Prepared by
March 2009
Postal address: 19 Gyro Court Gisborne South VIC 3437
Tel: 0400 995 363 E-mail:
[email protected]
matters more consulting pty ltd PAGE 1
Table of Contents
2.2 Central Coastal Board Boating Coastal Action
Plan............................................................
10
2.3 Victoria’s Tourism Industry Policies
.....................................................................................
10
2.4 Mornington Shire Economic Sustainability Strategy (draft)
................................................. 11
2.5 Mornington Peninsula Tourism Strategy
.............................................................................
12
2.6 Policy Context Summary
.....................................................................................................
13
3. Demand and Supply Analysis
..........................................................................................
14
3.1 Market Demand
...................................................................................................................
14
3.2 Market Supply
......................................................................................................................
15
3.3 Market Conclusion
...............................................................................................................
16
4. Economic Impacts
.............................................................................................................
17
4.5 Visitor Expenditure
Employment..........................................................................................
19
INTRODUCTION
Matters More Consulting Pty Ltd has been commissioned by Connell
Wagner, acting as planners for Yaringa Marina, to undertake a
preliminary economic impact assessment of the proposal to develop
additional marina and accommodation facilities at the existing
marina on Western Port in Victoria.
The report presents the following:
- Description of the project including the existing marina and its
current role, its location and the region in which it
operates;
- Policy context, comprising a review of current relevant
government policies at state and local level;
- Outline of the previously identified demand for marina berths and
existing supply in the wider region;
- Assessment of the economic impacts of the proposed project;
and
- Summary and conclusions of the analysis.
matters more consulting pty ltd PAGE 3
1. THE PROJECT
1.1 Introduction
This section provides a description of the existing Yaringa Marina
and its history, the project proposal, and the region in which this
proposed project is located.
1.2 Location
Yaringa Marina is located at the north-western point of Western
Port, as shown in Figure 1. It is 6 kms east of Somerville and the
north-south running Frankston – Flinders Road, while Western Port
Highway (Dandenong - Hastings Road) is approximately 4 kms west
from the marina.
The location benefits from being less than one hour by car from the
Melbourne CBD and is easily accessible by a resident population
catchment of some 4 million people. Travel time to the region has
been significantly reduced by the completion of the EastLink, and
the proposed Frankston Bypass will further reduce travel time to
Yaringa Marina from Melbourne.
Figure 1: Map of Western Port; location of Yaringa Marina
Source: Natmap Digital Maps 2008, Geoscience Australia
matters more consulting pty ltd PAGE 4
1.3 Existing Marina
The first jetty at Yaringa was built in 1960, making Yaringa the
oldest marina on Western Port. In early years, boats were berthed
on the mud and the bay was only accessible at high tide. With
regular tides in excess of 2 meters, this arrangement was not
suitable in the long run. In 1986, an all-tide access marina was
therefore established allowing boats to be berthed in wet berths or
in the extensive on-land storage area of Yaringa Marina.
The all-tide marina has slowly developed over its 22 year
existence, upgrading facilities at a measured pace as finances and
demand has dictated. Today, it remains a low-key marina with a
steadily growing base of loyal customers, accommodating a mix of
boats, including small fishing vessels, motor boats and cruisers
and yachts of various sizes and up to 15 meters in length.
Approximately 600 boats are currently stored at Yaringa Marina, of
which 150 are in wet berths and the remaining 450 are stored at the
significantly large hard-standing land storage area with covered
and uncovered storage.
Regular users of the marina include The Dolphin Research Institute,
Tide Master Environmental Tours, universities for student research
field trips, fishing clubs and boat clubs, and visiting yachts from
Western Port, Port Phillip Bay, Tasmania and further afield.
Likewise the marina is a popular destination for outings for groups
from, for example, special needs schools, hospitals and aged care
facilities, photography and art classes, and general tourists. The
Yaringa Marina Restaurant is also a noted venue for functions and
celebrations.
Increasingly, the marina is becoming an important marine service
centre. Slipping services are provided by the marina’s Travel Lift
with capacity to slip boats of up to 40 tonnes for inspection,
cleaning, antifouling, or storage. This capacity is extensively
used by visiting boats that utilise the clustered marine services
provided by on-site operators, and travel lift usage now exceeds
500 lifts per annum. With approximately 18-20 businesses operating
from Yaringa (refer Table 1 below) it effectively represents a
cluster of marine services that is unparalleled in breadth in
Victoria. In total, these businesses are estimated to have an
annual turnover in excess of $10 million dollars according to
estimates provided by the Yaringa Marina operator.
Table 1: Yaringa Marina Marine Business Directory
Business Name Service type Employment
Clow Marine Electronics Marine electronics 2
David Ryan Sails Sail-maker 2
GHD Studios Fibreglass manufacturing, repairs, repainting, re-fits
2
GHD Studios Painting and boat refurbishment 8
John Bakker Painting and boat refurbishment 2
Kojak’s Boatshed Boat detailing, tyres 3
Maintenance Engineering Solutions Metal fabrication, marine
engineering 3
Peninsula Marine Covers Boat covers, upholstery & repairs
1
Superior Masts & Rigging Yacht masts aluminium/SS welding
2
Supreme Marine Outboard mechanic, outboard motors/stern
drives/trailers 4
The Yacht Doctor Yacht maintenance and repairs 1
Yaringa Boat Harbour Marina Pens & Dry boat storage 8
Yaringa Boat Hire Boat hire, 7-day per week, fishing boats 1
Yaringa Boat Sales Used boat sales 1
Yaringa Boat Services Slipping and slipway services 2
Yaringa Chandlery Chandlery, gift shop, ice, bait, tackle 1
Yaringa Marina Restaurant Restaurant, fully serviced for lunch and
dinner 7 days /week 9
Yaringa Waterside Kiosk and Takeaway Kiosk breakfast and lunch 7
days/week 2
Total 54
matters more consulting pty ltd PAGE 5
Four fishing charters also operate from the marina on a full or
part time basis depending on weather and demand. These are:
- Reel Adventure operates with 2 – 3 people;
- The Bay Runner operates with 1 – 2 people;
- Top Gun operates with 1 – 2 people; and
- Christina (trailer-able boat) – operates with 1 person.
In total, it is estimated that approximately 60 people are employed
at the marina on a full time or part time basis.
Service and maintenance staff, including cleaners, casual
labourers, and administration and accounting services are employed
by these businesses on an as-required basis.
Additionally, limited visitor accommodation is available at the
Western Port Harbour Caravan Park which is located adjacent to the
marina. The caravan park comprises 55 sites, of which the majority
are occupied on a permanent basis. Visitors can be accommodated in
two park cabins, an on-site van, or at a limited number of tourist
van sites.
1.4 The Proposal
Yaringa Marina is proposing to upgrade and extend its range of
services. The development proposal aims to grow the number of boats
and visitors that use the marina from the existing 600 boats to
1,000 boats by 2012. This upgrade and extension will improve the
financial viability of the marine services cluster operating at the
marina, allowing them to expand and would strengthen the role of
Yaringa Marina as a one-stop location for boat servicing in
Victoria.
The development comprises:
- Creation of a basin and lock connected to the existing marina
with wet berth accommodation for 180 boats of up to 12 meters in
length;
- Development of 180 accommodation units with on-site management to
operate the accommodation unit leasing arrangements;
- Construction of an additional dry stack building and associated
equipment;
- Construction of new factories and infrastructure at 3 Lumeah Road
to replace rundown buildings and to accommodate expansion of marine
services currently operating from the site;
- Construction of offices which will accommodate park rangers and
water police (if required), the new boat sales business, and a
Western Port museum. Offices will replace some existing run-down
facilities which require modernisation; and
- Refurbishment of the existing harbour and upgrade of some of the
existing wet berths to accommodate larger boats up to 20
meters.
A diagram of the proposed development is shown in Master Plan 04 on
the following page.
YARINGA 2 & 4 LUMEAH ROAD SOMERVILLE VICTORIA 3912
MASTER PLAN
Copyright: ML Design (VIC) Pty Ltd Date: Monday, 1 September 2008
Drawn: KP Printed: Monday, 1 September 2008 File:
O:\final\2007099\CAD\05 ArchiCAD\2007099 Project OPT 2.pln Project
No. - Drawing No. - Revision No.:
2007099MP004
Level 2, 347 Flinders Lane, Melbourne VIC 3000
A.C.N. 100 387 326
T 61 3 8610 3700 F 61 3 8610 3777
[email protected] www.mldesign.biz
5. 14
5. 09
5. 38
5. 42
9
4.36
4.5 3
4.0 0
4.4 9
4.3 9
4.0 5
4.0 9
3.9 5
(2 49
.6 6)
0° 00
N O
R TH
10 CARSPACES
3
CARSPACES
7 CARSPACES BITUMEN CARPARK
TREATED PINE POST & HINGEJOINT TREATED PINE POST & CHAIN
WIRE MESH
TR EA
TE D
PI NE
P O
SPIKE PLACED RL. 5.40
SPIKE PLACED RL. 4.14
SPIKE PLACED RL. 4.20
SPIKE PLACED RL. 4.51
SPIKE PLACED RL. 4.64
SPIKE PLACED RL. 4.97
SPIKE PLACED RL. 4.67
SPIKE PLACED RL. 4.88
SPIKE PLACED RL. 4.48
SPIKE PLACED RL. 4.42
SPIKE PLACED RL. 4.40
SPIKE PLACED RL. 4.66
SPIKE PLACED RL. 4.90
SPIKE PLACED RL. 3.87
SPIKE PLACED RL. 3.81
SPIKE PLACED RL. 4.89
SPIKE PLACED RL. 4.73
SPIKE PLACED RL. 4.22
SPIKE PLACED RL. 4.91
SPIKE PLACED RL. 4.40
SPIKE PLACED RL. 3.90
NAIL FOUND ON POST OF PONTOON RL. 4.10
SPIKE IN BITUMEN RL. 4.34
4.14 YARINGA BOAT HARBOUR FIELD WORK COMPLETED IN NOVEMBER
2003
51.23
45.64
1.5 The Region
Yaringa Marina is located in Mornington Peninsula Shire, which
covers approximately 720km² of land and has an extensive coastline
of some 190 kms. Mornington Peninsula has a scenic and often
verdant landscape of rolling hills with water views from many high
points on the Peninsula. The sandy and sheltered beaches on the
north western shores of the Peninsula attract several million
visitors each year, most of whom come from metropolitan Melbourne
and many of whom have holiday homes on the Peninsula. The resident
population in Mornington Peninsula Shire is estimated at 142,6801
(June 2007), with population growth of 1.42% from the previous
year.
Western Port marinas, of which Yaringa is one of the largest, also
serve the population of approximately 284,000 in the Casey-Cardinia
growth area which is growing at 3.0% and 5.5% p.a.2 and forecast to
increase by 136,000 – 169,000 people or approximately 68,000 –
85,000 new households by 20303. This area has one of the highest
population growth areas in Australia and will result in a
significant increase in demand for recreational facilities within
the wider region.
Tourist visitation further augments the region’s resident
population, particularly during summer and on weekends. The
Peninsula Tourism Region which comprises Mornington Peninsula Shire
and City of Frankston is the tourism region outside of Melbourne
which receives the highest number of visitors with 4.4 million
visitors in the year to September 2008. In comparison, the Yarra
Valley and Dandenong Ranges received 3.4 million visitors, Phillip
Island received 2.0 million and Daylesford and Macedon Ranges
received 1.8 million visitors over the same period.
The economy of the region is diverse. Key industries4 in the
Mornington Peninsula Shire with output valued at over $500 million
per annum include:
- Manufacturing
- Construction
- Government Administration & Defence
Other significant industries with over $300 million and less than
$500 million in output include:
- Mining (industry includes quarries)
- Accommodation, Cafés & Restaurants
Industries of employment in Mornington Peninsula Shire are not
identical to the industries generating significant output due to
the difference in input mix of labour, capital and
skills/technology. The industries with the highest employment
levels5 include:
- Retail Trade (15.7% of jobs in Mornington Peninsula)
- Health Care & Social Assistance (12.6% of jobs)
- Manufacturing (10.4% of jobs)
- Construction (9.5% of jobs)
1 ID Consulting, accessed through Mornington Peninsula Website
http://www.id.com.au/profile/Default.aspx?id=118
2 ABS Cat 3218.0 Regional Population Growth Australia, 2005-06 3
Casey-Cardinia Growth Area Plan, Growth Areas Authority, DSE
4 Economic Sustainability Strategy, REMPLAN model data, draft
September 2008
5 ABS 2006 Census data
matters more consulting pty ltd PAGE 8
Tourism is not included specifically in these figures as tourism is
not measured as a separate industry. Instead, significant tourism
generated employment is included in sub-level industries, such as
accommodation (93.1%), cafés & restaurants (31.7%), clubs,
pubs, taverns & bars (19.1%), and retail trade (8.1%)6.
Overall, there is an estimated 38,000 jobs (full time, part time or
casual) in the Mornington Peninsula Shire. With a resident labour
force of 57,800, there is a jobs deficit in the local economy of
some 19,800 jobs. Additionally, the population growth in the
Casey-Cardinia corridor will result in a requirement for some
100,000 – 140,000 new jobs to 2030 of which a large share is
encouraged to be provided locally to reduce the need to commute
long distances to work as stated in the Casey-Cardinia Growth Area
Plan7.
Regional area population growth and increasing demand for
recreational opportunities and jobs within the regional area are
the key drivers for expansion at Yaringa Marina.
6 TTF Australia Tourism Employment Atlas 2005
7 Refer footnote 3
2. POLICY CONTEXT
Understanding the policies which guide development of marine and
accommodation infrastructure on the Mornington Peninsula is
important to provide understanding of the context in which the
proposal sits. This section summarises recent relevant policies and
strategies relating to the development proposal.
2.1 Victorian Coastal Strategy 2008
The Victorian Coastal Strategy 2008 (VCS) provides the State
Government’s policy framework for planning and sustainable
long-term management of coastal, estuarine, and marine environments
in Victoria.
There are four key principles in the Victorian Coastal Strategy
2008, in order of importance:
1. Provide for the protection of significant environmental and
cultural values;
2. Provide clear direction for the future;
3. Ensure sustainable use of natural coastal resources; and
4. Sustainable development on the coast.
Primarily, the third and fourth principles are more applicable to
the development project at Yaringa Marina. Section numbering below
refers to the guiding key principle.
Section 3.1.2 Boating is of particular relevance for Yaringa: this
section provides the background, policy and actions for boating
under the VCS. The VCS notes that boating in an important
recreational and social outlet in Victoria, and that boat
registrations are increasing at a faster rate than population
growth, leading to an increase in demand for facilities for boat
retrieval and storage. The policy response is to plan for
sustainable delivery of boating facilities to meet the increased
demand, taking safety, conservation objectives and quality of
experience for beach users into consideration. The policy also
states that access (new or existing) should be reviewed according
to the recreational boat facility hierarchy that is provided in VCS
Figure 11. Stated actions comprise (Action a) the implementation of
Coastal Action Plans across Victoria, and (Action b) the
development of a long-term strategy to develop safe boating
facilities and infrastructure across Victoria at strategic
sites.
It is noted that Yaringa is not included in the Recreational Boat
Facility Hierarchy 2030 (VCS Figure 11), which only identifies
Hastings and Tooradin in the north-western part of Western Port.
The policy therefore does not correspond completely with Action a,
which is to implement the Coastal Action Plan for the area. The
Coastal Action Plan identified Yaringa-Tooradin as an area for
investment focus, as discussed further in section 2.2 of this
document.
VCS section 3.3 Tourism reiterates the importance of tourism as a
key economic driver for Victoria, and the challenges involved in
balancing the demand for appropriate tourism development and the
policy to protect non-urban areas between settlements from
development. The VCS accepts the planning principles set out in the
Coastal Spaces: Inception Report8
regarding development of high quality visitor/tourist accommodation
of appropriate scale and intensity of use in the coastal
hinterland, under provision that accommodation is designed to
prevent conversion to permanent residential occurring.
VCS section 4.3.1 Local Ports recognises the important recreation
and tourism function of local ports as well as their role in
providing access to the coast. The main issue with local ports is
that often many agencies and authorities are involved in their
management and responsibilities are not always clear. The policy
response focuses on effective and efficient management of local
ports, that any development considers climate change, storm tides,
etc and that the community’s experience is enhanced. The VCS action
for local ports is to develop a local ports strategy.
8 Coastal Spaces Initiative, 2005, Department of Sustainability and
Environment
matters more consulting pty ltd PAGE 10
Yaringa Marina and its development project is supported under the
VCS, in that Yaringa is a facility which is being upgraded to meet
the demand improved and new boating facilities, and this is
occurring at an existing facility where incremental environmental
impacts are likely to be lower than at a new facility. Yaringa is
recognised as being a strategic location for this provision of
boating facilities in the local area’s Coastal Action Plan –
summarised below – Coastal Action Plans being the recognised
vehicles for implementing the strategic plans under VCS.
2.2 Central Coastal Board Boating Coastal Action Plan
The Boating Coastal Action Plan (2006) provides “regional guidance
across government for the planning, management and funding of the
network of recreational boating facilities” in the Central Coastal
district of Victoria including Port Phillip Bay and Western
Port.
The Boating Coastal Action Plan (BCAP) provides the framework and
principles to guide planning for and coordination of upgrade of
existing and development of new facilities across various
stakeholders. BCAP’s focus is on the short and medium term planning
horizon and its implementation would result in the network of
boating facilities in 2030 will provide “a level of service that
reflects the needs of the community”.
Guiding principles are provided as region-wide themes, supplemented
with local goals and priorities for each of the 11 boating areas
defined within the Central Coastal Board region.
Yaringa is located in Area 8 – North-West Western Port Boating
Area, which extends from West Head near Flinders through to Pelican
Point east of Tooradin. The goal for Area 8 is “to increase
opportunities and levels of service for recreational boating,
whilst acknowledging potential increase in commercial shipping and
the sensitive Western Port marine environment”.
Three local policies have been adopted for Area 8, in addition to
the region-wide policies, two of which are relevant for
Yaringa.
Policy A8.1 states that the strategic focus of investment to
significantly upgrade facilities will be at Hastings and at the
Yaringa-Tooradin area; and
Policy A8.2 states that any new boating facilities should be
developed within the environs of appropriately located existing
facilities.
As Yaringa is included in this local coastal action plan, the
implication of BCAP framework is that investment in upgrades to the
facilities provided at Yaringa Marina is supported under the VCS
action under 3.1.2 (b) to support the implementation of local
coastal action plans.
2.3 Victoria’s Tourism Industry Policies
10-Year Tourism and Events Industry Strategy
Victoria’s overall strategic direction for tourism is set out in
the 10-Year Tourism and Events Industry Strategy (October 2006),
prepared by Tourism Victoria. As part of this overall framework,
several more detailed strategies and plans have been developed.
These include the Regional Tourism Action Plan 2009-2012 and
Victoria’s Nature-based Tourism Strategy 2008- 2012, both of which
are particularly relevant for Yaringa Marina.
Regional Tourism Action Plan 2009-2012
Released in its final version in December 2008, the action plan
contains general strategies for tourism management and marketing
hierarchy and priorities across Victoria, as well as specific
priorities for the various campaign regions.
Yaringa is located in the Mornington Peninsula Campaign Region.
Priorities for Mornington Peninsula focus on enhancing its
reputation as a golf, family destination and food and wine
destination in proximity to Melbourne offering a diversity of
product. The action plan states that:
“The major opportunity for tourism development on the Mornington
Peninsula is realising investment and supporting infrastructure
priorities that enhance water-based and food
matters more consulting pty ltd PAGE 11
and wine experiences and leverage the region’s enhanced commercial
viability due to its proximity to Melbourne”.
Tourism Victoria states that it will work with State Government
agencies, the Regional Tourism Board, Local Government, investors
and industry to facilitate priority projects, including safe boat
harbours and boating facilities, over the 2009 – 2012
timeframe9.
Victoria’s nature-based tourism strategy 2008-2012
Nature-based tourism is one of the fastest growing tourism sectors,
and Victoria is well placed to capitalise on this growth due to its
many natural attractions, including an extensive and accessible
coastline. Approximately 37% of domestic visitors and 77% of
international visitors undertake at least one nature-based tourism
activity during their visit. Fishing and boating are considered
nature-based tourism activities and research presented in the
strategy shows that 13% of domestic overnight and 6% of domestic
day trip and international nature-based visitors go fishing during
their trip.
However, for Victoria to be more successful in nature-based tourism
it needs address gaps in what the strategy calls the five As –
attractions, access, activities, amenities and accommodation. The
strategy is specific in the need to improve or simply the planning
process to facilitate a greater level of private investment into
infrastructure and facilities that will enhance the visitor
experience and increase Victoria’s competitiveness as a
nature-based tourism destination. Specific mention is made of the
leasing terms for Crown land, and site specific legislation under
the Victorian Planning Provisions for development on private land
abutting and adjacent to protected areas.
The VCS references this nature-based tourism strategy and
importantly incorporates four principles to achieve coastal
planning objectives and increase regional tourism investment as a
result of the demand for accommodation and other built facilities
in the coastal environment.
2.4 Mornington Shire Economic Sustainability Strategy (draft)
The draft Economic Sustainability Strategy (ESS) for Mornington
Peninsula Shire was exhibited from September to December, 2008 and
is expected to be finalised in early 2009.
The 2008-2013 ESS aims to provide a clear policy framework to guide
sustainable economic development in the municipality. The strategy
comprises –
- a policy framework
- a series of projects and actions with implementation timeframe
and resource requirements, and
- key performance indicators for each policy element.
Economic output for the municipality is modelled using the REMPLAN
model and agriculture and related industries are recognised as
being important culturally and economically to the Peninsula.
Specifically, the need to pursue ongoing investment in further
development of the aquaculture industry – both freshwater and
marine – and access to water infrastructure is recognised in the
draft strategy10.
Tourism is identified as providing 4.8% or 5,370 jobs in the
Peninsula region which comprises Mornington Peninsula Shire and the
City of Frankston and generates annual expenditure of $534
million.
Activities at Yaringa Marina contribute towards these totals
through the proportion of spending by visitors to the marina on
items such as boat hire, boat servicing, and food sales from the
kiosk and at the restaurant, etc. Note that while many of these
visitors are from metropolitan
9 Regional Tourism Action Plan, Part B: Supporting Tourism Growth
in Victoria’s Regions, p33
10 Economic Sustainability Strategy, 2008, draft,p5.
matters more consulting pty ltd PAGE 12
Melbourne, they are defined as ‘visitors’ when residing 50kms or
more from Yaringa (definitions provided in Figure 2).
Priorities for infrastructure development needs which will support
economic development in the local economy are set out in Section
5.12 Infrastructure in the ESS. The identified requirement for
improved infrastructure for the tourism industry is relevant for
Yaringa, mainly because it identifies a need for improved access
for recreational boating. The policies in the ESS are therefore
supportive of infrastructure development at Yaringa Marina.
2.5 Mornington Peninsula Tourism Strategy
Since 2005, the Mornington Peninsula Sustainable Tourism
Development Plan has provided the framework for tourism development
actions and priorities on the Peninsula. It is a comprehensive
document and covers all aspects of tourism, from organisational and
structural matters to skills and product development, marketing and
investment gaps and priorities.
In the Plan, Western Port is identified as “a hidden treasure …..
one of a very few cool climate mangrove eco-systems in Australia
and … of national environmental significance.” The Plan goes on to
state that “Western Port provides fabulous ecotourism experiences
as it is a haven for migratory birdlife and home to the World’s
most southerly crop of White Mangroves.”11
In total, the Plan contains 44 Strategies under which are found 94
actions. The strategies and associated actions which are relevant
to the Yaringa Marina development proposal include:
Strategy 4: Improve access to the Mornington Peninsula to and from
the Bays, and Action 16 – Establish an upgrade program for
moorings, jetties and piers to improve water access, in conjunction
with Council and Parks Victoria.
Strategy 8: Facilitate new investment to meet accommodation needs,
and Action 20 – Undertake research into the supply and demand for
accommodation to identify accommodation gaps, for example in
large-scale accommodation, world-class accommodation, budget
accommodation and family accommodation.
Strategy 19: Use events to build off-peak visitation, and Action 54
– Identify off-peak events that could be established in traditional
summer destinations (e.g. Portsea/Sorrento, Western Port) that will
assist in changing visitor perceptions of these areas to being
potential year-round destinations.
Strategy 20: Encourage greater repeat visitation from holiday
home-owners and their visiting friends and relatives, particularly
off-peak, and Action 56 – Establish specific marketing strategies
to the holiday-home sector, focusing on promoting upcoming events
and seasonal activities.
11 Mornington Peninsula Sustainable Tourism Development Plan, 2005,
p39.
Figure 2: Definition of a Visitor
Day visitors are those who travel for a round trip distance of at
least 50 kilometres, are away from home for at least 4 hours, and
who do not spend a night away from home as part of their travel.
Routine travel such as commuting between work/school and home is
excluded.
Overnight trips are defined as trips involving a stay away from
home for at least one night, at a place at least 40 kilometres from
home.
Australian Tourism Research: Used in the National Visitor Survey
for the purposes of identifying visitation trends.
matters more consulting pty ltd PAGE 13
2.6 Policy Context Summary
Expansion and upgrade of the facilities at Yaringa Marina appear
well supported by a number of policies and strategies. In
summary:
- Victorian Coastal Strategy – supports upgrade of facilities and
development of sensitive tourist infrastructure including
accommodation in coastal areas to enable visitors to enjoy these
nature-based experiences;
- Boating Coastal Action Plan – identifies Yaringa as a ‘district’
level facility both at present and in the future, so Yaringa is a
marina which will remain operational and development will be
supported by the policy framework;
- Nature-based tourism strategy – highlights the importance of
developing tourism infrastructure of high quality to enable
visitors to enjoy Victoria’s nature-based assets and remain
competitive at both the national and international level.
Recognises the challenges faced by developers when proposing
infrastructure development on or near Crown Land both due to the
planning system and due to the short timeframe for lease of Crown
Land on which a development may sit. Activities at Yaringa are
defined as nature-based tourism and is a focus area for tourism
development in the state;
- Regional Tourism Action Plan – prioritises opportunities on the
Mornington Peninsula which enhance water-based and food and wine
experiences targeting the Melbourne market;
- Mornington Shire Economic Sustainability Strategy – out in draft
form, but it recognises the importance of tourism to the Mornington
Peninsula economy and is supportive of infrastructure development
which furthers tourism activities; and
- Mornington Peninsula Tourism Strategy – recognises Western Port
as “a hidden treasure’ and highlights development of water-related
infrastructure, and visitor accommodation, and initiatives which
will encourage off-peak and repeat visitation, particularly to
typical summer peak destinations.
matters more consulting pty ltd PAGE 14
3. DEMAND AND SUPPLY ANALYSIS
According to estimates by the marina operator, the additional wet
berths are likely to be taken up within a 2-year period.
To underpin this estimate, this section provides a summary of
analysis of market demand and supply that has been undertaken as
background work for BCAP and for various marina development
proposals in Victoria.
3.1 Market Demand
The Boating Industry Association of Victoria collects registration
data from responsible authorities in Australia. Presented in Table
2, this data shows that recreational boating registrations have
been on the rise across all states and territories over the 2003 to
2006 period.
Table 2: Recreational Boating Registrations – Australia 2003 -
2006
Location (State/Territory) June 2003 June 2004 June 2005 June 2006
Population
2006
New South Wales 190,000 196,234 203,393 217,844 6,817,182
1:31
Queensland 175,659 184,279 193,964 202,811 4,091,546 1:20
South Australia 50,000 51,844 55,100 56,400 1,568,204 1:28
West Australia 71,236 72,676 76,259 80,679 2,059,045 1:26
Tasmania 21,045 22,179 24,662 26,200 489,922 1:19
Northern Territory 25,000* 13,000 26,500 27,500 210,674 1:8
ACT 0 0 0 0 334,225 n.a.
679,931 689,763 733,662 770,021 20,701,488 1:27
Source: Boating Industry Association of Victoria, www.biavic.com.au
accessed 13 January 2009, and ABS Estimated Resident Population Cat
3201.0
Victoria, with a total of almost 160,000 registrations, lags behind
New South Wales and Queensland in number of registrations, and
Victoria’s ratio of boat registrations to population is high, at
one boat per 32 persons. Queensland and Tasmania, on the other
hand, have relatively higher rates of boat ownership than Victoria,
with one boat per 20 persons in Queensland and one boat per 19
persons in Tasmania. However, in Victoria the number of
recreational boating registrations has increased by 2.6% per annum
over the period from June 2003 to June 2006, while population
growth over the same period was 1.4% p.a.12.
More than half of the registered boats are in the Central Coastal
Board area13.
Further analysis of boat registrations in Victoria is provided in
Bellarine Safe Harbour – Market and Demand Analysis by Strathcorp
for Parks Victoria (2007). This report details the number of boats
registered in various size categories for the year 2006. This data
is relevant because boats over 8.6 meters in length are most likely
to require a wet berth and are not trailerable. According to
Strathcorp’s analysis, 3,902 boats or 2.46% of total registrations
are over 8.6 meters in length and on average 144 additional boats
per annum have been registered in this category in Victoria from
1996 to 2006. On average, cabin cruisers account for 70 new
registrations p.a. while yachts account for approximately 50 new
registrations p.a.
Volume 1 of the Boating Coastal Action Plan by the Central Coastal
Board is a background report on boating facilities and trends. The
background report contains analysis of demographic trends that are
likely to lead to an increase in demand for boating facilities in
Australia, boating trends in Victoria, and in demand by type of
boat.
12 Estimated Resident Population ABS Cat 3218.0
13 Boating Coastal Action Plan, Central Coastal Board
matters more consulting pty ltd PAGE 15
According to the background report most boat owners own smaller
boats, and on the Mornington Peninsula 40% of boat owners keep
their boat at home14. The ownership data is supported by Boating
Industry Association of Victoria data, which shows that 55% of boat
owners have boats of between 4.1 and 5.5 meters in length as shown
in Table 3. Importantly, the report indicates that as the
population ages and the average house block decreases in size, it
is likely that a greater proportion of these boats will be kept in
dry storage near boat ramps instead of at home.
Table 3: Melbourne Boat Show Survey 2006
4.0 meters or
Source: Boating Industry Association of Victoria, www.biavic.com.au
accessed 13 January 2009
In terms of supply of marina capacity, the report puts the number
of marina berths in Port Phillip at over 3,000 and references work
that “suggests that there is a general shortage of berths, even
considering a number of proposals in various stages”. The report
goes on to suggest that the relationship between demand and supply
is not straightforward, but that lack of marina berths and the
price of wet berths may have shifted demand towards smaller boats
and that the ownership pattern may change if more wet berths are
made available in more accessible locations and at a lower price.
Conversely, ownership patterns may change towards a greater number
of ‘time share’ boats if the costs associated with boat ownership
increase further. These costs are estimated to be approximately
$10,000 per year (in 2004) and covered wet berth rental, use of
power and water, security, hull cleaning and general boat
maintenance15.
Overall, the conclusion in the report is that “it is difficult to
predict future boating demand as that demand is intricately linked
to supply of facilities, services and destinations”16. It also
states that many existing marinas are at capacity and have a high
level demand for berths, and that there is demand for casual
berthing infrastructure and regimes in key locations and
destinations across the region. The report does not provide a
quantitative estimate of the future demand for boating facilities;
instead it provides a framework for response as demand arises
building on the concept of a regionally based network of boating
facilities.
3.2 Market Supply
In Port Phillip Bay, the existing marina berth capacity is
estimated in the BCAP background report at “over 3,000 berths”.
Furthermore, the number of berths is detailed in the Bellarine Safe
Harbour study 17 which shows the location and number of existing
berths at 3,749 at the following locations: Port Melbourne, St
Kilda, Brighton, Sandringham, Mordialloc, Patterson Lakes,
Mornington, Blairgowrie, Queenscliff, St Leonards, Port Arlington,
Geelong and Williamstown. In Port Phillip Bay, there were
additional planned berths at Docklands (600), Patterson Lakes
(151), Frankston (300), Mt Martha (600), Portarlington (66), and
Werribee South (1,000). This indicates that there is approximately
2,417 additional marina berths planned. Of these, construction has
commenced at Mt Martha and Docklands.
In North West Western Port there are also a number of facilities,
with ‘district’ rated facilities at Flinders, Stormy Point,
Yaringa, Warneet, and ‘regional’ rated facilities at Hastings and
Tooradin. Supply of wet berths in Western Port is not
detailed.
14 This survey was undertaken as part of a study that considered
boat ramp facilities so there is a risk of self-selection (boat
ramp users) in responses to the survey. 15 BCAP: Volume 1,
p34.
16 BCAP: Volume 1, p31.
17 Bellarine Safe Harbour – Market and Demand Analysis by
Strathcorp for Parks Victoria, 2007
matters more consulting pty ltd PAGE 16
3.3 Market Conclusion
As is stated in the BCAP background report, the relationship
between berth supply and boating demand is complex, and there are
indications that increasing the supply of marinas (destinations)
and wet berths (capacity) will induce demand – a factor that is not
fully analysed. There are several marina developments in the
planning stages at present, but these are located on Port Phillip
Bay and do not take advantage of the boating opportunities and
access to good quality fishing grounds that Western Port offers. At
present, Yaringa Marina and Western Port Marina are at capacity and
have waiting lists for wet berths. Yaringa Marina is seeking to
offer a lower- priced marina product, and it is likely that there
will be sustained demand for this type of product in the
recreational boating market.
matters more consulting pty ltd PAGE 17
4. ECONOMIC IMPACTS
The term ‘economic impact’ refers to the effects of an economic
activity on an economic system, for example, on the Peninsula
region’s economy. These effects are measured in monetary terms
(output and income) and number of jobs generated (employment). The
total effects exceed the initial impact as there are flow-on
effects to other sectors of the economy due to purchases by
businesses and households. Multipliers for flow-on effects measured
in terms of employment generated are generally in the order of one
to three, understood as when one additional job is created in the
repairs industry for example, another 1.7 jobs are created in the
wider economy.
This section identifies the key direct and indirect economic
impacts associated with the proposed development at Yaringa
Marina.
Likely economic impacts include:
- short term construction activity and employment, and associated
flow-on employment through expenditure by businesses and the
construction workers;
- short term activity as a result of purchase of new or replacement
boats;
- on-going local expenditure by visitors and holiday unit owners
staying in the accommodation units and flow-on benefits from this
expenditure;
- on-going expenditure by additional boat-owners at Yaringa as a
result of the increased number of wet berths and dry storage;
and
- on-going rate revenue for Mornington Peninsula Shire on the value
of new accommodation units and to cover increased provision of
services, including garbage services, wear and tear on local roads,
etc.
4.1 Investment
Total investment in the project is estimated by the developer at
approximately $95 million. This investment is comprised of:
- Construction of 180 accommodation units $54 million
- Development of basin, locks, roads and services $18 million
- Construction of dry stack building and equipment $5 million
- Construction of factories and associated infrastructure at 3
Lumeah Road $6 million
- Refurbishment of existing harbour $12 million
4.2 Construction-related Employment
Site works and building construction will require inputs from a
number of industries and result in positive flow-on effects to
other economic activities. These activities will generate short
term employment in the construction industry and in the wider
economy.
Australian National Accounts provide a detailed analysis of the
construction industry’s inputs and outputs, the linkages with other
industries and multipliers that indicate the initial effects,
production induced effects and the consumptions induced effects of
initial expenditure on construction. A detailed analysis of the
construction industry’s linkages is provided in the ABS Year Book
Australia 2002, Cat. 1301.0
In the construction industry, $1million of extra output generates 9
direct Full Time Equivalent (FTE) jobs, or approximately one job
per $111,000 in construction costs.
matters more consulting pty ltd PAGE 18
Approximately 860 direct FTE positions (rounded from 856 jobs) are
estimated to be generated as a result of the development project.
As construction is forecast to be completed within a twelve-month
period, these jobs will have duration of 12 months.
4.3 Boat Purchase-related Employment
Upon completion, the development will have increased the capacity
at the marina by 180 wet berths and 200 additional boat storage
spaces under cover, which presents an expansion and upgrade of boat
storage capacity. The operator estimates that it will take
approximately two years from completion until the additional berths
and dry storage area are fully occupied.
According to the operator at Yaringa, the new berths are likely to
be filled by a mix (one-third each) of:
- new boats purchased by people who do not currently own a
boat;
- upgrades to larger boat sizes from trailer-able boats by existing
boat owners who already keep their boat at Yaringa; and
- boats that are currently kept elsewhere.
It is expected that new boats at Yaringa will be an average of 12
meters in length.
New and upgraded dry storage areas are also likely to be taken up
by some newly purchased boats (trailer-able) and by boats that are
stored elsewhere. According to Yaringa’s operator, the past pattern
has been that 50% of spaces are filled by newly purchased boats and
50% are filled by boats that have been stored elsewhere.
Boat purchases or investment is detailed in Table 4 below.
Table 4: Estimated Boat Purchases
Category Additional Boat Investment Units Estimated Boating
Investment
Newly purchased boats by people not currently boat owners
$300,000 - $400,000 per boat (average market price for new boats of
12meters)
60 $21.0m
$150,000 - $200,000 per boat (average additional estimated
expenditure on upgrade)
60 $10.5m
Boats moved to Yaringa from elsewhere
Vacant berths in other locations will be filled with a mix of boats
– assume average expenditure of $200,000 per boat (some upgrades,
some new, etc)
60 $12.0m
Trailer-able boats in dry storage $20,000 - $60,000 per boat 100
$4.0m
Total $47.5m
Source: Matters More Consulting and Yaringa Marina operators
National Accounts Input-Output tables produced by ABS show that
every $1m output from the boat building industry requires input of
1.8 FTE (or output valued at $554,800 is produced per full time
equivalent employed person). On average, the estimated boating
investment of $47.5 million is therefore likely to generate
employment of 86 FTE, spread over the two year period that this
investment will occur.
4.4 Boating Expenditure Employment
Additionally, on-going annual expenditure by boat owners will
generate employment at Yaringa Marina and in the region. Annual
expenditure by boat owners is detailed in Table 5.
matters more consulting pty ltd PAGE 19
Table 5: Estimated Annual Expenditure per Boat (12 meter
average)
Item Annual Estimated Cost
Chandlery and equipment expenditure $10,000
Fuel $2,500
Boat maintenance at Marina Service Centre $4,000 - $5,000
Major works allowance ($50,000 - $100,000 every 10 years or so)
$7,500
Total – range $29,500 - $31,500
Source: Yaringa Marina operators
Annual expenditure by owners of trailer-able boats is lower than by
owners of boats in wet berths. According to the marina operator,
annual expenditure associated with a trailer-able boat is in the
order of $10,000 - $15,000 per year (assume an average of $12,500
per annum). A proportion of the trailer-able boats are kept in dry
storage, costs like insurance, fuel, equipment and boat maintenance
are still applicable, but many owners in this category are likely
to do a greater share of the work themselves at a lower
expense.
Estimated increase in annual total boating expenditure at Yaringa
Marina is shown in Table 6.
Table 6: Estimated Total Annual Boating Expenditure
Item Estimated Additional Boating Expenditure per
annum Units Estimated Total
Boating Expenditure per annum
$30,500 60 $1.83m
Upgrade of boats at Yaringa $18,000 60 $1.08m
Boats moved to Yaringa wet berths from elsewhere
Yaringa has lower costs compared to marinas on Port Phillip Bay, so
additional expenditure is likely to be relatively low. Assume
$15,000 on average.
60 $0.9m
$12,500 100 $1.25m
Source: Matters More Consulting
Additional annual expenditure at Yaringa, estimated at $5.0m, is
estimated to generate employment for 78 FTE. This employment is
based on the output and employment coefficients of the repair
industry used as a proxy for the variety of industries covered
under boating expenditure. The repair industry generates one job
per $64,000 expenditure on repairs.
The increase in the number of boats at Yaringa Marina will have a
significant impact on local employment as boat maintenance work,
berthing fees and fuel sales will generate jobs at the marina. Many
of these businesses will now be able to increase part time
employment to full time employment and will be able to take on
additional staff to grow the business.
4.5 Visitor Expenditure Employment
As the accommodation units proposed at Yaringa will be managed as
‘serviced apartments’ it is most likely that these units will be
purchased as holiday units and leased to visitors when not used by
the owners.
The holiday house market is known to account for approximately 75%
of all overnight visitors to the Mornington Peninsula, including
visiting owners and visitors staying in holiday houses. It is
matters more consulting pty ltd PAGE 20
estimated that there is in the order of 22,700 holiday homes18 on
the Peninsula which is approximately 30% of dwellings19.
Usage of the accommodation units is estimated to be similar or
higher than usage of holiday houses on the Peninsula. On average, a
holiday house owner would spend 78 nights a year in their holiday
house, and rent it to visitors for another 48 nights per year20.
Owners typically travel in smaller parties of 3.2 persons per
travel party, whereas visitors tend to be larger groups, on average
5.6 persons per travel party.
Visitation outcomes are shown in Table 7 below.
Table 7: Visitation Outcomes – Accommodation Units
Unit owners Visitors Total
77.6 occupied nights per unit 48.4 occupied nights per unit 126
occupied nights per unit p.a.
3.2 persons per travel party 5.6 persons per travel party Average
travel party of 4.1 persons
248.3 persons per unit p.a. (owners) 271.0 visiting persons per
unit p.a. 519.3 persons per unit p.a.
248.3 x 180 units =
44,694 unit owners’ nights p.a. 271 x 180 units = 48,780 visitor
nights p.a.
519.3 x 180 units =
Source: Matters More Consulting
Expenditure by visitors and visiting unit owners is derived from
information collected by Tourism Research Australia through the
National Visitor Survey. Data for 2007 is used; expenditure by
visiting unit owners is approximated by the ‘visiting friends &
relatives’ group, and expenditure by visitors is approximated by
the ‘holiday & leisure’ group. State level data is used, as
data by these subgroups is not published at local government
level.
Expenditure by unit owners and visitors:
- 44,694 unit owners nights x $80 per night = $3.58 million per
annum
- 48,780 visitor nights x $151 per night = $7.37 million per
annum
- Total overnight visitor expenditure = $10.95 million per
annum
According to past surveys of home owners and visitors, spending by
unit owners and visitors alike will be widespread on grocery and
deli items, restaurants and eating out, and on bakery items.
Visitors also tend to buy alcohol and shop at the local butcher,
chemist and at clothing outlets. Unit owners, on the other hand,
are twice as likely as visitors to buy homewares locally.
Employment generated by this expenditure is estimated at 110 jobs
per annum (rounded). This estimate is based on the tourism
employment of 5,370 jobs from tourism spending of $534 million or
one job per $99,440 in expenditure, rounded to $100,000 expenditure
per job21.
This estimate does not include the increase in day trip visitors to
the marina, and spending at its restaurant, kiosk, etc as a result
of Yaringa Marina becoming a better known destination on Western
Port. Therefore the $10.95 in visitor expenditure as a result of
increased visitation is a conservatively low estimate of the
economic impact as a result of visitor and unit owner expenditure
during visits to the proposed development.
18 Mornington Peninsula Study – Home Owners & Visitors, April
2006, Quantum Market Research
19 Dwellings data, 2006 Census, ABS 20 Refer footnote 17
21 Percentage tourism employment in the Peninsula Region from TTF
Australia Victorian Tourism Employment Atlas 2005, and updated with
2006 Census data on employment in the region.
matters more consulting pty ltd PAGE 21
4.6 Rates Revenue
Unit owners will be paying for maintenance and management of the
units as an on-going arrangement. A share of this expenditure will
be rates paid to the local Council as a contribution to general
provision of Council services, including local government
administration, local facilities and roads provision, and garbage
and landfill services.
Rates are calculated on the Capital Improved Value of a property
based on valuations undertaken every second year. Assuming that
units will have a capital improved value of $400,000 each.
Total rates payment to Council, based on 2008/09 rates is estimated
at $156,700 per annum as shown in Table 8.
Table 8: Estimated Rates Payable to Council
Rate Component Value (2008/09) Rate in $ per unit X180
accommodation units
Council rate X 0.0018430 $737.20 $132,696
Municipal charge $130 $130.00 $23,400
Total $867.20 $156,696
Source: Matters More Consulting
Council expenditure of $156,700 generates 1.3 FTE jobs based one
job in Government administration per $123,000 in
expenditure22.
4.7 Flow-On Employment
Flow-on effects in the wider economy include the initial effect,
the production effect, and the consumption induced effect23,
describes as follows:
- The initial effect measures the results of an initial $1 of extra
output of the industry and the related employment in the industry
to produce that output;
- The production effect measures the amount of output and
employment from industries that supply goods and services to the
industry to produce the initial $1m of extra output plus the extra
effort and employment in other industries to support the supplying
industries; and
- A consumption-induced effect is generated due to increased wages
and spending by the wages and salary earners receiving compensation
for their part in producing the above effects.
An industry specific multiplier is used to estimate the total
flow-on effects. The flow-on employment estimates for the proposed
development at Yaringa are shown in Table 9.
Table 9: Estimated Flow-on Employment – Short Term
Duration Activity
(indirect effect) Total employment
One year Construction 856 jobs 2.3 1,970 jobs 2,826 (rounded to
2,830)
Two years Boat investment (43 jobs p.a.) 86 jobs 1.7 146 jobs 232
(rounded to 230)
Source: Matters More Consulting.
Short term activities, i.e., construction and investment in boats
and boat upgrades, are estimated to generate a total of 2,120
additional FTE jobs.
22 ABS Input Output Tables - Cat. 5209.0
23 ABS Year Book Australia, 2002, Cat 1301.0
matters more consulting pty ltd PAGE 22
Table 10: Estimated Flow-on Employment – On-going
Duration Activity
(indirect effect) Total employment
On-going Overnight visitation expenditure 110 jobs p.a. 2.0 280
jobs 420 jobs p.a.
Council rates 1 job p.a. 2.2 2 jobs 3 jobs p.a.
Marine Services 78 jobs p.a. 1.3¹ 101 jobs 179 jobs p.a.
Total ongoing jobs 199 jobs p.a. 383 jobs 602 jobs p.a.
Source: Matters More Consulting. Note (1): Multiplier for repairs
industry used for Marine Services
On-going expenditure by visitors and visiting unit owners,
expenditure on rates, and on boating related activities is
estimated to generate 380 jobs in on-going flow-on
employment.
4.8 Summary and Conclusions
In summary, the proposed development of Yaringa Marina appears well
supported by current policies and strategies, including the Boating
Coastal Action Plan, the Victorian Coastal Strategy, tourism
strategies by Tourism Victoria and local economic development and
tourism policies by Mornington Peninsula Shire.
There appears to be increasing demand for marina infrastructure
although the exact relationship between supply and induced demand
is not fully analysed or modelled. Several marina developments are
currently progressing through the planning stages or have received
a development permit, however these developments are located on
Port Phillip Bay and do not take advantage of the good fishing and
recreation opportunities offered by Western Port.
The proposed development will have significant economic benefits,
bringing more boaters and other visitors to Yaringa Marina and
Western Port.
In summary, the likely economic impacts will include:
- Investment of $95 million in infrastructure upgrades and
construction at Yaringa;
- Construction employment of 860 FTE (rounded), and flow-on
employment of 1,970 FTE;
- Expenditure on purchases of new boats or trade-in/upgrade of
currently owned boats of $47.5 million, representing direct
employment of 86 FTE in the boat building industry and generating