Transcript
Page 1: Bldg.Floor Slabs ADDING FIRST FLOOR AND BASEMENT FLOOR …openlab.citytech.cuny.edu/...Bldg.06.Revit_.Floor_.1-Prof.King_.pdf · Adjust Graphics: Shift the Basement Level Bubble so

PROF. PAUL C. KING RA

New York City College of Technology

Fall 2011

LC.1200-1290 Tutorials.02 Bldg.General- Prof.King V.1.0.docx

Copyright © 2011 Paul C. King

Bldg.Floor Slabs ADDING FIRST

Overview: We will be adding

and the Lab Building

locker rooms for the Gym and Mechanical Rooms for the

North Elevation: Make the North Elevation

Level 1 with the left end of the

not the upper levels you will need

Unlock the level.

(Note: You may need to hide the display of the property lines)

Footing Elevation: Change the elevation of the

Add New Level: Create a New Level by Offsetting

Home > Levels > Pick Lines

Name this level

Select "Yes" when

Adjust Graphics: Shift the Basement Level Bubble so it does not overlap with "

Learning Community

New York City College of Technology ARCH_1290 & ARCH_1200

Prof.King V.1.0.docx

Building Development | Re

IRST FLOOR AND BASEMENT FLOOR SLABS

adding foundation slabs and structural floor slabs to

Lab Building. We will be adding a basement level to

locker rooms for the Gym and Mechanical Rooms for the entire

North Elevation the Current View. Select and align the left end of

with the left end of the Top of Footing Level. To move only level 1 and

not the upper levels you will need to Toggle 3D to 2D and you will need to

Unlock the level. When done also turn on the Bubble Display

(Note: You may need to hide the display of the property lines)

Change the elevation of the Top of Footing Level from -5' to

Create a New Level by Offsetting Top of Footing up 8 inches.

Home > Levels > Pick Lines Offset = 8" and Yes to "Make Plan View

Name this level Basement. The elevation of this level should be

" when prompted "Would you like to rename corresponding views?"

the Basement Level Bubble so it does not overlap with "

Learning Community

ARCH_1290 & ARCH_1200

Page 23 of 28

Building Development | Revit

floor slabs to the Gym, Atrium

to accommodate

entire complex.

lign the left end of

To move only level 1 and

and you will need to

Bubble Display.

(Note: You may need to hide the display of the property lines)

-12' - 8"

Make Plan View"

. The elevation of this level should be at -12-8"'

Would you like to rename corresponding views?"

the Basement Level Bubble so it does not overlap with "Top of Footing"

Page 2: Bldg.Floor Slabs ADDING FIRST FLOOR AND BASEMENT FLOOR …openlab.citytech.cuny.edu/...Bldg.06.Revit_.Floor_.1-Prof.King_.pdf · Adjust Graphics: Shift the Basement Level Bubble so

PROF. PAUL C. KING RA

New York City College of Technology

Fall 2011

LC.1200-1290 Tutorials.02 Bldg.General- Prof.King V.1.0.docx

Copyright © 2011 Paul C. King

Basement Level: Make the Basement Level

the basement leve

Duplicate Slab: Structure > Slab

We need to create our own 8" foundation slab

After renaming the new type,

Draw Slabs: Make certain the level is set to

Learning Community

New York City College of Technology ARCH_1290 & ARCH_1200

Prof.King V.1.0.docx

Building Development | Re

Basement Level the Current View and then Select

the basement level and change "View depth" to unlimited.

lab > Foundation Slab > 6" Foundation Slab

e need to create our own 8" foundation slab by duplicating the 6"

After renaming the new type, edit the structure and change the

ake certain the level is set to "Basement".

Learning Community

ARCH_1290 & ARCH_1200

Page 24 of 28

Building Development | Revit

"View Range" for

by duplicating the 6" slab

and change the thickness to 8"

Page 3: Bldg.Floor Slabs ADDING FIRST FLOOR AND BASEMENT FLOOR …openlab.citytech.cuny.edu/...Bldg.06.Revit_.Floor_.1-Prof.King_.pdf · Adjust Graphics: Shift the Basement Level Bubble so

PROF. PAUL C. KING RA

New York City College of Technology

Fall 2011

LC.1200-1290 Tutorials.02 Bldg.General- Prof.King V.1.0.docx

Copyright © 2011 Paul C. King

Create Slab: Structure > Slab

Draw Slabs: Draw 3 rectangles

Rectangles: For the Gym/Auditorium,

the inner corne

Learning Community

New York City College of Technology ARCH_1290 & ARCH_1200

Prof.King V.1.0.docx

Building Development | Re

lab > Foundation Slab > 8" Foundation Slab

Draw 3 rectangles to create the slabs for the Gym, Atrium and Lab Building

For the Gym/Auditorium, Atrium and Lab Building, draw rectangles snapping to

corners of the foundation walls.

Learning Community

ARCH_1290 & ARCH_1200

Page 25 of 28

Building Development | Revit

o create the slabs for the Gym, Atrium and Lab Building.

raw rectangles snapping to

Page 4: Bldg.Floor Slabs ADDING FIRST FLOOR AND BASEMENT FLOOR …openlab.citytech.cuny.edu/...Bldg.06.Revit_.Floor_.1-Prof.King_.pdf · Adjust Graphics: Shift the Basement Level Bubble so

PROF. PAUL C. KING RA

New York City College of Technology

Fall 2011

LC.1200-1290 Tutorials.02 Bldg.General- Prof.King V.1.0.docx

Copyright © 2011 Paul C. King

Level 1: Make Level 1

Create Floor: Structure > Floor > Structural Floor > Floor Generic

Rectangles: For the Gym/Auditorium,

rectangles snapping to the

Attach: Select Yes when prompted to attach walls to the floors bottom

Learning Community

New York City College of Technology ARCH_1290 & ARCH_1200

Prof.King V.1.0.docx

Building Development | Re

the Current View

Floor > Structural Floor > Floor Generic - 12"

For the Gym/Auditorium, the Atrium and the Lab Building we will draw

rectangles snapping to the outer corners of the foundation wall

Select Yes when prompted to attach walls to the floors bottom

Learning Community

ARCH_1290 & ARCH_1200

Page 26 of 28

Building Development | Revit

we will draw

oundation wall

Select Yes when prompted to attach walls to the floors bottom

Page 5: Bldg.Floor Slabs ADDING FIRST FLOOR AND BASEMENT FLOOR …openlab.citytech.cuny.edu/...Bldg.06.Revit_.Floor_.1-Prof.King_.pdf · Adjust Graphics: Shift the Basement Level Bubble so

PROF. PAUL C. KING RA

New York City College of Technology

Fall 2011

LC.1200-1290 Tutorials.02 Bldg.General- Prof.King V.1.0.docx

Copyright © 2011 Paul C. King

West Elevation: To copy the lab slabs to the upper levels,

Select Floor: Select the level 1

Copy Floor: Copy the level 1

Grid Cleanup: On the North

Learning Community

New York City College of Technology ARCH_1290 & ARCH_1200

Prof.King V.1.0.docx

Building Development | Re

To copy the lab slabs to the upper levels, set West Elevation

level 1 floor slab for the lab building

level 1 floor up to levels 2, 3, 4, 5 & 6.

and West elevations extend the grid lines below the basement

Learning Community

ARCH_1290 & ARCH_1200

Page 27 of 28

Building Development | Revit

the Current View

below the basement

Page 6: Bldg.Floor Slabs ADDING FIRST FLOOR AND BASEMENT FLOOR …openlab.citytech.cuny.edu/...Bldg.06.Revit_.Floor_.1-Prof.King_.pdf · Adjust Graphics: Shift the Basement Level Bubble so

PROF. PAUL C. KING RA

New York City College of Technology

Fall 2011

LC.1200-1290 Tutorials.02 Bldg.General- Prof.King V.1.0.docx

Copyright © 2011 Paul C. King

Review your work: Use a section view to check the

Create Section: View > Section

Drag the Section across the foundation wall and slabs

Section View: Right Click on the

Section View: View of cross

Showing Top of Footing,

Section Detail: View of section through Gym / Auditorium

Learning Community

New York City College of Technology ARCH_1290 & ARCH_1200

Prof.King V.1.0.docx

Building Development | Re

a section view to check the construction of the foundation, footings

View > Section

Drag the Section across the foundation wall and slabs

on the Section and then select "Go to View"

cross section through Gym / Auditorium

Showing Top of Footing, Basement and Level 1

View of section through Gym / Auditorium foundation wall and footing

Learning Community

ARCH_1290 & ARCH_1200

Page 28 of 28

Building Development | Revit

of the foundation, footings & slabs.

foundation wall and footing


Recommended