Transcript
Page 1: 5- Drainage Strategy ISO A1 Landscape - East Staffordshire

DfDesford 2012 A s1289ft²

119m²

4 Bed 2 S tory

Bu

xton 20

12 A

s1

47

7ft²

13

7.2

4 B

ed

2 Sto

r y

Bu

Ash

bou

rne

201

2 A

s

15

36

ft²

14

2.7

4 B

ed

2 S

tore

y

Ash

Buxton 2012 As

1477ft²

137.2m²

4 Bed 2 Story BuAshbourne 2012 As

1536ft²

142.7m²

4 Bed 2 Storey

Ash

A s hb o ur ne 2 0 12 A s

1536ft²

142.7m²

4 B ed 2 Storey

Ash

CoCompt on 2012 As

2090ft²

194m²

5 Bed 3 Storey CoCompton 2012 As

2090ft²

194m²

5 Bed 3 Storey

Mp

Yo

xall 2

012

As

13

13

ft²1

22

4 B

ed

2 S

tory

Yo

Yo

xall 2

012 A

s1

31

3ft²

12

2m

²4

Be

d 2

Sto

ry

Yo

Bu x

ton

20

12 A

s

14

77

ft²

13

7. 2

4 B

ed

2 S

tory

Bu

SO

4 2

012

L eft A

s1

04

6ft²

97.2

4 B

ed

6 P

ers

on

SO

4

Df

De

sford 201

2 As

12

89

ft²

11

9m

²

4 B

ed

2 S

tor

y

Df

Des

ford

20

12 A

s1

28

9ft²

11

9m

²4

Be

d 2

Sto

ry

Df

De

sford 2 01

2 As

128

9ft²

11

9m

²4

Be

d 2

Sto

ry

Bewdly 2012 As

1171ft²

108.7m²

4 Bed 2 Story Bw

Df

Des

ford

201

2 A

s1

28

9ft²

11

9m

²4

Be

d 2

Sto

ry

Df

De

sf ord 20

12 A

s

12

89

ft²

11

9m

²

4 B

ed

2 S

tory

ByB romley 2012 As

1759ft ²

163m²

5 Bed 3 Storey

6

7

8

9 10

1112

13

14 15

1617 18 19

20

2122

23

25

24

27

28

32

31

30

29

76757473

90

89

88

87

105

106

107

108

109

9192 93 94

95

96

97

98

99

125

126

129

130

110111

112 113 114 115

118

Bu

Bu

Ab

AbAb

Bu

Bu

Al Al

Yo

Yo

De

DeDe

De

De

De

By

Co

Co

Ha

HaHa

Mtp

Ha

Cr

Cr

CrCr

Cr

Mts

MtsMt

03

03

02

02

02 02

04

02

02

02

Bw

Sub

Potential Future

Access Link

03

0202

Lu

Lu

St

St

33

34

35

77

78

79

80

116

117

120/121

122123

124

02

02

02

08

St

St

St

*

128

*

*

*

*

*

SO

SO

SOSO

SO

SO

R

R

R

R SOSO SO

R

R

R

R

V3 V8V3

V7V3

V3V7

V7

V7

V3V1

V2

as

as

as as

as

as

asas

as as

as

as

as

asas

as

as

as

as

as

as

as

as

as

as

as

asas

as

as

as

as

op

opop

op

opop

op

op

op

op

op

opop

op

op

op

op

op

op

op

op

op

op

as

op

op

*

Ashbourne 2012 As

1536ft²

142.7m²

4 Bed 2 Storey

AshAb

op

Ashbourne 2012 As

1536ft²

142.7m²

4 Bed 2 S torey

AshAb

as

MpMapleton 2012 As

1261ft²

117m²

4 Bed 2 StoryMp

op

Yoxall 2012 As

1313ft²

122m²

4 Bed 2 S toryYoYo

as

MpMapleton 2012 As

1261ft²

117m²

4 Bed 2 StoryMp

op

Y oxall 2012 As

1313ft²

122m²

4 Bed 2 S toryYoYo

as

MpMapleton 2012 As

1261ft²

117m²

4 Bed 2 StoryMp

op

Mt V1 as

Ashbourne 2012 As 1536ft²

142.7m²

4 Bed 2 Storey

AshAb

opAb

op

Ashbourne 2012 As 1536ft²

142.7m²

4 Bed 2 Storey

Ash

An

Anop

as

03

02

as

opAn An

36

119FIRE APPLIANCE

TURNING

FACILITY

SO

SO

Proposed pump

stn compound.

Pump stn

access.

Stn

*

Low wall.

EXG FWS MHSTW REF 1601Cl - 51.53Il - 49.81 (taken from sewer records)

EXG FW

S MH

STW REF 2601

Cl - 51.55

Il - 49.73 (taken from sewer records)

EXG FW

S M

H

STW REF 2502

Cl - nil

Il - nil (taken from sew

er records)

EXG FWS MHSTW REF 2602Cl - nilI l - nil (taken from sewer records)

g

g

g

g

g

g g

g

g

g

g

gg

gg

g

g

g

g

g

g

g

g

g

g

g

g

g g

g

g

g

g

g

g

g

g

g

gg

g

g

g

g

g

g

TCBMILL CRESCEN

T

29

14

1

20

31

19

20

1

7

+3m @1:3

WET

MEADOW

NEW CONNECTION TO PHASE1

SECTION104 FOUL SEWER

PHASE1 FOUL

PUMP STATION

NEW SECTION104 FOUL SEWER IN

PLOT FRONTAGES TO CREATE

SPACE IN HIGHWAY FOR SURFACE WATER ATTENUATION

NEW SECTION104 SURFACE WATER BOX CULVERT OR

ELLIPTICAL PIPE ATTENUATION

FLOW CONTROL

MANHOLE

NEW OUTFALL

HEADWALL

EXISTING WATERCOURSE

EXISTING WATERCOURSE

POTENTIAL LOCATIONS FOR SHALLOW SWALE STORAGE

NEW TIMBER

FOOTBRIDGE

NEW TIMBER

FOOTBRIDGE

SUBJECT TO ROOT PROTETCION ZONES AND OWNERSHIP, EXISTING

CHANNEL TO BE CLEARED AND REPROFILED TO IMPROVE CAPACITY

2014s1262 - 101

Providence Land Ltd

Barton Park Phase2

Barton-Under-NeedwoodDrainage Strategy

Preliminary1 of 1

1:500 @ A1

SCH 29/10/2014

SCH 29/10/2014

DT 29/10/2014

DT 29/10/2014

Approved

Digital File Name:

Drawing Number:

Scale:

Checked:

Sheet No.:

Approved:

Drawn:

Status:

This document is the property of Jeremy Benn Associates Ltd. It shall not be reproduced in whole or in part, nor disclosed to a

third party, without the permission of Jeremy Benn Associates Ltd.

for

Rev.:

Designed:

CheckedDesignedDrawnDateModificationsRev.

General Notes

1. All dimensions shown are in metres unless otherwise stated and levels in metres to

Ordnance Datum.

2. Do not scale from this drawing. All dimensions must be checked/verified on site.

3. This drawing is to be read in conjunction with JBA Project Reports.

4. All works affecting flood defences, main watercourses and/or ordinary watercourses

will be subject to Consent for Permanent and Temporary Works under the Land

Drainage Act 1991.

The Old School HouseSt Joseph's Street

TADCASTERNorth YorkshireLS24 9HAUnited Kingdom

www.jbaconsulting.com

+44 (0)1937 837900+44 (0)845 8627772

[email protected]

Offices at Atherstone, Doncaster, Edinburgh, Haywards Heath, Limerick, Newcastle upon Tyne, Newport, Saltaire, Skipton, Tadcaster, Thirsk, Wallingford and Warrington

tf

e

Contains Ordnance Survey data © Crown copyright and database right 2014.World Imagery Source: Esri, DigitalGlobe, GeoEye, i-cubed, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community.

This map is reproduced from Ordnance Survey material with the permission of Ordnance Survey on behalf of the Controller of Her Majesty's Stationery Office © Crown copyright.

Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings.

P/2014/01490Received 14/11/2014

Recommended