CTITLE
DATE DATE
SHEET SIZE
PROJECT
ELEMENT
DATE
SCALE
COPYRIGHT
CLIENT
DISCIPLINE
REVDRAWING No.
ARCHITECT
CH'K APP'DATE
DRAWN CHECKED APPROVED
SL6 4AQ UKBerkshireMaidenhead1 Bath Road
REV DESCRIPTION BY
W: www.grontmij.co.ukE: [email protected]: +44(0)1628 639 860T: +44(0)1628 623 423
Registered in England: No 2748664
Registered Office: Grove House, Mansion Gate Drive, Leeds LS7 4DN
Grontmij Limited
PROJECT No.
SH
M
CA
V/E
U2200hx650
wx800d
WD
WH
V
ENTRANCE HALLWAYWCGUEST
DINING
LIVINGBEDROOM 02
BEDROOM 01
WCGUEST
EN-SUITE 01
02EN-SUITE
ENTRANCE HALLWAYKITCHEN
ROOMDRESSING
SH
2/02FCU(A)
2/01FCU(A)
UH
M
UP
SE
T
UP
SET
DOWN
SET
TO TYPE 1 APARTMENT220x90 FRESH AIR DUCT
REFRIGERANT LINES
SVP
SVP
GREY WATER
CAT1 WATER
CAT2 WATER
CABLE ROUTE
CAT2 WATER
GREY WATER
HWS F
GSVP
204x60
204x60
SVP SVP
FC
FC
220x90 EXHAUST DUCT
150x150 FRESH AIR DUCT
INTERFACE UNITLTHW F&R TO HEAT
220x90 SUPPLY DUCT
WHOLE HOUSE VENT UNIT
220x90 EXTRACT DUCT
HWS STORAGE CYLINDER
VP L3 ONLY
SVPVP
125
VCDVCD
VCD
VCD
VCD
VCD
RETURN AIR SLOTRECESSED LIGHT COVE/ TERMINATES CLOSE TO EXTRACT BRANCH DUCTS
SVPSS
VP L3 ONLY
200
SPRINKLER PIPEWORK
SPRINKLER PIPEWORK
SVPSS
125
FC FC
VP L3 ONLY
CAT2 WATER
SVPSS
FCU CONDENSATE DRAIN
WHV SUPPLY DUCT
WHV EXTRACT DUCT
x60204
x60204
FC
FC
LTHW F&R UNDER FLOOR HEATING
SPRINKLER PIPE
CAT1 WATER
CAT2 WATER
HWS F
REFRIGERANT LINES
SPRINKLER MAIN
LTHW F&R U/F HTG
200
150
VCD
OPTD
FC
UP
SET
SETDN
SUPPLY DUCTATTENUATOR IN
SPRINKLER PIPEWORK
TERMINATED TO RETURN AIR SLOTEXTRACT BRANCH DUCT
TO SHOWER HEADCAT 2 & HWS
SS
50 VP L3 ONLY
HEAT INTERFACE UNIT
SVP
SVP
SS SVP G
VCD
150150125
VCD
150
SHOWER HEAD
FC
OPTD
CONDENSATE DRAIN AT L/L
ACCESSABLE FROM BATH PANELTO L/L WITH IN LINE TRAPS FCU CONDENSATE DRAINS DROP
WITH IN LINE TRAPTO L/L CONNECT TO WASTE FCU CONDENSATE DRAIN DROP
CONNECT TO OPTDWHV CONDENSATE DRAIN
LIGHT
220x90 FRESH AIR DUCT400x400 FRESH AIR RISER DUCT
WH
VROOMDRESSING
UP
SET
DOWN
SET
SVP
SVPFC
FC FC
UP
SETDN
FC
FC
TO ABOVE APART 1 LEVEL 9150x150 FRESH AIR DUCT
APART 1 FROM L/L150x150 FRESH AIR DUCT
TO ABOVE APART 1 LEVEL 9150x150 FRESH AIR DUCT
APART 1 FROM L/L150x150 FRESH AIR DUCT
APART 2 LEVEL 8220x900 FRESH AIR DUCT
400x400 FRESH AIR SUPPLY
SCALE 1:20
LEVEL 8FRESH AIR RISER
DETAIL A
WH
VROOMDRESSING
UP
SET
DOWN
SET
SVP
SVPFC
FC FC
UP
SETDN
FC
SCALE 1:20
LEVEL 9FRESH AIR RISER
DETAIL A
FC
APART 2 FROM BELOW150x150 FRESH AIR DUCT
APART 1 FROM BELOW150x150 FRESH AIR DUCT
220x20 FRESH AIRDUCT APART 2
FRESH AIR SUPPLY FANS DUTY STANDBY
BELOW FANFA ATTENUATOR IN UETICAL ABOVE & FRESH AIR SUPPLY
PURPOSES.THIS DRAWING SHALL NOT TO BE USED FOR CONSTRUCTION
DO NOT SCALE.
ALL DATUM LEVELS IN METRES UNLESS NOTED OTHERWISE.
ALL DIMENSIONS IN MILLIMETRES UNLESS STATED OTHERWISE.
SERVICE(S) INTENDED.THIS DRAWING SHALL ONLY BE USED FOR THE SPECIFIC
10.
11.
8.
9.
3.
NOTES
1.
2.
4.
5.
6.
7.
FOR EQUIPMENT DETAILS REFER TO TECHNICAL SCHEDULES.
REFER TO RELEVANT SERVICES SCHEMATIC FOR SIZES.
ARCHITECTURAL AND STRUCTURAL DRAWINGS.THIS DRAWING TO BE READ IN CONJUNCTION WITH LATEST
MEASUREMENT OF ARCHITECTURAL OR STRUCTURAL WORKS.THIS DRAWING SHALL NOT BE USED FOR DETAIL OR
DRAWINGS AND TECHNICAL SPECIFICATIONS.THIS DRAWING TO BE READ IN CONJUNCTION WITH RELEVANT
106610/M/1000.FOR STANDARD SYMBOLS AND NOTATION REFER TO DRG No.
NORTH
CENTRE POINT TOWER
CO-ORDINATED SERVICES LAYOUT
CENTRE POINT
ALMACANTAR
08
A0 1:20
2013
MECHANICAL
UA AUG'12 SC NDB AUG'12 AUG'12
106610
10/10/2014P:\106610\CAD\M\C1204-2.dgnCAD REV 00
10/10/2014
P:\10
6610\
CA
D\
M\
C12
04-2.dgn
CAD REV 02
RICK MATHER ARCHITECTS CONRAN + PARTNERS
CPT LEVELS 3-9 - APARTMENT TYPE 2
HORIZONTAL FCU's, REFER TO DRAWING No. 106610/M/1350-2.FOR TYPICAL DETAILS OF DUCTWORK & GRILLE CONNECTION TO
TYPES & QUANTITY THROUGHOUT THE BUILDING.REFER TO ARCHITECT'S DRAWINGS FOR DETAILS OF APARTMENT
12.
13.
UPDATED STAGE E ISSUE00 MMB SC NDB NOV'13
106610/C/1204-2
UPDATED STAGE E ISSUE01 MMB SC NDB DEC'13
UPDATED STAGE E ISSUE02 MMB SC NDB MAR'14
UPDATED STAGE E ISSUE03 MMB SC NDB APR'14
UPDATED STAGE E ISSUE04 MMB IRC NDB JUN'14
UPDATED STAGE E ISSUE05 MMB IRC NDB JUL'14
UPDATED STAGE E ISSUE06 IRC PL NDB JUL'14
1 0 1 2
METRES
UPDATED STAGE E ISSUE07 IRC PL NDB JUL'14
UPDATED STAGE E ISSUE08 IRC PL NDB OCT'14
08
08 08