Class of 1954 Chemistry Research Building
Edwards Building
Kline
Biology
Tower
Kline Chemistry LaboratorySloane Physics
Laboratory
Sterling Chemistry Laboratory
Kline Geology
Laboratory
Wright Laboratory
West
Wright Laboratory
Sage Hall
Accessible Pedestrian Walkways
Accessible
Pedestrian
Walkways
Lay Down AreaLo
adin
g D
ock
Bass Center
Kline Biology Tower Library
(Underground)
Construction Fence & Scrim
Temporary Construction Access
as Required
Kline Biology Tower
Note:• Dimeo to coordinate Peabody Museum
tractor trailer deliveries with Peabody Museum
Handicap RampTemporary
Access Road
Yale Science Building
Footprint
Tree Protection
City Bus Stop
Bike Racks
Bike Racks
Bike Racks
Bike Racks
Loading Zone
Yale Science Building Physics
Footprint
PavilionFootprint
Manitowoc P602B or Similar
Temp Wall for
Curtainwall Removal
Bike Racks
Removable Fence to Accommodate Tractor
Trailer Access to Peabody
Yale Shuttle
Stop
Gate D20’ Slide
Truck Entry Into
Site
Delivery & Fire Truck Access to
Peabody Museum
Crane Swing Radius
Excavate for MH-18.Bass loading dock toremain open
YSB loading dockwork within fence line
Selective demo at Bass Bridge.3rd floor ramp removal starting7/2. No impact to Bass interior
Demo retaining wall through late July
Access SCL througheast entry
Temp wall in SCLhistoric corridor midJuly
Roofing work aboveCSSSI through July,followed by concretepour early August
Yale Science BuildingLogistics Plan Summer 2018
Updated 6/26/18