Page 1: Datalogger / DMV Modification Proposals - Summary Simon Trivella  26 th August 2010 Distribution Workstream - Elexon U P D A T E

Datalogger / DMV Modification Proposals - Summary

Simon Trivella – 26th August 2010Distribution Workstream - Elexon

UPDATE

Page 2: Datalogger / DMV Modification Proposals - Summary Simon Trivella  26 th August 2010 Distribution Workstream - Elexon U P D A T E

Content• Reminder of June 2010 presentation and potential Modification Proposals

• Modification Proposal 0224 (DM Elective) Update

• Daily Read statistics– DM population changes with DME switching (various scenarios)

• Update on WWU proposed Modification Proposals

UPDATE

Page 3: Datalogger / DMV Modification Proposals - Summary Simon Trivella  26 th August 2010 Distribution Workstream - Elexon U P D A T E

Background / Drivers• The world is changing – increase in AMR usage and new supplier

obligation increases the number of devices attached to meters– More options for obtaining data

– More cases of devices being disconnected resulting in lost data and therefore data not being usable

• DM elective (DME) due to be introduced in November 2010– Consistent with meter reading being a competitive activity

• Modification Proposal 0258A already implemented which reflects this changing world

– Allows Transporter to procure data from 3rd parties

June 2010

Page 4: Datalogger / DMV Modification Proposals - Summary Simon Trivella  26 th August 2010 Distribution Workstream - Elexon U P D A T E

Background / Drivers• DM Unbundling to be considered / developed

– Potential lengthy timescales

• WWU is drafting three Modification Proposals– Priority of position for Transporter equipment

– Removal DM voluntary (DMV) sites from DM liability regime

– Removal of DMV regime when DME is operational and after transition period

• Detailed discussions to take place at June 2010 Distribution Workstream

• Feedback / comments welcome in the interim period

June 2010

Page 5: Datalogger / DMV Modification Proposals - Summary Simon Trivella  26 th August 2010 Distribution Workstream - Elexon U P D A T E

DM Elective (DME) Update• Implementation Date confirmed as 21st November 2010

– Phase 1 (21st November 2010)

• AQ > 5,860,000 kWh (200,000 tpa)

– Phase 2 (21st November 2011)

• AQ > 2,196,000 kWh (75,000 tpa)

– Phase 3 (21st May 2012)

• AQ > 732,000 kWh (25,000 tpa)

• All Phases subject to a maximum DME count of 25,000

• Phase 2 & 3 dates can be later if Transporters determine necessary

• Modification Proposal required for earlier Phasing

UPDATE

Page 6: Datalogger / DMV Modification Proposals - Summary Simon Trivella  26 th August 2010 Distribution Workstream - Elexon U P D A T E

Daily Read StatisticsUPDATE

• DM Sites – All Distribution NetworksDME

Phase FIRM SNI TNI Total

n/a 199 270 10 479

n/a 37 15 1 53

1 134 193 5 332

1 102 289 15 406

1 63 261 13 337

2 52 46 2 100

3 17 13 0 30

n/a 18 17 1 36

622 1,104 47 1,773

<732,000

Total

>=2,196,001 and <5,860,000

>=732,001 and <2,196,000

Load Band kWh

>=58,600,000 mandatory

>=58,600,000 voluntary

>=29,300,000 and <58,600,000

>=14,650,000 and <29,300,000

>=5,860,000 and <14,650,000

532

1,241

30.0%

70.0%

Page 7: Datalogger / DMV Modification Proposals - Summary Simon Trivella  26 th August 2010 Distribution Workstream - Elexon U P D A T E

Daily Read StatisticsUPDATE

• 532 (30%) of current DM sites are above DM Mandatory threshold– 1,241 of DM sites are below the Mandatory threshold (includes Interruptibles)

• 1,151 (65%) of sites are Interruptible Supply Points– 296 of these would remain DMM if Firm

• Only 36 (2%) sites have AQ <732,000 kWh (not eligible for DME)

Page 8: Datalogger / DMV Modification Proposals - Summary Simon Trivella  26 th August 2010 Distribution Workstream - Elexon U P D A T E

Potential DM Population ChangesUPDATE

DM population with 100% 'switch' to DM Elective

0

250

500

750

1,000

1,250

1,500

1,750

2,000

Aug-10

Oct-10

Dec-10

Feb-11

Apr-11

Jun-1

1

Aug-11

Oct-11

Dec-11

Feb-1

2

Apr-12

Jun-1

2

Aug-12

Date

Supp

ly P

oint

s

DMV (100%)

DME (100%)

GT DRE

Page 9: Datalogger / DMV Modification Proposals - Summary Simon Trivella  26 th August 2010 Distribution Workstream - Elexon U P D A T E

Potential DM Population ChangesUPDATE

DM population with 50% 'switch' to DM Elective

0

250

500

750

1,000

1,250

1,500

1,750

2,000

Aug-10

Oct-10

Dec-10

Feb-1

1

Apr-11

Jun-1

1

Aug-11

Oct-11

Dec-11

Feb-1

2

Apr-12

Jun-1

2

Aug-12

Date

Supp

ly P

oint

s

DMV (50%)

DME (50%)

GT DRE

Page 10: Datalogger / DMV Modification Proposals - Summary Simon Trivella  26 th August 2010 Distribution Workstream - Elexon U P D A T E

Potential DM Population ChangesUPDATE

DM population with 10% 'switch' to DM Elective

0

250

500

750

1,000

1,250

1,500

1,750

2,000

Aug-10

Oct-10

Dec-10

Feb-1

1

Apr-11

Jun-1

1

Aug-11

Oct-11

Dec-11

Feb-1

2

Apr-12

Jun-1

2

Aug-12

Date

Supp

ly P

oint

s

DMV (10%)

DME (10%)

GT DRE

Page 11: Datalogger / DMV Modification Proposals - Summary Simon Trivella  26 th August 2010 Distribution Workstream - Elexon U P D A T E

Priority of position for Transporter equipment• Gives priority of position to Transporter dataloggers and data recorders

installed for UNC purposes

• UNC refers to IGE Meter Recommendations– Installation of Supply Meter only

– IGEM/GM/7A proposes that loggers used for fiscal purposes should have priority

• This does not apply to equipment used for other purposes (e.g. Demand Estimation)

• We recognise work to develop standard MPU contract

• For historical reasons Transporter equipment tends to have priority of position

• Modification raised to regularise situation and ensure that the position is clear within the UNC

June 2010

Page 12: Datalogger / DMV Modification Proposals - Summary Simon Trivella  26 th August 2010 Distribution Workstream - Elexon U P D A T E

Priority of position for Transporter equipment• Proposal placed on hold

– Feedback received at previous Workstreams

– Modification Proposal 0258A offers level of protection

• Revisit at a later stage

UPDATE

Page 13: Datalogger / DMV Modification Proposals - Summary Simon Trivella  26 th August 2010 Distribution Workstream - Elexon U P D A T E

Removal DM voluntary sites from DM liabilities• DMV sites can be from 73,200 kWh to 58,599,000 kWh

• Not material to daily balancing requirements

• Daily settlement data requirements are D+5

• Removal of DMV from DM liability regime would mean that networks concentrated on the DMM sites that are material to daily balancing

June 2010

Page 14: Datalogger / DMV Modification Proposals - Summary Simon Trivella  26 th August 2010 Distribution Workstream - Elexon U P D A T E

Removal DM voluntary sites from DM liabilities• Feedback from Distribution Workstream members

– Alignment with “competitive” alternative?

– Reduction in charges?

• Competitive alternative (currently) restricted to >732,000 kWh– This would leave an obligation on a small population of DMV

• No plans to align with DME rollout

• Proposed amendments– Limit removal to D+1 11am Read Submission (UNC TPD M 5.1)

– Reads not provided with D+5 remain subject to liabilities (UNC TPD M 5.2.3)

– No changes to rollout

• “big bang” approach

UPDATE

Page 15: Datalogger / DMV Modification Proposals - Summary Simon Trivella  26 th August 2010 Distribution Workstream - Elexon U P D A T E

Removal of DMV regime• Once competitive activity established then the bundled service should cease

to be an obligation– Transporters could act as a DM(E)SP (outside of UNC arrangements)

• Consistent with meter reading being competitive activity

• DM Elective will provide competitive alternative to DMV

• Phased approach consistent with DME rollout

• Transition period of [3] months following each Phase– 1st Phase transition period of [6] months

• After transition period all DMV sites become DME or NDM

June 2010

Page 16: Datalogger / DMV Modification Proposals - Summary Simon Trivella  26 th August 2010 Distribution Workstream - Elexon U P D A T E

Removal of DMV regime• Generally positive feedback from Distribution Workstream members

– Issues around <732,000 kWh sites as not eligible for DME

• Proposal updates– Transition period following Phase 1 to be 6 months

– Transition period following Phase 2 & 3 to be 3 months

– 73,200kWh to 732,000kWh also to be removed 3 months after Phase 3

• No competitive alternative (currently)

• Only 36 sites nationally (18 Firm & 18 Interruptible)

• Majority of sites are “drifters” (i.e. demand reduced)

• Consider option to allow existing ‘small’ DMVs to become DME?– Is this a viable option?

UPDATE

Page 17: Datalogger / DMV Modification Proposals - Summary Simon Trivella  26 th August 2010 Distribution Workstream - Elexon U P D A T E

Next steps• Further comments / feedback welcome

• [Draft] Modification Proposals to be raised in Sept/Oct 2010– Further Distribution Workstream discussions as necessary

UPDATE

Page 18: Datalogger / DMV Modification Proposals - Summary Simon Trivella  26 th August 2010 Distribution Workstream - Elexon U P D A T E

Datalogger / DMV Modification Proposals - Summary

Simon Trivella – 26th August 2010Distribution Workstream - Elexon