The following slides will show pictures taken from various The following slides will show pictures taken from various construction sites including some comments.construction sites including some comments.
Our main activities are soil improvement works, site Our main activities are soil improvement works, site infrastructure installation, power plant buildings like infrastructure installation, power plant buildings like machine hall, control room building, water treatment machine hall, control room building, water treatment plant, store- and workshop buildings, cooling towers, plant, store- and workshop buildings, cooling towers, cooling water intake and outfall structures, roads, cooling water intake and outfall structures, roads, outdoor facilities and landscaping.outdoor facilities and landscaping.
Civil ConstructionCivil Construction
What means civil construction on siteWhat means civil construction on site
• The Civil Site fabrication areaThe Civil Site fabrication area• Infrastructure preparationsInfrastructure preparations• Earthworks and foundationsEarthworks and foundations• Steel reinforced concrete worksSteel reinforced concrete works• Structural steelwork and claddingStructural steelwork and cladding• Other works related to civilOther works related to civil• Finishing worksFinishing works
Civil Construction Civil Construction
The Civil Site Fabrication AreaThe Civil Site Fabrication Area
The pictures are showing various foundation works The pictures are showing various foundation works and steel work performed during the early stage and steel work performed during the early stage of a combined cycle power station project of a combined cycle power station project (CCPP).(CCPP).
The Civil job is not an installation it is a fabrication job on siteThe Civil job is not an installation it is a fabrication job on site
Campo di Gibraltar, Spain, UHA Boiler Foundation
The Civil job is not an installation it is a fabrication job on siteThe Civil job is not an installation it is a fabrication job on site
Campo, UHA Boiler Foundation
The Civil job is not an installation it is a fabrication job on siteThe Civil job is not an installation it is a fabrication job on site
Campo, UHA
The Civil job is not an installation it is a fabrication job on siteThe Civil job is not an installation it is a fabrication job on site
UHA Boiler Stack Embedments
The Civil job is not an installation it is a fabrication job siteThe Civil job is not an installation it is a fabrication job site
Campo, UMC Main Maschine Building
Civil Construction Civil Construction
Infrastructure PreparationsInfrastructure Preparations
One of the first activities at site is the preparation of One of the first activities at site is the preparation of all necessary infrastructure. Such as site all necessary infrastructure. Such as site management office buildings, access roads lay management office buildings, access roads lay down areas, service lines (water, sewage, down areas, service lines (water, sewage, phone, power, etc.).phone, power, etc.).
Infrastructure PreparationsInfrastructure Preparations
Kogan Creek, Australia, Site Management Offices
Infrastructure PreparationsInfrastructure Preparations
Kemerton, Australia, Wheel wash facility
Infrastructure PreparationsInfrastructure Preparations
Kemerton, site access road
Infrastructure PreparationsInfrastructure Preparations
Kogan Creek, Banana Bridge Imrovement
Civil Construction Civil Construction
Earthworks and foundationsEarthworks and foundations
The major activities during the early stage of a The major activities during the early stage of a project are the earthworks and the construction project are the earthworks and the construction of all building foundations and equipment of all building foundations and equipment foundations for turbines, generators, foundations for turbines, generators, transformers and others.transformers and others.
Earthworks and foundationsEarthworks and foundations
Kogan Creek, Surface Water Retaining Basin
Earthworks and foundationsEarthworks and foundations
Kogan Creek, UHA Boiler Area Excavation
Earthworks and foundationsEarthworks and foundations
Ras Laffan,
Earthworks and foundationsEarthworks and foundations
Ras Laffan, Fa. Keller
Earthworks and foundationsEarthworks and foundations
Ras Laffan, 12UMB
Earthworks and foundationsEarthworks and foundations
Olkiluoto 3, Finland, main machine building
Turbine Table OLK3 Concrete Pour in May 2007
Earthworks and foundationsEarthworks and foundations
OLK3, Foundation Works
Earthworks and foundationsEarthworks and foundations
OLK3, Foundation works
Civil Construction Civil Construction
Steel reinforced concrete worksSteel reinforced concrete works
The concrete works are the most time consuming The concrete works are the most time consuming works of the entire civil activities on site.works of the entire civil activities on site.
One of the focus are the numerous embedded parts One of the focus are the numerous embedded parts that have to be placed in foundations. Those are that have to be placed in foundations. Those are steel ancor plates, steel pockets, bolts, steel ancor plates, steel pockets, bolts, conduits, earthing rods, and others.conduits, earthing rods, and others.
Steel reinforced concrete worksSteel reinforced concrete works
Arubal, Spain UGJ Cooling Tower Water Treatment Plant
Steel reinforced concrete worksSteel reinforced concrete works
Arubal, UST Workshop and Store Building
Steel reinforced concrete worksSteel reinforced concrete works
Arubal, UCA Control Room Building
Steel reinforced concrete worksSteel reinforced concrete works
Ras Laffan 2005, Transformer Bay
Steel reinforced concrete worksSteel reinforced concrete works
Duct for High Voltage Cables, Ras Laffan 2005
Steel reinforced concrete worksSteel reinforced concrete works
Kemerton, Gas Turbine Base Foundation
Steel reinforced concrete worksSteel reinforced concrete works
Gas Turbine and Generator Foundation
Steel reinforced concrete works (Sugen, India)Steel reinforced concrete works (Sugen, India)
Civil Construction Civil Construction
Structural steelwork and claddingStructural steelwork and cladding
Most of the building‘s carcasses are made of steelstructure, Most of the building‘s carcasses are made of steelstructure, double skin cladding and thermal insulation. double skin cladding and thermal insulation.
The building carcass has to fulfill noise protection The building carcass has to fulfill noise protection requirements as well as protection against dust, wind requirements as well as protection against dust, wind and water, freezing temperatures and/or heat.and water, freezing temperatures and/or heat.
The steel structure has to carry the load of the overhead The steel structure has to carry the load of the overhead cranes as well as load of equipment like piping, cranes as well as load of equipment like piping, mechanical modules, cable trays and others.mechanical modules, cable trays and others.
Structural steelwork and claddingStructural steelwork and cladding
Arubal, UMC Main Machine Building
Structural steelwork and claddingStructural steelwork and cladding
Arubal,10UMC and HRSG Boiler
Structural steelwork and claddingStructural steelwork and cladding
Kogan Creek, Australia
Structural steelwork and claddingStructural steelwork and cladding
Shuweihat
Civil Construction Civil Construction
Other works related to civilOther works related to civil
Those works can be soil improvement works (piling, Those works can be soil improvement works (piling, soil exchange) or conveyor belts for coal fired soil exchange) or conveyor belts for coal fired power plants, silos, bridges, rain water retaining power plants, silos, bridges, rain water retaining basins and so on.basins and so on.
Even the installation of a fully functioning concrete Even the installation of a fully functioning concrete mix plant on site can be part of our civil works.mix plant on site can be part of our civil works.
Other carcass worksOther carcass works
Kogan Creek, Conctere Mix Plant
Other carcass worksOther carcass works
Kogan Creek, Storm water dam – spill way
Other carcass worksOther carcass works
Iskenderun, Turkey, Coal Stockyard
Other carcass worksOther carcass works
Iskenderun, Coal Stockyard
Other carcass worksOther carcass works
Iskenderun, UET Storage Silos
Civil ConstructionCivil Construction
Finishing worksFinishing worksThe Control Room Building is the center of the The Control Room Building is the center of the
power plant control and consitst of control power plant control and consitst of control rooms, office space, sanitary installations, social rooms, office space, sanitary installations, social areas, meeting rooms and so on.areas, meeting rooms and so on.
Other buildings that require finishing works are for Other buildings that require finishing works are for instance the Water Treatment Building, Store- instance the Water Treatment Building, Store- and Workshop Building and Laboratory Building.and Workshop Building and Laboratory Building.
Finishing Works (UCA Sugen, India, Control Room)Finishing Works (UCA Sugen, India, Control Room)
Finishing Works (UCA Building, Sugen India)Finishing Works (UCA Building, Sugen India)
Finishing Works (USV and UGD, Sugen India)Finishing Works (USV and UGD, Sugen India)
Finishing Works UMC, 3 x Single Shaft, Sugen India)Finishing Works UMC, 3 x Single Shaft, Sugen India)