A new sports center was created to host the International Universiade 2011, consisting of a main stadium, a gymnasium, an indoor swimming hall and other sports facilities. The geometry of the roof above the grandstands has been accommodated by introducing an expressive series of folded triangular framework, arranged along radial main axes corresponding to the grid of the main building. The segmental roof structures are dissolved into a folded plate structure, where the primary members are the edge members of the folded plate structure. The deviation forces are transferred outwards via upper and lower primary members, which are anchored using strong slanting members along the back side. The secondary members of the folded plate structure also provide the local stability of the primary members and the supports for sheeting. The secondary members divide the primary members into equal parts.
: StadiumLength / width / roof depth: 290 / 271 / 70 mSeats: 60,000: Arena / Multifunctional HallDiameter: 155 mSeats: 18,000: Swimming HallLength / width: 176 / 92 mSeats: 3,000
Awards: 2011 Chinese Gold Medal Award of Steel Structure, 2011 Chinese Excellent Design Award of Steel Structure
Location Shenzhen, China
Owner Bureau of Public Works of Shenzhen Municipality
Completed 2011
Scope of our work conceptual design, construction design
Architect gmp · Architekten von Gerkan, Marg und Partner
pp he overall master plan for the complex places the three stadiums as a centerpiece with landscaped elements and a lake surrounding them. GMP Architekten made use of the typical elements of a traditional Chinese garden like rocks, water and landscaping in their design. The watercourses represent movement and development, while the stones and crystalline structures symbolize continuity and stability.
The main stadium is a multifunctional space that can be used for a variety of local, national and international sports occasions and events. With three tiers of seating, the stadium can fit up to 60,000 people inside. An indoor sports complex was designed for ice-skating, mega-performances, social gathering and small-scale exhibition shows and can seat 18,000 spectators. Finally the swimming complex has both a leisure and competition pool and can seat 3,000 spectators.
Crystalline and mountainous in form, the stadiums rise up to 65 meters in height. The steel prismatic shell is composed of a series of triangular facets and three distinct layers. The exterior is a translucent glazing made up of triangular laminated safety glass panes or polycarbonate slabs, the middle layer is structural steel, and the inner layer is translucent but meets requirements for acoustics and shade. These transparent facades infuse the stadiums with light during the day and at night, specialized lighting transforms the facade into a glowing surface illuminating the surrounding landscape as well as the venue inside.
Read more: GMP Architekten Completes 3 Sparkling Crystalline Stadiums for Shenzhen’s Universiade Games Universiade Sports Center-GMP Architekten – Inhabitat - Sustainable Design Innovation, Eco Architecture, Green Building
agi bahwa pusat bangunan olagraga dengan gaya arsitektur unik saat ini berada di China. Stadion utama yang digunakan di Olimpiade lalu misalnya, adalah salah satu contoh stadion yang sangat non-ortodoks. Dan kali ini kita akan melihat salah satu stadion yang baru saja selesai dibangun di Shenzen, China untuk World University Games. kompleks sport centre ini? Ok. Pertama adalah penempatan dari tiga stadion yang menempatinya adalah sesuatu yang tidak biasa. Studio desain arsitektur GMP Architekten sengaja membuat danau buatan yang mengelilingi ketiga stadion yang bentuknya terlihat seperti mahkota dengan cahaya lampu putih. Hasilnya, dari atas ketiga stadion ini seperti melayangSports Centre yang terdiri dari tiga stadion ini masing-masing diperuntukkan untuk olahraga spesifik; stadion utama yang bisa diisi 60 ribu penonton akan digunakan untuk event-event olahraga utama seperti sepakbola. Stadion kedua akan digunakan untuk olahraga indoor dan yang ketiga akan digunakan untuk olahraga air
Rabu, 09 April 2014
OLYMPIC STADIUM SHENZHEN2011 Universiade di Shenzhen
Universiades adalah World Games untuk siswa dan diadakan setiap tahun di musim dingin dan musim panas , yang diselenggarakan oleh Universitas Sports Federation International, Fédération Internationale du Sport Universitaire ( FISU ) . Pergi dengan jumlah atlet yang berpartisipasi , Universiade musim panas adalah yang terbesar kedua multi-event olahraga di dunia setelah Olimpiade musim panas . Ini diumumkan pada bulan Januari 2007 bahwa Universiade musim panas 26th 2011 adalah untuk mengambil tempat di Shenzhen .
Pusat olahraga Universiade terdiri dari stadion , ruang multifungsi dan kolam renang . Stadion di distrik Bao'an dirancang sebagai stadion atletik . Namun, selama 2011 Universiade , itu digunakan untuk pertandingan sepak bola
Universiade 2011 Sports Center, Desain untuk Sports Center Universiade di kota Shenzhen terinspirasi oleh lanskap bergelombang sekitarnya dan menghasilkan dialog formal yang merujuk pada hortikultura dan filsafat Cina terhadap tanah . Struktur atap proyek hingga 65 m, dan dirancang sebagai shell prismatik baja atas dasar segitiga faktor - ets . Kristal bentuk tiga stadia adalah tambahan ditekankan oleh pencahayaan fasad tembus di malam hari . Danau buatan menghubungkan stadion dengan ruang multifungsi melingkar di utara dan barat Balai renang persegi
panjang tersebut. The plaza olahraga sentral diakses melalui promenade dibangkitkan dari stadion individu. Stadion utama direncanakan akan multifungsi , memenuhi persyaratan kesempatan olahraga internasional dan peristiwa . Kapasitas total adalah 60.000 , yang duduk di tiga berdiri . Total diameter atap adalah 310 m dan 290 m memanjang di seluruh .
Segitiga kaca segi membuat bersinar mahkota sekitar trio stadion untuk Universitas Dunia Games saat ini sedang berlangsung di Shenzhen.
Indoor kompleks olahraga dirancang sebagai arena multifungsi melingkar untuk kompetisi olahraga dalam ruangan serta untuk ice -skating dan acara lainnya . Kapasitas keseluruhan approx . 18.000 penonton . Berenang kompleks membentuk modul ketiga dari Sports Center Universiade Shenzhen . Kapasitas keseluruhan approx . 3.000 penonton , kursi diatur pada dua berdiri .
Berikut ini adalah interior dari stadium ini:
http://stadiumdb.com/stadiums/chn/longgang_stadium
Stadion kedua host kegiatan dalam ruangan termasuk ice skating dan rumah-rumah ketiga kolam renang untuk acara akuatik.
Arsitek: Meinhard von Gerkan dan Stephan Schütz dengan Nicolas Pomränke; Project Leader: Ralf Sieber; Struktural Konsep dan Desain Roof: Schlaich, Bergermann und Partner - Sven Plieninger dengan Wei Chen; Klien: Biro Pekerjaan Umum Shenzhen Kota; Waktu Proyek: 2006; Waktu konstruksi: 2007-2011.
Pusat olahraga Universiade terdiri dari stadion , ruang multifungsi dan
kolam renang . Stadion di distrik Bao'an dirancang sebagai stadion
atletik . Namun, selama 2011 Universiade , itu digunakan untuk
pertandingan sepak bola
Universiade 2011 Sports Center, Desain untuk Sports Center
Universiade di kota Shenzhen terinspirasi oleh lanskap bergelombang
sekitarnya dan menghasilkan dialog formal yang merujuk pada hortikultura
dan filsafat Cina terhadap tanah . Struktur atap proyek hingga 65 m, dan
dirancang sebagai shell prismatik baja atas dasar segitiga faktor - ets .
Kristal bentuk tiga stadia adalah tambahan ditekankan oleh pencahayaan
fasad tembus di malam hari . Danau buatan menghubungkan stadion
dengan ruang multifungsi melingkar di utara dan barat Balai renang
persegi panjang tersebut. The plaza olahraga sentral diakses melalui
promenade dibangkitkan dari stadion individu. Stadion utama
direncanakan akan multifungsi , memenuhi persyaratan kesempatan
olahraga internasional dan peristiwa . Kapasitas total adalah 60.000 , yang
duduk di tiga berdiri . Total diameter atap adalah 310 m dan 290 m
memanjang di seluruh .
Segitiga kaca segi membuat bersinar mahkota sekitar trio stadion untuk
Universitas Dunia Games saat ini sedang berlangsung di Shenzhen.
Indoor kompleks olahraga dirancang sebagai arena multifungsi melingkar
untuk kompetisi olahraga dalam ruangan serta untuk ice -skating dan
acara lainnya . Kapasitas keseluruhan approx . 18.000 penonton .
Berenang kompleks membentuk modul ketiga dari Sports Center
Universiade Shenzhen . Kapasitas keseluruhan approx . 3.000 penonton ,
kursi diatur pada dua berdiri .
chitect: Meinhard von Gerkan and Stephan Schütz with Nicolas Pomränke
Project Leader: Ralf Sieber
Project Team: Xu Ji, Alexander Niederhaus, Huang Cheng, Niklas Veelken, Martin
Gänsicke, Stephanie Brendel, Marlene Törper, Andrea Moritz, Zheng Xin, Kralyu
Chobanov, Chen Zhicong, Thomas Krämer, Lin Wei, Martin Schulte-Frohlinden,
Plamen Stamatov, Christian Dorndorf, Lian Kian, Zhou Bin, Tobias Keyl, Li Ling, Helge
Lezius, Meng Xin, Kuno von Haefen
Structural Concept and Design Roof: schlaich bergermann und partner – Sven
Plieninger with Wei Chen
Technical building equipment: IG Tech
Lighting Design: Conceptlicht
Acoustics Acoustic: Design Ahnert
Facade Planning: Shen and Partner
Chinese Partner Practices: SADI (stadium), CNADRI (multifunctional hall), CCDI
(swimming hall), BLY (landscape design)
Client: Bureau of Public Works of Shenzhen Municipality
Stadium Seats: 60,000
Multifunctional Hall Seats: 18,000
Swimming Hall Seats: 3,000
Project Year: 2011
. Folded plate truss
Terdapat ikatan horizontal melintang di sisi
lebar hanya di tepi bangunan. Hal ini memungkinkan folded plate digunakan pada bentang
lebar dengan pertimbangan struktural yang matang.
Pelat adalah struktur planar kaku yang secara khas terbuat dari material monolith yang
tingginya kecil (tipis) dibandingkan dengan dimensi-dimensi lainnya. Beban yang umum
pada pelat mempunyai sifat banyak arah. Pelat dapat ditumpu diseluruh tepinya atau hanya
pada titik-titik tertentu (misalnya oleh kolom atau campuran antara tumpuan menerus dan
titik). Kondisi tumpuan dapat sederhana atau jepit. Pelat ini terbuat dari material padat ,
homogen yang memiliki sifat sama di segala arah.
Dengan membentuk lipatan-lipatan kaku pada suatu sistem struktur yang bekerja secara
efisien untuk menyalurkan beban sehingga memungkinkan dicapainya bentang-bentang
lebar di antara tumpuan-tumpuan yang direncanakan. Efisiensi dari struktur bidang lipat
dicapai karena struktur tersebut bekerja sekaligus sebagai pelat datar (slab), balok (beam),
dan rangka kaku (truss).
TRANSFER BEBAN
Transfer beban dalam struktur lipat terjadi melalui kondisi struktural dari pelat (beban tegak
lurus terhadap bidang tengah) atau melalui kondisi struktural dari paralel (slab load ke
pesawat).
Pada awalnya, kekuatan eksternal akan ditransfer karena kondisi struktural pelat ke pinggir
lebih pendek dari satu elemen lipat. Di sana, reaksi sebagai kekuatan aksial dibagi antara
elemen yang berdekatan yang menghasilkan strain kondisi struktural dari lembaran. Ini
mengarah pada pengiriman pasukan untuk bantalan.
Ketika selembar kertas tipis terletak antara
dua mendukung akan membungkuk karena fakta bahwa ia memiliki kekuatan yang cukup
untuk membawa beratnya sendiri.
Jika sepotong kertas yang sama dilipat maka akan
mampu mendukung seratus kali beratnya sendiri.
Jika beban meningkat melewati titik ini maka
struktur akan gagal dan lipatan akan meratakan keluar.
BENTUK DASAR
Bentuk -bentuk yang dapat dijadikan dasar perkembangan bentuk konstruksi lipat, yaitu
bentuk-bentuk dasar: pyramidal, prismatic dan semi prismatic. Bentuk prismatic ialah bentuk
yang terdiri dari bidang-bidang datar bersudut siku-siku dan bidang-bidang yang melintang
tegak lurus pada kedua belah sisi ujung bidang datar bersudut siku-siku.