Upload
others
View
6
Download
0
Embed Size (px)
Citation preview
XT500/XR100 HARWARE AND INSTALLATION
Slide 1 XR500/XR100 Basic Training
Hardware & Installation
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 2 Objectives
After completing this course you will:– 1) Perform a site evaluation– 2) Understand the discipline of wiring– 3) Install system hardware– 4) Correctly wire the panel, keypads and system
accessories– 5) Address DMP keypads and expanders on the
system– 6) Achieve line seizure of the panel phone line– 7) Pass the necessary exams to obtain your DMP
Certificate of Completion for this course.
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 3 Basic Tools
• Installer friendly• Basic tools needed for install
– List
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
XT500/XR100 HARWARE AND INSTALLATION
Slide 4 Site Evaluation
• Evaluate site and establish work plan– Site walk through– Consider location of various components
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 5 Panel Ground
• Terminal 4 grounding• Cold water pipe
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 6 Wire Routing
• Part of site evaluation is wire routing• While exploring site look for “pitfalls” and trouble
spots• Suitable locations for devices
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
XT500/XR100 HARWARE AND INSTALLATION
Slide 7 Pre-drilling
• Pre drill before pulling wire– Door jambs, top plates, ceilings
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 8 Wire Type and Distances
• Wire type and distance– 18 or 22 AWG unshielded– DO NOT use twisted pair
• Maximum bus distance– 710 modules
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 9 Keeping Documentation
• Documentation– Finish site evaluation, then document the install– Programming sheet is supplied– Write down as much information as possible
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
XT500/XR100 HARWARE AND INSTALLATION
Slide 10 Pulling Wire
• Pulling wire– Backbone of the system– Label wiring
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 11 Wire Tagging
• Wire tagging– Label or mark each wire pulled– One label on wire, matching label on box
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 12 Multiple Pulls
• Multiple pulls– Pay attention to labels– Consequences could be great
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
XT500/XR100 HARWARE AND INSTALLATION
Slide 13 Documentation
• Documentation– Write down tag numbers – Wiring the panel will go faster– Keep at site for service
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 14 Pulling Spare Wires
• Pulling Spare Wires on difficult pulls– Use a spare wire or consider a wire with multiple
conductors– Save time later for expansion
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 15 Mounting the Enclosure
• Mounting the Enclosure– Dry and secure– Protected from tampering and elements
• Install tip on enclosure
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
XT500/XR100 HARWARE AND INSTALLATION
Slide 16 Mounting Keypads*
• Mounting Keypads– Base and faceplate
• How to install-4 steps
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 17 Mounting Expanders
• Mounting Expanders– Molded housing with removable cover
• Cover contains module• 711 contained in base• Expanders include color coded wiring harness• Note on 718T
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 18 Pre-Install Review
The next 7 slides are a review for the Pre-Install Section
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
XT500/XR100 HARWARE AND INSTALLATION
Slide 19 Question 1
1) The purpose of a site evaluation is to establish ______________________________.
A. all of theseB. a work planC. equipment placementD. familiarity with the site
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 20 Question 1
1) The purpose of a site evaluation is to establish ______________________________.
A. all of theseB. a work planC. equipment placementD. familiarity with the site
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 21 Question 2
2) Before pulling any wire, be sure to _______________________________.
A. all of theseB. pre-drillC. mark the wireD. document wire numbers
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
XT500/XR100 HARWARE AND INSTALLATION
Slide 22 Question 2
2) Before pulling any wire, be sure to _______________________________.
A. all of theseB. pre-drillC. mark the wireD. document wire numbers
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 23 Question 3
3) To provide proper transient protection, terminal ____ must be connected to earth ground using ____ gauge or larger wire.
A. 4, 14B. 4, 18C. 10, 14D. 4, 22
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 24 Question 3
3) To provide proper transient protection, terminal ____ must be connected to earth ground using ____ gauge or larger wire.
A. 4, 14B. 4, 18C. 10, 14D. 4, 22
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
XT500/XR100 HARWARE AND INSTALLATION
Slide 25 Question 4
4) The panel enclosure must be mounted with the PCB removed.
TrueFalse
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 26 Question 4
4) The panel enclosure must be mounted with the PCB removed.
TrueFalse
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 27 Question 5
5) On long or difficult to access LX-Bus or keypad bus runs, it's a good idea to ________________.
A. take a break B. pull the wire backwardsC. pull a spare wire D. get someone else to help
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
XT500/XR100 HARWARE AND INSTALLATION
Slide 28 Question 5
5) On long or difficult to access LX-Bus or keypad bus runs, it's a good idea to ________________.
A. take a break B. pull the wire backwardsC. pull a spare wire D. get someone else to help
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 29 Question 6
6) Use no more than ____ feet of 16 gauge or ____ feet of 18 gauge wire between the transformer and the panel.
A. 40, 70 B. 70, 40C. 18, 22D. 2500, 500
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 30 Question 6
6) Use no more than ____ feet of 16 gauge or ____ feet of 18 gauge wire between the transformer and the panel.
A. 40, 70 B. 70, 40C. 18, 22D. 2500, 500
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
XT500/XR100 HARWARE AND INSTALLATION
Slide 31 Question 7
7) Maximum cumulative distance for LX-Bus and keypad bus circuits is __________, regardless of wire gauge.
A. 500 feetB. 15,000 feetC. 2,500 feet D. 4,000 feet
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 32 Question 7
7) Maximum cumulative distance for LX-Bus and keypad bus circuits is __________, regardless of wire gauge.
A. 500 feetB. 15,000 feetC. 2,500 feet D. 4,000 feet
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 33 Control Panel Wiring
• Control Panel Wiring– Evaluation is complete
• Simple to wire, wiring diagram inside enclosure
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
XT500/XR100 HARWARE AND INSTALLATION
Slide 34 AC Terminals 1 & 2
• AC Terminals 1 & 2– Connecting supplied transformer– Wire length limitations
• Note on grounding
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 35 Earth Ground
• Earth Ground– Proper ground is essential– Cold water pipe or ground rod
• Note on electrical grounds
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 36 Battery Terminals 3 & 4
• Battery Terminals – Connecting the battery with supplied leads– 318 Battery harness– Replacement period– No Gel Cell
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
XT500/XR100 HARWARE AND INSTALLATION
Slide 37 Battery Supervision
• Battery Supervision– How the panel supervises the battery.– Battery Trouble condition
• New battery consideration• 10.2 VDC panel disconnects battery
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 38 Power Requirements
• What happens during AC power failure
• All devices must be considered
• Battery calculator can be found on the website
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 39 Bell Output Terminals 5 & 6
• Bell Output Terminals• May output steady, pulsed or temporal• Note supervised bell output
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
XT500/XR100 HARWARE AND INSTALLATION
Slide 40 Keypad Data Bus Terminals 7-10
– Four Terminals• Terminal 7 (RED)• Terminal 8 (YELLOW)• Terminal 9 (GREEN)• Terminal 10 (BLACK)
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 41 J8 Programming Header
• J8 Programming Header– 4 pin connection for keypad (330 harness)
• Quick and easy• Alternative to 7-10• Location
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 42 Smoke Power Terminals 11 & 12
• Smoke Power– 12VDC for 4 wire smokes
• Sensor reset – unlatches• Total current shared
– Total draw 1.5A• Ground reference
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
XT500/XR100 HARWARE AND INSTALLATION
Slide 43 Protection Zones
• Protection Zones– Zone numbers 1 to 8
• Note on ground fault
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 44 Zone Operational Parameters
• Zone Operational Parameters– 3 zone conditions
• Open, Normal and Short
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 45 Powered Zones
• Powered Zones– Zones 9 and 10
• Class B (Style A)**• Note on separate negative terminals• Typical use• Note on programming
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
XT500/XR100 HARWARE AND INSTALLATION
Slide 46 Grounded Zones vs. Class 'B' Zones
• Panel zones 1-8– Common ground
• Zones 9 and 10– Positive and negative
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 47 Dry Contact Outputs
• Dry Contacts Outputs– 2 Auxiliary relays– 305 Relays
• Rated for 1Amp at 30 VDC’
• 431 harness needed.
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 48 Open Collector Outputs
• Open Collector Outputs– Switch to ground (no voltage)
• Uses• 4 total numbered 3 to 6• Note on connecting devices
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
XT500/XR100 HARWARE AND INSTALLATION
Slide 49 860 Relay Module
• 860 Relay Module– To provide relays for outputs 3 to 6
• Includes ONE relay• Power for unit• 3 hole pattern
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 50 J22 LX-Bus Header
• J22 LX bus header-Zones -Wireless -Programming
• J23 Jumper setting• Devices that can be used• Note on functionality
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 51 XR500 Only
• XR500 Interface cards• Interface card connection and Model 461
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
XT500/XR100 HARWARE AND INSTALLATION
Slide 52 XR500 LX-Bus Numbering
• XR500 LX-Bus Numbering scheme• Example• Note on J22 and interface cards
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 53 XR100 LX-Bus Numbering
• XR100 LX-Bus Numbering– 100 zones available from J22– Zone Range
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 54 J21 RS232 Connector (XR500 ONLY)
• J21 RS-232 connector– Allows direct programming– Allows serial connections
• J23 in “R” position• Note on J21 and J22
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
XT500/XR100 HARWARE AND INSTALLATION
Slide 55 RS-232 Status LEDs (XR500)
• RS-232 Status LEDs– Transmit LED operation– Receive LED operation
• Note on J23 and LX-Bus activity
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 56 LX-Bus LEDs (XR100)
• LX-Bus LEDs– Top LED operation– Bottom LED operation
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 57 J1- Ethernet Connector(XR500N shown XR100N similar)
• J1 Ethernet Connector– XR500N and XR100N -10base-T half duplex speed
• Link LED• Activity LED
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
XT500/XR100 HARWARE AND INSTALLATION
Slide 58 J3-Telephone Connector
• J3 Telephone Connector– Connection to public telephone
• Proper Line Seizure is vital• Note on built in line monitor
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 59 Proper Line Seizure Wiring
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 60 J16- Panel Reset Jumper
• J16 Panel Reset Jumper– Location– Processor restart
• Process of resetting the panel• Note on jumper location when shipped
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
XT500/XR100 HARWARE AND INSTALLATION
Slide 61 J4-Tamper Header
• J4 Tamper Header– For Options harness
• Detects unauthorized panel access
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 62 Wiring the Panel Review
The next 10 slides are a review for the Wiring the Panel Section
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 63 Question 1
1) When the battery voltage measured is below 11.9 VDC, a _______________ is indicated.
A. Battery TroubleB. Battery AlarmC. Battery Restoral
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
XT500/XR100 HARWARE AND INSTALLATION
Slide 64 Question 1
1) When the battery voltage measured is below 11.9 VDC, a _______________ is indicated.
A. Battery TroubleB. Battery AlarmC. Battery Restoral
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 65 Question 2
2) The panel's Yellow wire is the _______________ wire.
A. transmitB. groundC. receiveD. smoke power
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 66 Question 2
2) The panel's Yellow wire is the _______________ wire.
A. transmitB. groundC. receiveD. smoke power
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
XT500/XR100 HARWARE AND INSTALLATION
Slide 67 Question 3
3) The panel's Green wire is the _______________________ wire.
A. transmitB. groundC. receiveD. smoke power
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 68 Question 3
3) The panel's Green wire is the _______________________ wire.
A. transmitB. groundC. receiveD. smoke power
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 69 Question 4
4) The total combined current draw of all auxiliary devices powered by the panel must not exceed _______.
A. 50 mAB. 500 mA C. 1 AmpD. 1.5 Amps
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
XT500/XR100 HARWARE AND INSTALLATION
Slide 70 Question 4
4) The total combined current draw of all auxiliary devices powered by the panel must not exceed _______.
A. 50 mAB. 500 mA C. 1 AmpD. 1.5 Amps
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 71 Question 5
5) Zones 1 through 8 cannot detect _______________ conditions.
A. openB. shortedC. ground fault D. trouble
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 72 Question 5
5) Zones 1 through 8 cannot detect _______________ conditions.
A. openB. shortedC. ground fault D. trouble
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
XT500/XR100 HARWARE AND INSTALLATION
Slide 73 Question 6
6) The XR500 PCB provides ____ relay outputs, which are rated for 1 Amp at
30 VDC.
A. threeB. twoC. sixD. four
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 74 Question 6
6) The XR500 PCB provides ____ relay outputs, which are rated for 1 Amp at
30 VDC.
A. threeB. twoC. sixD. four
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 75 Question 7
7) To use the J22 LX-Bus header, set the 3-position jumper (J23) to the ____
position.
A. XB. RC. LD. none of these
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
XT500/XR100 HARWARE AND INSTALLATION
Slide 76 Question 7
7) To use the J22 LX-Bus header, set the 3-position jumper (J23) to the ____
position.
A. XB. RC. LD. none of these
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 77 Question 8
8) XR500 Zone numbers begin at _______ on LX-Bus™ number four.
A. 300B. 400C. 401D. 800
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 78 Question 8
8) XR500 Zone numbers begin at _______ on LX-Bus™ number four.
A. 300B. 400C. 401D. 800
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
XT500/XR100 HARWARE AND INSTALLATION
Slide 79 Question 9
9) When the three position jumper (J23) is set to “R” ________________________.
A. all of theseB. the panel may be connected to a serial deviceC. on-board LX-Bus is disabledD. an Interface card must be used for LX-Bus
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 80 Question 9
9) When the three position jumper (J23) is set to “R” ________________________.
A. all of theseB. the panel may be connected to a serial deviceC. on-board LX-Bus is disabledD. an Interface card must be used for LX-Bus
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 81 Question 10
10)The J1 Ethernet Connector has two LEDs. The Activity LED indicates
________________.
A. panel activityB. network activityC. door access activityD. computer activity
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
XT500/XR100 HARWARE AND INSTALLATION
Slide 82 Question 10
10)The J1 Ethernet Connector has two LEDs. The Activity LED indicates
________________.
A. panel activityB. network activityC. door access activityD. computer activity
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 83 Addressing Keypads
• All keypads must have a unique address if supervised• If unsupervised, keypads can have same address• The addressing procedure differs between keypad
models
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 84 7000/690/790 SeriesKeypad Addressing
• 7000/690/790 Series Keypad Addressing– There are 6 steps in addressing a DMP keypad
through INSTaller Options
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
XT500/XR100 HARWARE AND INSTALLATION
Slide 85 Rotary Switches
• Rotary Switches– 714 and 715 Zone expanders – Range for keypad bus addresses– Range for LX-Bus addresses
• Note on KP/LX-Bus jumper setting
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 86 Answering Machine Bypass
• Answering Machine Bypass– Operation
• Note on Armed Rings and/or Disarmed Rings
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 87 Finishing Up Review
The next 4 slides are a review for the Finishing Up Section
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
XT500/XR100 HARWARE AND INSTALLATION
Slide 88 Question 1
1) The 7000/690/790 series LCD keypads are addressed through the ________________.
A. keypad busB. Installer OptionsC. dip switchesD. all of these
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 89 Question 1
1) The 7000/690/790 series LCD keypads are addressed through the ________________.
A. keypad busB. Installer OptionsC. dip switchesD. all of these
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 90 Question 2
2) When addressing a 7000/690/790 series keypad, you enter ________ (INST) at the SET BRIGHTNESS prompt to access the installer options.
A. 6653 CommandB. 8144 CommandC. 3577 CommandD. 99 Command
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
XT500/XR100 HARWARE AND INSTALLATION
Slide 91 Question 2
2) When addressing a 7000/690/790 series keypad, you enter ________ (INST) at the SET BRIGHTNESS prompt to access the installer options.
A. 6653 CommandB. 8144 CommandC. 3577 CommandD. 99 Command
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 92 Question 3
3) To configure a device address for address 3, set the TENS switch to ____ and the ONES switch to address _____.
A. one, tenB. 3,1C. 3,0D. 0,3
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 93 Question 3
3) To configure a device address for address 3, set the TENS switch to ____ and the ONES switch to address _____.
A. one, tenB. 3,1C. 3,0D. 0,3
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
XT500/XR100 HARWARE AND INSTALLATION
8/08
Slide 94 Question 4
4) To achieve line seizure, the panel's phone jack (RJ31X or RJ38X) must be installed ______ the premise phones and the telephone company network.
A. betweenB. in parallel withC. after
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 95 Question 4
4) To achieve line seizure, the panel's phone jack (RJ31X or RJ38X) must be installed ______ the premise phones and the telephone company network.
A. betweenB. in parallel withC. after
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Slide 96 Congratulations!
You have completed the XR500/XR100 Hardware & Installation course.
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
LT-1009 © 2008 Digital Monitoring Products, Inc.