1
1
BIHAR PANCHYAT STRENGTHENING PROJECTPROCUREMENT PLAN FOR 18 MONTHS
I. General1. Project information:
Project Name: : Bihar Panchayat Strengthening Project Country : India Project Code : P102627 Implementing agency for this Procurement Plan : Bihar Gram Swaraj Yojana Society
2. Bank’s approval Date of the procurement Plan
Procurement Plan dated :Revision 1 :Revision 2 :Approved by the Bank on
:
3. Date of General Procurement Notice:
4. Period covered by this : 18 months
II. Goods and Works and Non-consulting services.
1 a) Procurement Methods and Thresholds
Category Method of Procurement
Threshold(US$ Equivalent)
ICB > 40,000,000 NCB Up to 40,000,000WorksShopping Up to 100,000ICB > 3,000,000 NCB 100,000 to 3,000,000Shopping Up to 100,000Goods and non-consulting servicesDirect Subject to 3.7 of the
guidelines1 b) Prior Review Threshold
- Works : First two contracts irrespective of value and all contracts exceeding US$ 5,000,000.- Goods : First two contracts irrespective of value and all contracts exceeding US$ 500,000- Direct Contracting: All contracts estimated to cost more than US$ 10,000
2. Pre-qualification. Not Applicable
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
2
2
3. Reference to (if any) Project Operational/Procurement Manual: BGSYS has prepared a
Procurement Manual and agreed with the Bank. All the contracts issued under the project will follow the World Bank’s Guidelines: Procurement under IBRD Loans and IDA Credits” dated January 2011. In case of any inconsistency between the Procurement Manual or Bihar Government Procurement Procedures and the Bank Guidelines, the latter shall prevail.
4. Any Other Special Procurement Arrangements:
A. National Competitive Bidding (NCB) method for procurement and goods and works as per the above value thresholds will be conducted in accordance with paragraph 3.3 and 3.4 of the World Bank Procurement Guidelines and the following provisions:
Only the model bidding documents for NCB agreed with the GOI Task Force (and as amended for time to time), shall be used for bidding;
Invitations to bid shall be advertised in at least one widely circulated national daily newspaper (or on a widely used website or electronic portal with free national and international access along with an abridged version of the said advertisement published in a widely circulated national daily inter-alia giving the website/electronic portal details from which the details of the invitation to bid can be downloaded), at least 30 days prior to the deadline for the submission of bids;
No special preferences will be accorded to any bidder either for price or for other terms and conditions when competing with foreign bidders, state owned enterprises, small scale enterprises or enterprises from any given state;
Extension of bid validity shall not be allowed with reference to Contracts subject to Bank prior review without the prior concurrence of the Bank (i) for the first request for extension if it is longer than four weeks; and (ii) for all subsequent requests for extension irrespective of the period (such concurrence will be considered by Bank only in cases of Force Majeure and circumstances beyond the control of the Purchaser/ Employer).
Re-bidding shall not be carried out with reference to Contracts subject to Bank prior review without the prior concurrence of the Bank. The system of rejecting bids outside a pre-determined margin or “bracket” of prices shall not be used in the project;
Rate contracts entered into by Directorate General of Supplies and Disposals will not be acceptable as a substitute for NCB procedures unless agreed with the Bank on case to case basis. Such contracts will be acceptable however for any procurement under the Shopping procedures. Framework Agreements using DGS&D rate contracts can be used to procure goods up to NCB threshold subject to incorporation of right to audit and Fraud & Corruption clauses.
Two or three envelope system will not be used (except when using e-Procurement system assessed and agreed by the Bank);
No negotiations are conducted even with the lowest evaluated responsive bidders.
Foreign bidders shall not be precluded from bidding.
5. Procurement Packages with Methods and Time Schedule –
3
3
Refer Table - 1 for Works & Goods and Table - 2 for Consulting Services.
III. Selection of Consultants
1 a) Selection Methods and Thresholds
Method of Procurement Threshold (US$ Equivalent)(a) Quality cum cost Based Selection No threshold(b) Quality Based Selection No threshold(c) Selection Made Under a Fixed Budget No threshold(d) Least Cost Selection No threshold(e) Selection Based on Consultant’s Qualifications
< 300,000
(f) Single Source Selection As per Consultant Guidelines Para 3.8 to 3.11
(g) Selection of Individual Consultants As per Consultant Guidelines Para 5.1 to 5.6
1 b) Prior Review Threshold
Consultancy Services: > US$ 200,000 equivalent for firms; and > US$ 100,000 equivalent for individuals All single source selections of value exceeding US $ 10,0002. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $ 800,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: NA 4. Reference to (if any) Project Operational/Procurement Manual: BGSYS has prepared the Project Procurement Manual and agreed with the Bank. All the contracts issued under the project will follow the “Guidelines: Selection and Employment of Consultants by World Bank Borrowers” dated January 2011. In case of any inconsistency between the Procurement Manual or Bihar Government Procurement Procedures and the Bank Guidelines, the latter shall prevail.
4
4
Reallocation of Project Funds by Component
Project ComponentsAllocation (USD in Million)
New Allocation (INR in Lakhs)
(Rs.66 = 1USD)
As per the procurement plan (Amount
in Rs Lakh)
Non Consult
ancy services
(on DAVP Rate
Contract)
Balance Amount (INR in Lakhs)
Component 1: 65 42900 33700 92001.(a) Construction of Panchayat Sarkar
Bhawans. 50 33000 33000 0
1.(b) Functional Panchayats-DLI based 15 9900 700 9200
Component 2: Capacity Building for Panchayati Raj Institutions 32.5 21450 9310 900 11240
2.1 PRI Institutional Strengthening 29.7 19602 9280 103222.1 (a) Core Institutional Capacity 6.7 4422 1825 25972.1 (b) Community Engagement 5 3300 1200 2100
2.1 (c) Communications and Mass Media 8 5280 3105 900 1275
2.1 (d) Building GP FM capacity 10 6600 3150 3450
2.2 PRI Capacity development (sanitation, drinking water) 2.8 1848 30 1818
Component 3: Strengthen the capacity to manage
decentralization (state wise)7.5 4950 3950 1000
(Dropped) Component 4 : Panchayat Performance Grants 0 0 0 0
Component 5: Project Management 15 9900 2465 7435
Total Project Funding 120 79200 50325 28875
5
5
PROCUREMENT SCHEDULE FOR CONSULTANCY FOR 18 MONTHS
COUNTRY : INDIABORROWER : GOVERNMENT OF INDIA PROJECT : BIHAR PANCHAYAT STRENGTHENING PROJECTDATED : September 20, 2016. [The plan has been prepared by breaking the format in 2 parts: Table-1A & Table-1B]
TABLE – 1A
Package No.
DescriptionMethod of Procureme
nt
Procurement
Authority
Procurement
Instances
Estimated Cost
(Lakhs in INR)
Estimated Cost (Lakhs
in USD)(1USD
= Rs.66)1 2 3 4 5 6 7
BH/BPSP/C-001
Third Party Quality Audit of the
Construction of 330 PSBs under the Project
QCBS BGSYS 1 100 1.52
BH/BPSP/C-002
Third party audit for the evaluation of 330 functional gram
panchayat
QCBS BGSYS 1 300 4.56
BH/BPSP/C-003
Environment Management Plan Preparation and
Monitoring for 330 PSBs
QCBS BGSYS 1 300 4.56
BH/BPSP/C-004
Hiring of Individual Consultants -
Panchayat Facilitation Experts
Selection of Individual
Consultants (10
individuals)
BGSYS 10 125 1.89
BH/BPSP/C-005
Citizens' Engagement Platform
CQS after approval by
the BankBGSYS 1 400 6.06
BH/BPSP/C-006
Integrated Mobile Van Awareness Camaign
for the Pallate basis on two Project Panchayats
Districts - Integrated Information Delivery
System
QCBS BGSYS 1 1200 10.61
BH/BPSP/C-007
Development of the Scripts for the Audio
and Audio-Visual Materials to be Produced for
Awareness Generation
Selection of Individual
ConsultantsBGSYS 1 100 1.52
6
6
Package No.
DescriptionMethod of Procureme
nt
Procurement
Authority
Procurement
Instances
Estimated Cost
(Lakhs in INR)
Estimated Cost (Lakhs
in USD)(1USD
= Rs.66)1 2 3 4 5 6 7
BH/BPSP/C-008
Designs for Training / Awareness Generation
Materials including Content Generation and Ready to Print Designs of Monthly
Newsletters in the Print Formats
QCBS BGSYS 1 250 3.03
BH/BPSP/C-009
Production of Audio Jingles & Fictional
Radio SerialsQCBS BGSYS 1 125 1.89
BH/BPSP/C-010
Production of a Series of Two Short Films QCBS BGSYS 1 700 9.09
BH/BPSP/C-011
Hiring of Experienced Professional for Training of Local
Cultural Troupes for Street Plays
Selection of Individual
ConsultantsBGSYS 1 30 0.45
BH/BPSP/C-012
Individual Economist with expertise in Public
Finance
Selection of Individual
Consultants (3 individuals
consultants)
BGSYS 3 75 1.14
BH/BPSP/C-013
Hiring of 800 Accountants for Hand-Holding Support to the GPs under 12 Project
Districts
QCBS BGSYS 1 3,000 45.45
BH/BPSP/C-014
Three Individual Consultants for
Developing the Code of Ethics for the Water-
Sanitation Programs for Bihar & Do's & Don'ts for Community with respect to Water-
Sanitation Program Implementation /
Management
Selection of Individuals
Consultants (3 individuals
consultants) /CQS- Firm
BGSYS 3 30 0.45
BH/BPSP/C-015
PMU for State Wide PFM Roll Out CQS BGSYS Multiple 400 6.06
BH/BPSP/C-016
PFM Software for the GPs
SSS after approval of
BankBGSYS 1 50 0.76
7
7
Package No.
DescriptionMethod of Procureme
nt
Procurement
Authority
Procurement
Instances
Estimated Cost
(Lakhs in INR)
Estimated Cost (Lakhs
in USD)(1USD
= Rs.66)1 2 3 4 5 6 7
BH/BPSP/C-017
Statutory Financial Audit Support for the
Project GPsQCBS BGSYS 1 800 12.12
BH/BPSP/C-018
Accounting Support for the Project GPs QCBS BGSYS 1 1,000 15.15
BH/BPSP/C-019
Accountant for Hand-Holding Support to GPs
for the Rest of the 26 Non-Project Districts in
Bihar
QCBS BGSYS 1 1,200 18.18
BH/BPSP/C-020
PMU for e-Panchayat Implementation
SSS after approval of
BankBGSYS 1 500 7.58
BH/BPSP/C-021
Base Line & End Line Surveys for Measuring
ProgressQCBS BGSYS 1 125 1.89
BH/BPSP/C-022
Internal Audit for the BGSYS Project
Management UnitsCQ (Firms) BGSYS 1 8 0.12
BH/BPSP/C-023
Statutory Audit to BGSYS Project
Implementation UnitsCQ (Firms) BGSYS 1 5 0.08
BH/BPSP/C-024
HR agency for Recruitment QCBS BGSYS 1 175 2.65
BH/BPSP/C-025
Admin ConsultantSelection of Individuals Consultants
BGSYS 1 50 0.76
BH/BPSP/C-026
Individual Consultant for Support to the
Procurement Unit of BGSYS
Selection of Individuals Consultants
BGSYS 1 20 0.30
BH/BPSP/C-027
Integrated Web Portal for BGSYS CQS BGSYS 1 125 1.89
BH/BPSP/C-028
Hiring of HR Support Agency QCBS BGSYS 1 130 1.97
8
8
PROCUREMENT SCHEDULE FOR GOODS FOR 18 MONTHS
COUNTRY : INDIABORROWER : GOVERNMENT OF INDIA PROJECT : BIHAR PANCHAYAT STRENGTHENING PROJECTDATED : September 20, 2016. [The plan has been prepared by breaking the format in 2 parts: Table-2A & Table-2B]
TABLE – 2A
Package No. Description
Method of
Procurement
Procurement
Authority
Procurement
Instances
Estimated Cost
(Lakhs in INR)
Estimated Cost (Lakhs
in USD)(1U
SD = Rs.66)
1 2 3 4 5 6 7BH/BPSP/
G-001
Pilot on Information Seeking Behavior of the Citizens with Information
KiosksNCB BGSYS 1 300 4.55
BH/BPSP/G-002
Printing of training modules for Capacity Building for Core
Institutional Strengthening (Induction)NCB BGSYS 1 400 6.06
BH/BPSP/G-003
Printing of training modules for Capacity Building Program under
Water-SanitationNCB BGSYS 1 300 4.55
BH/BPSP/G-004
Printing of training modules for Capacity Building for Core Institutional Strengthening
(Refresher)
NCB BGSYS 1 300 4.55
BH/BPSP/G-005
Printing of Pamphlets / Posters / Primers/ Banner for State Events NCB BGSYS 1 200 3.03
BH/BPSP/G-006
Monthly Printing and Circulation of Newsletters in the Newspaper format
for the GPsNCB BGSYS 1 600 9.09
BH/BPSP/G-007
Wall Paintings on the Aims & Objects of the Project NCB BGSYS 1 150 2.27
BH/BPSP/G-008
Hoadings, Kiosk and Wallwrap on the Aims & Objects of the Project NCB BGSYS 1 200 3.03
BH/BPSP/G-009
Print IEC material for integrated mobile complain in two pilot districts
and rest of the 10 project districtsNCB BGSYS 1 500 7.58
BH/BPSP/G-010
State Level Awareness Competitions on Promotion of the Objectives of the Project (Non-Consultancy Services)
NCB BGSYS 1 100 1.52
BH/BPSP/G-011
Project POPs , Calendar, Danglers, Posters, Gift Items, Sinages NCB BGSYS 1 150 2.27
BH/BPSP/G-012
Printing Training modules on Panchayat Financial Management NCB BGSYS 1 75 1.14
BH/BPSP/G-013 Office Furniture for DPMUs National
Shopping BGSYS 1 60 0.91
9
9
Package No. Description
Method of
Procurement
Procurement
Authority
Procurement
Instances
Estimated Cost
(Lakhs in INR)
Estimated Cost (Lakhs
in USD)(1U
SD = Rs.66)
1 2 3 4 5 6 7BH/BPSP/
G-014 Office Furniture for BPMUs NCB BGSYS 1 612 9.27
BH/BPSP/G-015 Power Back-Up System for SPMU National
Shopping BGSYS 1 15 0.23
BH/BPSP/G-016
Power Back-Up System for DPMUs & BPMUs NCB BGSYS 1 110 1.67
BH/BPSP/G-017
Laptops for DPMUs & BPMUs Level Positions NCB BGSYS 1 350 5.30
BH/BPSP/G-018
Desktops for SPMUs, DPMUs & BPMUs
National Shopping BGSYS 1 30 0.45
BH/BPSP/G-019
Mini-Laptops/Tablet for Community Resource Persons (Field Staff tagged
with BPMUs)NCB BGSYS 1 160 2.42
BH/BPSP/G-020 Printers for DPMUs & BPMUs National
Shopping BGSYS 1 50 0.76
BH/BPSP/G-021 Colour Printers for DPMUs National
Shopping BGSYS 1 30 0.45
BH/BPSP/G-022
Procurement of Consumables and Stationery Items
National Shopping BGSYS 1 40 0.61
BH/BPSP/G-023
Housekeeping services (Non-Consultancy Services)
National Shopping BGSYS 1 10 0.15
BH/BPSP/G-024
MS Office Licence for the Desktops / Laptops/Mini-laptop/Tablet at SPMU,
DPMUs, BPMUs & CRPs (Gram Panchayat Project Coordinators)
NCB BGSYS 1 300 4.55
10
10
PROCUREMENT SCHEDULE FOR CONSULTANCY FOR 18 MONTHS[The plan has been prepared by breaking the format in 2 parts: Table-1A & Table-1B]
Date : September 20, 2016. TABLE – 1B
Sl. N
o.
Pack
age
No.
Nam
e of
the
activ
ity
Des
crip
tion
of th
e A
ctiv
ity
Component
PP/R
1/R
2/R
3
ToR
Estim
ated
Cos
t (IN
R in
La
khs)
Met
hods
of S
elec
tion
@
**Pr
ior R
evie
w/P
ost r
evie
w
Adv
ertis
ing
for E
OI (
Dat
e)
Shor
t lis
ting
of E
OI
(Dat
e)
No
Obj
ectio
n fr
om
Ban
k/In
tern
al A
utho
rity
(Dat
e)
**R
FP F
inal
Dra
ft to
be
App
rove
d
RFP
Issu
ed (D
ate)
Prop
osal
Sub
mis
sion
by
bidd
ers
(Dat
e)
Tech
nica
l Eva
luat
ion
(Dat
e)
Ban
k/in
tern
al n
o ob
ject
ion
for T
echn
ical
Eva
luat
ion
No
obje
ctio
n by
B
ank/
inte
rnal
for c
ombi
ned
Eval
uatio
n / d
raft
cont
ract
Con
trac
t sig
ning
Dat
e
Con
trac
t Val
ue (i
nclu
sive
of
all a
pplic
able
taxe
s)N
ame
of C
onsu
ltant
/ N
atio
nalit
y &
Zip
Cod
e, if
U
SASe
rvic
es to
be
Com
plet
ed
(Dat
e).
**W
BR
No.
(onl
y in
cas
e of
pr
ior r
evie
w)
Exp.
Incu
rred
to D
ate
in
Lakh
s (IN
R) (
incl
. of t
axes
)
Sub Component
Comment
s
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
PP
30 October 2016
100 QCBS Prior
11/14/2016
12/29/2016
1/13/2017
1/23/2017
1/28/2017
2/27/2017
3/9/2017
3/24/2017
4/8/2017
4/15/2017
R
1
BH/BPSP/C-001
Third Party Quality Audit
of the Construction of 330 PSBs
under the Project
Hiring of Consultancy Services of a firm for third party quality monitoring of the
construction of 330 Panchayat Sarkar Bhawan Construction under the Project (Phase wise) –
Comp 1 (a): Construction of PSBs
Component-
1
A
Component
-1(a)
SN Jha
(SPM -
Finance)
PP
15 October 2016
300 QCBS Prior
10/30/2016
12/14/2016
12/29/2016
1/8/2017
1/13/2017
2/12/2017
2/22/2017
3/9/2017
3/24/2017
3/31/2017
R 2
BH/BPSP/C-002
Third party audit for the evaluation of
330 functional
gram panchayat
The Third Party auditor shall be responsible for time to time visit the sites with pre-determined
purposes and submit reports accordingly
Component-
1A
Component
-1(b)
SN Jha
(SPM -
Finance)
PP
15 October 2016
300 QCBS Prior
10/30/2016
12/14/2016
12/29/2016
1/8/2017
1/13/2017
2/12/2017
2/22/2017
3/9/2017
3/24/2017
3/31/2017
R 3
BH/BPSP/C-003
Environment Management
Plan Preparation
and Monitoring
for 330 PSBs
Implementation of environment management framework (EMF) and natural resource and
resettlement policy framework (RPF) for construction of 330 panchayat sarkar bhawans
Component-
1
A
Component
-1(b)
Mrinal
Sisodia
(SPM -HR &
Admin)
Component 1 (Consultancy Services) Proposed Expenditure as per the Procurement Plan 700
PP
30 October 2016
125
Selection of Individ
ual Consultants (10
individuals)
Prior
11/14/2016
12/9/2016
12/19/2016
12/24/2016
12/29/2016
1/28/2017
2/7/2017
2/17/2017
3/4/2017
3/11/2017
R
4
BH/BPSP/C-004
Hiring of Individual
Consultants - Panchayat Facilitation
Experts
Hiring of Panchayat Facilitation Experts for Policy Guidance (Acts, Rules & Manuals) /
Development and/or Upgradation Panchayat Financial Management Rules & Manuals with
Subsequent Development of Training Modules for Panchayat Finance Management Program /
Development of Case Studies / Success Stories/Background Materials - (10 individuals)
Component-
2
A
Component
-2.1(a)
Om Prakash
(SPM- CB)
5
BH/BPSP/C-005
Citizens' Engagement
Platform
Use of technologies for recording social audit reports of the vigilance committees, sharing
knowledge, expression of point of view with the provision restricted to Panchayati Raj & Rural Development Departments, Govt. of Bihar for
the 12 Project Districts. The platform shall facilitate to and fro flow of accurate and precise
Component-
2
PP
01 October 2016
400
CQS after
approval by
the Bank
Prior
10/16/2016
10/31/2016
11/10/2016
11/15/2016
11/20/2016
12/5/2016
12/15/2016
12/25/2016
1/9/2017
1/16/2017
Component
-2.1(a)
Sharad
Kumar
(PM- IT) & Om
11
11 Sl
. No.
Pack
age
No.
Nam
e of
the
activ
ity
Des
crip
tion
of th
e A
ctiv
ity
Component
PP/R
1/R
2/R
3
ToR
Estim
ated
Cos
t (IN
R in
La
khs)
Met
hods
of S
elec
tion
@
**Pr
ior R
evie
w/P
ost r
evie
w
Adv
ertis
ing
for E
OI (
Dat
e)
Shor
t lis
ting
of E
OI
(Dat
e)
No
Obj
ectio
n fr
om
Ban
k/In
tern
al A
utho
rity
(Dat
e)
**R
FP F
inal
Dra
ft to
be
App
rove
d
RFP
Issu
ed (D
ate)
Prop
osal
Sub
mis
sion
by
bidd
ers
(Dat
e)
Tech
nica
l Eva
luat
ion
(Dat
e)
Ban
k/in
tern
al n
o ob
ject
ion
for T
echn
ical
Eva
luat
ion
No
obje
ctio
n by
B
ank/
inte
rnal
for c
ombi
ned
Eval
uatio
n / d
raft
cont
ract
Con
trac
t sig
ning
Dat
e
Con
trac
t Val
ue (i
nclu
sive
of
all a
pplic
able
taxe
s)N
ame
of C
onsu
ltant
/ N
atio
nalit
y &
Zip
Cod
e, if
U
SASe
rvic
es to
be
Com
plet
ed
(Dat
e).
**W
BR
No.
(onl
y in
cas
e of
pr
ior r
evie
w)
Exp.
Incu
rred
to D
ate
in
Lakh
s (IN
R) (
incl
. of t
axes
)
Sub Component
Comment
s
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
R
information for meaningful citizens' engagement. Under this activity the Society
shall establish a call center manned with appropriate number of experts and human resources with technical know-how for the
center to function effectively. This activity shall be outsourced. This shall include development of Mobile Apps for panchayat with necessary software solution to maintain the back-end activities at the state level call center. The package shall also include the MIS for the
ongoing project related programs
A
Prakash
(SPM- I/C- M&E)
PP
15 October 2016
1200 QCBS Prior
10/30/2016
12/14/2016
12/29/2016
1/8/2017
1/13/2017
2/12/2017
2/22/2017
3/9/2017
3/24/2017
3/31/2017
R
6
BH/BPSP/C-006
Integrated Mobile Van Awareness
Campaign for the Piloted
basis on two Project
Panchayats Districts - Integrated Information
Delivery System
Mobile Awareness Campaign & On Ground activation of BPSP with the help of Trained Cultural Troupes, Narrowcasting of Audio
Jingles & Fictional Serials during the Interlude & Screening of Fictional Films under Comp.
2.1(b) -Civic Engagement [The prime focus of the activities shall be to indulge with audiences through structures set of abundant information on subjects related to participatory planning,
right & entitlements of the individuals & groups, collective decision making & collective action
against collective responsibilities / accountabilities as responsible citizens,
prioritization of the communities needs through engagement of the citizens in logical dialogues and discussions leading to consensus - in the
end leaving citizens with inquisitive minds forever, thereafter] (For Piloted basis on
projected panchayats district). This activity shall be preceded by a Pre-Cursor to Create
Buzz & Necessary Enthusiasm for the Upcoming Awareness Program for the Gram Panchayats. The Precursor Team shall be
Moving in a Branded Four Wheeler Ahead of the Integrated Mobile Van Working to Create
Ripples & Inquisitiveness. The Precursor Team shall handover the baton to the Integrated
Mobile Van over a period of a day on the 1st Day, before moving ahead to the next
Panchayat.
Component-
2
A
Component
-2.1(b)
Vishal
Singh
(SPM-
Communicatio
n)
7
BH/BPSP/C-007
Development of the Scripts for the Audio and Audio-
Visual Materials to be Produced
Selection of Individual Consultant for Development of Scripts for the Radio Jingles & Fictional Radio Serials (Awareness Generation
Materials including 150 Radio Jingles 130 Episodes of Duration of 27 - 30 Minutes of Fictional-Motivational Radio Serials), Two
Short Films (Scripts for Motivational-Fictional
Component-
2
PP
15 October 2016
100
Selection of Individ
ual Consultants
Post
10/30/2016
11/24/2016
12/4/2016
12/9/2016
12/14/2016
1/13/2017
1/23/2017
2/2/2017
2/17/2017
2/24/2017
Component
-2.1©
Om Prakash
(SPM- CB)
12
12 Sl
. No.
Pack
age
No.
Nam
e of
the
activ
ity
Des
crip
tion
of th
e A
ctiv
ity
Component
PP/R
1/R
2/R
3
ToR
Estim
ated
Cos
t (IN
R in
La
khs)
Met
hods
of S
elec
tion
@
**Pr
ior R
evie
w/P
ost r
evie
w
Adv
ertis
ing
for E
OI (
Dat
e)
Shor
t lis
ting
of E
OI
(Dat
e)
No
Obj
ectio
n fr
om
Ban
k/In
tern
al A
utho
rity
(Dat
e)
**R
FP F
inal
Dra
ft to
be
App
rove
d
RFP
Issu
ed (D
ate)
Prop
osal
Sub
mis
sion
by
bidd
ers
(Dat
e)
Tech
nica
l Eva
luat
ion
(Dat
e)
Ban
k/in
tern
al n
o ob
ject
ion
for T
echn
ical
Eva
luat
ion
No
obje
ctio
n by
B
ank/
inte
rnal
for c
ombi
ned
Eval
uatio
n / d
raft
cont
ract
Con
trac
t sig
ning
Dat
e
Con
trac
t Val
ue (i
nclu
sive
of
all a
pplic
able
taxe
s)N
ame
of C
onsu
ltant
/ N
atio
nalit
y &
Zip
Cod
e, if
U
SASe
rvic
es to
be
Com
plet
ed
(Dat
e).
**W
BR
No.
(onl
y in
cas
e of
pr
ior r
evie
w)
Exp.
Incu
rred
to D
ate
in
Lakh
s (IN
R) (
incl
. of t
axes
)
Sub Component
Comment
s
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
R
for Awareness Generation
Short Films of 1 Hour Duration) on Subjects including Participatory Planning Processes,
Collective Decision Making Processes, Identifying & Fixing Priorities following
Democratic Principles of Consistent Public Dialogues & Discussions, Citizens'
Engagement in Planning, Implementing & Monitoring the Development Projects,
Importance of Understanding the Power vested in Collective Efforts, Whole Hearted
Participation in the Constitutional Bodies - "Gram Sabhas & Ward Sabhas"
A
PP
15 October 2016
250 QCBS Prior
10/30/2016
12/14/2016
12/29/2016
1/8/2017
1/13/2017
2/12/2017
2/22/2017
3/9/2017
3/24/2017
3/31/2017
R
8
BH/BPSP/C-008
Designs for Training /
Awareness Generation Materials including Content
Generation and Ready to Print Designs
of Monthly Newsletters in the Print
Formats
Hiring of Consultancy Services for Development of Designs for Training Modules, IEC Materials & Monthly Newsletters for Print Formats under Comp 2.1 (c) - Communication
and Mass media.
Component-
2
A 1/23/2014
4/24/2014
2/3/2015
24/5/2015
4/13/2015
5/11/2015
10/14/2015
11/9/2015
Component
-2.1©
Vishal
Singh
(SPM-
Communicatio
n)
PP
15 October 2016
125 QCBS Prior
10/30/2016
12/14/2016
12/29/2016
1/8/2017
1/13/2017
2/12/2017
2/22/2017
3/9/2017
3/24/2017
3/31/2017
R 9
BH/BPSP/C-009
Production of Audio Jingles
& Fictional Radio Serials
Hiring of Consultancy Services for Production of Radio Jingles & Fictional Radio Serials in Accordance with the Scripts with an Aim &
Object of Providing the Citizens with Necessary Information on their Rights,
Entitlements, Responsibilities as Citizens, Importance of Participatory Planning & Requirements for Collective Actions for
Necessary Changes in the Appalling, Diabolic & Distraughtly Status Quo, Imminent
Requirements for In Practice Administrative & Fiscal Decentralization, et al under comp 2.1
(c) - Communication and Mass Media.
Component-
2
A 1/23/2014
4/24/2014
2/3/2015
24/5/2015
4/13/2015
5/11/2015
10/14/2015
11/9/2015
Component
-2.1©
Vishal
Singh
(SPM-
Communicatio
n)
10
BH/BPSP/C-010
Production of a Series of Two Short
Films
Hiring of Consultancy Services for Production of a Series of two Motivational-Fictional Short Film(s) in Accordance with the Scripts with an
Aim & Object of Providing the Citizens with Necessary Information on their Rights,
Entitlements, Responsibilities as Citizens, Importance of Participatory Planning &
Requirements for Collective Actions for Much Required Changes in the Appalling, Diabolic,
Distraughtly, Grim & Gruesome Social
Component-
2
PP
15 October 2016
700 QCBS Prior
10/30/2016
12/14/2016
12/29/2016
1/8/2017
1/13/2017
2/12/2017
2/22/2017
3/9/2017
3/24/2017
3/31/2017
Component
-2.1©
Vishal
Singh
(SPM-
Communicatio
n)
13
13 Sl
. No.
Pack
age
No.
Nam
e of
the
activ
ity
Des
crip
tion
of th
e A
ctiv
ity
Component
PP/R
1/R
2/R
3
ToR
Estim
ated
Cos
t (IN
R in
La
khs)
Met
hods
of S
elec
tion
@
**Pr
ior R
evie
w/P
ost r
evie
w
Adv
ertis
ing
for E
OI (
Dat
e)
Shor
t lis
ting
of E
OI
(Dat
e)
No
Obj
ectio
n fr
om
Ban
k/In
tern
al A
utho
rity
(Dat
e)
**R
FP F
inal
Dra
ft to
be
App
rove
d
RFP
Issu
ed (D
ate)
Prop
osal
Sub
mis
sion
by
bidd
ers
(Dat
e)
Tech
nica
l Eva
luat
ion
(Dat
e)
Ban
k/in
tern
al n
o ob
ject
ion
for T
echn
ical
Eva
luat
ion
No
obje
ctio
n by
B
ank/
inte
rnal
for c
ombi
ned
Eval
uatio
n / d
raft
cont
ract
Con
trac
t sig
ning
Dat
e
Con
trac
t Val
ue (i
nclu
sive
of
all a
pplic
able
taxe
s)N
ame
of C
onsu
ltant
/ N
atio
nalit
y &
Zip
Cod
e, if
U
SASe
rvic
es to
be
Com
plet
ed
(Dat
e).
**W
BR
No.
(onl
y in
cas
e of
pr
ior r
evie
w)
Exp.
Incu
rred
to D
ate
in
Lakh
s (IN
R) (
incl
. of t
axes
)
Sub Component
Comment
s
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
R
Situation, that, off late has become Self-Resistant and Averse in a way that the very
thinking of any change is looked at Scornfully. The devilish Status Quo is now nearly treated as Sacrosanct, Imminent Requirements for In-
Practice Administrative & Fiscal Decentralization, et al as a Step-by-Step Guide
for the Rural Audiences on Righteous Action Required for a nearly Synonym to Golden
Dawn (Communication people for participating Planning) under comp 2.1 (c) -
Communication and Mass media.
A 1/23/2014
4/24/2014
2/3/2015
12/17/2015
5/25/2016
PP
15 October 2016
30
Selection of Individ
ual Consultants
Post
10/30/2016
11/24/2016
12/4/2016
12/9/2016
12/14/2016
1/13/2017
1/23/2017
2/2/2017
2/17/2017
2/24/2017
R 11
BH/BPSP/C-011
Hiring of Experienced Professional for Training
of Local Cultural
Troupes for Street Plays
Hiring of Experienced Professional Performing Art Troupe from Institution Like National School
of Drama, New Delhi or equivalent for necessary research for Developing Scripts for
Plays & Accordingly Training the Locally Identified Cultural Troupes on Subjects like Collective Action through Participation for
Raising Voice Collectively in Public Forums & PRIs Meeting, especially in Gram Sabhas & Ward Sabhas, as the Most Potent Tool for
Creating the Required Pressure on the System to Yield to the Individual & Collective Rights,
Participatory Planning as a Tool for Addressing the Local Needs including the Demonstration of the Processes for Participatory Planning &
Prioritization of Need Comp . 2.1 (c) - Communication and Mass Media.
Component-
2
A 1/23/2014
4/24/2014
2/3/2015
12/17/2015
5/25/2016
Component
-2.1©
Vishal
Singh
(SPM-
Communicatio
n)
PP
15 October 2016
75
Selection of Individ
ual Consultants
(3 individuals
consultants)
Post
10/30/2016
11/24/2016
12/4/2016
12/9/2016
12/14/2016
1/13/2017
1/23/2017
2/2/2017
2/17/2017
2/24/2017
R
12
BH/BPSP/C-012
Individual Economist
with expertise in Public Finance
Consultancy Services of 3 individuals consultants with expertise in Public Finance to
act as Panchayat Finance Coordinator for assisting the state through the Society in
developing understanding on Investments Vs. Outcomes, Smoothening Fund Flow
Mechanism, Conduct Studies on Diversification of Fund Usages & Subsequent Gross
Resultants, Socio-Economic Impacts of the Grant-in-Aids from the Centre & State to the
GPs (Development of Social Capitals, Economic Advancements, Community Assets Creation & Usages, Sustainability Factors for the Positive Changes at the Levels of GPs, et
al)
Component-
2
A
Component
-2.1(d)
SN Jha
(SPM -
Finance)
13
BH/BPSP/C-013
Hiring of 800 Accountants
for Hand-Holding
Support to
Services of qualified manpower (accountants) for panchayat financial management (software
based) in the 12 project districts with 1 for every 4 GPs for a period of 24 months
@Rs.15,000/- per month = 800 accountants X
Component-
2
PP
15 October 2016
3,000 QCBS Prior
10/30/2016
12/14/2016
12/29/2016
1/8/2017
1/13/2017
2/12/2017
2/22/2017
3/9/2017
3/24/2017
3/31/2017
Component
-2.1(
Sharad
Kumar
(PM-
14
14 Sl
. No.
Pack
age
No.
Nam
e of
the
activ
ity
Des
crip
tion
of th
e A
ctiv
ity
Component
PP/R
1/R
2/R
3
ToR
Estim
ated
Cos
t (IN
R in
La
khs)
Met
hods
of S
elec
tion
@
**Pr
ior R
evie
w/P
ost r
evie
w
Adv
ertis
ing
for E
OI (
Dat
e)
Shor
t lis
ting
of E
OI
(Dat
e)
No
Obj
ectio
n fr
om
Ban
k/In
tern
al A
utho
rity
(Dat
e)
**R
FP F
inal
Dra
ft to
be
App
rove
d
RFP
Issu
ed (D
ate)
Prop
osal
Sub
mis
sion
by
bidd
ers
(Dat
e)
Tech
nica
l Eva
luat
ion
(Dat
e)
Ban
k/in
tern
al n
o ob
ject
ion
for T
echn
ical
Eva
luat
ion
No
obje
ctio
n by
B
ank/
inte
rnal
for c
ombi
ned
Eval
uatio
n / d
raft
cont
ract
Con
trac
t sig
ning
Dat
e
Con
trac
t Val
ue (i
nclu
sive
of
all a
pplic
able
taxe
s)N
ame
of C
onsu
ltant
/ N
atio
nalit
y &
Zip
Cod
e, if
U
SASe
rvic
es to
be
Com
plet
ed
(Dat
e).
**W
BR
No.
(onl
y in
cas
e of
pr
ior r
evie
w)
Exp.
Incu
rred
to D
ate
in
Lakh
s (IN
R) (
incl
. of t
axes
)
Sub Component
Comment
s
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
R
the GPs under 12 Project Districts
24 months X Rs.15,000/- per month = Rs.28,80,00,000/-
A
d) IT) & Om Prakash
(SPM- I/C- M&E) SN Jha
(SPM -
Finance)
PP
15 Decem
ber 2016
30
Selection of Individuals
Consultants
(3 individuals
consultants) /CQS- Firm
Post
12/30/2016
1/24/2017
2/3/2017
2/8/2017
2/13/2017
3/15/2017
3/25/2017
4/4/2017
4/19/2017
4/26/2017
R
14
BH/BPSP/C-014
Three Individual
Consultants for
Developing the Code of
Ethics for the Water-
Sanitation Programs for Bihar & Do's & Don'ts for Community with respect
to Water-Sanitation Program
Implementation /
Management
Hiring of short term Individual Consultant / Specialist to provide assistance on Developing
Community Training Materials for Water-Sanitation Program understanding and Hard-
Hitting Information for the Communities' Understanding with respect to Water-Sanitation Program Implementation, and Business Code
for the Program Implementation & Management Units at the State & Districts
Component-
2
A
Component-2.2
Om Prakash
(SPM- CB)
Component 2 (Consultancy Services) Proposed Expenditure as per the Procurement Plan 5,385
PP
15 October 2016
400 CQS Prior
10/30/2016
12/14/2016
12/29/2016
1/8/2017
1/13/2017
2/12/2017
2/22/2017
3/9/2017
3/24/2017
3/31/2017
15
BH/BPSP/C-015
PMU for State Wide
PFM Roll Out (IT expert , Financial
expert and Civil
engineer)
Project Management Unit at the SPMU for the roll out & monitoring of the PFM Program. The consultancy service provider shall provide the services of financial experts and IT experts for
managing PFM related services and civil engineers for support of third party quality audit , training programs for elected representatives (Mukhiya, Upmukhiya & Panchayat Secretary), accountants to be hired under the project for
GPs support, contract management for
Component-
3
R
Component-3
SN Jha
(SPM-
Finance),
RupaShre
e (PM-
15
15 Sl
. No.
Pack
age
No.
Nam
e of
the
activ
ity
Des
crip
tion
of th
e A
ctiv
ity
Component
PP/R
1/R
2/R
3
ToR
Estim
ated
Cos
t (IN
R in
La
khs)
Met
hods
of S
elec
tion
@
**Pr
ior R
evie
w/P
ost r
evie
w
Adv
ertis
ing
for E
OI (
Dat
e)
Shor
t lis
ting
of E
OI
(Dat
e)
No
Obj
ectio
n fr
om
Ban
k/In
tern
al A
utho
rity
(Dat
e)
**R
FP F
inal
Dra
ft to
be
App
rove
d
RFP
Issu
ed (D
ate)
Prop
osal
Sub
mis
sion
by
bidd
ers
(Dat
e)
Tech
nica
l Eva
luat
ion
(Dat
e)
Ban
k/in
tern
al n
o ob
ject
ion
for T
echn
ical
Eva
luat
ion
No
obje
ctio
n by
B
ank/
inte
rnal
for c
ombi
ned
Eval
uatio
n / d
raft
cont
ract
Con
trac
t sig
ning
Dat
e
Con
trac
t Val
ue (i
nclu
sive
of
all a
pplic
able
taxe
s)N
ame
of C
onsu
ltant
/ N
atio
nalit
y &
Zip
Cod
e, if
U
SASe
rvic
es to
be
Com
plet
ed
(Dat
e).
**W
BR
No.
(onl
y in
cas
e of
pr
ior r
evie
w)
Exp.
Incu
rred
to D
ate
in
Lakh
s (IN
R) (
incl
. of t
axes
)
Sub Component
Comment
s
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27consultancy firms for assisting panchayats in maintaining the books of accounts, statutory
financial audit, software based accounting and its state wide roll out, capacity building on use of the PFM software including troubleshooting
& onsite support as may be required). A
Accountin
g-CB) &
Om Prakash
(SPM-CB)
PP
01 Novem
ber 2016
50
SSS after
approval of Bank
Prior
10/16/2016
10/31/2016
11/10/2016
11/15/2016
11/20/2016
12/5/2016
12/15/2016
12/25/2016
1/9/2017
1/16/2017
R 16
BH/BPSP/C-016
PFM Software for
the GPs
Software for the Accounting and Financial Management System for the Panchayats in
Bihar.
Component-
3
A
Component-3
SN Jha
(SPM -
Finance) & Sharad
Kumar
(PM- IT)
PP
01 Decem
ber 2017
800 QCBS Prior
12/16/2017
1/30/2018
2/14/2018
2/24/2018
3/1/2018
3/31/2018
4/10/2018
4/25/2018
5/10/2018
5/17/2018
R
17
BH/BPSP/C-017
Statutory Financial
Audit Support for the
Project GPs
Hiring of Firm(s) for Annual Audit Coverage for all the Panchayats of the 12 Project Districts (Phase wise)-Selection of multiple agency for
performing task in multiple districts (@Rs.5000/- Per Panchayat Per year for 5
Years, 3191 GPs in 12 Project District) = 3191 GPs X 5 Years X Rs.5000/- per annum =
Rs.7,97,75,000/=
Component-
3
A
Component-3
SN Jha
(SPM -
Finance)
PP
30 October 2016
1,000 QCBS Prior
11/14/2016
12/29/2016
1/13/2017
1/23/2017
1/28/2017
2/27/2017
3/9/2017
3/24/2017
4/8/2017
4/15/2017
R 18
BH/BPSP/C-018
Accounting Support for the Project
GPs
Providing Assistance to the all Panchayats in the 12 Project Districts in Preparing and
Maintaining their Books of Accounts (Phase wise)-Selection of multiple agency for
performing task in multiple districts (@Rs.6000/- Per Panchayat Per year for 5
Years, 3191 panchayats in 12 Project District) = 3191 GPs X 5 Years X Rs.6000/- per annum
= Rs.9,57,30,000/-
Component-
3A
Component-3
SN Jha
(SPM -
Finance)
PP
30 October 2016
1,200 QCBS Prior
11/14/2016
12/29/2016
1/13/2017
1/23/2017
1/28/2017
2/27/2017
3/9/2017
3/24/2017
4/8/2017
4/15/2017
R 19
BH/BPSP/C-019
Accountant for Hand-Holding
Support to GPs for the Rest of the
26 Non-Project
Districts in Bihar
Services of qualified manpower for the panchayat financial management (software based) including hand-holding support for a
period of 12 months. Each of the accountants shall be responsible to help a minimum of 8 panchayats for assisting develop in-house
capacity for panchayat financial management. This assistance shall be applicable for the
remaining 26 districts (38 Districts - 12 Project Districts) with 5200 Gram Panchayats. The
Component-
3
A
Component-3
SN Jha
(SPM-
Finance),
RupaShre
e (PM-
16
16 Sl
. No.
Pack
age
No.
Nam
e of
the
activ
ity
Des
crip
tion
of th
e A
ctiv
ity
Component
PP/R
1/R
2/R
3
ToR
Estim
ated
Cos
t (IN
R in
La
khs)
Met
hods
of S
elec
tion
@
**Pr
ior R
evie
w/P
ost r
evie
w
Adv
ertis
ing
for E
OI (
Dat
e)
Shor
t lis
ting
of E
OI
(Dat
e)
No
Obj
ectio
n fr
om
Ban
k/In
tern
al A
utho
rity
(Dat
e)
**R
FP F
inal
Dra
ft to
be
App
rove
d
RFP
Issu
ed (D
ate)
Prop
osal
Sub
mis
sion
by
bidd
ers
(Dat
e)
Tech
nica
l Eva
luat
ion
(Dat
e)
Ban
k/in
tern
al n
o ob
ject
ion
for T
echn
ical
Eva
luat
ion
No
obje
ctio
n by
B
ank/
inte
rnal
for c
ombi
ned
Eval
uatio
n / d
raft
cont
ract
Con
trac
t sig
ning
Dat
e
Con
trac
t Val
ue (i
nclu
sive
of
all a
pplic
able
taxe
s)N
ame
of C
onsu
ltant
/ N
atio
nalit
y &
Zip
Cod
e, if
U
SASe
rvic
es to
be
Com
plet
ed
(Dat
e).
**W
BR
No.
(onl
y in
cas
e of
pr
ior r
evie
w)
Exp.
Incu
rred
to D
ate
in
Lakh
s (IN
R) (
incl
. of t
axes
)
Sub Component
Comment
s
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27total financial implication shall thus be = 650 accountants X 12 months X Rs.15000/- per
month = Rs.11,70,00,000/-
Accountin
g-CB) &
Om Prakash
(SPM-CB)
PP
01 Novem
ber 2016
500
SSS after
approval of Bank
Prior
11/16/2016
12/1/2016
12/11/2016
12/16/2016
12/21/2016
1/5/2017
1/15/2017
1/25/2017
2/9/2017
2/16/2017
R 20
BH/BPSP/C-020
PMU for e-Panchayat
Implementation
The Selected Agency shall be responsible for establishing Project Management Unit at the SPMU for the roll out & monitoring of the e-
Panchayat Program. The consultancy service provider shall provide the services of financial
experts and IT experts for managing e-Panchayat Implementation and its integration
with PFM software.
Component-
3
A
Component-3
SN Jha
(SPM -
Finance) & Sharad
Kumar
(PM- IT)
Component 3 (Consultancy Services) Proposed Expenditure as per the Procurement Plan 3,950
PP
15 October 2016
125 QCBS Prior
10/30/2016
12/14/2016
12/29/2016
1/8/2017
1/13/2017
2/12/2017
2/22/2017
3/9/2017
3/24/2017
3/31/2017
R 21
BH/BPSP/C-021
Base Line & End Line
Surveys for Measuring Progress
Hiring services of survey agency for data collection for Base Line & End-line Studies in accordance with the Results Framework for
BPSP including Report writing .
Component-
4
A
Component-4
Om Prakash
(SPM-
M&E)
PP
30 October 2016
8 CQ
(Firms)
Post
11/14/2016
11/29/2016
12/9/2016
12/14/2016
12/19/2016
1/3/2017
1/13/2017
1/23/2017
2/7/2017
2/14/2017
R 22
BH/BPSP/C-022
Internal Audit for the
BGSYS Project
Management Units
Hiring of CA firm for statutory audit of BGSYS Management Units (SPMU & DPMUs) - The lowest accounting unit under the project shall
be the DPMUs (@rs.30000 for 12 district and 1 SPMU unit per annum)
Component-
4A
Component-4
SN Jha
(SPM -
Finance)
PP
01 Decem
ber 2016
5 CQ
(Firms)
Post
12/16/2016
12/31/2016
1/10/2017
1/15/2017
1/20/2017
2/4/2017
2/14/2017
2/24/2017
3/11/2017
3/18/2017
R
23
BH/BPSP/C-023
Statutory Audit to BGSYS Project
Implementation Units
Hiring of CA (Individual Consultants) for Statutory Audit for BGSYS SPMU & DPMUs
(12,500 per unit per year)
Component-
4
A
Component-4
SN Jha
(SPM -
Finance)
PP
15 October 2016
175 QCBS Post
10/30/2016
12/14/2016
12/29/2016
1/8/2017
1/13/2017
2/12/2017
2/22/2017
3/9/2017
3/24/2017
3/31/201724
BH/BPSP/C-024
HR agency for
Recruitment
Hiring of HR agency for staff recruitment against approx 1500 positions in BGSYS
Component-
4 R
Component-4
Mrinal
Sisodia
17
17 Sl
. No.
Pack
age
No.
Nam
e of
the
activ
ity
Des
crip
tion
of th
e A
ctiv
ity
Component
PP/R
1/R
2/R
3
ToR
Estim
ated
Cos
t (IN
R in
La
khs)
Met
hods
of S
elec
tion
@
**Pr
ior R
evie
w/P
ost r
evie
w
Adv
ertis
ing
for E
OI (
Dat
e)
Shor
t lis
ting
of E
OI
(Dat
e)
No
Obj
ectio
n fr
om
Ban
k/In
tern
al A
utho
rity
(Dat
e)
**R
FP F
inal
Dra
ft to
be
App
rove
d
RFP
Issu
ed (D
ate)
Prop
osal
Sub
mis
sion
by
bidd
ers
(Dat
e)
Tech
nica
l Eva
luat
ion
(Dat
e)
Ban
k/in
tern
al n
o ob
ject
ion
for T
echn
ical
Eva
luat
ion
No
obje
ctio
n by
B
ank/
inte
rnal
for c
ombi
ned
Eval
uatio
n / d
raft
cont
ract
Con
trac
t sig
ning
Dat
e
Con
trac
t Val
ue (i
nclu
sive
of
all a
pplic
able
taxe
s)N
ame
of C
onsu
ltant
/ N
atio
nalit
y &
Zip
Cod
e, if
U
SASe
rvic
es to
be
Com
plet
ed
(Dat
e).
**W
BR
No.
(onl
y in
cas
e of
pr
ior r
evie
w)
Exp.
Incu
rred
to D
ate
in
Lakh
s (IN
R) (
incl
. of t
axes
)
Sub Component
Comment
s
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
A
(SPM -HR &
Admin)
PP
15 Novem
ber 2016
50
Selection of Individuals
Consultants
Post
11/30/2016
12/25/2016
1/4/2017
1/9/2017
1/14/2017
2/13/2017
2/23/2017
3/5/2017
3/20/2017
3/27/2017
R
25
BH/BPSP/C-025
Admin Consultant
Hiring of short term Individual Consultants / Specialists for assistance to Admin units of
BGSYS
Component-
4
A
Component-4
Mrinal
Sisodia
(SPM -HR &
Admin)
PP
15 October 2016
20
Selection of Individuals
Consultants
Post
10/30/2016
11/24/2016
12/4/2016
12/9/2016
12/14/2016
1/13/2017
1/23/2017
2/2/2017
2/17/2017
2/24/2017
R
26
BH/BPSP/C-026
Individual Consultant
for Support to the
Procurement Unit of BGSYS
Hiring of short term consultants/Specialists to provide assistance of Procurement to support
the respective units of BGSYS
Component-
4
A
Component-4
Jaideo
Sinha
(SPM -
Procurement)
PP
01 March 2016
125 CQS Post
3/16/2016
3/31/2016
4/10/2016
4/15/2016
4/20/2016
5/5/2016
5/15/2016
5/25/2016
6/9/2016
6/16/2016
R
27
BH/BPSP/C-027
Integrated Web Portal for BGSYS
Development and Management of Integrated Web Portal that includes HR – MIS, Training – MIS, Online Biometric Attendance, etc. for the
Society
Component-
4A
04 March 2016
3/15/2016
3/18/2016
3/21/2016
3/29/2016
3/29/2016
4/26/2016
5/2/2016
5/5/2016
5/5/2016
5/19/2016
13039260
CSM
technologies Pvt. Ltd./India/80000
1
Component-4
Sharad
Kumar
(PM- IT) & Om Prakash
(SPM- I/C- M&E)
PP
01 Novem
ber 2016
130 QCBS Prior
11/16/2016
12/31/2016
1/15/2017
1/25/2017
1/30/2017
3/1/2017
3/11/2017
3/26/2017
4/10/2017
4/17/2017
R 28
BH/BPSP/C-028
Hiring of HR Support Agency
Pay Roll & Performance Management of the BGSYS Staff at all levels (1575 employee for 18 Month- @ Rs.450 Per person per month)
Component-
4
A
Component-4
Mrinal
Sisodia
(SPM -HR &
Admin)
Component 4 (Consultancy Services) Proposed Expenditure as per the Procurement Plan 643
18
18
19
19
PROCUREMENT SCHEDULE FOR GOODS FOR 18 MONTHS[The plan has been prepared by breaking the format in 2 parts: Table-1A & Table-1B]
Date : September 20, 2016. TABLE – 2B
Bids
SL N
o.
Pack
age
No.
Nam
e of
the
activ
ity
Des
crip
tion
of G
oods
Com
men
ts
PP/A
/R1/
R2/
R3
Estim
ated
Con
trac
t Va
lue
(INR
in la
khs)
Met
hod
of P
rocu
rem
ent
Prio
r Rev
iew
/ Pos
t R
evie
w
Prep
arat
ion
of B
id
D
ocum
ent (
Dat
e)
Ban
k/In
tern
al N
o.
Obj
ectio
n to
Bid
ding
D
ocum
ent (
Dat
e)**
Invi
tatio
n (D
ate)
Ope
ned
on (D
ate)
Bid
eva
luat
ion
Dat
e
Ban
k/in
tern
al N
o ob
ject
ion
Con
trac
t Aw
ard
(Dat
e)
(LoA
)
Con
trac
t Sig
ned
(Dat
e)
Con
trac
t Val
ue
(incl
usiv
e of
all
appl
icab
le ta
xes)
(INR
in
Lakh
s)N
ame
of
Con
trac
tor/N
atio
nalit
y &
ZI
P C
ode
**W
BR
No.
(onl
y in
cas
e of
prio
r rev
iew
)
Dat
e of
com
plet
ion
of
Con
trac
tEx
p. In
cur-
red
to D
ate
(Rs
in L
akhs
) (in
clus
ive
of ta
xes/
Pric
e es
cala
tion)
Com
men
ts/S
ub
Com
pone
nts
Com
men
ts
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
PP 300 NCB Prior October
25, 2016
11/14/2016
12/4/2016
1/3/2017
1/18/2017
1/28/2017
2/17/2017
2/24/2017
R 1BH/BPSP/G-001
Pilot on Information Seeking Behavior of the Citizens with Information
Kiosks
Public Information Kiosk For 100 Panchayats to be made Functional
on Pilot Basis
Component-2
A
Component-2.1(a)
Vishal Singh (SPM-
Communication) & Sharad Kumar (PM-IT)
PP 400 NCB Prior October
25, 2016
11/14/2016
12/4/2016
1/3/2017
1/18/2017
1/28/2017
2/17/2017
2/24/2017
R 2
BH/BPSP/G-002
Printing of training modules for Capacity
Building for Core Institutional
Strengthening (Induction)
Printing of Training Modules under Capacity Building Program
(Induction)
Component-2
A
Component-2.1(a)
Om Prakash
(SPM- CB)
PP 300 NCB Prior Novemb
er 1, 2016
11/21/2016
12/11/2016
1/10/2017
1/25/2017
2/4/2017
2/24/2017
3/3/2017
R 3
BH/BPSP/G-003
Printing of training modules for Capacity
Building Program under Water-Sanitation
Printing of Training Modules under Capacity Building Program
(Capacity Development under Water - Sanitation in12 Project
Districts)
Component-2
A
Component-2.1(a)
Om Prakash
(SPM- CB)
PP 300 NCB Prior April 15, 2017
5/5/2017
5/25/2017
6/24/2017
7/9/2017
7/19/2017
8/8/2017
8/15/2017
R 4BH/BPSP/G-004
Printing of training modules for Capacity
Building for Core Institutional
Strengthening (Refresher)
Printing of Training Modules under Capacity Building Program
(Refresher)
Component-2
A
Component-2.1(a)
Om Prakash
(SPM- CB)
PP 200 NCB Prior January
15, 2017
2/4/2017
2/24/2017
3/26/2017
4/10/2017
4/20/2017
5/10/2017
5/17/2017
R 5BH/BPSP/G-005
Printing of Pamphlets / Posters / Primers/
Banner for State Events
Printing of awareness generation materials on the importance of
participatory planning, participatory planning processes, collective
participation in the meeting of gram sabhas & ward sabhas, collective
decision making processes, achievements under the project,
etc. for the state sponsored events during the course of the project
duration
Component-2
A
Component-2.1©
Vishal Singh (SPM-
Communication)
PP 600 NCB Prior August
15, 2016
9/4/2016
9/24/2016
10/24/2016
11/8/2016
11/18/2016
12/8/2016
12/15/2016
R 6
BH/BPSP/G-006
Monthly Printing and Circulation of
Newsletters in the Newspaper format for
the GPs
Printing of Monthly newsletter as prepared for Awareness Generation Program and delivery of the same
up to the level of block headquarters from where the copies shall be picked up by the authorized
representative by the Head of the Gram Panchayats for distribution in
Component-2
A
Component-2.1©
Vishal Singh (SPM-
Communication)
20
20
SL N
o.
Pack
age
No.
Nam
e of
the
activ
ity
Des
crip
tion
of G
oods
Com
men
ts
PP/A
/R1/
R2/
R3
Estim
ated
Con
trac
t Va
lue
(INR
in la
khs)
Met
hod
of P
rocu
rem
ent
Prio
r Rev
iew
/ Pos
t R
evie
w
Prep
arat
ion
of B
id
D
ocum
ent (
Dat
e)
Ban
k/In
tern
al N
o.
Obj
ectio
n to
Bid
ding
D
ocum
ent (
Dat
e)**
Bids
Bid
eva
luat
ion
Dat
e
Ban
k/in
tern
al N
o ob
ject
ion
Con
trac
t Aw
ard
(Dat
e)
(LoA
)
Con
trac
t Sig
ned
(Dat
e)
Con
trac
t Val
ue
(incl
usiv
e of
all
appl
icab
le ta
xes)
(INR
in
Lakh
s)N
ame
of
Con
trac
tor/N
atio
nalit
y &
ZI
P C
ode
**W
BR
No.
(onl
y in
cas
e of
prio
r rev
iew
)
Dat
e of
com
plet
ion
of
Con
trac
tEx
p. In
cur-
red
to D
ate
(Rs
in L
akhs
) (in
clus
ive
of ta
xes/
Pric
e es
cala
tion)
Com
men
ts/S
ub
Com
pone
nts
Com
men
ts
Invi
tatio
n (D
ate)
Ope
ned
on (D
ate)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24Panchayats .( 20 Pc X Rs. 15 X 8391 Panchayats X 30 Month)
PP 150 NCB PostAugust
15, 2016
9/4/2016
9/24/2016
10/24/2016
11/8/2016
11/18/2016
12/8/2016
12/15/2016
R
7BH/BPSP/G-007
Wall Paintings on the Aims & Objects of the
Project
Wall Painting of 5 Important Location in the Project Panchayats (Each wall painting of 200 sq. ft.).
The subject addressed through this intervention shall be importance of participatory planning, participatory
planning processes, collective participation in the meeting of gram sabhas & ward sabhas, collective
decision making processes, rights / entitlements / responsibilities of citizen, etc. -Component 2.1 ©
Component-2
A
Component-2.1©
Vishal Singh (SPM-
Communication)
PP 200 NCB PostAugust
15, 2016
9/4/2016
9/24/2016
10/24/2016
11/8/2016
11/18/2016
12/8/2016
12/15/2016
R 8BH/BPSP/G-008
Hoadings, Kiosk and Wallwrap on the Aims & Objects of the Project
It is important to keep people reminding of the priorities under the Panchayati Raj System. The best
ways of doing it is hoarding, wallwraps & information kiosks
Component-2
A
Component-2.1©
Vishal Singh (SPM-
Communication)
PP 500 NCB PriorAugust
15, 2016
9/4/2016
9/24/2016
10/24/2016
11/8/2016
11/18/2016
12/8/2016
12/15/2016
R 9BH/BPSP/G-009
Print IEC material for integrated mobile
complain in two pilot districts and rest of the
10 project districts
Printing of Information education and communication material for the distribution in the Panchayats for 12
project districts
Component-2
A
Component-2.1©
Vishal Singh (SPM-
Communication)
PP 100 NCB PostAugust
15, 2016
9/4/2016
9/24/2016
10/24/2016
11/8/2016
11/18/2016
12/8/2016
12/15/2016
R 10BH/BPSP/G-010
State Level Awareness Competitions on Promotion of the
Objectives of the Project (Non-Consultancy
Services)
Marathon, Cycle Competitions tagged with State Level National / International Festivals twice a year
on outsourced arrangements
Component-2
A
Component-2.1©
Vishal Singh (SPM-
Communication)
PP 150 NCB PostNovemb
er 25, 2016
12/15/2016
1/4/2017
2/3/2017
2/18/2017
2/28/2017
3/20/2017
3/27/2017
R 11BH/BPSP/G-011
Project POPs , Calendar, Danglers, Posters, Gift Items,
Sinages
These are important tools for creating brand out of the
commitments from the project to the people. These tools directly / indirectly helps people remain aware of the Project Aims &
Objects.
Component-2
A
Component-2.1(d)
Vishal Singh (SPM-
Communication)
21
21
SL N
o.
Pack
age
No.
Nam
e of
the
activ
ity
Des
crip
tion
of G
oods
Com
men
ts
PP/A
/R1/
R2/
R3
Estim
ated
Con
trac
t Va
lue
(INR
in la
khs)
Met
hod
of P
rocu
rem
ent
Prio
r Rev
iew
/ Pos
t R
evie
w
Prep
arat
ion
of B
id
D
ocum
ent (
Dat
e)
Ban
k/In
tern
al N
o.
Obj
ectio
n to
Bid
ding
D
ocum
ent (
Dat
e)**
Bids
Bid
eva
luat
ion
Dat
e
Ban
k/in
tern
al N
o ob
ject
ion
Con
trac
t Aw
ard
(Dat
e)
(LoA
)
Con
trac
t Sig
ned
(Dat
e)
Con
trac
t Val
ue
(incl
usiv
e of
all
appl
icab
le ta
xes)
(INR
in
Lakh
s)N
ame
of
Con
trac
tor/N
atio
nalit
y &
ZI
P C
ode
**W
BR
No.
(onl
y in
cas
e of
prio
r rev
iew
)
Dat
e of
com
plet
ion
of
Con
trac
tEx
p. In
cur-
red
to D
ate
(Rs
in L
akhs
) (in
clus
ive
of ta
xes/
Pric
e es
cala
tion)
Com
men
ts/S
ub
Com
pone
nts
Com
men
ts
Invi
tatio
n (D
ate)
Ope
ned
on (D
ate)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
PP 75 NCB PostNovemb
er 25, 2016
12/15/2016
1/4/2017
2/3/2017
2/18/2017
2/28/2017
3/20/2017
3/27/2017
R 12
BH/BPSP/G-012
Printing Training modules on Panchayat Financial Management
Printing of Training Modules on Panchayat Financial Management
in Accordance with the Budget, Accounts & Audit Manual of the
State @ Rs.250/- for the Intensive Training of Mukhiya, Up-Mukhiya & Panchayat Secretary for the Block Training Program (8191 Panchayat
X 3 + 1450 Accountant + 3377 Additional for the District & Block
Level Officials)
Component-2
A
Component-2.1(d)
Om Prakash
(SPM- CB)
Component -2 (Goods) Proposed Expenditure as per the Procurement Plan 3275
PP 60
National
Shopping
PostNovemb
er 1, 2016
11/16/2016
11/24/2016
12/2/2016
12/3/2016
12/8/2016
12/15/2016
12/22/2016
R
13BH/BPSP/G-013
Office Furniture for DPMUs
Purchase of Office Furniture & Fixtures for 12 District Units (5 lakh
per District)
Component-4
A
Component-
4
Mrinal Sisodia
(SPM -HR & Admin)
PP 612 NCB PriorFebruar
y 1, 2017
2/21/2017
3/13/2017
4/12/2017
4/27/2017
5/7/2017
5/27/2017
6/3/2017
R 14
BH/BPSP/G-014
Office Furniture for BPMUs
Purchase of Office Furniture & Fixtures for 204 Block Units (3 Lakh
per block)
Component-4
A
Component-
4
Mrinal Sisodia
(SPM -HR & Admin)
PP 15
National
Shopping
PostSeptember 15, 2016
9/30/2016
10/8/2016
10/16/2016
10/17/2016
10/22/2016
10/29/2016
11/5/2016
R
15BH/BPSP/G-015
Power Back-Up System for SPMU
Purchase of Power Back Up System for State Management
Units
Component-4
A
Component-
4
Mrinal Sisodia
(SPM -HR & Admin)
PP 110 NCB PriorFebruar
y 1, 2016
2/21/2016
3/12/2016
4/11/2016
4/26/2016
5/6/2016
5/26/2016
6/2/2016
R 16
BH/BPSP/G-016
Power Back-Up System for DPMUs & BPMUs
Purchase of Power Back Up System for 12 District and 204 Blocks management Units (50
Thousand per unit)
Component-4
A
Component-
4
Mrinal Sisodia
(SPM -HR & Admin)
PP 350 NCB PriorDecemb
er 15, 2016
1/4/2017
1/24/2017
2/23/2017
3/10/2017
3/20/2017
4/9/2017
4/16/2017
R 17BH/BPSP/G-017
Laptops for DPMUs & BPMUs Level Positions
Purchase of 647-Laptops District & Block Units Against 647 sanction
positions in BGSYS (@ 55 thousand per post)
Component-4
A
Component-
4
Mrinal Sisodia
(SPM -HR & Admin) &
Sharad Kumar (PM-IT)
PP 30
National
Shopping
PostDecemb
er 15, 2016
12/30/2016
1/7/2017
1/15/2017
1/16/2017
1/21/2017
1/28/2017
2/4/2017
R 18
BH/BPSP/G-018
Desktops for SPMUs, DPMUs & BPMUs
Purchase of 56- Desktops for BGSYS Management Unit (@ 53
thousand per Position)
Component-4
A
Component-
4
Mrinal Sisodia
(SPM -HR & Admin) &
Sharad Kumar (PM-IT)
22
22
SL N
o.
Pack
age
No.
Nam
e of
the
activ
ity
Des
crip
tion
of G
oods
Com
men
ts
PP/A
/R1/
R2/
R3
Estim
ated
Con
trac
t Va
lue
(INR
in la
khs)
Met
hod
of P
rocu
rem
ent
Prio
r Rev
iew
/ Pos
t R
evie
w
Prep
arat
ion
of B
id
D
ocum
ent (
Dat
e)
Ban
k/In
tern
al N
o.
Obj
ectio
n to
Bid
ding
D
ocum
ent (
Dat
e)**
Bids
Bid
eva
luat
ion
Dat
e
Ban
k/in
tern
al N
o ob
ject
ion
Con
trac
t Aw
ard
(Dat
e)
(LoA
)
Con
trac
t Sig
ned
(Dat
e)
Con
trac
t Val
ue
(incl
usiv
e of
all
appl
icab
le ta
xes)
(INR
in
Lakh
s)N
ame
of
Con
trac
tor/N
atio
nalit
y &
ZI
P C
ode
**W
BR
No.
(onl
y in
cas
e of
prio
r rev
iew
)
Dat
e of
com
plet
ion
of
Con
trac
tEx
p. In
cur-
red
to D
ate
(Rs
in L
akhs
) (in
clus
ive
of ta
xes/
Pric
e es
cala
tion)
Com
men
ts/S
ub
Com
pone
nts
Com
men
ts
Invi
tatio
n (D
ate)
Ope
ned
on (D
ate)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
PP 160 NCB PriorDecemb
er 15, 2016
1/4/2017
1/24/2017
2/23/2017
3/10/2017
3/20/2017
4/9/2017
4/16/2017
R 19BH/BPSP/G-019
Mini-Laptops/Tablet for Community Resource Persons (Field Staff tagged with BPMUs)
Purchase of Mini Laptop/Tablet for 797 CRP (@ 20 Thousand per
Position)
Component-4
A
Component-
4
Mrinal Sisodia
(SPM -HR & Admin) &
Sharad Kumar (PM-IT)
PP 50
National
Shopping
PostFebruar
y 1, 2017
2/16/2017
2/24/2017
3/4/2017
3/5/2017
3/10/2017
3/17/2017
3/24/2017
R 20
BH/BPSP/G-020
Printers for DPMUs & BPMUs
Purchase of 216- Printers for Block and District Units (@ 23 Thousand
Per unit)
Component-4
A
Component-
4
Mrinal Sisodia
(SPM -HR & Admin) &
Sharad Kumar (PM-IT)
PP 30
National
Shopping
PostMarch
15, 2017
3/30/2017
4/7/2017
4/15/2017
4/16/2017
4/21/2017
4/28/2017
5/5/2017
R 21
BH/BPSP/G-021
Colour Printers for DPMUs
Purchase of 12- Printers for District Units (@2.5 lakh per unit)
Component-4
A
Component-
4
Mrinal Sisodia
(SPM -HR & Admin) &
Sharad Kumar (PM-IT)
PP 40
National
Shopping
Post October 1, 2016
10/16/2016
10/24/2016
11/1/2016
11/2/2016
11/7/2016
11/14/2016
11/21/2016
R
22BH/BPSP/G-022
Procurement of Consumables and Stationery Items
Stationery Item, Housekeeping Items and computer peripherals
items for SPMU office Patna
Component-4
A
Component-
4
Mrinal Sisodia
(SPM -HR & Admin)
PP 10
National
Shopping
Post October 1, 2016
10/16/2016
10/24/2016
11/1/2016
11/2/2016
11/7/2016
11/14/2016
11/21/2016
R
23BH/BPSP/G-023
Housekeeping services (Non-Consultancy
Services)
Housekeeping services (Non-Consultancy Services) for SPMU
office Patna
Component-4
A
Component-
4
Mrinal Sisodia
(SPM -HR & Admin)
PP 300 NCB PriorDecemb
er 15, 2016
1/4/2017
1/24/2017
2/23/2017
3/10/2017
3/20/2017
4/9/2017
4/16/2017
R 24
BH/BPSP/G-024
MS Office Licence for the Desktops / Laptops/Mini-
laptop/Tablet at SPMU, DPMUs, BPMUs &
CRPs (Gram Panchayat Project Coordinators)
Purchase of 1500 -MS Office for State, District & Block Units (@ 20
Thousand per systems)
Component-4
A
Component-
4
Mrinal Sisodia
(SPM -HR & Admin) &
Sharad Kumar (PM-IT)
Component -4 (Goods) Proposed Expenditure per the Procurement Plan 1767
23
23
Table -3
PROCUREMENT PLAN FOR Non Consultancy(DAVP Rate)[BIHAR PANCHAYAT STRENGTHENING PROJECT]
WB LOAN No. 5160/IN
SL N
o.
Pack
age
No.
Des
crip
tion
of G
oods
Des
crip
tion
of G
oods
Com
pone
nt
PP/A
/R1/
R2/
R3
Estim
ated
C
ontr
act
Valu
e (IN
R
in la
khs)
Met
hod
of
Proc
urem
ent
Prio
r R
evie
w/
Post
R
evie
w
Prep
arat
ion
of B
id
D
ocum
ent
(Dat
e)
Com
men
ts
Com
men
ts
1 2 3 4 5 6 7 8 9 10 23 24
PP 500Direct
Contracting (DAVP)
Post December 15, 2016
R 1 BPSP/N
C-001
Broadcast of Radio Jingles on Radio at Directorate of Audio-Visual Publicity Rates
determined by the Ministry of Broadcasting, Govt. of India
Broadcast of Radio Jingles on Radio at Directorate of Audio-Visual Publicity Rates determined by the Ministry of Broadcasting,
Govt. of India (for a year)
Component-2
A
Component-2
Vishal Singh (SPM- Communication)
PP 150Direct
Contracting (DAVP)
Post December 15, 2016
R 2 BPSP/N
C-002
Broadcast of Fictional Radio Serial on Radio at Directorate of Audio-Visual
Publicity Rates determined by the Ministry of Broadcasting, Govt. of India
Broadcast of Fictional Radio Serial on Radio at Directorate of Audio-Visual Publicity Rates determined by the Ministry of Broadcasting,
Govt. of India (for a year)
Component-2
A
Component-2
Vishal Singh (SPM- Communication)
PP 250Direct
Contracting (DAVP)
Post December 15, 2016
R 3 BPSP/N
C-003
Phase-1,Broadcast of short films interviews, discussions on local TV
channels
Phase-1,Broadcast of short films interviews, discussions on local TV channels (for a year)
Component-2
A
Component-2
Vishal Singh (SPM- Communication)
Component -2 (Non-Consultancy) Proposed Expenditure as per the Procurement Plan 900
PROCUREMENT SCHEDULE FOR WORKS FOR 18 MONTHS
24
24
COUNTRY : INDIABORROWER : GOVERNMENT OF INDIA PROJECT : BIHAR PANCHAYAT STRENGTHENING PROJECTDATED : September 20, 2016.Note:- 330 Panchayat Sarkar Bhawans are to be treated as separate packages
TABLE – 4
PROCUREMENT PLAN FOR WORKS[BIHAR PANCHAYAT STRENGTHENING PROJECT]
WB LOAN No. 5160/IN Bids
SL N
o.
Pack
age
No.
Des
crip
tion
of W
orks
/ G
oods
PP/A
/R1/
R2/
R3
Est
imat
ed C
ontr
act
Val
ue (R
s. L
akhs
)
Met
hod
of
Proc
urem
ent
ICB
/NC
B
Rev
iew
Prep
arat
ion
of B
id
D
ocum
ent (
Star
t Dat
e)
Ban
k's N
o. O
bjec
tion
to B
iddi
ng D
ocum
ent
(Dat
e)**
Bid
doc
umen
t sen
t to
IPR
D fo
r pu
blic
atio
n
Invi
tatio
n (L
ast
Dat
e fo
r su
bmis
sion
)
Ope
ned
on (D
ate)
Bid
Eva
luat
ion
Con
trac
t Aw
ard
deci
ded
(Dat
e)
Ban
k's N
o. O
bjec
tion
to C
ontr
act A
war
d (D
ate)
**
Con
trac
t Sig
ned
(Dat
e)
Con
trac
t Val
ue
(incl
usiv
e of
all
appl
icab
le ta
xes)
Nam
e of
C
ontr
acto
r/N
atio
nalit
y &
ZIP
Cod
e**
WB
R N
o. (o
nly
in
case
of p
rior
rev
iew
)D
ate
of c
ompl
etio
n of
C
ontr
act/E
OT
ap
prov
ed
Com
men
ts
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
PP 100 each total 7500 NCB Post
November 1, 2016
N/A December 1, 2016
December 31, 2016
January 1, 2017
January 16, 2017
January 26,
2017N/A February 2,
2017 ______ ______ N/A
February
2, 2018
R
1BPSP/W-001 -075
Construction of Panchayat Sarkar Bhawan- 1 to 75 (in ______ Gram Panchayat _________ in Block of _______District ) There shall be 75 Packages for Each of the Panchayat Sarkar Bhawans
A
PP 100 each total 7500 NCB Post January
1, 2017 N/A January 31, 2017
March 2, 2017
March 3, 2017
March 18,
2017
March 28,
2017N/A April 4, 2017 ______ ______ N/A
April 4,
2018
R 2
BPSP/W-
076-150
Construction of Panchayat Sarkar Bhawan- 76 to150 (in ______ Panchayat _________Block in _______District ) There shall be 75 Packages for Each of the Panchayat Sarkar Bhawans
A
PP 100 each total 7500 NCB Post March
1, 2017 N/A March 31, 2017
April 30, 2017
May 1, 2017
May 16,
2017
May 26,
2017N/A June 2, 2017 ______ ______ N/A
June 2,
2018
R 3
BPSP/W-
151-226
Construction of Panchayat Sarkar Bhawan- 151 to 225 (in ______ Panchayat _________Block in _______District ) There shall be 75 Packages for Each of the Panchayat Sarkar Bhawans
A
PP100 each
total 10500
NCB Post April 1, 2017 N/A May 1,
2017May 31,
2017June 1, 2017
June 16,
2017
June 26,
2017N/A July 3, 2017 ______ ______ N/A
July 3,
2018
R 4
BPSP/W-
226-330
Construction of Panchayat Sarkar Bhawan- 226 to 330 (in ______ Panchayat _________Block in _______District ) There shall be 105 Packages for Each of the Panchayat Sarkar Bhawans
A
PP 30 Shopping Post
November 1, 2016
N/A NANovemb
er 11, 2016
November 12, 2016
November 15,
2016
November 18, 2016
N/A November 21, 2016 ______ ______ N/A
December
6, 2016
Component-4
R 5 BPSP/
W-331 Refurbishment of SPMU
A
PP 25 Shopping Post
October 15,
2016N/A NA October
25, 2016
October 26,
2016
October 29, 2016
November 1, 2016
N/A November 4, 2016 ______ ______ N/A
November 11,
2016
Component-4
R 6 BPSP/
W-332 Electrical works of SPMU
A
25
25
Page 1
PROCUREMENTPLAN India : India - Bihar Panchayat Strengthening ProjectGeneral InformationCountry: India Bank�s Approval Date of the Original Procurement Plan: 2017-03-08
Revised Plan Date(s): (comma delineated, leave blank if none) 2017-12-20Project ID: P102627 GPN Date: Project Name: India - Bihar Panchayat Strengthening ProjectLoan / Credit No: IDA / 51600Executing Agency(ies): Bihar Gram Swaraj Yojna Society, Panchayati Raj, Local Area Engineering Organization
WORKSActivity Reference No. /
Description Loan / Credit No. Component Review Type Method Market Approach ProcurementProcess
Prequalification(Y/N)
EstimatedAmount (US$)
Actual Amount(US$)
ProcessStatus
Draft Pre-qualificationDocuments
PrequalificationEvaluation Report
Draft Bidding Document/ Justification
Specific ProcurementNotice / Invitation
Bidding Documents asIssued
Proposal Submission /Opening / Minutes
Bid Evaluation Reportand Recommendation
for AwardSigned Contract Contract Completion
Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual
BH/BPSP/W-332 / RenovationElectrical works of SPMU
IDA / 51600 Project Management andCoordination Post Request for
Quotations Open - National
Single Stage - OneEnvelope 37,878.78 0.00 Pending
Implementation 2017-04-24 2017-06-19 2017-12-16
BH/BPSP/WB-006 /Construction of PanchayatSarkar Bhawan in(i) Bargaon Panchayat in BlockSilao &(ii) Shabait Panchayat in BlockSilao.
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-07 2017-10-20 2017-11-12 2017-12-17 2018-01-30 2018-02-19 2019-02-19
BH/BPSP/WB-003 /Construction of PanchayatSarkar Bhawan in(ii) Doiya Panchayat in BlockNoorsarai &(ii) Meyar Panchayat in BlockNoorsarai.
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-07 2017-10-20 2017-11-12 2017-12-22 2018-01-12 2018-02-07 2019-02-21
BH/BPSP/WB-005 /Construction of PanchayatSarkar Bhawan in(i) Gajipur Panchayat in BlockGiriyak &(ii) Jiyar Panchayat in BlockAsthawan.
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-07 2017-10-20 2017-11-12 2017-12-24 2018-03-08 2018-04-12 2018-10-09
BH/BPSP/WB-004 /Construction of PanchayatSarkar Bhawan in(i) Ajaipur Panchayat in BlockNoorsarai &(ii) Amba Panchayat in BlockRahui.
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-07 2017-10-20 2017-11-12 2017-12-24 2018-03-08 2018-04-12 2018-10-09
BH/BPSP/WB-002 /Construction of PanchayatSarkar Bhawan in(i) Devra Panchayat in BlockNaubatpur &(ii) Habaspur Goona Panchayatin Block Bikram.
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-07 2017-10-20 2017-11-12 2017-12-24 2018-03-08 2018-04-12 2018-10-09
BH/BPSP/WB-001 /Construction of PanchayatSarkar Bhawan in(i) Kosut Panchayat in BlockDhanarua &(ii) Vijaypura Panchayat in BlockDhanarua.
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-07 2017-10-20 2017-11-07 2017-11-29 2018-01-20 2018-02-24 2018-08-23
BH/BPSP/WB-007 /Construction of PanchayatSarkar Bhawan in(i) Ghostama Panchayat in BlockSilao &(ii) Gorma Panchayat in BlockSilao.
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-07 2017-10-20 2017-11-12 2017-12-24 2018-03-08 2018-04-12 2018-10-09
BH/BPSP/WB-008 /Construction of PanchayatSarkar Bhawan in (i) MeghiNagwan Panchayat in BlockBiharsharif & (ii) Bara Panchayatin Block Ben.
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-07 2017-10-20 2017-11-12 2017-12-24 2018-03-08 2018-04-12 2018-10-09
BH/BPSP/WB-009 /Construction of PanchayatSarkar Bhawan in(i) Aant Panchayat in Block Ben&(ii) Ben Panchayat in Block Ben.
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-07 2017-10-20 2017-11-12 2017-12-24 2018-03-08 2018-04-12 2018-10-09
BH/BPSP/WB-010 /Construction of PanchayatSarkar Bhawan in(i) Lodipur Panchayat in BlockRajgir &(ii) Akauna Panchayat in BlockBen.
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-07 2017-10-20 2017-11-12 2017-12-24 2018-03-08 2018-04-12 2018-10-09
BH/BPSP/WB-011 /Construction of PanchayatSarkar Bhawan in(i) Damodarpur BaldhaPanchayat in Block Nagarnausa& (ii) Kachhiyava Panchayat inBlock Nagarnausa.
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-07 2017-10-20 2017-11-12 2017-12-24 2018-03-08 2018-04-12 2018-10-09
BH/BPSP/WB-012 /Construction of PanchayatSarkar Bhawan in(i) Shivnagar Panchayat in BlockParvalpur &(ii) Chousanda Panchayat inBlock Parvalpur.
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-07 2017-10-20 2017-11-12 2017-12-24 2018-03-08 2018-04-12 2018-10-09
Page 2
BH/BPSP/WB-013 /Construction of PanchayatSarkar Bhawan in(i) Pillich Panchayat in BlockParvalpur &(ii) Asta Panchayat in BlockTharthari.
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-07 2017-10-20 2017-11-12 2017-12-24 2018-03-08 2018-04-12 2018-10-09
BH/BPSP/WB-014 /Construction of PanchayatSarkar Bhawan in(i) Juniyar Panchayat in BlockHilsa &(ii) Daniyava Pendapur-Panchayat in BlockEakangarsarai.
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-07 2017-10-20 2017-11-12 2017-12-24 2018-03-08 2018-04-12 2018-10-09
BH/BPSP/WB-016 /Construction of PanchayatSarkar Bhawan in(i) Rupauli Panchayat in BlockHanuman Nagar &(ii) SanahpurPanchayat in Block Singhwara.
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-07 2017-10-20 2017-11-12 2017-12-24 2018-03-08 2018-04-12 2018-10-09
BH/BPSP/WB-017 /Construction of PanchayatSarkar Bhawan in(i) Murho Panchayat in BlockMadhepura &(ii) Sakarpura BetaunaPanchayat in Block Madhepura.
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-07 2017-10-20 2017-11-12 2017-12-24 2018-03-08 2018-04-12 2018-10-09
BH/BPSP/WB-018 /Construction of PanchayatSarkar Bhawan in(i) Aourahi Eakpraha Panchayatin Block Gamahriya & (ii)Bhatarandha ParmanandapurPanchayat in Block Ghailadh.
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-07 2017-10-20 2017-11-12 2017-12-24 2018-03-08 2018-04-12 2018-10-09
BH/BPSP/WB-019 /Construction of PanchayatSarkar Bhawan in(i) Paina Panchayat in BlockChousa &(ii) Ghosai ParmanandapurPanchayat in Block Chousa.
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-07 2017-10-20 2017-11-12 2017-12-24 2018-03-08 2018-04-12 2018-10-09
BH/BPSP/WB-020 /Construction of PanchayatSarkar Bhawan in (i) Araipanchyat in Block Daudnagar &(ii) Karsaon Panchyat in BlockObra
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-07 2017-10-30 2017-11-12 2017-12-24 2018-03-08 2018-04-12 2018-10-09
BH/BPSP/WB-021 /Construction of PanchayatSarkar Bhawan in (i) OraPanchyat in Block Aurangabad &(ii) Ibrahimpur Panchyat in BlockAurangabad
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-08 2017-10-30 2017-11-13 2017-12-25 2018-03-09 2018-04-13 2018-10-10
BH/BPSP/WB-022 /Construction of PanchayatSarkar Bhawan in (i) KerkaPanchyat in Block Navinagar &(ii) Tengra Panchyat in BlockBaroon
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-08 2017-10-30 2017-11-13 2017-12-25 2018-03-09 2018-04-13 2018-10-10
BH/BPSP/WB-023 /Construction of PanchayatSarkar Bhawan in (i) SalaiyaPanchyat in Block Madanpur &(ii) Nima Ajan Panchyat in BlockMadanpur
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-08 2017-10-30 2017-11-13 2017-12-25 2018-03-09 2018-04-13 2018-10-10
BH/BPSP/WB-025 /Construction of PanchayatSarkar Bhawan in (i) HathiyaraPanchyat in Block Goh & (ii)Purhara Panchyat in BlockHaspura
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-08 2017-10-30 2017-11-13 2017-12-25 2018-03-09 2018-04-13 2018-10-10
BH/BPSP/WB-026 /Construction of PanchayatSarkar Bhawan in (i)Udavantnagar Panchyat in BlockUdvantnagar & (ii)KasapPanchyat in Block Udvantnagar
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-08 2017-11-13 2017-12-25 2018-03-09 2018-04-13 2018-10-10
BH/BPSP/WB-027 /Construction of PanchayatSarkar Bhawan in (i) AsniPanchyat in Block Udvantnagar& (ii) Sonpura Panchyat in BlockUdvantnagar
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-08 2017-10-30 2017-11-13 2017-12-25 2018-03-09 2018-04-13 2018-10-10
BH/BPSP/WB-028 /Construction of PanchayatSarkar Bhawan in (i) Korthu westPanchyat in Block Ghansyampur& (ii) Harinagar Panchyat inBlock Kusheshwar Asthan
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-08 2017-10-30 2017-11-13 2017-12-25 2018-03-09 2018-04-13 2018-10-10
BH/BPSP/WB-029 /Construction of PanchayatSarkar Bhawan in (i) HarhachchaPanchyat in Block Baheri & (ii)Pokharbhinda Panchyat in BlockTardih
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-08 2017-10-30 2017-11-13 2017-12-25 2018-03-09 2018-04-13 2018-10-10
Page 3
BH/BPSP/WB-030 /Construction of PanchayatSarkar Bhawan in (i) ChiloneePanchyat in Block Pratapganj &(ii) Koriapatti west Panchyat inBlock Triveniganj
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-08 2017-10-30 2017-11-13 2017-12-25 2018-03-09 2018-04-13 2018-10-10
BH/BPSP/WB-031 /Construction of PanchayatSarkar Bhawan in (i) MaheshuaPanchyat in Block Triveniganj &(ii) Lotuana south Panchyat inBlock Triveniganj
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-08 2017-10-30 2017-11-13 2017-12-25 2018-03-09 2018-04-13 2018-10-10
BH/BPSP/WB-032 /Construction of PanchayatSarkar Bhawan in (i) DinapattiPanchyat in Block Pipara & (ii)Tulaptti south Panchyat in BlockPipara.
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-08 2017-10-30 2017-11-13 2017-12-25 2018-03-09 2018-04-13 2018-10-10
BH/BPSP/WB-033 /Construction of PanchayatSarkar Bhawan in (i) ThuthiPanchyat in Block Chhatapur &(ii) Laxmipur Khunti Panchyat inBlock Chhatapur
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-08 2017-10-30 2017-11-13 2017-12-25 2018-03-09 2018-04-13 2018-10-10
BH/BPSP/WB-034 /Construction of PanchayatSarkar Bhawan in (i) KatharaPanchyat in Block Chhatapur &(ii) Bhimpur Panchyat in BlockChhatapur
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-08 2017-10-30 2017-11-13 2017-12-25 2018-03-09 2018-04-13 2018-10-10
BH/BPSP/WB-035 /Construction of PanchayatSarkar Bhawan in (i)Champanagar Panchyat in BlockRaghopur & (ii) Chithi Hanumannnagar Panchyat in Blocksaragadh Bhaptiyahi
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-08 2017-10-30 2017-11-13 2017-12-25 2018-03-09 2018-04-13 2018-10-10
BH/BPSP/WB-036 /Construction of PanchayatSarkar Bhawan in (i) MauraJharkha Panchyat in BlockSankarpur & (ii) Tamot persaPanchyat in Block Murliganj
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-08 2017-10-30 2017-11-13 2017-12-25 2018-03-09 2018-04-13 2018-10-10
BH/BPSP/WB-037 /Construction of PanchayatSarkar Bhawan in (i) JeetapurPanchyat in Block Murliganj &(ii) Haripurkala Panchyat inBlock Murliganj
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-08 2017-10-30 2017-11-13 2017-12-25 2018-03-09 2018-04-13 2018-10-10
BH/BPSP/WB-038 /Construction of PanchayatSarkar Bhawan in (i) BelariPanchyat in Block kumarkhand& (ii) Bishanpur KoilahiPanchyat in Block kumarkhand
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-08 2017-10-30 2017-11-13 2017-12-25 2018-03-09 2018-04-13 2018-10-10
BH/BPSP/WB-039 /Construction of PanchayatSarkar Bhawan in (i) Madhukarchak Panchyat in BlockBihariganj & (ii) BarahiAanandpura Panchyat in BlockUdakishunganj
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-08 2017-10-30 2017-11-13 2017-12-25 2018-03-09 2018-04-13 2018-10-10
BH/BPSP/WB-040 /Construction of PanchayatSarkar Bhawan in (i) PipraJagdish Panchyat in BlockBihiya & (ii) Goudadh RudranagarPanchyat in Block Bihiya
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-08 2017-10-30 2017-11-13 2017-12-25 2018-03-09 2018-04-13 2018-10-10
BH/BPSP/WB-041 /Construction of PanchayatSarkar Bhawan in (i) ShivpurPanchyat in Block Bihiya & (ii)Tiyar Panchyat in Block Bihiya
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-08 2017-10-30 2017-11-13 2017-12-25 2018-03-09 2018-04-13 2018-10-10
BH/BPSP/WB-042 /Construction of PanchayatSarkar Bhawan in (i) PanwariPanchyat in Block Tarari & (ii)Imadpur Panchyat in BlockTarari
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-08 2017-10-30 2017-11-13 2017-12-25 2018-03-09 2018-04-13 2018-10-10
BH/BPSP/WB-015 /"Construction of PanchayatSarkar Bhawan in(i) Sonki Panchayat in BlockDarbhanga Sadar &(ii) Chhotaipatti Panchayat inBlock Darbhanga Sadar.
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Pending
Implementation 2017-11-09 2017-11-14 2017-12-26 2018-03-10 2018-04-14 2018-10-11
BH/BPSP/WB-024 /Construction of PanchayatSarkar Bhawan in (i) KerapPanchyat in Block rafiganj & (ii)Dadhpi Panchyat in Block Goh
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-09 2017-10-30 2017-11-14 2017-12-26 2018-03-10 2018-04-14 2018-10-11
BH/BPSP/WB-043 /Construction of PanchayatSarkar Bhawan in (i) LadaniyaPanchyat in Block Laukahi & (ii)Majhuara Panchyat in BlockKhutauna
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-14 2017-11-09 2017-11-19 2017-12-31 2018-03-15 2018-04-19 2018-10-16
Page 4
BH/BPSP/WB-044 /Construction of PanchayatSarkar Bhawan in (i) SatgharaPanchyat in Block Rajnagar & (ii)Koilakh Panchyat in BlockRajnagar
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-14 2017-11-09 2017-11-19 2017-12-31 2018-03-15 2018-04-19 2018-10-16
BH/BPSP/WB-045 /Construction of PanchayatSarkar Bhawan in (i) BagarPanchyat in Block Tarari & (ii)Andhari Panchyat in BlockSahar
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-14 2017-11-09 2017-11-19 2017-12-31 2018-03-15 2018-04-19 2018-10-16
BH/BPSP/WB-046 /Construction of PanchayatSarkar Bhawan in (i) KajarPanchyat in Block Shahpur & (ii)Basauna Panchyat in BlockJagdishpur
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-14 2017-11-09 2017-11-19 2017-12-31 2018-03-15 2018-04-19 2018-10-16
BH/BPSP/WB-047 /Construction of PanchayatSarkar Bhawan in (i) BampaliPanchyat in Block Udavantnagar& (ii) Nawadaben Panchyat inBlock Udavantnagar
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-14 2017-11-09 2017-11-19 2017-12-31 2018-03-15 2018-04-19 2018-10-16
BH/BPSP/WB-048 /Construction of PanchayatSarkar Bhawan in (i) PurviBabura Panchyat in BlockBarhara & (ii) DaulatpurPanchyat in Block Koilwar
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-14 2017-11-09 2017-11-19 2017-12-31 2018-03-15 2018-04-19 2018-10-16
BH/BPSP/WB-049 /Construction of PanchayatSarkar Bhawan in (i) FarnaPanchyat in Block Barhara & (ii)Gundi Panchyat in BlockBarhara
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-14 2017-11-09 2017-11-19 2017-12-31 2018-03-15 2018-04-19 2018-10-16
BH/BPSP/WB-050 /Construction of PanchayatSarkar Bhawan in (i)BasantpurPanchyat in Block Ara sadar &(ii) Balua Panchyat in BlockBarhara
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-14 2017-11-09 2017-11-19 2017-12-31 2018-03-15 2018-04-19 2018-10-16
BH/BPSP/WB-051 /Construction of PanchayatSarkar Bhawan in (i)BarunaPanchyat in Block Agiawan & (ii)Nonaur Panchyat in BlockAgiawan
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-14 2017-11-09 2017-11-19 2017-12-31 2018-03-15 2018-04-19 2018-10-16
BH/BPSP/WB-052 /Construction of PanchayatSarkar Bhawan in (i)GarhaniPanchyat in Block Garhani & (ii)Echari Panchyat in BlockGarhani
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-14 2017-11-09 2017-11-19 2017-12-31 2018-03-15 2018-04-19 2018-10-16
BH/BPSP/WB-053 /Construction of PanchayatSarkar Bhawan in (i)LagmaPanchyat in Block Sonversa &(ii) Mahua Panchyat in BlockSonversa
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-23 2017-11-09 2017-11-28 2018-01-09 2018-03-24 2018-04-28 2018-10-25
BH/BPSP/WB-054 /Construction of PanchayatSarkar Bhawan in (i)BaithPanchyat in Block Sonversa &(ii) Mora Kopa Panchyat inBlock Sonversa
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-23 2017-11-09 2017-11-28 2018-01-09 2018-03-24 2018-04-28 2018-10-25
BH/BPSP/WB-055 /Construction of PanchayatSarkar Bhawan in (i)MubarakpurPanchyat in Block Salkhua & (ii)Kabira Panchyat in BlockSalkhua
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-23 2017-11-09 2017-11-28 2018-01-09 2018-03-24 2018-04-28 2018-10-25
BH/BPSP/WB-056 /Construction of PanchayatSarkar Bhawan in (i)HarebaPanchyat in Block Salkhua & (ii)Chanan Panchyat in BlockSalkhua
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-23 2017-11-09 2017-11-28 2018-01-09 2018-03-24 2018-04-28 2018-10-25
BH/BPSP/WB-057 /Construction of PanchayatSarkar Bhawan in (i)KapPachami Panchyat in BlockSaur Bazar & (ii) GamhariaPanchyat in Block Saur Bazar
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-23 2017-11-09 2017-11-28 2018-01-09 2018-03-24 2018-04-28 2018-10-25
BH/BPSP/WB-058 /Construction of PanchayatSarkar Bhawan in (i)SahuriaPachami Panchyat in BlockSaur Bazar & (ii) Chandaur PurbiPanchyat in Block Saur Bazar
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-11-23 2017-11-09 2017-11-28 2018-01-09 2018-03-24 2018-04-28 2018-10-25
BH/BPSP/WB-059 /Construction of PanchayatSarkar Bhawan in (i)NeemaPanchayat in Block Dobhi & (ii)Kurmawa Panchayat in BlockDobhi
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-12-01 2017-11-20 2017-12-06 2018-01-17 2018-04-01 2018-05-06 2018-11-02
Page 5
BH/BPSP/WB-060 /Construction of PanchayatSarkar Bhawan in (i)GhoraghatPanchayat in Block Dobhi & (ii)Bhalua Panchayat in BlockBarachatti
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-12-01 2017-11-20 2017-12-06 2018-01-17 2018-04-01 2018-05-06 2018-11-02
BH/BPSP/WB-061 /Construction of PanchayatSarkar Bhawan in (i)KorapPanchayat in Block Konch & (ii)Kawar Panchayat in BlockKonch
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-12-01 2017-11-20 2017-12-06 2018-01-17 2018-04-01 2018-05-06 2018-11-02
BH/BPSP/WB-062 /Construction of PanchayatSarkar Bhawan in (i)NarawatPanchayat in Block Atari &(ii)Panari Panchayat in BlockBelaganj
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-12-01 2017-11-20 2017-12-06 2018-01-17 2018-04-01 2018-05-06 2018-11-02
BH/BPSP/WB-063 /Construction of PanchayatSarkar Bhawan in (i)Alam NagarUtari Panchayat in Block AlamNagar & (ii)ParmanandpurPanchayat in Block Murliganj
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-12-04 2017-11-29 2017-12-09 2018-01-20 2018-04-04 2018-05-09 2018-11-05
BH/BPSP/WB-064 /Construction of PanchayatSarkar Bhawan in (i)TengarahaPariyahi Panchayat in BlockKumarkhand & (ii)JeevachhpurPanchayat in Block Gamhariya
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-12-04 2017-11-29 2017-12-09 2018-01-20 2018-04-04 2018-05-09 2018-11-05
BH/BPSP/WB-065 /Construction of PanchayatSarkar Bhawan in (i)Pipra KarautiPanchayat in BlockUdakisunganj & (ii)GopalpurPanchayat in BlockUdakisunganj
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-12-04 2017-11-29 2017-12-09 2018-01-20 2018-04-04 2018-05-09 2018-11-05
BH/BPSP/WB-066 /Construction of PanchayatSarkar Bhawan in (i)ChirauriPanchayat in Block Chausa &(ii)Laualagan East Panchayat inBlock Chausa
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-12-04 2017-11-29 2017-12-09 2018-01-20 2018-04-04 2018-05-09 2018-11-05
BH/BPSP/WB-067 /Construction of PanchayatSarkar Bhawan in (i)NardahPanchayat in Block Purainee &(ii)Durgapur Panchayat in BlockPurainee
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-12-04 2017-11-29 2017-12-09 2018-01-20 2018-04-04 2018-05-09 2018-11-05
BH/BPSP/WB-068 /Construction of PanchayatSarkar Bhawan in (i)JeeravaMadhailee Panchayat in BlockShankarpur & (ii)SonvarshaPanchayat in Block Shankarpur
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-12-04 2017-11-23 2017-12-09 2018-01-20 2018-04-04 2018-05-09 2018-11-05
BH/BPSP/WB-069 /Construction of PanchayatSarkar Bhawan in (i)TetrahPanchayat in Block Akodhi Gola& (ii)Bagha Khoh Panchayat inBlock Akodhi Gola
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-12-04 2017-11-29 2017-12-09 2018-01-20 2018-04-04 2018-05-09 2018-11-05
BH/BPSP/WB-070 /Construction of PanchayatSarkar Bhawan in (i)ChitouliPanchayat in Block Tilauthu &(ii)Sewahi Panchayat in BlockTilauthu
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-12-04 2017-11-29 2017-12-09 2018-01-20 2018-04-04 2018-05-09 2018-11-05
BH/BPSP/WB-071 /Construction of PanchayatSarkar Bhawan in (i)AkasheePanchayat in Block Sasaram &(ii)Rohtas Garh Panchayat inBlock Rohtas
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-12-04 2017-11-29 2017-12-09 2018-01-20 2018-04-04 2018-05-09 2018-11-05
BH/BPSP/WB-072 /Construction of PanchayatSarkar Bhawan in (i)ReriyaPanchayat in Block Kochas &(ii)Karup Panchayat in BlockShivsagar
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-12-04 2017-11-29 2017-12-09 2018-01-20 2018-04-04 2018-05-09 2018-11-05
BH/BPSP/WB-073 /Construction of PanchayatSarkar Bhawan in (i)KarharaPanchayat in Block Benipatti &(ii)Tyonth Panchayat in BlockBenipatti
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-12-04 2017-11-29 2017-12-09 2018-01-20 2018-04-04 2018-05-09 2018-11-05
BH/BPSP/WB-074 /Construction of PanchayatSarkar Bhawan in (i)TaraiyaPanchayat in Block Madhawapur& (ii)Pirokhar Panchayat inBlock Madhawapur
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-12-04 2017-11-29 2017-12-09 2018-01-20 2018-04-04 2018-05-09 2018-11-05
BH/BPSP/WB-075 /Construction of PanchayatSarkar Bhawan in (i)SidhapaPanchayat in Block Ladaniya &(ii)Chatra Gobrarua NorthPanchayat in Block Khajauli
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-12-05 2017-11-29 2017-12-10 2018-01-21 2018-04-05 2018-05-10 2018-11-06
Page 6
BH/BPSP/WB-076 /Construction of PanchayatSarkar Bhawan in (i)ChatraGobraura South Panchayat inBlock Khajauli & (ii)ChandradihMaharajpur Panchayat in BlockKhajauli
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-12-04 2017-11-29 2017-12-09 2018-01-20 2018-04-04 2018-05-09 2018-11-05
BH/BPSP/WB-077 /Construction of PanchayatSarkar Bhawan in (i)Shri KhindaPanchayat in Block Nokha &(ii)Chandi English Panchayat inBlock Sanjhouli
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-12-04 2017-11-29 2017-12-09 2018-01-20 2018-04-04 2018-05-09 2018-11-05
BH/BPSP/WB-078 /Construction of PanchayatSarkar Bhawan in(i)NonharPanchayat in BlockBikramganj & (ii)ManpurPanchayat in Block Bikramganj
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-12-04 2017-11-29 2017-12-09 2018-01-20 2018-04-04 2018-05-09 2018-11-05
BH/BPSP/WB-079 /Construction of PanchayatSarkar Bhawan in (i)lilwachhPanchayat in Block Dinara &(ii)Dawath MaharajpurPanchayat in Block Dawath
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-12-04 2017-11-29 2017-12-09 2018-01-20 2018-04-04 2018-05-09 2018-11-05
BH/BPSP/WB-080 /Construction of PanchayatSarkar Bhawan in (i)DhamniPanchayat in Block Barun &(ii)Dhangai Panchayat in BlockBarun
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Request for Bids Open - National
Single Stage - TwoEnvelope 443,077.00 0.00 Under
Implementation 2017-12-05 2017-11-29 2017-12-10 2018-01-21 2018-04-05 2018-05-10 2018-11-06
GOODSActivity Reference No. /
Description Loan / Credit No. Component Review Type Method Market Approach ProcurementProcess
Prequalification(Y/N)
EstimatedAmount (US$)
Actual Amount(US$)
ProcessStatus
Draft Pre-qualificationDocuments
PrequalificationEvaluation Report
Draft Bidding Document/ Justification
Specific ProcurementNotice / Invitation
Bidding Documents asIssued
Proposal Submission /Opening / Minutes
Bid Evaluation Reportand Recommendation
for AwardSigned Contract Contract Completion
Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual
BH/BPSP/G-015 / Power Back-Up System for SPMU
IDA / 51600 Project Management andCoordination Post Request for
Quotations Open - National
Single Stage - OneEnvelope 22,727.27 0.00 Under
Implementation 2017-04-24 2017-06-19 2017-12-16
BH/BPSP/G-026 / Printing ofDiary & Calender -2017
IDA / 51600Strengthen the StateGovernment capacity to managea gradual decentralization andempowerment process
Post Request forQuotations Open - National
Single Stage - OneEnvelope 22,727.27 0.00 Under
Implementation 2017-04-24 2017-06-19 2017-12-16
BH/BPSP/G-025 / MS OfficeLicence for the Desktops atSPMU, DPMUs, BPMUs
IDA / 51600 Project Management andCoordination Post Request for
Quotations Open - National
Single Stage - OneEnvelope 30,303.03 0.00 Pending
Implementation 2018-01-04 2018-03-01 2018-08-28
BH/BPSP/G-023 / Procurementof Consumables and StationeryItems For DPMU and BPMU
IDA / 51600 Project Management andCoordination Post Request for
Quotations Open - National
Single Stage - OneEnvelope 75,757.58 0.00 Pending
Implementation 2018-01-04 2018-03-01 2018-08-28
BH/BPSP/G-027 / Printing ofDiary & Calender -2018
IDA / 51600
Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.
Post Request forQuotations Open - National
Single Stage - OneEnvelope 22,727.27 0.00 Pending
Implementation 2017-10-08 2017-12-03 2018-06-01
BH/BPSP/G-021 / ColourPrinters for DPMUs
IDA / 51600 Project Management andCoordination Post Request for
Quotations Open - National
Single Stage - OneEnvelope 45,454.55 0.00 Pending
Implementation 2018-01-04 2018-03-01 2018-08-28
BH/BPSP/G-020 / Printers forDPMUs & BPMUs
IDA / 51600 Project Management andCoordination Post Request for
Quotations Open - National
Single Stage - OneEnvelope 75,757.58 0.00 Pending
Implementation 2018-01-04 2018-03-01 2018-08-28
BH/BPSP/G-018 / Desktops forSPMUs, DPMUs & BPMUs
IDA / 51600 Project Management andCoordination Post Request for
Quotations Open - National
Single Stage - OneEnvelope 45,454.55 0.00 Pending
Implementation 2017-12-20 2018-02-14 2018-08-13
BH/BPSP/G-016 / Power Back-Up System for DPMU
IDA / 51600 Project Management andCoordination Post Request for
Quotations Open - National
Single Stage - OneEnvelope 27,272.73 0.00 Pending
Implementation 2017-07-05 2017-08-30 2018-02-26
BH/BPSP/G-013 / OfficeFurniture for DPMUs
IDA / 51600 Project Management andCoordination Post Request for
Quotations Open - National
Single Stage - OneEnvelope 90,909.09 0.00 Pending
Implementation 2017-07-05 2017-08-30 2018-02-26
BH/BPSP/G-017 / Power Back-Up System for BPMU
IDA / 51600 Project Management andCoordination Post Request for Bids Open - National
Single Stage - OneEnvelope 154,545.45 0.00 Pending
Implementation 2017-10-16 2017-10-21 2017-12-02 2018-02-14 2018-03-21 2018-09-17
BH/BPSP/G-007 / WallPaintings on the Aims & Objectsof the Project
IDA / 51600
Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.
Post Request for Bids Open - National
Single Stage - OneEnvelope 227,272.73 0.00 Pending
Implementation 2017-10-02 2017-10-07 2017-11-18 2018-01-31 2018-03-07 2018-09-03
BH/BPSP/G-008 / Printing andInstallation of Hoardings, Kiosk,Wall-wrap, Banner, poster etc.in 12 Project Districts
IDA / 51600
Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.
Post Request for Bids Open - National
Single Stage - TwoEnvelope 303,000.00 0.00 Pending
Implementation 2017-12-15 2017-12-20 2018-01-31 2018-04-15 2018-05-20 2018-11-16
BH/BPSP/G-001 / Purchase of100 information machines to bedeployed at 100 GPs @estimated cost of INR 3 Lakhseach.
IDA / 51600
Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.
Post Request for Bids Open - National
Single Stage - TwoEnvelope 450,000.00 0.00 Pending
Implementation 2017-11-15 2017-11-20 2018-01-01 2018-01-28 2018-02-14 2018-05-15
Page 7
BH/BPSP/G-003 / Printing oftraining modules for Schemesunder BPSP and Department ofPanchayati Raj, Govt. of Bihare.g. Functional GramPanchayats, MukhyamantriGramin Peyjal Nischaye Yojna,Mukhyamantri Gramin Gali-NaliPakkikaran Nischaye Yojna, etc.
IDA / 51600
Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.
Post Request for Bids Open - National
Single Stage - TwoEnvelope 454,600.00 0.00 Pending
Implementation 2018-01-15 2018-01-20 2018-03-03 2018-05-16 2018-06-20 2018-12-17
BH/BPSP/G-004 / Printing oftraining modules for GramPanchayat Development Plan(GPDP)
IDA / 51600
Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.
Post Request for Bids Open - National
Single Stage - TwoEnvelope 454,600.00 0.00 Pending
Implementation 2018-03-15 2018-03-20 2018-05-01 2018-07-14 2018-08-18 2019-02-14
BH/BPSP/G-010 / Printing ofTraining modules on PanchayatFinancial Management forMukhiya, Up-Mukhiya, GPSecretary, Accountants Hired onOutsourced Arrangement and anAdditional 2 Functionaries in theGPs
IDA / 51600
Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.
Post Request for Bids Open - National
Single Stage - TwoEnvelope 113,700.00 0.00 Pending
Implementation 2017-11-15 2017-11-20 2018-01-01 2018-03-16 2018-04-20 2018-10-17
BH/BPSP/G-002 / Printing oftraining modules for RefresherCourse on Acts and Rules forPRI members and functionaries.
IDA / 51600
Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.
Post Request for Bids Open - National
Single Stage - TwoEnvelope 606,000.00 0.00 Pending
Implementation 2017-12-20 2017-12-25 2018-02-05 2018-04-20 2018-05-25 2018-11-21
BH/BPSP/G-009 / Printing ofIEC material for MobileAwareness Campaigns in the 2Pilot Project Districts andDistribution in the Gram Sabhasin rest of the 10 Project Districts.
IDA / 51600
Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.
Post Request for Bids Open - National
Single Stage - TwoEnvelope 757,600.00 0.00 Pending
Implementation 2017-12-15 2017-12-20 2018-01-31 2018-04-15 2018-05-20 2018-11-16
BH/BPSP/G-014 / OfficeFurniture for BPMUs
IDA / 51600 Project Management andCoordination Post Request for Bids Open - National
Single Stage - OneEnvelope 927,272.73 0.00 Pending
Implementation 2017-12-20 2017-12-25 2018-02-05 2018-04-20 2018-05-25 2018-11-21
NON CONSULTING SERVICESActivity Reference No. /
Description Loan / Credit No. Component Review Type Method Market Approach ProcurementProcess
Prequalification(Y/N)
EstimatedAmount (US$)
Actual Amount(US$)
ProcessStatus
Draft Pre-qualificationDocuments
PrequalificationEvaluation Report
Draft Bidding Document/ Justification
Specific ProcurementNotice / Invitation
Bidding Documents asIssued
Proposal Submission /Opening / Minutes
Bid Evaluation Reportand Recommendation
for AwardSigned Contract Contract Completion
Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual
BH/BPSP/G-028 / Designing,fabrication and presentation oftableau on 26th January, 2017
IDA / 51600Strengthen the StateGovernment capacity to managea gradual decentralization andempowerment process
Post Request forQuotations Open - National
Single Stage - OneEnvelope 12,121.21 0.00 Under
Implementation 2017-04-24 2017-06-19 2017-12-16
BH/BPSP/G-005 / Hiring of Non-Consultancy Services for EventManagement
IDA / 51600
Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.
Post Request forQuotations Open - National
Single Stage - OneEnvelope 90,909.09 0.00 Pending
Implementation 2017-07-05 2017-08-30 2018-02-26
BH/BPSP/G-024 /Housekeeping services (Non-Consultancy Services)
IDA / 51600 Project Management andCoordination Post Request for
Quotations Open - National
Single Stage - OneEnvelope 15,151.52 0.00 Pending
Implementation 2017-06-10 2017-08-05 2018-02-01
BH/BPSP/G-019 / Hiring of Non-Consultancy Services for RentalVehicles for the Project
IDA / 51600 Project Management andCoordination Post Request for
Quotations Open - National
Single Stage - OneEnvelope 75,757.58 0.00 Pending
Implementation 2018-01-04 2018-03-01 2018-08-28
BH/BPSP/G-029 / Designing,fabrication and presentation oftableau on 15th August, 2017
IDA / 51600
Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.
Post Request forQuotations Open - National
Single Stage - OneEnvelope 15,151.52 0.00 Pending
Implementation 2017-08-21 2017-10-16 2018-04-14
BH/BPSP/G-031 / Development& Operationalization of a MobileApp for Infrastructure AssetMapping
IDA / 51600 Project Management andCoordination Post Request for Bids Open - National
Single Stage - OneEnvelope 189,393.94 0.00 Pending
Implementation 2017-10-23 2018-04-21
BH/BPSP/G-030 / Hiring of Non-Consultancy Services for StateEvent (in 2018)
IDA / 51600
Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.
Post Request forQuotations Open - National
Single Stage - OneEnvelope 15,151.52 0.00 Pending
Implementation 2018-01-22 2018-03-19 2018-09-15
BH/BPSP/G-011 / Hiring of theNon-Consulting Firm for ProvidingServices of 800 Accountants(Hired on an OutsourcedArrangement) to Support GPsunder 12 Project Districts
IDA / 51600
Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.
Prior Request for Bids Open - National
Single Stage - TwoEnvelope 4,546,000.00 0.00 Pending
Implementation 2017-11-20 2017-11-25 2018-01-06 2018-03-21 2018-04-25 2018-10-22
BH/BPSP/G-012 / Hiring of anon-consulting firm for providingservices of 1300 Accountants(Hired on an OutsourcedArrangement) to Support GPsunder 26 Non-Project Districts inBihar (For 6 Months). In thiscase the detailed proposal maybe referred to comment section
IDA / 51600Strengthen the StateGovernment capacity to managea gradual decentralization andempowerment process
Prior Request for Bids Open - National
Single Stage - TwoEnvelope 1,819,000.00 0.00 Pending
Implementation 2017-11-20 2017-11-25 2018-01-06 2018-03-21 2018-04-25 2018-10-22
Page 8
BH/BPSP/G-032 / Hiring of ManPower Supply Agency for theSupply of 660 Human Resources(330 Data Entry Operator And330 Accountant) for 330Functional Gram Panchayats inPhase Wise Manner
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Prior Request for Bids Open - National
Single Stage - TwoEnvelope 3,800,000.00 0.00 Pending
Implementation 2017-12-05 2017-12-10 2018-01-21 2018-04-05 2018-05-10 2018-11-06
CONSULTING FIRMSActivity Reference No. /
Description Loan / Credit No. Component Review Type Method Market Approach Contract Type EstimatedAmount (US$)
Actual Amount(US$) Process Status Terms of Reference Expression of Interest
NoticeShort List and Draft
Request for ProposalsRequest for Proposals
as IssuedOpening of TechnicalProposals / Minutes
Evaluation of TechnicalProposal
Combined EvaluationReport and Draft
Negotiated ContractSigned Contract Contract Completion
Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual
BH/BPSP/C-024 / Hiring ofHuman Resource agency for staffrecruitment
IDA / 51600 Project Management andCoordination Prior Quality And Cost-
Based Selection Open - National
265,151.51 0.00 UnderImplementation 2017-03-07 2017-03-08 2017-03-28 2017-03-09 2017-05-11 2017-03-23 2017-06-08 2017-04-25 2017-07-08 2017-06-05 2017-08-12 2017-07-31 2017-09-16 2018-09-16
BH/BPSP/C-015 / PMU forState Wide PFM Roll Out
IDA / 51600Strengthen the StateGovernment capacity to managea gradual decentralization andempowerment process
Prior Quality And Cost-Based Selection Open - National
606,061.00 0.00 Under
Implementation 2017-04-10 2017-04-24 2017-05-01 2017-05-30 2017-06-14 2017-06-07 2017-07-12 2017-07-07 2017-08-11 2017-07-13 2017-09-15 2017-08-07 2017-10-20 2018-10-20
BH/BPSP/C-021 / Base Line &End Line Surveys for MeasuringProgress
IDA / 51600 Project Management andCoordination Post
ConsultantQualificationSelection
Open - National
189,394.00 0.00 UnderImplementation 2017-04-10 2017-04-21 2017-05-01 2017-06-14 2017-05-24 2017-07-14 2017-08-18 2018-02-14
BH/BPSP/C-028 / Hiring of HRSupport Agency
IDA / 51600 Project Management andCoordination Prior Quality And Cost-
Based Selection Open - National
196,970.00 0.00 UnderImplementation 2017-04-10 2017-06-01 2017-05-01 2017-06-05 2017-06-14 2017-07-24 2017-07-12 2017-08-11 2017-09-15 2017-10-20 2018-10-20
BH/BPSP/C-027 / IntegratedWeb Portal for BGSYS-Development and Management ofIntegrated Web Portal thatincludes HR - MIS, Training -MIS, Online BiometricAttendance, etc. for the Society
IDA / 51600 Project Management andCoordination Post
ConsultantQualificationSelection
Open - National
189,393.94 0.00 UnderImplementation 2017-04-19 2017-04-21 2017-05-10 2017-06-23 2017-07-23 2017-08-27 2018-02-23
BH/BPSP/C-007 / Hiring ofagency for Training NeedAssessment
IDA / 51600
Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.
PostConsultantQualificationSelection
Open - National
75,757.58 0.00 PendingImplementation 2017-08-31 2017-09-21 2017-11-04 2017-12-04 2018-01-08 2018-07-07
BH/BPSP/C-008 / Hiring ofagency for Research and Studieson thematic issues related toPRIs
IDA / 51600
Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.
PostConsultantQualificationSelection
Open - National
75,757.58 0.00 PendingImplementation 2017-07-17 2017-08-07 2017-09-20 2017-10-20 2017-11-24 2018-05-23
BH/BPSP/C-030 / IntegratedMobile Van AwarenessCampaign for the Piloted basison two Project PanchayatsDistricts - Integrated InformationDelivery System
IDA / 51600
Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.
Prior Quality And Cost-Based Selection Open - National
1,363,636.36 0.00 Under
Implementation 2017-05-30 2017-10-17 2017-06-20 2017-10-17 2017-08-03 2017-08-31 2017-09-30 2017-11-04 2017-12-09 2018-12-09
BH/BPSP/C-033 / Hiring of aCreative Agency on a short termconsultancy basis forDevelopment of Print Designs
IDA / 51600
Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.
PostConsultantQualificationSelection
Open - National
22,727.27 0.00 PendingImplementation 2017-05-25 2017-06-15 2017-07-29 2017-08-28 2017-10-02 2018-03-31
BH/BPSP/C-014 / Preparationof training Module and materialsfor Water & Sanitation Programs
IDA / 51600
Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.
PostConsultantQualificationSelection
Open - National
75,757.58 0.00 PendingImplementation 2017-06-30 2017-07-21 2017-09-03 2017-10-03 2017-11-07 2018-05-06
BH/BPSP/C-020 / PMU for e-Panchayat Implementation
IDA / 51600Strengthen the StateGovernment capacity to managea gradual decentralization andempowerment process
Prior Quality And Cost-Based Selection Open - National
757,575.76 0.00 Pending
Implementation 2017-07-31 2017-08-21 2017-10-04 2017-11-01 2017-12-01 2018-01-05 2018-02-09 2019-02-09
BH/BPSP/C-022 / Internal Auditfor the BGSYS ProjectManagement Units
IDA / 51600 Project Management andCoordination Post
ConsultantQualificationSelection
Open - National
12,121.21 0.00 PendingImplementation 2017-07-17 2017-08-07 2017-09-20 2017-10-20 2017-11-24 2018-05-23
BH/BPSP/C-023 / StatutoryAudit to BGSYS ProjectImplementation Units
IDA / 51600 Project Management andCoordination Post Least Cost Selection Open - National
7,575.76 0.00 Pending
Implementation 2017-05-31 2017-06-21 2017-08-04 2017-09-01 2017-10-01 2017-11-05 2017-12-10 2018-06-08
BH/BPSP/C-003 / Hiring of aconsultancy firm to assist theproject in implementation ofEnvironment ManagementFramework and Monitoring for330 PSBs
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Quality And Cost-Based Selection Open - National
151,500.00 0.00 Pending
Implementation 2018-01-10 2018-01-31 2018-03-16 2018-04-13 2018-05-13 2018-06-17 2018-07-22 2019-07-22
BH/BPSP/C-10 / Hiring ofagency for Development ofContent with Design for TrainingModules for fulfilment of BPSPObjectives vis-a-vis FunctionalGPs, Gram Panchayat FinancialManagement, GPDP and StateSchemes Implemented throughPanchayati Raj Deptt, GoB.
IDA / 51600
Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.
Post Quality And Cost-Based Selection Open - National
160,000.00 0.00 Pending
Implementation 2017-12-15 2018-01-05 2018-02-18 2018-03-18 2018-04-17 2018-05-22 2018-06-26 2019-06-26
Page 9
BH/BPSP/C-011 / Hiring of aConsultancy firm for Developmentof Community EngagementPlatform for MeaningfullyRecording the Citizens'Reactions on the Performance ofthe PRIs and Subsequent Issueof Advisory to the RespectivePRIs
IDA / 51600
Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.
Post Quality And Cost-Based Selection Open - National
151,600.00 0.00 Pending
Implementation 2017-12-25 2018-01-15 2018-02-28 2018-03-28 2018-04-27 2018-06-01 2018-07-06 2019-07-06
BH/BPSP/C-028/N / Hiring ofHR Support Agency Pay Roll &Performance Management of theBGSYS Staff at all levels (1575employee for 18 Month- @Rs.450 Per person per month)
IDA / 51600 Project Management andCoordination Post Quality And Cost-
Based Selection Open - National
200,000.00 0.00 PendingImplementation 2017-09-26 2017-10-17 2017-11-30 2017-12-28 2018-01-27 2018-03-03 2018-04-07 2019-04-07
BH/BPSP/C-001 / Third PartyQuality Audit of the Constructionof 330 PSBs under the Project
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Quality And Cost-Based Selection Open - National
227,272.73 0.00 Pending
Implementation 2017-12-15 2018-01-05 2018-02-18 2018-03-18 2018-04-17 2018-05-22 2018-06-26 2019-06-26
BH/BPSP/C-002 / Consultancyto monitor and enable process ofmaking 330 gram panchayatsFunctional
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Quality And Cost-Based Selection Open - National
454,545.45 0.00 Pending
Implementation 2018-02-15 2018-03-08 2018-04-21 2018-05-19 2018-06-18 2018-07-23 2018-08-27 2019-08-27
BH/BPSP/C-012 / Production ofTwo Short Films
IDA / 51600
Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.
Post Quality And Cost-Based Selection Open - National
454,545.45 0.00 Under
Implementation 2017-10-17 2017-10-12 2017-11-07 2017-10-17 2017-12-21 2018-01-18 2018-02-17 2018-03-24 2018-04-28 2019-04-28
BH/BPSP/C-031 / Hiring of Firmfor designing of all IEC materialfor the Project with Ready toPrint Designs
IDA / 51600
Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.
PostConsultantQualificationSelection
Open - National
200,000.00 0.00 UnderImplementation 2017-10-16 2017-10-12 2017-11-06 2017-10-17 2017-12-20 2018-01-19 2018-02-23 2019-10-16
BH/BPSP/C-032 / Hiring ofconsultancy firm for Production ofAudio Jingles & Fictional RadioSerials
IDA / 51600
Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.
Post Quality And Cost-Based Selection Open - National
380,000.00 0.00 Under
Implementation 2017-10-16 2017-10-12 2017-11-06 2017-10-17 2017-12-20 2018-01-17 2018-02-16 2018-03-23 2018-04-27 2019-04-27
BH/BPSP/C-018 / Identificationof Trainers & ToT for State WidePFM Training
IDA / 51600Strengthen the StateGovernment capacity to managea gradual decentralization andempowerment process
Post Quality And Cost-Based Selection Open - National
303,030.30 0.00 Pending
Implementation 2017-12-15 2018-01-05 2018-02-18 2018-03-18 2018-04-17 2018-05-22 2018-06-26 2019-06-26
BH/BPSP/C-037 / Hiring of theconsultancy firm for DLIVerification of 330 functionalPanchayats in 12 ProjectDistricts.
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
PostConsultantQualificationSelection
Open - National
190,000.00 0.00 PendingImplementation 2017-12-20 2018-01-10 2018-02-23 2018-03-25 2018-04-29 2018-10-26
BH/BPSP/C-010/N / Hiring ofagency for Development ofContent with Design for TrainingModules for fulfilment of BPSPObjectives vis-avis FunctionalGPs, Gram Panchayat FinancialManagement, GPDP & StateSchemes Implemented throughPanchayati Raj Department,Govt. of Bihar
IDA / 51600
Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.
Post Fixed BudgetSelection Open - National
160,000.00 0.00 Pending
Implementation 2017-12-10 2017-12-31 2018-02-13 2018-03-13 2018-04-12 2018-05-17 2018-06-21 2019-06-21
INDIVIDUAL CONSULTANTSActivity Reference No. /
Description Loan / Credit No. Component Review Type Method Market Approach Contract Type EstimatedAmount (US$)
Actual Amount(US$) Process Status Terms of Reference
Invitation toIdentified/Selected
ConsultantDraft Negotiated
Contract Signed Contract Contract Completion
Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual
BH/BPSP/C-029 / Hiring of theindividual consultant forDesigning and illustrating ofBooks and leaflets for electedrepetitive and functionaries underPRI
IDA / 51600Strengthen the StateGovernment capacity to managea gradual decentralization andempowerment process
Post Individual ConsultantSelection Open
4,545.45 0.00 Under
Implementation 2017-04-19 2017-04-21 2017-06-07 2017-06-28 2017-08-02 2018-01-29
BH/BPSP/C-006 / Hiring ofIndividual Consultants for theCapacity Building Cell
IDA / 51600
Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.
Post Individual ConsultantSelection Open
75,757.58 0.00 Pending
Implementation 2017-07-17 2017-09-04 2017-09-25 2017-10-30 2018-04-28
BH/BPSP/C-013 / IndividualEconomist with expertise inPublic Finance
IDA / 51600
Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.
Post Individual ConsultantSelection Open
113,636.36 0.00 Pending
Implementation 2017-06-15 2017-08-03 2017-08-24 2017-09-28 2018-03-27
BH/BPSP/C-025 / AdminConsultant
IDA / 51600 Project Management andCoordination Post Individual Consultant
Selection Open
30,303.03 0.00 PendingImplementation 2017-06-30 2017-08-18 2017-09-08 2017-10-13 2018-04-11
BH/BPSP/C-026 / IndividualConsultant for Support to theProcurement Unit of BGSYS
IDA / 51600 Project Management andCoordination Post Individual Consultant
Selection Open
30,303.03 0.00 PendingImplementation 2017-05-30 2017-07-18 2017-08-08 2017-09-12 2018-03-11
Page 10
BH/BPSP/C-034 / Hiring of CAfirm for Statutory Audit ofBGSYS SPMU office
IDA / 51600 Project Management andCoordination Prior Direct Selection Direct
380.00 0.00 Under
Implementation 2017-09-15 2017-09-25 2017-11-29 2018-05-28
BH/BPSP/C-005 / Hiring of anAgency for Training Programunder Core institutional CapacityBuilding Component - through aGovt/semi-Govt agency
IDA / 51600
Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.
Prior Direct Selection Direct
530,300.00 0.00 PendingImplementation 2017-12-15 2017-12-25 2018-02-28 2018-08-27
BH/BPSP/C-009 / Hiring of anagency for Computer literacyPrograms for the elected PRIrepresentatives through agovernment / semi-governmentagency
IDA / 51600
Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.
Prior Direct Selection Direct
227,300.00 0.00 UnderImplementation 2017-10-10 2017-09-25 2017-10-20 2017-12-24 2018-06-22
BH/BPSP/C-034/N / Hiring ofCA firm for Statutory Audit ofBGSYS SPMU office
IDA / 51600 Project Management andCoordination Post Direct Selection Direct
380.00 0.00 Pending
Implementation 2017-09-26 2017-10-06 2017-12-10 2018-06-08
BH/BPSP/C-009/N / Hiring of anagency for Computer literacyPrograms for the elected PRIrepresentatives through agovernment / semi-governmentagency
IDA / 51600
Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.
Post Direct Selection Direct
340,000.00 0.00 PendingImplementation 2017-10-10 2017-10-20 2017-12-24 2018-06-22
BH/BPSP/C-016 / Procurementof GPMS Software directly fromWest Bengal PRI includingTechnical Services (Hand-holdingServices for State Wide Roll Out,etc.)
IDA / 51600Strengthen the StateGovernment capacity to managea gradual decentralization andempowerment process
Post Direct Selection Direct
76,000.00 0.00 PendingImplementation 2017-11-15 2017-12-02 2018-01-18 2018-07-17
BH/BPSP/C-017 / OrganizingTraining Programs on usages ofGPMS for the Accountants (Tobe Taken on Board on anOutsourced Arrangement)through an internal arrangementsin collaboration with anygovernment / semi-governmentagency
IDA / 51600Strengthen the StateGovernment capacity to managea gradual decentralization andempowerment process
Post Direct Selection Direct
230,000.00 0.00 PendingImplementation 2017-11-28 2017-12-08 2018-02-11 2018-08-10
BH/BPSP/C-035 / Hiring of theconsultant firm for preparation ofDPR (330 Panchayat SarkarBhawans)
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Direct Selection Direct
45,000.00 0.00 PendingImplementation 2017-10-17 2017-10-27 2017-12-31 2018-06-29
BH/BPSP/C-036 / Hiring ofconsultancy firm forProgrammatic support to theBihar Gram Swaraj YojnaSociety
IDA / 51600
Capacity Building for PanchayatRaj Institutions: - Thiscomponent builds panchayats'core institutional competenciesto empower the m to achievesubstantive developmentoutcomes.
Post Direct Selection Direct
160,000.00 0.00 PendingImplementation 2017-12-20 2017-12-30 2018-03-05 2018-09-01
BH/BPSP/C-038 / Hiring ofIndividual Consultant forEnvironmental & SocialSpecialist (Safeguard Specialist)-1
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Individual ConsultantSelection Open
40,000.00 0.00 Pending
Implementation 2017-12-20 2018-02-07 2018-02-28 2018-04-04 2018-10-01
BH/BPSP/C-039 / Hiring ofIndividual Consultant forEnvironmental & SocialSpecialist (Safeguard Specialist)-2
IDA / 51600
Panchayat Sarkar Bhawan- Thiscomponent involves constructionand making functionalPanchayat Sarkar Bhawans inapproximat ely 300 Gr amPanchayats
Post Individual ConsultantSelection Open
40,000.00 0.00 Pending
Implementation 2017-12-20 2018-02-07 2018-02-28 2018-04-04 2018-10-01