BIM TO TIM – DIGITAL ENGINEERING NEXT STEPSBRISBIM FEB 2016
© Laing O’Rourke 2015, all rights reserved
OUR VISION FOR DIGITAL ENGINEERING2
“..we need to look beyond the concept as a software interface for producing better geometric information, and focus on the rich content that populates it. Digital Engineering will deliver an integrated set of geometric models, data and documentation that builds over the life of a project to capture all knowledge related to that asset”
Ray O’Rourke KBE Chairman & Chief Executive
integrated set of geometric models, integrated set of geometric models, an
integrated set of geometric models, integrated set of geometric models, integrated set of geometric models, integrated set of geometric models, integrated set of geometric models, integrated set of geometric models, that builds that builds
integrated set of geometric models, integrated set of geometric models, that builds that builds that builds
over the life of a project to capture all over the life of a project to capture all data and documentationdata and documentationover the life of a project to capture all over the life of a project to capture all over the life of a project to capture all over the life of a project to capture all knowledge related to that knowledge related to that knowledge related to that knowledge related to that over the life of a project to capture all over the life of a project to capture all knowledge related to that knowledge related to that over the life of a project to capture all over the life of a project to capture all over the life of a project to capture all over the life of a project to capture all over the life of a project to capture all over the life of a project to capture all over the life of a project to capture all over the life of a project to capture all
asset”asset”asset”asset”asset”
O’Rourke KBE O’Rourke KBE Chairman & Chief ExecutiveChairman & Chief Executive
O’Rourke KBE O’Rourke KBE Chairman & Chief ExecutiveChairman & Chief ExecutiveChairman & Chief ExecutiveChairman & Chief Executive
© Laing O’Rourke 2015, all rights reserved
WHY USE DIGITAL ENGINEERING3
© Laing O’Rourke 2015, all rights reserved
THE DIGITAL FUTURES QUESTION4
© Laing O’Rourke 2015, all rights reserved
THE DIGITAL FUTURES QUESTION5
reserved
© Laing O’Rourke 2015, all rights reserved
BIM TO TECHNOLOGY INFORMATION MANAGEMENT (TIM)6
https://www.linkedin.com/pulse/demise-bim-manager-ronan-collins?trk=prof-post
© Laing O’Rourke 2015, all rights reserved
DIGITAL ENGINEERING PROCESSES & DELIVERY
Basic Advanced
© Laing O’Rourke 2015, all rights reserved
WHAT ARE CLIENTS ASKING FOR ? (PART 2)8
© Laing O’Rourke 2015, all rights reserved
McKinsey & Co Survey (2016)• Data capture & analytics• 3d information linked to cost &
schedule• Collaborative platforms• Lifecycle approach
Laing O’Rourke response the trends is currently delivered through the DE menu and 5 steps
© Laing O’Rourke 2015, all rights © Laing O’Rourke 2015, all rights
© Laing O’Rourke 2015, all rights reserved
THE DIGITAL ENGINEERING STRATEGY9
© Laing O’Rourke, all rights reserved
100 Mount St, North Sydney, NSW
100 MOUNT STREETPROJECT
© Laing O’Rourke 2015, all rights reserved
11
100 MOUNT STREET TOWER, SYDNEY
© Laing O’Rourke 2015, all rights reserved
12
100 MOUNT STREET TOWER, SYDNEY
© Laing O’Rourke 2015, all rights reserved
13
100 MOUNT STREET TOWER, SYDNEY
© Laing O’Rourke 2016, all rights reserved.© Sydney Opera House Trust
Sydney Opera House, NSW
RENEWAL PROJECT ECIJOAN SUTHERAND THEATREJOAN SUTHERAND THEATRE
© Laing O’Rourke 2015, all rights reserved
15
SYDNEY OPERA HOUSE, JST RENEWAL PROJECT
Copyright Sydney Opera House Trust
© Laing O’Rourke 2015, all rights reserved
16
SYDNEY OPERA HOUSE, JST RENEWAL PROJECT
SOH/Consultant model v’s point cloud (clear differences)
Arup 2003-2010 historic model v’s point cloud Accurate to +- 5mm
Copyright Sydney Opera House Trust
Copyright Sydney Opera House TrustCopyright Sydney Opera House Trust
© Laing O’Rourke 2015, all rights reserved
17
SYDNEY OPERA HOUSE, JST RENEWAL PROJECT
Arup 2003-2010 model v’s point cloud Accurate to +- 2mmCopyright Sydney Opera House Trust
© Laing O’Rourke, all rights reserved
The Francis Crick Institute, London, UK
TECHNOLOGY INFORMATIONMANAGEMENT & DE
© Laing O’Rourke 2015, all rights reserved
19
PROPER PREPARATION PREVENTS POOR PERFORMANCE
• infrastructure industry ‘BIM’ protocols
• Software agnostic
• Industry readiness assessed
• 3D components library
© Laing O’Rourke 2015, all rights reserved
© Laing O’Rourke 2015, all rights reserved
20
INFORMATION ACCESS WITH THE END IN MIND
Estimating Document ControlQuality DeliveryHSEC Commissioning and
Asset management
Planning and Progress
MeasurementProject ControlsProcurement Contract
Administration FinanceEngineering and Design
Project Functions (information producers and consumers)(information producers and consumers)(information producers and consumers)(information producers and consumers)(information producers and consumers)
Estimating Document ControlQuality DeliveryHSEC Commissioning and
Asset management
Planning and Progress
MeasurementProject ControlsProcurement Contract
Administration FinanceEngineering and Design
Project FunctionsProject Functions (information producers and consumers)(information producers and consumers)(information producers and consumers)(information producers and consumers)(information producers and consumers)(information producers and consumers)
Project ControlsProject Controls
(information producers and consumers)(information producers and consumers)(information producers and consumers)(information producers and consumers)(information producers and consumers)(information producers and consumers)(information producers and consumers)
FinanceAdministration
© Laing O’Rourke 2015, all rights reserved
21
• 2D Drawings
• Possibly 3D bearing positioning
• Possibly 3D TIN of existing ground
Industry Business as Usual… …LOR DE
• Fully Modelled coordinated Structure
• Volume & Set out Checks
• WBS & Estimate attributes
• Drawing Links
TRADITIONAL TO DIGITAL ENGINEERING VIA GIS
positioningpositioningPossibly 3D bearing Possibly 3D bearing positioningpositioning
Possibly 3D TIN of existing groundPossibly 3D TIN of existing ground
Possibly 3D bearing Possibly 3D bearing
Possibly 3D TIN of existing groundPossibly 3D TIN of existing groundPossibly 3D TIN of existing groundPossibly 3D TIN of existing ground
© Laing O’Rourke 2015, all rights reserved
22
TRADITIONAL TO DIGITAL ENGINEERING VIA GIS
Uncoordinated Bridge length
Overlapping scope
Drainage design on obsolete alignment
Industry Business as Usual… …LOR DEOverlapping Overlapping scopescope
© Laing O’Rourke 2015, all rights reserved
23
THE TANGIBLE BENEFITS OF DIGITAL ENGINEERING
FME has the following benefits:Scope – Allow data transformation on many time of formats, including projections, colouring, image analysis, terrain
modelling etc.
Batch Processing – FME can process large number of files through different operations, particularly good at GIS like
format or file sizes
Library / Knowledge centre – FME has a good online knowledge base with example for most common tasks, and an
excellent support team
No Code Writing – ‘Visual’ Scripting
© Laing O’Rourke 2015, all rights reserved
24
THE TANGIBLE BENEFITS OF DIGITAL ENGINEERING
© Laing O’Rourke 2015, all rights reserved
Actual Design Cost
today
Planned Design Cost
DESIGNCONSTRUCTION
Possible Design Cost
Less expensive (tools & protocols are developed, team are
trained etc.)
More expensive (designers know better) in particular areas
such as GIS / CDE
Set up coordination and design review meetings around
models, as primary method of collaboration
Reduce drawings requirements up until IFC, by reducing the
abortive progressive drawing production allows better model
development
Quantities take off ownership, clear articulation on model
structure and development to allow this to happen
Dimension Control from models, this is contractual issue on
responsibilities of setting out that really needs to be resolved
© Laing O’Rourke 2015, all rights reserved
IN CONCLUSION25
• Digital Engineering is a Laing O’Rourke
committed project deliverable and therefore
a project team commitment;
• Digital Engineering is a Laing O’Rourke
Differentiator;
• Digital Engineering is NOT BIM;
• Digital Engineering is a ‘whole of project’
process;
• We use Digital Engineering as our ‘business
as usual’ approach on all project.
© Laing O’Rourke 2016, all rights reserved.© Laing O’Rourke 2015, all rights reserved.
26