Page 1: Beamline around IP8

Short summary of last weekend’s LHC and LHCb results, using slides of Richard Jacobbson and Olaf Behrendt from the Tuesday meeting of Aug 26

Page 2: Beamline around IP8

Beamline around IP8

IP8

TDI

TED

Page 3: Beamline around IP8

TED: • 28 tonne beam stopper• ~ 200 meter from LHCb

TDI: • Collimator with 5 meter long jaws• About 50 meters from LHCb• Cannot be fully closed!

Page 4: Beamline around IP8

What happened Friday

• 14.00: Machine closed-up• 16.00: Access to TI8 to unblock the dump at the end of

TI8 + access to solve cryogenics problems at point 2• 16.50 : CMS opens a ‘green door…• 17.50: Beam down to dump (TED) at the end of TID• VELO Tracks !!!• 19.00: TED taken out• Problem with LHC timing• 20.00 – 20.30: Beam down to TDI after some struggle• 20.38: First shot on TDI• 20.53: TDI open and first shot straight to point 7 (3km)!

Page 5: Beamline around IP8

<- Beam monitor near TDI

Beam screen near point 7(after LHCb!)

Page 6: Beamline around IP8

Saturday• Aperture measurements between point 7 and 8• LCHb was off (apart from beam conditions monitor)

Sunday• Beam on TED from ~10:30 to 12:30• Whole VELO on

Page 7: Beamline around IP8

Beam incidents on Saturday• LHCb BCM pulled beam dump at three dumps on TDI

– 11:22, 12:10, 12:47– BLMs on triplets and around TDI did not show ‘much’ higher losses– Loss appeared as a concentrated shower at ~9 o’clock in BCM as

seen along Beam 2• Hypothesis: Compatible with little or no kick and TDI open at top

• 7400 nA max (!) seen in sensor 2 as compared to <200 nA during TDI dumps on Friday night

• 36 pA/mips >105 particles per sensor >107 particles assuming an area of 10x10cm2

Beam 2

BCM Downstream station

8x8mm2

0

1

2

3

4

5

6

7

?

Page 8: Beamline around IP8

VELO results

Page 9: Beamline around IP8

• 5 modules on each side switched on• timing adjusted to expected SPD trigger signal

[from SPD and VELO signal propagation times]• data taking with 15 consecutive triggers

[window of 350 ns around the expected signal]• compensation for not optimal timing by

– lowering the cluster thresholds– enhancing the signal amplification

TED Run 1 (22.08.08)

Page 10: Beamline around IP8

A First Glimpse of Beam

Page 11: Beamline around IP8

First reconstructed tracks in VELO

run: 30764event: 156time: 17:56?

Page 12: Beamline around IP8

• linked hits

• not not linked hits

Page 13: Beamline around IP8
Page 14: Beamline around IP8

Timing

central trigger

Page 15: Beamline around IP8

TED Run 2 (24.08.08)

• all Si modules switched on• all but 10 sensors read out [TELL1 problems]

• timing window reduced to 5 consecutive triggers

Page 16: Beamline around IP8

run: 30933event: 1

Page 17: Beamline around IP8

run: 30933event: 12

Page 18: Beamline around IP8

Sunday’s runAlso other subdetector were onIT, PRS, SPD, Muon and PileUp

Page 19: Beamline around IP8

Recommended