PROCESS CONTROL
TheoryLeft side of brain = logical
4
PROCESS CONTROL
Control structures + PractiseRight side of brain = creative
5
PROCESS CONTROL
Theory & practiseCombine both sides!
6
Process control course.Four main elements:
1. PROCESS– Process dynamics: Step responses, simulation– Process control structures: Flowsheet (P&ID*). PID tuning
2. CONTROL– theory: Feedback idea, block diagrams, stability, transfer functions
(Laplace), feedforward/cascade/frequency response, identification, multivariable control (MPC)
3. PRACTISE– Laboratory– Simulation (Aspen, Hysys/Unisim..)
4. SYSTEMS– Modelling principles, Solution. State space models, linearization
(ABCD), optimization
*P&ID: Process and Instrumentation Diagrams
7
Difficult course
• Many new concepts
– Inputs and outputs, causality
– Feedback
– Stability• New mathematics
– Laplace
– Frequency analysis
– System theory (ABCD)• And all of this combined with practise: operation of real plants
• Too much for one course?
8
I teach the course in two parts
1. ”Process control” crash course (3 weeks)
– Focus on process control structures (P&ID)2. Standard process control course (11 weeks)
– Focus on theory
9
Crash course process control
Sigurd SkogestadInstitutt for kjemisk prosessteknologi
More information (literature, old exams, etc.):• www.nt.ntnu.no/users/skoge/prosessregulering_lynkurs
10
Why control?
• Until now: Design of process. Assume steady-state
• Now: Operation
time
Actual value(dynamic)Steady-state (average)
“Disturbances” (d’s)
11
Example: Control of shower temperature
MVs, CVs and control
12
LCH
Hs
flow in
flow out
OUTFLOW: INPUT FOR CONTROLINFLOW: DISTURBANCE
CLASSIFICATION OF VARIABLES
13
BLOCK DIAGRAMS
Controller(brain)
Measurementdevice
ys
Desired valueSetpoint
ys-ym
error
ym
measured output
FEEDBACK (measure output):
Process(shower)
uinput (MV)
youtput (CV)
d
Controller(brain)
Process(shower)
Measurementdevice
FEEDFORWARD (measure disturbance):
dm
measured disturbance
d
uinput (MV)
youtput (CV)
•All lines: Signals (information)•Blocks: controllers and process•Do not confuse block diagram (lines are signals) with flowsheet (lines are flows); see below
14
Most important control structures
1. Feedback control
2. Ratio control (special case of feedforward)
3. Cascade control
15
Process and instrumentation diagram (P&ID) (flowsheet)
TC2nd letter: C: controller I: indicator (measurement)
1st letter: Controlled variable (CV). What we are trying to control (keep constant)
T: temperature F: flow L: level P: pressure DP: differential pressure (Δp) C: composition X: quality H: enthalpy/energy
Ts
(setpoint CV)T(measured CV) MV (could be valve)
16
CC
LV
Typical distillation control: Two-point composition controlLV-configuration with inner T-loop
TCTs
xB
CC xD
17
Process dynamics (response)
• “Things take time”• Step response (step in u):
– k = Δy(∞)/ Δu – process gain– - process time constant (63%)– - process time delay
• Time constant Often equal to residence time = V[m3]/q[m3/s] (but not always!)• Can find (and k) from balance equations:
– Rearrange to match standard form of 1st order linear differential equation:
18
Pairing of variablesMain rule: “Pair close”The response (from input to output) should be fast, large and in one direction.
Avoid dead time and inverse responses!
19
Model-based tuning (SIMC rule)
• From step response
– k = Δy(∞)/ Δu – process gain
– - process time constant (63%)
– - process time delay
• Proposed SIMC controller tunings
k = Δy(∞)/ Δu
20
Process Control crash course (3 weeks):
1. Process operation: Why do we need process control?
2. Classification of variables (inputs, outputs, disturbances, measurements)
3. Feedback versus feedforward control
4. Block diagram representation (information diagrams, causality)
5. Flowsheet representation (process & instrumentation diagrams)
6. Single-loop control: Pairing of input and outputs
7. More advanced control: Ratio control, Cascade control,
8. The control hiearchy (optimization, advanced control, basic control)
9. Process dynamics (basics): first- and second order systems, time delay, identification
10. Process modelling: balance principle
11. PID control and tuning
12. Simulation
21
Control theory (11 weeks)“standard course”
13. Laplace transforms, transfer functions
14. Closed-loop response, derivation of PID tuning rules
15. Pros and cons of high gain feedback. Stability. Change dynamics. Biological systems
16. Dynamic systems (theory). poles, zeros, state space, observability, controllability
17. Control systems (theory), frequency analysis, stability conditions, robustness
18. Controller implementation: discrete control, windup, bumpless transfer
19. Identification (theory)
20. Multivariable control: interactions, MPC
22
+ 3. Practise
• LAB ?!!
– At least have demonstration
• SIMULATIONS ?!!
– Time consuming
23
+ 4. Systems engineering
• General modelling principles, DAE-system
• Solution of dynamic models (integration)
• Linearization, State space models (deviation variables)
• Optimization
24
Conclusion: Process systems engineering (PSE) and process control
• Process control is a key course
– Engineers must know some control!
• Usually too little time to focus on systems issues
– Need advanced course to cover process systems aspects of process control