Rehabilitate Airfield Pavements FY12 Addendum No. 2 Contract No. 9500473
DALLAS-FORT WORTH INTERNATIONAL AIRPORT
ADDENDUM NO. 2
TO THE REQUEST FOR BIDS
Contract No. 9500473
Rehabilitate Airfield Pavements FY12
Thursday, June 27, 2013 THE REQUEST FOR BIDS (RFB) FOR THE ABOVE IS HEREBY REVISED AS FOLLOWS:
THIS ADDENDUM CONSISTS OF 24 PAGES.
Item 1 – Revised Bid Schedule Remove Bid Form B-1 through B-23 ‘Bid Schedule’ included in the original bid package and in Addendum #1 in its entirety. Replace with the attached revised Bid Form B-1 through B-23 ‘Bid Schedule (revised 6-26-13)’. Pages B-24 through B-34 are still applicable and must be submitted as required.
FY12 Rehabilitate Airfield Pavements BID FORM (revised 6-26-13) Contract No. 9500473 B-5 Addendum No. 2
BID SCHEDULE
BASE BID: TAXIWAYS (WK, WL, WM, Q), NORTH AND SOUTH BLAST PADS
ITEM NO.
ESTIMATED
QUANTITY
UNIT
UNIT DESCRIPTION WITH
UNIT PRICE BID IN WORDS
UNIT
PRICE BID
AMOUNT
BID
1
1
LS
MOBILIZATION ______________________________________Dollars and _________________________________Cents per LUMP SUM (LS)
2
1
LS
INSURANCE ______________________________________ Dollars and __________________________________Cents per LUMP SUM (LS)
3 1 LS
INSTALL, MAINTAIN AND REMOVE TRAFFIC CONTROL AND BARRICADES ______________________________________Dollars and __________________________________Cents per LUMP SUM (LS)
4 2 EA
LIGHTED RUNWAY CLOSURE MARKERS ______________________________________Dollars and __________________________________Cents per EACH (EA)
5 59,405 SY
SODDING ______________________________________Dollars and __________________________________Cents per SQUARE YARD (SY)
6 35,230 SY
DEMOLITION (REMOVAL OF 4” TO 6” OF ASPHALT PAVEMENT INCLUDING BASE MATERIAL) ______________________________________Dollars and __________________________________Cents per SQUARE YARD (SY)
7 6,604 TN
2” TYPE D HMAC PAVEMENT SURFACE COURSE ______________________________________ Dollars and __________________________________Cents per TON (TN)
FY12 Rehabilitate Airfield Pavements BID FORM (revised 6-26-13) Contract No. 9500473 B-6 Addendum No. 2
ITEM NO.
ESTIMATED
QUANTITY
UNIT
UNIT DESCRIPTION WITH
UNIT PRICE BID IN WORDS
UNIT
PRICE BID
AMOUNT
BID
8 13,207 TN
4” TYPE B HMAC PAVEMENT SURFACE COURSE ______________________________________Dollars and __________________________________Cents per TON (TN)
9 60,032 SY
CEMENT TREATED BASE ______________________________________Dollars and _________________________________Cents per SQUARE YARD (SY)
10 58,698 SY
THERMOPLASTIC COAL-TAR EMULSION SEAL COAT ______________________________________Dollars and __________________________________Cents per SQUARE YARD (SY)
11 10,125 LF
JOINT SEALING FILLER ______________________________________Dollars and __________________________________Cents per LENGTH FEET (LF)
12 21,978 CY
EXCAVATION (UNCLASSIFIED) ______________________________________Dollars and __________________________________Cents per CUBIC YARD (CY)
13 1 EA
ADJUST ELEVATION OF EXISTING STORM MANHOLE ______________________________________Dollars and __________________________________Cents per EACH (EA)
14 3 EA
ADJUST ELEVATION OF EXISTING CLEAN-OUT ______________________________________Dollars and __________________________________Cents per EACH (EA)
15 1 LS
EROSION CONTROL ______________________________________Dollars and __________________________________Cents per LUMP SUM (LS)
FY12 Rehabilitate Airfield Pavements BID FORM (revised 6-26-13) Contract No. 9500473 B-7 Addendum No. 2
ITEM NO.
ESTIMATED
QUANTITY
UNIT
UNIT DESCRIPTION WITH
UNIT PRICE BID IN WORDS
UNIT
PRICE BID
AMOUNT
BID
16 139,600 SF
REMOVE PAVEMENT MARKINGS ______________________________________Dollars and _________________________________Cents per SQUARE FOOT (SF)
17 126,315 SF
PAINT – TAXIWAY BLACK ______________________________________Dollars and __________________________________Cents per SQUARE FOOT (SF)
18 50,526 SF
PAINT – TAXIWAY YELLOW - W/ GLASS BEADS ______________________________________Dollars and __________________________________Cents per SQUARE FOOT (SF)
19 10,800 SF
PAINT – HOLD BAR BLACK ______________________________________Dollars and __________________________________Cents per SQUARE FOOT (SF)
20 4,050 SF
PAINT – HOLD BAR YELLOW - W/ GLASS BEADS ______________________________________Dollars and __________________________________Cents per SQUARE FOOT (SF)
21 12,165 SF
PAINT – BLAST PAD BLACK ______________________________________Dollars and __________________________________Cents per SQUARE FOOT (SF)
22 9,075 SF
PAINT – BLAST PAD YELLOW W/ GLASS BEADS ______________________________________Dollars and __________________________________Cents per SQUARE FOOT (SF)
23 155 EA
REMOVE & SALVAGE LIGHT/REMOVE BASE CAN IN MODIFIED PAVEMENT AREAS ______________________________________Dollars and _______________________Cents per EACH (EA)
24 135 EA
REMOVE & SALVAGE LIGHT/BASE CAN TO REMAIN IN EXISTING PAVEMENT AREAS ______________________________________Dollars and _____________________Cents per EACH (EA)
FY12 Rehabilitate Airfield Pavements BID FORM (revised 6-26-13) Contract No. 9500473 B-8 Addendum No. 2
ITEM NO.
ESTIMATED
QUANTITY
UNIT
UNIT DESCRIPTION WITH
UNIT PRICE BID IN WORDS
UNIT
PRICE BID
AMOUNT
BID
25 10 EA
REMOVE & SALVAGE LIGHT/BASE CAN TO REMAIN AND ADD NEW STEEL COVERPLATE IN EXISTING PAVEMENT AREAS ______________________________________Dollars and ________ _______________________Cents per EACH (EA)
26 14,650 LF
REMOVE NO.6 AWG BARE COUNTERPOISE INCL GROUND RODS IN CONDUIT TRENCH ______________________________________Dollars and __________________________________Cents per LENGTH FEET (LF)
27 31,050 LF
REMOVE NO.6 AWG, L-824C IN CONDUIT OR DUCTBANK ______________________________________Dollars and __________________________________Cents per LENGTH FEET (LF)
28 12,000 LF
REMOVE CONDUIT IN MODIFIED PAVEMENT ______________________________________Dollars and __________________________________Cents per LENGTH FEET (LF)
29 3,150 LF
REMOVE CONDUIT IN EARTH ______________________________________Dollars and __________________________________Cents per LENGTH FEET (LF)
30 28,750 LF
NO.6 AWG, L-824C, INSTALLED IN CONDUIT OR DUCTBANK ______________________________________Dollars and __________________________________Cents per LENGTH FEET (LF)
31 16,840 LF
NO.6 AWG BARE COUNTERPOISE WIRE INCL GROUND RODS, INSTALLED IN CONDUIT TRENCH ______________________________________Dollars and __________________________________Cents per LENGTH FEET (LF)
32 3,000 LF
TEMPORARY/BYPASS CABLES IN 2” CONDUIT ______________________________________Dollars and __________________________________Cents per LENGTH FEET (LF)
FY12 Rehabilitate Airfield Pavements BID FORM (revised 6-26-13) Contract No. 9500473 B-9 Addendum No. 2
ITEM NO.
ESTIMATED
QUANTITY
UNIT
UNIT DESCRIPTION WITH
UNIT PRICE BID IN WORDS
UNIT
PRICE BID
AMOUNT
BID
33 70 EA
CABLE SPLICE ______________________________________Dollars and __________________________________Cents per EACH (EA)
34 6 EA
30KW, 5-STEP REGULATOR ______________________________________Dollars and __________________________________Cents per EACH (EA)
35 14,650 LF
1-WAY 2” PVC CONDUIT, SCHEDULE 40, P-153 ENCASED IN MODIFIED SHOULDER PAVEMENT ______________________________________Dollars and ______________________________Cents per (LF)
36 2,300 LF
1-WAY 2” PVC CONDUIT, SCHEDULE 40, DIRECT EARTH BURIED ______________________________________Dollars and __________________________________Cents per LENGTH FEET (LF)
37 300 LF
4-WAY 4” PVC CONDUIT, CONCRETE ENCASED ______________________________________Dollars and __________________________________Cents per LENGTH FEET (LF)
38 300 LF
ENCASE EXISTING 4-WAY, 4” PVC CONDUIT ______________________________________Dollars and __________________________________Cents per LENGTH FEET (LF)
39 65 EA
CONDUIT TRANSITION ______________________________________Dollars and __________________________________Cents per EACH (EA)
40 75 EA
DUCT MARKER ______________________________________Dollars and __________________________________Cents per EACH (EA)
FY12 Rehabilitate Airfield Pavements BID FORM (revised 6-26-13) Contract No. 9500473 B-10 Addendum No. 2
ITEM NO.
ESTIMATED
QUANTITY
UNIT
UNIT DESCRIPTION WITH
UNIT PRICE BID IN WORDS
UNIT
PRICE BID
AMOUNT
BID
41 10 EA
L-867D PULLBOX ______________________________________Dollars and __________________________________Cents per EACH (EA)
42 12 EA
ADJUST ELEVATION OF EXISTING STRUCTURE (2’X2’X2’ OR SMALLER) ______________________________________Dollars and __________________________________Cents per EACH (EA)
43 15 EA
ADJUST ELEVATION AND MODIFY FOR AIRCRAFT RATED OF EXISTING STRUCTURE (3’X3’X3’ OR LARGER) ______________________________________Dollars and _______________________________Cents per EACH (EA)
44 200 EA
L-861T LED MITL WITH L-867B BASE CAN IN MODIFIED SHOULDER PAVEMENT ______________________________________Dollars and _________ _______________________Cents per EACH (EA)
45 130 EA
L-861T LED MITL ON EXISTING L-867B BASE CAN ______________________________________Dollars and ________ _______________________Cents per EACH (EA)
46 60 EA
REMOVE AND REPAIR BOLTS/THREADS ON EXISTING BASE CAN ______________________________________Dollars and ________________________________Cents per EACH (EA)
47 30 EA
FURNISH AND INSTALL NEW L-830 ISOLATION TRANSFORMER, L-823 CONNECTOR, SPLICE KIT AND FIXTURE TAG ______________________________________Dollars and ________________________________Cents per EACH (EA)
48 75 EA
ADDITIONAL FIXTURE TAG ______________________________________Dollars and __________________________________Cents per EACH (EA)
FY12 Rehabilitate Airfield Pavements BID FORM (revised 6-26-13) Contract No. 9500473 B-11 Addendum No. 2
TOTAL BASE BID ITEMS: 1 THROUGH 48………………………………………………….. $________________________________
ADD ALTERNATE BID NO.1: TAXIWAY F FROM WK TO WL
ITEM NO.
ESTIMATED QUANTITY
UNIT
UNIT DESCRIPTION WITH
UNIT PRICE BID IN WORDS
UNIT
PRICE BID
AMOUNT
BID
1
1
LS
MOBILIZATION ______________________________________Dollars and _________________________________Cents per LUMP SUM (LS)
2
1
LS
INSURANCE ______________________________________Dollars and _________________________________Cents per LUMP SUM (LS)
3 5,470 SY
SODDING ______________________________________Dollars and _________________________________Cents per SQUARE YARD (SY)
4 5,849 SY
DEMOLITION (REMOVAL OF 4” TO 6” OF ASPHALT PAVEMENT INCLUDING BASE MATERIAL) ______________________________________Dollars and _________________________________Cents per SQUARE YARD (SY)
5 1,039 TN
2” TYPE D HMAC PAVEMENT SURFACE COURSE ______________________________________Dollars and _________________________________Cents per TON (TN)
6 2,079 TN
4” TYPE B HMAC PAVEMENT SURFACE COURSE ______________________________________Dollars and _________________________________Cents per TON (TN)
FY12 Rehabilitate Airfield Pavements BID FORM (revised 6-26-13) Contract No. 9500473 B-12 Addendum No. 2
ITEM NO.
ESTIMATED QUANTITY
UNIT
UNIT DESCRIPTION WITH
UNIT PRICE BID IN WORDS
UNIT
PRICE BID
AMOUNT
BID
7 9,496 SY
CEMENT TREATED BASE ______________________________________Dollars and _________________________________Cents per SQUARE YARD (SY)
8 9,238 SY
THERMOPLASTIC COAL-TAR EMULSION SEAL COAT ______________________________________Dollars and _________________________________Cents per SQUARE YARD (SY)
9 2,090 LF
JOINT SEALING FILLER ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)
10 2,557 CY
EXCAVATION (UNCLASSIFIED) ______________________________________Dollars and _________________________________Cents per CUBIC YARD (CY)
11 2 EA
ADJUST ELEVATION OF EXISTING CLEAN-OUT ______________________________________Dollars and _________________________________Cents per EACH (EA)
12 1 LS
EROSION CONTROL ______________________________________Dollars and _________________________________Cents per LUMP SUM (LS)
13 65 EA
REMOVE & SALVAGE LIGHT/REMOVE BASE CAN IN MODIFIED PAVEMENT AREAS _____________________________________Dollars and ______________________________Cents per EACH (EA)
14 1 EA
REMOVE & SALVAGE LIGHT/BASE CAN TO REMAIN IN EXISTING PAVEMENT AREAS ______________________________________Dollars and _______________________________Cents per EACH (EA)
FY12 Rehabilitate Airfield Pavements BID FORM (revised 6-26-13) Contract No. 9500473 B-13 Addendum No. 2
ITEM NO.
ESTIMATED QUANTITY
UNIT
UNIT DESCRIPTION WITH
UNIT PRICE BID IN WORDS
UNIT
PRICE BID
AMOUNT
BID
15 3,050 LF
REMOVE NO.6 AWG BARE COUNTERPOISE INCL GROUND RODS IN CONDUIT TRENCH ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)
16 7,310 LF
REMOVE NO.6 AWG, L-824C IN CONDUIT OR DUCTBANK ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)
17 2975 LF
REMOVE CONDUIT IN MODIFIED PAVEMENT ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)
18 100 LF
REMOVE CONDUIT IN EARTH ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)
19 8,200 LF
NO.6 AWG, L-824C, INSTALLED IN CONDUIT OR DUCTBANK ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)
20 3,310 LF
NO.6 AWG BARE COUNTERPOISE WIRE INCL GROUND RODS, INSTALLED IN CONDUIT TRENCH ______________________________________Dollars and _______________________________Cents per LF
21 850 LF
TEMPORARY/BYPASS CABLES IN 2” CONDUIT ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)
22 20 EA
CABLE SPLICE ______________________________________Dollars and _________________________________Cents per EACH (EA)
FY12 Rehabilitate Airfield Pavements BID FORM (revised 6-26-13) Contract No. 9500473 B-14 Addendum No. 2
ITEM NO.
ESTIMATED QUANTITY
UNIT
UNIT DESCRIPTION WITH
UNIT PRICE BID IN WORDS
UNIT
PRICE BID
AMOUNT
BID
23 3,060 LF
1-WAY 2” PVC CONDUIT, SCHEDULE 40, P-153 ENCASED IN MODIFIED SHOULDER PAVEMENT ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)
24 190 LF
1-WAY 2” PVC CONDUIT, SCHEDULE 40, DIRECT EARTH BURIED ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)
25 150 LF
4-WAY 4” PVC CONDUIT, CONCRETE ENCASED ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)
26 50 LF
ENCASE EXISTING 4-WAY, 4” PVC CONDUIT ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)
27 20 EA
CONDUIT TRANSITION ______________________________________Dollars and _________________________________Cents per EACH (EA)
28 15 EA
DUCT MARKER ______________________________________Dollars and _________________________________Cents per EACH (EA)
29 2 EA
L-867D PULLBOX ______________________________________Dollars and _________________________________Cents per EACH (EA)
30 6 EA
ADJUST ELEVATION OF EXISTING STRUCTURE (2’X2’X2’ OR SMALLER) ______________________________________Dollars and _________________________________Cents per EACH (EA)
FY12 Rehabilitate Airfield Pavements BID FORM (revised 6-26-13) Contract No. 9500473 B-15 Addendum No. 2
ITEM NO.
ESTIMATED QUANTITY
UNIT
UNIT DESCRIPTION WITH
UNIT PRICE BID IN WORDS
UNIT
PRICE BID
AMOUNT
BID
31 2 EA
ADJUST ELEVATION AND MODIFY FOR AIRCRAFT RATED OF EXISTING STRUCTURE (3’X3’X3’ OR LARGER) ______________________________________Dollars and _______________________________Cents per EACH (EA)
32 70 EA
L-861T QUARTZ MITL WITH L-867B BASE CAN IN MODIFIED SHOULDER PAVEMENT ______________________________________Dollars and ______________________________Cents per EACH (EA)
33 6 EA
L-861T QUARTZ MITL ON EXISTING L-867B BASE CAN ______________________________________Dollars and _______________________________Cents per EACH (EA)
34 10 EA
FURNISH AND INSTALL NEW L-830 ISOLATION TRANSFORMER, L-823 CONNECTOR, SPLICE KIT AND FIXTURE TAG ______________________________________Dollars and _______________________________Cents per EACH (EA)
35 20 EA
ADDITIONAL FIXTURE TAG ______________________________________Dollars and _________________________________Cents per EACH (EA)
TOTAL ADD ALTERNATE NO.1 BID ITEMS: 1 THROUGH 35…………………………… $________________________________
FY12 Rehabilitate Airfield Pavements BID FORM (revised 6-26-13) Contract No. 9500473 B-16 Addendum No. 2
ADD ALTERNATE BID NO.2: TAXIWAY F FROM WL TO WM
ITEM NO.
ESTIMATED QUANTITY
UNIT
UNIT DESCRIPTION WITH
UNIT PRICE BID IN WORDS
UNIT
PRICE BID
AMOUNT
BID
1
1
LS
MOBILIZATION ______________________________________Dollars and _________________________________Cents per LUMP SUM (LS)
2
1
LS
INSURANCE ______________________________________Dollars and _________________________________Cents per LUMP SUM (LS)
3 16,528 SY
SODDING ______________________________________Dollars and _________________________________Cents per SQUARE YARD (SY)
4 13,254 SY
DEMOLITION (REMOVAL OF 4” TO 6” OF ASPHALT PAVEMENT INCLUDING BASE MATERIAL) ______________________________________Dollars and _________________________________Cents per SQUARE YARD (SY)
5 2,207 TN
2” TYPE D HMAC PAVEMENT SURFACE COURSE ______________________________________Dollars and _________________________________Cents per TON (TN)
6 4,414 TN
4” TYPE B HMAC PAVEMENT SURFACE COURSE ______________________________________Dollars and _________________________________Cents per TON (TN)
7 20,117 SY
CEMENT TREATED BASE ______________________________________Dollars and _________________________________Cents per SQUARE YARD (SY)
8 19,619 SY
THERMOPLASTIC COAL-TAR EMULSION SEAL COAT ______________________________________Dollars and _________________________________Cents per SQUARE YARD (SY)
FY12 Rehabilitate Airfield Pavements BID FORM (revised 6-26-13) Contract No. 9500473 B-17 Addendum No. 2
ITEM NO.
ESTIMATED QUANTITY
UNIT
UNIT DESCRIPTION WITH
UNIT PRICE BID IN WORDS
UNIT
PRICE BID
AMOUNT
BID
9 4,805 LF
JOINT SEALING FILLER ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)
10 5,991 CY
EXCAVATION (UNCLASSIFIED) ______________________________________Dollars and _________________________________Cents per CUBIC YARD (CY)
11 28 EA
ADJUST ELEVATION OF EXISTING CLEAN-OUT ______________________________________Dollars and _________________________________Cents per EACH (EA)
12 1 LS
EROSION CONTROL ______________________________________Dollars and _________________________________Cents per LUMP SUM (LS)
13 30 EA
REMOVE & SALVAGE LIGHT/REMOVE BASE CAN IN MODIFIED PAVEMENT AREAS ______________________________________Dollars and _________ _______________________Cents per EACH (EA)
14 1,500 LF
REMOVE NO.6 AWG BARE COUNTERPOISE INCL GROUND RODS IN CONDUIT TRENCH ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)
15 2,600 LF
REMOVE NO.6 AWG, L-824C IN CONDUIT OR DUCTBANK ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)
16 1,250 LF
REMOVE CONDUIT IN MODIFIED PAVEMENT ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)
FY12 Rehabilitate Airfield Pavements BID FORM (revised 6-26-13) Contract No. 9500473 B-18 Addendum No. 2
ITEM NO.
ESTIMATED QUANTITY
UNIT
UNIT DESCRIPTION WITH
UNIT PRICE BID IN WORDS
UNIT
PRICE BID
AMOUNT
BID
17 240 LF
REMOVE CONDUIT IN EARTH ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)
18 2,650 LF
NO.6 AWG, L-824C, INSTALLED IN CONDUIT OR DUCTBANK ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)
19 1,800 LF
NO.6 AWG BARE COUNTERPOISE WIRE INCL GROUND RODS, INSTALLED IN CONDUIT TRENCH ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)
20 275 LF
TEMPORARY/BYPASS CABLES IN 2” CONDUIT ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)
21 6 EA
CABLE SPLICE ______________________________________Dollars and _________________________________Cents per EACH (EA)
22 1,575 LF
1-WAY 2” PVC CONDUIT, SCHEDULE 40, P-153 ENCASED IN MODIFIED SHOULDER PAVEMENT ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)
23 200 LF
1-WAY 2” PVC CONDUIT, SCHEDULE 40, DIRECT EARTH BURIED ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)
24 50 LF
4-WAY 4” PVC CONDUIT, CONCRETE ENCASED ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)
FY12 Rehabilitate Airfield Pavements BID FORM (revised 6-26-13) Contract No. 9500473 B-19 Addendum No. 2
ITEM NO.
ESTIMATED QUANTITY
UNIT
UNIT DESCRIPTION WITH
UNIT PRICE BID IN WORDS
UNIT
PRICE BID
AMOUNT
BID
25 8 EA
CONDUIT TRANSITION ______________________________________Dollars and _________________________________Cents per EACH (EA)
26 15 EA
DUCT MARKER ______________________________________Dollars and _________________________________Cents per EACH (EA)
27 1 EA
L-867D PULLBOX ______________________________________Dollars and _________________________________Cents per EACH (EA)
28 5 EA
ADJUST ELEVATION OF EXISTING STRUCTURE (2’X2’X2’ OR SMALLER) ______________________________________Dollars and _________________________________Cents per EACH (EA)
29 1 EA
ADJUST ELEVATION AND MODIFY FOR AIRCRAFT RATED OF EXISTING STRUCTURE (3’X3’X3’ OR LARGER) ______________________________________Dollars and ________ _______________________Cents per EACH (EA)
30 32 EA
L-861T QUARTZ MITL WITH L-867B BASE CAN IN MODIFIED SHOULDER PAVEMENT ______________________________________Dollars and ________________________________Cents per EACH (EA)
31 4 EA
L-861T QUARTZ MITL ON EXISTING L-867B BASE CAN ______________________________________Dollars and ________________________________Cents per EACH (EA)
32 4 EA
FURNISH AND INSTALL NEW L-830 ISOLATION TRANSFORMER, L-823 CONNECTOR, SPLICE KIT AND FIXTURE TAG ______________________________________Dollars and ________________________________Cents per EACH (EA)
FY12 Rehabilitate Airfield Pavements BID FORM (revised 6-26-13) Contract No. 9500473 B-20 Addendum No. 2
ITEM NO.
ESTIMATED QUANTITY
UNIT
UNIT DESCRIPTION WITH
UNIT PRICE BID IN WORDS
UNIT
PRICE BID
AMOUNT
BID
33 12 EA
ADDITIONAL FIXTURE TAG ______________________________________Dollars and _________________________________Cents per EACH (EA)
TOTAL ADD ALTERNATE NO.2 BID ITEMS: 1 THROUGH 33…………………………… $________________________________
ADD ALTERNATE BID NO.3: TAXIWAY F FROM WH TO WY
ITEM NO.
ESTIMATED QUANTITY
UNIT
UNIT DESCRIPTION WITH
UNIT PRICE BID IN WORDS
UNIT
PRICE BID
AMOUNT
BID
1
1
LS
MOBILIZATION ______________________________________Dollars and _________________________________Cents per LUMP SUM (LS)
2
1
LS
INSURANCE ______________________________________Dollars and _________________________________Cents per LUMP SUM (LS)
3 3,224 SY
SODDING ______________________________________Dollars and _________________________________Cents per SQUARE YARD (SY)
4 4,154 SY
DEMOLITION (REMOVAL OF 4” TO 6” OF ASPHALT PAVEMENT INCLUDING BASE MATERIAL) ______________________________________Dollars and _________________________________Cents per SQUARE YARD (SY)
5 718 TN
2” TYPE D HMAC PAVEMENT SURFACE COURSE ______________________________________Dollars and _________________________________Cents per TON (TN)
FY12 Rehabilitate Airfield Pavements BID FORM (revised 6-26-13) Contract No. 9500473 B-21 Addendum No. 2
ITEM NO.
ESTIMATED QUANTITY
UNIT
UNIT DESCRIPTION WITH
UNIT PRICE BID IN WORDS
UNIT
PRICE BID
AMOUNT
BID
6 1,436 TN
4” TYPE B HMAC PAVEMENT SURFACE COURSE ______________________________________Dollars and _________________________________Cents per TON (TN)
7 6,544 SY
CEMENT TREATED BASE ______________________________________Dollars and _________________________________Cents per SQUARE YARD (SY)
8 6,383 SY
THERMOPLASTIC COAL-TAR EMULSION SEAL COAT ______________________________________Dollars and _________________________________Cents per SQUARE YARD (SY)
9 1,570 LF
JOINT SEALING FILLER ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)
10 1,732 CY
EXCAVATION (UNCLASSIFIED) ______________________________________Dollars and _________________________________Cents per CUBIC YARD (CY)
11 4 EA
ADJUST ELEVATION OF EXISTING CLEAN-OUT ______________________________________Dollars and _________________________________Cents per EACH (EA)
12 1 LS
EROSION CONTROL ______________________________________Dollars and _________________________________Cents per LUMP SUM (LS)
13 20 EA
REMOVE & SALVAGE LIGHT/REMOVE BASE CAN IN MODIFIED PAVEMENT AREAS ______________________________________Dollars and ________ _______________________Cents per EACH (EA)
FY12 Rehabilitate Airfield Pavements BID FORM (revised 6-26-13) Contract No. 9500473 B-22 Addendum No. 2
ITEM NO.
ESTIMATED QUANTITY
UNIT
UNIT DESCRIPTION WITH
UNIT PRICE BID IN WORDS
UNIT
PRICE BID
AMOUNT
BID
14 1,650 LF
REMOVE NO.6 AWG BARE COUNTERPOISE INCL GROUND RODS IN CONDUIT TRENCH ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)
15 1,800 LF
REMOVE NO.6 AWG, L-824C IN CONDUIT OR DUCTBANK ______________________________________Dollars and ________________________________Cents per LENGTH FEET (LF)
16 1,650 LF
REMOVE CONDUIT IN MODIFIED PAVEMENT ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)
17 1,800 LF
NO.6 AWG, L-824C, INSTALLED IN CONDUIT OR DUCTBANK ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)
18 1,650 LF
NO.6 AWG BARE COUNTERPOISE WIRE INCL GROUND RODS, INSTALLED IN CONDUIT TRENCH ______________________________________Dollars and _________________________________Cents per LF
19 1,625 LF
1-WAY 2” PVC CONDUIT, SCHEDULE 40, P-153 ENCASED IN MODIFIED SHOULDER PAVEMENT ______________________________________Dollars and _________________________________Cents per LENGTH FEET (LF)
20 2 EA
CONDUIT TRANSITION ______________________________________Dollars and _________________________________Cents per EACH (EA)
21 2 EA
DUCT MARKER ______________________________________Dollars and _________________________________Cents per EACH (EA)
FY12 Rehabilitate Airfield Pavements BID FORM (revised 6-26-13) Contract No. 9500473 B-23 Addendum No. 2
ITEM NO.
ESTIMATED QUANTITY
UNIT
UNIT DESCRIPTION WITH
UNIT PRICE BID IN WORDS
UNIT
PRICE BID
AMOUNT
BID
22 21 EA
L-861T QUARTZ MITL WITH L-867B BASE CAN IN MODIFIED SHOULDER PAVEMENT ______________________________________Dollars and ________ _______________________Cents per EACH (EA)
23 2 EA
L-861T QUARTZ MITL ON EXISTING L-867B BASE CAN ______________________________________Dollars and ______________________________Cents per EACH (EA)
24 2 EA
FURNISH AND INSTALL NEW L-830 ISOLATION TRANSFORMER, L-823 CONNECTOR, SPLICE KIT AND FIXTURE TAG ______________________________________Dollars and _______ _______________________Cents per EACH (EA)
25 2 EA
ADDITIONAL FIXTURE TAG ______________________________________Dollars and _________________________________Cents per EACH (EA)
TOTAL ADD ALTERNATE NO.3 BID ITEMS: 1 THROUGH 25…………………………… $________________________________
TOTAL BID SUMMARY TOTAL BASE BID ITEMS: 1 THROUGH 48………………………..………………………… $________________________________ TOTAL ADD ALTERNATE NO.1 BID ITEMS: 1 THROUGH 35………………………… $________________________________ TOTAL ADD ALTERNATE NO.2 BID ITEMS: 1 THROUGH 33………………………… $________________________________ TOTAL ADD ALTERNATE NO.3 BID ITEMS: 1 THROUGH 25………………………… $________________________________ TOTAL PROJECT BID – BASE BID & ADD ALTERNATE BIDS NO.1, 2, 3: ………. $________________________________