All Experimenters’ Meeting WATER UPDATE

• Weekend activities• Start of new domestic water project• Industrial Cooling Water (ICW) leaks

Page 2: All Experimenters Meeting WATER UPDATE Weekend activities Start of new domestic water project Industrial Cooling Water (ICW) leaks

Weekend Activities(between 10 and 11 inches of rainfall)

• Flood Control Surface Water Activities• New Muon Lab switchgear• Main Ring B-3 transformer• MI-40 transformer• Sanitary lift station and adjacent structures

in Village• Meson Detector Building roof• Site 29 power outage

Page 3: All Experimenters Meeting WATER UPDATE Weekend activities Start of new domestic water project Industrial Cooling Water (ICW) leaks

Site Ponds

Page 4: All Experimenters Meeting WATER UPDATE Weekend activities Start of new domestic water project Industrial Cooling Water (ICW) leaks

West Weir

Page 5: All Experimenters Meeting WATER UPDATE Weekend activities Start of new domestic water project Industrial Cooling Water (ICW) leaks

East Weir

Page 6: All Experimenters Meeting WATER UPDATE Weekend activities Start of new domestic water project Industrial Cooling Water (ICW) leaks

Andy’s Pond

Page 7: All Experimenters Meeting WATER UPDATE Weekend activities Start of new domestic water project Industrial Cooling Water (ICW) leaks

Power Line Road

Page 8: All Experimenters Meeting WATER UPDATE Weekend activities Start of new domestic water project Industrial Cooling Water (ICW) leaks
Page 9: All Experimenters Meeting WATER UPDATE Weekend activities Start of new domestic water project Industrial Cooling Water (ICW) leaks

Weekend Activities(between 10 and 11 inches of rainfall)

• Flood Control Surface Water Activities• New Muon Lab switchgear• Main Ring B-3 transformer• MI-40 transformer• Sanitary lift station and adjacent structures

in Village• Meson Detector Building roof• Site 29 power outage

Page 10: All Experimenters Meeting WATER UPDATE Weekend activities Start of new domestic water project Industrial Cooling Water (ICW) leaks

Domestic Water Project

• Single DWS line vulnerability• Second DWS feed to WH and footprint• GPP project starts this week• Method of Horizontal Directional Drilling • WH east parking lot impact 9/17–10/17

Page 11: All Experimenters Meeting WATER UPDATE Weekend activities Start of new domestic water project Industrial Cooling Water (ICW) leaks

Industrial Cooling Water

• Supplies fire and cooling water make-up• System is in poor shape• Several recent pipe and valve failures• No significant operational impacts – yet

– Pond water quality diminished– Increased silt levels and zebra mussel shells

• Plans for GPP and longer term line Item project• Infrastructure must be part of future project

planning