Application for Complying Development Certificate
NAMBUCCA SHIRE COUNCIL Corporate and Community Services
issued under the Environmental Planning and Assessment Act 1979 — Sections 85 and 85A
OFFICE USE ONLY Updated 20 July 2012
Complying Development Application No: Land File No:
Date received: Fee Paid: Receipt no: If a planning instrument made under the Environmental Planning and Assessment Act 1979 identifies your proposed development to be complying development, use this form to apply for a complying development certificate. If the proposed development is minor, check to see whether it is exempt. You can apply to council or an accredited certifier. You will receive a complying development certificate within 7 days, if your application is successful.
Failure to complete the application form correctly and provide all necessary information will result in delays in refusal to accept the application.
1 Details of the applicant – (These details must relate to the person lodging and/or responsible for this application). Please note all correspondence will be sent to the applicant (not the owner) unless otherwise advised in writing.
Mr Ms Mrs Dr Other . . . . . . . . . . . Tick if you are the owner
First name
Family name
Company/Organisation (if applicable)
POSTAL ADDRESS
Suburb or town
State
Postcode
Day time
Fax
Mobile
Email address
Signature
Date
I declare to the best of my knowledge and belief that all the particulars hereon are correct in every detail and the information required has been supplied.
2 Identify the land you propose to develop Unit/street No
Street
Suburb, town or locality
Postcode
Lot/DP or Lot/Section/DP or Lot/Strata Plan no
3 Estimated value of the proposed development
$ The value of the work is to include professional building, labour, services, site costs and GST and is subject to a check by Council before final acceptance.
4 Describe the work you propose to carry out Type of development eg Dwelling, Dwelling Additions, Swimming Pool, Carport, Rural Shed
Updated 20 July 2012 page 2 of 15
5 Identify What Complying Policy this Application is Lodged Under
State Environmental Planning Policy (Exempt & Complying Development Codes) 2008 – NSW Housing Code (for further information see www.planning.nsw.gov.au/planning_reforms/housing_code.asp)
Nambucca Shire Council – DCP No 10 (Exempt & Complying Development 2007)
Applicant’s Signature:
6 Owner Details ALL property owners must sign this application. In the case of a company owning the subject land, all directors must sign the application and the company seal must also be attached. As the owner/s of the above property, I/we consent to this application: Owner (1)
Signature
Date
Owner (2)
Signature
Date
Owner (3)
Signature
Date
Owner (4)
Signature
Date
Postal Address
Suburb or town
State
Postcode
Day time
Mobile
Email address
7 Principal Certifying Authority
By submitting this Complying Development Application to Nambucca Shire Council, I/we hereby appoint Nambucca Shire Council as the Principal Certifying Authority.
8 Approvals under Section 68 Does this application also seek approval for any of the matters listed in Sec 68 of the Local Government Act 1993? (eg sewer, water, stormwater, OSMS, wood heaters connections) See the Council’s Explanatory Notes for a further list.
Applicant Signatures
Yes. Please attach separate application No
Updated 20 July 2012 page 3 of 15
9 Owner-Builder or Builder’s Details If this information is not known at the time of lodgement, it is to be advised to Council 48 hours (2 days) before commencement of work. Note: A copy of your Home Indemnity Insurance/Owner-Builder Permit is required when received.
Owner-Builder’s Name
OR
Owner-Builder Permit Number
A Builder’s Name
Address
Day time
Mobile
Licence No
B Plumber’s Name (if applicable)
Address
Day time
Mobile
Licence No
10 Privacy policy
The information you provide in this application will enable your application to be assessed by Council. The application will also be kept in a register by the Council that can be viewed by the public at any time. Please contact the Council if the information in your application is incorrect or changes.
11 Schedule to application for a complying development certificate
Please complete this schedule for the purpose of providing information to the Australian Bureau of Statistics. All NEW Buildings on this Application Please complete the following details:
• Number of storeys (including underground floors) • Gross floor area of new building (m²)
Residential Buildings Only Please complete the following details on residential structures
• Number of dwellings to be constructed • Number of pre-existing approved dwellings on the site • Number of dwellings to be demolished • Will the new dwellings be attached to other new
buildings? Yes No
• Will the new buildings be attached to existing buildings? Yes No
• Does the site contain a Dual Occupancy? (NB Dual Occupancy = two dwellings on the same site)
Yes No
Updated 20 July 2012 page 4 of 15
Materials Please indicate the code ⌧ that best describes materials to be used in the construction of the new building on this Application
Walls Roof Floor Frame Brick
(double) 11 Tiles 10 Concrete
or slate 20 Timber 40
Brick (veneer)
12 Concrete or Slate
20 Timber 40 Steel 60
Concrete or stone
20 Fibre cement
30 Other 80 Aluminium 70
Fibre cement
30 Steel 60 Not specified
90 Other 80
Timber 40 Aluminium 70 Not specified
90
Curtain glass
50 Other 80
Steel 60 Not specified
90
Aluminium 70
Other 80
Not specified
90
12 Forwarding Instructions (Please provide instructions for forwarding Determination)
Post to applicant Pick Up Phone No:
Updated 20 July 2012 page 5 of 15
Complying Development Certificate Checklist
Required Supplied Yes No
PLANS (Minimum 3 Copies)
Plans include the site plan, floor plan, elevations and section. Plans must be drawn to scale.
The following information must be included on all plans and documents:
Lot number, section number (if applicable), DP number (found on rate notice or land title)
Measurements in metric
The position of true north
Additions/alterations (coloured in red)
Draftsman/Architect name and date
Reference No or Drawing No
SITE PLAN (3 copies)
A site plan is a birds-eye view of the proposed development and/or existing buildings on the site and its position in relation to boundaries and neighbouring developments. A site plan should include: Drawings to scale preferably 1:250. Location of the new and/or existing buildings in relation to site boundaries. Location of any existing and proposed fences and landscaping features such as swimming pool,
retaining walls, paved areas and driveways. Show the levels of the lowest floor, and of any yard or unbuilt on area belonging to that floor, and the
levels of the adjacent ground. Location of any watercourses. Levels – contour and spot levels (0.5m contours). Wind rating for the site. Proposed cut/fill levels are to be shown to depth and cubic metres. Method of sediment control
should be shown. Special considerations apply for excavations in acid sulphate soils. Easements and rights of way. Existing stormwater drainage location. If stormwater run-off will increase show proposed drainage
details. Location of vehicle access and car parking (indicating extent of cut and fill and gradients). Site fencing during construction. Location and type of retaining structures BASIX commitments where applicable
Measurements including: Length, width and site area of land, both existing and proposed. Distance from external walls and outermost part of proposed building to all boundaries.
FLOOR PLAN (3 copies)
A floor plan is a birds-eye view of your proposed layout of rooms and any existing rooms within the development. Floor plans should include: Drawings to scale preferably 1:100. Outline of existing building/development on site (shown dotted). Room names, areas and dimensions. Window and door locations and sizes. Floor levels in relation to ground levels. Finished floor to ceiling height. Overall height of buildings (RL’s). Location of plumbing fixtures. Wall structure type and thickness. BASIX commitments where applicable
Updated 20 July 2012 page 6 of 15
Required Supplied Yes No
ELEVATION PLAN (3 copies)
Elevation plans are a side on view of your proposal. Elevations of all four sides (north, south, east and west facing) of your development need to be included in your application. Elevation plans should include: Drawings to scale preferably 1:100. Outline of existing building/development on site (shown dotted). Exterior cladding type and roofing material/colour. Window sizes and location. Chimneys, flue exhaust vents, duct inlet or outlet. Reduced Levels (preferably AHD) for Ridge & Floor. Roof pitch degrees. Shadow diagrams (where applicable).
SECTION PLAN (3 copies)
A section(s) is a diagram showing a cut through the development at the most typical point. Sections should include: Drawings to scale preferably 1:100. Section names and where they are shown on plan (i.e. A/A B/B etc). Room names. Room and window heights. Details of chimneys, fire places and stoves. Roof pitch and covering. Site works, finished and proposed floor & ground levels in RL’s (indicate cut, fill and access grades). BASIX commitments to energy efficiency – insulation – where applicable.
SPECIFICATIONS (2 copies)
A specification is a written statement that should include as a minimum: The construction of the building to specific BCA or Australian Standards and materials to be used. Type and colour of external finishes. Whether the materials will be new or second-hand, and if second-hand materials are to be used,
particulars. The method of drainage, effluent disposal and provision of water supply. Any other details relevant to the construction of the building.
FOOTING/SLAB DESIGN (2 copies)
Simple footings or slabs for minor structures such as pergolas, patios etc can be designed in accordance with Australian Standard 2870. More complex and larger structures will need to be designed by a practising Structural Engineer or Geotechnical Report on soil types if using AS 2870 designs.
FRAME/BRACING DETAILS (2 copies)
Timber and steel member sizes are to be shown on the plans. If the construction involves use of pre-manufactured trusses this should be indicated and details can
be provided prior to the frame inspection. Details of bracing to resist horizontal wind forces, and tie down connections to resist up wind forces,
designed to the appropriate wind rating are to be submitted. Note: Wind Category Assessment is to be indicated on the plan for the site.
HOME BUILDING ACT REQUIREMENTS (2 copies)
In the case of proposed residential building work, where the works are valued at $5,000 (Owner Builder) and $12,000 (Contract Builders) and over, the following is required prior to work commencing: (a) Home Indemnity Insurance provided by contract builder (works over $12,000) or (b) Owner/Builder Permit (works over $5,000) Please contact the Department of Fair Trading for further information on this requirement (Ph: 133.220) or 22 Park Street, Coffs Harbour (Ph: 6653.0700) Web address: www.fairtrading.nsw.gov.au.
Updated 20 July 2012 page 7 of 15
Required Supplied Yes No
BASIX INFORMATION (2 copies)
A BASIX Certificate is required for new homes and renovation work valued at $50,000 or more as well as swimming pools with a 40,000 litre or more capacity. For further information please contact BASIX Help Line on 1300 650 908 or www.basix.nsw.gov.au.
OTHER CONSIDERATIONS FOR COMPLYING DEVELOPMENT
BUSHFIRE ASSESSMENT (dwellings, alterations and additions to dwellings and buildings proposed within 10m of any dwelling)
Please check with Council to ascertain if the property is in a bushfire prone area. If so, your application will require completion of a Bush Fire Assessment Report (Pgs 22-24) of the Building in Bush Fire Prone Areas Single Dwellings booklet available from Council. Associated construction notes to be shown on the plans. A helpful fact sheet is available on Council’s web site: www.nambucca.nsw.gov.au.
SECTION 68 APPROVALS (WATER, SEWER, STORMWATER & OSSM, SOLID FUEL HEATER, STORMWATER DRAINS TO INTER-ALLOTMENT DRAINS)
If the proposal involves water, sewer, stormwater drainage work or on-site sewer management system, a Section 68 Approval is required. This application is available on Council’s web site: www.nambucca.nsw.gov.au together with a fact sheet regarding On-site Sewer Management Systems.
WORKS ON COUNCIL LAND (SECTION 138)
Any works which are carried out on Council’s land and road reserves requires a Section 138 Approval. This type of approval is often sought for driveways but also for storage of materials on footpaths setting up cranes/concrete pumps, etc. This application is available from Council’s web site: www.nambucca.nsw.gov.au.
FLOOD CONSIDERATION
Please check with Council to ascertain if the location of the building is in a flood prone area. A helpful fact sheet is available on Council’s web site: www.nambucca.nsw.gov.au.
CONTAMINATED LAND
The applicant is required to declare any past or present uses which have contaminated the site.
INDUSTRIAL/COMMERCIAL
Due to the scale and complexity of commercial and industrial buildings, the minimum level of additional information to be included is to detail the proposed use of building, fire access/systems, stormwater drainage and disabled access.
TRADE WASTE DISPOSAL
If the development proposal involves the disposal of any commercial/industrial waste a completed Liquid Trade Waste Service Application form will be required to be completed. This application is available from Council’s web site: www.nambucca.nsw.gov.au (includes grease traps, wash down bays, oil and grit arrestors).
Confirmation of submission of all required documentation I hereby declare that I have satisfied myself that this submission is in compliance with Nambucca
Shire Council’s Development Control Plan No 10 – Exempt and Complying Development. This property does not contravene Clause 3.2 “Land on which Complying Development may not be carried out” (Page 34) and 3.3 “General Requirements for Complying Development” (Page 35) of that DCP. (Copy of which is attached)
Any false or misleading information may lead to prosecution.
I further confirm that all required documentation has been submitted with this application.
OFFICE USE
SIGNATURE OF APPLICANT/PERSON PREPARING PLANS
Initials of Building Surveyor accepting
application
Updated 20 July 2012 page 8 of 15
3.0 COMPLYING DEVELOPMENT — PRELIMINARY 3.1 What is Complying Development? Section 76A(5) of the EP&A Act allows Council to identify a category of development known as ‘complying development’. The Act allows Council to determine that certain types of development can be complying development when it is assessed against predetermined standards set out in either a LEP or DCP. There is no merits assessment of complying development, therefore where a development complies with the predetermined standards, Council or the accredited certifier must issue a Complying Development Certificate (ie an approval for that development). These approvals are issued with the predetermined conditions that are listed in this DCP. It should be noted that some of these conditions are prescribed (ie they must be included in the Complying Development Certificate) in the Regulations. In determining whether your development proposal can be undertaken as complying development, you must determine the following: a That it will not be undertaken on land that is identified below as being land on which complying development
may not be carried out; b That it complies with the general requirements listed below; and c That it complies with the specific requirements for your particular development listed in Section 4. 3.2 Land on which Complying Development may not be carried out The EPA states that complying development cannot be undertaken if: a The development is designated development; b The development is a development for which development consent cannot be granted except with the
concurrence of a person other than the consent authority or the Director-General of National Park and Wildlife as referred to in Section 79B(3) of the Act;
c It applies to land that is critical habitat; d It applies to land that is, or is part of, a wilderness area within the mean of the Wilderness Act 1987; e It is land that comprises, or on which there is, an item of the environmental heritage:
i that is subject to an interim heritage order under the Heritage Act 1977, or that is listed on the State Heritage Register under that Act; or
ii that is identified as such an item in an environmental planning instrument. f It is land that is identified as an environmentally sensitive area in the environmental planning instrument that
makes provision for the complying development. In addition to the requirements of the Act, complying development cannot be undertaken if: g The development is integrated development under the EP&A Act or prohibited development under the NLEP. h It is land within a heritage conservation area that is identified as such in an environmental planning instrument
applying to the land; i The land at any time previously been used:
i As a service station; ii As a sheep or cattle dip; iii For intensive agriculture; iv For mining or an extractive industry; v For waste storage or waste treatment; and/or vi For the manufacture of chemicals, asbestos, or asbestos products.
j The proposed work is within 40m of a perennial watercourse identified by a 1:50000 topographic map held by the Land Information Centre;
k The land is an Aboriginal Place identified by the National Parks and Wildlife Act 1974 or a potential archaeological site, containing a relic or an Aboriginal conservation area under the NLEP;
l The land is reserved or dedicated under the National Parks and Wildlife Act 1974; m The land is a State Forest dedicated under the Forestry Act 1916; n The surface of the land has a slope greater than 18 degrees from the horizontal;
Updated 20 July 2012 page 9 of 15
o The land is mapped as wetland by SEPP No 14 – Coastal Wetlands; p The land is mapped as rainforest by SEPP No 26 – Littoral Rainforests; q The site of the proposed development is greater that 1ha in area and has not been previously assessed under
SEPP 44 – Koala Habitat protection or is not consistent with an approved Plan of Management"; and/or r The land is affected by ‘Clause 67 – What restrictions apply to development adjoining railways’ under the
NLEP. 3.3 General Requirements for Complying Development To be complying development, the development must: a Meet the relevant deemed to comply provisions and performance requirements of the BCA; b Comply with the standards listed in Section 4 that apply to your development; c Be more than 1 metre from any easement or public sewer main; d Comply with any positive covenants or restrictions as to user imposed by Council on the title of the land. Note: A positive covenant or restriction as to user may relate to a building envelope, vegetation retention, flooding etc and are usually imposed as a result of a condition of subdivision. e Comply with Clause 66 (Development on land containing potential acid sulfate soils) of the NLEP and a
preliminary assessment in accordance with Clause 66(4) has not been undertaken; f Comply with NSW Rural Fire Service's Planning for Bushfire Protection Guidelines 2006 on lands identified as
bushfire prone on the "Nambucca Shire Bushfire Prone Land Maps" g Comply with the requirements of Nambucca Shire Council's Floodplain Risk Management Plan, excluding
lands which are identified as High Hazard Floodways. h Complies with Clause 57 (What provisions apply with respect to development adjoining extractive industries?)
under the NLEP. i Not contravene any condition of any development consent applying to the land. j Be consistent with any plan of management approved under SEPP No 44 – Koala Habitat and with any recovery
plan or threat abatement plan in force under the Threatened Species Conservation Act 1995, that apply to the land.
k Direct stormwater run off from the new structures and any existing structures affected by new work being directed to the street gutter or a registered stormwater easement, an approved on-site disposal system approved under Section 68 of the LGA 1993 or on properties in rural zones, away from adjoining properties and on-site effluent disposal systems. In all cases, the development must only require a gravity based stormwater drainage system.
l Comply with building heights identified in Development Control Plan 3 - Residential Development. Note: Specific reference to RFS Guideline "Building in Bushfire Prone Areas Single Dwellings” and Nambucca Floodplain Risk Management Plan Appendix A, Tables A1 & A2.
Updated 20 July 2012 page 10 of 15
Sample Drawing SITE PLAN
Updated 20 July 2012 page 11 of 15
Sample Drawing FLOOR PLAN
Updated 20 July 2012 page 12 of 15
Sample Drawing ELEVATIONS
Updated 20 July 2012 page 13 of 15
Sample Drawing SECTION DETAILS
Updated 20 July 2012 page 14 of 15
Sample Drawing FRAME BRACING
Updated 20 July 2012 page 15 of 15
Office use only
CD no: _______________________
Assessment no: _______________________
Property no: _______________________
Fees Receipt Type CDC Application Fee (253) $___________ (in accordance with DCP 10 — Exempt & Complying Development) (includes GST) Notification Fee – Section 101 (254) $ 29.00 (includes GST) Long Service Levy (0.35% over $24,999) (263) $___________ Sewer/Stormwater/Water Inspection Fee($135.00) (271) ___________ (includes GST) Connection Sewer Connection ($72.00) (270) ___________
Connection to Drinking Water ($72.00) (270) ___________
Connection to Stormwater System ($72.00) (270) ___________ (See Separate Register) Septic Tank Application Fee ($154.00) ___________ (See Separate Register) Inspection Fees Number required: _____ (Line 10) $___________ (includes GST) Occupation Certificate (Line 13) $___________ (includes GST) TOTAL FEES APPLICABLE TO CD CERTIFICATE $___________
** Credit Card Surcharge Fee (if applicable) $___________
Amount Paid
$ Date
Receipt No
Nambucca Shire Council PO Box 177 MACKSVILLE NSW 2447 Ph: 02 6568 2555 Fax: 02 6568 2201