Page 1: Accelerated Bridge Construction Examples - Vermont · PDF fileAccelerated Bridge Construction Examples • We have been using ABC methods to build bridges since 2007 on approximately

Accelerated Bridge Construction Examples

• We have been using ABC methods to build bridges since

2007 on approximately 25 projects.

• We used this approach in response to Tropical Storm Irene

• The following slides show some examples of past projects

Page 2: Accelerated Bridge Construction Examples - Vermont · PDF fileAccelerated Bridge Construction Examples • We have been using ABC methods to build bridges since 2007 on approximately

Accelerated Bridge Construction

Driven steel piles with precast concrete cap for abutment

Page 3: Accelerated Bridge Construction Examples - Vermont · PDF fileAccelerated Bridge Construction Examples • We have been using ABC methods to build bridges since 2007 on approximately

Accelerated Bridge Construction

The first of three Precast Concrete Caps being placed

Page 4: Accelerated Bridge Construction Examples - Vermont · PDF fileAccelerated Bridge Construction Examples • We have been using ABC methods to build bridges since 2007 on approximately

Accelerated Bridge Construction

Precast concrete Abutment in place and ready for Superstructure

Page 5: Accelerated Bridge Construction Examples - Vermont · PDF fileAccelerated Bridge Construction Examples • We have been using ABC methods to build bridges since 2007 on approximately

Accelerated Bridge Construction

Precast Concrete NEXT Beam lifted into place

Page 6: Accelerated Bridge Construction Examples - Vermont · PDF fileAccelerated Bridge Construction Examples • We have been using ABC methods to build bridges since 2007 on approximately

Accelerated Bridge Construction

The second NEXT Beam being placed

Page 7: Accelerated Bridge Construction Examples - Vermont · PDF fileAccelerated Bridge Construction Examples • We have been using ABC methods to build bridges since 2007 on approximately

Accelerated Bridge Construction

Three NEXT Beams in place with the final unit ready

Page 8: Accelerated Bridge Construction Examples - Vermont · PDF fileAccelerated Bridge Construction Examples • We have been using ABC methods to build bridges since 2007 on approximately

Accelerated Bridge Construction

Precast Bridge Unit (PBU) delivered to site

Page 9: Accelerated Bridge Construction Examples - Vermont · PDF fileAccelerated Bridge Construction Examples • We have been using ABC methods to build bridges since 2007 on approximately

Accelerated Bridge Construction

Precast Bridge Unit (PBU) lifted onto abutments

Page 10: Accelerated Bridge Construction Examples - Vermont · PDF fileAccelerated Bridge Construction Examples • We have been using ABC methods to build bridges since 2007 on approximately

Accelerated Bridge Construction

Precast Bridge Units (PBUs) connected together

Page 11: Accelerated Bridge Construction Examples - Vermont · PDF fileAccelerated Bridge Construction Examples • We have been using ABC methods to build bridges since 2007 on approximately

Rigid Frame Examples

• Generally arch shapes and flat-top frames are both allowed

• There are many different configurations available

Page 12: Accelerated Bridge Construction Examples - Vermont · PDF fileAccelerated Bridge Construction Examples • We have been using ABC methods to build bridges since 2007 on approximately

Rigid Frames

Site is dewatered and excavated for footing

Page 13: Accelerated Bridge Construction Examples - Vermont · PDF fileAccelerated Bridge Construction Examples • We have been using ABC methods to build bridges since 2007 on approximately

Rigid Frames

Precast footing section lifted into position

Page 14: Accelerated Bridge Construction Examples - Vermont · PDF fileAccelerated Bridge Construction Examples • We have been using ABC methods to build bridges since 2007 on approximately

Rigid Frames

Footing components are connected together

Page 15: Accelerated Bridge Construction Examples - Vermont · PDF fileAccelerated Bridge Construction Examples • We have been using ABC methods to build bridges since 2007 on approximately

Rigid Frames

Abutment is backfilled and compacted

Page 16: Accelerated Bridge Construction Examples - Vermont · PDF fileAccelerated Bridge Construction Examples • We have been using ABC methods to build bridges since 2007 on approximately

Rigid Frames

Precast frame is lifted into position on the abutment

Page 17: Accelerated Bridge Construction Examples - Vermont · PDF fileAccelerated Bridge Construction Examples • We have been using ABC methods to build bridges since 2007 on approximately

Rigid Frames

More sections added – Note dewatering pipe

Page 18: Accelerated Bridge Construction Examples - Vermont · PDF fileAccelerated Bridge Construction Examples • We have been using ABC methods to build bridges since 2007 on approximately

Rigid Frames

Top of frame is waterproofed

Page 19: Accelerated Bridge Construction Examples - Vermont · PDF fileAccelerated Bridge Construction Examples • We have been using ABC methods to build bridges since 2007 on approximately

Rigid Frames

Gravel roadway surface is placed over frame section

Page 20: Accelerated Bridge Construction Examples - Vermont · PDF fileAccelerated Bridge Construction Examples • We have been using ABC methods to build bridges since 2007 on approximately

Rigid Frames

Side view of frame with guardrail attached

Page 21: Accelerated Bridge Construction Examples - Vermont · PDF fileAccelerated Bridge Construction Examples • We have been using ABC methods to build bridges since 2007 on approximately

Building Bridges pre-1995


Recommended