\.\ :' ,y E 35 10 Central Parkvv-cry S W. Certification of Submitted Documentation Decatur . AL 35603 256/ 350-1002 Fax 256/ 350 - 33 15 This certification is prepared and provided in accordance with 40 C.F.R. § 122.22: I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. George P. Strohm 01/Zo/09 I I Date Tru-Line Manufacturing Company ,, ,1 1 / •, .

y 256 / 3 50 -1002 Fax 256 / 350-33 15 - US EPA · 256 / 3 50 -1002 Fax 256 / 350-33 15 This ... inception. only product ... 4. Please find attached in Attachment A copies of the

Embed Size (px)

Citation preview

\.\ : ' ,y

E 3510 Central Parkvv-cry S W.

Certification of Submitted Documentation

Decatur. AL 35603 256/ 350-1002

Fax 256/ 350-33 15

This certification is prepared and provided in accordance with 40 C.F.R. § 122.22:

I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.

~~7/_~ George P. Strohm

01/Zo/09 I I Date Pre~;itl c r,t , Tru-Line Manufacturing Company

• ,, ,1 1 / •, .

01114/09

Mr. Michael Hom U.S. Environmental Protection Agency Clean Water Enforcement Branch 61 Forsyth Street SW Atlanta. GA 30303-8960

Re: Information Request - Section 308 of the Clean Water Act Discharge of Perfluorinated Compounds

Dear Mr. Hom.

In response to your request for information Tru-Line Manufacturing presents the following:

Provide a narrative description £~(the products manufctctured or services provided hy the Company's primary and secondary business at its Decatur, Alabama locationfor each calendar year beginning with calendar year 1996 to I hu present.

1. Tru-Line Manufacturing is a metal fabricator in the business of providing fluid transfer lines to the Original Equipment Manufacturer (OEM) industry. The processes involved in producing fluid transfer lines includes cutting purchased low ~arbon steel tubing, deburring, cleaning, end forming. brazing, bending, and powder coating the finished product per the customers' specifications. The business was established in 1976 and this is the only product manufactured at this facility since its inception.

Tru-Line Coatings. secondary business in operation in the Tru-Line Manufacturing facility was in operation from calendar year 1993-2006. This business was strictly a custom coating powder coating process. However, the waste streams produced were all part ofTru-Line Manufacturing's effluent. Provide the Standard Industrial Class{fication and North American Industry ( 'lassification .S~vstem codesjiH the Compan.v 's business (es) at its Decatur, Alabama locationjor each calendar year beginning with calendar year 1996 to present.

2. The Standard Industrial Classification Code is 3498 and the North American Industry Classification System code is 331210. From 1996 through 2006, the assigned SIC code was 3188. However, SIC 3188 was in error and was corrected in 2006.

Note: OSHA documentation received in 2003 (Work-Related Injury and Illness Data Collection Form. 2003) listed Tru-Line Manufacturing's SIC code as 3317 which pertains to the manufacture of steel tubing/pipes and is therefore not applicable to purchased steel tubing.

Pro1·ide a list and a general estimate of the amounts o{rav., and finished materials that mar have contained P FCs which were used in the Company's operations to manufacture products or services at its Decatur, Alabama location for each calendar year beginnins; with calendar year 1996 to the present. 3. PFCs have not been used in the manufacturing of products by Tru-Line Manufacturing in any calendar year since 1996.

Provide a copy of the Material S'({lety Data SheetsfiJr the raw materials used in the Company's operations to manufacture products or provide services at its Decatur, Alabama location for each calendar year bes;inning with calendar year 1996' to the present.

4. Please find attached in Attachment A copies of Matenal Safety Data Sheets for the tubing used in Tru-Line Manufacturing's operations to manufacture products. The raw materiaL low carbon steel tubing has remained constant since the calendar year 1996.

Has the Company ever used PFCs in its operations to manufacture products or provide services at its Decatur. Alabama location? flso, provide the name ofthe PFC and a general estimate o{the amounts used.for each calendar year beginning with calendar year 1996 to the present.

5. PFCs have not been used in the operations to manufacture t1uid transfer lines at Tru-Line Manufacturing in any calendar year from 1996 to the present. Has the Cornpany ever used telomers orfluoropolymers in its operations to manufacture products or provide services at its Decatur, Alabama location? {l so. prm•ide the name ofthe telemoer orfluoropolymer and a general estimate vl the amounts usedfor each calendar year beginning with calendar year 1996 to the present

6. Neither telomers nor t1uoropolymers have been used in the manufacture of t1uid transfer lines at Tru-Line Manufacturing for the period beginning 1996 to the present.

Provide a narrative description of the byproducts, waste streams and emissions .kom the Company's locationfor each calendar year from calendar year 1996 to the present.

7. Tru-Line Manufacturing Company utilizes two tube washers containing alkaline cleaners and an iron phosphate pretreatment prior to powder coating. There are two phosphate processes, one is an immersion line that includes an alkaline cleaner. an inhibited phosphoric acid pickle, iron phosphate and a petroleum based rust preventative. This line has been operational from 1996 to current. In addition, a spray washer phosphate line was introduced in 1997 that includes an alkaline cleaner, iron phosphate, and a non-chrome sealer. pH adjust is the only treatment required at this time. Waste streams are monitored with monthly samples analyzed in accordance with the issued State Indirect Discharge(SID) Permit. The Discharge Monitoring Report (DMR) is then forwarded to Decatur City as well as the Alabama Department of Environmental Management. There are no byproducts as a result of the manufacturing processes at Tru-Line Manufacturing. Emissions have been analyzed and determined to not require permitting.

Provide a narrative description ofthe disposal methods and disposal locations of the hJproducts, waste streams and emissions from the Company's operations to manufacture products or provide services at its Decatur, Alabama locationfor each calendar yearfi·om calendar year 1996 to the present.

8. Sludges and oils skimmed from the surface of tanks and chemicals no longer used in production are collected in waste disposal drums, samples are taken and analyzed (TCLPs and pR) and the drums are disposed. Depending upon the waste stream. the drums may either be incinerated, stabilized and placed in a landfill or used in fuels blending for recycling by the approved waste disposal service in accordance with DOT regulations.

Year #Drums Waste Stream/Disposal Method Disposal Facility 1996 6 Cleaner/Oil,Fe Phosphate Sludge, EagleDisposal, Oil/ Absorbents, Mineral Spirits- Walterboro, SC Incinerated 1997 10 Cleaner/Oil, Fe Phosphate Sludge. Safety Disposal Oil! Absorbents, Waste Cleaner- Systems,

Incinerated Hampton, SC 1998 15 Cleaner/Oil, Fe Phosphate Sludge. Safety Disposal Oil/ Absorbents-Incinerated Systems Hampton,SC 1999 13 Cleaner/OiL Fe Phosphate Sludge. Safety Disposal Oil/ Absorbents- Incinerated Systems, Hampton, SC 2000 0 No waste shipments in CY2000

I

I

i i

Year #Drums Waste Stream/Disposal Method Disposal Facility 2001. 12 Cleaner/Oil, Fe Phosphate Sludge. Chemtron 0 l/08/0 1 Oil/ Absorbents-Fuels Blend Avon, OH 2001' 16 Cleaner/Oil, Fe Phosphate Sludge. Chemtron 10/31/01 Oil/ Absorbents. Cleaner/ Absorbents - Avon, OH Fuels Blend 2002 19 Cleaner/OiL Fe Phosphate Sludge, Chemtron Oil/Absorbents, Waste Oil- Fuels Avon, OH Blend 2003 17 Cleaner/Oil, Fe Phosphate Sludge. Chemtron Oil/ Absorbents-Fuels Blend Avon, OH 2004 22 Cleaner/Oil, Fe Phosphate Sludge. Chemtron Oil/ Absorbents. Waste Oil. Filter Avon, OH Media/Oil-Fuels Blend 2005 14 Cleaner/Oil, Fe Phosphate Sludge, Chemtron Oil/ Absorbents, Filter Media/Oil-Fuels Avon, OH Blend 2006 0 No waste shipments in CY2006. 2007. 21 Cleaner/Acid. Fe Phosphate Sludge, Environmental 01/10/07 Oil/Absorbents, Waste Oil, Sodium Enterprises Hydroxide, Waste Oil/Chromium- Cincinnati, OH Stabilization/Landfill. Fuels Blending,

Deepwell Injection (Waste f---- Oil/Chromium) 2007. 14 Cleaner/ Acid, Fe Phosphate Sludge, Environmental 12/27/07 Oil/Absorbents, Waste Oil, Waste Enterprises Oil/Barium- Stabilization/Landfill, Cincinnati, OH L Fuels Blending (Oil/Barium)

Pro1·ide a narrative description of any pollution abatement equipment and/or pretreatment process that has been applied to the byproducts and waste streams ji-om the Company's operations to manz{facture products or provide services at its Decatur. Alabama location prior to their discharge into the Decatur Utilities sewe1,· system for each calendar year beginning ·with calendar year 1996 to the present.

9. For the time period of calendar year 1996 to the present. pollution abatement and or/pretreatment of any waste stream that is released to the Decatur Utilities sewer system is limited to pH adjust per the SID permit.

Proride any analytical data or monitoring results indicating the presence of PFCs or fluoride in the b}}Jroducts and waste streamsfl·om the Company's operations to manulacture products or provide services at its Decatur, Alabama locution that were discharged into the Decatur Utilities sewer system for each calendar year beginning with calendar year 1996 to the present.

I

I

10. A review of materials used in the manufacture of Tru-Line Manufacturing fluid transfer lines did not yield any PFC or fluoride containing material. Further. the issued SID permit does not.require analysis for PFCs or fluoride and analytical results are not available for these two parameters for wastewater or byproducts.

Prm·ide a copy of any permit. contract or agreement that the Company may have or Jun·e had relating to the discharge of b;products and waste streams into the Decatur Utilities sewer system (include with this information copies of any permit applicaf ions) for each calendar year beginning with calendar year 1996 to the present.

11. Please find attached copies of the applicable SID pennits (Attachment B) for calendar years 1996 to present for the requirements of effluent discharged into Decatur Utilities sewer system.

Has the Company performed any monitoring or sampling of ambient air, sw:face 11·ater, groundwater or soilfor PFCs at and around the Company's Decatur, Alabama location? !{so. provide the resulting analytical or monitoring results. 12. A review of materials used in the manufacture of fluid transfer lines at Tru-Line Manufacturing Company did not yield any PFC sand therefore monitoring and/or sampling of ambient air, surface water, groundwater or soil for PFCs is not appli~able and analysis is not available.

REFER TO MATERIAL SAFETY DATA SHEET

Overexposure to dusts or fumes generated during welding or burning steels, particularly those containing chromium or nickel , may cause respiratory disease.

High exposure to fumes during welding or burning of zinc coated products can cause reversible short-term flu-like symptoms.

Prolonged skin contact with coated steel may cause skin irritation in sensitive individuals.

LIMIT inhalation of dusts or fumes generated during processing.

LIMIT skin contact.

Overexposure to metal fumes: Move to fresh air. Seek medical attention if necessary Skin contact: Wash with soap and water.

Read the relevant Material Safety Data Sheet for more information

,..~ ArcelorMittal

CONSULTER LA FICHE SIGNALETIQUE

La surexposition aux poussieres ou aux fumees generees Iars du soudage, surtout des aciers contentant du chrome ou du nickel, pourrait provoquer des maladies respiratoires.

Une exposition intensive aux fumees Iars du soudage des produits revetus de zinc pourrait provoquer a court terme des symptomes reversibles de grippe. Le contact avec Ia peau et les aciers revetus pourrait provoquer une irritation de Ia peau chez certains individus.

LIMITER L'inhalation des poussieres ou des fumees generees pendant Ia transformation.

LIMITER Le contact avec Ia peau Si l'individu est surexpose aux fumees venant des metaux, emmenez Ia personne pour qu'elle puisse avoir de l'air frais. Demandez des soins medicaux si necessaire. S'il y a contact avec Ia peau. lavez Ia peau a l'eau et au savon.

Veuillez consulter Ia fiche signaletique pertinente pour plus de renseignements.

ArcelorMittal Dofasco Inc., P. 0. Box 2460, Hamilton, Ontario L8N 3J5 (905) 54807200 (800) DOFASCO

Attachment A

~ ArcelorMittal

Material Safety Data Sheet ,_Material

Synonyms Manufacturer

Telephone No.

-8•atlcNI f·I'ROIHICT ID&ITFICATIOII __ 11.;.:.!!......__ ____ ,_ COLD ROLLED SHEET STEEL

Cold Rolled Carbon Sheet Steel, Dofascoloy ArcelorMittal Dofasco Inc., P.O. Box 2460, Hamilton, Ontario, Canada L8N 3J5 (905) 548-7200 Material Use Manufacture of steel articles

•• c .... .I CJfA.ZAIIDOCia ~

WHMIS Class D2A, D2B

Hazardous lngrecMents I Weight% I CAS No. I LD50 I Exposure Limit (mgl_m~) Steel:

Coating:

Iron (Fe) Manganese (Mn) Chromium (Cr) Nickel (Ni)

-95

~1 .65

K-J1.1 ~-12

7439-89-6 7439-96-5 7~7-3

7440-02-0

30 glkg (rat-oraQ 9 glkg (rat-oral)

u u

5 (Fume) 0.2 0.5 1.5

(Hazardous Ingredients :J iists components which meet the reporting requirements of the Hazardous Products Ad.)

(No Coating Applied)

Surface Treatments:

(Constitutes less than 0.1% oftotal steel weight)

1. Oils ( PL-7105-A, Quaker Ferrocote 61-AUS, Quaker Ferrocote 61 MAL HCL-1G) Hydrotreated naphthenic mineral oils or petroleum based lubricating oil containing petroleum sulphonates and anti-oxidants. Oil Coating weights range from 1.1 to 5.4 g/m2 per side.

2. Pre Temper solution (Quaker Qwerl599, Tempershield 6925) Water based solution of sodium nitrite and surfactants. Trace quantities remain after drying.

Note: Suppfier MSDS for surface treatment oils are available from your ArcelorMittaJ Dofasco Technical Service Manager. ArcelorMttal Dofasco Steel products do not contain and are not manufactured with any Class I or Class II ozone depleting substances. ArcelorMttal Dofasco Cold Rolled sheet steel products meet the specific requirements of the Global Automotive Stakeholder Group (GADSL V2.0, 2006-01-10), European End-of-Life-Vehicle Directive (ELV2000/53EC), US Toxics in Packaging (Meet the 100 ppm combined total for Mercury, Cadmium, Lead and Hexavalent Chromium), European Packaging and Packaging Wastes Directive (94/62/ec), European Waste Electrical and Electronic Equipment Directive (WEEE2002/961EC), Restriction of Hazardous Substances (RoHS) List (2()()(Y95/EC). All ArcelorMittal Dofasco Cold RoUed products supplied to automotive are listed within International Material Data System (IMDS). Attachment A

Legend: U = Unknown NA =Not Applicable

'

L

~ ArcelorMittal Material Safety Data Sheet

COLD ROLLED SHEET STEEL . Section 3 CPffYSIC:AL MTA S•c:,_ 4 CFiiiE MID IEJCIII.OSIOIIMTA

Silver Grey Metallic Solid Non ::; Flammable. Will not support combustion Boiling Pt. ('C) - N.A. S.CU.. 8 CJEACnVITY MTA Melting Pt. (0 C) - 1530

Stable: Contact with strong mineral acids will release flammable Specific Gravity- 7.5 to 8 hydrogen gas

-J S.cfiM 8 Dr'OXJCOl.OGICAL ,.....,_. 1

·= ROUTE OF ENTRY

None in its natural state. Operations such as welding, burning, grinding or machining may pose acute or chronic inhalation health effects. Skin or eye contact with coating oils may cause irritation with prolonged or repeated contact.

EFFECTS OF ACUTE EXPOSURE None to sheet steel. Welding, burning, grinding or machining can generate metal particulate or elemental oxide fumes. Inhalation overexposure to manganese fume has been reported to cause "metal fume fever" characterized by fever and chills (i.e., flu-like symptoms). Such an overexposure is unlikely due to the small amount of manganese available. Fumes or mists of surface treatment oils may irritate the eyes and upper respiratory tract, and cause headache, dizziness and I or nausea if exposure is excessive.

EFFECTS OF CHRONIC EXPOSURE None to sheet steel. Chronic inhalation overexposure to metal fume (i.e ., iron oxide fume) may cause a benign pneumoconiosis (i.e., .siderosis) with few or no symptoms. Repeated or prolonged contact to coating oils may cayse skin irritation and dermatitis.

IRRITANCY Carcinogenicity- Chromium and Nickel (See Additional Information) SYNERGISTIC MATERIALS None Reproductive, Teratogenicity, Mutagenicity c no known effects u .I

7C.Bil8ITA,.,.__.• -t.' -. ~ I

Dependent upon the process being performed on the sheet steel material. Each operation must be addressed for suitable personal protective equipment required. General ventilation is normally adequate. Welding requires local exhaust ventilation or fume filter respirator, gloves and eyeware. Avoid prolonged or repeated skin contact, launder oil-contaminated clothing. Use oil impervious gloves if required to prevent contact. Avoid eye contact with oil contaminated hands.

••dtal 8 CF.aJ" AID ·- •·. r Eyes - Flush with water Skin - Wash contact areas with soap and water Inhalation - For overexposure to metal fume, remove person to fresh air. Seek medical attention.

ADDITIONAL INFORMATION IARC lists certain hexavalent chromium compounds under its Group 1- "Confirmed Human Carcinogen". IARC lists certain nickel compounds under its Group 2A- "Suspected Human Carcinogen". Welding fume may also contain contaminants from fluxes and I or other welding consumables. Oil coatings should be removed prior to welding or grinding to minimize smoke generation. - ...

• t:P~t&WtAJ'IOII Mn ~ . ,,. ' I ' ,. ,, ct

. .,: PREPARED BY A~1aeHONet A I DATE PREPARED Health and Safety Department (905) 548-7200 January 28, 2008

Legend: U = Unknown NA =Not Applicable

.. ··· A~A'M~ . . - - . . DEPAR1"ME~I:9f.~~~JI_RO&,I!NJ~':'·, .MAt:J~GEMENT,

PERMIITEE:

FACILITY LOCATION:

PERMIT NUMBER:

POTW LOCATION:

SOURCE OF DISCHARGE:

. ·T:;::. ' ..• ~.· ... -r:=.'. :1· I ·E_ ; _;~-,_ ,,:,_ -. · '\1·~· _., - - ril · oiSCHAi"{Ge'PERilnrl" ··- -~~

TRU-LINE MANUFACTURING INC

3510 CENTRAL AVENUE SW DECATUR, AL

IU 08-52-00228

DECATUR DRY CREEK (AL0048593}

INDUSTRIAL WASTES RESULTING FROM METAL FINISHING OPERATIONS

In accortfance witli aruf su6ject to tlie provisions of )Ifa6ama 'WaterPoffuticn Contro[)Ict, as amerufed; Coae of _ft.fa6ama 1975, §§ 22-22-1 to 22-22-14 (tlie ~WWPGI::1 tlie )Ifa6ama f£nvironmenta[ 'Ma1Ulfjement )Ict, as amerufed, Coae of ftfa6ama 1975, §§22-22jt-1 to 22-22)I-15, aruf rufes ami regufaticns cufopted tliereumier, ami su6ject Jurtlier to tlie azscliarge £imitations, monitorill{j requirements ami otlier terms aruf cotufitions set fortfi in tfiis pennit, tlie Pennittee is liere6y autliorizu{ to discfiarge itufustria( wastes from tlie a6ove-descri6ed source to waters of tlie State tlirougli tlie a6m,e-named pu6fufy owned treatment worf<§ ('rl'O'IW)

ISSUANCE DATE: DECEMBER 14, 2004

EFFECTIVE DATE: JANUARY 1, 2005

EXPIRATION DATE: DECEMBER 31,2009

Alabama Department of Environmental Management

~· "'

,~ ~bEM __________ __

JAMES W. WARR DIRECTOR (Acting)

Bimingham 8rallCh 11 o Vulcan Road

Attachment B ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT POST OFFICE Box 301463 36130-1463 + 1400 COUSEUM BLVD. 36110-2059

MONTGOMERY, ALABAMA WWW.ADEM.STATE.Al.US

DECEMBER 14, 2004

RHONDA FISKE TRU-LINE MANUFACTURING INC 3510 CENTRAL AVENUE SW DECATUR AL 35603

(334) 271-7700

RE: Final SID Permit Number IU 08 52 00228

Dear Ms. Fiske:

Attached is the issued copy of the above referenced permit.

Boa RILEY GOVERNOR

Facsimiles: (334) AdrrinlstraUon: 271-7950

General Counsel: 394-4332 Nr: 279-3044

land: 279-3050 Water: 279-3051

Groundwater: 270-5631 Field Operabons: 272-8131

laboratory: 277-8718 Mining: 394-4326

Education/Outreach: 394-4383

We will look forward to receiving monitoring data in accordance with the conditions of your Permit. Please see PART I.F., Pages 4 and 5 for your reporting requirements. In order to minimize the paperwork burden on both of us, we ask that when submitting the required Discharge Monitoring Reports (DMR's), please do not submit lab worksheets, logs, reports or other paperwork, not specifically required by the permit unless requested to do so by ADEM staff. You are also requested to submit a copy of the DMR to the POTW.

If there are questions or comments in reference to the permit or related monitoring requirements, please contact Scott Ramsey of this office at (334) 274-4220.

J:k Eric Sanderson, Chief Industrial Section Water Division

lim

Enclosure

pc: City of Decatur: Final Permit

Mike McCary, P & S: Final Permit

Montgomery Field Office: Final Permit

Decatur Branch Mobile Branch 2204 Perimeter Road

Mobile - Coastal Blmingham, Alabama 35209-4 702 (205) 942-6168

2715 Sandlin Road, S.W. Decatur. Nabama 35603-1333 (256) 353-1713

Mobile. Alabama 36615-1131 (251) <450-3400

<4171 Convnande<s Drive Mobile, Alabarne 36615-1<421 (251)<432-6533

~

\.~ (205) 941-1603 (Fax) (256) 340-9359 (Fax) (251) <479-2593 (Fax) (251) 432-8598 (Fax) Printed on Recycled Paper

TABLE OF CONTENTS t;

DISCHARGE LIMITATIONS, CONDITIONS, AND REQUIREMENTS

A. Discharge Limitations and Monitoring Requirements

B. Discharge and Monitoring Locations

C. General Pretreatment Standards and Prohibitions

D. Categorical Pretreatment Standards

E. Discharge Monitoring and Record Keeping Requirements I. Representative Sampling 2. Test Procedures 3. Recording of Results 4. Records Retention and Production 5. Reduction, Suspension, or Termination of Monitoring and/or Reporting 6. Monitoring Equipment and Instrumentation

F. Discharge Reporting Requirements I. Reporting of Monitoring Results 2. Noncompliance Resampling and Notification 3. Hazardous Waste Discharge Notification 4. Slug Discharge

G. Other Reporting and Notification Requirements I. Submittals To Publicly Owned Treatment Works 2. Anticipated Noncompliance 3. Termination of Discharge 4. Updating Information 5. Cooling Water and Boiler Water Additives 6. Duty to Provide Information

H. Schedule of Compliance

PART II OTHER REQUIREMENTS, RESPONSIBILITIES, AND DUTIES

A. Operational and Management Requirements I. Facilities Operation and Maintenance 2. Best Management Practices 3. Spill Prevention, Control, and Management

B. Other Responsibilities I. Right of Entry and Inspection 2. Duty to Mitigate Adverse Impact

C. Bypass and Upset I. Bypass 2. Upset

D. Duty To Comply With Permit, Rules, and Statutes I. Duty to Comply 2. Removed Substances 3. Loss or Failure of Treatment Facilities 4. Compliance With Statutes and Rules

E. Permit Transfer, Modification, Suspension, Revocation, and Reissuance I. Duty to Reapply or NotifY of Intent to Cease Discharge 2. Change in Discharge 3. Transfer of Permit 4. Permit Modification and Revocation 5. Permit Termination 6. Permit Suspension 7. Request For Permit Action Does Not stay Any Permit Requirement

PART III OTHER PERMIT CONDITIONS

A. Civil and Criminal Liability I. Tampering 2. False Statements 3. Permit Enforcement 4. Relief from Liability

B. Oil and Hazardous Substance Liability C. Property and Other Rights D. Availability of Reports E. Expiration of Permits For New or Increased Discharges F. Definitions G. Severability

PART IV ADDITIONAL REQUIREMENTS, CONDITIONS, AND LIMITATIONS A. lTO Requirements B. Dilution Prohibition

, I ~

l i l !} ~

TRU-LJNE MANUFACTURING, INC. SID PERMIT NUMBER IU 08 52 00228 PART I Page 1

A. DISCHARGE LIMITATIONS AND MONITORING REQUIREMENTS

PART I

During the period beginning the effective date of this permit and lasting through the expiration date of this permit, the permittee is authorized to introduce industrial wastes into the POTW from the following outfall(s):

DSN001s: Process Wastewater from metal finishing operations.

Such discharge shall be limited and monitored by the permittee as specified below:

""

EFFLUENT CHARACTERISTIC UNli.S. OISCMABGE LIMIIATIQNS MQNITQBING BEQUIBEMEtl[S 1l21 Daily Minimum Daily Maximum Monthly Average Measurement Sample Frequency Type

Flow MGD - monitor .02 Daily Totalized pH s.u. 5.0 10.5 - Daily Grab Cadmium, Total mg/1 - 0.69 0.26 1/month Composite Chromium, Total mg/1 - 2.77 1.71 1/month Composite Copper, Total mg/1 - 3.38 2.07 1/month Composite Lead, Total mg/1 - 0.69 0.43 1/month Composite Nickel, Total mg/1 - 3.98 2.38 1/month Composite Silver, Total mg/1 - 0.43 0.24 1/month Composite Zinc, Total mg/1 - 2.61 1.48 1/month Composite Cyanide, Total mg/1 - 1.20 0.65 1/6 months Grab Total Toxic Organics~ mg/1 - 2.13 - 1/6 months Grab

Jj Samples collected to comply with the monitoring requirements specified above shall be collected at the following location: At the 1earest accessible location just prior to discharge and after final treatment. Unless otherwise specified, composite samples shall be time composite samples collected using automatic sampling equipment or a minimum of eight (8) equal volume grab samples collected over equal time intervals. All composite samples shall be collected for the total period of discharge not to exceed 24 hours. ?/ If only one sampling event occurs during a month, the sample result shall be reported on the discharge monitoring report as both the monthly average and daily maximum value for all parameters with a monthly average limitation. ~/ See Part IV.A. for Total Toxic Organics monitoring requirements

PART I \ Page 2

• B. DISCHARGE AND MONITORING LOCATIONS

All wastewater discharged under this pennit shall be discharged to the POTW at the location(s) described below and all monitoring and sampling required by this pennit shall be performed at the location(s) described below.

Discharge: OOis

Location of Monitoring Point: Concrete catchment sump/flume.

Location of Discharge Point: Concrete catchment sump/flume.

C. GENERAL PRETREATMENT STANDARDS AND PROHIBITIONS

I. The permittee shall not discharge or, in any manner, introduce into the publicly owned treatment works any pollutant(s) which, alone or in conjunction with a discharge or discharges from other sources, causes pass through or interference or in any other manner adversely impacts the operation or performance of the treatment works, to include the method of sludge disposal in use by the publicly owned treatment works.

2. The pennittee shall not discharge or, in any manner, introduce any of the following pollutants into the publicly owned treatment works:

a. Pollutants which may create a fire or explosive hazard, including, but not limited to, wastestreams with a closed cup flash point of less than I 40 degrees Fahrenheit or 60 degrees Centigrade using the test methods specified in 40 CFR 261.2I;

b. Pollutants which may cause corrosive structural damage to the treatment works, but in no case discharges with a pH lower than 5.0;

c. Solid or viscous pollutants in amounts which may cause obstruction to the flow in sewers, or other interference in the treatment works;

d. Any pollutant, including oxygen demanding pollutants (BOD, etc.) of such volume or strength as to cause interference in the treatment works;

c. Heat in amounts which may inhibit biological activity in the treatment plant resulting in interference but in no case in such quantities that the temperature of the influent, at the treatment plant, exceeds 40 degrees centigrade or I 04 degrees Fahrenheit;

f. Pollutants which may result in the presence of toxic gases, vapors, or fumes within the treatment works in a quantity that may cause acute worker health and safety problems;

g. Unless specifically authorized by this permit, any pollutants not generated at the facility for which this permit was issued; or

h. Petroleum oil, biodegradable cutting oil, or products of mineral oil origin in amounts that will cause pass through or interference.

3. The permittee shall not discharge or introduce any pollutant into the POTW at any location other than at a discharge point described and authorized by this permit.

4. Groundwater

This permit does not authorize any discharge to groundwater. Should a threat of groundwater contamination occur, the Director may require groundwater monitoring to properly assess the degree of the problem and the Director may require that the permittee undertake measures to abate any such discharge and/or contamination.

5. Discharge of Wastewater Generated by Others

The discharge of wastewater, generated by any process, facility, or by any other means not under the operational control of the permittee or not identified in the application for this permit or not identified specifically in the description of an outfall in this permit is not authorized by this permit.

'D. CATEGORICALPRETREATMENTSTANDARDS

PART I Page 3

I. Regardless of whether the requirements of a categorical pretreatment standard promulgated as a federal regulation by EPA are included in the requirements of this permit, the permittee shall attain compliance with the standard no later than three years after its promulgation or no later than the date required by the standard.

2. If a categorical pretreatment standard applicable to any part of the discharge authorized by this permit has been or is in the future promulgated by EPA, the permittee shall submit to the Department a baseline report within 180 days after the effective date of the categorical standard. The report shall be prepared and shall contain the information required bUQCFR Section 403.12. 3. If a categorical pretreatment standard applicable to any part of the discharge authorized by this permit has been or is in the future promulgated by EPA, the permittee shall submit to the Department a compliance report within 90 days after the final compliance date of the categorical standard. The report shall be prepared in accordance with 40 CFR Section 403.12 and shall contain the information required by this Act.

E. DISCHARGE MONITORING AND RECORD KEEPING REQUIREMENTS

I . Representative Sampling

Samples and measurements taken as required herein shall be representative of the volume and nature of the monitored discharge and shall be in accordance with the provisions of this permit.

2. Test Procedures

Test procedures for the analysis of pollutants shall conform to 40 CFR Part 136 and guidelines published pursuant to Section 304(h) of the FWPCA, 33 U.S. C. Section 1314(h). If more than one method for analysis of a substance is approved for use, a method having a detection limit lower than the permit limit shall be used. If the detection limit of all methods is higher than the permit limit the method having the lowest detection limit shall be used and a report of less than detection limit shall constitute compliance, however should EPA approve a method with a lower detection limit during the term of this permit the permittee shall use the newly approved method.

When an EPA approved test procedure for analysis of a pollutant does not exist, the Director or his designee shall approve the procedure to be used.

3. Recording of Results

For each measurement or sample taken pursuant to the requirements of this permit, the permittee shall record the following information:

a. The facility name and location, point source number, date, time and exact place of sampling;

b. The name(s) ofperson(s) who obtained the samples or measurements;

c. The dates and times the analyses were performed;

d. The name(s) of the person(s) who performed the analyses;

e. The analytical techniques or methods used, including source of method and method number; and

f. The results of all required analyses.

Such records shall be maintained whether the permittee or his contractor performs the sampling and/or analyses. 4. Records Retention and Production

a. The permittee shall retain records of all monitoring infonnation, including all calibration and maintenance records and all original strip chart recordings for continuous monitoring instrumentation, copies of all reports required by the permit, and records of all data used to complete the above reports and the application for this permit, for a period of at least three years from the date of the sample measurement, report or application. This period may be extended by request of the Director at any time. If litigation or other enforcement action, under the A WPCA and/or the FWPCA, is ongoing which involves any of the above records, the records shall be kept until the litigation is resolved. Upon the written request of the Director or his designee, the permittee shall provide the Director with a copy of any record required to be retained by this paragraph. Copies of these records should not be submitted unless requested.

Page 4 b. All records required to be kept for a period of three years shall be kept at the pennitted facility or an alternate location approved by the Department in writing and shall be available for inspection.

5. Reduction, Suspension, or Termination of Monitoring and/or Reporting

a. The Director may, with respect to any point source identified in Provision I. A. of this permit, authorize the permittee to reduce, suspend or terminate the monitoring and/or reporting required by this pennit upon the submission of a written request for such reduction, suspension or termination by the permittee, supported by sufficient data which demonstrates to the satisfaction of the Director that the discharge from such point source will continuously meet the discharge limitations specified in Provision I. A. ofthis permit. --

b. It remains the responsibility of the permittee to comply with the monitoring and reporting requirements of this permit until written authorization to reduce, suspend or terminate such monitoring and/or reporting is received by the permittee from the Director.

6. Monitoring Equipment and Instrumentation

All equipment and instrumentation used to determine compliance with the requirements of this permit shall be installed, maintained, and calibrated in accordance with the manufacturer's instructions or, in the absence of manufacturer's instructions, in accordance with accepted practices. The permittee shall develop and maintain quality assurance procedures to ensure proper operation and maintenance of all equipment and instrumentation. The quality assurance procedures shall include the proper use, maintenance, and installation, when appropriate, of monitoring equipment at the plant site.

F. DISCHARGE REPORTING REQUIREMENTS

I. Reporting of Monitoring Requirements

a. The permittee shall conduct the required monitoring in accordance with the following schedule:

MONITORING REQUIRED MORE FREQUENTLY THAN MONTHLY AND MONTHLY shall be conducted during the first full month following the effective date of coverage under this permit and every month thereafter.

QUARTERLY MONITORING shall be conducted at least once during each calendar quarter. Calendar quarters are the periods of January through March, April through June, July through September, and October through December. The pennittee shall conduct the quarterly monitoring during the first complete calendar quarter following the effective date of this permit and is then required to monitor once during each quarter thereafter. Quarterly monitoring may be done anytime during the quarter, unless restricted elsewhere in this permit, but it should be submitted with the last DMR due for the quarter, i.e., (March, June, September and December DMR's).

SEMIANNUAL MONITORING shall be conducted at least once during the period of January through June and at least once during the period of July through December. The permittee shall conduct the semiannual monitoring during the first complete calendar semiannual period following the effective date of this permit and is then required to monitor once during each semiannual period thereafter. Semiannual monitoring may be done anytime during the semiannual period, unless restricted elsewhere in this permit, but it should be submitted with the last DMR for the month of the semiannual period, i.e. (June and December DMR's).

ANNUAL MONITORING shall be conducted at least once during the period of January through December. The permittee shall conduct the annual monitoring during the first complete calendar annual period following the effective date of this permit and is then required to monitor once during each annual period thereafter. Annual monitoring may be done anytime during the year, unless restricted elsewhere in this permit, but it should be submitted with the December DMR.

b. The permittee shall submit discharge monitoring reports (DMRs) on the forms provided by the Department and in accordance with the following schedule:

REPORTS OF MORE FREQUENTLY THAN MONTHLY AND MONTHLY TESTING shall be submitted on a monthly basis. The first report is due on the 28th day of February, 2005. The reports shall be submitted so that they are received by the Department no later than the 28th day of the month following the reporting period.

REPORTS OF QUARTERLY TESTING shall be submitted on a quarterly basis. The first report is due on the 28th day of [ ) . The reports shall be submitted so that they are received by the Department no later than the 28th day of the month following the reporting period.

rAKT 1 PageS

REPORTS OF SEMIANNUAL TESTING shall be submitted on a semiannual basis. The reports are due on the 28th day of JANUARY and the 28th day of JULY. The reports shall be submitted so that they are received by the Department no later than the 28th day of the month following the reporting period.

REPORTS OF ANNUAL TESTING shall be submitted on an annual basis. The first report is due on the 28th day of JANUARY. The reports shall be submitted so that they are received by the Department no later than the 28th day of the month following the reporting period.

c. The DMR must be legible and bear an original signature. Photo and electronic copies of the signature are not acceptable and shall not satisfy the reporting requirements of this permit. If the pemuttee, using approved analytical methods as specified in Provision I. E. 2. monitors any discharge from a point source for a limited substance identified in Provision I. A. of this permit more frequently than required by this permit, the results of such monitoring shall be included in the calculation and reporting of values on the DMR Form and the increased frequency shall be indicated on the DMR Form. In the event no discharge from a point source identified in Provision I. A of this permit and described more fully in the permittee's application occurs during a monitoring period, the permittee shall report "No Discharge" for such period on the appropriate DMR Form.

d. All reports and forms required to be submitted by this permit, the A WPCA and the Department's Rules, shall be signed by a "responsible official" of the permittee as defined in ADEM Administrative Code Rule 335-6-5-.14 or a "duly authorized representative" of such official as defined in ADEM Administrative Code Rule 335-6-5-.14 and shall bear the following certification:

"I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. "

e. All reports and forms required to be submitted by this permit, the A WPCA and the Department's Rules, shall be addressed to:

Alabama Department of Environmental Management Industrial Section, Water Division

Post Office Box 301463 Montgomery, Alabama 36130

f. If this permit is are-issuance, then the permittee shall continue to submit DMRs in accordance with the requirements of their previous permit until such time as DMRs are due as discussed in Part I.F.l.b. above. 2. Noncompliance Re-sampling and Notification

a. If for any reason, (I) the permittee's discharge causes interference or pass through at the POTW or (2) an unpermitted direct or indirect discharge of pollutants occurs as a result of the permittee's actions or from the permittee's property or facility the permittee shall orally report the occurrence and circumstances of such discharge to the Director within 24-hours after the permittee becomes aware of the occurrence of such discharge. In addition to the oral report, the permittee shall submit to the Director a written report as provided in c. below, no later than five (5) days after becoming aware of the occurrence of such discharge (unpermitted discharges properly reported to the Department under any other requirement are not required to be reported under this provision).

b. If for any reason, the permittee's discharge does not comply with any limitation of this permit, the permittee shall submit to the Director a written report as provided in c. below, such report shall be submitted with the next Discharge Monitoring Report required to be submitted by Provision I. F. I. of this permit after becoming aware of the occurrence of such noncompliance.

c. Any written report required to be submitted to the Director by Provision I. F. shall be submitted using a copy of the Noncompliance Notification Form provided with this permit and shall include the following information: (I) A description of the discharge and cause of noncompliance;

(2) The period of noncompliance, including exact dates and times or, if not corrected, the anticipated period of time that the noncompliance is expected to continue; and

(3) A description of the steps taken and/or being taken to reduce or eliminate the noncomplying discharge and to prevent its recurrence.

' 4

d.

PART I Page 6

Within 30 days after becoming aware of the exceedance of a permit limit for any parameter, the permittee shall resample and test for this parameter and shall submit the results of the testing to the Department with the next discharge monitoring report submittal. If this permit requires the monitoring of the parameter more often then once every 30 days this requirement is satisfied and additional sampling is not required.

3. Hazardous Waste Discharge Notification

a. The permittee shall notify the publicly owned treatment works, the Department, and the Director of the EPA Region IV Waste Management Division of any discharge under this permit of a substance which is..a-Hsted or characteristic waste under Section 300 I of RCRA.

b. The notification shall include a description of the hazardous waste(s) discharged, specifying the volume and concentration of the waste(s) and the type of discharge (continuous, batch, or other), identifying the hazardous constituents contained in the listed waste(s) and estimating the volume of hazardous waste(s) expected to be discharged during the following twelve months. The notification shall be made within 30 days after the effective date of this permit or within 30 days of the first discharge of the hazardous waste(s).

c. The permittee shall be exempt from these reporting requirements during a calendar month in which no more than I 00 kilograms of a hazardous waste are discharged, unless the waste is an acute hazardous waste as specified in 40 CFR 261.5(e), (f), (g) and (j). Discharge of more than 100 kilograms of a hazardous waste in any given month requires a one-time notification. Subsequent months during which the industrial user discharges more than 100 kilograms of a hazardous waste do not require additional notification, except for an acute hazardous waste.

d. In the case of new regulations under Section 300 I of RCRA identifying additional characteristics of hazardous wastes or listing any additional hazardous waste, the permittee shall make notification as required in Provision I. F. 3. a. and b. of the discharge of such substance within 90 days of the effective date of such regulations. e. In the case of any notification, the permittee shall certify that it has a program in place to reduce the volume and toxicity of the wastes to the degree it has determined to be economically practicable and that it has selected the method of treatment, storage, or disposal currently available which minimizes the present and future threat to human health and the environment.

4. Slug Discharges

The permittee shall notify the publicly owned treatment works and the Department of any slug type discharge that may cause pass through or interference with the treatment works. Such notification shall be made to the treatment works immediately after the permittee becomes aware of the event and to the Department during the first normal business day after becoming aware of the event. The permittee shall coordinate with the operator of the treatment works and shall develop a notification procedure that is acceptable to the operator. The permittee may be required to establish a formal slug load control program if such is cletermined by the Director or his designee to be required to prevent pass through or interference.

G. OTHER REPORTING AND NOTIFICATION REQUIREMENTS

I. Submittals to Publicly Owned Treatment Works

The Department may require the permittee at any time to submit copies of any or all reports, notifications, applications, or other documents, that are submitted by the permittee to the Department, to the POTW receiving the discharge(s) authorized by this permit. Upon notification by the Department, the permittee shall submit copies of the required documents to the POTW no later than the required date of submittal to the Department.

2. Anticipated Noncompliance

The pemtittee shall give the Director written advance notice of any planned changes or other circumstances regarding a facility which may result in noncompliance with pemtit requirements.

3. Termination of Discharge

The permittee shall notify the Director, in writing, when all discharges from any point source(s) identified in Provision I. A. of this permit have permanently ceased. This notification shall serve as sufficient cause for instituting procedures for modification or termination of this permit.

4. Updating Information

a. The permittee shall inform the Director of any change in the permittee's mailing address or telephone number or in the permittee's designation of a facility contact or office(s) having the authority and responsibility to prevent and abate violations of the A WPCA, the Department's Rules and the terms and conditions of this permit, in writing, no later than

- i ' I"AKT 1 Page 7

ten (10) days after such change. Upon request of the Director or his designee, the permittee shall furnish the Director with an update of any information provided in the permit application.

b. If the permittee becomes aware that it failed to submit any relevant facts in a permit application, or submitted incorrect information in a permit application or in any report to the Director, it shall promptly submit such facts or information with a written explanation for the mistake and/or omission.

5. Duty to Provide Information

The permittee shall furnish to the Director, within a reasonable time, any information which theD~ector or his designee may request to determine whether cause exists for modifying, suspending, or revoking this permit, in whole or in part, or to determine compliance with this permit.

6. Cooling Water and Boiler Water Additives

a. The permittee shall notify the Director in writing not later than sixty ( 60) days prior to instituting the use of any biocide corrosion inhibitor or chemical additive in a cooling or boiler system, not identified in the application for this permit, from which discharge is allowed by this permit. Notification is not required for additives that do not contain a heavy metal(s) as an active ingredient and that pass through a wastewater treatment system prior to discharge nor is notification required for additives that should not reasonably be expected to cause the cooling water or boiler water to exhibit toxicity as determined by analysis of manufacturer's data or testing by the permittee. Such notification shall include:

(I) Name and general composition of biocide or chemical, (2) 96-hour median tolerance limit data for organisms representative of the biota of the waterway into which the discharge will ultimately reach, (3) Quantities to be used, (4) Frequencies of use, (5) Proposed discharge concentrations, and (6) EPA registration number, if applicable.

b. The use of a biocide or additive containing tributyl tin, tributyl tin oxide, zinc, chromium or related compounds in a cooling or boiler system(s), from which a discharge regulated by this permit occurs, is prohibited. Zinc and chromium may be used in special circumstances if the permit contains limits for these substances. The use of any additive, not identified in this permit or in the application for this permit or not exempted from notification under this permit is prohibited, prior to a determination by the Department that permit modification to control discharge of the additive is not required or prior to issuance of a permit modification controlling discharge of the additive.

H. SCHEDULE OF COMPLIANCE

I. The permittee shall achieve compliance with the discharge limitations specified in Provision I. A. in accordance with the following schedule:

COMPLIANCE SHALL BE ATTAINED ON THE EFFECTIVE DATE OF THIS PERMIT

2. No later than 14 calendar days following a date identified in the above schedule of compliance, the permittee shall submit either a report of progress or, in the case of specific actions being required by identified dates, a written notice of compliance or noncompliance. In the latter case, the notice shall include the cause of noncompliance, any remedial actions taken, and the probability of meeting the next scheduled requirement.

PART II

A. OPERATIONAL AND MANAGEMENT REQUIREMENTS

I. Facilities Operation and Maintenance

The permittee shall at all times properly operate and maintain all facilities and systems of treatment and control (and related appurtenances) which are installed or used by the permittee to achieve compliance with the conditions of the permit. Proper operation and maintenance includes effective performance, adequate funding, adequate operator staffing and training, and

PART D PageS

adequate laboratory and process controls, including appropriate quality assurance procedures. This provision requires the operation of backup or auxiliary facilities only when necessary to achieve compliance with the conditions of the permit. 2. Best Management Practices

a Except where expressly authorized to do so by an applicable categorical pretreatment standard, the permittee shall not increase the use of process water or, in any other way, attempt to dilute a discharge as a partial or complete substitute for adequate treatment to achieve compliance with a categorical pretreatment standard or any requirement of this permit.

b. The permittee shall prepare, implement, and maintain a Spill Prevention, Control and Countermeasures (SPCC) Plan in accordance with 40 CFR Part 112 if required thereby.

c. The permittee shall prepare, submit for approval and implement a Best Management Practices (BMP) Plan for containment of any or all process liquids or solids, in a manner such that these materials do not present a significant potential for discharge, if so required by the Director or his designee. When submitted and approved, the BMP Plan shall become a part of this permit and all requirements of the BMP Plan shall become requirements of this permit. 3. Spill Prevention, Control and Management

The permittee shall provide spill prevention, control, and/or management sufficient to prevent any spills of stored pollutants from entering a water of the state or a publicly or privately owned treatment works. Any containment system used to implement this requirement shall be constructed of materials compatible with the substance(s) stored and which shall prevent the contamination of groundwater and such containment system shall be capable of retaining a volume equal to I I 0 percent of the capacity of the largest tank for which containment is provided.

B. OTHER RESPONSIBILITIES

I. Right of Entry and Inspection

The permittee shall allow the Director, or an authorized representative, upon the presentation of proper identification to: a. Enter upon the permittee's premises where a regulated facility or activity is located or conducted, or where records must be kept under the conditions of the permit;

b. Have access to and copy, at reasonable times, any records that must be kept under the conditions of the permit; c. Inspect at reasonable times any facilities, equipment (including monitoring and control equipment), practices, or operations regulated or required under the permit; and

d. Sample or monitor at reasonable times, for the purposes of assuring permit compliance or as otherwise authorized by the A WPCA, any substances or parameters at any location.

2. Duty to Mitigate Adverse Impacts

The permittee shall promptly take all reasonable steps to mitigate and minimize any adverse impact to waters resulting from noncompliance with any discharge limitation specified in Provision I. A. of this permit, including such accelerated or additional monitoring of the discharge, influent and effluent at the POTW, and/or the waterbody receiving the POTW discharge as necessary to determine the nature and impact of the noncomplying discharge.

C. BYPASS AND UPSET

I. Bypass

a. Any bypass is prohibited except as provided in b. and c. below:

b. A bypass is not prohibited if:

(I) It does not cause any discharge limitation specified in Provision I., A. of this permit to be exceeded; and (2) It is necessary for essential maintenance of a treatment or control facility or system to assure efficient operation of such facility or system.

c. A bypass is not prohibited and need not meet the discharge limitations specified in Provision I., A. of this permit if:

(I)

(2)

(3)

It is unavoidable to prevent loss oflife, personal injury, or severe property damage;

PART II Page 9

There are no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes, or maintenance during normal periods of equipment downtime; and

The permittee submits a written request for authorization to bypass to the Director at least ten (10) days prior to the anticipated bypass (if possible), the permittee is granted such authorization, and the permittee complies with any conditions imposed by the Director to minimize any adverse impact to waters resulting from the bypass.

d. The permittee has the burden of establishing that each of the conditions of Provisions II. C. I b. or c. have been met to qualify for an exception to the general prohibition against bypassing contained in Provision II. C. I a. and an exemption, where applicable, from the discharge limitations specified in Provision I. A. of this permit.

2. Upset

a. A discharge which results from an upset need not meet the discharge limitations specified in Provision I. A., of this permit if:

(I) No later than 24-hours after becoming aware of the occurrence of the upset, the permittee orally reports the occurrence and circumstances of the upset to the Director or his designee; and

(2) No later than five (5) days after becoming aware of the occurrence of the upset, the permittee furnishes the Director with evidence, including properly signed, contemporaneous operating logs, or other relevant evidence, demonstrating that (i) an upset occurred; (ii) the permittee can identify the specific cause(s) of the upset; (iii) the permittee's facility was being properly operated at the time of the upset; and (iv) the permittee promptly took all reasonable steps to minimize any adverse impact to waters resulting from the upset.

b. The permittee has the burden of establishing that each of the conditions of Provision II C. 2. a. of this permit have been met to qualify for an exemption from the discharge limitations specified in Provision I. A. of this permit.

D. DUTY TO COMPLY WITH PERMIT, RULES, AND STATUTES

I. Duty to Comply

a. The permittee must comply with all conditions of the permit. Any permit noncompliance constitutes a violation of the A WPCA and the FWPCA and is grounds for enforcement action, for permit termination, revocation and reissuance, suspension, modification; or denial of a permit renewal application.

b. The necessity to halt or reduce production or other activities in order to maintain compliance with the conditions of the permit shall not be a defense for a permittee in an enforcement action.

c. The discharge of wastewater to the POTW from a source not specifically identified in the permit application for this permit and not specifically included in the description of an outfall in this permit is not authorized and shall constitute noncompliance with this permit.

d. The permittee shall take all reasonable steps, including cessation of production or other activities, to minimize or prevent any violation of the permit or to minimize or prevent any adverse impact of any permit violation.

2. Removed Substances

Solids, sludges, filter backwash, or any other pollutant or other waste removed in the course of treatment or control of wastewaters shall be disposed of in a manner that complies with all applicable Department Rules.

3. Loss or Failure of Treatment Facilities

Upon the loss or failure of any treatment facility, including but not limited to the loss or failure of the primary source of power of the treatment facility, the permittee shall, where necessary to maintain compliance with the discharge limitations specified in Provision I. A. of this permit, or any other terms or conditions of this permit, cease, reduce, or otherwise control production and/or all discharges until treatment is restored.

4. Compliance with Statutes and Rules

a. This permit has been issued under ADEM Administrative Code, Chapter 335-6-5. All provisions of this chapter, that are applicable to this permit, are hereby made a part ofthis permit. A copy ofthis chapter may be obtained for a small

CAAI ll

Page 10 charge from the Office of General Counsel, Alabama Department of Environmental Management, Post Office Box 301463, Montgomery, AL 36130-1463.

b. This permit does not authorize the noncompliance with or violation of any Laws of the State of Alabama or the United States of America or any regulations or rules implementing such laws. FWPCA, 33 U.S.C. Section 1319, and Code of Alabama 1975, Section 22-22-14.

E. PERMIT TRANSFER, MODIFICATION, SUSPENSION, REVOCATION, AND REISSUANCE

I. Duty to Reapply or Notify of Intent to Cease Discharge

a. If the permittee intends to continue to discharge beyond the expiration date of this permit, the permittee shall file a complete permit application for reissuance of this permit at least 180 days prior to its expiration. If the permittee does not intend to continue discharge beyond the expiration of this permit, the permittee shall submit written notification of this intent which shall be signed by an individual meeting the signatory requirements for a permit application as set forth in ADEM Administrative Code Rule 335-6-5-.14.

b. Failure of the permittee to apply for reissuance at least 180 days prior to permit expiration will void the automatic continuation of the expiring permit provided by ADEM Administrative Code Rule 335-6-5-.11 and should the permit not be reissued for any reason any discharge after expiration of this permit will be an unpermitted discharge. 2. Change in Discharge

The permittee shall apply for a permit modification at least 180 days in advance of any facility expansion, production increase, process change, or other action that could result in the discharge of additional pollutants or increase the quantity of a discharged pollutant such that existing permit limitations would be exceeded or that could result in an additional discharge point. This requirement applies to pollutants that are or that are not subject to discharge limitations in this permit. No new or increased discharge may begin until the Director has authorized it by issuance of a permit modification or a reissued permit. 3. Transfer of Permit

This permit may not be transferred or the name of the permittee changed without notice to the Director and subsequent modification or revocation and reissuance of the permit. In the case of a change in name, ownership or control of the permittee's premises only, a request for permit modification in a format acceptable to the Director is required at least 30 days prior to the change. In the case of a change in name, ownership or control of the permittee's premises accompanied by a change or proposed change in effluent characteristics, a complete permit application is required to be submitted to the Director at least 180 days prior to the change. Whenever the Director is notified of a change in name, ownership or control, he may decide not to modify the existing permit and require the submission of a new permit application.

4. Permit Modification and Revocation

a. This permit may be modified or revoked and reissued, in whole or in part, during its term for cause, including but not limited to, the following:

(I) If cause for termination under Provision II E.4.a.(l) ofthis permit exists, the Director may choose to revoke and reissue this permit instead of terminating the permit;

(2) If a request to transfer this permit has been received, the Director may decide to revoke and reissue or to modify the permit; or

(3) If modification or revocation and reissuance is requested by the permittee, the Director may grant the request. b. This permit may be modified during its term for cause, including but not limited to, the following:

(I) If cause for termination under Provision II E. 5. of this permit exists, the Director may choose to modify this permit instead of terminating this permit;

(2) There are material and substantial alterations or additions to the facility or activity generating wastewater which occurred after permit issuance which justify the application of permit conditions that are different or absent in the existing permit;

(3) The Director has received new information that was not available at the time of permit issuance and that would have justified the application of different permit conditions at the time of issuance;

(4) A new or revised categorical pretreatment standard applicable to the discharge(s) authorized by this permit is promulgated;

(5) Errors in calculation of discharge limitations or typographical or clerical errors were made;

PART ll Page ll

(6) When the standards or regulations on which the permit was based have been changed by promulgation of amended standards or regulations or by judicial decision after the permit was issued;

(7) To the extent allowed by ADEM Administrative Code, Rule 335-6-5-.18, permits may be modified to change compliance schedules;

(8) When required by the reopener conditions in this permit;

(9) When required to correct technical mistakes, such as errors in calculation, or mistaken interpretations of law made in determining permit conditions;

(I 0) When requested by the permittee and when the Director determines that the modification will not result in a violation of federal or state law, regulations or rules; or

(11) When more stringent or additional permit requirements are required to prevent pass through or interference. 5. This permit may be terminated during its term for cause, including but not limited to, the following:

a. Violation of any term or condition of this permit;

b. The permittee's misrepresentation or failure to disclose fully all relevant facts in the permit application or during the permit issuance process or the permittee's misrepresentation of any relevant facts at any time;

c. Materially false or inaccurate statements or information in the permit application or the permit;

d. A change in any condition that requires either a temporary or permanent reduction or elimination of the permitted discharge;

e. The permittee's discharge causes pass through or interference or threatens human health or welfare or the maintenance of water quality standards;

f. Permanent closure of the facility generating the wastewater permitted to be discharged by this permit or permanent cessation of wastewater discharge;

g. The Director determines that the permittee cannot comply with new or revised requirements of any applicable standard or limitation; or

h. Any other cause allowed by the ADEM Administrative Code, Chapter 335-6-5.

6. This permit may be suspended during its term for cause, including but not limited to, the reasons for termination listed in Provision I E. 5. of this permit.

7. The filing of a request by the permittee for modification, suspension or revocation of this permit, in whole or in part, does not stay any permit term or condition.

PART III

A. CIVIL AND CRIMINAL LIABILITY

1. Tampering

Any person who falsifies, tampers with, or knowingly renders inaccurate any monitoring device or method required to be maintained or performed under the permit shall, upon conviction, be subject to penalties as provided by the A WPCA. 2. False Statements

Any person who knowingly makes any false statement, representation, or certification in any record or other document submitted or required to be maintained under this permit, including monitoring reports or reports of compliance or noncompliance shall, upon conviction, be subject to penalties as provided by the A WPCA.

3. Permit Enforcement

a. This permit is a permit for the purpose of the A WPCA and the FWPCA and as such any terms, conditions, or limitations of this permit are enforceable under state and federal law. The necessity to halt or reduce production or other activities in order to comply with this permit shall not be a defense for the permittee in an enforcement action.

PARTID Page 12

b. Any person required to have a SID permit pursuant to ADEM Administrative Code Chapter 335-6-5 and who discharges pollutants without said permit, who violates the conditions of said permit, who discharges pollutants in a manner not authorized by the permit, or who violates applicable orders of the Department or any applicable rule or standard of the Department, is subject to any one or combination of the following enforcement actions under applicable statutes.

(I) An administrative order requiring abatement, compliance, mitigation, cessation, clean-up, and/or penalties; (2) An action for damages;

(3) An action for injunctive relief; or

( 4) An action for penalties.

4. Relief From Liability

Except as provided in Provision II. C. I. (Bypass) and Provision II. C. 2. (Upset), nothing in this permit shall be construed to relieve the permittee of civil or criminal liability under the A WPCA or FWPCA for noncompliance with any term or condition of this permit.

B. OIL AND HAZARDOUS SUBSTANCE LIABILITY

Nothing in this permit shall be construed to preclude the institution of any legal action or relieve the permittee from any responsibilities, liabilities or penalties to which the permittee is or may be subject under Section 311 of the FWPCA, 33 U.S.C. Section 1321. C. PROPERTY AND OTHER RIGHTS

This permit does not convey any property rights in either real or personal property, or any exclusive privileges, nor does it authorize any injury to persons or property or invasion or other private rights, or any infringement of federal, state, or local laws or regulations, nor does it authorize or approve the construction of any physical structures or facilities or the undertaking of any work in any waters of the state or of the United States.

D. A V AJLABILITY OF REPORTS

Except for data detetmined to be confidential under Code of Alabama 1975, Section 22-22-9(c), all reports prepared in accordance with the tenns of this permit shall be available for public inspection at the offices of the Department. Effiuent data shall not be considered confidential.

E. EXPIRATION OF PERMITS FOR NEW OR INCREASED DISCHARGES

I. If this permit was issued for a new discharger or new source, this permit shall expire eighteen months after the issuance date if construction of the facility has not begun during the eighteen-month period.

2. If this permit was issued or modified to allow the discharge of increased quantities of pollutants to accommodate the modification of an existing facility and if construction of this modification has not begun during the eighteen month period after issuance of this permit or permit modification, this permit shall be modified to reduce the quantities of pollutants allowed to be discharged to those levels that would have been allowed if the modification of the facility had not been planned. 3. Construction has begun when the owner or operator has:

a. Begun, or caused to begin as part of a continuous on-site construction program:

(I) Any placement, assembly, or installation of facilities or equipment; or

(2) Significant site preparation work including clearing, excavation, or removal of existing buildings, structures, or facilities which is necessary for the placement, assembly, or installation of new source facilities or equipment; or

b. Entered into a binding contractual obligation for the purpose of placement, assembly, or installation of facilities or equipment, which are intended to be used in its operation within a reasonable time. Options to purchase or contracts which can be tem1inated or modified without substantial loss, and contracts for feasibility, engineering, and design studies do not constitute a contractual obligation under the paragraph. The entering into a lease with the State of Alabama for exploration and production of hydrocarbons shall also be considered beginning construction.

.._ .. ~. . PART m Page 13 F. DEFINITIONS

• I. Average monthly discharge limitation - means the highest allowable average of "daily discharges" over a calendar month, calculated as the sum of all "daily discharges" measured during a calendar month divided by the number of "daily discharges" measured during that month (zero discharge days shall not be included in the number of "daily discharges" measured and a less than detectable test result shall be treated as a concentration of zero if the most sensitive EPA approved method was used).

2. Average weekly discharge limitation - means the highest allowable average of "daily discharges" over a calendar week, calculated as the sum of all "daily discharges" measured during a calendar week divided by the number of "daily discharges" measured during that week (zero discharge days shall not be included in the number of "daily disch~ measured and a less than detectable test result shall be treated as a concentration of zero if the most sensitive EPA approved method was used). 3. A WPCA- means the Alabama Water Pollution Control Act.

4. Bypass- means the intentional diversion of waste streams from any portion of a treatment facility. 5. Categorical pretreatment standard - means any regulation containing pollutant discharge limits promulgated by the EPA in accordance with Section 307(b) and (c) of the FWPCA, which applies to industrial users. 6. Daily discharge - means the discharge of a pollutant measured during any consecutive 24-hour period in accordance with the sample type and analytical methodology specified by the discharge permit.

7. Daily maximum- means the highest value of any individual sample result obtained during a day. 8. Daily minimum- means the lowest value of any individual sample result obtained during a day. 9. Day- means any consecutive 24-hour period.

I 0. Department - means the Alabama Department of Environmental Management.

II. Director- means the Director of the Department.

12.. Discharge -means the introduction of any sewage, industrial waste, pollutant, or other waste into a publicly owned treatment works.

13. Discharge monitoring report (DMR) - means the form approved by the Director to accomplish the reporting requirements of a SID pem1it.

14. EPA- means the United States Environmental Protection Agency.

15. FWPCA- means the Federal Water Pollution Control Act.

16. Indirect discharger or industrial user - means a nondomestic discharger who discharges pollutants to a publicly owned treatment works.

17. Permit application -means forms and additional information that is required by ADEM Administrative Code Rule 335-6-5-.13 and applicable permit fees.

18. Point source - means "any discernible, confined and discrete conveyance, including but not limited to any pipe, channel, ditch, tunnel, conduit, well, discrete fissure, container, rolling stock, concentrated animal feeding operation, or vessel or other floating craft, ... from which pollutants are or may be discharged." Section 502(14) of the FWPCA, 33 U.S. C. Section 1362(14). 19. Pollutant- includes for purposes of this permit, but is not limited to, those pollutants specified in Code of Alabama 1975, Section 22-22-l(b)(3) and those effluent characteristics specified in Provision I. A. of this permit. 20. Publicly owned treatment works (POTW)- means a treatment works as defined by Section 212 of the FWPCA, which is owned by the state, a municipality, a regional entity composed of two or more municipalities, or another entity created by state or local authority for the purpose of collecting and treating municipal wastewater. This definition does not include pipes, sewers or other conveyances not connected to a facility providing treatment. The term also means the municipality as defined in Section 502(4) of the FWPCA, which has jurisdiction over the "indirect discharges" to and the discharges from such a treatment works. 21. RCRA- means the Federal Resource Conservation and Recovery Act.

22. Severe property damage - means substantial physical damage to property, damage to the treatment facilities which causes them to become inoperable, or substantial and permanent loss of natural resources which can reasonably be expected to occur in the absence of a bypass. Severe property damage does not mean economic loss caused by delays in production.

PART ID Page 14 23. State indirect discharge permit or SID permit- means a permit issued to an industrial user.

24. Upset - means an exceptional incident in which there is an unintentional and temporary noncompliance with technology-based permit discharge limitations because of factors beyond the reasonable control of the permittee. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment facilities, inadequate facilities, lack of preventive maintenance, or careless or improper operation.

25. Waters - means "(a]ll waters of any river, stream, watercourse, pond, lake, coastal, ground or surface water, wholly or partially within the State, natural or artificial. This does not include waters which are entirely confined IIIMHetained completely upon the property of a single individual, partnership or corporation unless such waters are used in interstate commerce." Code of Alabama 1975, Section 22-22-l(b)(2). Waters "include all navigable waters" as defined in Section 502(7) of the FWPCA, 22 U.S.C. Section 1362(7), which are within the State of Alabama.

26. Week- means the period beginning at twelve midnight Saturday and ending at twelve midnight the following Saturday. G. SEVERABILITY

The provisions of this permit are severable, and if any provision of this permit or the application of any provision of this pennit to any circumstance is held invalid, the application of such provision to other circumstances, and the remainder of this pennit, shall not be affected thereby.

PART IV A. TOTAL TOXIC ORGANIC (TTO) REQUIREMENTS

Total Toxic Organics (TIO) shall be defined as found in the applicable regulation (e.g., 40 CFR Parts 413, 433, 464, 465, 467, 468, or 469). TIO monitoring shall be necessary only for those compounds which are possibly present as a result of screening analyses, and/or a detailed review of TTO sources used in the facility. Annual certification shall be submitted by the permittee in January that the TTO parameters tested during the previous calendar year were those which could reasonably be expected as a result of screening analyses and/or presence of the TTO compound on-site. In addition to TTO monitoring, the Director or his designee may require that the permittee prepare and submit for approval and implementation a toxic organic management plan [or solvent management plan]. In lieu ofTIO monitoring, facilities subject to 40 CFR Part 413,433, and 469 may submit a toxic organics management plan [or solvent management plan] which identifies toxic organic compounds used, the method of disposal used instead of discharge (such as reclamation, contract hauling or incineration) and procedures used for ensuring that toxic organics do not routinely spill or leak into the wastewater. The Department shall review the plan and initial TIO analysis, and if the plan is approved, the plan and any Department comments shall become a requirement of this permit. If design or construction is needed for the plan, engineering plans and specifications shall be submitted to the Department for review.

Should toxic organic pollutant levels be sufficiently low for those facilities subject to 40 CFR Part 413, 433, or 469 and the toxic organic management plan [or solvent management plan] is approved by the Department, the Department may waive further monitoring requirements provided all monitoring reports submitted thereafter include the following certification: "Based on my inquiry of the person or persons directly responsible for managing compliance with the permit limitation [or pretreatment standard] for total toxic organics (TTO), I cerlify that, to the best of my knowledge and belief, no dumping of concentrated toxic organics into the wastewaters has occurred since filing of the last discharge monitoring reporl. I furlher cerlify that this facility is implementing the toxic organic management plan {or solvent management plan] submitted to the permitting (or control) authority. n

Should in-plant conditions change such that the toxic organic management plan (or solvent management plan) is no longer valid (i.e., spill containment is modified, toxic organic compounds used are changed, etc.), a modified plan and implementation schedule shall be submitted 90 days prior to such change and must be approved by the Department to again discontinue TIO monitoring. In any event, the toxic organic management plan [or solvent management plan] shall be reviewed and updated at least yearly after approval by the Department, to assure that the plan is still valid and meets the intent of this permit. Such review and update shall include, but not be limited to, a review of toxic organics used, containment provisions for each, and a physical examination of all components of the containment or management system used. Records of this yearly review shall be maintained by the permittee for a minimum of three years. Discharge ofTIO to any waste stream limited by this permit shall in no case be intentional, unless the waste treatment system is designed to remove TIO, and such discharge has been specifically approved by the ADEM Water Division.

B. DILUTION PROHIBITION

The permittee shall not augment the use of process wastewater as a partial or total substitute for adequate treatment to achieve compliance with any limitation in this permit.

~ MONTHLY DMR ADEM DISCHARGE MONITORING REPORT MONTH , 20 ---""--!...:! ~IJ

COMPANY: TRU-LINE MANUFACTURING INC. LOCATION: 3510 CENTRAL AVENUE SW DSN001S DECATURAL SID NO: IU 08 52 00228 PARAM Flow pH Cd,T Cr,T Cu,T Pb,T Ni,T Ag,T Zn,T Cn,T TTO MJN - 5.0 - - - - - - - - -MAX monitor 10.5 0.69 2.77 3.38 0.69 3.98 0.43 2.61 1.2 2.13 MO.AVG 0.02 - 0.26 1.71 2.07 0.43 2.38 0.24 1.48 0.65 -FREQ daily daily 1/month 1/month 1/month 1/month 1/month 1/month 1/month 1/6months 1/6months UNITS MGD s.u. mg/1 mg/1 mg/1 mg/1 mg/1 mg/1 mg/1 mg/1 mg/1 1 2 I 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

MAX MO.AVG I certify under penalty ot law that thrs document and all attachments were prepared under my drrectron or supervrsron rn accordance wrtn a system desraned to assure t 1at aualrtred personnel prOIJ4Ifly gather and evaluate the information submitted. Based on my inquiry of the persons or persons who manage the system, or those persons directly responsible for gathering the infonnation, the information submitted is, to the best of my knowledge and belief, true, accurate and complete. I am aware that there are significant penalties for submitting false infonnation, including the possibility of fine.l'ld imprisonment for knowing violations.

~

~

--

Signature & Title of Responsible Official Date ADEM Form 457 8/02

Printed Name & Title of Responsible Official

'L ADEM _____ _

JAMESW. WARR

DIRECTOR

Birmngham 110 Vulcan Road

Attachment B ALABAMA DEPARTMENT OF eNVIRONMENTAL MANAGEMENT

May 19, 1999

RHONDA FISKE

POST OFFICE BOX 301463 + 1400 COLISEUM BLVD. 36110-2059 MONTGOMERY, ALABAMA 36130-1463

WWW.ADEM.STATE.AL.US

(334) 271-7700

TRU-LINE MANUFACTURING INC 3510 CENTRAL A VENUE SW DECATUR AL 35603

RE: Final SID Pennit SID Pennit Number IU 08 52 00228

Dear Ms. Fiske.:

Attached is the issued copy of the above referenced pemlit.

DON SIEGELMAN

GovERNOR

Facsimiles: (334) Administration: 271-7950

Nrc 279-3044 Land: 279-3050

Water: 279-3051 Groundwater: 270-5631

Field Operations: 272-8131 Laboratory: 277-8718

Educalion!Outreach: 213-4399

\Ve will look forward to receiving monitoring data in accordance with the conditions of your Permit. Please see PART I.F., Pages 4 and 5 for your reporting requirements. In order to nlininlize the pape1work burden on both of us, we ask that when subnlitting the required Discharge Monitoring Reports (DMR's). please do not submit lab worksheets, logs, reports or other paperwork, not specifically required by the pemlit unless requested to do so by ADEM staff.

If there are questions or comments in reference to the pernlit or related monitoring requirements, please contact Tom Cleveland ofthis office at (334) 271-7850.

Sincerely,

;:j1f~ l -+4'-EdgaYk. Hughes, Chief Industrial Section Water Division

/ar

pc: City of Decatur Mike McCary, Pern1its and Services Montgomery Field Office

Decatur Mobile 2204 Perimeter Road

Mobile - Coastal Birrringham. Alabama 35209-4702 (205) 942-6168

2708 6th Avenue, SE, Suite B Decatur, Alabama 35603-1508 (256) 353-1713

Mobile, Alabama 36615-1131 (334) 450-3400

4171 CofTYll3nders Drive Mobile, Alabama 36615-1421 (334) 432-8533

Prtnled on Recyded Paper (205) 941-1603 (Fax] (256) 340-9359 [Fax] (334) 4 79-2593 (Fax] (334) 432-6596 [Fax)

PERMITTEE:

FACILITY LOCATION:

PERMIT NUMBER:

POTW LOCATION:

SOURCE OF DISCHARGE:

' ' . :...,;.,...;_ . n u:LINE MANUFACTURING, INC.

351Q,CENTRAL A VENUE, SW DECATUR, ALABAMA

IU 08 52 00228

DECATUR DRY CREEK

METAL FINISHING OPERATIONS

In accordance with and subject to the provisions of Alabama Water Pollution Control Act. as amended. Code of Alabama 1975. §§ 22-22-1 to 22-22-14 (the "A WPCA ''), the Alabama Environmental Management Act. as amended, Code of Alabama 1975. §§22-22A-I to 22-22A-/5, and rules and regulations adopted thereunder. and subject further to the discharge limitations, monitoring requirements and other terms and conditions set forth in this permit. the Permittee is hereby authorized to discharge industrial wastes from the above-described source to waters of the State through the above-named publicly owned treatment works ("POTW").

ISSUANCE DATE: May 19, 1999

EFFECTIVE DATE: October 1, 1999

EXPIRATION DATE: September 30, 2004

Ala b.~~¥ D~p~e~fofEilyiromnen~~,M~~gemeot · ' ,· · · ~ {-%::·· ;· ', ..: -:· ;;;:::~ ·~~ .)~ ··;.

. .

#,~~f:s~~t;t~~s~_,}\ --. -··' ~ -· ---- __ :o=.<t~--

I '

PART I

PART II

PART Ill

PART IV

SID PERMIT

TABLE OF CONTENTS

DISCHARGE LIMITATIONS, CONDITIONS, AND REQUIREMENTS

A. Discharge Limitations and Monitoring Requirements

B. Discharge and Monitoring Locations

C. General Pretreatment Standards and Prohibitions

D. Categorical Pretreatment Standards

E. Discharge Monitoring and Record Keeping Requirements I Representative Sampling

Test Procedures Recording of Results

4. Records Retention and Production 5 Reduction. Suspension, or Tem1ination of Monitoring and1or Reporting 6 Monitoring Equipment and Instrumentation

F Discharge Reporting Requirements I Reporting of Monitoring Results 2. Noncompliance Resampling and Notification

Hazardous Waste Discharge Notification 4 Slug Discharge

G Other Reporting and Notification Requirements I Submittals To Publicly 0\\11ed Treatment WorJ..s

Anticipated Noncompliance 3. Temlination of Discharge 4. Updating Information 5. Cooling Water and Boiler Water Additives 6. Duty to Provide lnfomJation

H Schedule of Compliance

OTHER REQUIREMENTS. RESPONSIBILITIES, AND DUTIES

A Operational and Management Requirements I. facilities Operation and Maintenance

Best Management Practices Spill Prevention. Control, and Management

B. Other Responsibilities I Right of Entry and Inspection

Duty to l\1itigate Adverse Impact

C Bypass and Upset 1. Bypass

Upset

D Duty To Comply With Pemlit. Rules. and Statutes I Duty to Comply 2. Removed Substances 3. Lo>S or Failure of Treatment Facilities 4 Compliance With Statutes and Rules

E Permit. Transfer. Modification. Suspension. Revocation, and Reissuance I. Duty to Reapply or Notify of Intent to Cease Discharge 2. Change in Discharge

Transfer ofPemut 4 Pennit Modification and Revocation 5. Pem1it Tem1ination 6 Pem1it Suspension

Request For Pemut Action Docs Not stay Any Pemut Requirement

OTHER PER/v11T CONDITIONS

A Civil and Criminal Liability 1 Tampering

False Statements Pennit Enforcement

4 Relief Front Liability

13 Oil and Hazardous Substance Liability C. Property and Othe1 Rights D Availability of Reports E Exp~ration of Pennits For New or Increased Discharges r. Definitions G Severability

ADDIT!Ol\:AL REQUIREMENTS. CONDITIONS, AND LIMITATIONS

A Total Toxic Organics ReqUirements

j i

I I

!

TRU-LINE MANUFACTURING, INC. SID PERMIT NUMBER IU 08 52 00228 PART I Page 1

A. DISCHARGE LIMITATIONS AND MONITORING REQUIREMENTS

PART I

During the period beginning the effective date of this permit and lasting through the expiration date of this permit, the permittee is authorized to introduce industrial wastes into the POTW from the following outfall(s):

DSNOOl: Process wastewater from metal finishing operations.

Such discharge shall be limited and monitored by the permittee as specified below:

EFFLUENT CHARACTERISTIC UNITS DISCHARGE LIMIIAIIQNS MQNIIQRING REQUIREMEr!IS ll Daily Minimum Daily Maximum Monthly Average ~/ Measurement

Frequency

Flow MGD Monitor Monitor Daily pH s.u. 5.0 10.5 - Daily Cadmium, Total mg/1 0.69 0.26 1/Month Chromium, Total mg/1 - 2.77 1.71 1/Month Copper, Total mg/1 3.38 2.07 1/Month Lead, Total mg/1 - 0.69 0.43 !/Month Nickel, Total mg/1 - 3.98 2.38 1/Month Silver, Total mg/1 0.43 0.24 1/Month Zinc, Total mg/1 2.61 1.48 1/Month Cyanide, Total mg/1 - 1.20 0.65 1/6 Months Total Toxic Organics 'JI mg/1 2.13 - 1/6 Months

J) Samples collected to comply with the monitoring requirements specified above shall be collected at the locations described in Part I. B. of this permit. Unless otherwise specified, composite samples shall be time composite samples collected using automatic sampling equipment or a minimum of eight (8) equal volume grab samples collected over equal time intervals. All composite samples shall be collected for the total period of discharge not to exceed 24 hours. y Monthly average limits apply only when a parameter is monitored more than once in a month.

J! See Part IV.A. for Total Toxic Organics monitoring requirements.

Sample Type

Totalized Grab Composite Composite Composite Composite Composite Composite Composite Grab Grab

PART I Page 2

B. DISCHARGE AND MONITORING LOCATIONS

All wastewater discharged under this permit shall be discharged to the POTW at the location(s) described below and all monitoring and sampling required by this permit shall be performed at the location(s) described below.

Discharge: DSNOOI

Location of Monitoring Point: Concrete catchment sumplflume

Location of Discharge Point: Concrete catchment sump/flume

C. GENERAL PRETREATMENT STANDARDS AND PROHIBITIONS

I. The permittee shall not discharge or, in any manner, introduce into the publicly owned treatment works any pollutant(s) which, alone or in conjunction with a discharge or discharges from other sources, causes pass through or interference or in any other manner adversely impacts the operation or performance of the treatment works, to include the method of sludge disposal in use by the publicly owned treatment works.

2. The permittee shall not discharge or, in any manner, introduce any of the following pollutants into the publicly owned treatment works:

a Pollutants which may create a fire or explosive hazard, including, but not limited to, wastestreams with a closed cup flashpoint of less than 140 degrees Fahrenheit or 60 degrees Centigrade using the test methods specified in 40 CFR 261.21;

b. Pollutants which may cause corrosive structural damage to the treatment works, but in no case discharges with a pH lower than 5.0;

c. Solid or viscous pollutants in amounts which may cause obstruction to the flow in sewers, or other interference in the treatment works;

d. Any pollutant, including oxygen demanding pollutants (BOD, etc.) of such volume or strength as to cause interference in the treatment works;

e. Heat in amounts which may inhibit biological activity in the treatment plant resulting in interference but in no case in · such quantities that the temperature ofthe influent, at the treatment plant, exceeds 40 degrees centigrade or I 04 degrees Fahrenheit;

f. Pollutants which may result in the presence of toxic gases, vapors, or fumes within the treatment works in a quantity that may cause acute worker health and safety problems;

g. Unless specifically authorized by this permit, any pollutants not generated at the facility for which this permit was issued; or

h. Petroleum oil, biodegradable cutting oil, or products of mineral oil origin in amounts that will cause pass through or interference.

3. The permittee shall not discharge or introduce any pollutant into the POTW at any location other than at a discharge point described and authorized by this permit.

4. Groundwater

PART I Page 3

This pennit does not authorize any discharge to groundwater. Should a threat of groundwater contamination occur, the Director may require groundwater monitoring to properly assess the degree of the problem and the Director may require that the pennittee undertake measures to abate any such discharge and/or contamination.

5. Discharge of Wastewater Generated by Others

The discharge of wastewater, generated by any process, facility, or by any other means not undentre- operational control of the pennittee or not identified in the application for this pem1it or not identified specifically in the description of an outfall in this penni! is not authorized by this pennit.

D CATEGORICALPRETREATMENTSTANDARDS

I. Regardless of whether the requirements of a categorical pretreatment standard promulgated as a federal regulation by EPA are included in the requirements of this pennit, the pennittee shall attain compliance with the standard no later than three years after its promulgation or no later than the date required by the standard.

2. If a categorical pretreatment standard applicable to any part of the discharge authorized by this penn it has been or is in the future promulgated by EPA, the pennittee shall submit to the Department a baseline report within 180 days after the effective date of the categorical standard. The report shall be prepared and shall contain the information required by 40 CFR Section 403.12.

3. If a categorical pretreatment standard applicable to any part of the discharge authorized by this pennit has been or is in the future promulgated by EPA, the pennittee shall submit to the Department a compliance report within 90 days after the final compliance date of the categorical standard. The report shall be prepared in accordance with 40 CFR Section 403.12 and shall contain the infonnation required by this Act.

E. DISCHARGE MONITORING AND RECORD KEEPING REQUIREMENTS

I. Representative Sampling

Samples and measurements taken as required herein shall be representative of the volume and nature of the monitored discharge and shall be in accordance with the provisions of this pennit.

2. Test Procedures

Test procedures for the analysis of pollutants shall confonn to 40 CFR Part 136 and guidelines published pursuant to Section 304(h) of the FWPCA, 33 U.S.C. Section 1314(h). If more than one method for analysis of a substance is approved for use, a method having a detection limit lower than the penni! limit shall be used. If the detection limit of all methods is higher than the penni! limit the method having the lowest detection limit shall be used and a report of less than detection limit shall constitute compliance, however should EPA approve a method with a lower detection limit during the tenn of this pem1it the pennittee shall use the newly approved method.

When an EPA approved test procedure for analysis of a pollutant does not exist, the Director or his designee shall approve the procedure to be used.

3. Recording of Results

For each measurement or sample taken pursuant to the requirements of this permit, the pennittee shall record the following infonnation:

a. The facility name and location, point source number, date, time and exact place of sampling;

b. The name(s) of person(s) who obtained the samples or measurements;

c. The dates and times the analyses were performed;

d. The name(s) of the person(s) who perfonned the analyses;

..

e. The analytical techniques or methods used, including source of method and method number; and

f. The results of all required analyses.

Such records shall be maintained whether the permittee or his contractor performs the sampling and/or analyses.

4. Records Retention and Production

PART I Page 4

a. The permittee shall retain records of all monitoring information, including all calibration and maintenance records and all original strip chart recordings for continuous monitoring instrumentation, copies of all reports required by the permit, and records of all data used to complete the above reports and the application for this permit, for a period of at least three years from the date of the sample measurement, report or application. This period may be extended by request of the Director at any time. If litigation or other enforcement action, under the AWPCA and/or the FWPCA, is ongoing which involves any of the above records, the records shall be kept until the litigation is resolved. Upon the written request of the Director or his designee, the permittee shall provide the Director with a copy of any record required to be retained by this paragraph. Copies of these records should not be submitted unless requested.

b. All records required to be kept for a period of three years shall be kept at the permitted facility or an alternate location approved by the Department in writing and shall be available for inspection.

5. Reduction, Suspension, or Termination of Monitoring and/or Reporting

a. The Director may, with respect to any point source identified in Provision I. A. of this permit, authorize the permittee to reduce, suspend or terminate the monitoring and/or reporting required by this pem1it upon the submission of a written request for such reduction, suspension or termination by the pem1ittee, supported by sufficient data which demonstrates to the satisfaction of the D1rector that the discharge from such point source will continuously meet the discharge limitations specified in Provision I. A. of this permit.

b. It remains the responsibility of the permittee to comply with the monitoring and reporting requirements of this permit until \Witten authorization to reduce, suspend or terminate such monitoring and/or reporting JS received by the permittee from the Director.

6. Monitoring Equipment and Instrumentation

All equipment and instrumentation used to determine compliance with the requirements of this pem1it shall be installed, maintained, and calibrated in accordance with the manufacturer's instructions or, in the absence of manufacturer's instructions, in accordance with accepted practices. At a minimum, flow measurement devices shall be calibrated at least once every 12 months.

F. DISCHARGE REPORTING REQUIREMENTS

I. Reporting of Monitoring Requirements

a. The permittee shall conduct the required monitoring in accordance with the following schedule:

MONITORING REQUIRED MORE FREQUENTLY THAN MONTHLY AND MONTHLY shall be conducted during the first full month following the effective date of coverage under this permit and every month thereafter.

QUARTERLY MONITORING shall be conducted at least once during each calendar quarter. Calendar quarters are the periods of January through March, April through June, July through September, and October through December. The permittee shall conduct the quarterly monitoring during the first complete calendar quarter following the effective date of this pem1it and is then required to monitor once during each quarter thereafter. Quarterly monitoring may be done anyt1me during the quarter, unless restricted elsewhere in this permit, but it should be reported on the last DMR due for the quarter, i.e., (March, June, September and December DMR 's).

PART I Page 5

SEMIANNUAL MONITORING shall be conducted at least once during the period of January through June and at least once during the period of July through December. The permittee shall conduct the semiannual monitoring during the first complete calendar semiannual period following the effective date of this permit and is then required to monitor once during each semiannual period thereafter. Semiannual monitoring may be done anytime during the semiannual period, unless restricted elsewhere in this permit, but it should be reported on the last DMR for the month of the semiannual period, i.e. (June and December DMR's).

ANNUAL MONITORING shall be conducted at least once during the period of January through December. The permittee shall conduct the annual monitoring during the first complete calendar annual period following the effective date of this permit and is then required to monitor once during each annual period thereafter. Annual monitoring may be done anytime during the year, unless ·restricted elsewhere in this permit, but it should be reported on the December DMR.

b. The permittee shall submit discharge monitoring reports (DMRs) on the forms provided by the Department and in accordance with the following schedule:

REPORTS OF MORE FREQUENTLY THAN MONTHLY AND MONTHLY TESTING shall be submitted on a monthly basis. The first report is due on the 28th day of November 1999. The reports shall be submitted so that they are received by the Department no later than the 28th day of the month following the reporting period.

REPORTS OF QUARTERLY TESTING shall be submitted on a [quarterly J basis. The first report is due on the 28th day of [ J The reports shall be submitted so that they are received by the Department no later than the 28th day of the month following the reporting period.

REPORTS OF SEMIANNUAL TESTING shall be submitted on a [semiannual J basis. The reports are due on the 28th day of JANUARY and the 28th day of JULY. The reports shall be submitted so that they are received by the Department no later than the 28th day of the month following the reporting period.

REPORTS OF ANNUAL TESTING shall be submitted on an [ annual J basis. The first report is due on the 28th day of JANUARY . The reports shall be submitted so that they are received by the Department no later than the 28th day of the month following the reporting period.

c. The DMR must be legible and bear an original signature. Photo and electronic copies of the signature are not acceptable and shall not satisfy the reporting requirements of this permit. If the pem1ittee, using approved analytical methods as specified m Provision I. B. 2. monitors any discharge from a point source for a limited substance identified in Provision I. A. of this pc1mit more frequently than required by this permit, the results of such monitoring shall be included in the calculation and reporting of values on the DMR Form and the increased frequency shall be indicated on the DMR Fom1. In the event no discharge from a point source identified in Provision I. A of this permit and described more fully in the permittee's application occurs during a monitoring period, the permittee shall report "No Discharge" for such period on the appropriate DMR Form.

d. All reports and forms required to be submitted by this permit, the A WPCA and the Department's Rules, shall be signed by a "responsible official" of the permittee as defined in ADEM Administrative Code Rule 335-6-5-.14 or a "duly authorized representative" of such official as defined in ADEM Administrative Code Rule 335-6-5-.14 and shall bear the following certification:

"I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my mquiry of the person or persons who manage the system, or those persons directly responsible for gathering information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowmg violations."

e. All reports and fonns required to be submitted by this permit, the A WPCA and the Department's Rules, shall be addressed to:

Alabama Department of Environmental Management Industrial Section, Water Division

Post Office Box 301463 Montgomery, Alabama 36130

Page 6

2. Noncompliance Resampling and Notification

a. If for any reason, (I) the permittee's discharge causes interference or pass through at the POTW or (2) an unpermitted direct or indirect discharge of pollutants occurs as a result ofthe permittee's actions or from the permittee's property or facility the permittee shall orally report the occurrence and circumstances of such discharge to the Director within 24-hours after the permittee becomes aware of the occurrence of such discharge. In addition to the oral report, the permittee shall submit to the Director a written report as provided in c. below, no later than five (5) days after becoming aware of the occurrence of such discharge (unpermitted discharges properiy reported to the Department under any other requirement are not required to be reported under this provision).

b. If for any reason, the permittee's discharge does not comply with any limitation of this permit, the permittee shall submit to the Director a written report as provided in c. below, such report shall be submitted with the next Discharge Monitoring Report required to be submitted by Provision I. F. I. of this permit after becoming aware of the occurrence of such noncompliance.

c. Any written report required to be submitted to the Director by Provision I. F. shall be submitted using a copy of the Noncompliance Notification Form provided with this permit and shall include the following information:

(I) A description of the discharge and cause of noncompliance;

(2) The period of noncompliance, including exact dates and times or, if not corrected, the anticipated period of time that the noncompliance is expected to continue; and

(3) A description ofthe steps taken and/or being taken to reduce or eliminate the noncomplying discharge and to prevent its recurrence.

d. Within 30 days after becoming aware of the exceedance of a permit limit for any parameter, the permittee shall resample and test for this parameter and shall submit the results of the testing to the Department with the next discharge monitoring report submittal. If this pem1it requires the monitoring of the parameter more often then once every 30 days this requirement is satisfied and additional sampling is not required.

3. Hazardous Waste Discharge Notification

a. The pennittee shall notify the publicly owned treatment works, the Department, and the Director of the EPA Region IV Waste Management Division of any discharge under this permit of a substance which is a listed or characteristic waste under Section 300 I of RCRA.

b. The notification shall include a description of the hazardous wastc(s) discharged, specifying the volume and concentration of the waste(s) and the type of discharge (continuous, batch, or other), identifying the hazardous constituents contained in the listed waste(s) and estimating the volume of hazardous waste(s) expected to be discharged during the following twelve months. The notification shall be made within 30 days after the effective date of this permit or within 30 days of the first discharge of the hazardous waste(s).

c. The permittee shall be exempt from these reporting requirements during a calendar month in which no more than I 00 kilograms of a hazardous waste are discharged, unless the waste is an acute hazardous waste as specified in 40 CFR 261.5( e), (f), (g) and U). Discharge of more than I 00 kilograms of a hazardous waste in any given month requires a one-time notification. Subsequent months during which the industrial user discharges more than I 00 kilograms of a hazardous waste do not require addttional notification, except for an acute hazardous waste.

d. In the case of new regulations under Section 300 I of RCRA identifying additional characteristics of hazardous wastes or listing any additional hazardous waste, the permittee shall make notificatiOn as required in Provision I. F. 3. a. and b. of the discharge of such substance within 90 days of the effective date of such regulations.

PART I Page 7

e. In the case of any notification, the permittee shalf certify that it has a program in place to reduce the volume and toxicity of the wastes to the degree it has determined to be economically practicable and that it has selected the method of treatment, storage, or disposal currently available which minimizes the present and future threat to human health and the environment

4. Slug Discharges

The permittee shall notify the publicly owned treatment works and the Department of any slug type discharge that may cause pass through or interference with the treatment works. Such notification shall be made to the treatment works immediately after the permittee becomes aware of the event and to the Department during the first normal business day after becoming aware of the event The permittee shall coordinate with the operator of the treatment works and shall develop a notification procedure that is acceptable to the operator. The permittee may be required to establish a formal slug load control program if such is determined by the Director or his designee to be required to prevent pass through or interference.

G. OTHER REPORTING AND NOTIFICATION REQUIREMENTS

I. Submittals To Publicly Owned Treatment Works

The Department may require the permittee at any time to submit copies of any or all reports, notificatiOns, applications, or other documents, that are submitted by the permittee to the Department, to the POTW receiving the discharge(s) authorized by this permit Upon notification by the Department, the permittee shall submit copies of the required documents to the POTW no later than the required date of submittal to the Department.

2. Anticipated Noncompliance

The pem1ittee shall give the Director written advance notice of any planned changes or other circumstances regarding a facility which may result in noncompliance with permit requirements.

3. Termination of Discharge

The permittee shall notify the Director, in writing, when all discharges from any point source(s) identified in Provision L A. of this permit have permanently ceased. This notification shall serve as sufficient cause for instituting procedures for modification or termination of this permit.

4. Updating Information

a. The permittee shall inform the Director of any change in the pern1ittee's mailing address or telephone number or in the permittee's designation of a facility contact or office(s) having the authority and responsibility to prevent and abate violations of the A WPCA, the Department's Rules and the tem1s and conditions of this pem1it, in writmg, no later than ten (I 0) days after such change. Upon request of the Director or his designee, the pem1ittee shall furnish the Director with an update of any information provided in the permit application.

b. If the permittee becomes aware that it failed to submit any relevant facts in a pern1it application, or submitted incorrect information in a permit application or in any report to the Director, it shall promptly submit such facts or information with a written explanation for the mistake and/or omission.

5 Duty to Provide Information

The permittee shall furnish to the Director, within a reasonable time, any information which the Director or his designee may request to determine whether cause exists for modifying, suspending, or revoking this pem1it, in whole or in part, or to detem1ine compliance with this permit

6. Cooling Water and Boiler Water Additives

PART I Page 8

a. The permittee shall notify the Director in writing not later than sixty (60) days prior to instituting the use of any biocide corrosion inhibitor or chemical additive in a cooling or boiler system, not identified in the application for this permit, from which discharge is allowed by this permit. Notification is not required for additives that do not contain a heavy metal(s) as an active ingredient and that pass through a wastewater treatment systtm'l'-prior to discharge nor is notification required for additives that should not reasonably be expected to cause the cooling water o; boiler water to exhibit toxicity as detem1ined by analysis of manufacturer's data or testing by the permittee. Such notification shall include:

(I) name and general composition of biocide or chemical, (2) 96-hour median tolerance limit data for organisms representative of the biota of the waterway into which the discharge will ultimately reach, ( 3) quantities to be used, ( 4) frequencies of use, (5) proposed discharge concentrations, and (6) EPA registration number, if applicable.

b. The use of a b10cidc or additive containing tributyl tin, tributyl tin oxide, zinc, chromium or related compounds in a cooling or boiler system(s), from which a discharge regulated by this permit occurs, is pruhib1ted. Zinc and chromium may be used in special circumstances if the permit contains limits for these substances. The use of any additive, not identified in this permit or in the application for this permit or not exempted from notification under this permit is prohibited, prior to a determination by the Department that permit modification to control discharge of the additive is not required or prior to issuance of a permit modification controlling discharge of the additive.

H. SCHEDULE OF COMPLIANCE

I. The permittee shall achieve compliance with the discharge limitations specified in Provision !. A. in accordance with the following schedule:

COMPLIANCE SHALL BE ATTAINED ON THE EFFECTIVE DATE OF THIS PERMIT

2. No later than 14 calendar days following a date identified in the above schedule of compliance, the pcnnittec shall submit either a rcpo11 of progress or, in the case of specific actions being required by identified dates, a written notice of compliance or noncompliance. In the latter case, the notice shall include the cause of noncompliance, any remedial actions taken, and the probabil 1ty of meeting the next scheduled requirement.

PART II

A. OPERATIONAL AND MANAGEMENT REQUIREMENTS

I. Facilities Operation and Maintenance

PART II Page 9

The permittee shall at all times properly operate and maintain all facilities and systems of treatment and control (and related appurtenances) which are installed or used by the permittee to achieve compliance with the conditiOns of the permit. Proper operation and maintenance includes effective performance, adequate funding, adequate operator staffing and training, and adequate laboratory and process controls, including appropriate quality assurance procedures. This provision requires the operation of backup or auxiliary facilities only when necessary to achieve compliance with the conditions of the permit.

2. Best Management Practices

a. Except where expressly authorized to do so by an applicable categorical pretreatment standard, the permittee shall not increase the use of process water or, in any other way, attempt to dilute a discharge as a partial or complete substitute for adequate treatment to achieve compliance with a categorical pretreatment standard or any requirement of this permit.

b. The permittee shall prepare, implement, and maintain a Spill Prevention, Control and Countermeasures (SPCC) Plan in accordance with 40 CFR Part 112 if required thereby.

c. The permittee shall prepare, submit for approval and implement a Best Management Practices (BMP) Plan for containment of any or all process liquids or solids, in a manner such that these materials do not present a significant potential for discharge, if so required by the Director or his designee. When submitted and approved, the BMP Plan shall become a part of this permit and all requirements of the BMP Plan shall become requirements of this penni!.

3. Spill Prevention, Control and Management

The permittee shall provide spill prevention, control, and/or management sufficient to prevent any spills of stored pollutants from entering a water of the state or a publicly or privately owned treatment works. Any containment system used to implement this requirement shall be constructed of materials compatible with the substance(s) stored and which shall prevent the contamination of groundwater and such containment system shall be capable of retaming a volume equal to II 0 percent of the capacity of the largest tank for which containment is provided.

B OTHER RESPONSIBILITIES

I. Right of Entry and Inspection

The permittee shall allow the Director, or an authorized representative, upon the presentation of proper identification to:

a. enter upon the permittee's premises where a regulated facility or activity is located or conducted, or where records must be kept under the conditions of the permit;

b. have access to and copy, at reasonable times, any records that must be kept under the conditions of the permit;

c. inspect at reasonable times any facilities, equipment (including monitoring and control equipment), practices, or operations regulated or required under the pem11t; and

d. sample or monitor at reasonable times, for the purposes of assuring permit complmnce or as otherwise authorized by the A WPCA, any substances or parameters at any location.

2. Duty to Mitigate Adverse Impacts

PART II Page 10

The permittee shall promptly take all reasonable steps to mitigate and minimize any adverse impact to waters resulting from noncompliance with any discharge limitation specified in Provision I. A. of this permit, including such accelerated or additional monito;ing of the discharge, influent and effluent at the POTW, and/or the waterbody receiving the POTW discharge as necessary to determine the nature and impact of the noncomplying discharge.

C. BYPASS AND UPSET

I. Bypass

a. Any bypass is prohibited except as provided in b. and c. below:

b. A bypass is not prohibited if:

(I) It does not cause any discharge limitation specified in Provision 1., A. of this permit to be exceeded; and

(2) It is necessary for essential maintenance of a treatment or control facility or system to assure efficient operation of such facility or system.

c. A bypass is not prohibited and need not meet the discharge limitations specified in Provision 1., A. of this pem1it if:

(I) It is unavoidable to prevent loss of life, personal injury, or severe property damage;

(2) There are no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes, or maintenance during normal periods of equipment downtime; and

(3) The permittee submits a written request for authorization to bypass to the Director at least ten (I 0) days prior to the anticipated bypass (if possible), the permittee is granted such authorization, and the permittee complies with any conditions imposed by the Director to minimize any adverse impact to waters resulting from the bypass.

d. The permittee has the burden of establishing that each of the conditions of Provisions II. C. l b. or c. have been met to qualify for an exception to the general prohibition agamst bypassing contatned in ProvisiOn II. C. l a. and an exemption, where applicable, from the discharge limitations specified in Provision LA. of this permit.

2. Upset

a. A discharge which results from an upset need not meet the discharge limitations specified in Provision I. A., of this permit if:

(I) No later than 24-hours after becoming aware of the occurrence of the upset, the permittee orally reports the occurrence and circumstances of the upset to the Director or his designee; and

(2) No later than five (5) days after becoming aware of the occurrence of the upset, the permittee furnishes the Director with evidence, including properly signed, contemporaneous operating logs, or other relevant evidence, demonstrating that (i) an upset occurred; (ii) the pem1ittee can identify the specific cause(s) of the upset; (iii) the pem1ittee's facility was being properly operated at the time of the upset; and (iv) the permittee promptly took all reasonable steps to minimize any adverse impact to waters resulting from the upset.

b. The permittee has the burden of establishing that each of the conditions of Prov1sion II C. 2. a. of this permit have been met to qualify for an exemption from the discharge limitations specified in Provision I. A. of this permit

PART II

D. DUTY TO COMPLY WITH PERMIT, RULES, AND STATUTES

I . Duty to Comply

a. The permittee must comply with all conditions of the permit. Any permit noncompliance constitutes a violation of the A WPCA and the FWPCA and is grounds for enforcement action, for permit terminaticrrr;-Tevocation and reissuance, suspension, modification; or denial of a permit renewal application.

b. The necessity to halt or reduce production or other activities in order to maintain compliance with the conditions of the permit shall not be a defense for a permittee in an enforcement action.

c. The discharge of wastewater to the POTW from a source not specifically identified in the permit application for this permit and not specifically included in the description of an outfall in this permit is not authorized and shall constitute noncompliance with this permit.

d. The permittee shall take all reasonable steps, including cessation of production or other activities, to minimize or prevent any violation of the permit or to minimize or prevent any adverse impact of any permit violation.

2. Removed Substances

Solids, sludges, filter backwash, or any other pollutant or other waste removed in the course of treatment or control of wastewaters shall be disposed of in a manner that complies with all applicable Department Rules.

3. Loss or Failure of Treatment Facilities

Upon the loss or failure of any treatment facility, including but not limited to the loss or failure of the primary source of power of the treatment facility, the permittee shall, where necessary to maintain compliance with the discharge limitations specified in Provision I. A. of this permit, or any other terms or conditions of this permit, cease, reduce, or otherwise control production and/or all discharges until treatment is restored.

4. Compliance With Statutes and Rules

a. This permit has been issued under ADEM Administrative Code, Chapter 335-6-5. All provisions of this chapter, that are applicable to this permit, are hereby made a part of this permit. A copy of this chapter may be obtained for a small charge from the Office of General Counsel, Alabama Department of Environmental Management, 1751 Congressman Dickinson Drive, Montgomery, AL 36130.

b. This permit does not authorize the noncompliance with or violation of any Laws of the State of Alabama or the United States of America or any regulations or rules implementing such laws. FWPCA, 33 U.S.C. Section 1319, and Code of Alabama 1975, Section 22-22-14.

E. PERMIT TRANSFER, MODIFICATION, SUSPENSION, REVOCATION, AND REISSUANCE

I. Duty to Reapply or Notify of Intent to Cease Discharge

a. If the permittee intends to continue to discharge beyond the expiration date of this permit, the pem1ittee shall file a complete permit application for rcissuance of this permit at least 180 days prior to its expiration. If the pem1ittee docs not intend to continue discharge beyond the expiration of this permit, the permittee shall submit written notification of this intent which shall be signed by an individual meeting the signatory requirements for a permit application as set forth in ADEM Administrative Code Rule 335-6-5-.14.

b. Failure of the permittee to apply for reissuance at least 180 days prior to permit expiration will void the automatic continuation of the expiring permit provided by ADEM Administrative Code Rule 335-6-5-.11 and should the pem1it not be reissued for any reason any discharge after expiration of this permit will be an unpermitted discharge.

2. Change in Discharge

PART II Page 12

The pennittee shall apply for a penni! modification at least 180 days in advance of any facility expansion, production increase, process change, or other action that could result in the discharge of additional pollutants or increase the quantity of a discharged p6llutant such that existing pennit limitations would be exceeded or that could result in an additional discharge point. This requirement applies to pollutants that are or that are not subject to discharge limitations in thi~it. No new or increased discharge may begin until the Director has authorized it by issuance of a penn it modification or a reissued penn it.

3. Transfer of Penn it

This pennit may not be transferred or the name of the pennittee changed without notice to the Director and subsequent modification or revocation and reissuance of the penni!. In the case of a change in name, ownership or control of the pennittee's premises only, a request for pennit modification in a fonnat acceptable to the Director is required at least 30 days prior to the change. In the case of a change in name, ownership or control of the pennittee's premises accompanied by a change or proposed change in effluent characteristics, a complete penni! application is required to be submitted to the Director at least 180 days prior to the change. Whenever the Director is notified of a change in name, ownership or control, he may decide not to modify the existing permit and require the submission of a new penn it application.

4. Pennit Modification and Revocation

a. This penni! may be modified or revoked and reissued, in whole or in part, during its term for cause, including but not limited to, the following:

( 1) 1f cause for termination under Provision ll EA.a.( I) of this permit exists, the Director may choose to revoke and reissue this permit instead of terminating the pem1it;

(2) 1f a request to transfer this permit has been received, the Director may decide to revoke and reissue or to modify the permit; or

(3) If modification or revocation and reissuance is requested by the permittee, the Director may grant the request.

b. This pem1it may be modified during its term for cause, including but not limited to, the following·

( 1) If cause for termination under Provision ll E. 5. of this permit exists, the Director may choose to modify this permit instead ofterminatmg this permit;

(2) There are material and substantial alterations or additions to the facility or activity generatmg wastewater which occurred after permit issuance which justify the application of permit conditions that are different or absent in the existing permit;

(3) The Director has received new information that was not available at the time of permit issuance and that would have justified the application of different penn it conditions at the time of 1ssuance;

(4) A new or revised categorical pretreatment standard applicable to the discharge(s) authorized by this permit is promulgated;

(5) Errors in calculation of discharge limitations or typographical or clerical errors were made;

(6) When the standards or regulations on which the permit was based have been changed by promulgation of amended standards or regulations or by judicial decision after the permit was issued;

PART Ill Page 13

(7) To the extent allowed by ADEM Administrative Code, Rule 335-6-5-.18, permits may be modified to change compliance schedules;

(8) When required by the reopener conditions in this permit;

(9) When required to correct technical mistakes, such as errors in calculation, or mistaken interpretations of law made in determining permit conditions;

(I 0) When requested by the permittee and when the Director determines that the modification will not result in a violation of federal or state law, regulations or rules; or

(I I ) When more stringent or additional permit requirements are required to prevent pass through or interference.

5. This permit may be terminated during its term for cause, including but not limited to, the following:

a. Violation of any term or condition of this permit;

b. The permittee's misrepresentation or failure to disclose fully all relevant facts in the permit application or during the permit issuance process or the permittee's misrepresentation of any relevant facts at any time;

c. Materially false or inaccurate statements or information in the permit application or the permit;

d. A change in any condition that requires either a temporary or permanent reduction or elimination of the permitted discharge;

e. The permittee's discharge causes pass through or interference or threatens human health or welfare or the maintenance of water quality standards;

f. Permanent closure of the facility generating the wastewater permitted to be discharged by this permit or permanent cessation of wastewater discharge;

g. The Director determines that the permittee cannot comply with new or revised requirements of any applicable standard or limitation; or

h. Any other cause allowed by the ADEM Administrative Code, Chapter 335-6-5.

6. This permit may be suspended during its term for cause, including but not I imited to, the reasons for termination listed in Provision I E. 5. of this pem1it.

7. The filing of a request by the permittee for modification, suspension or revocation of this pem1it, in whole or in part, does not stay any permit term or condition.

PART Ill

A CIVIL AND CRIMINAL LIABILITY

I. Tampering

Any person who falsifies, tampers with, or knowingly renders inaccurate any monitoring device or method required to be maintained or performed under the permit shall, upon conviction, be subject to penalties as provided by the A WPCA.

2. False Statements

Any person who knowingly makes any false statement, representation, or certification in any record or other document submitted or required to be maintained under this permit, including monitoring reports or reports of compliance or noncompliance shall, upon conviction, be subject to penalties as provided by the A WPCA.

Page 14

3. Permit Enforcement

a. This permit is a permit for the purpose of the A WPCA and the FWPCA and as such any terms, conditions, or limitations of this permit are enforceable under state and federal law. The necessity to halt or reduce production or other activities in order to comply with this permit shall not be a defense for the permittee in an enforcement action.

b. Any person required to have a SID permit pursuant to ADEM Administrative Code Chapter 335-6-5 and who discharges pollutants without said permit, who violates the conditions of said permit, \VI'IO-discharges pollutants in a manner not authorized by the permit, or who violates applicable orders of the Department or any applicable rule or standard of the Department, is subject to any one or combination of the following enforcement actions under applicable statutes.

(I) An administrative order requiring abatement, compliance, mitigation, cessation, clean-up, and/or penalties;

(2) An action for damages;

(3) An action for injunctive relief; or

(4) An action for penalties.

4. Relief From Liability

Except as provided in Provision II. C. I. (Bypass) and Provision II. C. 2. (Upset), nothing in this permit shall be construed to relieve the permittee of civil or criminal liability under the A WPCA or FWPCA for noncompliance with any term or condition of this permit.

B. OIL AND HAZARDOUS SUBSTANCE LIABILITY

Nothing in this permit shall be construed to preclude the institution of any legal action or relieve the permittee from any responsibilities, liabilities or penalties to which the pennittee is or may be subject under Section 311 of the FWPCA, 33 U.S. C. Section 1321.

C. PROPERTY AND OTHER RIGHTS

This permit does not convey any property rights in either real or personal property, or any exclusive privileges, nor does it authorize any injury to persons or property or invasion or other pnvate rights, or any infringement of federal, state, or local laws or regulations, nor docs it authorize or approve the constructiOn of any physical structures or facilities or the undertaking of any work in any waters of the state or of the United States.

D. AVAILABILITY OF REPORTS

Except for data determined to be confidential under Code of Alabama 1975, Section 22-22-9(c), all reports prepared in accordance with the terms of this permit shall be available for public inspection at the offices of the Department. Effiuent data shall not be considered confidential.

E. EXPIRATION OF PERMITS FOR NEW OR INCREASED DISCHARGES

I. If this permit was issued for a new discharger or new source, this permit shall expire eighteen months after the issuance date if construction of the facility has not begun during the eighteen-month period.

2. lfth1s pem1it was issued or modified to allow the discharge of increased quantities of pollutants to accommodate the modification of an existing facility and if construction of this modification has not begun during the eighteen month period after issuance of th1s permit or pem1it modification, this permit shall be modified to reduce the quantities of pollutants allowed to be discharged to those levels that would have been allowed if the modification of the facility had not been planned.

3. Construction has begun when the owner or operator has:

a. begun, or caused to begin as part of a continuous on-site construction program:

. ' "·

(I) any placement, assembly, or installation of facilities or equipment; or

PART Ill Page 15

(2) significant site preparation work including clearing, excavation, or removal of existing buildings, structures, or facilities which is necessary for the placement, assembly, or installation of new source facilities or equipment; or

b. entered into a binding contractual obligation for the purpose of placement, assembly, -orinstallation of facilities or equipment which are intended to be used in its operation within a reasonable time. Options to purchase or contracts which can be terminated or modified without substantial loss, and contracts for feasibility, engineering, and design studies do not constitute a contractual obligation under the paragraph. The entering into a lease with the State of Alabama for exploration and production of hydrocarbons shall also be considered beginning construction.

F. DEFINITIONS

I. Average monthly discharge limitation - means the highest allowable average of "daily discharges" over a calendar month, calculated as the sum of all "daily discharges" measured during a calendar month divided by the number of "daily discharges" measured during that month (zero discharge days shall not be included in the number of "daily discharges" measured and a less than detectable test result shall be treated as a concentration of zero if the most sensitive EPA approved method was used).

2. Average weekly discharge limitation- means the highest allowable average of "daily discharges" over a calendar week, calculated as the sum of all "daily discharges" measured during a calendar week divided by the number of "daily discharges" measured during that week (zero discharge days shall not be included in the number of "daily discharges" measured and a less than detectable test result shall be treated as a concentration of zero if the most sensitive EPA approved method was used).

3. A WPCA- means the Alabama Water Pollution Control Act.

4. Bypass- means the intentional diversion of waste streams from any portion of a treatment facility.

5. Categoncal pretreatment standard - means any regulation containing pollutant discharge limits promulgated by the EPA in accordance with Section 307(b) and (c) of the FWPCA, which applies to industrial users.

6. Daily discharge - means the discharge of a pollutant measured during any consecutive 24-hour period in accordance with the sample type and analytical methodology specified by the discharge permit.

7. Daily maximum- means the highest value of any individual sample result obtained during a day.

8. Daily mmimum- means the lowest value of any individual sample result obtained dunng a day.

9. Day- means any consecutive 24-hour period.

I 0. Department- means the Alabama Department of Environmental Management.

II. Director'- means the Director of the Department.

12. Discharge - means the introduction of any sewage, industrial waste, pollutant, or other waste into a publicly owned treatment works.

13. Discharge monitoring report (DMR)- means the form approved by the Director to accomplish the reporting requirements of a SID permit.

14. EPA- means the United States Environmental Protection Agency.

15. FWPCA- means the Federal Water Pollution Control Act.

16. Indirect discharger or industrial user- means a nondomestic discharger who discharges pollutants to a publicly owned treatment works.

-~------- .. ·---------

. .; PART Ill Page 16

17. Permit application - means forms and additional infom1ation that is required by ADEM Administrative Code Rule 335-6-5-.13 and applicable permit fees.

18. Point source- means "any discernible, confined and discrete conveyance, including but not limited to any pipe, channel, ditch, tunnel, conduit, well, discrete fissure, container, rolling stock, concentrated animal feeding operation, or vessel or other floating craft, ... from which pollutants are or may be discharged." Section 502(14) ofthe FWPCA, 33 U.S.C. Section 1362(14).

19. Pollutant- includes for purposes of this permit, but is not limited to, those pollutants specified in Code of Alabama 1975, Section 22-22-1 (b)(3) and those effluent characteristics specified in Provision I. A. of this pem1it.

20. Publicly owned treatment works (POTW)- means a treatment works as defined by Section 212 of the FWPCA, which is owned by the state, a municipality, a regional entity composed of two or more municipalities, or another entity created by state or local authority for the purpose of collecting and treating municipal wastewater. This definition does not include pipes, sewers or other conveyances not connected to a facility providing treatment. The term also means the municipality as defined in Section 502(4) of the FWPCA, which has jurisdiction over the "indirect discharges" to and the discharges from such a treatment works.

21. RCRA- means the Federal Resource Conservation and Recovery Act.

22. Severe property damage- means substantial physical damage to property, damage to the treatment facilities which causes them to become inoperable, or substantial and permanent loss of natural resources which can reasonably be expected to occur in the absence of a bypass. Severe property damage docs not mean economic loss caused by delays m production.

23. State indirect discharge permit or SID permit- means a permit issued to an industrial user.

24. Upset - means an exceptional incident in which there is an unintentional and temporary noncompliance with technology-based permit discharge limitations because of factors beyond the reasonable control of the permittee. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment facilities, inadequate facilities, lack of preventive maintenance, or careless or improper operation.

25 Waters- means "[a]ll waters of any river, stream, watercourse, pond, lake, coastal, ground or surface water, wholly or partially within the State, natural or artificial. This does not include waters which are entirely confined and retained completely upon the property of a single individual, partnership or corporation unless such waters are used in interstate commerce." Code of Alabama 1975, Section 22-22-l(b)(2) Waters "include all navigable waters" as defined in Section 502(7) of the FWPCA, 22 U.S.C. Section 1362(7), which arc within the State of Alabama

26. Week -means the period beginning at twelve midnight Saturday and ending at twelve midnight the following Saturday.

G. SEVERABILITY

The provisions of this permit arc severable, and if any provision of this pem1it or the application of any provision of this permit to any circumstance is held invalid. the application of such provision to other circumstances, and the remainder of this permit, shall not be affected thereby.

PART IV

A TOTAL TOXIC ORGANICS REQUIREMENTS

Total Toxic Organics (TTO) shall be defined as found in 40 CFR 433.ll(e). TTO monitoring shall be necessary only for those compounds which arc possibly present as a result of screening analyses, and/or a detailed review of sources ofTTO used in the facility.

In lieu of the monitoring requirements for TTO, the permittee may submit for Departmental review a toxic organics management plan which identifies toxic organic compounds used, the method of disposal used instead of discharge (such as reclamation, contract hauling or incineration) and procedures for ensuring that toxic organics do not routinely spill or leak into the wastewater. The plan and initial TTO analysis shall be reviewed by ADEM, and if the plan is approved, the plan and any ADEM comments shall become a requirement of this permit. If design or construction is needed for the plan, all plans and specification shall be submitted to the ADEM in accordance with ADEM Admin. Code 335-6-3. Should toxic organic pollutant levels be sufficiently low, and the toxic organic management plan is approved by ADEM, ADEM may waive further monitoring requirements provided all monitoring reports submitted thereafter include the following certification:

"Based 011 my i11quiry of the person or perso11s directly respo11sible for ma11agi11g compliance with the permit limitations for total toxic organics (TTO), I certijj• that, to the best of my knowledge and belief, no discharge of toxic organics in concelltrations above those established by this permit, or other laws or ordinances, has occurred since filing of the last discharge monitoring report. I further certify that this facility is implementing the solvent management plan submitted to the permitting (or control) authority."

PART IV Page 17

Should in-plant conditions change such that the toxic organic management plan is no longer valid (i.e., spill containment is modified, toxic organic compounds used are changed, etc.), a modified plan and implementation schedule shall be submitted 90 days prior to such change and must be approved by ADEM to again discontinue 'ITO monitoring. In any event, the toxic organic management plan shall be reviewed and updated at least yearly after approval by ADEM, to assure that the plan is still valid and meets the intent of this permit. Such review and update shall include, but not be limited to, a review of toxic organics used, containment provisions for each, and a physical examination of all components of the containment or management system used. Records of this yearly revi~hall be maintained by the permittee for a minimum of three years.

Discharge of 'ITO to any waste stream limited by this permit shall in no case be intentional, unless the waste treatment system is designed to remove ITO, and such discharge has been specifically approved by the ADEM Water Division.

DILUTION PROHIBITION

The permittee shall not increase the volume of process water for the purpose of dilution as a partial or total substitute for adequate treatment to achieve compliance with any limitation in this pem1it.

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - INDUSTRIAL SECTION NONCOMPLIANCE NOTIFICATION FORM

PERMITTEE NAME:

PERMIT NUMBER:

FACILITY LOCATION

DMR REPORTING PERIOD

I. DESCRIPTION OF DISCHARGE:

NONCOMPLIANCE PARAMETER(S ):

CAUSE OF NONCOMPLIANCE: (Attach additional pages if necessary)

2. PERIOD OF NONCOMPLIANCE: (Include exact date(s) and time(s) or, if not corrected, the anticipated time the noncompliance is expected to continue):

3. DESCRIPTION OF STEPS TAKEN AND/OR BEING TAKEN TO REDUCE OR ELIMINATE THE NONCOMPLYING DISCHARGE AND TO PREVENT ITS RECURRENCE (attach additional pages if necessary):

NAME AND TITLE OF RESPONSIBLE OFFICIAL (type or print)

SIGNATURE OF RESPONSIBLE OFFICIAL DATE SIGNED

[116]

MONTHLY DMR COMPANY: TRU-LINE MANUFACTURING, INC.

DSN001 PARAM Flow pH Cd, T MIN - 5.0 -MAX Monitor 10.5 0.69 MO.AVG Monitor - 0.26 FREQ Daily Daily 1/month UNITS MGD s.u. mg/1

1 I 2 I 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

MAX AO.AVG oennv unaer penaltY or 1aw tna tniS aocument ana au anacnmen

ADEM DISCHARGE MONITORING REPORT LOCATION: 3510 CENTRAL AVENUE, SW

DECATUR. ALABAMA Cr, T Cu, T Pb, T Ni, T Ag, T

- - - - -2.77 3.38 0.69 3.98 0.43 1.71 2.07 0.43 2.38 0.24

1/month 1/month 1/month 1/month 1/month mg/1 mg/1 mg/1 mg/1 mg/1

s were preparea unaer mv 01rect1on or superv1s1on 1n accordance w1th a svstem

MONTH '19 --------SID NO. IU 08 52 00228

Zn, T Cn, T no - - -

2.61 1.20 2.13 1.48 0.65 -

1/month 1/6 months 1/6 months mg/1 mg/1 mg/1

.

'

'

I

I

I i

des1aned to assure that aualifled Personnel roperty gather and evaluate the information submitted. Based on my inquiry of the persons or persons who manage the system. or those persons directly responsible for gathering the information, li information submitted is, to the best of my knowledge and belief, true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of te ilnd imprisonment for knowing violations.

_;;'.::,~;re of Responsible Official Date ADEM 8/95

t f" ~~

~ ~

f .~.:. f.~

t ~ }:,

t

:1\ .. .,

~

• ' t'l . ~· ')

...

James W. Warr, Director

Mailing Address: PO BOX 301463 MONTGOMERY Al 36130-1463

Physical Address: 1751 Cong. W.l. Dickinson Drive Montgomery, Al 36109-2608

(205)271-7700 FAX 270-5612

Field Offices:

110 Vulcan Road Birmingham, Al 35209-4702 (205) 942-6168 FAX 941 -1603

400 Well Street P.O. Box 953 Decatur, Al 35602-0953 (205) 353-1713 FAX 340-9359

2204 Perimeter Road Mobile,Al . 36615-1131 (205) 450-3400 FAX 479-2593

August 26, 1994

Mr. George Strohm President Tru-Line Manufacturing, Inc. 3510 Central Avenue, SW Decatur,AJL 35603

Dear Mr. Strohm:

RE: Final SID Permit Number IU 08 52 00228

·-

Attached is the issued copy of the above referenced Permit.

Jim folsom Governor

We will look forward to receiving monitoring data in accordance with the conditions of your Permit. Please see Part l.F., pages 4 and 5 for your reporting requirements. When submitting Discharge Monitoring Reports, do not submit lab worksheets, logs, reports or other paperwork, not specifically required by the permit unless requested to do so by ADEM staff.

If there· are questions or comments in reference to the permit or related monitoring requirements, please contact Tom Cleveland at 205/271-7850 of this offij.

~i el _ _, . /~

John A. Pool Chief Industrial Branch Water Division

JAPfi'Cibt

Enclosure: Final Permit

cc: City of Decatur w/enc: Final Permit

cc: Birmingham Field Office

cc: Marilyn Elliott, Permits & Services

- r0i Pnnted on Recycktd Paper \':).'

PERMIITEE:

FACILITY LOCATION:

PERMIT NUMBER:

POTW LOCATION:

SOURCE Of DISCHARCE:

Truline Manufacturing

Decatur, Alabama

IU 08 52 00228

Dry Creek POTW- Decatur

Industrial wastes rf'sulting from metal finishing operations.

In accon{arra witli and su~iert lo tfrr l'ro;•i.<icm..r of 5f{a6ama •Watrr 'l'o((ution Corttro( 51ct, a..r amend£tf, Cotk of~ 1975, §§ 22·22 I to 22 ·22-14 {tfrc :'1'11'1'(.'1 '), tfre 51{a6ama 'Eirrtironmcntaf Management Jtct, as amender£, Coae of Jt(@amo 1975, §§22 ·22.'1 ·1 to 22 ·22,'1 · 15·, aruf rrdt'.< tllttf regulations adopted tliaeun.tfer, and su6ject furtlier to tfie tfiscfiargr. {imitations, mo~ritm'ill!J rcqrlirrmt'lll.< mrd t•Lfrt'r tmn.< mrd r.onditicm.< .<rt fortfr in tfiis permit, tlie Permittee i..r fierc6y autlioriutf to lisdiargc indi~.<tria{ uraste.< from tfrr a6ouc -dcscri6etf wurr.e to waters of tfre State tlirougli tlie a6or1e-narned pu6fic~1 oumetf trratrnent uw(< {''.1'CYJ1W').

ISSUANCE DATE: August 24, 1994

EFFECTIVE DATE: October 1, 1994

EXPIRATION DATE: September 30, 1999

PART I

PARTIJ

PARTID

PART IV

SID PERMIT

TABLE OF CONTENTS

DISCHARGE LIMITATIONS, CONDIDONS, AND REQUIREMENTS

A.

B.

c.

D.

E.

F.

G.

H.

Discharge Limitations and Monitoring Requirements

Discharge and Monitoring Locations

General Pretreatment Standards and Prohibitions

Categorical Pretreatment Standards

Discharge Monitorin~ and Record Keeping Requirements I. Representative Sampling 2. Test Procedures 3. Recording of Results 4. Records Retention and Production 5. Reduction, Suspension, or Termination of Monitoring and/or Reporting 6. Monitoring Equipment and Instrumentation

Discharge Reporting Requirements I. Reporting of Monitoring Results 2. Noncompliance Resampling and Notification 3. Hazardous Waste Discharge Notification 4. Slug Discharge

Other Reportin~ and Notification Requirements I. Submittals To Publicly Owned Treatment Works 2. Anticipated Noncompliance 3. Termination of Discharge .. . Updating Information 5. Cooling Water and Boiler Water Additives 6. Duty to Provide Information

Schedule of Compliance

011IER REQUIREMENTS, RESPONSIBILITIES, AND DUITES

A. Operational and Management Requirement~ l. Facilities Operation and Maintenance 2. Best Management Practices 3. Spill Prevention, Control, and Management

B. Other Responsibilities i Right of Entry and Inspection ?. Duty to Mitigate Adverse Impact

C. Bypass and Upset l. Bypass 2. Upset

IJ. Duty To Comply With Permit, Rules, and Statutes I. Duty to Comply 2. Removed Substances 3. Loss or Failure of Treatment Facilities 4. Compliance With Statutes and Rules

E. Permit Transfer, Modification, Suspension, Revocation, and Rcissuancc I. Duty to Reapply or Notify of Intent to Cease Discharge 2. Change in Discharge 3. Transfer of Permit 4. Permit Modification and Revocation 5. Permit Termination 6. Permit Suspension 7. Request For Permit Action Does Not stay Any Permit Requirement

OTHER PERMIT CONDIDONS

A. Civil and Criminal Liability I. Tampering 2. False Statements 3. Permit Enforcement 4. Relief From Liability

B. Oil and Hazardous Substance Liability

C. Property and Other Rights

D. Availability of Reports

E. Expiration of Permits For New or Increased Discharges

F. Definitions

G. Severability

ADDITIONAL REQUIREMENTS, CONDIDONS, AND LIMIT A 110NS

A. Total Toxic Organics

;1 '

I i il

Truline Mfg. (IU 08 52 00228) PART I Page I

PART I A. DISCHARGE LIMITATIONS AND MONITORING REQUIREMENTS

. '

During the period beginning the effective date of this permit and lasting through the expiration date of this permit, the permittee is authorized to introduce industrial wastes into the POTW from the following outfall(s):

DSNOOI: Process wastewater from metal finishing operatioil'>.

Such discharge shall be limited and monitored by the permittee as specified below:

EFFLUENT CHARACTERISTIC UNITS DISCHARGE LIMITATIONS MONITORING REQUIREMENTS 1/

Flow pH Cadmium, Total Chromium, Total Copper, Total Lead, Total Nickel, Total Silver. Total Zinc, Total Cyanide, Total , . Total Toxic Organics~;

MGD s.u. mg/1 mg/l mg/1 mg/1 mg/l mg!l mg;l mg/1 mv;1

""

Daily Minimum Daily Maximum

Monitor 5.0 10.5

0.69 2.77 3.31\ 0.69 3.98 0.43 2.61 \.20 2.13

Monthly Average~/ Measurement Frequency

Monitor Dailv Daily

0.26 !!Month 1.71 !!Month 2.07 !/Month 0.43 !!Month 2.38 !/Month 0.24 !/Month l.4l\ !/Month 0.65 l/6 Months

116 Months

l! Samples collected to comply with the monitoring requirements specified above shall be collected at the locations described in Part l.B. of this permit. Unless otherwise specified, composite samples shall be time composite samples collected using automatic sampling equipment or a minimum of eight (l\) equal volume grab samples collected over equal time intervals. All composite samples shall be collected for the total period of discharge not to exceed 24 hours. ]i Monthly average limits apply only when a parameter is monitored mere th<m once in a month. J/ See Part IV.A. for Total Toxic Organics monitoring requirements.

Sample Type

Totalized Grab Composite Composite Composite Composite Composite Composite Composite Grab Grab

PART I Page 2

B. DISCHARGE AND MONITORING U)CA TIONS

All wastewater discharged under this pennit shall be discharged to the POTW at the location(s) described below and all monitoring and sampling required by this permit shall be performed at the location(s) described below.

Discharge: DSNOOl

Location of Monitoring Point: Zinc Phosphate process discharge line at the l" parshall flume. Located at the southeast comer of the building.

Location of Discharge Point: Manhole located at the southeast corner of property.

C. GENERAL PRETREATMENT STANDARDS AND PROHIBffiONS 1. The permittee shall not discharge or, in any manner, introduce into the publicly owned treatment works any pollutant(s) which, alone or in conjunction with a discharge or discharges from other sources, causes pass through or interference or in any other manner adversely impacts the operation or performance of the treatment works, to include the method of sludge disposal in use by the publicly owned treatment works.

Tht permittee shall not discharge or, in any manner, introduce any of the following pollutants into the publicly owned treatment works:

a. Pollutants which may create a fire or explosive hazard, including, but not limited to, wastestreams with a closed cup flashpoint of less than 140 degrees Fahrenheit or 60 degrees Centigrade using the test methods specified in 40 CFR 261.21;

b. Pollutants which may cause corrosive structural damage to the treatment works, but in no case discharges with a pH lower than 5.0;

c. Solid or viscous pollutants in amounts which may cause obstruction to the flow in sewers, or other interference in the treatment works;

d. Any pollutant, including oxygen demanding pollutants (BOD, etc.) of such volume or strength as to cause interference in the treatment works;

e. Heat in amounts which may inhibit biological activity in the treatment plant resulting in interference but in no case in such quantities that the temperature of the influent, at the treatment plant, exceeds 40 degrees centigrade or 104 degrees Fahrenheit;

f. Pollutants which may result in the presence of toxic gases, vapors, or fumes within the treatment works in a quantity that may cause acute worker health and safety problems;

g. Unless specifically authorized by this permit, any pollutants not generated at the facility for which this pennit was issued; or

h. Petroleum oil, biodegradable cutting oil, or products of mineral oil origin in amounts that will cause pass through or interference.

3. The permittee shall not discharge or introduce any pollutant into the POTW at any location other than at a discharge point described and authorized by this pennit.

4. Groundwater

PAKT I Page 3

This permit does not authorize any discharge to groundwater. Should a threat of groundwater contamination occur, the Director may reguire groundwater monitoring to properly assess the degree of the problem and the Director may reqmre that the permittee undertake measures to abate any such discharge and/or contan1ination.

5. Discharge of Wastewater Generated by Others

The discharge of wastewater, generated by any process, facility, or by any other means not under the operational control of the permittee or not identified in the application for this pem1it or not identified specifically in the description of an outfall in this permit is not authorized by this pennit. D. CA'IEGORICAL PRHTRHATMBNf STANDARDS

1. Regardless of whether the requirements of a categorical pretreatment standard promulgated as a federal regulation by EPA are mcluded in the requirements of this permit, the permittee shall attain compliance with the standard no later than three years after its promulgation or no later than the date required by the standard.

2. If a categorical pretreatment standard applicable to any part of the discharge authorized by this permit has been or is in the future promulgated by EPA, the permittee shall submit to the Department a baseline report within 180 days after the effective date of the categorical standard. The report shall be prepared and shall contain the information required by 40 CFR Section 403.12. 3. If a categorical pretreatment standard applicable to any part of the discharge authorized by this permit has been or is in the future promulgated by EPA, the permittee shall submit to the Department a compliance report within 90 days after the final compliance date of the categorical standard. The report shall be prepared in accordance with 40 CFR Section 403.12 and shall contain the information required by this Act.

E. DISCHARGE MONITORING AND RECORD .KHHPJNG REQUIREMENTS

1. Representative Sampling

Samples and measurements taken as required herein shall be representative of the volume and nature of the monitored discharge and shall be in accordance with the provisions of this permit. 2. Test Procedures

Test procedures for the analysis of pollutants shall conform to 40 CFR Part 136 and guidelines published pursuant to Section 304(h) of the FWPCA, 33 U.S.C. Section 1314(h). If more than one method for analysis of a substance is approved for use, a method having a detection limit lower than the pem1it limit shall be used. If the detection limit of all methods is higher than the permit limit the method having the lowest detection limit shall be used and a report of less than detection limit shall constitute compliance, however should EPA approve a method with a lower detection limit during the term of this permit the permittee shall use the newly approved method. When an EPA approved test procedure for analysis of a pollutant does not exist, the Director or his designee shall approve the procedure to be used.

3. Recording of Results

For each measurement or sample taken pursuant to the requirements of this permit, the pem1ittee shall record the following information:

a. The facility name and location, point source number, date, time and exact place of sampling; b. The nan1e(s) of person(s) who obtained the samples or measurements;

c. The dates and times the analyses were perfom1ed;

d. The name(s) of the person(s) who performed the analyses;

C.l'UU. 1

Page 4

e. The analytical techniques or methods used, including source of method and method number; and

f. The results of all required analyses.

Such records shall be maintained whether the permittee or his contractor performs the sampling and/or analyses.

4. Records Retention and Production

a. The permittee shall retain records of all monitoring infonnation, including all calibration and maintenance records and all original strip chart recordings for continuous monitoring instrumentation, copies of all reports required by the pennit, and records of all data used to complete the above reports and the application for this permit, for a period of at least three years from the date of the sample measurement, report or application. This period may be extended by request of the Director at any time. If litigation or other enforcement action, under the A WPCA and/or the FWPCA, is ongoing which involves any of the above records, the records shall be kept until the litigation is resolved. Upon the written request of the Director or his designee, the pennittee shall provide the Director with a copy of any record required to be retained by this paragraph. Copies of these records should not be submitted unless requested.

b. All records required to be kept for a period of three years shall be kept at the pennitted facility or an alternate location approved by the Department in writing and shall be available for inspection.

5. Reduction, Suspension, or Termination of Monitoring and/or Reporting

a. The Director may, with respect to any point source identified in Provision I. A. of this permit, authorize the pennittee to reduce, suspend or tenninate the monitoring and/or reporting required by this pennit upon the submission of a written request for such reduction, suspension or tennination by the pennittee, supported by sufficient data which demonstrates to the satisfaction of the Director that the discharge from such point source will continuously meet the discharge limitations specified in Provision I. A. of this pennit. b. It remains the responsibility of the pennittee to comply with the monitoring and reporting requirements of this permit until written authorization to reduce, suspend or tenninate such monitoring and/or reporting is received by the pennittee from the Director.

6. Monitoring Equipment and Instrumentation

All equipment and instrumentation used to detennine compliance with the requirements of this pennit shall be installed, maintained, and calibrated in accordance with the manufacturer's instructions or, in the absence of manufacturer's instructions, in accordance with accepted practices. At a minimum, flow measurement devices shall be calibrated at least once every 12 months.

F. DISCHARGE REPORTING .REQUIREMENTS

I. Reporting of Monitoring Requirements

a. The pennittee shall conduct the required monitoring m accordance with the following schedule:

MONITORING REQUIRED MORE FREQUENTI..Y THAN MONTHLY AND MONTIIL Y shall be conducted during the first full month following the effective date of coverage under this permit and every month thereafter.

QUAR'IERLY MONITORING shall be conducted at least once during each calendar quarter. Calendar quarters are the periods of January through March, April through June, July through September, and October through December. The permittee shall conduct the quarterly monitoring during the first complete calendar quarter following the effective date of this permit and is then required to monitor once during each quarter thereafter.

PART I Page 5

SEMIANNUAL MONITORING shall be conducted at least once during the period of Janual)' through June and at least once dun~g the penod of July through December. The pennittee shall c~mduct the sel!llannual momtonng dunng the first co~plete calendar semiannual period followmg the effective date of thts penrut and ts then reqUired to morutor once during each semiannual period thereafter.

ANNUAL MONITORING shall be conducted at least once during the period of Janual)' through December. The permittee shall conduct the annual monitoring during the first complete calendar annual period following the effective date of this pennit and is then required to monitor once during each annual period thereafter.

b. The pennittee shall submit discharge monitoring reports (DMRs) on the fonns provided by the Department and in accordance with the following schedule:

REPORTS OF MORE FREQUENTLY THAN MONTHLY AND MONTIIL Y TESTING shall be submitted on a [ monthly ] basis. The first report is due on the 28th day of November 1994. The reports shall be submitted so that they are received by the Department no later than the 28th day of the month following the reporting period.

REPORTS OF QUARTERLY TESTING shall be submitted on a [ n/a ] basis. The first report is due on the 28th day of n/a . The reports shall be submitted so that they are received by the Department no later than the 28th day of the month following the reporting period.

REPORTS OF SEMIANNUAL TF..STING shall be submitted on a SEMIANNUAL basis. The reports are due on the 28th day of JANUARY and the 28th day of JULY. The reports shall be submitted so that they are received by the Department no later than the 28th day of the month following the reporting period.

REPORTS OF ANNUAL TESTING shall be submitted on an ANNUAL basis. The first report is due on the 28th day of JANUARY . The reports shall be submitted so that they are received by the Department no later than the 28th day of the month following the reporting period.

c. The DMR must be legible and bear an original signature. Photo and electronic copies of the signature are not acceptable and shall not satisfy the reporting requirements of this pennit. If the pennittee, using approved analytical methods as specified in Provision I. B. 2. monitors any discharge from a point source for a limited substance identified in Provision I. A. of this pennit more frequently than required by this pennit, the results of such monitoring shall be included in the calculation and reporting of values on the DMR Form and the increased frequency shall be indicated on the DMR Form. In the event no discharge from a point source identified in Provision I. A of this pennit and described more fully in the permittee's application occurs during a monitoring period, the permittee shall report "No Discharge" for such period on the appropriate DMR Form.

d. All reports and forms required to be submitted by this permit, the A WPC A and the Department's Rules, shall be signed by a "responsible official" of the permittee as defined in ADEM Administrative Code Rule 335-6-5-.14 or a "duly authorized representative" of such official as defined in ADEM Administrative Code Rule 335-6-5-.14 and shall bear the following certification:

•I oerti1Y UDder peaalty of law that this document aad all attachments were prepared under my diredion or ltlpi!IVilioll in aoooolance with a sy1tem designed to UIIIIIC that qualified personnel prqiCily gather aad evaluale the illformation IUbmitted. Hued OR my inquiry of the person or pelllOIIS who 111a11age the system. or those penons dinlctJy re8p01Wble for gal.beriag information, the information IUbmiltEd is, to the bellt of my knowledge aad belief. true, accurate, aad Olll'qllete. I am aware lhat there are significant penalties for IIUbmitting false infonnalion, including die possibility of fine and imprisonment for bowing violations."

d. All reports and fonns required to be submitted by this permit, the A WPC A and the Department's Rules, shall be addressed to:

Director Alabama Department of Environmental Management 1751 Congressman Dickinson Drive Montgomery, Alabama 36130 Attention: Industrial Branch, Water Division

2. Noncompliance Resampling and Notification

a. If for any reason, (1) the permittee's discharge causes interference or pass through at the POTW or (2) an unpermitted direct or indirect discharge of pollutants occurs as a result of the permittee's actions or from the permittee's property or facility the permittee shall orally report the occurrence and circumstances of such discharge to the Director within 24-hours after the permittee becomes aware of the occurrence of such discharge. In addition to the oral report, the permittee shall submit to the Director a written report as provided in-c. below, no later than five (5) days after becoming aware of the occurrence of such discharge (unpermitted discharges properly reported to the Department under any other requirement are not required to be reported under tbis provision).

b. If for any reason, the permittee's discharge does not comply with any limitation of this permit, the permittee shall submit to the Director a written report as provided in c. below, such report shall be submitted with the next Discharge Monitoring Report required to be submitted by Provision I. F. 1. of this permit after becoming aware of the occurrence of such noncompliance.

c. Any written report required to be submitted to the Director by Provision I. F. shall be submitted using a copy of the Noncompliance Notification Form provided with this permit and shall include the following information:

(1)

(2)

(3)

A description of the discharge and cause of noncompliance;

The period of noncompliance, including exact dates and times or, if not corrected, the anticipated period of time that the noncompliance is expected to continue; and

A description of the steps taken and/or being taken to reduce or eliminate the noncomplying discharge and to prevent its recurrence.

d. Witbin 24 hours after becoming aware of the exceedance of a permit limit for any parameter, the permittee shall resample and test for this parameter and shall submit the results of the testing to the Department with the next discharge monitoring report submittal. If this permit requires daily monitoring of the parameter, this requirement is satisfied and additional sampling is not required.

3. Hazardous Waste Discharge Notification

a.

b.

c.

d.

The permittee shall notify the publicly owned treatment works, the Department, and the Director of the EPA Region IV Waste Management Division of any discharge under this pem1it of a substance which is a listed or characteristic waste under Section 3001 of RCRA.

The notification shall include a description of the hazardous waste(s) discharged, specifying the volume and concentration of the waste(s) and the type of discharge (continuous, batch, or other), identifying the hazardous constituents contained in the listed waste(s) and estimating the volume of hazardous waste(s) expected to be discharged during the following twelve months. The notification shall be made within 30 days after the effective date of tbis permit or within 30 days of the first discharge of the hazardous waste(s).

The pem1ittee shall be exempt from these reporting requirements during a calendar month in wbich no more than 100 kilograms of a hazardous waste are discharged, unless the waste is an acute hazardous waste as specified in 40 CFR 261.5(e), (f), (g) and (j). Discharge of more than 100 kilograms of a hazardous waste in any given month requires a one-time notification. Subsequent months during wbich the industrial user discharges more than 100 kilograms of a hazardous waste do not require additional notification, except for an acute hazardous waste.

In the case of new regulations under Section 3001 of RCRA identifying additional characteristics of hazardous wastes or listing any additional hazardous waste, the pem1ittee shaH make notification as required in Provision I. F. 3. a. and b. of the discharge of such substance within 90 days of the effective date of such regulations.

e.

Page 7

In the case of any notification, the permittee shall certify that it has a program in place to reduce the volume and toxicity of the wastes to the degree it has determined to be economically practicable and that it has selected the method of treatment, storage, or disposal currently available which minimizes the present and future threat to human health and the environment.

4. Slug Discharges

The permittee shall notify the publicly owned treatment works and the Department of any slug type discharge that may cause pass through or interference with the treatment works. Such notification shall be made to the treatment works immediately after the permittee becomes aware of the event and to the Department during the first normal business day after becoming aware of the event. The permittee shall coordinate with the operator of the treatment works and shall develop a notification procedure that is acceptable to the operator. The permittee may be required to establish a formal slug load control program if such is determined by the Director or his designee to be required to prevent pass through or interference.

G. arHER. REPORTING AND NOTIFICATION REQUIRHMENTS

1. Submittals To Publicly Owned Treatment Works

The Department may require the permittee at any time to submit copies of any or all reports, notifications, applications, or other documents, that are submitted by the permittee to the Department, to the POTW receiving the discharge(s) authorized by this permit. Upon notification by the Department, the permittee shall submit copies of the required documents to the POTW no later than the required date of submittal to the Department.

2. Anticipated Noncompliance

The permittee shall give the Director written advance notice of any planned changes or other circumstances regarding a facility which may result in noncompliance with permit requirements. 3. Tem1ination of Discharge

The permittee shall notify the Director, in writing, when all discharges from any point source(s) identified in Provision I. A. of this permit have permanently ceased. This notification shall serve as sufficient cause for instituting procedures for modification or termination of this pem1it. 4. Updating Information

a.

b.

The permittee shall inform the Director of any change in the permittee's mailing address or telephone number or in the permittee's designation of a facility contact or office(s) having the authority and responsibility to prevent and abate violations of the A WPCA, the Department's Rules and the tem1s and conditions of this permit, in writing, no later than ten (10) days after such change. Upon request of the Director or his designee, the permittee shall furnish the Director with an update of any information provided in the permit application.

If the permittee becomes aware that it failed to submit any relevant facts in a permit application, or submitted incorrect information in a permit application or in any report to the Director, it shall promptly submit such facts or infomwtion with a written explanation for the mistake and/or omission.

5. Duty to Provide Information

The pem1ittee shall furnish to the Director, within a reasonable time, any infonnation which the Director or his designee may request to determine whether cause exists for modifying, suspending, or revoking this permit, in whole or in part, or to determine compliance with this pem1it.

6. Cooling Water and Boiler Water Additives

PART I Pate 8

a. The permittee shall notify the Director in writing not later than sixty (60) days prior to instituting the use of any biocide corrosion inhibitor or chemical additive in a cooling or boiler system, not identified in the application for this permit, from which discharge is allowed by this permit. Notification is not required for additives that do not contain a heavy metal(s) as an active ingredient and that pass through a wastewater treatment system prior to discharge nor is notification required for additives ftrar should not reasonably be expected to cause the cooling water or boiler water to exhibit toxicity as determined by analysis of manufacturer's data or testing by the pennittee. Such notification shall include:

( 1) name and general composition of biocide or chemical, (2) 96-hour median tolerance limit data for organisms representative of the biota of

the waterway into which the discharge will ultimately reach, (3) quantities to be used, ( 4) frequencies of use, (5) proposed discharge concentrations, and (6) EPA registration number, if applicable.

b. The use of a biocide or additive containing tributyl tin, tributyl tin oxide, zinc, chromium or related compounds in a cooling or boiler system(s), from which a discharge regulated by this permit occurs, is prohibited. Zinc and chromium may be used in special circumstances if the permit contains limits for these substances. The use of any additive, not identified in this permit or in the application for this permit or not exempted from notification under this pem1it, prior to a determination by the Department that pem1it modification to control discharge of the additive is not required or prior to issuance of a permit modification controlling discharge of the additive is prohibited.

R SCHEDULE OFCOMPUANCE

1. The permittee shall achieve compliance with the discharge limitations specified in Provision I. A. in accordance with the following schedule:

COMPLIANCE SHALL BE A TrAINED ON TIIE EPFECfiVE DATE OF TillS PERMIT

2. No later than 14 calendar days following a date identified in the above schedule of compliance, the permittee shall submit either a report of progress or, in the case of specific actions being required by identified dates, a written notice of compliance or noncompliance. In the latter case, the notice shall include the cause of noncompliance, any remedial actions taken, and the probability of meeting the next scheduled requirement.

Page 9

PARTll

A OPERATIONAL AND MANAGHMHNT REQUJRHMHNTS

1. Facilities Operation and Maintenance

The pemtittee shall at all times properly operate and maintain all facilities and systems of trea_tment and control (and related appurtenances) which are installed or used by the permittee to achieve compliance with the conditions of the permit. Proper operation and maintenance includes effective performance, adequate funding, adequate operator staffing and training, and adequate laboratory and process controls, including appropriate quality assurance procedures. This provision requires the operation of backup or auxiliary facilities only when necessary to achieve compliance with the conditions of the permit.

2. Best Management Practices

a. Except where expressly authorized to do so by an applicable categorical pretreatment standard, the permittee shall not increase the use of process water or, in any other way, attempt to dilute a discharge as a partial or complete substitute for adequate treatment to achieve compliance with a categorical pretreatment standard or any requirement of this permit.

b. The permittee shall prepare, implement, and maintain a Spill Prevention, Control and Countermeasures (SPCC) Plan in accordance with 40 CFR Part 112 if required thereby.

c. The permittee shall prepare, submit for approval and implement a Best Management Practices (BMP) Plan for containment of any or all process liquids or solids, in a manner such that these materials do not present a significant !otential for discharge, if so required by the Director or his designee. When submitte and approved, the BMP Plan shall become a part of this permit and all requirements of the BMP Plan shall become requirements of this pennit.

3. Spill Prevention, Control and Management

The permittee shall provide spill prevention, control, and/or management sufficient to prevent any spills of stored pollutants from entering a water of the state or a publicly or privately owned treatment works. Any containment system used to implement this requirement shall be constructed of materials compatible with the substance(s) stored and which shall prevent the contamination of groundwater and such containment system shall be capable of retaining a volume equal to 110 percent of the capacity of the largest tank for which containment is provided.

B. OTHER RESPONSIBII...lTIES

1. Right of Entry and Inspection

The permittee shall allow the Director, or an authorized representative, upon the presentation of proper identification to:

a. enter upon the permittee's premises where a regulated facility or activity is located or conducted, or where records must be kept under the conditions of the penn it;

b. have access to and copy, at reasonable times, any records that must be kept under the conditions of the pemtit;

c. inspect at reasonable times any facilities, equipment (including monitoring and control equipment), practices, or operations regulated or required under the pennit; and

d. sample or monitor at reasonable times, for the purposes of assuring permit compliance or as otherwise authorized by the A WPCA, any substances or parameters at any location.

Page 10

2. Duty to Mitigate Adverse Impacts

The permittee shall promptly take all reasonable steps to mitigate and minimize any adverse impact to waters resulting from noncompliance with any discharge limitation specified in Provision I. A. of this permit, including such accelerated or additional monitoring of the discharge, influent and effluent at the POTW, and/or the waterbody receiving the POTW discharge as necessary to determine the nature and impact of the noncomplying discharge.

C. BYPASS AND UPSET

I. Bypass

a. Any bypass is prohibited except as provided in b. and c. below:

b. A bypass is not prohibited if:

(1) It does not cause any discharge limitation specified in Provision I., A. of this permit to be exceeded; and

(2) It is necessary for essential maintenance of a treatment or control facility or system to assure efficient operation of such facility or system.

c. A bypass is not prohibited and need not meet the discharge limitations specified in Provision I., A. of this permit if:

(1) It is unavoidable to prevent loss of life, personal injury, or severe property damage;

(2) There are no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes, or maintenance during nonnal periods of equipment downtime; and

(3) The permittee submits a written request for authorization to bypass to the Director at least ten (l 0) days prior to the anticipated bypass (if possible), the permittee is granted such authotization, and the permittee complies with any conditions imposed by the Director to minimize any adverse impact to waters resulting from the bypass.

d. The permittee has the burden of establishing that each of the conditions of Provisions II.

2. Upset

C. 1 b. or c. have been met to qualify for an exception to the general prohibition against bypassing contained in Provision II. C. 1 a. and an exemption, where applicable, from the discharge limitations specified in Provision I. A. of this permit.

a. A discharge which results from an upset need not meet the discharge limitations specified in Provision I. A., of this pern1it if:

(1) No later than 24-hours after becoming aware of the occurrence of the upset, the pem1ittee orally reports the occurrence and circumstances of the upset to the Director or his designee; and

(2) No later than five (5) days after becoming aware of the occurrence of the upset, the permittee furnishes the Director with evidence, including properly signed, contemporaneous operating logs. or other relevant evidence, demonstrating that (i) an upset occurred; (ii) the permittee can identify the specific cause(s) of the upset; (iii) the permittee's facility was being properly operated at the time of the upset: and (iv) the permittee promptly took all reasonable steps to minimize any adverse impact to waters resulting from the upset.

b. The permittee has the burden of establishing that each of the conditions of Provision II C. 2. a. of this permit have been met to qualify for an exemption from the discharge limitations specified in Provision I. A. of this permit.

r~• u Page 11

D. DUfY TO COMPLY WfiH PERMIT, RULES, AND SfATIJTBS

1. Duty to Comply

a. The permittee must comply with all conditions of the permit. Any permit noncompliance constitutes a violation of the A WPCA and the FWPCA and is grounds for enforcement action, for permit termination, revocation and reissuance, suspension, modification; or denial of a permit renewal application.

b. The necessity to halt or reduce production or other activities in order to maintain compliance with the conditions of the permit shall not be a defense for a permittee in an enforcement action.

c. The discharge of wastewater to the POTW from a source not specifically identified in the permit application for this permit and not specifically included in the description of an outfall in this permit is not authorized and shall constitute noncompliance with this permit.

d. The l?ermittee shall take all reasonable steps, including cessation of production or other activtties, to minimize or prevent any violation of the permit or to minimize or prevent any adverse impact of any permit violation.

2. Removed Substances

Solids, sludges, filter backwash, or any other pollutant or other waste removed in the course of treatment or control of wastewaters shall be disposed of in a manner that complies with all applicable Department Rules.

3. Loss or Failure of Treatment Facilities

Upon the loss or failure of any treatment facility, including but not limited to the loss or failure of the primary source of power of the treatment facility, the permittee shall, where necessary to maintain compliance with the discharge limitations specified in Provision I. A. of this permit, or any other tenns or conditions of this pem1it, cea~e, reduce, or otherwise control production and/or all discharges until treatment is restored.

4. Compliance With Statutes and Rules

a. This permit has been issued under ADEM Administrative Code, Chapter 335-6-5. All provisions of this chapter, that are applicable to this pem1it, are hereby made a part of this permit. A copy of this chapter may be obtained for a small charge from the Office of General Counsel, Alabama Department of Environmental Management, 1751 Congressman Dickinson Drive, Montgomery, AL 36130.

b. This permit does not authorize the noncompliance with or violation of any Laws of the State of Alabama or the United States of America or any regulations or rules implementing such laws. FWPCA, 33 U.S.C. Section 1319, and Code of Alabama 1975, Section 22-22-14.

E. PERMIT TRANSFER. MODIFICATION, SUSPENSION, REVOCATION, AND RHISSUANCE

1. Duty to Reapply or Notify of Intent to Cease Discharge

a. If the permittee intends to continue to discharge beyond the expiration date of this pem1it, the pem1ittee shall file a complete permit application for reissuance of this permit at least 180 days prior to its expiration. If the pem1ittee does not intend to continue discharge beyond the expiration of this penni!, the permittee shall submit written notification of this intent which shall be signed by an individual meeting the signatory requirements for a permit application as set forth in ADEM Administrative Code Rule 335-6-5-.14.

b. Failure of the permittee to apply for reissuance at least 180 days prior to pem1it expiration will void the automatic continuation of the expiring permit provided by ADEM Administrative Code Rule 335-6-5-.11 and should the permit not be reissued for any reason any discharge after expiration of this permit will be an unpermitted discharge.

Page 12

2. Change in Discharge

a. The permittee shall apply for a permit modification at least 180 days in advance of any facility expansion, production increase, process change, or other action that could result in the discharge of additional pollutants or increase the quantity of a discharged pollutant such that existing permit limitations would be exceeded or that could result in an additional discharge point. This requirement applies to pollutants that are or that are not subject to discharge limitations in this permit. No new or increased discharge may begin until the Director has authorized it by issuance of a permit modification or a reissued permit.

3. Transfer of Permit

This pennit may not be transferred or the name of the permittee changed without notice to the Director and subsequent modification or revocation and reissuance of the permit. In the case of a change in name, ownership or control of the permittee's premises only, a request for permit modification in a format acceptable to the Director is required at least 30 days prior to the change. In the case of a change in name, ownership or control of the permittee's premises accompanied by a change or proposed change in effluent characteristics, a complete permit application is required to be submitted to the Director at least 180 days prior to the change. Whenever the Director is notified of a change in name, ownership or control, he may decide not to modify the existing permit and require the submission of a new permit application.

4. Permit Modification and Revocation

a. This permit may be modified or revoked and reissued, in whole or in part, during its term for cause, including but not limited to, the following:

(1) If cause for tem1ination under Provision II E.4.a.(l) of this permit exists, the Director may choose to revoke and reissue this permit instead of tem1inating the permit;

(2) If a request to transfer this permit has been received, the Director may decide to revoke and reissue or to modify the permit; or

(3) If modification or revocation and rcissuance is requested by the pem1ittee, the Director may grant the request.

b. This permit may be modified during its term for cause, including but not limited to, the following:

( 1) If cause for termination under Provision II E. 5. of this permit exists, the Director may choose to modify this pem1it instead of terminating this pem1it;

(2) There are material and substantial alterations or additions to the facility or activity generating wastewater which occurred after permit issuance which justify the application of permit conditions that are different or absent in the existing permit;

(3) The Director has received new information that was not available at the time of permit issuance ar1d that would have justified the application of different permit conditions at the time of issuance;

(4) A new or revised categorical pretreatment standard applicable to the discharge(s) authorized by this permit is promulgated;

(5) Errors in calculation of discharge limitations or typographical or clerical errors were made;

(6) When the standards or regulations on which the pennit was based have been char1ged by promulgation of amended starJdards or regulations or by judicial decision after the permit was issued:

L..t'l..l:.'l....l. ......._

Pagel3

(7) To the extent allowed by ADEM Administrative Code, Rule 335-6-5-.18, permits may be modified to change compliance schedules;

(8) When required by the reopener conditions in this permit;

(9) When required to correct technical mistakes, such as errors in calculation, or mistaken interpretations of law made in determining permit conditions;

(1 0) When requested by the permittee and when the Director detem1ines that the modification will not result in a violation of federal or state law, regulations or rules; or

( 11) When more stringent or additional permit requirements are required to prevent pass through or interference.

5. This permit may be terminated during its term for cause, including but not limited to, the following:

a. Violation of any term or condition of this permit;

b. The ~ermittee 's misrepresentation or failure to disclose fully all relevant facts in the penmt application or during the permit issuance process or the permittee's misrepresentation of any relevant facts at any time;

c. Materially false or inaccurate statements or information in the permit application or the pem1it;

d. A change in any condition that requires either a temporary or permanent reduction or elimination of the permitted discharge;

e. The permittee's discharge causes pass through or interference or threatens human health or welfare or the maintenance of water quality standards;

f. Permanent closure of the facility generating the wastewater permitted to be discharged by this permit or pennanent cessation of wastewater discharge;

g. The Director determines that the permittee cannot comply with new or revised requirements of any applicable standard or limitation; or

h. Any other cause allowed by the ADEM Administrative Code, Chapter 335-6-5.

6. This permit may be suspended during its term for cause, including but not limited to, the reasons for termination listed in Provision I E. 5. of this permit.

7. The filing of a request by the permittee for modification, suspension or revocation of this pem1it, in whole or in part, does not stay any pem1it tem1 or condition.

PARTID

A. OVIL AND CRIMINAL UABll.ITY

1. Tampering

Any person who falsifies, tampers with, or knowingly renders inaccurate any monitoring device or method required to be maintained or performed under the permit shall, upon conviction, be subject to penalties as provided by the A WPCA.

2. False Statements

Any person who knowingly makes any false statement, representation, or certification in any record or other document submitted or required to be maintained under this pennit, including monitoring reports or reports of compliance or noncompliance shall, upon conviction, be subject to penalties as provided by the A WPCA.

3. Pennit Enforcement

PARTID Page 14

a. This permit is a permit for the purpose of the A WPCA and the FWPCA and as such any terms, conditions, or limitations of this permit are enforceable under state and federal law. The necessity to halt or reduce production or other activities in order to comply with this permit shall not be a defense for the permittee in an enforcement action.

b. Any person required to have a SID permit pursuant to ADEM Admiillstrative Code Chapter 335-6-5 and who discharges pollutants without said permit, who violates the conditions of said penuit, who discharges pollutants in a manner not authorized by the permit, or who violates applicable orders of the Department or any applicable rule or standard of the Department, is subject to any one or combination of the following enforcement actions under applicable statutes.

(1) An administrative order requiring abatement, compliance, mitigation, cessation, clean-up, and/or penalties;

(2) An action for damages;

(3) An action for injunctive relief; or

( 4) An action for penalties.

4. Relief From Liability

Except as provided in Provision II. C. 1. (Bypass) and Provision II. C. 2. (Upset), nothing in this permit shall be construed to relieve the permittee of civil or criminal liability under the A WPCA or FWPCA for noncompliance with any term or condition of this permit.

B. Oll. AND HAZARDOUS SUBSTANCE I.JABllJTY

Nothing in this pem1it shall be construed to preclude the institution of any legal action or relieve the pennittee from any responsibilities, liabilities or penalties to which the permittee is or may be subject under Section 311 of the FWPCA, 33 U.S.C. Section 1321.

C. PROPERTY AND OTIIHR RIGHfS

This permit does not convey any property rights in either real or personal property, or any exclusive privileges, nor does it authorize any injury to persons or property or invasion or other private rights, or any infringement of federal, state, or local laws or regulations, nor does it authorize or approve the construction of any physical structures or facilities or the undertaking of any work in any waters of the state or of the United States.

D. AVAILABILITY OF REPORTS

Except for data determined to be confidential under Code of Alabama 1975, Section 22-22-9(c), all reports prepared in accordance with the terms of this permit shall be available for public inspection at the offices of the Department. Effluent data shall not be considered confidential.

E. EXPIRATION OF PERMITS FOR NEW OR INCREASED DISCHARGES

1. If this permit was issued for a new discharger or new source, this permit shall expire eighteen months after the issuance date if construction of the facility has not begun during the eighteen month period.

2. If this permit was issued or modified to allow the discharge of increased quantities of pollutants to accommodate the modification of an existing facility and if construction of this modification has not begun during the eighteen month period after issuance of this permit or pem1it modification, this pem1it shall be modified to reduce the quantities of pollutants allowed to be discharged to those levels that would have been allowed if the modification of the facility had not been planned.

3. Construction has begun when the owner or operator has:

a. begun, or caused to begin as part of a continuous on-site construction program:

( 1) any placement, assembly, or installation of facilities or equipment; or

PARTID Page 15

(2) significant site preparation work including clearing, excavation, or removal of existing buildings, structures, or facilities which is necessary for the placement, assembly, or installation of new source facilities or equipment; or

b. entered into a binding contractual obligation for the purpose of placement... assembly, or installation of facilities or equipment which are intended to be used in its operation within a reasonable time. Options to purchase or contracts which can be tenninated or modified without substantial loss, and contracts for feasibility, engineering, and design studies do not constitute a contractual obligation under the paragraph. The entering into a lease with the State of Alabama for exploration and production of hydrocarbons shall also be considered beginning construction.

F. DEPINITIONS

l. Average monthly discharge limitation- means the highest allowable average of "daily discharges" over a calendar month, calculated as the sum of all "daily discharges" measured during a calendar month divided by the number of "daily discharges" measured during that month (zero discharge days shall not be included in the number of "daily discharges" mea•mred and a less than detectable test result shall be treated as a concentration of zero if the most sensitive EPA approved method was used).

2. Average weekly discharge limitation - means the highest allowable average of "daily discharges" over a calendar week, calculated as the sum of all "daily discharges" measured during a calendar week divided by the number of "daily discharges" measured during that week (zero discharge days shall not be included in the number of "daily discharges" measured and a less than detectable test result shall be treated as a concentration of zero if the most sensitive EPA approved method was used).

3. A WPCA- means the Alabama Water Pollution Control Act.

4. Bypass- means the intentional diversion of waste streams from any portion of a treatment facility.

5. Categorical pretreatment standard - means any regulation containing pollutant discharge limits promulgated by the EPA in accordance with Section 307(b) and (c) of the r"WPCA, which applies to industrial users.

6. Daily discharge - means the discharge of a pollutant measured during any consecutive 24 hour period in accordance with the sample type and analytical methodology specified by the discharge permit.

7. Daily maximum- means the highest value of any individual sample result obtained during a day.

8. Daily minimum -means the lowest value of any individual sample result obtained during a day.

9. Day - means any consecutive 24-hour period.

10. Department - means the Alabama Department of Environmental Management.

11. Director- means the Director of the Department.

12. Discharge - means the introduction of any sewage, industrial waste, pollutant, or other waste into a publicly owned treatment works.

B. Discharge monitoring report (DMR)- means the fom1 approved by the Director to accomplish the reporting requirements of a SID pem1it.

14. EPA - means the United States Environmental Protection Agency.

15. FWPCA- means the Federal Water Pollution Control Act.

16. Indirect discharger or industrial user- means a nondomestic discharger who discharges pollutants to a publicly owned treatJ.nent works.

17.

18.

19.

20.

21.

22.

23.

24.

25.

26.

CftJ\..l .l.l.l

Page 16

Permit application - means forms and additional information that is required by ADEM Administrative Code Rule 335-6-5-.13 and applicable permit fees.

Point source - means "any discernible, confined and discrete conveyance, including but not limited to any pipe, channel, ditch, tunnel, conduit, well, discrete fissure, container, rolling stock, concentrated animal feeding operation, or vessel or other floating craft, ... from which pollutants are or may be discharged." Section 502(14) of the FWPCA, 33 U.S.C. Section 1362(14).

Pollutant - includes for purposes of this permit, but is not limited to, those pollutants specified in Code of Alabama 1975, Section 22-22-l(b)(3) ruill those effluent characteristics specified in Provision I. A. of tbis permit.

Publicly owned treatment works (POTW) - means a treatment works as defined by Section 212 of the FWPCA, which is owned by the state, a municipality, a regional entity composed of two or more municipalities, or another entity created by state or local authority for the purpose of collecting and treating municipal wastewater. Tbis definition does not include pipes, sewers or other conveyances not connected to a facility providing treatment. The tern1 also means the municipality as defined in Section 502(4) of the FWPCA, which bas jurisdiction over the "indirect discharges" to and the discharges from such a treatment works.

RCRA- means the Federal Resource Conservation and Recovery Act.

Severe property damage -means substantial physical damage to property, dan1age to the treatment facilities which causes them to become inoperable, or substantial and permanent loss of natural resources which can reasonably be expected to occur in the absence of a bypass. Severe property damage does not mean economic loss caused by delays in production.

State indirect discharge permit or SID permit - means a permit issued to an industrial user.

Upset - means an exceptional incident in which there is an unintentional and temporary noncompliance with technology-based permit discharge limitations because of factors beyond the reasonable control of the permittee. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment facilities, inadequate facilities, lack of preventive maintenance, or careless or improper operation.

Waters - means "la]ll waters of any river, stream, watercourse, pond, lake, coastal, ground or surface water, wholly or partially within the State, natural or artificial. This does not include waters which are entirely confined and retained completely upon the property of a single individual, partnership or corporation unless such waters are used in interstate commerce." Cod~ of Alabama 1975, Section 22-22-l(b)(2). Waters "include all navigable waters" as defined in Section 502(7) of the FWPCA, 22 U.S.C. Section 1362(7), which are within the State of Alaban1a. Week - means the period beginning at twelve midnight Saturday and ending at twelve midnight the following Saturday.

G. SEVHRABH..ITY

The provisions of this pem1it are severable, and if any provision of this permit or the application of any provision of this permit to any circumstance is held invalid, the application of such provision to other circumstances, and the remainder of this permit, shall not be affected thereby.

PART IV

A. TOTAL TOXIC ORGANICS REQUIREMENTS

PART IV Page 17

Total Toxic Organics (TTO) shall be defined as found in 40 CFR 433.ll(e). TTO monitoring shall be necessary only for those compounds which arc possibly present as a result of screening ftftalyses, and/or a detailed review of sources of TTO used in the facility.

In lieu of the monitoring requirements for TTO, the permittee may submit for Departmental review a toxic organics management plan which identifies toxic organic compounds used, the method of disposal used instead of discharge (such as reclamation, contract hauling or incineration) and procedures for ensuring that toxic organics do not routinely spill or leak into the wastewater. The plan and initial TTO analysis shall be reviewed by ADEM, and if the plan is approved, the plan and any ADEM comments shall become a requirement of this permit. If design or construction is needed for the plan, all plans and specification shall be submitted to the ADEM in accordance with ADEM Engineering Regulations. Should toxic organic pollutant levels be sufficiently low, and the toxic organic management plan is approved by ADEM, ADEM may waive further monitoring requirements provided all monitoring reports submitted thereafter include the following certification:

"Based on my inquiry of the person or persons directly responsible for managing compliance with the permit limitations for total toxic organics (1TO), I certify that, to the best of my knowledge and belief, no discharge of toxic organics in concentrations above those established by this permit, or other laws or ordinances, has occurred since filing of the last discharge monitoring reporL I further certifY that this facility is implementing the solvent management plan submitted to the permitting (or control) authority. "

Should in-plant conditions change such that the toxic organic management plan is no longer valid (i.e., spill containment is modified, toxic organic compounds used are changed, etc.), a modified plan and implementation schedule shall be submitted 90 days prior to such change and must be approved by ADEM to again discontinue TTO monitoring. In any event, the toxic organic management plan shall be reviewed and updated at least yearly after approval by ADEM, to assure that the plan is still valid and meets the intent of this permit. Such review and update shall include, but not be limited to, a review of toxic organics used, containment provisions for each, and a physical examination of all components of the containment or management system used. Records of this yearly review shall be maintained by the permittee for a minimum of three years.

Discharge of TTO to any waste stream limited by this permit shall in no case be intentional, unless the waste treatment system is designed to remove TTO, and such discharge has been spcctfically approved by the ADEM Water Division.

DILUTION PROHIBITION

The permittee shall not augment the usc of process wastewater as a partial or total substitute for adequate treatment to achieve compliance with any limitation in this permit.

MONTHLY

COMPANY: Tru-Line Manufacturing, Inc. EFF: 1011194 EXP: 9130199 DSN001 LIU 08 52 00228) PARAM Flow oH Cd T Cr T Cu T MIN - 5.0 - - -MAX Mon 10.5 .69 2. 77 3.38 MO.AVG. Mon - .26 1. 71 2.07 FREO -da i 1 v dailv 1 lmo 1 lmo 1 lmo UNITS MGD s. u. mall mall mall

1 2 3 4 5 6 7 8 9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 -MAX

ADEM DISCHARGE MONITORING REPORT

LOCATION: Decatur

Pb T Ni T Aa T Zn T - - - -0.69 3.98 0.43 2.61 0.43 us 0.24 1.48 1/mo 1 /mo 1/mo 1 lmo ma/1 mall mall mall

MONTH ,_I 9;--

SID IU 08 52 228

... Cn T TTO - -1.20 2.13 0.65 -116mo 116mo mall mall

1 I

·-I l

t

f F

1~ ...

~r

.,.·

" l r t MO.AVG.

"'I cerufy under oenalty of law that tbJs document an-d nii--;n;:hmems w~~Pt-~p;red ~nder my dJreCtJon or .;uper"'IStOn· tn a(.;cordance wtth a system destgoed to assure that qualified personnel properly gather and evalUate the mfonnaticvi submmed. Based Oo my mquuy of tl:te p(Tsoo or petwns wbo ;:

.. manage the system, or those persons direCtly respoostblc for gatberillg the mformatJon, the mformatJon submitted IS, to the best of my knowledge and belle f. true, accurate. and complete I am aware that there are SJgruficam penaJues for SUbiD.Ittmg false mformatJon. ux:Judmg tbe possJb!hty of fine and r rmpnsomnent FiX koD"N"mg VJOlatJons

f ·"lt.\-.-: ~·trc ofRe<;poii<;Jhle Offictal ·.,..,~

_____ Date: __________ _ !

ADEM~