Construction in 2015
Resurfacing
Reactive/Preventive Maintenance
Bridge/Culvert
Continued Construction from 2014
New Construction in 2015
2015 DISTRICT 3 CONSTRUCTION PROGRAM
MEDINA COUNTY 15
Medina County Projects (continued)
PID
Number
Route &
Section Work Type Location
Sale Date
Est. Start
&
Est. End
Est. Cost
&
Contactor
Maintenance of Traffic
88773 MED-94-1.16 Resurface Urban paving in Wadsworth
4/9/15
6/1/15
12/31/15
$890,000
Unknown
Maintained with flaggers;
Night paving work
92883 MED-303-6.00 Resurface Urban Paving in Brunswick 4/9/15
7/1/15
10/31/15
$1,500,000
Unknown
Maintained with flaggers;
All work at night
97541
MED-CR-29-
4.69 & MED-CR-
46-3.41
Bridge
Replacement Congress Road and Seville Road 4/20/15
5/25/15
9/1/15
$1,000,000
Unknown
90-day detour at both
structures
81338 MED-94-3.8 Rehabilitation Reconstruct and improve the SR 94
and I-76 interchange corridor 5/21/15
7/2/15
8/31/17
$9,100,000
Unknown
Maintained with flaggers
96227 MED-71-24.02 Intersection
Improvement
Improve the I-71 south exit to SR 303
with widening and extending 5/21/15
8/31/15
10/16/15
$3,300,000
Unknown
Slip ramp closed during
construction; SR 303:
Maintained at all times
77038 MED-271-0.00 Preventive
Maintenance From I-71 to Summit County line 6/18/15
8/1/15
9/30/15
$1,700,000
Unknown
One lane maintained in
each direction at all times
2015 DISTRICT 3 CONSTRUCTION PROGRAM
MEDINA COUNTY 16
Resurfacing
Reactive/Preventive Maintenance
Bridge/Culvert
Continued Construction from 2014
New Construction in 2015
2015 DISTRICT 3 CONSTRUCTION PROGRAM
RICHLAND COUNTY 17
Richland County Projects
PID
Number
Route &
Section Work Type Location
Sale Date
Est. Start
&
Est. End
Est. Cost
&
Contactor
Maintenance of Traffic
88808 RIC-95-0.00 Resurface
On SR 95 from the Knox County line
to the Village of Perrysville and on SR
603 from SR 95 to SR 39
7/10/14
8/8/14
7/31/15
$3,010,466.61
Shelly & Sands
Maintained with flaggers at
all times
88827 RIC-42-12.34 Bridge Repair
Between Smith Avenue and 8th
Avenue in the City of Mansfield 10/16/14
6/15/15
8/28/15
$294,252.80
Page Excavating
28-day detour
82261 RIC-30- FY14 Sign
Replacement
From just west of the SR 309 overpass
to the Ashland County line 4/10/14
5/21/14
5/18/15
$156,240.00
Lake Erie Const.
One lane maintained at all
times in each direction
97112 CR-303-1.02 &
CR-303-3.68
Bridge
Replacements Pleasant Valley Road 6/5/14
3/16/15
5/31/15
$2,251,602.00
Complete General
CR-303-1.02: 45-day detour
CR-303-3.68: 60-day detour
97540 RIC-TR-383
CR-31
Bridge
Replacement
On Hay Road and on Bellville Johnson
Road 1/29/15
4/1/15
8/31/15
$1,237,840
Complete General
CR-31: 75-day detour
TR-383: 45-day detour
93710 RIC-CULVERTS
2015
Culvert
Rehabilitation At various locations on US 30 and I-71 2/10/15
5/1/15
8/31/15
$149,716.00
Stanley Miller*
Maintained at all times
82263 RIC-30-
SYSSIGN
Sign
Replacement On US 30 and SR 309 3/20/15
5/1/15
4/1/16
$240,000
Unknown
Maintained at all times
88728 RIC-13-14.41 Resurface Urban Paving in Mansfield on SR 13,
SR 39, SR 430, US 42 and SR 545 5/18/15
5/1/15
8/1/15
$4,190,000
Unknown
Signalized lane closure for
bridge work; Truck traffic
may be detoured
79792 RIC-71-0.0 Preventive
Maintenance
From the Morrow County line to just
south of the SR 39 interchange
6/18/15
8/1/15
10/1/15
$3,900,000
Unknown
One lane maintained in each
direction at night with two
lanes maintained during day
*Apparent low bidder
2015 DISTRICT 3 CONSTRUCTION PROGRAM
RICHLAND COUNTY 18
Resurfacing
Reactive/Preventive Maintenance
Bridge/Culvert
Continued Construction from 2014
New Construction in 2015
2015 DISTRICT 3 CONSTRUCTION PROGRAM
RICHLAND COUNTY 19
Richland County Projects (continued)
PID
Number
Route &
Section Work Type Location
Sale Date
Est. Start
&
Est. End
Est. Cost
&
Contactor
Maintenance of Traffic
86839 RIC-39-1.87 Resurface Urban Paving in Shelby on SR 39,
SR 61 and SR 96 6/18/15
8/1/15
10/1/15
$1,800,000
Unknown
Maintained at all times
93118 RIC-39-24.93 Resurface From SR 603 to the Ashland/Holmes
County line 6/18/15
8/1/15
11/30/15
$3,370,000
Unknown
Maintained with flaggers
or signalized lane
closures for bridge work
93096 RIC-30-9.13 Reactive
Maintenance
From just west of SR 309 to the
Mansfield corporation limit
6/18/15
8/1/15
12/1/15
$500,000
Unknown
One lane maintained in
each direction
93122 RIC-314-0.00 Resurface
From Morrow County line to SR 61,
including within the City of Ontario
9/24/15
4/1/16
12/31/16
$2,300,000
Unknown
Maintained with flaggers
2015 DISTRICT 3 CONSTRUCTION PROGRAM
RICHLAND COUNTY 20
Resurfacing
Reactive/Preventive Maintenance
Bridge/Culvert
Continued Construction from 2014
New Construction in 2015
2015 DISTRICT 3 CONSTRUCTION PROGRAM
WAYNE COUNTY 21
Wayne County Projects
PID
Number
Route &
Section Work Type Location
Sale Date Est. Start
&
Est. End
Est. Cost
&
Contactor
Maintenance of Traffic
83203 WAY-585-2.75 Section
Improvement
Between Geyers Chapel Road and
Thompson Road
6/5/14
8/4/14
9/30/15
$3,480,723.10
Mark Schaffer
SR 585: 150-day detour
Geyers Chapel Rd: Intermittent Detours
83453 WAY-BH-
FY2015
Bridge
Repairs
On seven bridge decks along US 30;
SR 94, SR 585; SR 172 and
SR 302
12/11/14
5/1/15
9/30/15
$1,535,000.00
APBN Inc.
14-day detour of SR 302 to US 30 West
ramp as well as various signalized single
lane closures at other structures
94902 WAY-250-7.10 Culvert
Construction
Just east of Old Lincolnway and just
south of Secrest Road
1/15/15
3/2/15
8/31/15
$109,226.79
Stanley Miller
Maintained at all times
90936 WAY Safe Routes
to School Village of Creston
1/15/15
4/1/15
6/30/15
$307,116.45
Stanley Miller
Maintained at all times
86728 WAY-94-14.16 Resurface
From Fox Lake Road to the City of
Wadsworth, and on SR 585 from
SR 94 to Summit County line
2/26/15
5/1/15
10/31/15
$3,000,000
Unknown
Signalized lane closure for bridge work
with two short closures of CR 70; One
lane maintained with flaggers
86840 WAY-57-10.82 Resurface Urban paving in Rittman 3/19/15
5/1/15
8/1/15
$1,100,000
Unknown
Signalized lane closure for bridge work;
One lane maintained with flaggers
87745 WAY-30-9.18 Preventative
Maintenance in the City of Wooster
3/5/15
5/26/15
9/10/15
$794,217.00
Strawser Const.
One lane maintained at all times in each
direction; possible night time ramp closures
91300 WAY-3-1.40 Slide Repair 0.25 south of Newkirk Road
4/23/15
5/15/15
8/31/15
$500,000
Unknown
90-day detour
84605 WAY-302-4.86
WAY-302-6.22
Culvert
Replacements
At two locations between Silver
Road and Smyser Road
6/4/15
8/1/15
11/1/15
$750,000
Unknown
45-day detour
2015 DISTRICT 3 CONSTRUCTION PROGRAM
WAYNE COUNTY 22
Resurfacing
Reactive/Preventive Maintenance
Bridge/Culvert
Continued Construction from 2014
New Construction in 2015
2015 DISTRICT 3 CONSTRUCTION PROGRAM
WAYNE COUNTY 23
Wayne County Projects (continued)
PID
Number
Route &
Section Work Type Location
Sale Date Est. Start
&
Est. End
Est. Cost
&
Contactor
Maintenance of Traffic
98736 WAY-30-3.96 Culvert
Replacement 0.75 mile east of Firestone Road 6/4/15
7/15/15
8/15/15
$100,000
Unknown
Single lane or shoulder closures as
needed
77476 WAY-30-11.79 Surface
Treatment
From the SR 3 interchange to just
east of Kansas Road 7/2/15
8/13/15
10/30/15
$3,500,000
Unknown
One lane maintained in each direction
90882 WAY-604-0.01 Bridge Repair
At the Ashland/Wayne County line 8/13/15
4/1/16
5/31/16
$580,000
Unknown
90-day detour
87710 WAY-21-0.00 Reactive
Maintenance
From the Stark County line to the
Summit County line 10/22/15
5/1/16
9/30/16
$1,600,000
Unknown
One lane maintained in each direction
2015 DISTRICT 3 CONSTRUCTION PROGRAM
WAYNE COUNTY 24
Resurfacing
Reactive/Preventive Maintenance
Bridge/Culvert
Continued Construction from 2014
New Construction in 2015
2015 DISTRICT 3 CONSTRUCTION PROGRAM
DISTRICT WIDE PROJECTS 25
District Wide Projects
PID
Number
Route &
Section Work Type Location
Sale Date
Est. Start
&
Est. End
Est. Cost
&
Contactor
Maintenance of Traffic
96718 D03 MOW
FY2014-15
Mowing Various routes and sections
throughout District Three
12/12/13
5/15/14
11/15/15
$659,834.00
Tom Mayle & Sons
Maintained at all times
89419 D03-LOOP-
FY2013
Loop
Maintenance
Various routes and sections
throughout District Three
1/17/13
6/6/13
5/31/15
$99,410.00
Perram Electric Maintained at all times
96719 D03 MOW
FY2014-15
Mowing Various routes and sections
throughout District Three
1/9/14
5/12/14
11/15/15
$324,000.00
Brypan LLC Maintained at all times
95217 D03 PR
FY2013
Pruning,
Tree/Bush
Removal
Various routes and sections
throughout District Three
3/28/13
6/27/13
5/31/15
$116,530.00
VanCuren
Maintained at all times
89429 D03 RPM
FY2014
Raised
Pavement
Markers
Various routes and sections
throughout District Three
3/27/14
6/17/14
4/30/15
$164,455
A & A Safety
Maintained at all times
96720 D03 MOW
FY2014-15
Mowing Various routes and sections
throughout District Three
3/27/14
5/12/14
11/15/15
$354,364.00
Brypan LLC
Maintained at all times
86693 D03 CHIP
FY2015
Chip Seal On State Route 303 from the Huron
County Line to village of LaGrange
7/24/14
5/1/15
6/30/15
$558,464.00
Erie Blacktop
Maintained with flaggers
84581 D03 BH
FY2015
Bridge Repair Several structures on SR 2 in Erie
County; Coen Road & Barnes Road
were repaired in 2014
8/21/14
10/6/14
8/31/15
$637,660.09
Bridge Overlay
Risden Road: 30-day detour
89444 D03 PR
FY2015
Pruning,
Tree/Bush
Removal
Various routes and sections
throughout District Three
8/21/14
10/29/14
9/30/15
$656,225
Van Curen
Maintained at all times
89443 D03 GR
FY2015
Guardrail
Repair
Various routes and sections
throughout District Three
10/2/14
1/30/15
1/13/16
$584,755
Lake Erie Const.
Maintained at all times
2015 DISTRICT 3 CONSTRUCTION PROGRAM
DISTRICT WIDE PROJECTS 26
Resurfacing
Reactive/Preventive Maintenance
Bridge/Culvert
Continued Construction from 2014
New Construction in 2015
2015 DISTRICT 3 CONSTRUCTION PROGRAM
DISTRICT WIDE PROJECTS 27
District Wide projects (continued)
PID
Number
Route &
Section Work Type Location
Sale Date
Est. Start
&
Est. End
Est. Cost
&
Contactor
Maintenance of Traffic
93864
D03 Mohican
Campground
Resurfacing State Park campgrounds and Culvert
Replacements in the State Forest
11/26/14
4/15/15
5/22/15
$731,355.40
Karvo Paving
Maintained at all times
89445
D03 LG
FY2015
Lighting
Maintenance
Various routes and sections
throughout District Three
12/11/14
2/15/15
8/31/15
$105,609.80
Greenwich Elec
Maintained at all times
84587
D03 DECK
OVERLAYS
FY2015
Bridge
Maintenance
Various bridges along State Route 2
in Erie and Lorain Counties
2/26/15
1/15/15
10/31/15
$525,000.00
B&G
Construction
30-day detour of Main Street in
Amherst; one lane maintained in each
direction on the other structures
89446
D03 LOOP
FY2015
Loop Detector
Repair
Various routes and sections
throughout District Three
2/26/15
6/1/15
5/31/17
$189,312.75
Perram Electric
Maintained at all times
89447
D03 RPM
FY2015
Raised
Pavement
Markers
Various routes and sections
throughout District Three
3/26/15
6/1/15
9/1/15
$347,000
Unknown
Maintained at all times
89448
D03 PM
FY2015
Pavement
Marking
Various routes and sections
throughout District Three
6/4/15
7/1/15
10/1/15
$2,445,000
Unknown
Maintained at all times
86697
D03 MICRO
FY2016
Preventive
Maintenance
Preventive Maintenance - Surface
Treatment
6/18/15
8/1/15
11/1/15
$2,449,000
Unknown
Maintained at all times
86698
D03 SMOOTH
FY2016
Preventive
Maintenance
Preventive Maintenance - Surface
Treatment
6/18/15
8/1/15
10/1/15
$1,656,000
Unknown
Maintained with flaggers
97357
D03 PR
FY2016
Pruning,
Tree/Bush
Removal
Various routes and sections
throughout District Three
7/2/15
8/1/15
8/1/16
$200,000
Unknown
Maintained at all times
2015 DISTRICT 3 CONSTRUCTION PROGRAM
DISTRICT WIDE PROJECTS 28
Resurfacing
Reactive/Preventive Maintenance
Bridge/Culvert
Continued Construction from 2014
New Construction in 2015
To provide easy conveyance of people
and goods from place to place, we will:
Take care of what we have;
Make our system work better;
Improve safety;
Enhance capacity
A long-term, reliable, professional and
highly productive organization
O U R M I S S I O N
O U R V I S I O N
For more information, Allen C. Biehl, P.E., District Deputy Director at (419) 207-7002,
Robert L. Weaver, P.E., P.S., District Construction Administrator at (419) 207-7158, or
Christine Myers, Public Information Officer at (419) 207-7182.
Like us on Facebook: www.facebook.com/OhioDepartmentofTransportationDistrict3
Follow us on Twitter: www.twitter.com/ODOT_NorthCenOH
Statewide Traffic Information: www.Ohgo.com
For general information, call (800) 276-4188 or visit District 3’s Web site at: www.transportation.ohio.gov/dist3