10 September 2009 energynetworks.orgenergynetworks.org 1
Common Methodology Group Work
PRESENTED BY OLIVER DAY
Common Distribution Charging Methodology
Impact Analysis
10 September 2009
Caveats…
• Based on individual DNO averages• Need to consider your typical usage
• Common model – DNO specific inputs• Different end user behaviour• Different costs
• Current DNO models may be very different, resulting in sometimes opposing starting positions
10 September 2009 energynetworks.org
Domestic Unrestricted
energynetworks.org 3
10 September 2009 energynetworks.org
Domestic Two Rate
energynetworks.org 4
10 September 2009 energynetworks.org
Small Non Domestic Unrestricted
energynetworks.org 5
10 September 2009 energynetworks.org
Small Non Domestic Two Rate
energynetworks.org 6
10 September 2009 energynetworks.org
LV Medium Non Domestic
energynetworks.org 7
10 September 2009 energynetworks.org
LV HH Metered
energynetworks.org 8
10 September 2009 energynetworks.org
HV HH Metered
energynetworks.org 9
10 September 2009 energynetworks.org
NHH UMS
energynetworks.org 10
10 September 2009 energynetworks.org
HH UMS
energynetworks.org 11
10 September 2009
LDNO Charges
• Charges based on end user tariffs• IDNO charged end user tariff with discount• Discount based on IDNO boundary voltage• Discounts applied using ‘portfolio’ approach
10 September 2009 energynetworks.org
LDNO LV: LV End User Discount
energynetworks.org 13
10 September 2009 energynetworks.org
LDNO HV: End User Discount
energynetworks.org 14
10 September 2009
Time bands
• 3 time bands: Green, Amber and Red • Vary from DNO to DNO • Reflect the DNO’s network usage• Weekday and weekend
10 September 2009 energynetworks.org
Weekday
energynetworks.org 16
* EDF’s time bands are in GMT for weekdays, all other DNOs are in UK clock time