18
Civic Precinct, Gordon Street Telephone 1300 622 529 Email [email protected] PO Box 41 Mackay QLD 4740 Australia Facsimile 07 4944 2400 www.mackay.qld.gov.au YOUR REF: 11NQ032 OUR REF: DA-2011-91 27 May 2011 SGS PTY LTD C/- Humphreys Reynolds Perkins North Queensland PO Box 244 MACKAY QLD 4740 Dear Sir/Madam DECISION NOTICE Applicant: SGS PTY LTD Proposal: Material Change of Use - General Industry (Coal Testing Facility and Industrial Induction Training) Application Number: DA-2011-91 Address: 13-17 Interlink Court, PAGET QLD 4740 Property Description: Lot 15 on SP193944 Please find enclosed the above Decision Notice with the relevant attachments: Decision Notice Assessment Manager’s Conditions Approved Plans Appeal Rights Notice to Commence Use If you require any further information, please contact Matthew Ingram.

YOUR REF: 11NQ032 - Mackay Council · 2014-09-29 · Civic Precinct, Gordon Street Telephone 1300 622 529 Email [email protected] PO Box 41 │Mackay │QLD 4740 │ Australia

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: YOUR REF: 11NQ032 - Mackay Council · 2014-09-29 · Civic Precinct, Gordon Street Telephone 1300 622 529 Email council@mackay.qld.gov.au PO Box 41 │Mackay │QLD 4740 │ Australia

 

Civic Precinct, Gordon Street Telephone 1300 622 529 Email [email protected] PO Box 41 │Mackay │QLD 4740 │ Australia Facsimile 07 4944 2400 www.mackay.qld.gov.au

 

YOUR REF: 11NQ032 OUR REF: DA-2011-91

27 May 2011 SGS PTY LTD C/- Humphreys Reynolds Perkins North Queensland PO Box 244 MACKAY QLD 4740 Dear Sir/Madam DECISION NOTICE

Applicant: SGS PTY LTD

Proposal: Material Change of Use - General Industry (Coal Testing Facility and Industrial Induction Training)

Application Number: DA-2011-91 Address: 13-17 Interlink Court, PAGET QLD 4740 Property Description: Lot 15 on SP193944

Please find enclosed the above Decision Notice with the relevant attachments:

Decision Notice Assessment Manager’s Conditions Approved Plans Appeal Rights Notice to Commence Use If you require any further information, please contact Matthew Ingram.

This is a Mackay Regional Council digitally signed document.

Page 2: YOUR REF: 11NQ032 - Mackay Council · 2014-09-29 · Civic Precinct, Gordon Street Telephone 1300 622 529 Email council@mackay.qld.gov.au PO Box 41 │Mackay │QLD 4740 │ Australia

Decision Notice Sustainable Planning Act

 

Civic Precinct, Gordon Street Telephone 1300 622 529 Email [email protected] PO Box 41 │Mackay │QLD 4740 │ Australia Facsimile 07 4944 2400 www.mackay.qld.gov.au

 

Application Number: DA-2011-91

Date of Decision: 27 May 2011

1. APPLICANT/S DETAILS

Name: SGS PTY LTD

Postal Address:

C/- Humphreys Reynolds Perkins North Queensland

PO Box 244

MACKAY QLD 4740

2. PROPERTY DETAILS

Property Address: 13-17 Interlink Court, PAGET QLD 4740

Property Description: Lot 15 on SP193944

3. OWNER’S DETAILS

Mackay Storage A Pty Ltd and Mackay Storage B Pty Ltd

PO Box 1502, FREMANTLE WA 6959

4. PROPOSAL Material Change of Use - General Industry (Coal Testing Facility and Industrial Induction Training)

5. DECISION TYPE

DEVELOPMENT DECISION Material Change of Use Development Permit

Pursuant to the Mackay City Planning Scheme

Approved in Full subject to Conditions

This is a Mackay Regional Council digitally signed document.

Page 3: YOUR REF: 11NQ032 - Mackay Council · 2014-09-29 · Civic Precinct, Gordon Street Telephone 1300 622 529 Email council@mackay.qld.gov.au PO Box 41 │Mackay │QLD 4740 │ Australia

Decision Notice Sustainable Planning Act

 

Civic Precinct, Gordon Street Telephone 1300 622 529 Email [email protected] PO Box 41 │Mackay │QLD 4740 │ Australia Facsimile 07 4944 2400 www.mackay.qld.gov.au

 

6. ASSESSMENT MANAGER’S CONDITIONS

The conditions relevant to this decision are attached to this notice. These conditions are clearly identified to indicate whether the assessment manager or a concurrence agency imposed them.

7. IDAS REFERRAL AGENCIES

It is advised that there are no Referral Agencies for this Application.

8. SUBMISSIONS

There were no properly made submissions received on this application.

9. PLANNING SCHEME

This decision is issued under the Mackay City Planning Scheme.

10. SUPERSEDED PLANNING SCHEME

Not Applicable

11. FURTHER APPROVALS REQUIRED

Operational Works - Compliance Permit (Already Lodged) Operational Works - Compliance Certificate (Access, Car Park, Landscaping, Sewer Connections) Building Works - Development Permit (Industrial Building)

12. PRELIMINARY APPROVAL OVERRIDING THE PLANNING SCHEME

Not Applicable

13. RELEVANT PERIOD The standard relevant period states in Section 341 of the Sustainable Planning Act apply to each aspect of development in this approval, if not stated in the conditions of approval attached.

14. APPEALS Attached is an extract from the Sustainable Planning Act which details your appeal rights and the

appeal rights of any submitters regarding this decision. 15. ASSESSMENT MANAGER SIGNATURE

Name Leah Sorohan

Position Principal Planner

Signature Date

This is a Mackay Regional Council digitally signed document.

leahs
Typewritten Text
27 May 2011
Page 4: YOUR REF: 11NQ032 - Mackay Council · 2014-09-29 · Civic Precinct, Gordon Street Telephone 1300 622 529 Email council@mackay.qld.gov.au PO Box 41 │Mackay │QLD 4740 │ Australia

ASSESSMENT MANAGER CONDITIONS Application Number: DA-2011-91 Applicant’s Name: SGS PTY LTD

Decision Date: 27 May 2011  

Page 1 of 8 

1. Plan of Development

The approved General Industry development must be completed and maintained generally in accordance with the Plan of Development (identified in the Table below) and supporting documentation which forms part of this application, except as otherwise specified by any condition of this approval.

Project Number

Title Sheet Issue Prepared by Date

10020 Site Plan A100 D Doring Design 12.05.11 10020 Ground Floor

Plan A101 D Doring Design 12.05.11

10020 Elevations/ Sections

A102 D Doring Design 12.05.11

2. Maintenance of Development

Maintain the approved development (including landscaping, carparking, driveways and other external spaces) in accordance with the approved drawing(s) and/or documents, and any relevant Council engineering or other approval required by the conditions.

3. Conflict between plans and written conditions

Where a discrepancy or conflict exists between the written condition(s) of the approval and the approved plans, the requirements of the written condition(s) will prevail.

4. Notice of Intention to Commence the Use

Prior to the commencement of the use on the site, written notice must be given to Council that the use (development and/or works) fully complies with the decision notice issued in respect of the use (please see attached notice for your completion).

5. Parkland Contribution

A parkland contribution must be paid in accordance with the Council’s Policy on Developer Contributions for Parkland.

6. Transport Network Contributions

A transport network contribution must be paid in accordance with Councils Policy on Transport Network Contributions.

This is a Mackay Regional Council digitally signed document.

Page 5: YOUR REF: 11NQ032 - Mackay Council · 2014-09-29 · Civic Precinct, Gordon Street Telephone 1300 622 529 Email council@mackay.qld.gov.au PO Box 41 │Mackay │QLD 4740 │ Australia

ASSESSMENT MANAGER CONDITIONS Application Number: DA-2011-91 Applicant’s Name: SGS PTY LTD

Decision Date: 27 May 2011  

Page 2 of 8 

7. Stormwater Drainage Contributions

A stormwater drainage contribution must be paid in accordance with the Council’s Policy stormwater drainage contributions policy.

8. Contributions Payment Timing

All contributions and charges must be paid prior to the date of issue of the Development Permit for Building Works at the rate applicable at the time of payment.

9. Acid Sulphate Soils

The proposed works and development may trigger the application and implementation of State Planning Policy 2/02: Planning and Managing Development in Acid Sulphate Soils. Consequently, a site Based Acid Sulphate Soil Management Plan may be required if any of the applicable requirements are triggered. Should this be the case, the management plan must be prepared by a suitably qualified professional and submitted to Council for approval at the time of submission of the Operational Works Application.

10. Invert Crossing

An invert crossing must be constructed in accordance with Council’s Standard Drawing No. PA3-773 and Council’s Policy 024 for access to Interlink Court.

11. Damage

Any damage which is caused to Council’s infrastructure as a result of the proposed development must be repaired immediately.

12. Compliance with Council Standards

All design and construction for the development must be in accordance with Council’s Policies, Engineering Design Guidelines, Standard drawings and standard specifications.

13. Electricity and Telecommunications Services

The approved development must be provided with electricity and telecommunications infrastructure.

This is a Mackay Regional Council digitally signed document.

Page 6: YOUR REF: 11NQ032 - Mackay Council · 2014-09-29 · Civic Precinct, Gordon Street Telephone 1300 622 529 Email council@mackay.qld.gov.au PO Box 41 │Mackay │QLD 4740 │ Australia

ASSESSMENT MANAGER CONDITIONS Application Number: DA-2011-91 Applicant’s Name: SGS PTY LTD

Decision Date: 27 May 2011  

Page 3 of 8 

14. Lawful Point of Discharge

Downstream drainage to a lawful and practical point of discharge which has been nominated as stormwater pit 1/1 as shown on the attached annotated Council A3-4529 drawing.

15. Stormwater Drainage

Stormwater from the site (including roofwater) shall be collected within the property boundaries and discharged via an underground system to Council’s stormwater system.

16. Ponding and Diversion of Stormwater

Ponding of stormwater resulting from the development must not occur on adjacent sites and stormwater formerly flowing onto the site must not be diverted onto other sites. The site shall be graded so that it is free draining.

17. Site Based Stormwater Management Plan - High Risk

Council’s Stormwater Quality Risk Classification has classified this development as “High Risk” as defined Mackay City Council’s Engineering Design Guidelines - Soil and Water Quality Management – Planning Scheme Policy No. 15.07.

The SBSMP must be submitted to Council for approval at the time of to submission of the Operational Works applications.

18. Stormwater Quality Improvement Device

Provide a Stormwater Quality Improvement Device (SQID) in the form of a Bio-Retention Basin with a filter media area of at least 112m². All stormwater runoff from the site must pass through this basin.

19. Direct Pumping from Mackay Water’s Reticulation System

Pumping direct from Council water mains for potable or fire fighting supply is not permitted.

This is a Mackay Regional Council digitally signed document.

Page 7: YOUR REF: 11NQ032 - Mackay Council · 2014-09-29 · Civic Precinct, Gordon Street Telephone 1300 622 529 Email council@mackay.qld.gov.au PO Box 41 │Mackay │QLD 4740 │ Australia

ASSESSMENT MANAGER CONDITIONS Application Number: DA-2011-91 Applicant’s Name: SGS PTY LTD

Decision Date: 27 May 2011  

Page 4 of 8 

20. Connection to Sewer Services

The sanitary drainage system must discharge to the discharge point shown on the annotated Council A3-4540 drawing. (as attached).

21. Sewers Policy

All building work is to comply with Council’s Policy MW02 – “Building Over and Adjacent to Sewers”.

22. Connection to Water Services

The development must connect to the water service shown on the annotated Council A3-4540 drawing. (as attached).

23. Live Connections

Mackay Water is to carry out all water connection and live sewer work at the developer’s expense.

24. Floor Level

The minimum habitable floor level of the proposed development must be the higher of:

300mm above the Q100 flood level (Q100 flood level = RL 5.62m AHD); 300 mm above the top of kerb; 300 mm above the crown of the road; 225 mm above ground level; or a level which allows the connection of all sanitary fixtures to the designated

sewer connection point by means of sanitary drainage which complies with AS3500.

25. Landscape Plan Required

A detailed site and footpath landscaping plan must be prepared by a qualified Landscape Designer and must be submitted with Operational Works Approval application. The plan must show for all areas identified on the approved plan of development the following:

This is a Mackay Regional Council digitally signed document.

Page 8: YOUR REF: 11NQ032 - Mackay Council · 2014-09-29 · Civic Precinct, Gordon Street Telephone 1300 622 529 Email council@mackay.qld.gov.au PO Box 41 │Mackay │QLD 4740 │ Australia

ASSESSMENT MANAGER CONDITIONS Application Number: DA-2011-91 Applicant’s Name: SGS PTY LTD

Decision Date: 27 May 2011  

Page 5 of 8 

Landscape specification of sufficient detail so that landscape works are to be carried out;

Plant schedule detailing number of plants, species, pot size and height at planting;

Details of soil and mulch types, including depths, areas of turf, garden edges and paving finishes; and

the details of the irrigation system.

Any proposed landscaped works within Council’s Road Reserve must comply with Planning Scheme Policy No.11 – Landscaping.

26. Completion of Landscaping

All of the landscaping works shown on the approved plan must be completed before the development is occupied.

27. Minimum Car Parking Spaces

The car parking area must be constructed, sealed, linemarked and drained for a minimum of 83 car parking spaces in accordance with the approved plan and maintained thereafter. The carparking classification is Class 1 for internal parking and is to be designed in accordance with Australian Standard AS/NZS2890.1 – 2004 – Off street parking. All car parking spaces and isle widths shall be accessible by B99 design vehicles.

28. Disabled Car Parking Space

The car parks designated for disabled persons are to comply with Australian Standard AS/NZ2890.6 – 2009 – Part 6 - Off Street for People with Disabilities.

29. Protection of Landscape areas from Carparking

The landscaped areas adjoining the car parking area must be protected from vehicles by a 125 mm high vertical concrete kerb or similar obstruction.

30. Loading /unloading

The loading and unloading of vehicles and the delivery of goods to and from the premises must at all times be undertaken entirely within the site and be so conducted as to cause minimum interference with other vehicular traffic.

This is a Mackay Regional Council digitally signed document.

Page 9: YOUR REF: 11NQ032 - Mackay Council · 2014-09-29 · Civic Precinct, Gordon Street Telephone 1300 622 529 Email council@mackay.qld.gov.au PO Box 41 │Mackay │QLD 4740 │ Australia

ASSESSMENT MANAGER CONDITIONS Application Number: DA-2011-91 Applicant’s Name: SGS PTY LTD

Decision Date: 27 May 2011  

Page 6 of 8 

31. Use of Car Parking areas

The areas set aside for parking, vehicle manoeuvring and loading and unloading, must not be used for the storage or placement of goods or materials.

32. Fencing

Security fencing along the front boundary (if any) is to be constructed of a visually appealing material other than plain chain wire fencing. Minimum acceptable material is coloured/Powder coated chain wire fencing.

33. Aesthetic Screening

The outdoor storage of any equipment or material and any service area must be aesthetically screened so as not to be visible from any road to which the site has frontage

34. Compliance with Conditions

All conditions must be complied with prior to the occupancy of the building for the approved use, unless specified in an individual condition.

ASSESSMENT MANAGER’S ADVICE

1. Local Laws

The approved development must also comply with Council’s Local Laws under the Local Government Act 1993 from time and other controls.

2. Hours of Work

It is the applicant/owner’s responsibility to ensure compliance with Section 440R of the Environmental Protection Act 1994, which prohibits any construction, building and earthworks activities likely to cause audible noise (including the entry and departure of heavy vehicles) between the hours of 6:30pm and 6:30am from Monday to Saturday and at all times on Sundays or Public Holidays.

This is a Mackay Regional Council digitally signed document.

Page 10: YOUR REF: 11NQ032 - Mackay Council · 2014-09-29 · Civic Precinct, Gordon Street Telephone 1300 622 529 Email council@mackay.qld.gov.au PO Box 41 │Mackay │QLD 4740 │ Australia

ASSESSMENT MANAGER CONDITIONS Application Number: DA-2011-91 Applicant’s Name: SGS PTY LTD

Decision Date: 27 May 2011  

Page 7 of 8 

3. Dust Control

It is the applicant/owner’s responsibility to ensure compliance with Section 319 General Environmental Duty of the Environmental Protection Act 1994, which prohibits unlawful environmental nuisance caused by dust, ash, fumes, light, odour or smoke beyond the boundaries of the property during all stages of the development including earthworks and construction.

4. Sedimentation Control

It is the applicant/owner’s responsibility to ensure compliance with Chapter 8, Part 3C of the Environmental Protection Act 1994 to prevent soil erosion and contamination of the stormwater drainage system and waterways.

5. Noise During Construction and Noise in General

It is the applicant/owner’s responsibility to ensure compliance with Chapter 8, Part 3B of the Environmental Protection Act 1994.

6. General Safety of Public During Construction

It is the principal contractor’s responsibility to ensure compliance with Section 31 of the Workplace Health and Safety Act 1995. Section 31(1)(c) states that the principal contractor is obliged on a construction workplace to ensure that work activities at the workplace are safe and without risk of injury or illness to members of the public at or near the workplace.

It is the responsibility of the person in control of the workplace to ensure compliance with Section 30 of the Workplace Health and Safety Act 1995. Section 31(1)(c) states that the person in control of the workplace is obliged to ensure there is appropriate, safe access to and from the workplace for persons other than the person’s workers.

7. Contaminated Land

It is strictly the applicant/owner’s responsibility to source information regarding contaminated land from the Environmental Protection Agency, Contaminated Land Section as Council has not conducted detailed studies and does not hold detailed information pertaining to contaminated land.

This is a Mackay Regional Council digitally signed document.

Page 11: YOUR REF: 11NQ032 - Mackay Council · 2014-09-29 · Civic Precinct, Gordon Street Telephone 1300 622 529 Email council@mackay.qld.gov.au PO Box 41 │Mackay │QLD 4740 │ Australia

ASSESSMENT MANAGER CONDITIONS Application Number: DA-2011-91 Applicant’s Name: SGS PTY LTD

Decision Date: 27 May 2011  

Page 8 of 8 

8. Summary of Developer Contributions as at date of approval.

Note: Contributions paid at the time nominated in the relevant condition will be re-calculated at current applicable rate, at that time.

Infrastructure Catchment Number of Units/ET’s/

EP’s/VPD Parks Paget 9.62EP Stormwater Drainage Network

Bakers Creek South West Mackay Main Drain

90% of 0.609ha*

Transport Network Mackay 217.35vpd *A credit towards the applicable stormwater contribution of $24,082 per impervious hectare applies to the site. This figure is correct as of May 2011 and the amount owingat this date is $25,601. In order to calculate the quantum of the contribution at the time of payment, please refer to Council’s website for the indexed Policy Contribution rates.

This is a Mackay Regional Council digitally signed document.

Page 12: YOUR REF: 11NQ032 - Mackay Council · 2014-09-29 · Civic Precinct, Gordon Street Telephone 1300 622 529 Email council@mackay.qld.gov.au PO Box 41 │Mackay │QLD 4740 │ Australia

01

A102

01

A102

10° 7°

10°

02

A102

02

A102

TRANFORMER AREAFOR ERGON (3m X 3m)

83 CARPARKS

2500

5500

7000

5500

5500

7000

5450

7400

3000

INTE

RLIN

K CT

LANDS

CAPIN

G

CONCRETEPATH

BOUNDARY 101.43 m

BO

UN

DA

RY

60.0

5 m

BOUNDARY 101.40 m

BO

UN

DA

RY

60.0

5 m

LANDS

CAPIN

G

1 2 3 4 5 6 7 8 9 10

BALCONY AND ROOFOVER CARPARKS

11 12 13 14 15 16 18 19

21 22

17

24 25 26 29 30 31 32 332823 27 34 35 36 37 38 39 40

DESIGN LARGE RIGID TRUCKMinimium Turning Circle : 21.65m

42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61

63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83

2m WIDE X 76m BIO-RETENTION AREA

62SCREENEDGARBAGEREFUSEAREA

3000

LANDSCAPING AREA131.75m2

10°

LANDSCAPING AREA309.55m2

1200mm WIDE CONC. PATH

1200

1200mm WIDE CONC. PATH

LANDSCAPING AREA

LANDSCAPING AREA98.58m2

WALL UNDER

WALLUNDER

WALLUNDER

LANDSCAPING AREA79.74m2

6000

20

41

COPYRIGHT 2011C

@A1

client\

status\ description\

address\

scale\

issue date\

sheet\

project no\m/ 0404 755250

p/ po box 3387

merewether nsw 2291

residential commercial industrial

consultants\

issuedate desciption

issue\

30.03.11 ISSUED FOR DEVELOPMENT APPLICATION A

DSTRUCTURAL ENGINEER - VDM Consulting (Mackay)A: Suite C11, Level 2, Canegrowers Building, 120 Wood Street, Mackay 4740P: 61 7 4953 1055 | F: 61 7 4953 4855

TOWN PLANNING:- Humphreys Reynolds Perkins North QldA: Level 2, 56 Gordon Street, Mackay - PO Box 244, Mackay 4740P: 61 7 4953 2877 | F: 61 7 4953 2577

14.04.11 CHANGES ISSUED FOR DEVELOPMENT APPLICATION B18.04.11 CHANGES ISSUED FOR DEVELOPMENT APPLICATION C12.05.11 CHANGES ISSUED TO COUNCIL FOR DEVELOPMENT APPLICATION D

LOT 15, 13 INTERLINK CT, PAGET, QLD,4740

As indicatedCOAL TESTING FACILITY + INDUSTRIAL INDUCTION TRAINING

12.05.11

DEVELOPMENT APPLICATION

10020

A100

view to entry view from road view from carpark

1 : 200A100Site Plan1

Area ScheduleName Area Carparking Req

GROUND FLOOR TESTING FACILITY 1128 m²GROUND FLOOR WAREHOUSE 1425 m²UPPER FLOOR PALLET STORAGE 375 m²UPPER FLOOR TRAINING 500 m²Grand total 3428 m²

aerial view of site

subject site

1128/100 =11.3

Site Area = 6090m2Landscaping Area = 619.6m2 which is 10.2% of the site area

1425/100 =14.3

1 space /employee/student = 40

(69.4) 70 CARPARKS REQUIRED

83 CARPARKS PROVIDED

375/100 =3.8

This is a Mackay Regional Council digitally signed document.

matthewi
Manual DA & Date
Page 13: YOUR REF: 11NQ032 - Mackay Council · 2014-09-29 · Civic Precinct, Gordon Street Telephone 1300 622 529 Email council@mackay.qld.gov.au PO Box 41 │Mackay │QLD 4740 │ Australia

UP

UP

01

A102

01

A102

279 m²open office

290 94910

WAREHOUSE

83 CARPARKS

BOUNDARY 101.40 mB

OU

ND

AR

Y60

.05

m

BOUNDARY 101.43 m

BO

UN

DA

RY

60.0

5 m

7400

26125 3000

61060

53750

STAX ATHEIGHTS

71 m²furnace

445 m²lab

reception

48 m²lunch

51 m²coking

107 m²shipping area

62 m²float sink

71 m²crushing

80 m²cool room

40 m

²A

RD

150 m²wet area

57 m²drying

12 m²office 01

12 m²office 02

15 m²office 03

14 m²office 04

14 m²office 05

15 m

²ro

adw

ay

dus

t

36 m²D04

2/D02DRY SIZE

DRY SIZE

DRY SIZE

DRYTUMBLE

13 m²prep sup.

12 m²xray

32 m²drop shatter

18 m²lab super

39 m²meeting

47 m²petrolab

printer

kitchenettelive samplesbalance bench

fume cupboard phos AA

18 m²archive

male female

58 m²gas bottle storage

2521

5500

7000

5500

5500

7000

5450

MEZZANINE OVER

18 m²petro prep

envi room

02

A102

02

A102

06

04

02

6780

5526

6000

1800

0101

A B C

5200 5120 5120 4210 6595 5180 5570

D E F G H I J K L

6009 6009 6009 6096

M N

13138 13225

03

05

07

08

09

10

11

12

EQEQ

EQEQ

EQEQ

EQEQ

1200

4401

1200

2m WIDE X 76m BIO-RETENTION AREA

3000

DRUM

STORAGE

(CONC)

01

A102

01

A102

FIREEXIT

129 m²

OUTDOOR

BREAKOUT

server/store

office 01office 02 office 03

reception

training room 01

training room 03

375 m²mezzanine pallet

02

A102

02

A102

06

04

02

01

G H I J K L5570 6009 6009 6009 6096 M N13138 13225

training room 02

breakout

COPYRIGHT 2011C

@A1

client\

status\ description\

address\

scale\

issue date\

sheet\

project no\m/ 0404 755250

p/ po box 3387

merewether nsw 2291

residential commercial industrial

consultants\

issuedate desciption

issue\

30.03.11 ISSUED FOR DEVELOPMENT APPLICATION A

DSTRUCTURAL ENGINEER - VDM Consulting (Mackay)A: Suite C11, Level 2, Canegrowers Building, 120 Wood Street, Mackay 4740P: 61 7 4953 1055 | F: 61 7 4953 4855

TOWN PLANNING:- Humphreys Reynolds Perkins North QldA: Level 2, 56 Gordon Street, Mackay - PO Box 244, Mackay 4740P: 61 7 4953 2877 | F: 61 7 4953 2577

14.04.11 CHANGES ISSUED FOR DEVELOPMENT APPLICATION B18.04.11 CHANGES ISSUED FOR DEVELOPMENT APPLICATION C12.05.11 CHANGES ISSUED TO COUNCIL FOR DEVELOPMENT APPLICATION D

LOT 15, 13 INTERLINK CT, PAGET, QLD,4740

As indicatedCOAL TESTING FACILITY + INDUSTRIAL INDUCTION TRAINING

12.05.11

DEVELOPMENT APPLICATION

10020

A101 1 : 200A101Ground Floor Plan1

1 : 200A101Upper Floor Plan2

This is a Mackay Regional Council digitally signed document.

matthewi
Manual DA & Date
Page 14: YOUR REF: 11NQ032 - Mackay Council · 2014-09-29 · Civic Precinct, Gordon Street Telephone 1300 622 529 Email council@mackay.qld.gov.au PO Box 41 │Mackay │QLD 4740 │ Australia

RLGround Floor Level10000

RLGround Ceiling Level12550

RLUpper Ceiling Level15850

2700

600255

0

POWDERCOATEDMETAL LOUVRES

PAINT FINISH TOCONCRETE TILT-UPPANELS

COLORBOND KLIPLOKROOF SHEETING

010305070809101112

RLGround Floor Level10000

RLGround Floor Level

10000

RLGround Ceiling Level

12550RL

Upper Floor Level13150

RLUpper Ceiling Level15850

POWDERCOATEDMETAL LOUVRES

PAINT FINISH TOCONCRETE TILT-UPPANELS

CORPORATE SIGNAGEFIXED TO WALL

METAL FRAMEDWINDOWS

COLORBOND CUSTOMORBROOF SHEETING

HORIZONTAL METALSUN SCREEN

ABCDEFGHIJKLMN

RLGround Floor Level

10000

RLGround Ceiling Level

12550RL

Upper Floor Level13150

RLUpper Ceiling Level

15850

POWDERCOATEDMETAL LOUVRES

PAINT FINISH TOCONCRETE TILT-UPPANELS

CORPORATE SIGNAGEFIXED TO WALL

METAL FRAMEDWINDOWS

A B C D E F G H I J K L M N

RLGround Floor Level

10000

RLUpper Floor Level

13150

RLUpper Ceiling Level

15850

2700

600255

0

5850

POWDERCOATEDMETAL LOUVRES

PAINT FINISH TOCONCRETE TILT-UPPANELS

CORPORATE SIGNAGEFIXED TO WALL

METAL FRAMEDWINDOWS

HORIZONTAL METALSUN SCREEN

CORPORATE SIGNAGEFIXED TO WALL

06040201 07 08 09 10 11 12

RLGround Floor Level

10000

RLGround Ceiling Level

12550RL

Upper Floor Level13150

RLUpper Ceiling Level

15850mezzanine pallet

WAREHOUSE

POWDERCOATEDMETAL LOUVRES

PAINT FINISH TOCONCRETE TILT-UPPANELS

STEEL RAFTERS TOENGINEERS FUTURE DETAIL

COLORBOND KLIPLOKROOF SHEETING

R.CONC. SLABTO ENGINEERSFUTURE DETAIL

A B C D E F G H I J K L M N

RLGround Floor Level

10000

RLUpper Floor Level

13150

RLUpper Ceiling Level

15850

lab

2700

600255

0

PAINT FINISH TOCONCRETE TILT-UPPANELS

STEEL TRUSSES TOENGINEERS FUTURE DETAIL

COLORBOND CUSTOMORBROOF SHEETING

R.CONC. SLABTO ENGINEERSFUTURE DETAIL

06040201 07 08 09 10 11 12

WALL

8100

SCREENEDGARBAGE AREA

office 01 server/store femaleOUTDOOR

BREAKOUT

COPYRIGHT 2011C

@A1

client\

status\ description\

address\

scale\

issue date\

sheet\

project no\m/ 0404 755250

p/ po box 3387

merewether nsw 2291

residential commercial industrial

consultants\

issuedate desciption

issue\

30.03.11 ISSUED FOR DEVELOPMENT APPLICATION A

DSTRUCTURAL ENGINEER - VDM Consulting (Mackay)A: Suite C11, Level 2, Canegrowers Building, 120 Wood Street, Mackay 4740P: 61 7 4953 1055 | F: 61 7 4953 4855

TOWN PLANNING:- Humphreys Reynolds Perkins North QldA: Level 2, 56 Gordon Street, Mackay - PO Box 244, Mackay 4740P: 61 7 4953 2877 | F: 61 7 4953 2577

14.04.11 CHANGES ISSUED FOR DEVELOPMENT APPLICATION B18.04.11 CHANGES ISSUED FOR DEVELOPMENT APPLICATION C12.05.11 CHANGES ISSUED TO COUNCIL FOR DEVELOPMENT APPLICATION D

LOT 15, 13 INTERLINK CT, PAGET, QLD,4740

As indicatedCOAL TESTING FACILITY + INDUSTRIAL INDUCTION TRAINING

12.05.11

DEVELOPMENT APPLICATION

10020

A102

1 : 200A102East Elevation1

1 : 200A102North Elevation2

1 : 200A102South Elevation3

1 : 200A102West Elevation4

1 : 200A102Section 101

1 : 200A102Section 202

This is a Mackay Regional Council digitally signed document.

matthewi
Manual DA & Date
Page 15: YOUR REF: 11NQ032 - Mackay Council · 2014-09-29 · Civic Precinct, Gordon Street Telephone 1300 622 529 Email council@mackay.qld.gov.au PO Box 41 │Mackay │QLD 4740 │ Australia

This is a Mackay Regional Council digitally signed document.

renan
Rectangle
renan
Rectangle
renan
Callout
SEWER CONNECTION
renan
Callout
WATER SERVICE CONNECTION
Page 16: YOUR REF: 11NQ032 - Mackay Council · 2014-09-29 · Civic Precinct, Gordon Street Telephone 1300 622 529 Email council@mackay.qld.gov.au PO Box 41 │Mackay │QLD 4740 │ Australia

This is a Mackay Regional Council digitally signed document.

renan
Rectangle
renan
Callout
STORMWATER CONNECTION
Page 17: YOUR REF: 11NQ032 - Mackay Council · 2014-09-29 · Civic Precinct, Gordon Street Telephone 1300 622 529 Email council@mackay.qld.gov.au PO Box 41 │Mackay │QLD 4740 │ Australia

Decision Notice Sustainable Planning Act

 

Civic Precinct, Gordon Street Telephone 1300 622 529 Email [email protected] PO Box 41 │Mackay │QLD 4740 │ Australia Facsimile 07 4944 2400 www.mackay.qld.gov.au

 

Sustainable Planning Act Appeals Chapter 7 Part 1 Planning and Environment Court: Division 8 – Appeals to court relating to development applications 1) An applicant for a development application may appeal to the court against any of the following - (a) the refusal, or the refusal in part, of the development application; (b) any condition of a development approval, another matter stated in a development approval and the identification or inclusion of a code under section 242; (c) the decision to give a preliminary approval when a development permit was applied for; (d) the length of a period mentioned in section 341; (e) a deemed refusal of the development application. (2) An appeal under subsection (1)(a), (b), (c), or (d) must be started within 20 business days (the applicant’s appeal period) after- (a) if a decision notice or negotiated decision notice is given-the day the decision notice or negotiated decision notice is given to the applicant; or (b) otherwise-the day a decision notice was required to be given to the applicant.

462 Appeals by submitters - General (1) A submitter for a development application may appeal to the court only against- (a) the part of the approval relating to the assessment manager’s decision about any part of the application requiring impact assessment under section 314; or (b) the part of the approval relating to the assessment manager’s decision under section 327 (2) To the extent an appeal may be made under subsection (1), the appeal may be against 1 or more of the following- (a) the giving of a development approval; (b) any provision of the approval including- (i) a condition of, or lack of condition for, the approval; or (ii)the length of a period mentioned in section 341 for the approval. (3) However, a submitter may not appeal if the submitter- (a) withdraws the submission before the application is decided; or (b) has given the assessment manager a notice under section 339(1)(b)(ii) (4) The appeal must be started within 20 business days (the submitter’s appeal period) after the decision notice or negotiated decision notice is given to the submitter.

463 Additional and extended appeal rights for submitters for particular development applications (1) This section applies to a development application to which chapter 9, part 7 applies. (2) A submitter of a properly made submission for the application may appeal to the court about a referral agency’s response made by a prescribed concurrence agency for the application. (3) However, the submitter may only appeal against a referral agency’s response to the extent it relates to- (a) if the prescribed concurrence agency is the chief executive (fisheries)-development that is- (i)a material change of use of premises for aquaculture; or (ii)operational work that is the removal, damage or destruction of a marine plant. (4) Despite section 462(1), the submitter may appeal against the following matters for the application even if the matters relate to code assessment- (a) a decision about a matter mentioned in section 462(2) if it is a decision of the chief executive (fisheries); (b) a referral agency’s response mentioned in subsection (2)

464 Appeals by advice agency submitters (1) Subsection (2) applies if an advice agency, in its response for an application, told the assessment manager to treat the response as a properly made submission. (2) The advice agency may, within the limits of its jurisdiction, appeal to the court about- (a) any part of the approval relating to the assessment manager’s decision about any part of the application requiring impact assessment under section 314; or (b) any part of the approval relating to the assessment manager’s decision under section 327. (3) The appeal must be started within 20 business days after the day the decision notice or negotiated decision notice is given to the advice agency as a submitter. (4) However, if the advice agency has given the assessment manager a notice under section 339(1)(b)(ii), the advice agency may not appeal the decision.

This is a Mackay Regional Council digitally signed document.

Page 18: YOUR REF: 11NQ032 - Mackay Council · 2014-09-29 · Civic Precinct, Gordon Street Telephone 1300 622 529 Email council@mackay.qld.gov.au PO Box 41 │Mackay │QLD 4740 │ Australia

Decision Notice Sustainable Planning Act

 

Civic Precinct, Gordon Street Telephone 1300 622 529 Email [email protected] PO Box 41 │Mackay │QLD 4740 │ Australia Facsimile 07 4944 2400 www.mackay.qld.gov.au

 

NOTICE OF INTENTION TO COMMENCE USE

Planning Approval DA-2011-91

Date of Approval 27-May-2011

Approved Material Change of Use - General Industry (Coal Testing Facility and Industrial Induction Training)

Location 13-17 Interlink Court, PAGET QLD 4740

Property Description Lot 15 on SP193944 I am hereby notifying you of my intention to commence the approved use on ______________________________ (insert date). I have read the conditions of the above Decision Notice and believe that all the applicable conditions have been complied with. Applicant: SGS PTY LTD Address: C/- Humphreys Reynolds Perkins North Queensland, PO Box 244, MACKAY QLD 4740

_________________________________________ Signature of Applicant Date: ______________

This is a Mackay Regional Council digitally signed document.