Broadway Avenue Streetscape ProjectCity of Albert Lea
Streetscape Design Committee Meeting
October 29, 2012
1
Presentation Outline
� Street Widths, Sidewalk Widths and Bump-Out Configuration
� Decorative Sidewalk and Crosswalk Treatment
� Water Street Plaza
� William Street Plaza
� Fountain Lake Park Improvements
2
� Fountain Lake Park Improvements
� Light Fixtures on Broadway
� Stormwater Discussion
STREET WIDTHS, SIDEWALK WIDTHS
AND BUMP-OUT CONFIGURATION
3
Street Widths, Sidewalk Widths and
Bump-Out Configuration
� Based on input from City Staff, Streetscape Design Committee
and City Council, proceed with current street width and bump-
out configuration
� Dropped curb at intersections
� Reduce or eliminate reverse curves at curb tie-ins (to extent
4
� Reduce or eliminate reverse curves at curb tie-ins (to extent
practical)
� Remove existing signal systems and replace with four-way stops
Typical Block Layout
5
Proposed Street/Sidewalk Section
6
A Sample Block
7
Bumpouts w/ Amenities
8
DECORATIVE SIDEWALK,
CROSSWALK, AND PAVEMENT
TREATMENT
9
TREATMENT
Decorative Sidewalk, Crosswalk and
Pavement Treatment� Based on input from City Staff, Streetscape Design Committee
and City Council, proceed with concrete pavers for decorative
sidewalk, crosswalks and pavement (pedestrian plaza)
� Color: Millstream (Red and Grey Mix)
� Pattern: Herringbone
� Pavers in Sidewalk:
10
� Pavers in Sidewalk:
– Size: 7⅞” x 3⅞” x 2⅝”
– Subbase type: Concrete w/ sand setting bed
� Paver on Crosswalk
– Size: 7⅞” x 3⅞” x 3⅛”
– Subbase type: Concrete w/ bituminous setting bed
Enhanced Pavement
11
Enhanced Pavement
12
WATER STREET PLAZA
13
Water Street Plaza
� Based on input from City Staff, Streetscape Design Committee
and City Council, consider two options:
� Full Streetscape Treatment (Estimated Cost $160,000)
– Decorative concrete pavers for street and sidewalk
– Trees and tree grates
– Decorative street lighting
14
– Other landscaping amenities – benches, litter receptacles, planters
� Limited Streetscape Treatment (Estimated Cost $125,000)
– Eliminate decorative concrete pavers in sidewalk and pavement areas
and use plain concrete
– Trees, decorative street lighting, and other landscaping amenities same
as full streetscape design
Water Street Plaza
15
Water Street Plaza
16
Preliminary Cost EstimateWater Street Pedestrian Plaza : $161,700
Water Street Plaza
17
Preliminary Cost EstimateReduced Scope Water Street Pedestrian Plaza: $125,000
($36,700 less than full design)
WILLIAM STREET PLAZA
18
William Street Plaza
� Based on input from City Staff, Streetscape Design Committee
and City Council, utilize limited streetscape treatment :
� Full Streetscape Treatment: ($115,000)
– Plain concrete for street and sidewalk
– Trees and tree grates
– Decorative street lighting
19
– Decorative street lighting
– Other landscaping amenities – benches, litter receptacles, planters
William Street Plaza
20
Preliminary Cost EstimateWilliam Street Pedestrian Plaza______________$115,000
FOUNTAIN LAKE PARK
IMPROVEMENTS
21
Fountain Lake Park Improvements
� Based on input from City Staff, Streetscape Design Committee
and City Council, proceed with Broadway Avenue/Fountain
Street intersection and Fountain Lake Park as previously
presented
� Items requiring further investigation/discussion:
– Size, configuration, design of dock
22
– Size, configuration, design of dock
– Repairs to overlook
Fountain Lake Park
23
Fountain Street Connection
24
Fountain Lake ParkAccessible/Maintenance Access
25
Fountain Lake Park
26
Fountain Lake Park
27
Fountain Lake Park
28
Fountain Lake ParkLookout Area
29
Fountain Lake ParkLookout Seating
30
Fountain Lake Park
31
Preliminary Cost EstimateFountain Lake Park Improvements______________$350,000
STREETSCAPE AMENITIES
32
Bench – Litter Receptacle
33
PlantersConcrete
34
Bollards
35
Kiosk - Wayfinding
36
LIGHT FIXTURES ON BROADWAY
37
Light Fixtures on Broadway Avenue� Based on input from City Staff, Streetscape Design Committee
and City Council, the following street lighting design is
recommended:
� Mid-block street lights:
– 15-foot high standards: Black or Dark Green decorative poles
– LED Acorn-style fixture: Lumec Serenade or similar, dimmable
– Fixtures for hanging banners – 10 feet to bottom of banner
38
– Fixtures for hanging banners – 10 feet to bottom of banner
– Duplex outlets up towards the top of pole for festive lights
� Intersection street lights:
– 30-foot high standards: Black or Dark Green decorative poles
– LED drop globe downlight -style fixture: Lumec Domus or similar,
dimmable
– Fixtures for hanging banners – 10 feet to bottom of banner
– Duplex outlets
Mid-Block Street Lights
39
Intersection Street Lights
40
STORM SEWER AND STORMWATER
TREATMENT DISCUSSION
41
Previous Storm Sewer and Storm Water
Treatment Option– Area north of Clark Street:
� Collect storm water run-off in a storm sewer system that runs north to lake
� Treat storm water in rain garden in Fountain Lake Park before discharging to lake
– Area south of Clark Street:� Collect storm water run-off from area south of Clark Street in a storm sewer
system that connects to existing storm sewer on William Street
� Storm sewer system on William Street flows to Morin Park storm water lift
42
� Storm sewer system on William Street flows to Morin Park storm water lift
station
� Treat storm water using tree filter boxes
– Tree filter boxes:� Expensive to construct
� Will require frequent cleaning and maintenance
� Limits tree grate configuration and size of tree
43
Tree Box Filters
44
Alternative Storm Sewer and Storm Water
Treatment Option (Preferred)
– Collect storm water run-off from entire project corridor in a storm
sewer system that runs north to lake
– Treat storm water in rain garden in Fountain Lake Park before
discharging to lake
– Treatment effectiveness will be reduced slightly – larger drainage
area flowing to rain garden
45
area flowing to rain garden
– Storm sewer on Broadway Avenue will be deeper (approx 9’ max).
– No storm water will be directed to storm sewer on William Street
– Area draining to Morin Park storm water lift station will be reduced
slightly (approx 1.3 acres)
– max.)
46
Preliminary Cost Estimate
47
Broadway Avenue Streetscape Project
Thanks for your time!