ARKHI-TEKTONS SYSTEMS LTD
COMPANY PROFILE
Architects. Planners. Interior Designers .
Construction Project Managers. Facility
Managers. Fit-out Contractor's.
Occidental Plaza,Westlands,
3rd Floor.
P.O. Box 67674-00200, NAIROBI,KENYA.
Cellphone: 0720300638
0734703549
Email: [email protected]
Letter of Introduction.
Letter of Introduction.
Registration Certificate PIN Certificate
RESIDENTIAL PROJECTS
RESIDENTIAL PROJECTS
PROJECT; Proposed Residential house at Garden Estate.
PROJECT COST;KSH 30Million.
PROJECT STATUS; Construction commencement; January2012.
CLIENT; Mr.Ndinika.
LOCATION;Niarobi. .
1
Perspective from the entry
Floor Plan
Front elevation
Side Elevation
RESIDENTIAL PROJECTS
PROJECT; Proposed Maisonette at Dumberi.
PROJECT COST;KSH 11.5 Million.
PROJECT STATUS; Construction commencement; March 2011.
CLIENT; C.N Kariuki.
LOCATION;Kiambu .
2
Perspective from the entry
Floor Plan
Front elevation
Side Elevation
RESIDENTIAL PROJECTS
PROJECT; Proposed 3-bedroom bungalow in Eldoret.
PROJECT COST;KSH 4.5 Million.
PROJECT STATUS; Construction commencement, August 2010.
CLIENT; Aaron Biwott.
LOCATION;Sergoi,Uasin-Gishu district,Eldoret.
3
Perspective from the entry
Floor Plan
Front elevation
Side Elevation
RESIDENTIAL PROJECTS
PROJECT; Proposed maisonette.
PROJECT COST;KSH 11.2 Million.
PROJECT STATUS; Local authority approval stage.Feb 2011.
CLIENT; Mr. Kivuti S.M
LOCATION; Rongai,Nairobi.
4
Perspective from the entry
Floor Plans
Rear perspective
RESIDENTIAL PROJECTS
PROJECT; Proposed Maisonette in Rongai.
PROJECT COST;KSH 14 Million.
PROJECT STATUS; Construction stage.
CLIENT; Albert Nyambaso Kerongo.
LOCATION;Rongai,Nairobi Metro..
5
Perspective from the entry
Floor Plans
Rear Perspective
RESIDENTIAL PROJECTS
PROJECT; Proposed Maisonette in Juja,Thika.
PROJECT COST;KSH 5.5Million.
PROJECT STATUS; Construction stage
Commencement date ;April 2008.
CLIENT; Samson Kamau.
LOCATION;Juja,Nairobi Metro..
6
Perspective from the entry
Floor Plans
Front Elevation
RESIDENTIAL PROJECTS
PROJECT; Proposed Refurbishments at Oscar’s Residence.
PROJECT COST;KSH 3.3Million.
PROJECT STATUS; Complete.
CLIENT; Oscar Muriu.
LOCATION;Karen,Nairobi Metro..
7
Photo of the complete scheme
Floor Plans
Works in progress
RESIDENTIAL PROJECTS
PROJECT; Proposed Executive Apartments at Kikuyu.
PROJECT COST;KSH 45Million.
PROJECT STATUS; Construction Stage
Commencement date; May 2010.
CLIENT; Jack Tharamba.
LOCATION;Kikuyu,Nairobi Metro..
8
Perspective showing the frontage
Floor Plans
Elevations
RESIDENTIAL PROJECTS
PROJECT; Proposed Apartments Juja, NAIROBI.
PROJECT COST;KSH 37.9Million.
PROJECT STATUS; Construction Stage
CLIENT; Dr.Joyce Njenga.
LOCATION;Juja,Nairobi Metro..
9
Perspective showing the frontage
Floor Plan
Side Elevations
RESIDENTIAL PROJECTS
PROJECT; Proposed Apartments Langata, NAIROBI.
PROJECT COST;KSH 18.2Million.
PROJECT STATUS; Local authority approval stage.
CLIENT; MR. Boniface Irungu.
LOCATION;Langata,Nairobi Metro..
10
Perspective showing the frontage
Floor Plan
Side Elevations
RESIDENTIAL PROJECTS
PROJECT; Proposed Apartments Thindigwa, Kiambu,NAIROBI.
PROJECT COST;KSH 45.2Million.
PROJECT STATUS; Local authority approval stage.
CLIENT; MR. C.N Wachira.
LOCATION;Thindigwa,kiambu,Nairobi Metro..
11
Perspective showing the frontage
Floor Plan
Entry point perspective
RESIDENTIAL PROJECTS
PROJECT; Proposed Residential house at Garden Estate.
CLIENT; Mr.Rajan A.
LOCATION;Niarobi. .
12
Perspective from the entry
Perspective from the rear.
RESIDENTIAL PROJECTS
PROJECT; Proposed Residential house at Kakamega.
CLIENT; Mrs.Shavuya Zainabu.
LOCATION;Kakamega. .
13
Perspective from the entry
Perspective from the rear.
RESIDENTIAL PROJECTS
PROJECT; Proposed Apartments Kilimani,NAIROBI.
PROJECT COST;KSH 200Million.
PROJECT STATUS; Local authority approval stage.
CLIENT; MR. Ramesh.
LOCATION;Kilimani,Nairobi Metro..
14
Perspective showing the frontage
Floor Plan
Entry point perspective
RESIDENTIAL PROJECTS
PROJECT; Proposed Town Houses Kilimani,NAIROBI.
PROJECT COST;KSH 128Million.
PROJECT STATUS; Local authority approval stage.
CLIENT; MR. Dinesh.
LOCATION;Kilimani,Nairobi Metro.
15
Perspective showing the frontage
Floor Plan
Entry point perspective
RESIDENTIAL PROJECTS
PROJECT; Proposed Apartments Thika.
PROJECT COST;KSH 140Million.
PROJECT STATUS; Local authority approval stage.
CLIENT; MR. Edwin Kadudu.
LOCATION;Thika,Kiambu County.
16
Perspective showing the frontage
Floor Plan
Entry point perspective
RESIDENTIAL PROJECTS
PROJECT; Proposed Maisonette at Ngong.
CLIENT; Bjohn Maaskart.
LOCATION;Ngong –Kajiado county.
17
Perspective from the entry
Perspective from the side.
PROJECT COST;
PROJECT STATUS; Construction stage.
Construction Commencement Date; August 2015.
Floor plans.
RESIDENTIAL PROJECTS
PROJECT; Proposed refurbishments at Ngong.
CLIENT; Bjohn Maaskart.
LOCATION; Ngong –Kajiado county.
18
Perspective from the side.
Perspective from the Front.
PROJECT COST;
PROJECT STATUS; Construction stage.
Construction Commencement Date; Jan 2016.
Floor plans.
COMMERCIAL,HOSPITALITY,INDUSTRIAL &
INSTITUTIONAL PROJECTS
100
PROJECT; Proposed SYNOD house, Bondo.
PROJECT COST;KSH 185Million.
PROJECT STATUS; Construction Stage
Commencement date; July 2008.
CLIENT; A.C.K Church, Diocese of Bondo.
LOCATION;Bondo,Nyanza Kenya.
101
Perspective showing the frontage
Floor Plan
Northern Perspective
COMMERCIAL,HOSPITALITY,INDUSTRIAL
& INSTITUTIONAL PROJECTS
PROJECT; Proposed Rapids camp-sagana.
PROJECT COST;KSH 9Million.
PROJECT STATUS; Construction Commencement date; January 2012.
CLIENT; Rapids camp sagana.
LOCATION;Muranga Kenya.
102
Perspective showing the frontage
Floor Plan
Rear Perspective
COMMERCIAL,HOSPITALITY,INDUSTRIAL
& INSTITUTIONAL PROJECTS
PROJECT; Proposed Trade Circle Go-Downs.
PROJECT COST;KSH …………………..Million.
PROJECT STATUS; Local Authorities approval stage
CLIENT; Trade Circle Lmtd.
LOCATION;Industrial Area,NairobiKenya.
103
Frontage Elev
Floor Plan
Side Elevation
COMMERCIAL,HOSPITALITY,INDUSTRIAL
& INSTITUTIONAL PROJECTS
PROJECT; Proposed PEFA church, Githurai.
PROJECT COST;KSH …………………..Million.
PROJECT STATUS; Local Authorities approval stage
CLIENT; PEFA Church Githurai.
LOCATION;Githurai,Nairobi Metro.
104
Perspective showing the frontage
Floor Plans
Side Elevation
COMMERCIAL,HOSPITALITY,INDUSTRIAL
& INSTITUTIONAL PROJECTS
PROJECT; Proposed Cottages at Ole-polos.
PROJECT COST;KSH …………………..Million.
PROJECT STATUS; Clients approval stage
CLIENT; Dr. Alice.
LOCATION;Ole-polos,Nairobi Metro.
105
Perspective showing the frontage
Floor Plans
COMMERCIAL,HOSPITALITY,INDUSTRIAL
& INSTITUTIONAL PROJECTS
PROJECT; Proposed Administration block and Library.
PROJECT COST;KSH 12.4 Million.
PROJECT STATUS; Local Authorities approval stage
CLIENT; Board of governors and P.T.A
Mt.Kinangop Girls Sec School.
LOCATION; Engineer ,Kinangop.
106
Perspective showing the frontage
Floor Plan
Perspective showing the rear
COMMERCIAL,HOSPITALITY,INDUSTRIAL
& INSTITUTIONAL PROJECTS
PROJECT; Proposed Bomas ii.
PROJECT COST;KSH 447 Million.
PROJECT STATUS; Stake-holders feasibility approval stage
CLIENT; Muka-mukuu cooperative society &
Government of Kenya.
LOCATION; Ol-donyo sabuk-Kilima mbogo
Nairobi metro-politan region.
107
Perspective showing the frontage
Aerial perspective showing
the Site Plan
Perspective showing
main auditorium’s interiors
COMMERCIAL,HOSPITALITY,INDUSTRIAL
& INSTITUTIONAL PROJECTS
PROJECT; Proposed Student Hostels ,Athi-river.
PROJECT COST;KSH 12.9Million
PROJECT STATUS; Construction stage;
Commencement date; June 2009
CLIENT; Mrs Ndungu.
LOCATION; Athi-river
Nairobi metro-politan region.
108
Perspective showing the entry façade.
Ground Floor plan.
Plan Showing a
single hostel
unit.
Front Elevation.
COMMERCIAL,HOSPITALITY,INDUSTRIAL
& INSTITUTIONAL PROJECTS
PROJECT; Proposed Water tanks stand,Kiambu.
PROJECT COST;KSH 240,000/=
PROJECT STATUS; Completion date; June 2009.
CLIENT; Mr Peter Mungai.
LOCATION; Kiambu
Nairobi metro-politan region.
109
Perspectives showing the Water Tanks.
Ground Floor plan.
Front Elevation.
COMMERCIAL,HOSPITALITY,INDUSTRIAL
& INSTITUTIONAL PROJECTS
PROJECT; Proposed Commercial Development
at Malili,Machakos ,Mombasa RD.
PROJECT COST;KSH 27.9Million
PROJECT STATUS; L.A approval stage;
Date; June 2011.
CLIENT; Mr. Victor Kariuki.
LOCATION; Malili I.C.T Park area,Machakos,Mombasa RD
Nairobi metropolitan region.
110
Perspective showing the entry façade.
Floor plans.
Perspective showing the side view
and service yard.
COMMERCIAL,HOSPITALITY,INDUSTRIAL
& INSTITUTIONAL PROJECTS
PROJECT; Proposed Orthodox Church at Mai mahiu.
CLIENT; Orthodox Church.
LOCATION;Mai Mahiu .
111
Perspective from the entry
Perspective from the rear side.
PROJECT COST;
PROJECT STATUS; Completed- Date; March 2012.
COMMERCIAL,HOSPITALITY,INDUSTRIAL
& INSTITUTIONAL PROJECTS
PROJECT; Proposed Galitos,Creamy Inn,Chicken Inn at Tasia in Embakasi.
CLIENT; Mohamed.
LOCATION; Tasia –Nairobi county.
112
Perspective from the front(façade).
Birds Eye view Perspective.
PROJECT COST;Kshs 20 Million
PROJECT STATUS; Planning & local authority approval stage.
Construction Commencement Date; Jan 2016.
Ground Floor plan.
COMMERCIAL,HOSPITALITY,INDUSTRIAL
& INSTITUTIONAL PROJECTS
INTERIOR DESIGN PROJECTS
200
INTERIOR DESIGN PROJECTS.
PROJECT; Proposed I&M Bank at Gigiri .
CLIENT; I&M Bank.
LOCATION;Gigiri –Nairobi County.
201
Perspective showing the interior.
Perspective from the lounge.
PROJECT COST;Kshs 27 Million.
PROJECT STATUS; Completed; May 2014.
Perspective from the main entrance.
Perspective showing the back office.
INTERIOR DESIGN PROJECTS.
PROJECT; Proposed I&M Bank at Kitale .
CLIENT; I&M Bank.
LOCATION;Kitale –Trans-Nzoia County.
202
Perspective showing the interior.
PROJECT COST;Kshs 18 Million.
PROJECT STATUS; Completed; Jan 2015.
Perspective from the bulk cashier door.
Perspective showing the ATM side.
INTERIOR DESIGN PROJECTS.
PROJECT; Proposed Maina & Mwangi Associates.
CLIENT; Mr. David Maina.
LOCATION; Fig-Tree Building –Nairobi County.
203
PROJECT COST;Kshs 4 Million.
PROJECT STATUS; Completed; Jan 2015.
PROJECT; Proposed Dental Clinic.
CLIENT; Mr. Susan Maina.
LOCATION; Nairobi County.
PROJECT COST;Kshs 11 Million.
PROJECT STATUS; Fit-Out commencement Date; October 2015.
PROJECT; Proposed I&M Bank at Thika,Lavington,Garden City.
CLIENT; I&M Bank Ltd.
LOCATION; As Indicated –Kenya.
PROJECT COST;Approx Kshs 20 Million per branch.
PROJECT STATUS; Completed; June 2015.