COMPANY PROFILE
PT. GRAHA SOLUSI TEKNIK
MAKE DIFFERENCE
ENGINEERING | CONSTRUCTION CONTRACTOR
1
TABLE OF CONTENT
Pengantar .......................................................................................................................................................... 2
Data Administrasi .............................................................................................................................................. 3
Visi dan Misi....................................................................................................................................................... 4
Kebijakan Perusahaan ....................................................................................................................................... 5
Kebijakan Keselamatan dan Kesehatan dalam Pekerjaan ................................................................................ 6
Struktur Organisasi – PT. GRAHA SOLUSI TEKNIK ............................................................................................ 7
Team Management ............................................................................................................................................ 8
1 Legalitas Perusahaan ............................................................................................................................... 9
1.1 Surat Pengesahan Badan Usaha........................................................................................................ 9
1.2 Surat Domisili Badan Usaha ............................................................................................................ 10
1.3 Surat Keterangan Terdaftar NPWP .................................................................................................. 11
1.4 Tanda Daftar Perseroan Terbatas ................................................................................................... 12
1.5 Surat Izin Usaha Perdagangan (SIUP) Menengah ............................................................................. 13
1.6 Izin Usaha Jasa Konstruksi ............................................................................................................. 14
1.7 Angka Pengenal Importir - Umum ................................................................................................... 15
1.8 Identitas Pengurus Perusahaan ....................................................................................................... 16
1.9 Nomor Identitas Kepabeanan ......................................................................................................... 17
1.10 Sertifikat Badan Usaha Pelaksana Konstruksi Mekanik ...................................................................... 19
1.11 Sertifikat Badan Usaha Pelaksana Konstruksi Elektrik ....................................................................... 20
1.12 Tanda Anggota PAKLINA ................................................................................................................ 21
1.13 Sertifikat Ahli Teknik Tenaga Listrik dan Mekanik ............................................................................. 22
2 Experience List. PT GRAHA SOLUSI TEKNIK .......................................................................................... 23
3 Customer List. PT EKSAKTA SINERGI INDONESIA ................................................................................ 25
4 Experience List. PT EKSAKTA SINERGI INDONESIA .............................................................................. 26
5 Total Site in Telecommunication Project ............................................................................................... 29
Service Project in Electrical & Instrumentation Field ...................................................................................... 30
Service Project in Telecommunication Field .................................................................................................... 35
Tools and Equipments ..................................................................................................................................... 37
Tools for Installation..................................................................................................................................... 37
Tools For Commissioning BTS & MW ............................................................................................................. 37
Tools For Electrical Testing ........................................................................................................................... 37
Commissioning Tools For Fire Alarm .............................................................................................................. 37
Safety Equipments ....................................................................................................................................... 37
2
Pengantar
Dengan mempertimbangkan
• Setelah bertahun-tahun berpengalaman dalam menangani proyek-proyek mekanikal,elektrikal, instrumentasi dan sistim komunikasi untuk industri, gedung dan perkantoran.
• Merekrut dan menyediakan pekerja terampil di bidang teknik
• Keinginan yang kuat untuk mengembangkan kemampuan pekerja dan berkontribusi dalam
pembangunan negara. Kami memutuskan untuk mendirikan sebuah perusahaan, yang mengkhususkan diri dalam bidang konstruksi mekanik, listrik, instrumentasi dan system telekomunikasi sebagai kontraktor, yang bernama: PT GRAHA SOLUSI TEKNIK Dengan banyaknya pengalaman yang kami miliki dan keyakinan yang kuat, kerja keras dan manajemen yang profesional, kami percaya bahwa kami dapat memenuhi kebutuhan klien kami. PT. GRAHA SOLUSI TEKNIK dikendalikan oleh tim manajemen yang berpengalaman dalam menangani proyek-proyek dalam bidang seperti tersebut diatas serta mendapat dukungan penuh dalam hal financial maupun teknikal dari PT. Eksakta Sinergi Indonesia yang dalam hal ini adalah sebagai sister company Atas dasar pengalaman dan keahlian kami, kami yakin dapat bekerja sama dengan Anda untuk memberikan kinerja terbaik dengan prinsip saling menguntungkan. Demikian yang dapat kami sampaikan.
Jakarta, 14 April 2014
Desti Relawati Direktur
3
Data Administrasi
Alamat Kantor : Jl. Raya Bekasi KM 19. Blok M. No. 30 Pulogadung, Jakarta Timur 13260 Telepon Kantor : +62.21 29834505 Fax : +62.21 29834505 E-mail : [email protected] Website : www.ptgst.co.id Sertifikat dan Legalitas Nama Perusahaan : PT. Graha Solusi Teknik Jenis Usaha : Perdagangan Umum, Konstruksi dan Jasa Notaris : Kokoh Henry. SH . mKN No. Akta Pendirian : 11 Tanggal Akta : April, 14, 2014 No. Registrasi Perusahaan : AHU-02727.40.10.2014 No. SK Domisili : 032/1.842.5 No. Registrasi Pajak : S-4964KT/WPJ.20/KP.0603/2014 No. NPWP : 70.107.670.5-005.000 No. SIUP : 509/24.1PM.7/31.75/-1824/e/2016 No. TDP : 09.04.1.46.39086 No. SBU : 0186682 No. SIUJK : 1-908040-3172-2-00069 No. Asosiasi : V.00.21.VI.14/1147 No. SBU : 0186682 No. NIK : 01.052865 No. API : 090612551-P Rekening Perusahaan Bank : PT. Bank Negara Indonesia (Persero) No. Rekening : 034 254 4282 Atas Nama : PT. Graha Solusi Teknik Bank : PT. Bank Rakyat Indonesia (Persero) No. Rekening : 0230-02-000228-30-4 No. Rekening : 0230-01-002953-30-7 Atas Nama : PT. Graha Solusi Teknik
4
Visi dan Misi
Visi
• Mendukung perusahaan Nasional & Internasional di layanan dan solusi di bidang listrik instrumentasi dan
telekommunikasi di Indonesia
• Menjadi perusahaan yang kompetitif
• Menjaga hubungan bisnis jangka panjang atas dasar saling menguntungkan dan kemitraan
• Memberikan kualitas terbaik dari pekerjaan dan sesuai standar teknis yang ditentukan
• Berusaha lebih baik dari kontraktor lainnya dalam bidang pekerjaan sejenis.
Misi
• Memberdayakan sumber daya manusia yang berpengalaman di bidangnya.
• Berkomitmen pada perbaikan terus-menerus dalam memberikan sumber daya dan produk berkualitas tinggi.
• Mendukung kebutuhan pembangunan di Indonesia .
• Memberikan kesejahteraan bagi karyawan dan berkontribusi terhadap lingkungan.
• Memberikan pelanggan Produk dan Layanan berkualitas tinggi.
• Tumbuh menjadi perusahaan yang sehat , berkualitas tinggi dan menjunjung etika dalam berbisnis.
5
Kebijakan Perusahaan
TUJUAN PERUSAHAAN
• Memberdayakan sumber daya manusia yang berpengalaman di bidangnya.
• Mendukung kebutuhan pembangunan di Indonesia.
• Memberikan kekayaan karyawan dan kontribusi terhadap lingkungan.
• Memberikan pelanggan Produk dan Jasa berkualitas.
• Tumbuh menjadi Sehat, Berkualitas dengan memegang prinsip etika bisnis KUALITAS KEBIJAKAN
• Kebijakan PT. Graha Solusi Teknik untuk memberikan kualitas yang baik
• Antara produk dan layanan, yang sesuai dengan persyaratan kontrak dan peraturan untuk
memenuhi kepuasan pelanggan.
• Manajemen PT. Graha Solusi Teknik memiliki komitmen terhadap kualitas, oleh sumber daya alokasi
yang diperlukan untuk keberhasilan pelaksanaan BUDAYA PERUSAHAAN
• Efektif dan Efisien
• Rajin dan Produktif
• Nilai tambah pada setiap pekerjaan
• Inisiatif dan kreatif
• Harmonis dan Team Work yang kuat
6
1 2
9 4 8
Kebijakan Keselamatan dan Kesehatan dalam Pekerjaan PT. Graha Solusi Teknik. Bertanggung jawab secara moral dan hukum untuk menyediakan, mempromosikan dan memelihara lingkungan kerja yang aman dan sehat di seluruh area operasi perusahaan. Tujuan kami adalah untuk mengembangkan dan meningkatkan praktek kerja dan perilaku untuk mencegah cedera, penyakit atau kerusakan properti.
Keamanan dan Keselamatan sebagai elemen kunci dari tujuan manajemen bisnis
Berkonsultasi dengan karyawan, pelanggan dan pemasok untuk berbagi dan belajar dari satu sama lain pengalaman keselamatan
Memberikan informasi, pelatihan dan kepemimpinan kebutuhan untuk memungkinkan semua personil untuk bekerja dan berperilaku dengan cara yang aman
Meninjau dan memantau standar kesehatan dan keselamatan untuk menentukan efektivitas kebijakan dan program,mengidentikasi area untuk perbaikan dan memastikan kepatuhan terhadap peraturan pemerintah
Memastikan manajemen dan karyawan sepenuhnya peduli dengan tanggung jawab keselamatan mereka dan harapan perusahaan
Maksimum mencegah Kecelakaan diwilayah kerja Anda
Mengintegrasikan praktek keselamatan dan lingkungan kerja yang aman ke semua tingkat kegiatan perusahaan
Memenuhi kebutuhan pelanggan terutama dalam keselamatan
Mengindentifikasi dan antisipasi bahaya keamanan dan merespon segera untuk mengendalikan dan mencegah mereka
7
Struktur Organisasi – PT. GRAHA SOLUSI TEKNIK
8
Team Management Direktur : Desti Relawati
Manager Administrator Engineer 1. Agus Wibowo. MT 1. Bayu Kusuma Murti 1. Mashyudi 2. Agung Ginanjar. ST 2. Safitri Laraswati 2. Agus Priyanto 2. Muhammad Kurnia 3. Ashara 3. Bayu Pratomo
Supervisor Staff & Technician Total Technician 1. Naim Rusdiana 1. Sandy Ramadani 50 Personil 2. Zainal Arifin 2. Wagino 3. Jaya Adiputra 3. Muhamad Arief P. 4. Bambang Cahyadi 4. Mubasir 5. Yayat Hidayat 5. Khayadi 6. Rizul Chodfie 6. Sopiyauloh
9
1 Legalitas Perusahaan
1.1 Surat Pengesahan Badan Usaha
10
1.2 Surat Domisili Badan Usaha
11
1.3 Surat Keterangan Terdaftar NPWP
12
1.4 Tanda Daftar Perseroan Terbatas
13
1.5 Surat Izin Usaha Perdagangan (SIUP) Menengah
14
1.6 Izin Usaha Jasa Konstruksi
15
1.7 Angka Pengenal Importir - Umum
16
1.8 Identitas Pengurus Perusahaan
17
1.9 Nomor Identitas Kepabeanan
18
19
1.10 Sertifikat Badan Usaha Pelaksana Konstruksi Mekanik
20
1.11 Sertifikat Badan Usaha Pelaksana Konstruksi Elektrik
21
1.12 Tanda Anggota PAKLINA
22
1.13 Sertifikat Ahli Teknik Tenaga Listrik dan Mekanik
23
2 Experience List. PT GRAHA SOLUSI TEKNIK
No Description Order No Customer Project Value
1 Pengadaan Bahan Bakar Solar untuk Genset No. 17/0921/DLP/GPL/PL1 Bank Indonesia 216,832,000
Data Center BI, Gedung Learning Center BI, Tgl. 19 Maret 2015
Gedung BI Juanda dan Museum BI Kota 2 Pengadaan Peralatan dan Instalasi Mekanikal No. 17/1127/DLP/GPL/PL1 Bank Indonesia 105,403,142
Elektrikal Ruang Rapat Besar DLP Lantai 3 Tgl. 10 April 2015
Gedung Kebon Sirih KOPERBI Jakarta 3 Perbaikan Isolasi Pipa Lantai 2, Penarikan No. 17/1458/DLP/GPL/PL1 Bank Indonesia 121,984,335
Kabel Power Chiller Gedung Tipikal dan KWH Tgl. 11 Mei 2015
Meter Gedung Kebon sirih 4 Perbaikan dan Penggantian Peralatan Fire No. 17/1459/DLP/GPL/PL1 Bank Indonesia 220,757,240
Fighting Gedung Tipikal Arsek KOPERBI Tgl. 11 Mei 2015
Jakarta 5 Pengadaan Kabel Power san aksesorie Kabel No. 17/1506/DLP/GPL/PL1 Bank Indonesia 24,994,970
untuk Penggantian Instalasi Kabel Power Tgl. 15 Mei 2016
Peralatan AC Split Gedung C dan D KOPERBI
Jakarta 6 Penggantian Rollingdoor No. 1 No. 17/1736/DLP/GPL/PL1 Bank Indonesia 47,250,000
Lantai Basement 1 Gedung C KOPERBI Jakarta Tgl. 4 Juni 2015 7 Pengadaan dan Pemasangan AC Split Ruang No. 17/1888/DLP/GPL/PL1 Bank Indonesia 41,149,680
ATM serta Regrouping Lampu Penerangan Tgl. 18 Juni 2015
dan Stop Kontak Lt.1 dan 2 Gedung D
KOPERBI Jakarta 8 Penggantian Box Hydrant Lengkap (Selang No. 17/2202/DLP/GPL/PL1 Bank Indonesia 80,037,410
dan Noszzel) di antara Taman Gedung C, D dan Tgl. 13 Juli 2015
Instalasi Pipa Solar di Gedung C KOPERBI
Jakarta 9 Penyediaan Power Supply Server OJK Lt.1 No. 17/2511/DLP/GPL/PL1 Bank Indonesia 128,597,590
Gedung Tipikal KOPERBI Jakarta Tgl. 11 Agustus 2015 10 Service AC dan Penarikan Kabel Power No. 17/2515/DLP/DPL/PL1 Bank Indonesia 63,460,144
Pressure Fan di Area Data Center KOPERBI Tgl. 11 Agustus 2015
Jakarta 11 Sound Attenuator, Tata Udara dan Relokasi No. 17/2548/DLP/GPL/PL1 Bank Indonesia 200,450,839
Lampu Parkir di Gedung dan Halaman Gedung Tgl. 13 Agustus 2015
Fasilitas Sosial KOPERBI Jakarta 12 Pengadaan Ring Basket dan Scoreboard No. 17/2654/DLP/GPL/PL1 Bank Indonesia 152,006,250
untuk Fasilitas Olah Raga di Gedung Fasos Tgl. 21 Agustus 2015
KOPERBI Jakarta 13 Pengadaan Battery Genset pada Menara No. 17/2715/DLP/GPL/PL1 Bank Indonesia 96,679,000
Radius Prawiro, Menara Sjafrudiin dan Tgl. 28 Agustus 2015
Gedung Thamrin KOPERBI Jakarta 14 Pengadaan Bahan Bakar Solar untuk Genset No. 17/2830/DLP/GPL/PL1 Bank Indonesia 216,832,000
Data Center, Gedung D dan Gedung Kebon Tgl. 3 September 2015
Sirih KOPERBI Jakarta 15 Mekanikal Elektrikal Perpustakaan di Menara No. 17/2872/DLP/GPL/PL1 Bank Indonesia 67,872,000
Sjafrudin Prawiranegara dan Pemasangan Tgl. 7 September 2015
Sanitasi Lantai 24 Menara Radius Prawiro
KOPERBI Jakarta 16 Jasa Maintenance ME Rumah Bank Indonesia No. ESI-PO-1200299 PT. Eksakta Sinergi
Indonesia 2,060,810,909
Periode Juni 2015 sd Mei 2017 Tgl. 11 September 2015 17 Pemeliharaan dan Perawatan Peralatan No. 17/3154/DLP/GPL/PL1 Bank Indonesia 168,846,521
Mekanikal elektrikal (ME) Data Center Bank Tgl. 29 September 2015
Indonesia di Gedung Tipikal KOPERBI Jakarta
(Periode Oktober 2015 sd Maret 2016) 18 Pengadaan dan Pemasangan Lampu LED T8, No. 17/3559/DLP/GPL/PL1 Bank Indonesia 111,278,497
Basement 2 Gedung D KOPERBI Jakarta Tgl. 30 Oktober 2015 19 Penggantian Rollingdoor No. 5, 6 dan 7 Lt.1 No. 17/3829/DLP/GPL/PL1 Bank Indonesia 196,316,111
Gedung C KOPERBI Jakarta Tgl. 24 Nopember 2016 20 Waterproofing Dak dan Isolasi Ruang Genset No.
DMPT2L/07.12.01/SPK/2015 Badan Pusat 97,570,000
Kantor BPS Jakarta Tgl. 7 Desember 2015 Statistik Jakarta
24
No Description Order No Customer Project Value
21 Perbaikan Mekanikal Elektrikal Gedung No. 17/4041/DLP/GPL/PL1 Bank Indonesia 135,897,000
Fasos KOPERBI Jakarta Tgl. 8 Desember 2015 22 Penyediaan Sarana dan Prasarana Hard Material No. 17/4089/DLP/GPL/PL1 Bank Indonesia 38,830,000
Kegiatan Acara Peringatan Ibadah dan Perayaan Tgl. 14 Desember 2015
Natal 2015 di Flores Ballroom, Lobby Level dan
Sumba Room 3rd Level Hotel Borobudur Jakarta 23 Pengadaan Spare Part Pemeliharaan untuk No. 17/4161/DLP/GPL/PL1 Bank Indonesia 17,767,035
Gedung C, D & Masjid KOPERBI Jakarta Tgl. 21 Desember 2015 24 Pengelolaan Peralatan Mekanikal dan No. 14/4246/DLP/GPL/PL1 Bank Indonesia 246,961,000
Elektrikal di Gedung Tipikal, Arsek, Data Center Tgl. 30 desember 2015
Kebon Sirih, Fasos KOPERBI Jakarta bulan Jan'16 25 Penggantian Spare Parts AC Presisi di Data Center No. 18/115/DLP-GPL-
PL1/Srt/B Bank Indonesia 216,658,200
Bank Indonesia KOPERBI Jakarta Tgl. 14 Januari 2016 26 Pengadaan Bahan Bakar Solar untuk Genset No. 18/126/DLP-GPL-
PL1/Srt/B Bank Indonesia 149,072,000
Gedung D, Gedung Fasos, Museum BI Kota Tgl. 15 Januari 2016
dan Learning Center BI Jakarta 27 Pemindahan Tukar Unit Genset dari Rumah No. 18/137/DLP-GPL-
PL2/Srt/B Bank Indonesia 27,164,500
Jabatan Dewan Gubernur Bank Indonesia Tgl. 22 Januari 2016
Jl. Senopati 8 ke Rumah Jabatan Dewan
Gubernur Bank Indonesia Jl. Panglima Polim 28 Pengelolaan Peralatan Mekanikal dan No. 18/311/DLP-
GPL/PL1/Srt/B Bank Indonesia 246,961,000
Elektrikal di Gedung Tipikal, Arsek, Data Center Tgl. 29 Januari 2016
Kebon Sirih, Fasos KOPERBI Jakarta bulan Feb'16
25
3 Customer List. PT EKSAKTA SINERGI INDONESIA
No Customer Name Field Years
1 PT. NOKIA SIEMENS NETWORKS Telecommunication 2008 - 2012
2 PT. GRAHA USAHA TEKNIK Telecommunication 2008 - 2011
Electrical & Instrumentation 2010 - 2011
Electrical 2011
3 PT. SIEMENS INDONESIA Electrical & Instrumentation 2008 - 2014
Building Maintenance 2013 - 2014
4 PT. SINAR REKAYASA TEKNIK Electrical & Instrumentation 2009 - 2011
5 PT. AREVA T&D Electrical 2009 - 2012
6 PT. HANDIJAYA SUKATAMA Electrical 2009
7 CV. CAHAYA AGUNG SENTOSA Electrical 2009
8 PT. STARWAY Telecommunication 2009 - 2010
9 PT. FIRETECH PERKASA Fire Alarm System 2010
10 PT. ALCORA MITRA PRATAMA Electrical 2010 - 2011
11 PT. SMS ENERGY Electrical 2011
12 PT. SARANA INSTRUMENT Electrical 2011
13 PT. AURA MITRA GANGSA Electrical 2011
14 PT. YASA INDUSTRI NUSANTARA Electrical 2011
15 PT. MITRA INTI DINAMIKA Electrical 2011
16 PT. HUAWEI TECH INVESTMENT Telecommunication 2012
17 PT. MAKMUR SEJAHTERA WISESA Electrical 2012 - 2013
18 PT. INTEX TELECOM SYSTEM INDONESIA Telecommunication 2014
19 PT. NOKIA SOLUTIONS and NETWORKS INDONESIA Telecommunication 2013 - 2014
20 PT. ABADI BANGUN PERKASA Electrical 2014
21 PT. FITI INDONESIA Electrical 2014
22 PT. ALSTOM Electrical & Instrumentation 2014
23 PT. MEINDO ELANG INDAH Electrical & Instrumentation 2014
24 PT. SAPTA INDRA SEJATI Electrical 2015
25 PT. SEMEN PADANG Electrical & Instrumentation 2016
26
4 Experience List. PT EKSAKTA SINERGI INDONESIA
SUBSTATION PROJECT END USER ORDER YEAR
Gardu Induk PLN. Padang Sambian BALI
PLN PT. Siemens Indonesia - PTD 2012
Installation, Test and Commissioning : 150kV (5 Line bay : 2 Transformer bays, 1 Bus coupler bay, 2 Outgoing bays )
Gardu Induk PLN. Krembangan SURABAYA
PLN
PT. Siemens Indonesia - PTD
2012 Installation, Test and Commissioning Relay Control Panel : 150kV (5 Line bay : 2 Transformer bays, 1 Bus coupler bay, 2 Outgoing bays )
Gardu Induk PLN. Cibabat BANDUNG
PLN
PT. Siemens Indonesia - PTD
2013 Installation, Test and Commissioning Relay Control Panel : 150kV (5 Line bay : 2 Transformer bays, 1 Bus coupler bay, 2 Outgoing bays
Gardu Induk PLN. Marunda JAKARTA
PLN
PT. Siemens Indonesia - PTD
2013 Installation, Test and Commissioning Relay Control Panel : 150kV (5 Line bay : 2 Transformer bays, 1 Bus coupler bay, 2 Outgoing bays
MINING, OIL & GAS PROJECT END USER ORDER YEAR
Unit-52 Major Outage 2008, PT. Newmont Benete Field
PT. Newmont Nusa Tenggara
PT. Siemens
Indonesia. PG 2008 Electrical & Instrumentation Combustion Inspection : Check electrical
device relay protection and control system, Instrument calibration and setting. :
TAR 2009 Chevron Geothermal Indonesia, Drajat Garut
CHEVRON AREVA. T&D 2009 Installation, Test and Commissioning : Dismantle, re-install & commissioning 13,8kV and 6,3kV Auxiliary bus-duct, Auxiliary Transformer 10 MVA, 6.3 kV Medium Voltage, 380 Volt Switchboard and 380 Volt Motor Control Center
GOLAR FSRU Offshore West JAVA
GOLAR FSRU Offshore West
JAVA
PT. Siemens
Indonesia. PG-OG 2013 Modification, setting and test : Modification & relay setting for Sea water
pump, transformer, bus coupler steam generator and diesel generator.
Chevron Geothermal Indonesia, Salak-Sukabumi
CHEVRON
Torishima Guna Engineering
2014 Installation, Test and Commissioning : Dismantle, re-install & commissioning, 380 Volt Switchboard and 380 Volt Motor Control Center
Pertamina Refinery Unit VI Balongan Installation, Test and Commissioning PERTAMINA Meindo Elang Sakti 2014
INDUSTRIAL PROJECT END USER ORDER YEAR
Installation Network system, lighting and small power NSN Regional
Office, Palembang
PT. Nokia Siemens
network
2009
Installation and test : Installation and test network system, distribution panel, lighting and small power.
Installation and test lighting and small power Honda Showroom Danau Sunter,
Jakarta
PT. Handijaya
Sukatama
2009
Installation and test : Installation and test distribution panel, lighting and small power.
Sengkang EMO GT-21 South Sulawesi Power Plant
Sengkang South Sulawesi
PT. Siemens
Indonesia. PG
2009
Electrical and Instrument : Dismantle Siemens Turbine Electrical & Instrument Equipments.
Sengkang EMO GT-21 Emergency Outage South Sulawesi Power Plant
Sengkang South Sulawesi
PT. Siemens
Indonesia. PG
2010
Electrical and Instrument : Inspection and verify for Electrical & Instrument Equipments
Installation and Commissioning : Installation and Commissioning of Automation Genset
27
INDUSTRIAL PROJECT END USER ORDER YEAR
Wiring and testing PLC/HMI panel
Wiring and testing : Wiring and testing Control system PLC/HMI Allen Bradley for 94 cubicle
Workshop Duren Sawit, Jakarta
PT. Alcora Mitra Pratama
2009 & 2010
Installation network system, lighting and small power Building A & B, Pulomas Jakarta
PT. Siemens Indonesia BA
2010 Installation and test : Installation and test network system, distribution
panel, lighting and small power.
Maintenance and repair Fire Alarm System Bontang,
Kalimantan Timur
PT. Firetech Perkasa
2010 Maintenance, setting and repair : Maintenance, setting and repair fire
alarm system, re-set and testing equipment
KS, Steelelting Shop (SSP1) Revitalization Project.
PT, Krakatau Steel (SSP-1)
PT. Siemens Indonesia. A&C
2010
Installation, Test and Assistance Commissioning : Erection & termination GIS MV Switchgear type 8DA10 Extendable Fixed-Mounted Circuit-Breaker Switchgear up to 40.5 kV,
Assistance Commissioning 6kV, 20kV Switchgear & 400V LV cubicle at Furnace Breaker 7 & 8, Termination 24kV
KS_HSM Retrofit Project, Cilegon PT, Krakatau Steel (HMS)
PT. Siemens
Indonesia. A&C
2010 Installation, Test and Assistance Commissioning : Installation, pulling,
termination and test control device system, PLC/HMI
Maintenance of Billboard
Pulomas, Jakarta
PT. Siemens Indonesia.
2010 Maintenance and repair : Maintenance and repair billboard Siemens
OFFSHORE Phase II (Fabrication CPP & AUP Platform) Project, HESS Ujung Pangkah
PT. Guna Nusa
Fabricators
PT. Graha Usaha
Teknik
2010-2011
Instrument, Electrical and Telecom Installation : Instrument & telecom : Cable pulling, termination, Installation Instrument equipment, JB, Paging, CCTV, Microwave transmission, alarm, telecommunication system, Electrical : Cable pulling, termination LV, MV, small power, lighting, 20 kV / 400V MCC Switchgear, Generator, Transformer & UPS system.
Supply 400 VAC power system for MCC Pertamina PT. Pertamina Tanjung Priok,
Jakarta
PT. Alcora Mitra
Pratama
2011 Installation, pulling and termination : Installation MCC panel, puling and termination cables 2x 4x300sqmm from Generator to MCC panel
Installation and test instrument system PT. Pertamina Tanjung Priok,
Jakarta
PT. Yasa Industri
Nusantara
2011 Installation and calibration : Installation and calibration pressure valve, pressure switch etc.
Maintenance of SIEMENS Sign
Arkadia, Jakarta
PT. Siemens Indonesia.
2011 Maintenance and repair : Maintenance and repair of SIEMENS Sign
Installation Automation Genset Daihatsu
Sunter, Jakarta
PT. SMS Energy
2011
Installation and Commissioning : Installation and Commissioning of Automation Genset
Installation CCTV SSP-1
Installation, test and Commissioning : Installation, test and Commissioning CCTV 6 units for Furnace EAF-6, EAF-7 and EAF-8.
PT, Krakatau Steel (SSP-1)
PT. Siemens Indonesia. A&C 2011
IKPP 20kV GIS & Cables Installation, Test and Commissioning : Installation, termination and commissioning Medium-Voltage Switchgear Type 8DA Extendable Fixed-Mounted Circuit-Breaker Switchgear up to 40.5 kV, Single Bus-bar, Single-Pole Metal-Enclosed, Gas-Insulated
PT. Indah Kiat Pulp & Paper
Serang, Banten
PT. Siemens Indonesia. A&C 2012
Dismantling & re-install of 8DJH 20kV panel L type Dismantle, Installation, test & commissioning : Dismantle, Installation, test & commissioning of 8DJH 20 kV panel
PT. Sunrise Textile, Bekasi
PT. Siemens Indonesia. A&C 2012
Maintenance & Purifying Transformer 550kVA Maintenance, purifying, Test and Commissioning : Transformer 550kV
Arkadia
PT. Siemens Indonesia. A&C
2013
ITP Simoprime world 20kV Panel Finish Mill Installation, Test and Commissioning : Installation & Commissioning of Simoprime World Panel 20kV Finish Mill
ITP Cibinong,
Bogor
PT. Siemens
Indonesia. PTD 2013
ITP Simoprime world 20kV Panel Raw Mill Installation, Test and Commissioning : Installation & Commissioning of Simoprime World Panel 20kV Raw Mill P3&P4
ITP Cibinong, Bogor
PT. Siemens Indonesia. PTD 2013
28
MAINTENANCE PROJECT END USER ORDER YEAR
North Duri Cogeneration Plant, Chevron, Riau
MCTN CHEVRON PT. Siemens Indonesia. PG 2008 & 2009
Electrical Protection, switchgear, MCC, Transformer & Instrumentation Inspection and test Hot Gas Path Inspection (HGPI) & Combustion Inspection (CI) : Inspection electrical and test : Transformer Protection, Inspect & verify of transformer, oil temperature, buchkholz, pressure relief device, tank conservator oil level, tap changer, sudden pressure relay. General electric MDP relay (MDP-OI), voltage & Frequency transducer, auto synchrocheck relay busler and auxiliary contact from corrosion & replace if necessary.
North Duri Cogeneration Plant, Chevron, Riau
MCTN CHEVRON PT. Sinar Rekayasa Teknik 2009 & 2011
Electrical Protection, switchgear, MCC, Transformer & Instrumentation Inspection and test Hot Gas Path Inspection (HGPI) & Combustion Inspection (CI) : Inspection electrical and test : Trafo Protection, Inspect & verify of trafo, oil temperature, buchkholz, pressure relief device, tank conservator oil level, tap changer, sudden pressure relay. General electric MDP relay (MDP-OI), voltage & Frequency transducer, auto syncrhron check relay busler and auxiliary contact from corrosion & replace if necessary.
Building Maintenance *Pulomas Factory
Electrical, Mechanical and Civil *Arkadia Office PT. Siemens 2014 - 2015
*Cilegon Factory Indonesia `
Perawatan Elektrikal dan Mekanikal Rumah Dinas Jabatan Dewan Gubernur Bank Indonesia Bank Indonesia 2015 - 2017
TRANSMISION PROJECT END USER ORDER YEAR
Overhead Line 20kV power distribution for WTP & WIP
PT ADARO Tanjung Tabalong, South
Kalimantan.
PT Makmur Sejahtera Wisesa 2012 & 2013
Electrical and Civil Installation, test and Commissioning : Installation of 20kV concrete pole included accessories and OHL / underground cables, soil test investigation, WTP & WIP Gardu compact erection, additional high for concrete pole by pedestal up to 4 m, test and Commissioning
Overhead Line 20kV power distribution for TR1 & TR2 Electrical and Civil Installation, Test and Commissioning Installation of 20kV concrete pole included accessories and OHL / underground cables, soil test investigation, TR1 & TR2 Gardu. test and Commissioning
PT. Sapta Indra Sejati
Tanjung Tabalong Kalimantan
PT. Sapta Indra Sejati 2015
29
5 Total Site in Telecommunication Project
Region Customer Scope of Work Total Jabodetabek Huawei MW Dismantle and Packing Antenna MW (0.3m - 1.2m) 95 Hop Huawei MW Installation and Commissioning Ip Migration 27 Hop Huawei MW Upgrade Capacity: Below tower 24 Hop Huawei MW Upgrade Capacity Upgrade: Exclude antenna 50 Hop Huawei MW Upgrade MW PDH (0.3m - 1.2m) 111 Hop NSN MW Upgrade Cell Max GSM Antenna 67 Hop NSN SDH Installation HiT 7035/7050/7070/7300 15 Hop NSN SDH Upgrade Capacity 4 Hop NSN SDH Installation Waveguide 2 Hop NSN SDH Installation SRA4 (2.4m - 3.0m) 15 Hop Total 410 Site/Hop Central Java Huawei MW Installation and Commissioning CE & WRFU Expansion 205 Hop Huawei MW Upgrade Capacity & Protection 86 Hop NSN SDH Installation Rectification Capacity 6 Hop NSN SDH Installation SRA4 (2.4m - 3.0m) 4 Hop Total 301 Site/Hop East Java NSN SDH Installation HiT 7035/7050,7070/7300 5 Hop NSN SDH Installation Rectification Capacity 11 Hop NSN SDH Installation SRA4 (2.4m - 3.0m) 29 Hop NSN SDH Installation Waveguide 8 Hop NSN MW Installation and Commissioning Cell Max GSM Antenna 3 Hop Total 56 Site/Hop West Java Huawei BTS Installation and Commissioning BTS/NodeB 294 Sites Huawei MW Installation and Commissioning Colo Sub-system/Cabinet 123 Sites Huawei MW Installation and Commissioning PDH-MW (0.3m - 1.2m) 156 Hop Huawei MW Installation and Commissioning PDH-MW (1.2m - 1.8m) 5 Hop Huawei MW Dismantle and Packing PDH-MW (0.3m - 1.2m) 14 Hop Huawei MW Upgrade Changes ODU / IDU 42 Hop Huawei MW Upgrade Capacity: Below tower 18 Hop Huawei MW Upgrade Capacity: MW PDH (0.3m - 1.2m) 38 Hop Huawei MW Upgrade Capacity & Protection 12 Hop Huawei MW Upgrade Capacity (Upgrade Software) 153 Hop NSN BTS Installation and Commissioning BS241 Indoor/Outdoor 2G BS1 42 Sites NSN MW Installation and Commissioning PDH-MW (0.3m - 1.2m) 42 Hop NSN SDH Installation HiT 7035/7050/7070/7300 6 Hop NSN SDH Installation Rectification Capacity 12 Hop NSN SDH Installation SRA4 (2.4m - 3.0m) 19 Hop NSN SDH Installation Waveguide 7 Hop Total 983 Site/Hop Bali-Lombok Huawei BTS Installation and Commissioning BTS/NodeB: Antenna Mounting 11 Sites Huawei BTS Installation Hardware Installation 3 Sites Huawei BTS Installation and Commissioning Macro BTS/NodeB 18 Sites Huawei MW Survey Engineering & Design (BTS+MW) 232 Sites Huawei MW Dismantle and Packing PDH-MW (0.3m - 1.2m) 5 Hop Huawei MW Installation and Commissioning PDH-MW (0.3m - 1.2m) 25 Hop NSN SDH Installation HiT 7035/7050/7070/7300 2 Hop NSN SDH Installation SRA4 (2.4m - 3.0m) 4 Hop Total 300 Site/Hop North Sumatra NSN BTS Installation BS241 Indoor/Outdoor 2G BS1 160 Sites
NSN BTS Dismantle and Packing BS241 Indoor/Outdoor 2G BS1 29 Sites NSN MW Dismantle and Packing PDH-MW (0.3m - 1.2m) 29 Hop NSN MW Installation and Commissioning PDH-MW (0.3m - 1.2m) 207 Hop NSN MW Installation and Commissioning Cell Max GSM Antenna 7 Hop NSN SDH Installation HiT 7035/7050/7070/7300 8 Hop NSN SDH Installation Rectification Capacity 12 Hop NSN SDH Installation SRA4 (2.4m - 3.0m) 31 Hop NSN SDH Upgrade Capacity 6 Hop NSN SDH Installation Waveguide 17 Hop Total 506 Site/Hop South Sumatra NSN SDH Installation HiT 7035/7050/7070/7300 2 Hop
NSN SDH Installation Rectification Capacity 17 Hop NSN SDH Installation SRT1F (2.4m - 3.0m) 17 Hop NSN SDH Installation Waveguide 9 Hop Total 45 Site/Hop
TOTAL 2,621 Site/Hop
30
Service Project in Electrical & Instrumentation Field
UJUNG PANGKAH DEVELOPMENT OFFSHORE PHASE II CPP & AUP EPCC PROJECT. PT. EKSAKTA SINERGI INDONESIA, working on HESS platform construction under the customer PT. Graha Usaha Teknik with located at PT Gunanusa Fabricator, Bojonegara Cilegon which consists of 4 platform modules, namely: Compression & Production Platform (CPP), Compression Module(CM), Accommodation & Utilities Platform(AUP) & Living Quarter (LQ).
The job description consist installation of Electrical, Telecom system, Instrumentation & Hook up Instrumentation.
1. Electrical System. Installation of LV & MV cubicle. Installation of Transformer. Installation of Emergency diesel. Installation of Fire water pump. Installation of Gas Turbine Generator. Pulling & termination of Control, LV & MV cables. Pre-commissioning & Commissioning
2. Instrumenttation System.
Installation of Emergency Shutdown (ESD) System. Installation of Process System (PCS). Installation of Fire & Gas System (FGS). Installation of Instrument equipment (PT, LT, FT, TT, SDV) Hook up & Tubing installation. Calibration test. Loop check.
3. Telecom System. Installation of Digital Microwave Radio (DMR). Installation of VHF & UHF system. Installation of Public Address / General Alarm (PAGA system). Installation of Closed Circuit Television (CCTV system). Installation of Telephone, Private Automatic Branches Exchange (PABX) & Local Area Network (LAN) system. Installation of Entertainment system. Pulling & termination of Telecom cable.
After 6 months fabrication process is carried out at PT Gunanusa, these modules are delivered to its destination in Ujung Pangkah (offshore, 40km from Gresik ) using a barge.
31
COMBUSTION TURBINE HOT GAS PATH INSPECTION AND COMBUSTION INSPECTION NORTH DURI COGENERATION PLANT, RIAU
PT EKSAKTA SINERGI INDONESIA performed an Electrical & Instrumentation Inspection services during Hot Gas Path Inspection (HGPI) & Combustion Inspection (CI) of Combustion Turbine North Duri Cogeneration Plant, Riau. The Services is lump-sump for planned maintenance schedule during contract period and be performed in prudent manners and shall comply with Safety, Health & Environmental regulation and procedures.
32
The Electrical Inspection scope of work included the following:
1. Protection Cabinet 2. Main Transformer 3. Station Service Transformer 4. Generator 5. Insulated Phase Bus 6. MV Switchgear 7. LV Switchgear 8. LV Motor Control Center 9. Starting Motor 10. Grounding System
The Instrumentation Inspection scope of work included the following:
1. Combustion Turbine Instrumentation System 2. Heat Recovery System Generators Instrumentation System 3. Generator Instrumentation System
Fig.1_Wear proper PPE before & during activity
Our Client is very concern about Safety, Health & Environmental regulation and procedures. Before starting every activity we have to submit Standard Repair Procedure & Job Safety Analysis as the completeness of permit to work. Personal Protective Equipment related to the job has to be worn as a mandatory.
Fig.2_Measurement of voltage residue after shutdown plant
Fig.3_Install grounding stick on MV Switchgear
33
Fig.4_ Verifying transformer protection relay function
Fig.5_ Replace gasket of transformer bushing HV side
230kV
Fig.6_ 20kV GIS Cable Arrangement at IKPP Serang
Fig.7_ 20kV GIS Cable & Relay HV test at IKPP Serang
Fig.8_ Move the Post Insulator into its Support install
Fig.9_ Disconnection Switch function test
34
Overhead Line 20kV Power Distribution for WTP & WIP
Fig.1_ 20kV Transmission
Fig.2_ 20kV End Pole
Fig.3_Safety talk / briefing
Fig.4_Commissioning 20kV panel.
Fig.5_ Energize 20kV panel transmission
Fig. 6_Energize 20kV panel transmission
35
Service Project in Telecommunication Field
View of telecom tower
PDH & SDH Microwave that have been Implemented
View of completed BTS/Node B & service Rack Enclosure that have been Implemented.
36
Toolbox meeting conducted and documented
Personnel to pray before starting work
Tools
First aid kit available on site
Personnel Protection Equipment such as function of work team
37
Tools and Equipments
Tools for Installation
1. Standard Electrical Tool : 10 boxes 2. Standard Mechanical Tool : 10 boxes
Tools For Commissioning BTS & MW
1. Digital Multimeter : 5pcs 2. BER Test : 1 pcs 3. Noted book : 5 pcs 5. Site Master (Anritsu) : 1 units 6. Compass Shuunto : 3 sets 7. Halca : 5 sets
Tools For Electrical Testing
1. AC/DC Clamp Meter : 2 sets 2. Digital Multi Tester : 4 sets 3. Phase Sequence : 2 sets 4. Digital Insulation Tester : 2 sets 5. DC HIPOT Tester : 1 set 6. Digital Earth Tester : 1 sets 7. Temperature Tester : 1 sets 8. Omicron CPC 100 : 1 set 9. Omicron CMC 256 : 1 set 10.CB Analyzer : 1 set 11.Michroohmmeter : 1 set
Commissioning Tools For Fire Alarm
1. Standard tool set for technician : 2 boxes 2. Dual rs232 ITF box B3D 021 : 1 pc 3. ST key SWE11 M3C011 : 1 pc 4. Laptop w/ Software Algoworks : 1 Unit 5. Smoke Detector Test (RE6 O.H.ST) : 1 pc 6. Heat Detector Test (RE6T O.H.ST) : 1 pc 7. Telescope rod 1,6m/4m FDUM 291 : 1 pc 8. Test gas can REF 8 (Aerosol) : 1 pc 9. Grounding Tester : 1 pc
Safety Equipments
1. Safety Helmet with Chin Strap : 20 pcs 2. Safety Helmet for Climber : 10 pcs 3. Full Body Safety Harness w/ lanyard : 30 pcs 4. Rubber Safety Gloves 10kV : 6 pcs 5. Fire Extinguisher : 6 pcs