Dragos Andrei
PPRA Annual Meeting, 2012
7/27/2019 Andrei PRRC Update
2/28
} BARM was published 10 years ago} Almost all graphics (charts and photographs)
are outdated and needed to be replaced
} Some of the text needed to be updated
7/27/2019 Andrei PRRC Update
3/28
} No references were included} Unwanted symbols appear on some charts,
possibly due to software incompatibility
} The four ARRA disciplines are presented inthe following order: HIR CP
FDR CR
7/27/2019 Andrei PRRC Update
4/28
7/27/2019 Andrei PRRC Update
5/28
} More logical order of chapters: CP, HIR, CR, FDR
7/27/2019 Andrei PRRC Update
6/28
ColdPlaning
PmenC
ton
PCHotIn-PlaceRecycling
ColdRecycling
Full DepthReclamation
Time
7/27/2019 Andrei PRRC Update
7/28
} Please review text and send last comments toyour technical committee chair; committeewill synthesize and submit one final
corrected text} Please provide new photographs where
missing can be provided directly to PRRC:online, email, CD, etc.
}Our deadline is March 1
st
we asked for anextension
7/27/2019 Andrei PRRC Update
8/28
1. http://dl.dropbox.com/u/63577901/Chapter%201%20Introduction.docx2. http://dl.dropbox.com/u/63577901/Chapter%202%20Asphalt%20Recycling%20and
%20Reclaiming%20Strategies%20in%20Pavement%20Management.docx
3. http://dl.dropbox.com/u/63577901/Chapter%203%20Project%20Evaluation.docx4. http://dl.dropbox.com/u/63577901/Chapter%204%20HIR%20Project%20Analysis.docx5. http://dl.dropbox.com/u/63577901/Chapter%205%20HIR%20Mix%20Design.docx6. http://dl.dropbox.com/u/63577901/Chapter%206%20HIR%20Construction.docx7.
http://dl.dropbox.com/u/63577901/Chapter%207%20HIR%20Specifications%20and%20Inspection.docx
8. http://dl.dropbox.com/u/63577901/Chapter%208%20CP%20Construction.docx9. http://dl.dropbox.com/u/63577901/Chapter%209%20CP%20Specifications%20and
%20Inspection.docx10. http://dl.dropbox.com/u/63577901/Chapter%2010%20FDR%20Project%20Analysis.docx11. http://dl.dropbox.com/u/63577901/Chapter%2011%20FDR%20Mix%20Design.docx12. http://dl.dropbox.com/u/63577901/Chapter%2012%20FDR%20Construction.docx13. http://dl.dropbox.com/u/63577901/Chapter%2013%20FDR%20Specifications%20and
%20Inspection.docx
14. http://dl.dropbox.com/u/63577901/Chapter%2014%20CIR%20Project%20Analysis.docx15. http://dl.dropbox.com/u/63577901/Chapter%2015%20CIR%20Mix%20Design.docx16. http://dl.dropbox.com/u/63577901/Chapter%2016%20CIR%20Construction.docx17. http://dl.dropbox.com/u/63577901/Chapter%2017%20CIR%20Specifications%20and
%20Inspection.docx
7/27/2019 Andrei PRRC Update
9/28
} ARRA Technical Committee Chairs andMembers
7/27/2019 Andrei PRRC Update
10/28
PRRC Initiative 1
7/27/2019 Andrei PRRC Update
11/28
} Pavement Preservation ETG Emulsion Task Force OklahomaCity, May 2011
} Geo-Institute, Tulsa, OK June 2011} NCAT Professor Training Course July 2011} Atlanta In-Place Recycling Seminar August 2011}
Rocky Mountain Asphalt User Producer Group Billings, MT, Oct.2011} ARRA Semi-Annual Meeting Nov. 2011} SF Bay Area MTC Climate Initiative Seminar Oakland, CA., Jan.
2012} TRB Washington DC, Jan. 2012} Ontario Good Roads Association Meeting Toronto, Canada,
January 2012} Conference Call, Aggregate Supplier on Effects of Recycling Jan
2001} Wyoming DOT Engineers Meeting Casper, WY, March 2012
7/27/2019 Andrei PRRC Update
12/28
} Bill Kitch @ ASCE San Bernardino/RiversideBranch meeting
} Dragos @ ISAP Asphalt Pavements andEnvironment Workshop at TRB WG2: Cold Recycling of RAP
mix design approaches in various countries structural design approaches in various countries
(including distress mechanisms) research databases and information sharing focus areas for future research
} Dragos @ ASCE GI Pavements CommitteeMeeting at TRB
7/27/2019 Andrei PRRC Update
13/28
} Roadmap 3, PRRCs newsletter} www.PRRCenter.org (1,030 visits in last 6
months)
} LinkedIn Education and Outreach Group Research and Innovation Group Sustainability Toolbox Group
7/27/2019 Andrei PRRC Update
14/28
} BARM, 2nd Edition} Virtual BARM} High RAP Literature Review} Integrating Recycling and Reclaiming
Strategies in Pavement Management
7/27/2019 Andrei PRRC Update
15/28
} Oklahoma State University Contract withOklahoma Transportation Center
} Started January 2012}
Projected completion, Summer 2013} Could include Frequently Asked Questions
Fall 2013} Considering one of two formats:
Beyond Roads http://www.beyondroads.com WSDOT Pavement Design Guide http://training.ce.washington.edu
7/27/2019 Andrei PRRC Update
16/28
PRRC Initiative 2
7/27/2019 Andrei PRRC Update
17/28
7/27/2019 Andrei PRRC Update
18/28
} NCHRP 9-51: Material Properties of Cold In-Place Recycled and Full-Depth ReclamationAsphalt Concrete for Pavement Design
$500,000 30 months
7/27/2019 Andrei PRRC Update
19/28
PRRC Initiative 3
7/27/2019 Andrei PRRC Update
20/28
} Help Desk Executive Director responding to help desk requests Questions and answers are being archived for
future Frequently Asked Questions web page
FAQ page may be merge with Virtual BARM
7/27/2019 Andrei PRRC Update
21/28
} Pavement Recycling Projects Database} Sustainability Calculator
7/27/2019 Andrei PRRC Update
22/28
For the Advancement of Pavement Recyclingand Reclaiming
7/27/2019 Andrei PRRC Update
23/28
} CAT Paving Products} Colas Solutions} Construction MaterialRecycling} Coughlin Company} Ergon Asphalt &Emulsions} Garrity Asphalt
Recycling
} Green RoadsRecycling} Intermountain} Kennametal} Pavement RecyclingSystems} Roadtec} Rock Solid
Stabilization andReclamation} The Barnhardt Group
7/27/2019 Andrei PRRC Update
24/28
} Vital funds to keep the Center going} Recognition on our website, newsletters,
tradeshow presentations, etc.
} Makes possible the Golden Leaf Award andcall for papers.
} Automatic membership in PRRC InitiativesSteering Committees
} New members are always welcome.
7/27/2019 Andrei PRRC Update
25/28
7/27/2019 Andrei PRRC Update
26/28
7/27/2019 Andrei PRRC Update
27/28
7/27/2019 Andrei PRRC Update
28/28
Dragos Andrei, Ph.D., P.E., M. ASCE
Associate Professor, Civil Engineering Department
Technical Director, Pavement Recycling and Reclaiming Center
CAL POLY POMONA
Office: 909.869.2487 Mobile: 818.458.9483
Email: [email protected]
Web: www.prrcenter.org