Transcript
Page 1: Board Three Boneyard Creek Intervention

MATERIALITY

PATH

Stone WallProvides retention of earth along lower path.

Corten Steel ScreenProvides shading for occupants above and and a disconnect with the the street.

Concrete PathCreates a structurally sound path impervious to the rising of the creek.

Douglas Fir Timber Con-structionUsed in the post and lintel con-struction of the raised path and bridge nodes.

Lower Path

Street Level Path

Raised Path

Creek Bed

Recommended