Upload
trinhdang
View
235
Download
3
Embed Size (px)
Citation preview
,2008-09
SUMMERY OF MLA FUND RELEASED BY MIN. OF UD
AC No. Name of MLA Amt. released on Date
AC No. 1 Sh. Ashok AhujaAC No. 2 Smt.Sheila DikshitAC No. 3 Smt.Taj Dar BabarAC No. 4 Sh.Sushil ChoudharyAC No. 5 Sh.T.S. MarwahAC No. 6 Sh. Parvez HashmiAC No. 7 Sh.Subhash ChopraAC No. 8 Sh Yoganand ShastriAC No. 9 Smt Kiran Walia
AC No. 10 Smt Barkha SinghAC No. 11 Sh.Karan Singh TanwarAC No. 12 Sh.Jagdish MukhiAC No. 13 Sh.Harcharan Singh BalliAC No. 14 Sh.O.P.BabbarAC No. 15 Sh.Ramesh LambaAC No. 16 Sh.Mala Ram GangwalAC No. 17 Sh.Anil BhardwajAC No. 18 Sh.S.C. VatsAC No. 19 Sh Ravindra Nath BansalAC No. 20 Sh.Jai Bhagawan AggarwalAC No. 21 Sh.Kulwant RanaAC No. 22 Sh.Surendra KumarAC No. 23 Sh Jai Kishan AC No. 24 Sh Raj Kumar ChouhanAC No. 25 Sh Bejinder Singh AC No. 26 Sh.Dayanand ChandelaAC No. 27 Sh.Mukesh SharmaAC No. 28 Sh Ranbir KharbAC No. 29 Sh. Mahabal MishraAC No. 30 Sh.Dharam Dev SolankiAC No. 31 Sh Vijay LochavAC No. 32 Sh. Balram TanwarAC No. 33 Sh Vijay JollyAC No. 34 Sh.Prem SinghAC No. 35 Sh.Ramesh BidhuriAC No. 36 Sh.Ram Vir Singh BidhuriAC No. 37 Sh.Brahm PalAC No. 38 Sh.Amrish Singh GautamAC No. 39 Smt.Meera BhardawajAC No. 40 Sh.Ashok Kumar WaliaAC No. 41 ShArvindra Singh LovelyAC No. 42 Sh HarshwardhanAC No. 43 Sh. Naseeb SinghAC No. 44 Sh Narendra NathAC No. 45 Sh.Veer Singh DhinganAC No. 46 Sh.Baljor Singh AC No. 47 Sh.Ram Babu SharmaAC No. 48 Sh Vinay SharmaAC No. 49 Sh.Mateen AhmadAC No. 50 Sh.Bhishm SharmaAC No. 51 Sh Sahib Singh Chauhan
AC No. 52 Sh Mohan Singh BishtAC No. 53 Sh Mange Ram GargAC No. 54 Sh.Charan Singh KanderaAC No. 55 Sh.Jile Singh ChauhanAC No. 56 Sh.Mangat Ram SinghalAC No. 57 Smt..Anjali RaiAC No. 58 Sh.Shoaib IqbalAC No. 59 Sh.Haroon YushufAC No. 60 Sh.Prahlad Singh SawhneyAC No. 61 Sh.Surender Pal Singh BitooAC No. 62 Sh.Kunvar Karan SinghAC No. 63 Sh.Shadi RamAC No. 64 Sh.Rajesh JainAC No. 65 Sh.Subesh SachdewaAC No. 66 Sh. Ramakant GosomiAC No. 67 Sh. P.C. YogiAC No. 68 Sh S.P. RatawalAC No. 69 Sh M.L. SodhiAC No. 70 Sh. Rajesh Lilothia
total 0 0 0 0 0 0 0
SUMMERY OF MLA FUND RELEASED BY MIN. OF UD
Amt. released on Date
000000000000000000000000000000000000000000000000000
Total Amt. Released
0000000000000000000
0 0 0 0
SOUTH DELHI MUNICIPAL CORPORATIONSTATUS REPORT OF MLA FUND FOR THE YEAR 2008-09 FOR THE MONTH ENDING MAY 2014
Zone Name of MLA Interest AMOUNT BOOKED BILLS VERIFIED Completed
CIVIL ELECT HORT. C.S.E CIVIL ELECT HORT. C.S.E WorksNos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Amt
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 32 33
4 Central 189.95 75.19 23.99 289.13 40 186.90 5 24.28 0 0.00 0 0.00 45 211.18 77.94 37 152.64 5 23.90 0 0.00 0 0.00 42 176.54 9 34.69 33 141.85 23.44 M-I(12-23.44),,,,,
5 Central Sh.T.S. Marwah 172.90 30.55 20.47 223.92 43 175.62 5 19.56 0 0.00 0 0.00 48 195.18 28.74 41 148.33 5 15.97 0 0.00 0 0.00 46 164.31 7 30.36 39 133.95 13.73
6 Central 332.33 92.79 28.08 453.20 33 167.77 14 40.78 0 0.00 0 0.00 47 208.55 244.65 28 112.23 14 37.54 0 0.00 0 0.00 42 149.78 7 36.61 35 113.17 36.21
7 Central 353.38 60.82 24.88 439.08 60 336.43 1 2.28 0 0.00 0 0.00 61 338.71 100.36 58 305.47 1 2.26 0 0.00 0 0.00 59 307.73 30 186.42 29 121.31 15.79
8 South 100.00 72.34 19.05 191.39 31 84.05 0 0.00 0 0.00 0 0.00 31 84.05 107.34 23 63.50 0 0.00 0 0.00 0 0.00 23 63.50 1 1.95 22 61.55 14.49 ,M-II(9-14.49),,,,
9 South Smt Kiran Walia 100.00 74.58 16.61 191.19 24 147.90 5 10.86 0 0.00 0 0.00 29 158.76 32.43 21 125.99 5 10.12 0 0.00 0 0.00 26 136.11 12 93.80 14 42.31 19.25 M-I(11-19.25),,,,,
10 South Smt Barkha Singh 100.00 14.68 8.35 123.03 19 58.81 0 0.00 0 0.00 0 0.00 19 58.81 64.22 19 57.42 0 0.00 0 0.00 0 0.00 19 57.42 2 5.68 17 51.75 0.07 M-I(2-0.07),,,,,
11 West 100.00 6.83 16.81 123.64 2 6.83 0 0.00 0 0.00 0 0.00 2 6.83 116.81 2 6.81 0 0.00 0 0.00 0 0.00 2 6.81 0 0.00 2 6.81 0.00 ,,,,,
12 West 292.17 153.92 25.57 471.66 89 427.53 0 0.00 0 0.00 0 0.00 89 427.53 44.13 88 389.28 0 0.00 0 0.00 0 0.00 88 389.28 37 192.57 51 196.71 22.66 ,,M-III(37-22.66),,,
13 West 143.54 23.23 24.05 190.82 28 131.08 7 29.63 0 0.00 0 0.00 35 160.71 30.11 28 121.76 7 27.35 0 0.00 0 0.00 35 149.11 12 60.18 23 88.93 8.27
14 West Sh.O.P.Babbar 191.85 15.94 19.05 226.84 58 192.32 4 14.20 1 1.65 0 0.00 63 208.18 18.66 52 165.13 4 13.64 1 1.64 0 0.00 57 180.42 5 13.31 52 167.10 20.76
15 West 100.00 97.55 19.08 216.63 37 162.32 7 23.65 0 0.00 0 0.00 44 185.98 30.65 33 128.61 6 21.86 0 0.00 0 0.00 39 150.47 10 49.66 29 100.82 31.23
16 West 158.24 51.14 21.15 230.53 35 135.81 1 3.46 0 0.00 0 0.00 36 139.26 91.27 34 118.44 1 3.34 0 0.00 0 0.00 35 121.79 7 23.08 28 98.70 10.26
23 N.Garh Sh Jai Kishan 100.00 119.57 16.91 236.48 38 173.77 8 27.87 0 0.00 0 0.00 46 201.64 34.84 38 160.10 8 24.85 0 0.00 0 0.00 46 184.96 0 0.00 46 184.96 0.00 ,,,,,
24 N.Garh 192.68 47.69 18.06 258.43 59 240.03 0 0.00 0 0.00 0 0.00 59 240.03 18.39 58 221.18 0 0.00 0 0.00 0 0.00 58 221.18 2 8.86 56 212.33 6.39 ,,M-III(3-6.39),,,
25 N.Garh 287.69 45.17 14.23 347.09 51 244.44 15 70.96 0 0.00 0 0.00 66 315.39 31.70 48 197.25 14 65.28 0 0.00 0 0.00 62 262.53 15 82.57 47 179.96 38.29
26 West 100.00 46.26 18.08 164.34 33 134.13 2 7.73 0 0.00 0 0.00 35 141.86 22.47 29 117.34 2 7.37 0 0.00 0 0.00 31 124.71 1 4.97 30 119.75 16.54 ,M-II(5-16.54),,,,
27 West 100.00 160.00 18.71 278.71 45 194.29 0 0.00 0 0.00 0 0.00 45 194.29 84.41 45 193.52 0 0.00 0 0.00 0 0.00 45 193.52 5 22.11 40 171.41 0.57 ,,,M-IV(5-0.57),,
28 N.Garh Sh Ranbir Kharb 164.30 29.04 15.56 208.90 50 181.62 0 0.00 0 0.00 0 0.00 50 181.62 27.28 50 181.71 0 0.00 0 0.00 0 0.00 50 181.71 0 0.00 50 181.71 0.00 ,,,,,
29 N.Garh 199.98 52.85 17.15 269.98 59 251.75 0 0.00 0 0.00 0 0.00 59 251.75 18.23 57 242.50 0 0.00 0 0.00 0 0.00 57 242.50 0 0.00 57 242.50 6.79 ,M-II(2-6.79),,,,
30 N.Garh 248.31 5.41 12.49 266.21 40 188.65 4 15.14 0 0.00 0 0.00 44 203.79 62.42 40 185.84 4 14.37 0 0.00 0 0.00 44 200.21 1 4.60 43 195.61 0.13 M-I(1-0.13),,,,,
31 N.Garh Sh Vijay Lochav 139.88 1.51 12.12 153.51 45 153.23 0 0.00 0 0.00 0 0.00 45 153.23 0.28 44 148.58 0 0.00 0 0.00 0 0.00 44 148.58 1 1.75 43 146.82 4.38 ,,M-III(2-4.38),,,
32 South 100.00 24.46 17.42 141.88 23 79.20 0 0.00 0 0.00 0 0.00 23 79.20 62.69 20 63.90 0 0.00 0 0.00 0 0.00 20 63.90 1 1.92 19 61.98 14.74 ,,,M-IV(4-14.74),,
33 South Sh Vijay Jolly 157.08 16.74 16.27 190.09 31 99.21 16 66.88 0 0.00 0 0.00 47 166.08 24.01 30 87.08 16 64.95 0 0.00 0 0.00 46 152.03 0 0.00 46 152.03 4.84 ,,M-III(1-4.84),,,
34 South Sh.Prem Singh 100.00 334.17 32.85 467.02 8 35.16 0 0.00 0 0.00 0 0.00 8 35.16 431.85 8 33.83 0 0.00 0 0.00 0 0.00 8 33.83 0 0.00 8 33.83 0.00 ,,,,,
35 Central 100.00 37.60 18.61 156.21 29 132.36 0 0.00 0 0.00 0 0.00 29 132.36 23.85 28 122.71 0 0.00 0 0.00 0 0.00 28 122.71 4 23.10 24 99.61 7.18 ,,M-III(5-7.18),,,
36 Central 100.00 51.88 18.63 170.51 23 100.77 0 0.00 0 0.00 0 0.00 23 100.77 69.75 22 91.18 0 0.00 0 0.00 0 0.00 22 91.18 3 12.60 19 78.58 6.32 ,,,M-IV(4-6.32),,
65 West 175.19 15.58 17.36 208.13 40 147.90 0 0.00 0 0.00 0 0.00 40 147.90 60.23 39 144.50 0 0.00 0 0.00 0 0.00 39 144.50 3 12.80 36 131.70 2.95 M-I(4-2.95),,,,,
Total 4599.47 1757.47 531.59 6888.53 1073 4569.89 94 357.28 1 1.65 0 0.00 1168 4928.82 1959.71 1020 4086.84 92 332.81 1 1.64 0 0.00 1113 4421.30 175 903.58 938 3517.72 325.29
Remarks:- Balance unbooked amount has already been sent back to UD department, Govt. of NCT of Delhi.
A/C NO
FUNDS RELEASE
D
Previous unbooked Amt.
TOTAL AMT.
AVAILABLE FOR BOOKING
TOTAL AMOUNT BOOKED
* FUNDS AVAILABLE
FOR BOOKING
TOTAL AMT. OF BILLS VERIFIED
Under Progress
Remarks (Liabilites)
`lacs
Liabilities details
Works Expenditure
ExpenditureAmt
(`lacs)Amt
(`lacs)Amt
(`lacs)Amt
(`lacs)Amt
(`lacs)Amt (`lacs) Amt
(`lacs)Amt
(`lacs)Amt
(`lacs)Amt
(`lacs)Amt
(`lacs)Amt
(`lacs)Amt
(`lacs) Div(No.,Amt.`lacs)
Sh.Sushil Choudhary
M-I(8-12.54),,,,E-I(1-1.19),
Sh. Parvez Hashmi
,M-II(11-35.1),,,E-I(1-1.11),
Sh.Subhash Chopra
,M-II(11-14.75),,,,EE(Pr.)(21-1.04)
Sh Yoganand Shastri
Sh.Karan Singh Tanwar Sh.Jagdish MukhiSh.Harcharan Singh Balli
M-I(6-6.42),,M-III(5-0.2),,E-I(1-1.65),M-I(1-2),,M-III(10-18.76),,,
Sh.Ramesh Lamba
M-I(14-30.14),,,,E-I(1-1.1),
Sh.Mala Ram Gangwal
M-I(6-8.52),M-II(2-1.74),,,,
Sh Raj Kumar Chouhan
Sh Bejinder Singh ,M-II(14-26.28),M-III(4-8.25),,E-I(1-3.76),
Sh.Dayanand ChandelaSh.Mukesh Sharma
Sh. Mahabal MishraSh.Dharam Dev Solanki
Sh. Balram Tanwar
Sh.Ramesh BidhuriSh.Ram Vir Singh BidhuriSh.Subesh Sachdewa
deptt. deptt. deptt. deptt.Div. Div. Div. Div. Div. Div.
civil elect hort cse M-I M-II M-III M-IV E-I EE(Pr.)
Status Report of MLA, Sh. Ashok AhujaAC No. 1,2008-09
S.No.
Name of Work deptt. Div. D.O.S D.O.C ExpenditureDate of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Status Report of MLA, Smt.Sheila DikshitAC No. 2,2008-09
S.No.
Name of Work deptt. Div. D.O.S D.O.C ExpenditureDate of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Status Report of MLA,Smt.Taj Dar BabarAC No. 3,2008-09
Name of Work deptt. Div. D.O.S D.O.C Expenditure
CIVIL M-I 26.06.08 28.03.09 198973 21.08.08 05.12.09 198973
ELECT E-I 23.06.08 09.01.09 218811 06.03.09 04.05.09 174157
ELECT E-I 23.06.08 09.01.09 222335 27.01.09 P 167793
ELECT E-I 23.06.08 09.01.09 220810 24.01.09 P 183539
ELECT E-I 23.06.08 09.01.09 240618 07.11.08 06.01.09 238856
ELECT E-I 23.06.08 09.01.09 218978 15.01.09 P 166956
CIVIL M-I 15.07.08 11.07.08 199131 20.08.08 25.09.08 197900
CIVIL M-I 15.07.08 11.07.08 196859 23.08.08 07.10.08 196571
CIVIL M-I 15.07.08 11.07.08 199534 22.08.08 23.10.08 199519
CIVIL M-I 22.07.08 11.07.08 186733 22.08.08 09.09.08 186733
S.No.
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
1 Dev of toilet block of swepers qrs.by replacing doors tiles and roof grading in w.no.153/CZ
123/12/08/08 M-I C.Zone
M/s Pooja Const.
2 Prov. of semi high mast lioght pole near h.no.832 Kotla Firozshah CZ
59/29.09.08/EE(E)-I
M/s Channa & Co.
3 Prov. of semi high mast lioght pole near banglo no.130 Sunder Ngr.CZ
50/17.09.08/EE(E)-I
M/s Channa & Co.
4 Prov. of semi high mast lioght pole near banglo no.99 Sunder Ngr.CZ
174/16.01.09/EE(E)-I
M/s Channa & Co.
5 P/F of HPSV street light fitting atSunder Ngr and Nizamuddin East.CZ
101/31.10.08/EE(E)-I
M/s Repair Shop
6 Prov. of semi high mast lioght pole near banglo no.19 Sunder Ngr.CZ
49/12.09.08/EE(E)-I
M/s Channa & Co.
7 P/l RMC with drainage on road berms from Banglow no.12 to 9 in Jaipur Estate in w.no.154 CZ
144/20.08.08/EE(M)-I
M/s Sudhir Const.
8 P/l RMC in lane from h.no. C-27 to B-29A with drainage in Nijammuddin West in w.no.154 CZ
135/20.08.08/EE(M)-I
M/s Shabin Entp.
9 P/l RMC with drainage on road berms from D-6 to D-1 and A-86 to 90 in Nizamuddin East in w.no.154 CZ
136/20.08.08/EE(M)-I
M/s Roop Narain Chaudhary
10 Dev of gali no.18 Bhargav lane and adj lane by pdg RMC in Darya Ganj in w.no. 153 CZ
142/20.08.08/EE(M)-I
M/s Suman Assos.
CIVIL M-I 22.07.08 11.07.08 194055 21.08.08 17.10.08 194055
CIVIL M-I 22.07.08 11.07.08 182146 26.08.08 24.09.08 182146
CIVIL M-I 29.07.08 25.07.08 197595 05.09.08 10.11.08 197152
CIVIL M-I 29.07.08 25.07.08 198914 04.09.08 10.10.08 198914
CIVIL M-I 29.07.08 25.07.08 197754 04.09.08 18.09.08 196547
CIVIL M-I 30.07.08 25.07.08 194270 12.11.08 06.05.10 192092
CIVIL M-I 30.07.08 25.07.08 135055 05.09.08 31.10.08 128513
CIVIL M-I 30.07.08 25.07.08 164243 05.09.08 04.12.08 161156
CIVIL M-I 30.07.08 25.07.08 191688 05.09.08 31.10.08 191688
CIVIL M-I 01.08.08 11.07.08 491540 29.09.08 28.11.08 491062
CIVIL M-I 06.08.08 25.07.08 418937 25.09.08 21.10.08 418937
CIVIL M-I 06.08.08 05.08.08 358906 12.03.09 10.06.09 350267
C/O Steps near Mandir at Vikram Ngr. in C-153/CZ CIVIL M-I 06.08.08 05.08.08 275635 16.01.09 09.03.09 275635
CIVIL M-I 14.08.08 14.06.08 5000000 03.10.08 P 4425699
CIVIL M-I 29.09.08 28.08.08 184683 09.01.09 23.03.09 184050
CIVIL M-I 29.09.08 28.08.08 179292 12.01.09 05.03.09 179292
CIVIL M-I 29.09.08 28.08.08 173052 12.01.09 06.04.09 167305
CIVIL M-I 29.08.08 28.08.08 482000 27.02.09 24.04.09 475076
ELECT E-I 17.09.08 05.09.08 90813 20.12.08 06.01.09 82190
ELECT E-I 17.09.08 05.09.08 196787
11 Dev of gali adj T-Series, building Darya Ganj by pdg by RMC in w.no.153 City Zone
137/20.08.08/EE(M)-I
M/s Roop Narain Chaudhary
12 Dev of Bharat Ram road & back lane side of Police station near Hindi park by pdg RMC in w.no.153 CZ
145/20.08.08/EE(M)-I
M/s Tarun Entp.
13 P/L RMC in lane from h.no.67 to C-29 in Jangpura-B in C-154/CZ
197/04.0908/(M)-I
M/s Bansal Entp.
14 P/L cc interlocking tile on road berms along park opp.103 to 126 and Kucha berm infront of h.no.144 to 120 in Sunder Ngr. in C-154/CZ
200/04.09.08/EE(M)-I
M/s Manoj Assos.
15 P/L cc interlocking tiles inthe lane along park side of Banglow no.30 and 37 in Sunder Ngr. C-154/CZ
194/04.09.08/EE(M)-I
M/s Ajay Const Co.
16 Dev of gali in Harijan Basti and near Mandir at Village Nangli Razapur by pdg RMC in C-153/CZ
195/04.09.08/EE(M)-I
M/s Uushal Bharat
17 Dev of gali in nafisa Masjid at Sarai Kale Khan by pdg RMC in C-153/CZ
199/04.09.08/EE(M)-I
M/s Kay Const Co.
18 Dev of gali no.T-86 at sarai Kale Khan by pdg RMC in C-153/CZ
192/04.09.08/EE(M)-I
M/s Ajay builders
19 Dev of gali Chand Biwi Camp at sarai Kale Khan by pdg RMC in C-153/CZ
198/04.09.08/EE(M)-I
M/s Laxmi Assos.
20 Dev of gali near DJB Office in 1 Darya Ganj by pdg RMC in C-153/CZ
226/24.09.08/EE(M)-I
M/s Bansal Entp.
21 P/L RMC interlocking tiles on road berms around park and Banglow from 52 to 71 in Sunder ngr. C-154/CZ
227/24.09.08/EE(M)-I
M/s Suman Assos.
22 Dev of footpath and side berms from shop no.4574/15 to 4551/16 at Padam Singh Marg by pdg RMC in Darya Gamj in C-153/CZ
357/02.01.09/EE(M)-I
M/s Priyadar Sri Const Co.
23 376/02.01.09/EE(M)-I
M/s Narender Kumar Const Co.
24 C/O Community Hall/Recreation Center at Sarai Kale Khan in CZ
05/23.09.08/EE(M)-I
M/s Ashok Kumar Jain
25 Dev of both side berm infront of Khalsa School at Khar Khana road road in w.no. 153 CZ
371/02.01.09/EE(M)-I
M/s Dinesh Kumar
26 Dev of fotthpath Dargah Shawri to shop no. 5045/9 at Khar Khana Darya Ganj in w.no. 153 CZ
356/02.01.09/EE(M)-I
M/s Manoj Assos.
27 Dev of footpath from foot over bridge to shop no. 5044/9 at Khar Khana road Darya Ganj in w.no. 153 CZ
359/02.01.09/EE(M)-I
M/Sindian Supply Agency
28 Dev of road surface by bituman mastic in side road of DC Office Darya Ganj in C-153/CZ
464/26.02.09/EE(M)-I
M/s Ashok Kumar Gupta
29 prov. of lighting arrangement in badminton Court at Nizamuddin Basti near Community Hall Center under C-153/CZ
140/12.12.08/EE(E)-I
M/s AE Engg. & builders
30 Prov. of street lighting arrangement with GI pole 8 mtr. at Nizamuddin East at Nizamuddin Basti under CZ
ELECT E-I 17.09.08 05.09.08 154072 15.02.09 06.03.09 106728
CIVIL M-I 29.09.08 24.09.08 240171 27.04.09 22.06.09 236422
CIVIL M-I 29.09.08 24.09.08 163491 16.02.09 23.04.09 163491
CIVIL M-I 29.09.08 25.09.08 307293 27.02.09 06.04.09 307293
CIVIL M-I 29.09.08 20.09.08 294241 27.02.09 06.04.09 293293
CIVIL M-I 29.11.08 24.09.08 198358 05.02.09 31.03.09 198358
CIVIL M-I 19.06.08 26.05.08 199708 07.08.08 08.09.08 199595
CIVIL M-I 19.06.08 26.05.08 199780 02.09.08 06.04.09 199780
CIVIL M-I 19.06.08 26.05.08 199075 20.08.08 06.01.10 198646
Dev of gali near Gurudwara in Vikram Ngr. in w.no.153/CZ CIVIL M-I 19.06.08 26.05.08 199606 07.08.08 01.10.08 199606
CIVIL M-I 19.06.08 26.05.08 197548 18.08.08 14.16.08 197548
ELECT E-I 19.06.08 16.05.08 276192
ELECT E-I 19.06.08 16.05.08 235714 06.03.09 04.05.09 170928
ELECT E-I 19.06.08 16.05.08 275617
ELECT E-I 19.06.08 16.05.08 272983 12.01.09 P 168427
31 Prov. of semi high mast pole near Mother Dairy at Radha Krishan Mandir at Jungpura-B under CZ
187/03.02.09/EE(E)-I
M/s Kamal Elect.
32 Dev of road from h.no. 4759/23 to 4764/23 by pdg RMC adj. Ansari road at Darya Ganj in w.no.153/CZ
484/27.02.09/EE(M)-I
M/s Puneet Const Co.
Dev of road from h.no. 4768/23 to 4765/23 by pdg RMC adj Bharat Ram road at Darya Ganj in w.no. 153/CZ
416/04.02.09/EE(M)-I
M/s Kay Const Co.
34 Dev of road from h.no. 32 to 40 by pdg RMC at Brij Mohan marg in darya Ganj in w.no. 153/CZ
486/27.02.09/EE(M)-I
M/s Bansal Entp.
35 Dev of road infront of h.no. 26A by pdg RMc adj Medical Association road at Darya Ganj in w.no. 153 CZ
473/27.02.09/EE(M)-I
M/s Monu Entp.
36 Dev of road surface by pdg mix concrete infront of h.no. 71 near Police Station at Darya Ganj in w.no. 153 City Zone
415/27.02.09/EE(M)-I
M/s Narender Kumar Const Co.
37 Dev of lane between h.no.T-61 and T-62 in Nangli Razapur by pdg RMC in w,vo.153/CZ
97/06.08.08/EE(M)-I
M/s Bansal Entp.
38 Dev of lane between h.no.B-47,B-36, B-37,A-41, and A-44,A-42 in Vikram Ngr.w.no.153/CZ
94/06.08.08/EE(M)-I
M/s Pooja Const.
39 Dev of open space and gali near h.no.E-49 Vikram Ngr.in w.no.153/CZ
95/06/08/08/EEM_I
M/s Rajiv Kumar
40 99/06.08.08/EE(M)-I
M/s Saman Assos.
41 Dev of Footpath of Mahrishi Naval Marg from JLN Marg to Sweepers Qtr. by pdg RMC w.no.153/CZ
96/06.08.08/EE(M)-I
M/s Pooja Const.
42 Prov. of semi-high mast pole near Mahila Park Nizamuddin West under CZ w.no.154
43 Prov. of semi-high mast pole near RB house Nizamuddin Basti CZ w.no.154
59/29.09.08/EE(M)-I
M/s Channa & Co.
44 Prov. of semi -high mast pole near Bavli Gate Nizamuddin Basti under CZ w.no.154
45 Prov.of semi-high mast pole at opp. Musafir Khan Nizamuddin Basti CZ w.no.154
58/29.09.08/EE(E)-I
M/s Channa & Co.
13075583
Status Report of MLA,Sh.Sushil ChoudharyAC No. 4,2008-09
S.No.
Name of Work deptt. Div. D.O.S D.O.C ExpenditureDate of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
CIVIL M-I 04.08.08 08.07.08 312500 05.05.09 23.07.09 312500
CIVIL M-I 04.08.08 08.07.08 401900 M/s Sunil Penwar 11.05.10 P 342978
CIVIL M-I 04.08.08 08.07.08 595000 26.05.09 p 592051
CIVIL M-I 04.08.08 22.07.08 594850 M/s Priya Darshni 20.03.09 12.05.10 403260
CIVIL M-I 04.08.08 2.07.08 465100 02.03.09 14.09.09 346146
CIVIL M-I 29.08.08 25.07.08 590600 15.01.09 20.04.09 590600
CIVIL M-I 29.08.08 25.07.08 677100 09.02.09 28.05.10 676683
CIVIL M-I 29.08.08 25.07.08 432400 25.12.08 09.03.09 418802
CIVIL M-I 29.08.08 25.07.08 446700 04.10.09 30.12.09 298095
CIVIL M-I 29.08.08 25.07.08 535800
CIVIL M-I 29.08.08 25.07.08 418050 20.12.08 06.02.09 416350
CIVIL M-I 29.08.08 05.08.08 376200 M/s JeePee Const. 04.06.09 31.08.09 375737
CIVIL M-I 29.08.08 05.08.08 593300 M/s Sunil Cont. 18.12.08 30.08.10 593300
CIVIL M-I 29.08.08 05.08.08 497200 22.07.09 23.09.09 496708
CIVIL M-I 29.08.08 05.08.08 467150 19.05.09 18.08.09 467150
CIVIL M-I 29.08.08 05.08.08 398200 M/s Sunil Cont. 02.02.09 P 322529
CIVIL M-I 29.08.08 05.08.08 550000
CIVIL M-I 29.08.08 05.08.08 340500 13.05.09 12.08.09 322474
CIVIL M-I 29.08.08 05.08.08 434650 M/s Sunil Cont. 21.03.09 05.05.09 410998
1 Dev of back lane by pdg RMC in gali no.4 and gali no.6 Wazir nagar in w.no. 158 CZ
384/02.03.09/EE(M)-I
M/s Pupinder Pal Singh
2 Dev of back lane by pdg RMC from h.no. 1742/2 and h.no. 1743 to h.no. 1744 in Sher Singh Bazar in K.M. Pur in w.no. 158 CZ
313/03.02.10/EE(M)-I
3 Dev of lane by pdg U/G drainage system and cc pav. from h.no. 2027 to 2015 and 2015 to 2021, h.no. 2033 to 2030 and its links lanes near chopal in village Pilanji, K.M. Pur in w.no. 158 CZ
326/16.02.09/EE(M)-I C.N.Z
M/S Kanwal Jit Singh Khurana
4 Const. and Dev. of back lane by cc interlocking tiles from h.no.A-359 to A-374 in A block Defence cly. in w.no. 159 CZ
194/12.12.08/EE(M)-I
5 Const. and Dev. of back lane by cc interlocking tiles from h.no.D-39 to D-45 in D block NDSE-II in w.no. 159 CZ
186/11.12.08/EE(M)-I
M/s Gopal Goyal
6 Dev of backlane by pdg RMC from h.no.23A to 26A in Ring Road Vikram Vihar Lajpat Ngr.-IV in C-160/CZ
268/12.01.09/EE(M)-I/CZ
M/s G. Pee Const Co.
7 Dev of road side berm in backlane of Ring road Banglows from h.no.1 to 15 Ring Road and h.no.16 to h.no.36 Ring Road in Lajpat Ngr.-IV in C-160/CZ
292/29.01.09/EE(M)-I
M/s G.Pee Const Co.
8 Dev of backlane by pdg RMC from h.no.I-26 to I-36,I-37 to I-34 and I-34 to I-32 in I-Block in Lajpat Ngr.-III in C-160/CZ
218/16.12.08/EE(M)-I
M/s Surbhi Const.
9 Dev of backlane by pdg interlocking tiles rom h.no.I-37 to I-17 in I-Block in Lajpat Ngr.-III in C-160/CZ
251/02.01.09/EE(M)-I
M/s Dinesh Ent.
10 Dev of road by pdg RMC from Hari Om Mandir to back of h.no.34/211 in Vikram Vihar Lajpat Ngr.-IV in C-160/CZ
11 Dev of backlane by pdg RMC from h.no.22A to near h.no.17A Ring Road Banglows in Vikram Vihar in Lajpat Ngr.-IV in C-160/CZ
192/11.12.08/EE(M)-I
M/s Deepak Assos.
12 Pdg RMC in backlane from h.no.D-410 to D-416 in D-Block Defence Colony in C-159/CZ
265/12.01.09/EEM-I
13 Pdg RMC in backlane from h.no.C-341 to C-350 in C-Block Defence Colony in C-159/CZ
229/17.12.08/EE(M)-I
14 Pdg RMC in backlane from h.no.D-298 to D-307 in D-Block Defence Colony in C-159/CZ
80/01.07.09/EE(M)-I
M/s Pupinder Pal Singh
15 Pdg RMC in backlane from h.no.C-16 to C-23 in C-Block Defence Colony in C-159/CZ
209/12.12.08/EE(M)-I
M/s Pupinder Pal Singh
16 Pdg RMC in backlane from h.no.B-43 to B-50 in B-Block Defence Colony in C-159/CZ
180/11.12.08/EE(M)-I/CZ
17 Pdg RMC in backlane from h.no.C-411 to C-417 and C-414 to C-421 in C-Block Defence Colony in C-159/CZ
18 Pdg RMC in backlane from h.no.C-286 to C-291 in C-Block in Defence Colony in C-159/CZ
297/03.02.09/EE(M)-I
M/s Pupinder Pal Singh
19 Pdg RMC in backlane from h.no.D-396 to D-402 in D-Block Defence Colony in C-159/CZ
212/12.12.08/EE(M)-I/CZ
CIVIL M-I 09.09.08 18.08.08 483569 03.10.08 04.12.08 483569
CIVIL M-I 07.10.08 10.09.08 594000 M/s Y.K Builder 06.05.09 09.10.09 494000
CIVIL M-I 07.10.08 10.09.08 427600 M/s A.K. Enterp. 23.04.09 15.10.09 427507
CIVIL M-I 07.10.08 10.09.08 597600 02.02.09 08.12.09 596729
CIVIL M-I 07.10.08 10.09.08 496000 M/s Laxmi Asso. 11.05.09 10.02.11 447098
CIVIL M-I 07.10.08 10.09.08 597000 05.06.09 P 594595
CIVIL M-I 07.10.08 10.09.08 599600 M/s Sunil Cont. 10.08.09 P 451780
ELECT E-I 07.10.08 12.08.08 597948 24.12.08 14.12.09 581562
ELECT E-I 07.10.08 09.08.08 580000 28.02.09 15.03.10 578840
ELECT E-I 07.10.08 27.08.08 450506 16.12.08 22.12.08 443274
ELECT E-I 07.10.08 11.08.08 400000 18.12.08 16.03.09 393639
ELECT E-I 07.10.08 06.08.08 400000 24.12.08 06.03.09 392661
CIVIL M-I 06.20.08 28.05.08 172000
CIVIL M-I 30.12.99 28.05.08 494800 M/s Sunil Cont. 10.10.08 08.12.08 456730
CIVIL M-I 06.20.08 28.05.08 486700 08.11.08 29.01.09 382477
CIVIL M-I 06.20.08 28.05.08 553000 26.09.08 P 293518
CIVIL M-I 06.20.08 28.05.08 439000 M/s Sunil Cont. 10.09.08 03.03.09 378760
CIVIL M-I 06.20.08 28.05.08 581800 15.10.08 08.11.08 482941
CIVIL M-I 06.20.08 28.05.08 493000 13.09.08 P 406123
20 Dev. of back lane from h.no.B-11 to F-63 upto J-7 by pdg RMC in Lajpat nagar IV in w.o.160/CZ
135/29.09.08/EE(M)-I/CZ
M/s Deepak Assos.
21 Dev. of road by pdg mastic asphalt from h.no.2 to 38 & h.no. 38 to 50 Armit nagar in w.no. 158/CZ
294/29.01.09/EEM-I
22 Dev. of road by pdg mastic asphalt from h.no. A-54 to A-70 in Amrit nagar in w.no. 158/Central Zone
284/15.01.09/EEM-I
23 Dev of road by pdg mastic asphalt from h.no. C-9 in C block NDSE-I in w.no. 158/CZ
287/15.01.09/EE(M)-I
M/s A.K. Enterp.
24 Dev. of road by pdg RMC from h.no. C-42 to C-31 in C block NDSE-I in w.no. 158 CZ
312/03.02.09/EE(M)-I
25 Dev. of road by pdg RMC from figure tone beauty parlour to Badli kerosin Oil Depot Pilanji village nallah road KM pur in in w.no. 158 CZ
300/03.02.09/EE(M)-I/CZ
M/s Surbhi Const.
26 Dev. of road by pdg RMC and Construction of footpah from h.no.7/120 to 1/16 Prem nagar in w.no. 158 CZ
333/25.02.09/EEM-I
27 P/o lighting arrangment with pole at Sowal nagar Amar cly., Lajpat nagar -III in w.no. 159 & 160 CZ
137/16.12.08/EE(E)-IV
M/s Electra Fusion Technologies
28 P/o lighting arrangement with pole at Kotla, Sewa Nagar, NDSE-I in AC-4 CZ (15 NOS. Pole)
354/26.02.09/EE(E)-IV
M/s Hhi-tech Electricals
29 P/o fancy lighting arrangement at B block Amar cly, opp. DMS booth w.no.160 CZ
79/16.12.08/EE(E)-IV
M/s Sushma Electricals
30 P/o of 250 watt street lighting arrangement at Amar cly. Dayanand cly., Lajpat Nagar -III AC-4 CZ
95/16.12.08/EE(E)-IV
M/s Neeraj Electricals
31 P/o 250watt street light arrangement at Kotla Mubarakpur, NDSE,II and sewa nagar in AC-4 CZ
112/16.12.08/EE(E)-IV
M/s S.T. Electricals
32 Dev of side berms from h.no.I-1 to I-10 in I-block Lajpat Ngr-III in w.no.160/CZ
33 Dev of side berms by pdg cc between O and Q Block and N to P Block Old Double Storey Lajpat Ngr.IV in w.no.160/CZ
118/02.09.08/EE(M)-I
34 Dev of back lane by pdg RMC from h.no.A-131 to A-144 and A-166 to A-130 in A-Block Dayanand Colony Lajpat Ngr.IV in w.no.160/CZ
115/02.09.08/EE(M)-I
M/s DSA Const Co.
35 Dev of back lane by pdg RMC from h.no.A-105 to A-95 and A-105 to A-145 in A-Block Dayanand Colony Lajpat Ngr.IV in w.no.160/CZ
116/02.09.08/EE(M)-I/CZ
M/s DSA Const Co.
36 Dev of back lane by pdg RMC from h.no. A-164 to A-146 in A-Block Dayanand Colony Lajpat Ngr.IV in w.no.160/CZ
117/02.09.08/EE(M)-I
37 Dev of back lane by pdg RMC from h.no.I-1 to I-9 in I-Block Lajpat Ngr.-III in w.no.160/CZ
120/02.09.08/EE(M)-I
M/s Bansal Entp.
38 Imp. of side berms by pdg RMC from h.no.A-28 Amar Colony to Block no.5 Old double Storey Lajpat Ngr.-IV in w.no.160/CZ
114/02.09.08/EE(M)-I
M/s DSA Const Co.
CIVIL M-I 06.20.08 28.05.08 421800 10.12.08 P 116928
CIVIL M-I 06.20.08 28.05.08 495989 02.02.09 P 348479
CIVIL M-I 06.20.08 28.05.08 331282 18.11.08 15.01.09 258322
CIVIL M-I 06.20.08 28.05.08 366000 24.03.09 24.11.09 365096
CIVIL M-I 06.20.08 28.05.08 395790 19.09.08 10.11.08 357242
CIVIL M-I 06.20.08 28.05.08 450900 M/s Sunil Cont. 25.10.08 27.01.09 450900
CIVIL M-I 06.20.08 28.05.08 85312 24.09.08 08.11.08 84876
39 Dev of road side berms by pdg cc pavment along nallah from Police Staff Qtrs. to I-10 (Gurudwara) in I-Block Lajpat Ngr.-III in w.no.160/CZ
119/02.09.08/EE(M)-I
M/s Kunwal Jit Singh Khurana
40 Dev of road side berms from h.no.A-99 to h.no.A-53 and back side of Khalsa School by pdg interlocking tiles in w.no.160/CZ
143/219.09.08/EE(M)-I
M/s Universal Const.
41 Dev of lane from h.no.G-51 to G-58 by pdg RMC in Lajpat Ngr.-III in w.no.160/CZ
145/29.09.08/EE(M)-I
M/s DSA Const Co.
42 Dev of road side berms in the back of ring road Banglows from h.no.6/57 to 6/5 and 4/8 to 4/3 and 2/8 to 2/5 and A-57 to A-7 and B-58 to B-9 in old Double Storey Lajpat Ngr.-IV in w.no.160/CZ
223/16.12.08/EE-M-I
M/s Kunwal Jit Singh Khurana
43 Dev of lane from h.no.G-8 to G-15 around park by pdg RMC in Lajpat Ngr.-III in w.no.160/CZ
112/28.08.08/EE(M)-I
M/s Garg Const Co.
44 Dev of road side berms by pdg RMC in the back lane of ring road Banglows starting from h.no.D-55 to D-8,F-57 to F-9,H-57 to H-7,J-57 to J-7,L-57 to L-7,N-57 to N-9 and P-57 to P-7 in Old Double Storey Lajpat Ngr.-IV in w.no.160/CZ
146/29.09.08/EE(M)-I
45 P/L RMC and drainage system in chowk from h.no.O-19 to O-23 in Old Double Storey Lajpat Ngr.-IV near Jagdish Shastri Chowk in w.no.160/CZ
109/25.08.08/EE(M)-I
M/s Garg Const Co.
Status Report of MLA,Sh.T.S. MarwahAC No. 5,2008-09
S.No.
Name of Work deptt. Div. D.O.S D.O.C Expenditure
CIVIL M-I 04.08.08 28.07.08 576150
CIVIL M-I 04.08.08 28.07.08 415600 09.02.09 16.03.09 376758
CIVIL M-I 04.08.08 28.07.08 308500
CIVIL M-I 04.08.08 28.07.08 278000 M/s J.R. Const. 30.01.09 10.04.09 278000
CIVIL M-I 04.08.08 28.07.08 384000 09.02.09 11.06.09 339136
CIVIL M-I 04.08.08 28.07.08 270600 12.03.09 23.03.09 249230
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
1 C/o of foothpath and road side berms from h.no. 1 to 30 (both side) in Vinodpuri in Lajpat nagar -II in w.no. 155 CZ
2 Dev. of lane/ back lane by pdg. cc pav. and drainage system from h.no. 81 to 152, 153 to 167 and 110 to 162 in Vinodpuri Lajpat nagar in w.no. 155 CZ
222/16.12.08/EE(M-I
M/s N. H builders
3 Dev. of back lane by pdg RMC from h.no.1 to 10, 11 to 22 and h.no. 21 to 30 in Vinodpuri Lajpat nagar in w.no. 15 CZ
4 Dev. of back lane by pdg RMC from h.no.60 to 70 in Vinodpuri Lajpat nagar in w.no. 15 CZ
283/15.01.09/EE(M)-I
5 Dev. of back lane by pdg RMC from h.no.31 to 60 infront of Shhetla Mata Mandir in Vinodpuri Lajpat nagar in w.no. 15 CZ
216/16.12.08/EE(M)-I
M/s N. H builders
6 Dev of lane by pdg cc pav. from h.no. A-11/90 to A-11/99 in A-11 block Lajpat nagar -II in w.no. 155 CZ
237/17.12.08/EE(M)-I
M/s Pupinder Pal Singh
CIVIL M-I 04.08.08 28.07.08 584000 23.04.09 05.02.10 444500
CIVIL M-I 04.08.08 28.07.08 596400 23.04.09 05.02.10 455143
CIVIL M-I 04.08.08 28.07.08 465550 06.02.09 16.04.09 392720
CIVIL M-I 04.08.08 28.07.08 490750 01.04.09 23.04.09 487589
CIVIL M-I 04.08.08 28.07.08 564850 08.10.09 04.06.10 499469
CIVIL M-I 04.08.08 28.07.08 598300 10.04.09 P 512713
CIVIL M-I 04.08.08 28.07.08 537100 10.02.09 13.03.09 470844
CIVIL M-I 04.08.08 28.07.08 588300 02.04.09 P 511003
CIVIL M-I 04.08.08 28.07.08 598700 09.03.09 P 596179
CIVIL M-I 04.08.08 28.07.08 358500 06.02.09 01.04.09 314446
CIVIL M-I 04.08.08 28.07.08 585000 22.04.09 26.10.09 499659
CIVIL M-I 04.08.08 28.07.08 577900 01.09.09 12.05.10 499783
CIVIL M-I 04.08.08 28.07.08 546650 29.04.10 18.05.10 499977
CIVIL M-I 04.08.08 28.07.08 442400 16.02.09 02.03.09 397934
CIVIL M-I 04.08.08 01.08.08 355000 12.03.09 23.03.09 345752
CIVIL M-I 04.08.08 01.08.08 393000 25.12.08 25.02.09 387398
7 Covering of open storm water drain by pdg RCC slab in Siddarth enclave fromflat no. 82 to main gate, 82 to 73, 58 to 43, 16 to 37, 13 to 10, 81 to 11 in Siddarth Enclave in w.no. 156 CZ
289/15.01.09/EE(M)-I
M/s G. Pee Const Co.
8 Covering of open storm water drain by pdg RCC slab in Sidharth Enclave from flat no.253 to 268,214 to 250,211 to 193,G-29 to 116, 127 to 193 and parking area in Sidharth Enclave in C-156/CZ
282/15.01.09/EE(M)-I
M/s G. Pee Const Co.
9 Dev of roads by pdg RMC from h.no.58 to 39 near Balmiki Chaupal and road side berms by pdg interlocking tiles adj to B/Wall of IIT Qtrs. in Kilokari Village in C-156/CZ
239/17.12.08/EE(M)-I
M/s Surbhi Const.
10 Dev of roads by pdg RMC from h.no.6/A to 26,15 to 19 near Jatav Chaupal,80 to 76 ,73 to 65 near Chaupal in Kilokari Village in C-156/CZ
311/03.02.09/EE(M)-I
M/s Laxmi Assos.
11 Dev of roads by pdg RMC from h.no.85 to 128,126D to 126A,40A to 43,41 to 42,44 to 40C,40B to 40,45 to 45A and 48 to 50 in Kilokari Village in C-156/CZ
79/01.07.09/EE(M)-I
M/s Bhupender Pal Singh
12 Dev of roads by pdg RMC from h.no.46 to 29,29 to 43,29 to Thaper Chember and 85 to 128 in Kilokari Village in C-156/CZ
232/17.12.08/EE(M)-I
M/s N. H builders
13 Dev of roads by pdg RMC from h.no.132 to 118,141 to Community Center and 146B to 150A in Kilokari Village in C-156/CZ
183/11.12.08/EE(M)-I
M/s N. H builders
14 Dev of roads by pdg RMC from h.no.96 to 87,96 to 113B,100 to 103,110 to 145 and 141 to 134 in Kilokari Village in C-156/CZ
182/11.12.08/EE(M)-I
M/s N. H builders
15 Dev of roads by pdg RMC Shop no.148 to 150/A and 19 to Balmiki Chaupal in Kilokari lage in C-156/CZ
285/15.01.09/EE(M)-I
M/s Pupinder Pal Singh
16 Dev of roads by pdg RMC from h.no.141 to 146B,146B to 585 in Kilokari Village in C-156/CZ
181/11.12.08/EE(M)-I
M/s N. H builders
17 Dev of roads by pdg RMC from Mandir to CMS Office in Kilokari Village in C-156/CZ
198/12.12.08/EE(M)-I
M/s N. H builders
18 Dev of lanes by pdg RMC from Urinal to Post Office,h.no.69 to Koli Camp,h.no.19 to 31,38 to38A,31 to 22,27 to 29,54 to 46 and 53 to 37 in Hari Ngr. Ashram(East)in C-156/CZ
115/25.08.09/EE(M)-I
M/s Pupinder Pal Singh
19 Dev of lanes by pdg RMC from h.no.61 to 340A,342 to 346,336 to 65, Mandir to h.no.71,59 to 68,346 to 347/5 and 80 to 75 in Hari Ngr.Ashram(East)in C-156/CZ
251/21.01.10/EE(M)-I
M/s Pupinder Pal Singh
20 Dev of lanes by pdg RMC from h.no.179/3 to 201 Jeevan Ngr.in C-156/CZ
202/12.12.08/EE(M)-I
M/s N. H builders
21 Dev of drainage system infront of h.no.A-11/3 to A-11/5 around the park and h.no.A-11/35 to A-11/43 in A-11 Block Lajpat Ngr. in C-155/CZ
231/17.12.08/EE(M)-I
M/s Pupinder Pal Singh
22 Dev of backlane by pdg RMC and drainage system from h.no.A-11/10 to A-11/22 Lajpat Ngr.-II in C-155/CZ
177/11.12.08/EE(M)-I
M/s Deepak Assos.
CIVIL M-I 04.08.08 01.08.08 383000 30.12.08 09.02.09 356456
CIVIL M-I 04.08.08 01.08.08 228000 12.01.09 27.02.09 213140
CIVIL M-I 04.08.08 01.08.08 308700 M/s J.R. Const. 27.01.09 16.03.09 304788
CIVIL M-I 04.08.08 01.08.08 314850 M/s J.R. Const. 10.02.09 20.03.09 314850
CIVIL M-I 04.08.08 01.08.08 283000 18.03.09 27.05.09 256527
CIVIL M-I 04.08.08 01.08.08 394000 15.01.09 30.03.09 365581
CIVIL M-I 04.08.08 01.08.08 261000 22.12.08 27.02.09 244138
CIVIL M-I 04.08.08 01.08.08 294950 14.02.09 30.04.09 275011
CIVIL M-I 04.08.08 01.08.08 296000 01.01.09 09.02.09 277428
CIVIL M-I 04.08.08 01.08.08 346700 24.02.09 25.03.09 344848
CIVIL M-I 04.08.08 01.08.08 327000 15.01.09 05.03.09 324872
CIVIL M-I 04.08.08 01.08.08 312300 11.01.09 13.03.09 312300
CIVIL M-I 04.08.08 01.08.08 312000 11.06.09 P 259091
CIVIL M-I 04.08.08 01.08.08 375000 13.04.09 06.06.09 374339
CIVIL M-I 04.08.08 01.08.08 206000 06.06.09 01.09.09 205207
CIVIL M-I 04.08.08 01.08.08 503850 15.06.09 18.08.09 432206
CIVIL M-I 04.08.08 01.08.08 344350 05.09.09 22.08.09 283557
CIVIL M-I 04.08.08 01.08.08 361600 12.03.09 P 296278
CIVIL M-I 04.08.08 16.05.08 398485 M/s V.V. Entp. 25.07.08 28.11.08 274903
23 Dev of lane by pdg cc pac around park infront of h.no.A-83 to A-11 Block Lajpat Ngr.-II in C-155/CZ
199/12.12.08/EE(M)-I
M/s Gopal Goyal
24 Dev of lane by pdg cc pav from h.no.B-11/21 to B-11/89 in B-11 Block Lajpat Ngr.-II in C-155/CZ
254/02.01.09/EE(M)-I
M/s Gopal Goyal
25 Dev of lane by pdg RMC around the park from h.no.D-11/10 to D-11/11 and D-11/25 to D-11/29B in Lajpat Ngr.-II in C-155/CZ
281/15.01.09/EE(M)-I
26 Dev of lane by pdg RMC from h.no.D-11/24 to D-11/28,h.no.D-11/28 to D-11/32 and h.no.D-11/35 to Pushpa Mkt.in Lajpat Ngr.-II in C-155/CZ
286/15.01.09/EE(M)-I
27 Dev of lane by pdg RMC around the park from h.no.D-11/4 to D-11/7 to D-11/12 in Lajpat Ngr.-II in C-155/CZ
261/05.01.09/EE(M)-I
M/s K.N. builders
28 Dev of lane by pdg cc pav. from RMC from h.no.G-11/57 to G-11/82 in Lajpat Ngr.-II in C-155/CZ
252/02.01.09/EE(M)-I
M/s Gopal Goyal
29 Dev of side/backlane by pdg cc pav.from h.no.I-13 to I-73 in I-Block in Lajpat Ngr.-II in C-155/CZ
200/12.12.08/EE(M)-I
M/s Gopal Goyal
30 Dev of lane by pdg c pav.from h.no.J-11/10 to J-11/13 and around park near h.no.J-11/10 in Lajpat Ngr.-II in C-155/CZ
309/03.02.09/EE(M)-I
M/s Gopal Goyal
31 Dev of lane/backlane by pdg cc pav.infront of park of J-11/10 and h.no.J-11/2 to J-11/44 in Lajpat Ngr.-II in C-155/CZ
187/11.12.08/EE(M)-I
M/s Gopal Goyal
32 Dev of lane by pdg cc pav.and drainage system around the park from h.no.J-11/27 to J-11/34 in Lajpat Ngr.-II in C-155/CZ
298/03.02.09/EE(M)-I
M/s Sunlight Const.
33 Dev of backlane by pdg cc pav.and drainage system from h.no.J-11/22 to J-11/14 and J-11/23 to J-11/26 in Lajpat Ngr.-II in C-155/CZ
225/16.12.08/EE(M)-I
M/s Sunlight Const.
34 Dev of draiange system along with park in E-1/7 in Lajpat Ngr.-II in C-155/CZ
250/02.01.09/EE(M)-I
M/s Surbhi Const.
35 Dev of backlane by pdg RMC from h.no.E-21 to E-35 in E-Ist Block in Lajpat Ngr.-I in C-155/CZ
368/02.03.09/EE(M)-I
M/s Suman Asso
36 Dev of pdg RMC and drainage system from E-88 to F-99 near Nallah in Lajpat Ngr.-I in C-155/CZ
346/26.02.09/EE(M)-I
M/s G. Pee Const Co.
37 Dev of drainage system from h.no.F-1/131 to F-1/136,H-13 to H-55 and 125,h.no.F-1/136 in Lajpat Ngr.-I in C-155/CZ
43/28.05.09/Eem_I
M/s Surbhi Const.
38 Dev of chowk by pdg interlocking tiles from h.no. C-11/132 to C-11/138, C-11/123 to C-11/94 in Lajpat nagar -II in w.no. 155, CZ
67/02.06.09/EE(M)-I
M/s Pupinder Pal Singh
39 Dev of lane/back lane/side lane by pdg cc pav. from h.no. F11/37 to F11/40, F-11/13 to F11/17 in Lajpat nagar -II in w.no.155/CZ
50/28.05.09/EE(M)-I
M/s Pupinder Pal Singh
40 Dev of back lane by pdg RMCand drainage system from h.no. F11/49 to F11/62, F-11/80 to F11/109 in Lajpat nagar -II in w.no.155/CZ
370/02.03.09/EE(M)-I
M/s Suman Asso
41 P/O Tubewell in park opp. h.no.L-19 Lajpat Ngr-II in w.no.155/CZ
200/09.07.08/EE(M)-I
P/o Tubewell in park opp. h.no.A-5 Lajpat Ngr-II w.no.155/CZ CIVIL M-I 04.08.08 16.05.08 398023 M/s V.V. Entp. 25.07.08 28.11.08 275579
CIVIL M-I 04.08.08 16.05.08 398219 M/s V.V. Entp. 25.07.08 28.11.08 284162
ELECT E-I 04.08.08 24.05.08 374331 19.10.08 17.12.08 334291
ELECT E-I 04.08.08 22.05.08 310000 30.12.08 10.02.09 256081
ELECT E-I 04.08.08 21.05.08 420000 08.09.08 17.11.08 314992
ELECT E-I 04.08.08 23.05.08 371632 19.10.08 17.12.08 331309
ELECT E-I 04.08.08 26.05.08 480000 17.09.08 P 360607
42 198/09.07.08/EE(M)-I
43 Prov. of Tubewell in park near h.no.B-25 Lajpat Ngr-II w.no.155/CZ
199/09.07.08/EE(M)-I
44 Prov.of lighting arrangement with pole at Lajpat Ngr.-I all blocks in w.no.155/CZ
47/13.10.08/EE(E)-IV
M/s Techno-view Elec.
45 Prov.of lighting arrangement with pole at Vinoba Puri and Krishna Mkt.in w.no.155/CZ
188/24.12.08/EE(E)-IV
M/s M.J. Elec. & Electro.
46 Prov.of Street lighting arrangement at Vinoba Puri and Krishna Mkt.,Lajpat Ngr.-I,II and Kilokri in w.no.155/CZ
27/04.09.08/EE(E)-IV
M/s Sushma Elec.
47 Prov.of lighting arrangement with pole at Lajpat Ngr.-II all blocks in w.no.155/CZ
47/13.10.08/EE(E)-IV
M/s Techno-view Elec.
48 Prov. of S.H.M.L. at Lajpat Ngr.-II /A-95 and J-13 Lajpat Ngr.-II in w.no.155/CZ
31/09.09.08/EE(E)-IV
M/s Cheena & Co.
Status Report of MLA,Sh. Parvez HashmiAC No. 6,2008-09
S.No.
Name of Work deptt. Div. D.O.S D.O.C Expenditure
CIVIL M-II 06.26.08 25.06.08 2424700 24.10.08 P 1568931
CIVIL M-II 21.07.08 26.06.08 282000 29.11.08 28.01.09 252934
CIVIL M-II 07.08.08 10.07.08 498800 03.10.08 10.12.08 483078
CIVIL M-II 07.08.08 10.07.08 462800 04.10.08 10.12.08 429469
CIVIL M-II 07.08.08 10.07.08 480800 06.10.08 10.12.08 426574
CIVIL M-II 07.08.08 10.07.08 485300 07.10.08 10.12.08 470583
CIVIL M-II 13.08.08 06.08.08 490970 27.12.08 P 437373
CIVIL M-II 25.08.08 31.07.08 499950 08.12.08 06.01.09 293747
CIVIL M-II 25.08.08 31.07.08 499650 10.12.08 31.12.08 290281
CIVIL M-II 25.08.08 31.07.08 499950 26.12.08 06.03.09 322326
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
1 Stg. of Okhla Road from Bus Stand to Main Road and Approach Road to teachers College in w.no.206/CZ SH: Resurfacing of road
25/26.09.2008/EE(Pr.)-II/CNZ.
M/s Dhingra Const. co.
2 C/O Toilet Block in Dhobi Ghat in CSP Flats,EOK in C-194/CZ
167/18.10.08/EE(M)-II
M/s Rana builders
3 Remodeling of Nallah from Mosque to RD-15 in Gaffar Manzil Extn. in C-206/CZ
26/30.09.08/EE(M)-II
M/s Shobi builders
4 Remodeling of Nallah from RD-15 to RD-30 in Gaffar Manzil Extn. in C-206/CZ
27/30.09.08/EE(M)-II
M/s Shobi builders
5 Remodeling of Nallah from RD-30to RD-45 in Gaffar Manzil Extn. in C-206/CZ
28/30.09.08/EE(M)-II
M/s Shobi builders
6 Remodeling of Nallah from RD-45 to RD-60 in Gaffar Manzil Extn. in C-206/CZ
29/30.09.08/EE(M)-II
M/s Shobi builders
7 C/O SW Drain in Noor Ngr.along Jamia B/Wall and Corner of Noor Ngr.to Okhla Vihar in C-206/CZ
164/13.10.08/EE(M)-II
M/s K.N. builders
8 Pdg drainage system and RMC infront Factory no.206,207 and 401 to 410 in Okhla Industrial Estate-III Modi Mill C-193/SNP Div-M-II/CZ
173/25.10.08/EE(M)-II
M/s Parkash Entp.
9 Pdg drainage system and RMC infront of h.no.5 and 8 Sardar Basti opp.Gurudwara Taimoor Ngr.C-193/SNP Div-M-II/CZ
172/25.10.08/EE(M)-II
M/s k.N. builders
10 Pdg drainage system and RMC infront of h.no.43 to 39A,38 to 39 and 20 to 34 and 21 to 31 and 11 to 19 and 44 to 39B in Bharat Ngr.C-193/SNP Div-M-II/CZ
175/25.10.08/EE(M)-II
M/s Sunlight Const.
CIVIL M-II 25.08.08 31.07.08 498700 21.01.09 06.03.09 300279
CIVIL M-II 25.08.08 31.07.08 499500 18.12.08 13.04.09 424325
CIVIL M-II 25.08.08 31.07.08 499800 18.12.08 13.02.09 393409
ELECT E-I 05.09.08 14.05.08 469361 30.12.08 29.01.09 469361
CIVIL M-II 10.09.08 29.08.08 499100 17.12.08 P 440539
CIVIL M-II 10.09.08 29.08.08 498550 15.01.09 16.02.09 313643
CIVIL M-II 13.10.08 11.10.08 435000 11.03.09 10.05.09 363492
CIVIL M-II 13.10.08 11.10.08 334950 Inder Const. 11.03.09 p 277301
CIVIL M-II 13.10.08 11.10.08 489600
CIVIL M-II 13.10.08 11.10.08 478000
CIVIL M-II 13.10.08 11.10.08 434000 11.03.09 30.03.09 287359
CIVIL M-II 13.10.08 11.10.08 578000
CIVIL M-II 13.10.08 11.10.08 386000 11.03.09 08.04.09 318528
CIVIL M-II 13.10.08 11.10.08 360950
CIVIL M-II 13.10.08 11.10.08 436000 11.03.09 10.05.09 379691
CIVIL M-II 13.10.08 11.10.08 322000 04.03.09 27.03.09 270629
CIVIL M-II 13.10.08 11.10.08 215000 11.03.09 08.07.09 177792
CIVIL M-II 13.10.08 11.10.08 511900 11.03.09 09.05.09 428045
CIVIL M-II 13.10.08 11.10.08 433900 11.03.09 07.12.09 364214
CIVIL M-II 13.10.08 11.10.08 427000 11.03.09 P 353651
11 Pdg drainage system and RMC in lane from h.no.50 to 67,50 to 60,57 to 91 and 102 to 104 Bad Deep Sweet to Lalu Kude Ram shop in Bharat Ngr.C-193/SNP Div-M-II/CZ
174/25.10.08/EE(M)-II
M/s Bansal Entp.
12 Pdg drainage system and RMC slab infront of Lotus tempal and Friends Colony Police Station in C-193/SNP Div-M-II/CZ
170/25.10.08/EE(M)-II
M/s Sunlight Const.
13 Pdg drainage system and Agra Stone in Community Center Mkt.area in D-Block NFC in C-193/SNP Div-M-II/CZ
171/25.10.08/EE(M)-II
M/s Rana builders
14 P/O street lighting arrangement on the existings poles at Noor Ngr.in C-205/CZ
219/24.12.08/EE(E)-IV
M/s Neeraj Elec.
15 C/o drain and pdg RCC slab from h.no. B-16 to B-36 in B block East of Kailash in w.no. 194 in E.O.K in w.no. 194/CZ
181/02.12.08/EE(M)-I
M/s Dinesh Ent.
16 Pdg and laying RMC and drainage system from h.no. 209 to 220 in Prakash Mohalla in w.no. 194/CZ
182/08.12.08/EE(M)-II
M/s Laxmi Assos.
17 Imp. of lane by pdg RMC and drainage system in Azim ki dairy opp. Kabirstan land Zakir nagar in w.no. 205/CZ
234/02.03.09/EE(M)-II
M/s R.K. Const Co.
18 Imp of berms by pdg RMC near MCD pry School and along flat of Zamia staff in noor nagar Okhla in w.no. 206 CZ
231/21.03.09/EE(M)-II
19 Dev od foothpath from A-184 to A-200 and A-16 in NFC by pdg interlocking tiles in w.no. 206 CZ
20 Dev od foothpath from B-473 to B-461 in NFC by pdg interlocking tiles in w.no. 206 CZ
21 Dev of road side side berms by pdg interlocking tiles from h.no. C-698 to C-714 in NFC by pdg interlocking tiles in w.no. 206 CZ
242/02.03.09/EE(M)-II
M/s Parkash Entp.
22 Imp. of lane by pdg interloking tiles from h.no. B-512 to B-521 and 337, 346 in NFC Okhla in w.no.206 CZ
23 Imp of berms by pdg RMC adj. h.no. 257 and near MCD park in Noor Nagar Okhla in w.no. 206/CZ
236/02.03.09/EE(M)-II
M/s Inder Const Co.
24 C/o footpath from h.no. C-695 to C-682 and C-744 in NFC by pdg interloking tiles in w.no. 206/CZ
25 Imp of lane by pdg RMC from along Hr. Sec School in Noor Nagar Okhla in w.no. 206 CZ
232/02.03.09/EE(M)-II
M/s Inder Const Co.
26 Imp. of lane by pdg RMC from h.no.112 street no.15 along MCd park, h.no. 41 street no.8, h.no. 46 and 47 in street no.2 in Noor nagar Okhla in w.no.206/CZ
235/02.03.09/EE(M)-II
M/s R.K. Const Co.
27 Imp od lane by pdg RMc from h.no. 116, C-27 and 22A and 22B/1 to 26A in Noor nagar Okhla in w.no. 206/CZ
233/02.03.09/EE(M)-II
M/s R.K. Const Co.
28 Dev of lane by pdg RMC and imp.of drainage system from h.no. 385/218 to Nallah and upto h.no. 183 from h.no. 325/24 in Gaffar Nagar in w.no. 206/CZ
237/02.03.09/EE(M)-II
M/s Inder Const Co.
29 Imp of lane by pdg RMC from opp. Danish Khan to 161/18, 161/3 and 161/9 to 161/18 in Joga Bai in w.no. 205/CZ
241/02.03.09/EE(M)-II
M/s Happy Const Co.
30 Imp of lane by pdg RMC and drainage system adj. h.no. 25B/1 Lajabab in Jaga Bai in w.no. 205/CZ
238/02.03.09/EE(M)-II
M/s Happy Const Co.
CIVIL M-II 13.10.08 11.10.08 423000 11.03.09 P 379821
CIVIL M-II 13.10.08 11.10.08 366000 11.03.09 10.05.09 303838
CIVIL M-II 13.10.08 11.10.08 563900 11.03.09 09.05.09 471201
CIVIL M-II 13.10.08 11.10.08 461600
ELECT E-I 13.10.08 11.10.08 204279 27.12.08 23.01.09 204185
P/o High mast light pole at Masicgarh in w.no. 205/CZ ELECT E-I 13.10.08 11.10.08 203970 29.12.08 13.01.09 201786
ELECT E-I 13.10.08 11.10.08 206617 26.12.08 23.01.09 206427
ELECT E-I 13.10.08 11.10.08 201327 26.12.08 23.01.09 201108
P/o High mast light with pole at Kalindi cly. w.no. 205/CZ ELECT E-I 13.10.08 11.10.08 203665 18.12.08 26.12.08 203099
P/o High mast light pole at Khizrabad under w.no.205/CZ ELECT E-I 13.10.08 11.10.08 205215 21.01.09 30.01.09 204973
ELECT E-I 13.10.08 11.10.08 398208 26.12.08 23.01.09 396086
ELECT E-I 13.10.08 11.10.08 398208 24.12.08 30.12.08 397732
ELECT E-I 13.10.08 11.10.08 204438 26.12.08 23.01.09 204118
ELECT E-I 13.10.08 11.10.08 199925 04.03.09 09.03.09 199315
P/o street lighting (HPSV) Gaffar Manzil AC-06/CZ ELECT E-I 13.10.08 11.10.08 393630 14.07.09 13.08.09 323538
ELECT E-I 20.06.08 02.06.08 474613 04.10.08 10.11.08 339498
ELECT E-I 20.06.08 02.06.08 314258 M/s A.K. Elect. 29.09.08 P 203250
31 Imp of lane by pdg from house adj 165, near Golden store and 3B/2 in Joga Bai in w.no. 205/CZ
240/02.03.09/EE(M)-II
M/s Happy Const Co.
32 Dev. of lane by pdg RMC and drainage system from h.no. D-35 to D-52, D-33/1 413 and 403 and 465/18 to A-50 in Batla house in w.no. 206/CZ
250/02.03.09/EE(M)-II
M/s Happy Const Co.
33 Dev of lane by pdg RMC and imp. if drainage system from h.no. 172/42 to 174/15, street no. 5 to Little Flower School, 93/324 to 321/72 in Gaffar nagar in w.no. 206/CZ
230/02.03.09/EE(M)-II
M/s R.K. Const Co.
34 C/o foothpath from A-29 to A-25 and A-16 in NFC in w.no. 206/CZ
35 P/o Higfh mast light with pole at C block NFC under w.no.206/CZ
243/26.12.08/EE(E)-IV
M/s Repair Shop
36 236/26.12.08/EE(E)-IV
M/s Vikas Elect. Store
37 P/o High mast light with pole at T point Jamia under w.no. 205/CZ
194/24.12.08/EE(E)-IV
M/s Maanu Elect.
38 P/o High mast light with pole at A block New friends cly. under w.no. 205/Cz
256/26.12.08/EE(E)-IV
M/s Pragati Engineers
39 96/16.12.08/EE(E)-IV
M/s Neeraj Elec.
40 269/20.01.09/EE(E)-IV
M/s Anna-Purna Elect.
41 P/o 2 Nos. High mast light with pole at Kalindi Kunj under AC-06/CZ
205/24.012.08EE(E)-IV
M/s Electra Fusion Tech.
42 P/o 2 Nos High mast light with pole near Holy Family Hospital under AC-06/CZ
191/24.12.08/EE(E)-IV
M/s Forward Engineers
43 P/o High mast light with pole at Okhla xing under w.no. 206/CZ
220/24.12.08/EE(E)-IV
M/s Anna-Purna Elect.
44 P/o High mast light with pole at round about Jamia w.no. 205/CZ
324/03.02.09/EE(E)-IV
M/s Vivek Elect.
45 28-49/06.07.09/EE(E)-IV
M/s Electra Fusion Tech.
46 P/O street light arrangement at Shri Niwaspuri and Okhla AC no.6/CZ
41/03.10.08/EE(E)-IV
M/s Sachdeva Electricals
47 P/O Street light fittings at Masigarh and Ishwar Ngr. AC no.6/CZ
37/22.09.08/EE(E)-IV
Status Report of MLA, Sh.Subhash ChopraAC No. 7,2008-09
S.No.
Name of Work deptt. Div. D.O.S D.O.C ExpenditureDate of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
CIVIL M-II 23.06.08 27.05.08 513000 16.12.08 P 281793
CIVIL M-II 23.06.08 27.05.08 498100 06.09.08 P 406684
CIVIL M-II 23.06.08 27.05.08 463700 02.09.08 05.12.08 390220
CIVIL M-II 23.06.08 27.05.08 492600 01.10.08 03.02.09 466532
P/L RMC from h.no.G-156 to G-66A in Kalkaji w.no.196/CZ CIVIL M-II 23.06.08 27.05.08 498600 04.09.08 31.10.08 416868
CIVIL M-II 16.07.08 27.05.08 499500 23.09.08 02.12.08 348092
CIVIL M-II 16.07.08 09.07.08 284300 16.09.08 31.10.08 231969
CIVIL M-II 16.07.08 09.07.08 498300 22.09.08 15.12.08 443763
CIVIL M-II 16.07.08 09.07.08 393300 22.09.08 22.01.09 332502
P/L RMC around park near h.no.F-51 Kalkaji in C-196/CZ CIVIL M-II 28.07.08 16.07.08 232900 20.10.08 06.04.09 212975
CIVIL M-II 28.07.08 16.07.08 499100 17.10.08 22.01.09 424162
CIVIL 30.07.08 28.07.08 499752 23.09.08 P 497405
CIVIL 30.07.08 28.07.08 499230 30.09.08 P 496685
CIVIL 30.07.08 28.07.08 499320 23.09.08 P 496626
CIVIL 30.07.08 28.07.08 499677 30.09.08 P 488987
CIVIL 30.07.08 28.07.08 499861 30.09.08 P 496670
CIVIL 30.07.08 28.07.08 269620 29.09.08 P 266977
CIVIL 30.07.08 28.07.08 499616 30.09.08 P 489010
1 Imp.of park B/Wall by pdg grit wash and M.S.grill near flat no.48 in Desh Bandhu Appt. Kalkaji w.no.196/CZ
168/18.10.08/EE(M)-II
M/s Rana builders
2 P/L cement concrete from h.no.363/05 to 404/05 in gali no.05 Govindpuri w.no.196/CZ
89/05.09.08/EE(M)-II
M/s Rana builders
3 P/L RMC from h.no.B-386 to B-508 and B-63 to B-135 in B-Block Transit Camp w.no.196/CZ
66/27.08.08/EE(M)-II
M/s Dev Const Co.
4 P/L RMC and drainage system from shop no.60 to Hans Raj Sethi Marg in Krishna Mkt. Kalkaji w.no.196/CZ
135/26.09.08/EE(M)-II
M/s Aditya Bhardwaj
5 65/27.08.08/EE(M)-II
M/s Dev Const Co.
6 P/L RMC and interlocking tiles near Flat no.21A,28A,31A and 36A in Pkt.-B in Gangotri Enclave in C-190/CZ
112/16.09.08/EE(M)-II
M/s K.N. builders
7 P/L RMC from h.no.G-77 to G-80B(Park)in G-Block Kalkaji in C-196/CZ
107/16.09.08/EE(M)-II
M/s Dev Const Co.
8 P/L cc from h.no.524/06 to h.no.574/07,521/06 to 729/07,518/06 to 731/07,516/06 to 732/07 and 595/06 to 587/06 in Govind Puri in C-196/CZ
109/16.09.08/EE(M)-II
M/s K.N. builders
9 P/L RMC from h.no.G-30,G-35 and G-37 in Kalkaji in C-196/CZ
111/16.09.08/EE(M)-II
M/s Dev Const Co.
10 157/13.10.08/EE(M)-II
M/s Dinesh Entp.
11 P/L Rmc and drainagesystem near h.no.F-78,F-67,F-70 and F-13 in F-Block Kalkaji in C-196/CZ
156/13.10.08/EE(M)-II
M/s Prakash Entp.
12 Stg.of road by dense carpetting from h.no.G-77 to G-112 and G-153 to G-173 in G-Block Kalkaji in SZ
EE(Pr.)
127/20.08.08/EE(Pr.)-South
M/s Mukesh Assos. Pvt. Ltd.
13 Stg.of road by dense carpetting from h.no.4/1 to 4/12 and h.no.6/1 to 6/63 Kalkaji Extn. in SZ
EE(Pr.)
126/20.08.08/EE(Pr.)-South
M/s Mukesh Assos. Pvt. Ltd.
14 Stg.of road by dense carpetting from h.no.G-66B to G-173 in Kalkaji in SZ
EE(Pr.)
130/20.08.08/EE(Pr.)-South
M/s Mukesh Assos. Pvt. Ltd.
15 Stg.of road by dense carpetting from h.no.DD-1 to DD-70 and DD-80 to DD-19 in Kalkaji in SZ
EE(Pr.)
129/20.08.08/EE(Pr.)-South
M/s Mukesh Assos. Pvt. Ltd.
16 Stg.of road by dense carpetting from h.no.E-12 to E-115 and E-75 to E-79 in E-Block Kalkaji in SZ
EE(Pr.)
131/20.08.08/EE(Pr.)-South
M/s Mukesh Assos. Pvt. Ltd.
17 Stg.of road by dense carpetting opp.Primary School Building of K-Block Kalkaji in SZ
EE(Pr.)
137/20.08.08/EE(Pr.)-South
M/s Mukesh Assos. Pvt. Ltd.
18 Stg.of road by dense carpetting from h.no.2/1 to 5/1 in Kalkaji Extn.SZ
EE(Pr.)
128/20.08.08/EE(Pr.)-South
M/s Mukesh Assos. Pvt. Ltd.
CIVIL 30.07.08 28.07.08 499814 30.09.08 P 497221
CIVIL 30.07.08 28.07.08 499504 30.09.08 P 496742
CIVIL 30.07.08 28.07.08 499536 30.09.08 P 496994
CIVIL 30.07.08 28.07.08 499064 23.09.08 P 496517
CIVIL 30.07.08 28.07.08 499569 08.10.08 P 496901
CIVIL 30.07.08 28.07.08 499487 08.10.08 P 496705
Stg.of road by dense carpetting opp.h.no.M-56 Kalkaji SZ CIVIL 30.07.08 28.07.08 499198 08.10.08 P 496476
Stg.of road by dense carpetting of H-Block Kalkaji SZ CIVIL 30.07.08 28.07.08 499677 23.09.08 P 497184
Stg.of road by dense carpetting opp. h.no.H-43, Kalkaji SZ CIVIL 30.07.08 28.07.08 499487 08.10.08 P 488472
CIVIL 30.07.08 28.07.08 499537 23.09.08 P 489010
CIVIL 30.07.08 28.07.08 499263 08.10.08 P 488475
CIVIL 30.07.08 28.07.08 499837 23.09.08 P 497507
CIVIL 30.07.08 28.07.08 499407 08.10.08 P 496883
CIVIL M-II 11.08.08 31.07.08 421500 18.10.08 30.01.09 350857
CIVIL M-II 11.08.08 31.07.08 504200 21.10.08 18.12.08 488385
CIVIL M-II 10.09.08 30.08.08 469300 05.03.09 P 316860
19 Stg.of road by dense carpetting from h.no.E-1 to E-175 in Kalkaji in SZ
EE(Pr.)
124/20.08.08/EE(Pr.)-South
M/s Mukesh Assos. Pvt. Ltd.
20 Stg.of road by dense carpetting front road of BSES Office in Kalkaji in SZ
EE(Pr.)
125/20.08.08/EE(Pr.)-South
M/s Mukesh Assos. Pvt. Ltd.
21 Stg.of road by dense carpetting from h.no.DD-12 to DD-35 in Kalkaji SZ
EE(Pr.)
123/20.08.08/EE(Pr.)-South
M/s Mukesh Assos. Pvt. Ltd.
22 Stg.of road by dense carpetting from h.no.G-1 to G-68 and G-1 to G-66 in G-Block Kalkaji in SZ
EE(Pr.)
122/20.08.08/EE(Pr.)-South
M/s Mukesh Assos. Pvt. Ltd.
23 Stg.of road by dense carpetting from h.no.M-16 to M-20 and M-21 to M-36 in Kalkaji in SZ
EE(Pr.)
140/20.08.08/EE(Pr.)-South
M/s Mukesh Assos. Pvt. Ltd.
24 Stg.of road by dense carpetting from h.no.M-1 to M-37 in Kalkaji in SZ
EE(Pr.)
132/20.08.08/EE(Pr.)-South
M/s Mukesh Assos. Pvt. Ltd.
25 EE(Pr.)
138/20.08.08/EE(Pr.)-South
M/s Mukesh Assos. Pvt. Ltd.
26 EE(Pr.)
134/20.08.08/EE(Pr.)-South
M/s Mukesh Assos. Pvt. Ltd.
27 EE(Pr.)
133/20.08.08/EE(Pr.)-South
M/s Mukesh Assos. Pvt. Ltd.
28 Stg.of the road by dense carpetting from h.no.J-84 to J-60 Rampuri, Kalkaji SZ
EE(Pr.)
139/20.08.08/EE(Pr.)-South
M/s Mukesh Assos. Pvt. Ltd.
29 Stg.of the road by dense carpetting b/w h.no.M-10,Balmiki Mandir Kalkaji SZ
EE(Pr.)
142/20.08.08/EE(Pr.)-South
M/s Mukesh Assos. Pvt. Ltd.
30 Stg.of the road by dense carpetting from h.no.L-16 to L-30 Kalkaji SZ
EE(Pr.)
141/20.08.08/EE(Pr.)-South
M/s Mukesh Assos. Pvt. Ltd.
31 Stg.of the road by dense carpetting from h.no.L-31 to L-43 Kalkaji SZ
EE(Pr.)
135/20.08.08/EE(Pr.)-South
M/s Mukesh Assos. Pvt. Ltd.
32 P/L RMC from h.no.L-1 to L-4 and L-5 to L-8 in L-Block Kalkaji in C-196/SZ
146/13.10.08/EE(M)-II
M/s Ganpati Const Co.
33 P/L RMC near Flat no.25,210 and PWD Office in Tilak Khand Giri Ngr.in C-196/SZ
155/13.10.08/EE(M)-II
M/s K.N. builders
34 C/o drain from h.no. A-414 to A-33 to A-4 in A block and transit camp w.no.196/CZ
222/25.02.09/EE(M)-II
M/S Garg Const.
CIVIL M-II 23.09.08 10.09.08 525300 26.02.09 11.05.09 440330
CIVIL M-II 23.09.08 20.09.08 490100
pdg rain shelter in M block Tikona park GK-II in w.no. 189/SZ CIVIL M-II 29.09.08 23.07.08 197700
CIVIL M-II 10.10.08 24.09.08 497600 04.03.09 01.07.09 462668
CIVIL M-II 10.10.08 24.09.08 505500 05.03.09 27.07.09 469213
CIVIL M-II 30.07.08 28.07.08 2500000 29.12.08 P 2486316
CIVIL M-II 30.07.08 28.07.08 1800000 11.01.09 11.03.09 1800000
I/S of internal road of block -C in Kalkaji in AC-07/CZ CIVIL M-II 30.07.08 28.07.08 1480098 09.06.09 P 1339410
CIVIL M-II 30.07.08 28.07.08 2243899 11.01.09 P 2170713
CIVIL M-II 10.09.08 30.08.08 499481 M/s S.S. Engg. 13.10.08 P 493624
ELECT E-I 17.09.08 24.05.08 228240 03.10.08 10.10.08 225613
CIVIL 30.07.08 28.07.08 499336 23.09.08 P 488612
CIVIL M-II 05.05.08 02.05.08 510800 17.09.08 23.10.08 420265
CIVIL M-II 28.05.08 07.05.08 496500 24.09.08 22.01.09 414914
CIVIL M-II 28.05.08 07.05.08 524300 24.09.08 16.12.08 491195
CIVIL M-II 28.05.08 16.05.08 199964 M/s S.S. Engg. 17.09.08 08.12.08 199964
CIVIL M-II 02.06.08 16.05.08 199906 16.09.08 20.10.08 197497
CIVIL M-II 02.06.08 16.05.08 199713 17.09.08 30.01.09 199000
CIVIL M-II 03.06.08 15.05.08 493400 23.09.08 24.01.09 408472
35 Pdg Laying RMC from shop.no. 1 to 20 back lane in Krishna mkt. Kalkaji w.no. 196/CZ
214/25.02.09/EE(M)-II
M/s K.S. builders
36 Pdg Laying RMC near h.no. B-74 top B-55 in B block Kalkaji EE(M)-II Central Zone
37
38 pdg/laying RMC from h.no.1 to 47, 49 to 89, 146 to 186 and 258 to 282 in Subash Khand Giri nagar in w.no. 196/CZ
211/25.02.09/EE(M)-II
M/s Dev Const Co.
39 Pdg/laying RMC from h.no. 2 to 26 and h.no. 34 to 58 in Bal Mukund Khand Giri nagar w.no. 196/CZ
209/25.02.09/EE(M)-II
M/s Surbhi Const.
40 I/S of internal roads by dense carpeting in A-block Kalkaji, AC-07/CZ
260/02.12.08/EE(Pr.) South
M/s Mukesh Assos. Pvt. Ltd.
41 I/S internal of road by dense carpeting in B block, Kalkaji in AC-07/CZ
262/02.12.08/EE(Pr.) South
M/s Mukesh Assos. Pvt. Ltd.
42 323/05.02.09 EE(Pr.) S.Z
M/s Mukesh Assos. Pvt. Ltd.
43 Stg of the road by dense carpeting from back of Alaknanda mkt. along J-I and J-11 DDA flats, along Raghunath Mandir upto Tara apptt. road and main road between J-I, J-II, J-III, block Janta flats Kalkaji in AC-07/CZ
261/02.12.08/EE(Pr)South
M/s Mukesh Assos. Pvt. Ltd.
44 Provision and fixing MS grill on B/wall of park Mandakani apptt. from gate no. 1 to 7 in w.no. 196/CZ
138/06.10.08/EE(M)-II
45 P/o lighting arrangement with six poles at MCD park S-161 GK-II in w.no. 189/SZ
42/03.10.08/EE(E)-IV
M/s Repair Shop
46 Stg. of road by dense carpetting from h.no. G-1 to G-10, Kalkaji South Zone
EE(Pr.)
136/20.08.08/EE(Pr.)-South
M/s Mukesh Assos. Pvt. Ltd.
47 P/L RMC from h.no.G-123 to h.no.G-89 in G-Block Kalkaji W.no.196/CZ
105/16.09.08/EE(M)-II
M/s Bansal Entp.
48 P/L RMC from h.no.831C/7 to h.no.1343/13 in Govind Puri w.no.195/CZ
108/16.09.08/EE(M)-II
M/s Bansal Entp.
49 P/L RMC at approach road of B-block Transit Camp near T-Junction of Baba Feteh Singh Marg at w.no.196/CZ
103/16.09.08/EE(M)-II
M/s Aay Kay Const Co.
50 P/L RMC from h.no.G-66A to G-60A in G-Block Kalkaji w.no.196/CZ
96/09.09.08/EE(M)-II
51 P/L cc from h.no.B-267 to B-278 to B-183 in B-Block Transit Camp w.no.196/CZ
96/09.09.08/EE(M)-II
M/s Vats Const Co.
52 C/O drain from h.no.B-284 to B-194 in B-Block Transit Camp w.no.196/CZ
95/09.09.08/EE(M)-II
M/s Kanwar Pal Singh
53 P/L RMC from h.no.G-1A to G-8B in G-Block Kalkaji w.no.196/CZ
110/16.09.08/EE(M)-II
M/s Bansal Entp.
CIVIL M-II 03.06.08 15.05.08 498000 01.10.08 02.12.08 408023
CIVIL M-II 03.06.08 15.05.08 511800 24.09.08 11.11.08 423797
CIVIL M-II 03.06.08 15.05.08 495900 22.09.08 25.10.08 410348
CIVIL M-II 03.06.08 15.05.08 491000 21.09.08 03.11.08 404364
CIVIL M-II 20.06.08 28.05.08 484900 20.10.08 18.12.08 478417
CIVIL M-II 20.06.08 28.05.08 377411 16.12.08 P 304428
CIVIL M-II 20.06.08 28.05.08 199367 21.10.08 20.12.08 170164
P/L RMC in pkt.E Gangotri Enclave Alaknanda w.no.190/CZ CIVIL M-II 20.06.08 25.05.08 692400 15.12.08 P 686364
54 P/L RMC from h.no.G-31 to G-27 to G-20B to G-18B in G-Block Kalkaji w.no.196/CZ
136/26.09.08/EE(M)-II
M/s Bansal Entp.
55 P/L RMC from h.no.K-18 to K-21 to K-28 to K-32 in K-Block Kalkaji w.no.196/CZ
102/16.09.08/EE(M)-II
M/s Bansal Entp.
56 P/L RMC from h.no.K-86 to K-135 in K-Block Kalkaji w.no.196/CZ
106/16.09.08/EE(M)-II
M/s Bansal Entp.
57 P/L RMC from h.no.G-123 to G-149 in G-Block Kalkaji w.no.196/CZ
104/16.09.08/EE(M)-II
M/s Bansal Entp.
58 P/L RMC from h.no.L-25 to L-32 and L-51 to L-52 in L-Block Kalkaji w.no.196/CZ
166/13.10.08/EE(M)-II
M/s Aay Kay Const Co.
59 P/L interlocking tiles from h.no.153 to 137 and 154 to 138 in Nilgiri Appt. w.no.190/CZ
183/08.12.08/EE(M)-II
M/s Rai Bros. & Assos.
60 P/L cc from h.no.B-315 to B-291 in B-Block Transit Camp w.no.196/CZ
163/13.10.08/EE(M)-II
M/s Dev Const Co.
61 184/08.12.08/EE(M)-II
M/s Aay Kay Const Co.
Status Report of MLA,Sh Yoganand ShastriAC No. 8,2008-09
S.No.
Name of Work deptt. Div. D.O.S D.O.C Expenditure
CIVIL M-II 09.07.08 23.05.08 199631 18.08.08 15.10.08 199631
CIVIL M-II 09.07.08 23.05.08 197607 02.09.08 23.12.08 196963
CIVIL M-II 09.07.08 23.05.08 198000 M/s Ramkesh 10.09.08 31.10.08 198000
CIVIL M-II 09.07.08 23.05.08 199000 21.08.08 17.10.08 198980
CIVIL M-II 09.07.08 23.05.08 199000 15.09.08 30.10.08 198779
CIVIL M-II 09.07.08 23.05.08 197762 28.08.08 10.10.08 197762
CIVIL M-II 09.07.08 23.05.08 198000 02.09.08 P 194868
CIVIL M-II 09.07.08 23.05.08 199629
CIVIL M-II 24.07.08 16.07.08 199958 17.10.08 12.12.08 165603
CIVIL M-II 25.07.08 17.07.08 460000 30.10.08 15.11.09 460000
CIVIL M-II 25.07.08 17.07.08 490000 30.10.08 22.01.09 490000
CIVIL M-II 25.07.08 17.07.08 400000 22.10.08 19.01.11 400000
CIVIL M-II 28.08.08 23.05.08 174609 26.04.09 20.08.09 139480
CIVIL M-II 28.08.08 23.05.08 199478
CIVIL M-II 28.08.08 23.05.08 177952
CIVIL M-II 28.08.08 23.05.08 199929
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
1 Imp of back lane by P/l interlocking tiles from h.no. B-34 to B-43 at Sarvodya Enclave in w.no. 161/Sz
70/08.08.08/EE(M)-II
M/s Kwality Entp.
2 Imp of road berms by P/l interlocking tiles from entrance gate no. 3 to opp. B-25 at Sarvodya Enclave in w.no.161/SZ
91/25.08.08/EE(M)-II
M/s Gya Dass Const. Co.
3 Imp of road berm by P/l interlocking tiles from h.no. D-13 to D-23 at Geetanjali Enclave in w.no.161/SZ
90/25.08.08/EE(M)-II
4 Imp of B/wall and walkway infront of 10 b/k Malviya nagar in w.no.161 SZ
66/25.08.08/EE(M)-II
M/s Pooja Entp.
5 Imp. of road by P/L intrelocking tiles from Entrance Gate no.2 to opp.h.no.B-24 at Sarvodya Enclave in C-161/SZ
92/25.08.08/EE(M)-II
M/s Tanwar Const.
6 Imp.of back lane by P/L intrelocking tiles from h.no.B-51 to B-44 at Sarvodya Enclave in C-161/SZ
88/25.08.08/EE(M)-II
M/s Kuldeep Const. Co.
7
Imp of foothpath adj. to gate no. 3 opp. Mothers International School by p/l interlocking tiles and kerb stone at Sarvodya Enclave in C-161/SZ
89/25.08.08/EE(M)-II
M/s Sunil Kumar
8 Dev ogf lane from h.no.25/3 to 13B and adj to h.no.27 at Adchini Village in w.no 161/SZ
9 Const and raising of B/wall of park in appart. Panchshil enclave in w.no.191/SZ
123/07.10.08/EE(M)-II
M/s Sadhara Assos.
10 Pdg and laying interlocking tiles in parking area C-4 in pkt.-C Sheikh Sarai SFS-1 in w.no.191/SZ
162/21.10.08/EE(M)-II
M/s Pappu Seth
11 Pdg and laying interlocking tiles in parking area C-6 in pkt.-C Sheikh Sarai SFS-1 in w.no.191/SZ
161/21.10.08/EE(M)-II
M/s Kuldeep Const. Co.
12 Pdg and laying interlocking tiles in parking area B-1 and B-5 in pkt.-B Sheikh Sarai SFS-1 in w.no.191/SZ
152/13.10.08/EE(M)-II
M/s Pappu Seth
13 Pdg cc from h.no. E-2/10 to E-2/16 in E block Malviya nagar in w.no.161/SZ
244/17.02.09/EE(M)-II
M/s J.K. Const. & Co.
14 Pdg cc from Balmiki temple to Sr. Sec School and h.no. 70-B in village Hauz Rani in w.no.162/SZ
15 Pdg cc from h.no.282 Baba dairy to 226 to near MC Pry. School in village Hauz Rani in w.no.162/SZ
16 Pdg cc from Kabab Corner to H U Khan Sherwani house and near Gandhi park in village Hauz Rani in w.no.162/SZ
CIVIL M-II 28.08.08 23.05.08 199241
CIVIL M-II 28.08.08 23.05.08 178391
CIVIL M-II 28.08.08 23.05.08 199794 17.02.09 16.06.09 160407
P/L CC in back lane of h.no.B-1/1 in Malviya Ngr.in C-162/SZ CIVIL M-II 28.08.08 23.05.08 144308P/L CC in back lane of h.no.1/6 in Malviya Ngr. in C-162/SZ CIVIL M-II 28.08.08 23.05.08 147030
CIVIL M-II 28.08.08 23.05.08 173343 16.02.09 18.06.09 139292
CIVIL M-II 28.08.08 11.08.08 499393 26.05.09 24.07.09 384998
CIVIL M-II 28.08.08 11.08.08 495049 01.06.09 22.07.09 396279
CIVIL M-II 28.08.08 11.08.08 260133 26.05.09 27.11.09 213418
CIVIL M-II 28.08.08 11.08.08 254375 26.05.09 30.11.09 207510
CIVIL M-II 28.08.08 11.08.08 269378 18.03.09 21.01.10 219302
CIVIL M-II 28.08.08 11.08.08 181513 01.06.09 27.11.09 147362
CIVIL M-II 07.10.08 29.09.08 367050 21.01.09 17.03.09 341613
CIVIL M-II 07.10.08 29.09.08 558900 12.02.09 12.08.09 513311
CIVIL M-II 07.10.08 25.09.08 586100 14.01.09 08.04.09 586100
17
Pdg cc from h.no. 74 to Press enclave road, h.no.79 to Chaudhary Mamchan house and h.no.77 to Mamchand in village Hauz Rani in w.no.162/SZ
18 Pdg cc from h.no.262 to 267/1 (Ammu) and near h.no. 148 in village Hauz Rani in w.no.162/SZ
19 P/L CC in back lane of h.no.M-7913 and B-1/155 in Malviya Ngr. in C-162/SZ
206/19.01.09/EE(M)-II
M/s Harsha Const.
20 21
22 P/L CC in back lane of h.no.E-3/7 to E-2/8 in E-Block Malviya Ngr. in C-162/SZ
198/09.01.09/EE(M)-II
M/s Harsha Const.
23 Dev of road berms by pdg RMC adj park from h.no.F-11/1 to Gol Chukkar in F-Block Malviya Ngr. in C-162/SZ
241/17.02.09/EE(M)-II
M/s J.K. Const. & Co.
24 Dev of road by pdg RMC between h.no.F-11/6 and oark in F-Block Malviya Ngr. in C-162/SZ
253/20.02.09/EE(M)-II
M/s J.K. Const. & Co.
25 Dev of lane by pdg RMC between h.no.F-7/12 and F-8/12 in F-Block Malviya Ngr. in C-162/SZ
242/17.02.09/EE(M)-II
M/s J.K. Const. & Co.
26 Dev of road by pdg RMC between h.no.F-3/1 and F-4/1 in F-Block Malviya Ngr. in C-162/SZ
243/17.02.09/EE(M)-II
M/s J.K. Const. & Co.
27 Dev of road by pdg RMC between h.no.F-3/1 and F-1/4 in F-Block Malviya Ngr. in C-162/SZ
245/17.02.09/EE(M)-II
M/s J.K. Const. & Co.
28 Dev of road berm by pdg RMC between gate adj h.no.F-11/12 and Gurudwara in F-Block Malviya Ngr. in C-162/SZ
250/20.02.09/EE(M)-II
M/s J.K. Const. & Co.
29
dev of internal roads pdg RMc from h.no. 33 to 34, 25 to 26, 18 to 25, 58 to 59, 57 to 58 and around park in Kailash Kunj in w.no. 192/CZ
264/12.01.09/EE(M)-II
M/s Suman Assos.
30 Dev of back lane by pdg RMC from h.no. M-2 to M-32 in M block GK-I i w.no. 192/CZ
316/03.02.09/EE(M)-I
M/s Sunil Const.
31
Dev of back lane by pdg interlocking tiles fromh.no. E-185 to E-203, E-286 to E-264, E-109 to E-133 in E block in GK-I in w.no. 192/CZ
260/05.01.09/EE(M)-II
M/s Gopal Goyal
Status Report of MLA,Smt Kiran WaliaAC No. 9,2008-09
S.No.
Name of Work deptt. Div. D.O.S D.O.C Expenditure
CIVIL M-I 23.06.08 26.05.08 499708 01.10.08 22.12.08 491469
CIVIL M-I 23.06.08 23.05.08 199805 29.08.08 15.01.09 199805
CIVIL M-I 23.06.08 23.05.08 499887 M/s Ravi Gupta 14.08.08 28.02.09 499887
ELECT E-I 23.06.08 30.05.08 233885 29.01.09 22.05.09 199695
CIVIL M-I 12.08.08 25.07.08 319689 08.09.09 P 261466
P/L RMC in lane of Vijay Mandal janta Flats in C-161/SZ CIVIL M-I 12.08.08 25.07.08 470317 08.08.09 P 379202
P/L RMC in lane of Sarvpriya Vihar Janta Flats in C-161/SZ CIVIL M-II 12.08.08 25.07.08 247091 29.07.09 01.09.09 197911
ELECT E-I 25.08.08 11.08.08 213694 02.01.09 01.02.09 203576
P/O semi high mast light in Hauz Khas Village in C-163/SZ ELECT E-I 28.08.08 11.08.08 215280 26.02.08 10.09.09 208378
ELECT E-I 25.08.08 11.08.08 213176 03.01.09 02.02.09 206815
ELECT E-I 25.08.08 11.08.08 209669 01.01.09 30.01.09 193246
CIVIL M-I 16.09.08 07.08.08 275400 10.02.09 30.07.09 230890
CIVIL M-I 16.09.08 07.08.08 346550 28.05.09 P 278795
CIVIL M-I 16.09.08 07.08.08 309800
CIVIL M-I 16.09.08 07.08.08 447500 28.02.09 P 437235
CIVIL M-I 16.09.08 25.08.08 568200
CIVIL M-I 16.09.08 25.08.08 522700 02.03.09 02.06.09 481972
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
1 Covering of drain by RCC slab near h.no.C-12 in Green Park in C-163/SZ
162/08.08.08/EE(M)-I
M/s Chajju Ram Bedwal
2 Dev to park by prov. walkway with interlocking pavers near h.no. B-2/63 in S.j. Enclave in C-163/SZ
199/22.08.08/EE(M)-I
M/s Vinod Prakash Entp.
3 Covering of drian by RCC slab near h.no.A-6 in Green Park in C-163/SZ
163/08.08.08/EE(M)-I
4 P/O semi high mast light at park opp. kalu Sarai Village Sarvpriya vihar w.no.161 under SZ
290/20.01.09/EE(E)-I
M/s Perfect Elect. Works
5 P/L interlocking tiles and RMC in lane from h.no.45 to Gurudwara and infront of Masjid at Kalu sarai in C-161/SZ
82/29.06.09/EE(M)-II
M/s Denish Builders
6 83/29.06.09/M-II S.Z
M/s Shalib Gupta
7 80/22.06.09/EE(M)-SZ-II
M/s Shalib Gupta
8 P/O semi high mast light in B-1 Safdarjang Enclave in C-163/SZ
195/24.12.08/EE(E)-IV
M/s Electra Fusion Techn.
9 380/26.02.09/EE(E)-IV
M/s Saturn Elect.
10 P/O semi high mast light in park infront of h.no.285 Gulmohar Enclave in C-164/SZ
254/26.12.08/EE(E)-IV
M/s Pragati Engg.
11 P/O semi high mast light at Sudarshan Road Gautam Ngr.in C-164/SZ
201/24.12.08/EE(E)-IV
M/s Maya Elect.
12 Dev. of street lane by pdg cc near h.no. 34 in Hauz Khas village in C-163 SZ
405/30.01.09/EE(M)-I
M/s Jitender Kumar
13 Dev of back lane by pdg cc behind S-II in Greeen park in E-163/SZ
451/20.02.09 M-I SZ
M/s DSA Const Co.
14 Stg. of road by pdg dense carpeting from X-63 to X-49 in Green park in C-163/SZ
15 Dev top back lane by pdg interlocking pavers behind D-27 in Green park at C-163/SZ
452/20.02.09/EE(M)-I
M/s DSA Const Co.
16 Stg. of road by pdg dense carpeting from h.no. B-6/23 to B-6/46 and near B-6/47 in SJ enclave in C-163/SZ
17 Dev of street lane by pdg cc near h.no. 49/B-2 in Arjun nagar in C-163/SZ
453/20.02.09/EE(M)-I
M/s Neel Const & Govt. Supp.
CIVIL M-I 16.09.08 25.08.08 406850 01.06.09 P 330885
CIVIL M-I 16.09.08 25.08.08 437750 22.05.09 P 344173
CIVIL M-I 16.09.08 25.08.08 398850 27.02.09 21.07.09 334703
CIVIL M-I 18.09.08 25.08.08 341650 M/s N.A. Const. 06.03.09 29.06.09 282600
Dev. of pavment of main mkt. at Green park in C-163/SZ CIVIL M-I 25.09.08 22.08.08 5000000 24.08.09 P 4975275
CIVIL M-I 18.06.08 19.05.08 499813 13.11.08 P 499813
CIVIL M-I 18.06.08 21.05.08 499955 13.11.08 P 499955
CIVIL M-I 18.06.08 13.05.08 499822 13.11.08 P 499822
CIVIL M-I 18.06.08 13.05.08 499629 13.11.08 P 499629
CIVIL M-I 18.06.08 15.05.08 499632 13.11.08 P 374004
CIVIL M-I 18.06.08 15.05.08 499764 12.09.08 27.11.08 499764
CIVIL M-I 23.06.08 24.05.08 499950
18 Dev of street lane by pdg cc near h.no. 186F in Arjun nagar in C-163/SZ
449/02.02.09/M.S-I
M/s DSA Const Co.
19 Dev of street lane by pdg cc near h.no. 142 in Arjun nagar in C-163/SZ
454/20.02.09/M-I
M/s DSA Const Co.
20 Dev of street/lane by pdg cc near h.no. 70/3 in Humayunpur in C-163/SZ
450/20.02.09/EE(M)-I
M/s Kuldeep Const Co.
21 Dev of street/lane by pdg. cc near h.no. 62R in Humayunpur in C-163/SZ
459/24.02.09/EE(M)-I
22 117/21.08.09M-I
M/s Rupinder Pal Singh
23 Stg.of road by dense carpetting from H-47 to H-35 in Green Park Extn. in C-163/SZ
303/13.10.08/EE(M)-I
M/s Dhingra Const Co.
24 Stg. of road by dense carpetting from gate no.1 to gate no.3 in SFS Flats Kalu Sarai Vijay Mandal Enclave in C-164/SZ
303/13.10.08/EE(M)-I
M/s Dhingra Const Co.
25 Stg. of road by dense carpetting from U-23 to U-13 in Green Park Extn.in C-163/SZ
303/13.10.08/EE(M)-I
M/s Dhingra Const Co.
26 Stg. of road by prov. dense carpetting from U-8 to V-26 in Green Park main in C-163/SZ
303/13.10.08/EE(M)-I
M/s Dhingra Const Co.
27 Stg. of road by dense carpetting from V-1 to U-12 in Green Park Extn. in C-163/SZ
303/13.10.08/EE(M)-I
M/s Dhingra Const Co.
28 Dev. to road berms by prov. cc along B/Wall of DDA SFS Flats Kalu Sarai in C-164/SZ
191/22.08.08/EE(M)-I
M/s Aay Kay Const Co.
29 Dev.to parking area by prov. red sand stone in DDA SFS Flats Kalu Sarai in C-164/SZ
Status Report of MLA,Smt Barkha SinghAC No. 10,2008-09
S.No.
Name of Work deptt. Div. D.O.S D.O.C Expenditure
CIVIL M-I 04.07.08 30.05.08 499900 11.09.08 03.12.08 499784
CIVIL M-I 04.07.08 30.05.08 299600 M/s M.K. Entp. 12.09.08 29.10.08 299360
CIVIL M-I 04.07.08 30.05.08 199628 13.09.08 04.11.08 199628
CIVIL M-I 29.07.08 09.07.08 199668 05.09.08 13.10.08 199564
CIVIL M-I 04.09.08 19.08.08 199550 13.10.08 30.12.08 199550
CIVIL M-I 05.09.08 25.08.08 498942 01.03.09 30.04.09 394949
CIVIL M-I 05.09.08 25.08.08 199860 29.02.09 31.03.09 179675
CIVIL M-I 02.06.08 28.05.08 499371 27.08.08 27.08.08 498370
CIVIL M-I 20.06.08 28.05.08 312324 05.09.08 P 307778
CIVIL M-I 20.06.08 28.05.08 266073 09.09.08 08.12.08 266073
CIVIL M-I 20.06.08 28.05.08 257905 M/s Lalit Kumar 10.10.08 23.10.08 257905
CIVIL M-I 20.06.08 28.05.08 261205 02.09.08 16.10.08 261205
CIVIL M-I 20.06.08 28.05.08 143069 09.09.08 10.10.08 141692
CIVIL M-I 20.06.08 28.05.08 261933 17.11.08 P 259876
CIVIL M-I 23.06.08 30.05.08 492245 27.08.08 08.11.08 492245
CIVIL M-I 23.06.08 30.05.08 463910 08.08.08 20.09.08 463910
CIVIL M-I 23.06.08 30.05.08 378535 23.09.08 18.11.08 378535
CIVIL M-I 23.06.08 30.05.08 249424 22.09.08 11.11.08 244424
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
1 P/F kota stone in open space in Sect-9 Mkt. in R.K. Puram in w.no.167/SZ
226/10.09.08/EE(M)-I
M/s Bahadur Singh Contct.
2 P/F interlocking tiles from h.no.142 to h.no.1105 Sect-12,R.K. Puram w.no.167/SZ
227/10.09.08/EE(M)-I
3 P/L RMC in side berm of Satya Sai Bal Vihar to h.no.533 Sect-5, R.K.Puram in w.no.167/SZ
228/10.09.08/EE(M)-I
M/s P.C. Mehraf Co.
4 Dev of Bank Street by P/L RMC from Community Hall to C-211 Shop no.in Munirka Village in C-166/SZ
224/05.09.08/EE(M)-I
M/s Pappu Seth
5 P/F Red Sand Stone on Walkway in park front of h.no.D-121 in Anand Niketan in C-168/SZ
276/06.10.08/EE(M)-I
M/s Pupinder Pal Singh
6 Dev of lane by p/l RMC from h.no.332 to 314,321 to 326 and adj area in Munirka Village in C-166/SZ
443/20.02.09/EE(M)-I
M/s Pappu Seth
7 Dev of parking area along Mother Dairy by p/l interlocking tile of parki in mkt.infront of R.K.Puram Sec.-3 C-166/SZ
444/20.02.09/EE(M)-I
M/s Shalab Gupta
8 Stg. of internal roads by dense carpetting near community centre Sec-6 R.K.Puram/SZ
113/20.08.08/EE(Pr.)/South
M/s Mukesh Assos. Pvt. Ltd.
9 Dev of road by P/L RMC from Pump House to Guest House in Air India Colony Vasant Vihar w.no.165/SZ
208/26.08.08/EE(M)-I
M/s Sonu Const. Co.
10
Dev of lanes by P/L RMC in Indian Airlines Colony Block no.A1/121 to 160 and A1/161 to 200 Vasant Vihar in w.no.165/SZ
207/26.08.08/EE(M)-I
M/s Ravi builders
11 Dev of lane by P/L RMC from A32/497 to A1/8 and B10/109 in Air India Colony Vasant Vihar w.no.165/SZ
206/26.08.08/EE(M)-I
12 Dev of road berms by P/L interlocking tiles from outer ring road to Taxi Stand in Vasant Appt. w.no.165/SZ
209/26.08.08/EE(M)-I
M/s H.G. Assos.
13 Dev of road by P/L RMC from road connecting Samshan Bhoomi to Vasant Appt. in w.no.165/SZ
183/22.08.08/EE(M)-I
M/s Happy Const.
14 Dev of road by Pdg dense carpet from Flat no. 103 to gate no.9 Vasant Enclave w.no.165/SZ
338/13.10.08/EE(M)-I
M/s Dhingra Const Co.
15 P/F cc interlocking tiles from h.no.637 to community Centre and upto h.no.771 in Sec-6 R.K. Puram in C-168/SZ
160/06.08.08/EE(M)-I
M/s Shalabh Gupta
16 P/L cc interlocking tiles on road berm along h.no.958 to h.no.1046 in Sec-8 R.K.puram C-168/SZ
159/06.08.08/EE(M)-I
M/s Dinesh Kumar
17 P/L cc interlocking tiles on road berm along h.no.913 to h.no.646 in Sec-8 R.K.puram C-168/SZ
158/06.08.08/EE(M)-I
M/s Balbir Singh Tanwar & Co.
18 P/F cc interlocking tiles along Electric Sub Stn. opp. Nanak Pura Mkt. in c-168/SZ
157/06.08.08/EE(M)-I
M/s Sonu Const. Co.
CIVIL M-I 23.06.08 30.05.08 197973 22.08.08 11.11.08 19797319 Const. of Toe Wall from Mother Dairy Booth to toward urinal block front of Sec-6 R.K.Puram Mkt.in C-168/SZ
161/06.08.08/EE(M)-I
M/s R.K. Const. Co.
Present Position
Liabilities Rs.lacs
Present Position
Liabilities Rs.lacs
Completed 0.00
In Prog. 0.45
In Prog. 0.55
In Prog. 0.37
Completed 0.00
In Prog. 0.52
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Present Position
Liabilities Rs.lacs
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
In Prog. 5.74
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
1.97
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
2.76
In Prog. 0.65
2.76
In Prog. 1.05
0.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
16.81
Present Position
Liabilities Rs.lacs
Completed 0.00
In Prog. 0.59
In Prog. 0.03
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
5.36
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
In Prog. 0.76
5.50
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
In Prog. 0.02
In Prog. 1.48
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
1.72
Completed 0.00
Completed 0.00
In Prog. 2.59
Completed 0.00
Completed 0.00
In Prog. 0.87
In Prog. 3.05
In Prog. 1.48
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
23.44
5.76
Completed 0.00
3.09
Completed 0.00
Completed 0.00
Completed 0.00
Present Position
Liabilities Rs.lacs
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
In Prog. 0.86
Completed 0.00
In Prog. 0.77
In Prog. 0.03
Completed 0.00
In Prog. 0.85
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
In Prog. 0.53
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
In Prog. 0.65
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
In Prog. 1.19
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.00
13.73
In Prog. 8.56
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
In Prog. 0.54
Completed 0.00
Completed 0.00
Completed 0.00
Present Position
Liabilities Rs.lacs
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
In Prog. 0.59
Completed 0.00
Completed 0.00
In Prog. 0.58
4.90
4.78
Completed 0.00
5.78
Completed 0.00
3.61
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
In Prog. 0.73
In Prog. 0.43
Completed 0.00
Completed 0.00
4.62
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
In Prog. 1.11
0.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
36.21
Present Position
Liabilities Rs.lacs
In Prog. 2.31
In Prog. 0.91
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
In Prog. 0.02
In Prog. 0.03
In Prog. 0.03
In Prog. 0.11
In Prog. 0.03
In Prog. 0.03
In Prog. 0.11
In Prog. 0.03
In Prog. 0.03
In Prog. 0.03
In Prog. 0.03
In Prog. 0.03
In Prog. 0.03
In Prog. 0.03
In Prog. 0.02
In Prog. 0.11
In Prog. 0.11
In Prog. 0.11
In Prog. 0.02
In Prog. 0.03
Completed 0.00
Completed 0.00
In Prog. 1.52
Completed 0.00
4.90
1.98
Completed 0.00
Completed 0.00
In Prog. 0.14
Completed 0.00
In Prog. 1.41
In Prog. 0.73
In Prog. 0.06
Completed 0.00
In Prog. 0.11
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
In Prog. 0.73
Completed 0.00
In Prog. 0.06
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
15.79
Completed0
Completed0
Completed0
Completed0
Completed0
Completed0
In Prog. 0.03132
1.99629
Completed0
Completed 0
Completed 0
Completed 0
Completed 0
1.99478
1.77952
1.99929
Present Position
Liabilities Rs.lacs
1.99241
1.78391
Completed0
1.443081.4703
Completed0
Completed0
completed0
Completed0
Completed0
Completed0
Completed0
Completed
0
Completed0
Completed
000000000000000
00000000000000000000000000000000000000000000000
14.49
Completed0
Completed0
Completed0
Completed0
In Prog.0.58223
In Prog.0.91115
Completed0
Completed0
Completed0
Completed0
Completed0
Completed 0In Prog.
0.67755
3.098
In Prog. 0.10265
5.682
Completed 0
Present Position
Liabilities Rs.lacs
In Prog.0.75965
In Prog.0.93577
Completed0
Completed 0In Prog.
0.24725
In Prog. 0
In Prog. 0
In Prog. 0
In Prog. 0
In Prog. 1.25628
Completed 0
4.99950000000000000000000000
00000000000000000000000000000000000000000
19.25
Completed 0.00
Completed0.00
Completed0.00
Completed0.00
Completed0.00
Completed0.00
Completed0.00
Completed
0.00
In Prog. 0.05
Completed
0.00
Completed0.00
Completed0.00
Completed0.00
In Prog. 0.02
Completed 0.00
Completed0.00
Completed
0.00
Completed 0.00
Present Position
Liabilities Rs.lacs
Completed0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.07
deptt. deptt. deptt. deptt.Div. Div. Div. Div. Div. Div.
civil elect hort cse M-I M-II M-III M-IV E-I EE(Pr.)
Status Report of MLA,Sh.Karan Singh TanwarAC No. 11,2008-09
S.No.
Name of Work deptt. Div. D.O.S D.O.C
CIVIL M-I
03.09.08 09.08.08 484700 29.10.08 03.12.08 482221
Completed
CIVIL M-I26.09.08 15.09.08 198300 25.11.08 22.11.08 198300
Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Expenditure
Present Position
1 P/F of steel benches for various park in Nangal Raya in C-110/WZ
465/13.10.08/EE(M)-I
M/s Bajrang Engineers
2 Pdg and fixing MS steel benches in satya niketan w.no.168/SZ
340/17.10.08/EE(M)-I
M/s Neel Const
Status Report of MLA, Sh.Jagdish MukhiAC No. 12,2008-09
S.No. Name of Work deptt. Div. D.O.S D.O.C
civil M-III 23.06.08 21.05.08 438927 23.08.08 30.12.08 433104 Completed
civil M-III 23.06.08 21.05.08 494125 18.08.08 06.11.08 492133 Completed
civil M-III 23.06.08 12.05.08 439100 29.08.08 P 439100 In Prog.
civil M-III 23.06.08 12.05.08 548900 29.08.08 P 522600 In Prog.
civil M-III 23.06.08 12.05.08 557200 29.08.08 P 522600 In Prog.
civil M-III 23.06.08 12.05.08 644400 29.08.08 P 606100 In Prog.
civil M-III 23.06.08 12.05.08 684200 04.09.08 P 518912 In Prog.
civil M-III 23.06.08 12.05.08 696300 15.09.08 P 600351 In Prog.
civil M-III 23.06.08 12.05.08 696300 15.09.08 P 600351 In Prog.
civil M-III 23.06.08 12.05.08 696300 15.09.08 P 600351 In Prog.
civil M-III 23.06.08 12.05.08 691400 04.09.08 P 627426 In Prog.
civil M-III 23.06.08 12.05.08 694100 04.09.08 P 627426 In Prog.
civil M-III 23.06.08 12.05.08 688700 04.09.08 P 627426 In Prog.
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Expenditure
Present Position
1 C/O drain and pdg RMC behind A-2 Mkt.(park side)along park opp.A-2/45 in A-2 Block Janakpuri C-117/WZ
280/14/04/08/EE(M)-III
M/s Manish Nayar
2 Pdg RMC opp. Rich Harvest School park to 235,park to 230,and along Rich Harvest School A-1 Block Janakpuri WZ
305/14.08.08/EE(M)-III
M/s A. B builders
3 Pdg RMC from h.no.188 to 200 in C-Block C-117/WZ
319/28.08.08/EE(M)-III
M/s Star Const
4 Pdg RMC from h.no.60 to 76 in C-1 Block janakpuri C-117/WZ
319/28.08.08/EE(M)-III
M/s Star Const
5 Pdg RMC from h.no.201 to 208 in C-1 Block janakpuri C-117/WZ
319/28.08.08/EE(M)-III
M/s Star Const
6 Pdg RMC from h.no.152 to Hardwari lal pank and side in A-5A Block janakpuri C-117/WZ
319/28.08.08/EE(M)-III
M/s Star Const
7 Pdg RMC from WZ-30 to WZ-24,WZ-24 to WZ-24A in Harijan Basti Aslapur, Janakpuri C-117/WZ
310/28.08.08/EE(M)-III
M/s Mahesh Const.
8 Pdg RMC in becklane from h.no.1 to 15 in A-1 block in Janakpuri C-117/WZ
329/12.09.08/EE(M)-III
M/s Star Const
9 Pdg RMC in becklane from h.no.15 to 61 in A-1 Block Janakpuri C-117/WZ
329/12.09.08/EE(M)-III
M/s Star Const
10 Pdg RMC in becklane from h.no.110 to 128 in A-1 Block Janakpuri C-117/WZ
329/12.09.08/EE(M)-III
M/s Star Const
11 Pdg RMC in frontlane from h.no.15 to 298 in A-1 Block Janakpuri C-117/WZ
318/28.08.08/EE(M)-III
M/s Star Const
12 Pdg RMC in frontlane from h.no.283 to 277 in A-1 Block Janakpuri C-117/WZ
318/28.08.08/EE(M)-III
M/s Star Const
13 Pdg RMC in from h.no.297 to 284(front side0 in A-1 Block Janakpuri C-117/WZ
318/28.08.08/EE(M)-III
M/s Star Const
civil M-III 23.06.08 06.06.08 448223 23.08.08 15.12.08 442975 Completed
civil M-III 23.06.08 06.06.08 296121 22.08.08 23.06.09 293430 Completed
civil M-III 23.06.08 06.06.08 295425 14.08.08 31.01.09 208850 Completed
civil M-III 23.06.08 06.06.08 225273 21.09.08 02.04.09 224410 Completed
civil M-III 23.06.08 06.06.08 262428 22.08.08 30.12.08 149914 Completed
civil M-III 23.06.08 06.06.08 440474 22.08.08 14.01.09 390432 Completed
civil M-III 23.06.08 06.06.08 373914 16.08.08 19.12.08 373246 Completed
civil M-III 23.06.08 06.06.08 336759 26.08.08 P 332759 In Prog.
civil M-III 14.07.08 30.06.08 499423 23.08.08 29.11.08 499345 Completed
civil M-III 14.07.08 30.06.08 475775 23.08.08 02.12.08 474799 Completed
civil M-III 14.07.08 30.06.08 499080 23.08.08 15.01.09 452921 Completed
civil M-III 14.07.08 30.06.08 478308
14 Defv of lane by pdg RMC and drain from A-69 to D-127 becklane in D-Block in East Uttam Ngr. in WZ
298/14.08.08/EE(M)-III
M/s Sahil builders
15 Dev of lane by pdg RMC and drain from F-46 to F-43 in F-Block in Milap Ngr. C-119,WZ
245/13.08.09/EE(M)-III
M/s Devender Kumar
16 Dev of lane by pdg RMC and drain from B-13 to B-11 in B-Block in Milap Ngr. C-119,WZ
304/14.08.08/EE(M)-III
M/s Manish Nayar
17 Dev of lane by RMC and drain from A-24 to A-18 becklane in A-Block East Uttam Ngr. C-119/WZ
324/12.09.08/EE(M)-III
M/s Balaji Const.
18 Dev of lane by RMC and drain from D-13 to D-6 in D-Block East Uttam Ngr. Milap Ngr.in WZ.
291/14.08.08/EE(M)-III
M/s Prince Entp.
19 Dev of lane by RMC and drain from A-51 to A-57 in A-Block East Uttam Ngr.in WZ.
289/14.08.08/EE(M)-III
M/s Mahesh Kumar Const.
20 Dev of lane by RMC and drain from A-38 to A-50 (becklane) in A-Block East Uttam Ngr.in WZ.
270/14.08.08/EE(M)-III
M/s L.Gee Const.
21 Dev of lane by RMC and drain from A-51 to A-57 becklane in A-Block East Uttam Ngr.in WZ.
292/14.08.08/EE(M)-III
M/s Jatin Jaggi
22 Dev of becklane from 1 to 26, 26 to 24 in C-4B block C-118 Janakpuri in WZ.
300/14.08.08/EE(M)-III
M/s Sahil builders
23 Dev to pavment/road side berms from 20 to 8 and 26 in C-2D Block in C-118 in Janakpuri.
293/14.08.08/EE(M)-III
M/s Money Const.
24 Dev to road side berms and pavment from 1 to 12, 70 to 72, 30 to 40 in C-4D C-117 in Janakpuri in WZ.
303/14.08.08/EE(M)-III
M/s Som Const.
25 Dev of becklane from 93 to 94, 10 to 107 in C-4G block in Janakpuri in WZ.
civil M-III 14.07.08 30.06.08 374900 23.08.08 17.11.08 373816 Completed
civil M-III 14.07.08 30.06.08 429591 23.08.08 23.08.10 429551 Completed
civil M-III 14.07.08 30.06.08 302871 23.08.08 09.09.09 289726 Completed
civil M-III 14.07.08 06.06.08 346900 25.11.08 05.12.08 199594 Completed
civil M-III 14.07.08 06.06.08 358500 27.11.08 12.10.08 199094 Completed
civil M-III 14.07.08 06.06.08 399000 22.10.08 10.06.08 233546 Completed
civil M-III 14.07.08 06.06.08 282299 14.08.08 20.10.08 282140 Completed
civil M-III 14.07.08 06.06.08 276303 23.08.08 26.11.08 276303 Completed
26 Dev of road side berms from main gate to h.no.10 and 18 to 95 in C-6A in C-118 Janakpuri in WZ.
275/14.08.08/EE(M)-III
M/s Ghan Shyam Dass
27 Dev of pavment/road side berms from 26 to 36,21 to 25,37 to 45,46 to 50 in C-2D in C-118 in Janakpuri.
297/14.08.08/EE(M)-III
M/s Praveen Kr. Const.
28 Dev to becklane from 127 to 132,51 to 65 in C-6B block in C-118 WZ Janakpuri.
301/14.08.08 M-III
M/s neel Trader
29 P/F SFRC slab on drain from h.no.A-69 to D-127 becklane in East Uttam Ngr. and from B-24 to A-18 becklane in East Uttam Ngr. and from h.no.D-13 to D-6 in East Uttam Ngr. and from h.no.A-51 to A-57 in East Uttam Ngr. in C-119/WZ in Milap Ngr. WZ.
566/13.10.08/EE(M)-III
M/s Star Const
30 P/F SFRC slab on drain from h.no.A-38 to A-50 becklane in East Uttam Ngr. and from 9A-51 to A-57 becklane in East Uttam Ngr. and from h.no.A-7,A-13 in East Uttam Ngr. and from G-111 to G-106 in G-Block Uttam Ngr. in C-119/WZ in Milap Ngr. WZ.
568/13.10.08/EE(M)-III
M/s Star Const
31 P/F SFRC slab on drain from h.no.F-46 to F-43 in Milap Ngr.and from B-13 to B-11 in Milap Ngr.and from h.no.D-111 to D-115 in Uttam Ngr. and h.no.D-154 to D-170 in Uttam Ngr.and from A-79 to A-70 in Uttam Ngr. and from h.no.J-72 to J-96 in Uttam Ngr. in C-119/WZ in Milap Ngr. WZ.
565/13.10.08/EE(M)-III
M/s Amit Const
32 Dev of lane by RMC of drain from h.no.J-72 to J-96 in J-Block Uttam Ngr. WZ
279/14.08.08/EE(M)-III
M/s Ashok Bansal
33 Dev of lane by RMC of drain from h.no.A-79 to A-70 in A-Block Uttam Ngr. WZ
273/14.08.08/EE(M)-III
M/s Om Mark builders
civil M-III 14.07.08 06.06.08 293780 23.08.08 26.02.08 170807 Completed
civil M-III 14.07.08 06.06.08 293780 23.08.08 07.01.09 293781 Completed
civil M-III 14.07.08 06.06.08 282299 14.08.08 08.12.08 276317 Completed
civil M-III 18.07.08 30.06.08 499000 26.12.08 20.06.09 498713 Completed
civil M-III 23.07.08 30.06.08 421812 15.12.08 23.10.09 421812 Completed
civil M-III 23.07.08 30.06.08 311705 19.09.08 04.11.09 311140 Completed
civil M-III 23.07.08 06.06.08 336759 12.10.08 24.03.09 336693 Completed
civil M-III 23.07.08 06.06.08 441841 22.10.08 17.01.09 441146 Completed
civil M-III 25.07.08 12.07.08 484000 23.08.08 22.08.09 434504 Completed
civil M-III 25.07.08 12.07.08 484000 23.08.08 06.06.09 382102 Completed
civil M-III 01.08.08 30.06.08 769000 22.06.09 P 766000 In Prog.
civil M-III 01.08.08 30.06.08 704100 06.08.09 P 701135 In Prog.
civil M-III 23.05.08 21.05.08 694300 04.09.08 P 625630 In Prog.
34 Dev of lane by RMC of drain from h.no.D-154 to D-170 in D-Block Uttam Ngr. WZ
274/14.08.08/EE(M)-III
M/s V.K. Sahni
35 Dev of lane by RMC of drain from h.no.D-111 to D-15 in D-Block Uttam Ngr. WZ
296/14.08.08/EE(M)-III
M/s Bhutani Entp.
36 Dev of lane by RMC of drain from h.no.G-111 to G-106 in G-Block Uttam Ngr. WZ
251/13.08.08/EE(M)-III
M/s Vijay Kumar jha
37 Dev of open space on site of C-4E Mkt. opp. Govt. School in C-118 Janakpuri
302/14.08.08/EE(M)-III
M/s Prince Entp.
38 Dev of different park of C-2 Block in C-118 Janakpuri WZ.
326/12.09.08M-III
M/s Chiter Mal
39 Dev of road side berms from 1 to 46 and 27 to 325 in C-4B block C-118 Janakpuri WZ
327/12.09.08/EE(M)-III
M/s Som Const.
40 Dev of lane by RMC of drain from A-7 to A-13 in A-Block in East Uttam Ngr.
417/13.10.8/EE(M)-III
M/s Sahil builders
41 Dev of drainage system from h.no.M-78 to h.no.12,13 in M-Block in Uttam Ngr. WZ
593/13.10.08/EE(M)-III
M/s Kriti Assos.
42 C/O hut/Rain Sheleter in park opp h.no.67 in Narang Colony in C-117/WZ
306/14.08.08/EE(M)-III
M/s Mahesh Const.
43 C/O hut/Rain Sheleter in park opp h.no.201 in A-2 Block Janakpuri in C-117/WZ
286/14.08.08/EE(M)-III
M/s Mahesh Const.
44 Dev of open space infront of C-4E Mkt. on Ram Mandir marg in C-118 Janakpuri in C-118/WZ
43/17.06.09/EE(M)-III
M/s A.K. & Co.
45 Dev of open space ground/space and Parking space in C-2C Block Pkt.2 Mkt. in C-118/in Janakpuri in WZ
67/31.07.09/EE(M)-III
M/s A.K. & Co.
46 Pdg RMC from h.no.85 to 82,85 to 47,46 to 47,23to 15,64 to 59 in C-1A Block Janak Puri in w.no.117/WZ
313/28.08.08/EE(M)-III
M/s Star Const
civil M-III 23.05.08 21.05.08 699700 04.09.08 P 625630 In Prog.
civil M-III 23.05.08 21.05.08 693300 05.09.08 P 651308 In Prog.
civil M-III 23.05.08 21.05.08 695900 05.09.08 P 651308 In Prog.
civil M-III 23.05.08 21.05.08 699700 05.09.08 P 651308 In Prog.
civil M-III 30.09.08 12.09.08 499000 22.10.08 P 470511 In Prog.
civil M-III 30.09.08 12.09.08 499000 22.10.08 07.01.09 462323 Completed
civil M-III 30.09.08 12.09.08 493000 22.10.08 21.12.09 479446 Completed
civil M-III 30.09.08 12.09.08 444800 22.10.08 29.10.09 429189 Completed
civil M-III 30.09.08 12.09.08 454000 22.10.08 21.12.09 442272 Completed
civil M-III 30.09.08 12.09.08 672000 02.03.09 P 670000 In Prog.
civil M-III 30.09.08 12.09.08 499000 22.10.08 21.12.08 462453 Completed
civil M-III 30.09.08 12.09.08 425000 12.10.08 P 410509 In Prog.
47 Pdg RMC from h.no.1 to 12 and along B/Wall from Pankha Road to Parking C-1A Block Janakpuri in w.no.117/WZ
313/28.08.08/EE(M)-III
M/s Star Const
48 Pdg RMC from 115 to 111,111 to 104,103 to 96 and 94 to 80 in A-1B Block Janakpuri in w.no.117/WZ
320/10.09.08/EE(M)-III
M/s Star Const
49 Pdg RMC from h.no.184 to 187,166 to 169,81 to 92,74 to 69,47 to 52 and oppsite 18A in A-5B and A-5C in Janakpuri w.no.117/WZ
320/10.09.08/EE(M)-III
M/s Star Const
50 Pdg RMC from h.no.351 to 383 in A-5A Block in Janakpuri in w.no.117/WZ
320/10.09.08/EE(M)-III
M/s Star Const
51 Const /imp of road side berms from 259 to 288, 203 to 230, 75 to 102 in C-4B block Janakpuri C-118 WZ
635/13.10.08/EE(M)-III
M/s Babbar Entp.
52 Const/imp of road side berms from 308 to 202, 173 to 147, 27 to 326 in C-4B block Janakpuri in WZ
627/07.01.09/EE(M)-III
M/s Rohit Const.
53 Cont/ Imp of road side berms from 16 to 25, 41 to 45, 30 to 40 in C-4 D block Janakpuri in w.no.118/WZ
619/13.10.08/EE(M)-III
M/s Babbar Entp.
54 Pdg MS grill and tiles at intersaction of Janakpuri marg and Dabri road in w.no.118/Wz
634/13.10.08/EE(M)-III
M/s Babbar Entp.
55 Pdg MS grill and tiles at intersaction of Janakpuri marg and b-2 marg opp. mahila college inw.no.118/Wz
633/13.10.08/EE(M)-III
M/s Babbar Entp.
56 Const/Imp of back lane from 116 to 153 in C-4 F block janakpuri w.no.118/WZ
957/02.03.09/EE(M)-II
M/s Rohit Const.
57 Const/imp of road side berms from 19 to 45, 9 to 79, 46 to 79 and 46 to 1 in c-6 b block in janakpuri in w.no.118/WZ
622/13.10.08/EE(M)-III
M/s Rohit Const.
58 Const/imp of back lane from 19 to 25, in C-5 A block in janakpuri in w.no.118/WZ
630/13.10.08/EE(M)-III
M/s R.K. Entp.
civil M-III 30.09.08 12.09.08 499000 22.10.08 29.12.09 469620 Completed
civil M-III 30.09.08 12.09.08 498000 22.10.08 08.06.09 495955 Completed
civil M-III 30.09.08 12.09.08 496000 26.10.09 08.06.09 481139 Completed
civil M-III 30.09.08 12.09.08 451000 22.10.08 21.12.08 451000 Completed
civil M-III 30.09.08 12.09.08 320000 22.10.08 21.01.09 299553 Completed
civil M-III 30.09.08 12.09.08 676900 22.10.08 21.02.09 576419 Completed
civil M-III 30.09.08 12.09.08 498000 22.10.08 P 464923 In Prog.
civil M-III 03.10.08 12.09.08 461000 11.10.08 20.12.08 461000 Completed
civil M-III 03.10.08 12.09.08 244000 16.10.08 16.01.09 243988 Completed
civil M-III 03.10.08 12.09.08 519000 22.10.08 P 515792 In Prog.
civil M-III 03.10.08 12.09.08 467000 22.10.08 09.01.09 463519 Completed
59 Const/imp of road side berms from 123 to 118 in C-4 E block in janakpuri in w.no.118/WZ
618/13.10.08/EE(M)-III
M/s Babbar Entp.
60 Const/imp of park B/wall opp h.no. 329 in C-4 E block in janakpuri in w.no.118/WZ
121/13.10.08/EE(M)-III
M/s Babbar Entp.
61 Const/imp of park B/wall opp h.no. 21, 68 and 130 in C-3 b block in janakpuri in w.no.118/WZ
620/13.10.08/EE(M)-III
M/s Babbar Entp.
62 Const/imp of drainage system and road side berms from near 115 to 126, 120 to 192, 14 to 198 in C-6 B block in janakpuri in w.no.118/WZ
628/13.10.08/EE(M)-III
M/s Rohit Const.
63 Const/imp of road side berms from infront of h.no. 330 to 340 in C-2 block in janakpuri in w.no.118/WZ
642/13.10.08/EE(M)-III
M/s Shri Sharma Const.
64 Const/imp of lane and drainage system and road side berms from C-3 (SFS) 286 to 289 in janakpuri in w.no.118/WZ
645/13.10.08/EE(M)-III
M/s Shivam Const.
65 Const/imp of drainage system and road side berms from 100 to 147 in C-3 block in janakpuri in w.no.118/WZ
644/13.10.08/EE(M)-III
M/s Shivam Const.
66 Pdg RMC from Prof joginder singh marg to CSF office in janakpuri w.no.117
536/13.10.08/EE(M)-III
M/s Metric Engineering
67 Imp of road side berms and const of drain opp. Mandir in A-2 block and pdg interlocking tiles opp. Vardhman mkt. in Janakpuri in w.no.117/WZ
534/13.10.08/EE(M)-III
M/s Eagle Entp.
68 Pdg RMC from WZ-22 to 10b to 10 to WZ-34 to chopal in village Asalatpur in Janakpuri w.no.117/Wz
531/13.10.08/EE(M)-III
M/s Star Const
69 Pdg RMC from 80 foot ROW road to A-5A block Janakpuri w.no.117/Wz
539/13.10.08/EE(M)-III
M/s Shiv Kumar Gupta
civil M-III 03.10.08 12.09.08 404200 22.10.08 P 361160 In Prog.
civil M-III 03.10.08 12.09.08 332000 22.10.08 P 297105 In Prog.
civil M-III 03.10.08 12.09.08 508000 21.10.08 08.04.09 508000 Completed
civil M-III 03.10.08 12.09.08 570000 22.10.08 P 530102 In Prog.
civil M-III 03.10.08 12.09.08 500000 22.10.08 27.07.09 500000 Completed
civil M-III 03.10.08 12.09.08 428000 16.10.08 P 377114 In Prog.
civil M-III 03.10.08 12.09.08 446000 15.10.08 P 443965 In Prog.
civil M-III 03.10.08 12.09.08 437000 22.10.08 21.12.08 374419 Completed
civil M-III 03.10.08 12.09.08 534000 22.10.08 21.12.08 493242 Completed
civil M-III 03.10.08 12.09.08 466000 22.10.08 P 413709 In Prog.
civil M-III 03.10.08 12.09.08 436000 23.10.08 P 399962 In Prog.
civil M-III 03.10.08 12.09.08 352000 14.02.09 P 269037 In Prog.
70 Imp of road side berms and const of drain park to h.no. 196 in A-3 block in janakpuri in w.no.117/WZ
527/13.10.08/EE(M)-III
M/s Pawan Kumar
71 Imp to side berms and const of drain from h.no. 270 to 261 A-1 block in janakpuri w.no.117/WZ
529/13.10.08/EE(M)-III
M/s Pawan Kumar
72 C/o drian from B-1 marg to A-5A Double storey block Janakpuri w.no.117/Wz
537/13.10.08/EE(M)-III
M/s Devender Kumar
73 pdg RMC and const f drain in back lane from h.no. 114 to 126 in Chander nagar w.no.117/Wz
538/13.10.08/EE(M)-III
M/s Shiv Kumar Gupta
74 C/o of drain from h.no.16 to gate no.2 in A-1 block janakpuri w.no. 117/Wz
532/13.10.08/EE(M)-III
M/s Star Const
75 Imp to side berms and const of drain from mojor deepak tyagi marg to h.no. 270 in A-1 block Janakpuri wno. 117 WZ
528/13.10.08/EE(M)-III
M/s Pawan Kumar
76 Pdg RMC opp. PNT block at B-1 marg in janakpuri w.no.117/Wz
530/13.10.08/EE(M)-III
M/s Star Const
77 Imp to road by pdg RMC and drain from J-74 to J-77 in J block Uttam nagar w.no.119/Wz
576/13.10.08/EE(M)-III
M/s Rohit Const.
78 Imp to road by pdg RMC and drain from E-1 to E-13 in E block Uttam nagar w.no. 119/Wz
569/13.10.08/EE(M)-III
M/s Rohit Const.
79 Imp to road by pdg RMc and drain from h.no. RZ-39 to RZ-33 in South extn-I Uttam nagar w.no. 119/WZ
580/13.10.08/EE(M)-III
M/s Manhut Const.
80 Imp to road by pdg RMC and drain from J-74 to J-91 in J block Uttam nagar w.no.119/Wz
579/13.10.08/EE(M)-III
M/s Manheet Const Co.
81 Imp to road by pdg RMc and drain from b-9 to B-20 gali no.34 in B block Uttam nagar w.no. 119/WZ
816/05.02.09/EE(M)-III
M/s Eagle Entp.
civil M-III 03.10.08 12.09.08 300300 14.02.09 P 229111 In Prog.
civil M-III 03.10.08 12.09.08 507800 14.02.09 P 389534 In Prog.
civil M-III 03.10.08 12.09.08 569000 22.10.08 P 495312 In Prog.
civil M-III 03.10.08 12.09.08 591000 22.10.08 P 528443 In Prog.
civil M-III 03.10.08 12.09.08 413000 22.10.08 18.12.08 365946 Completed
civil M-III 03.10.08 12.09.08 467000 11.12.08 16.05.09 467000 Completed
civil M-III 03.10.08 12.09.08 699800 26.06.09 P 693344 In Prog.
civil M-III 03.10.08 12.09.08 500000 11.12.08 14.08.09 457725 Completed
Status Report of MLA,Sh.Harcharan Singh BalliAC No. 13,2008-09
82 Imp to road by pdg RMC and drain from b-8A to B-8B in B block in Uttam nagar w.no. 119/WZ
815/05.02.09/EE(M)-III
M/s Eagle Entp.
83 Imp to road by pdg RMC and drain from A-86 to A-83 in A block Uttam nagar w.no. 119/WZ
817/05.02.09M-III
M/s Eagle Entp.
84 Imp to road by pdg RMC and drain from D-96 to D-101 in D block back lane Uttam nagar w.no. 119/WZ
570/13.10.08/EE(M)-III
M/s Rohit Const.
85 Imp to road by pdg RMC and drain from Z-106 to Z-77, 78 in Z block Uttam nagar w.no. 119/WZ
581/13.10.08/EE(M)-III
M/s Manhut Const.
86 Imp to road by pdg RMC and drain from Z-111 to Z-96 in Z block Uttam nagar w.no. 119/WZ
574/13.10.08/EE(M)-III
M/s Nikhil Const.
87 pdg RMC from WZ-44 to WZ-43, 66 to 70, 7 to 79 and opp 71 in village Possangipur in w.no. 117/WZ
692/02.12.08/EE(M)-III
M/s Shiv Kumar Gupta
88 pdg RMC and const of SW drain from A-3/70 to 82 in A3 block janakpuri w.no.117 WZ
42/17.6.09/EE(M)-III
M/S Kishan Kumar Gupta
89 Imp to road side berms and c/o drain from h.no. 188 to 196 in A3 block janakpuri w.no. 117 WZ
696/02.12.08/EE(M)-III
M/s Devender Kumar
S.No.
Name of Work deptt. Div. D.O.S D.O.C
ELECT E-I 27.05.08 26.05.08 598801 15.10.08 15.12.08 587063 Completed
CIVIL M-I 11.06.08 04.06.08 1E+06 25.05.09 P 1056777 In Prog.
CIVIL M-I 18.06.08 04.05.08 1E+06 16.10.08 P 1005131 In Prog.
ELECT E-I 23.06.08 06.05.08 258610 15.09.08 25.10.08 253362 Completed
ELECT M-I 23.06.08 06.05.08 180422 04.02.09 05.04.09 173179 Completed
ELECT E-I 23.06.08 05.05.08 475415 29.09.08 04.06.09 457172 Completed
ELECT E-I 23.06.08 16.05.08 555581 01.10.08 22.10.09 549073 Completed
CIVIL M-I 23.06.08 26.05.08 498633 02.08.08 24.02.09 496142 Completed
CIVIL M-I 23.06.08 26.05.08 452818 06.11.08 03.06.09 449483 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Expenditure
Present Position
1 P/O lighting arrangement at different main chowk and main points of assambly C-no.13 under WZ
185/10.10.08/EE(E)-III
M/s Perfect Electrical works
2 C/O yoga hall in 654 MIG Maya Puri in C-111/WZ
856/02.03.09/EE(M)-I
M/s Mukesh Kumar Const
3 Dev of road from Mangal Pandey road to CB-18 along Deen Dayal Hospital in Hari Ngr. C-111/WZ
425/30.09.08/EE(M)-I
M/s Cheena builders
4 Prov. of 1X400 watt flood light arrangement in the Mini Stadium Hari Ngr. under WZ
144/08.09.08/EE(E)-III
M/s Aman Elec. Const.
5 Prov. of Cascade Fountain in 17 Block Subhash Ngr. in w.no.112/WZ
377/28.01.09/EE(E)-III
M/s Shri Balaji Elect.
6 Prov.of post top lantern fitting from Cambridge School to Arya Samaj Mandir on Arya Samaj road Subhash Ngr. in w.no.112/WZ
96/12.08.08/EE(E)-III
M/s S.G. Ent.
7 Prov. of post top, lantern fitting from 4 block chowk to T-point 3 Block Arya Samaj road Subhash Ngr. in w.no.112/WZ
152/17.09.08/EE(E)-III
M/S A.K. Electricals
8 Dev of road by pdg drainage and RMC from h.no.B-217 to B-225 in BE-block in Hari Ngr. C-111/WZ
85/24.07.08/EE(M)-I
M/s Sahil builders
9 Dev of lane by RMC from h.no.M-68 to M-61,WZ-173 to A-247 and WZ-176 to M-39 in M-block Hari Ngr. WZ
77/24.07.09/EE(M)-I
M/s Mahesh Kumar Const.
CIVIL M-I 23.06.08 26.05.08 344305 19.12.08 25.02.09 341190 Completed
CIVIL M-I 23.06.08 26.05.08 499376 01.08.08 27.01.09 497400 Completed
CIVIL M-I 23.06.08 26.05.08 368694 30.07.08 22.06.09 368343 Completed
CIVIL M-I 23.06.08 26.05.08 428035 28.07.08 . 287981 In Prog.
CIVIL M-I 23.06.08 26.05.08 364869 28.07.08 P 239880 In Prog.
CIVIL M-I 23.06.08 26.05.08 464021 28.07.08 P 434169 In Prog.
CIVIL M-I 04.07.08 26.05.08 414920 27.08.08 23.01.08 414900 Completed
CIVIL M-I 09.07.08 19.05.08 498486 23.07.08 19.12.08 498400 Completed
CIVIL M-I 09.07.08 19.05.08 498326 14.10.08 03.07.09 498300 Completed
CIVIL M-I 09.07.08 19.05.08 499206 31.07.08 30.10.08 499181 Completed
CIVIL M-I 17.07.08 30.06.08 426966 18.08.08 12.02.09 371062 Completed
CIVIL M-I 17.07.08 06.05.08 491293 27.08.08 30.03.09 483268 Completed
10 Dev of lane by RMC from h.no.M-23 to M-30 and 15 M-15 to M-22 in M-Block Hari Ngr. WZ
88/24.07.09/EE(M)-I
M/s Om Mark builders
11 Dev of road by pdg RMC and drainage system from road.no.32 to DE-216 in BE-block in Hari Ngr.C-111/WZ
117/25.07.08/EE(M)-I
M/s Praveen Kumar Const.
12 Dev of road by pdg RMC and drainage system from B-228 to B-224 in BE-block in Hari Ngr.C-111/WZ
82/24.07.09/EE(M)-I
M/s Ghan Shyam Dass
13 Dev to lane by RMC from h.no.M-46 to M-60 in M-Block in Hari Ngr.C-111/WZ
94/24.07.09/EE(M)-I
M/s Arjun Entp.
14 Dev to lane by RMC from h.no.C-157 to CB-17 in C-Block in Hari Ngr.C-111/WZ
86/24.07.09/EE(M)-I
M/s Som Const.
15 Dev to lane by RMC from h.no.BE-260 to BE-249,BE-40 to BE-64 and BE-197 to Be-191 in BE-Block in Hari Ngr.C-111/WZ
87/24.07.09/EE(M)-I
M/s Y.K. Saini
16 Dev to lane by RMC from h.no.C-175 to C-183 in C-Block in Hari Ngr. C-111/WZ
289/18.08.08/EE(M)-I
M/s M.P. Assos
17 Dev of road by RMC from h.no.MS 10 to 470/JI in MS Block C-110/WZ
69/22.07.08/EE(M)-I
M/s Chittarmal
18 Dev of road by RMC from h.no.DB-68 to DB-74 in DB Block in Hari Ngr. C-110/WZ
68/22.07.08/EE(M)-I
M/s Mukesh Kumar Const
19 Dev of road by RMC from DB-82 to DB-87 in DB-Block Hari Ngr. C-110/WZ
67/22.07.08/EE(M)-I
M/s Rohit Const
20 C/O B/Wall and pdg Senetery fitting to Library at Hari Enclave in C-111/WZ
290/18.08.08/EE(M)-I
M/s Y.K. Saini
21 Dev of lane by RMC from h.no.C-195 to C-185 in C-Block Hari Ngr. C-111/WZ
288/18.08.08/EE(M)-I
M/s Prince Entp.
CIVIL M-I 31.07.08 11.06.08 230000 28.08.08 26.09.08 199892 Completed
CIVIL M-I 31.07.08 11.06.08 177000 11.02.09 26.02.09 79237 Completed
CIVIL M-I 31.07.08 11.06.08 343800 17.12.08 P 176792 In Prog.
CIVIL M-I 29.08.08 30.06.08 496000 19.09.08 27.10.08 452305 Completed
CIVIL M-I 30.09.08 05.09.08 188200 31.01.09 05.10.09 187739 Completed
CIVIL M-III 10.10.08 19.05.08 578800 05.02.09 P 573704 In Prog.
CIVIL M-III 10.10.08 20.09.08 529000 17.02.09 P 527000 In Prog.
CIVIL M-III 10.10.08 20.09.08 501600 24.07.09 P 498600 In Prog.
CIVIL M-III 10.10.08 20.09.08 284100 19.02.09 P 277527 In Prog.
CIVIL M-III 10.10.08 20.09.08 697900 20.08.09 P 694599 In Prog.
CIVIL M-I 10.10.08 20.09.08 511200 05.02.09 12.04.09 498812 Completed
ELECT E-I 10.10.08 05.09.08 411000 10.02.09 P 245838 In Prog.
22 C/O main gate at Mini Stadium Shyam Vatika in Hari Ngr. in C-111/WZ
354/28.08.08/EE(M)-I
M/s Rajveer Gupta
23 Face lifiting og wall at VIP Plateform at Mini Stadium Shyam Vatika Hari Ngr. C-111/WZ
754/11.02.09/EE(M)-I
M/s Rajveer Gupta
24 Pdg False Ceiling at VIP Plateform at Mini Stadium Shyam Vatika Hari Ngr. C-111/WZ
579/17.12.08/EE(M)-I
M/s Pankaj builders
25 Pdg Drainage flooring and Wall Lining at Mini Stadium Shyam Vatika in Hari Ngr.in C-111/WZ
401/19.09.08/EE(M)-I
M/s Vashisth Const
26 Pdg openable gate at Mini stadium Shyam Vatika in Hari Nagar C-111 in WZ
684/31.01.09/EE(M)-I
M/s Bajrang Engg.
27 Pdg RMC from h.no. 52 to park in CD blocck Hari Nagar IN C-109/WZ
810/04.02.09/EE(M)-III
M/s L. Gee Const.
28 C/o drainage & foothpath from h.no. 8A to B-65 in Asha park w.no.109/WZ
902/17.02.09/EE(M)-II
M/s Bajrang Engg.
29 C/o drainage & foothpath from h.no. 9A to B-66 in Asha park in C-109/WZ
812/04.02.09/M-III
M/s Krishan Kumar Gupta
30 C/o designer gate in park opp. CD-42 in Hari nagar C-109/WZ
842/10.02.09/EE(M)-III
M/s R.N. builders
31 C/o drain from K block Fateh nagar to Ashok nagar road at Suhag Banquet road in C-109/WZ
76/18.08.09/EE(M)-II
M/s Bansal Const.
32 C/o drain and RMC from CD-42 to Major Rajeev Lal road in CD block Hari nagar in C-109/WZ
813/04.02.09/EE(M)-I
M/s Bansal Const.
33 P/O Electri installed and post top latern fittings in mini stadoum in Hari nagar w.no.109/WZ
380/04.02.09/EE(E)-III
M/s Aman Elec. Const.
ELECT E-I 10.10.08 05.09.08 483278 05.03.09 30.03.09 469385 Completed
CIVIL M-I 31.07.08 11.06.08 78293 17.12.08 18.01.09 68428 Completed
34 P/o SHM light in mini Stadium Hari Nagar in w.no.111/WZ
552/26.02.09/EE(E)-III
M/s Perfect Electrical works
35 Dev of roof of VIP platform at mini stadium Shyam Vatika Hari nagar C-111/WZ
581/17.12.08/EE(M)-I
M/s Pankaj builders
Status Report of MLA,Sh.O.P.BabbarAC No. 14,2008-09
S.No.
Name of Work deptt. Div. D.O.S D.O.C
elect E-I 02.5.008 04.03.08 569427 15.08.08 20.09.08 559256 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Expenditure
Present Position
1 Prov. of posttop lantern light fittings in park Vikas Puri area WZ
99/14.08.08/EE(E)-III
M/s Dev Engineers
elect E-I 02.05.08 04.03.08 281000 01.09.08 29.09.08 280701 Completed
elect E-I 06.06.08 26.05.08 399658 16.10.08 01.11.08 361477 Completed
elect E-I 06.06.08 26.05.08 170000 01.08.08 01.09.08 162779 Completed
civil M-III 18.06.08 25.04.08 309108 14.07.08 P 275178 In Prog.
civil M-III 18.06.08 25.04.08 350440 16.07.08 03.03.09 335132 Completed
civil M-III 18.06.08 25.04.08 309108 14.07.08 P 276402 In Prog.
civil M-III 18.06.08 25.04.08 311518
civil M-III 18.06.08 25.04.08 313892
civil M-III 18.06.08 28.05.08 297260 14.08.08 22.10.08 295901 Completed
civil M-III 20.06.08 28.05.08 199600 23.08.08 04.11.08 198404 Completed
civil M-III 20.06.08 28.05.08 397760 14.08.08 11.10.08 392187 Completed
civil M-III 20.06.08 28.05.08 498346 22.08.08 05.12.08 497522 Completed
civil M-III 20.06.08 28.05.08 200000 23.08.08 16.10.08 200000 Completed
2 Prov. of posttop lantern light fittings in park between Kangra Niketan and Vikas Kunj w.no.113/WZ
112/29.08.08/EE(E)-III
M/s Paras Const Co.
3 Prov. of lighting arrangement at tilak Ngr. area w.no.113/WZ
190/16.10.08/EE(E)-III
M/s Neeraj Entp.
4 Prov. of street light with pole at tilak Ngr. area w.no.113/WZ
79/25.07.09/EE(E)-III
M/s Ram Gopal & Co.
5 C/O B/S/D in lane from BA-23 to BA-253 in Tagore Garden in AC-14/WZ
204/04.07.08/EE(M)-III
M/s Vashishth Const.
6 C/O B/R/S berms of lane of BA block Tagore garden from BA-328 to BA-340 by interlocking tiles on both sides in Tagore Garden in AC/WZ
205/07.07.08/EE(M)-III
M/s Ravinder Const.
7 C/O B/S/D in lane from BA-292 to BA-306 in Tagore Garden in AC/WZ
203/04.07.08/EE(M)-III
M/s Vashishth Const.
8 C/O B/S/D in lane from BA-275 to BA-289 in Tagore Garden in AC/WZ
9 C/O B/S/D in lane from BA-328 to BA-340 in Tagore Garden in AC/WZ
10 C/O road berms by prov. tiles infront of KG-III/1 to KG-III/33 in Vikas Puri AC-14/WZ
223/13.08.08/EE(M)-III
M/s A.K. Entp.
11 C/O lane by pdg RMC opp. A-24 to A-25 along B/Wall of MCD store and BSES office in Sankar Garden AC-14/WZ
258/13.08.08/EE(M)-III
M/s Ashok Bansal
12 C/O lane by pdg RMC from 16/18 to 16/25 in Tilak Ngr.AC-14/WZ
256/13.08.08/EE(M)-III
M/s M.P. Assos.
13 C/O lane by pdg rmc in gali no. 2 and 3 New Mahabeer Ngr.in AC/WZ
235/13.08.08/EE(M)-III
M/s Arjun Entp.
14 C/O becklane by pdg rmc from 13/1 to 13/5 Tilak Ngr.in AC-14/WZ
240/13.08.08/EE(M)-III
M/s Om Mark builders
civil M-III 20.06.08 28.05.08 496963 22.08.08 14.11.08 493365 Completed
civil M-III 20.06.08 28.05.08 398929 13.08.08 11.08.08 397790 Completed
civil M-III 20.06.08 28.05.08 200000 23.08.08 22.10.08 199498 Completed
civil M-III 20.06.08 28.05.08 499365 13.08.08 31.01.09 499365 Completed
civil M-III 20.06.08 28.05.08 200000 22.08.08 11.12.08 194207 Completed
civil M-III 20.06.08 28.05.08 200000 09.11.09 20.01.10 195859 Completed
civil M-III 20.06.08 28.05.08 198582 22.08.08 28.11.08 198425 Completed
civil M-III 20.06.08 28.05.08 399494 22.08.08 26.11.08 395285 Completed
civil M-III 20.06.08 28.05.08 399611 23.10.08 20.12.08 395380 Completed
civil M-III 20.06.08 28.05.08 200000 25.08.08 22.10.08 200000 Completed
civil M-III 20.06.08 28.05.08 199823 20.08.08 28.01.09 199261 Completed
15 C/O becklane by pdg rmc from 13/3 to 13/23 Tilak Ngr.in AC-14/WZ
229/13.08.08/EE(M)-III
M/s Neel Traders
16 C/O lane by pdg RMC from h.no.1 to h.no.20 and 31 to 50 in Tihar Camp Ajay Enclave Ext. AC-14/WZ
228/13.08.08/EE(M)-III
M/s Neel Traders
17 C/O lane by pdg RMC from D-23 to D-40 gali no.4 Krishna Park AC-14/WZ
263/13.08.08/EE(M)-III
M/s Om Mark builders
18 C/O both side road side berms on service lane by pdg interlocking tile fron 1/6 Tilak Ngr. near Vishal Mega Mart to Tilak Ngr. Metro Station near shop no. 36 New Mkt. Tilak Ngr. in AC-14/WZ
232/1308.08/EE(M)-III
M/s Mahesh Const.
19 C/O lane by pdg RMC from S-3/76 to S-3/69 Old Mahabeer Ngr. AC-14/WZ
248/13.08.08/EE(M)-III
M/s A.K. Entp.
20 C/O lane by pdg RMC from S-3/62 to S-3/68 Old Mahabeer Ngr. AC-14/WZ
226/13.08.08/(M)-III
M/s Praveen Kumar Const.
21 C/O lane by pdg RMC from S-3/55 to D-54 Old Mahabeer Ngr. AC-14/WZ
264/13.08.08/EE(M)-III
M/s A.B. builders
22 C/O lane by pdg RMC from A-104 to A-99 and A-105 to A-111 Ganesh Ngr. AC-14/WZ
231/13.08.8/EE(M)-III
M/s A.B. builders
23 C/O lane by pdg RMC in gali no.20 opp. W-20/1 to Iqbal Singh Chakki Wala in New Mahabeer Ngr. AC-14/WZ
265/13.08.08/EE(M)-III
M/s L. Gee Const Co.
24 C/O lane by pdg RMC from 17/12 to 17/16 Tilak Ngr. AC-14/WZ
252/13.08.08/EE(M)-III
M/s Hankhelen Singh
25 C/O road by MP from A-1A to BN-39B,B-25A to A-18A in DDA flat opp. 12-Block Tilak Ngr. AC-14/WZ
242/13.08.08/EE(M)-III
M/s Umda Const.
civil M-III 20.06.08 25.05.08 499553 22.08.08 30.12.08 498581 Completed
civil M-III 20.06.08 01.06.08 376400 16.12.08 07.03.09 374186 Completed
civil M-III 20.06.08 01.06.08 376400 22.10.08 23.10.09 374545 Completed
civil M-III 20.06.08 .1.06.08 224000 22.10.08 04.04.09 220402 Completed
civil M-III 20.06.08 01.06.08 312400 26.12.08 P 309993 In Prog.
civil M-III 09.07.08 01.06.08 312400 26.12.08 P 309860 In Prog.
civil M-III 25.07.08 28.05.08 473500 11.10.08 10.12.08 399353 Completed
civil M-III 25.07.08 28.05.08 300000 10.10.08 07.01.09 266358 Completed
civil M-III 11.11.06 28.05.08 284600 22.10.09 21.01.09 228881 Completed
civil M-III 25.07.08 28.05.08 284600 22.10.08 21.01.09 227759 Completed
civil M-III 25.07.08 28.05.08 500000 22.10.08 06.03.09 417129 Completed
26 C/O service lane along Najafgarh road by pdg RMC from Janakpuri East Metro Station to B-120 Ganesh Ngr. AC-14/WZ
227/13.08.08/EE(M)-III
M/s Sahil builders
27 C/O rain shelter in AC-Block park Tagore Garden C-105/WZ
585/17.12.08/EE(M)-III
M/s Mahesh Const.
28 C/O rain shelter in AD-Block park Tagore Garden C-105/WZ
539/13.10.08m_iii
M/S Kukeash Const
29 C/O designer gate in AC-b lock park Tegore Garden in C-105/WZ
540/13.10.08/EE(M)-III
M/s Mukesh Const Co.
30 C/O designer gate in AD-block park opp.AD-77 Tegore Garden in C-105/WZ
587/17.12.09/EE(M)_I
M/s Cheema Build.
31 C/O designer gate in AD-block on main road side near Urinal Tegore Garden in C-105/WZ
586/17.12.09/EE(M)-I
M/s Cheema Build.
32 C/O park B/Wall with both side marble wash plaster on East side B/Wall of Distt. park,New Krishna park adj to Vikas kunj Society in AC-14/WZ
375/01.10.08/EE(M)-III
M/s Manish Const Co.
33 C/O B/Wall with railing in ground from 20B/11 to 20B/22 in Tilak Ngr.AC-14/WZ
379/01.10.08/EE(M)-III
M/s Om Mark builders
34 C/O 50 no.cc benches for verious park of ward no.C-113,C-114,in AC-14/WZ
482/13.10.08/EE(M)-III
M/s Om Mark builders
35 C/O 50 no. p.c.c.benches for verious park of ward C-105,C-106 in AC-14/wz
481/13.10.08/EE(M)-III
M/s Om Mark builders
36 C/O 2 no. Ornamental gates in Green Belt Park out side Shanker Garden on Nej road in AC-14/WZ
469/13.10.08/EE(M)-III
M/s Gaurav Const Co.-II
civil M-III 25.07.08 28.05.08 300000
civil M-III 25.07.08 28.05.08 300000 10.10..08 09.01.09 255953 Completed
civil M-III 25.07.08 28.05.08 388000
civil M-III 25.07.08 07.07.08 374200 22.10.08 18.08.09 317618 Completed
civil M-III 25.07.08 09.07.08 374200 09.10.08 P 159763 In Prog.
hort E-I 29.07.08 28.07.08 165387 07.08.08 28.08.08 164431 Completed
civil M-III 11.08.08 28.05.08 276600
civil M-III 11.08.08 28.05.08 499818 23.09.08 15.11.08 499109 Completed
civil M-III 11.08.08 28.05.08 499600 04.10.08 10.11.08 484581 Completed
civil M-I 11.08.08 09.07.08 301800 06.10.08 01.12.08 263441 Completed
civil M-I 11.08.08 09.07.08 350000 03.10.08 12.03.09 318988 Completed
37 C/O Ornamental gates in Park infrontof F-215 Raghubeer Ngr. in AC-14/WZ
38 C/O Ornamental gates in Park infront of KG-II/190 Vikaspuri in AC-14/WZ
370/01.10.08/EE(M)-III
M/s Gaurav Const Co.-II
39 C/O Ornamental hut in Park near Ramlila Ground opp. MCD Staff Qtr. in 32 Block in Ashok Ngr. in AC-14/WZ
40 C/O 2 no.Ornamental gate each in Park near Sanskrit Mahavidhyalya and TC-1150 in T.C. Camp Raghubeer Ngr.in AC-14/WZ
971/13.010.08M-III
M/s Om Mark builders
41 C/O 2 no.Ornamental gates in 608 Qtr. in Tegore Garden Ext.in AC-14/WZ
380/01.10.08/EE(M)-II
M/s Om Mark builders
42 P/O Tubewell in park infront of 1/1 Mall Road in Tilak Ngr. under AC-14/WZ
385/06.08.08/EE(E)-Hort.
M/s Seth Const.
43 C/O Wall with ornamental grill on Island on Ngj Road at Subhash Ngr. Red Light near Subhash Ngr. drain in Ajay Enclave in AC-14/WZ
44 C/O Chowk behind Bata Showroom and 5/6 Block D.S.Tilak Ngr. in AC-14/WZ
852/22.09.08/EE(M)-I
M/s Honey Const.
45 C/O service lane along N.G. road by pdg RMC from K-10 New Mahavir Ngr. to M.I. New Mahavir Ngr. Mandir on main Ngj Road opp.New Mahavir Ngr. red light in AC-14/WZ
416/03.10.08/EE(E)-III
M/s Shree Ji Const Co.
46 C/O backlane by pdg RMC from h.no. WZ-29 to WZ-100 in Sant Ngr. Extn. in AC-14/WZ
374/11.10.08/EE(M)-I
M/s Manjeet Const Co.
47 C/O lane by pdg RMC from 8/9 to 8/30,8/31 to 8/33 in Tilak Ngr. in AC-14/WZ
419/03.10.08/EE(M)-I
M/s Manjeet Const Co.
civil M-I 11.08.08 09.07.08 350000 13.10.08 15.12.08 350000 Completed
civil M-I 14.08.08 09.07.08 495000 14.10.08 21.11.08 487575 Completed
civil M-I 14.08.08 09.07.08 400000 15.10.08 29.01.08 394222 Completed
civil M-III 19.08.08 .07.07.08 179300 22.10.08 22.08.09 179300 Completed
civil M-I 19.08.08 18.08.08 463300 13.10.08 21.12.08 432038 Completed
civil M-I 20.06.08 25.05.08 199823
civil M-III 20.06.08 25.05.08 499877 18.08.08 07.11.08 499877 Completed
civil M-III 20.06.08 25.05.08 199800 12.09.08 19.11.08 196987 Completed
civil M-III 20.06.08 25.05.08 200000 22.08.08 21.10.08 199205 Completed
civil M-III 20.06.08 25.05.08 396823 14.08.08 03.10.08 396791 Completed
civil M-III 29.08.08 24.08.08 199000 15.10.08 24.11.08 183872 Completed
48 C/O lane by pdg RMC from 24/1 to 24/6 in Ashok Vihar in AC-14/WZ
487/13.10.08/EE(M)-I
M/s Sabarwal Const Co.
49 C/O road by pdg RMC from Harijan Colony(80yds)culvert over Subhash Ngr.drain near WZ-179 Sant Ngr. to WZ-14 Sant Ngr.Extn. in AC-14/WZ
489/13.10.08/EE(M)-I
M/s Shree Ji Const Co.
50 C/O lane by pdg RMC from 20B/96 to 20B/105 in Tilak Ngr. in AC-14/WZ
484/13.10.08/EE(M)-I
M/s Maa Durga Const Co.
51 C/O Toilet Block outside in Ganesh Ngr. Mkt. on N.G.road near Ganesh Ngr. Subway in C-114/WZ
488/13.10.08M-III
M/s Amit Const Co
52 C/O Rawndom Stone Masonary Wall with grills along Subhash Ngr. drain in 134 Allternative plot Chaukhandi in AC-14/WZ
610/13.10.08/EE(M)-I
M/s Rakesh Entp.
53 C/O road by MP from A-18A to B-39A in DDA Flat opp.12-Block Tilak Ngr. AC-14/WZ
54 C/O Service lane along Neg road by pdg RMC from Ganesh Ngr.Subway to WZ-1 Ganesh Ngr. in AC-14/WZ
222/13.08.08/EE(M)-III
M/s Parveen Kumar Const.
55 C/O road side berms by pdg interlocking tiles from C-15 to Mother Dairy Both in New Krishna Park in AC-14/WZ
325/12.09.08/EE(M)-III
M/s Ghan Shyam Dass
56 C/O lane by pdg RMC from shop no.48 to 5/57 D.S.Tilak Ngr. AC-14/WZ
339/13.08.08/EE(M)-III
M/s M.P. Assos.
57 C/O Chowk by pdg RMC from 20A-27 to 20A/37 in Tilak Ngr.in AC-14/WZ
225/13.08.08/EE(M)-III
M/s Gupta Engg. Cost.
58 C/O lane by pdg RMC from 20A/11 to 20A/17 Tilak Ngr.in AC-14/WZ
486/13.10.08/EE(M)-III
M/s Maa Durga Const Co.
civil M-III 29.08.08 28.05.08 198935 22.10.08 14.01.09 198430 Completed
civil M-III 29.08.08 29.08.08 198400 20.10.08 25.11.08 193299 Completed
civil M-III 03.09.08 24.08.08 375000 22.12.08 11.12.08 350613 Completed
civil M-III 03.09.08 09.07.08 350000 13.10.08 17.01.08 349254 Completed
civil M-III 03.09.08 09.07.08 339000 28.12.08 15.04.09 335922 Completed
59 C/O walkway in park behind B-52 Shanker Garden in AC-14/WZ
448/13.10.08/EE(M)-III
M/s Devender Kumar
60 C/O lane by pdg RMC from 11/48 to 11/53 Tilak Ngr.in AC-14/WZ
485/13.10.08/EE(M)-III
M/s Maa Durga Const Co.
61 C/O backlane by pdg RMC from 22/1 to 22/7 and 22/35 to 22/38 in Tilak Ngr.in AC-14/WZ
483/13.10.08/EE(M)-III
M/s Shree Maa Durga Const
62 C/O Ornamental Hut in A-Block Park opp.A-79 Shanker Garden in AC-14/WZ
490/13.10.08/EE(M)-III
M/s Manish Const
63 C/o lane by pdg RMC infront of lane WZ-29 to WZ-44 Sant nagar Extn. Ac-14/WZ
762/19.12.08
M/s Shiv Kumar gupta
Status Report of MLA,Sh.Ramesh LambaAC No. 15,2008-09S.No. Name of Work deptt. Div. D.O.S D.O.C
ELECT E-I 23.05.08 12.05.08 198000 12.09.08 10.12.08 197965 Completed
ELECT E-I 30.05.08 22.05.08 399852 18.07.08 19.08.08 387698 Completed
ELECT E-I 30.05.08 11.04.08 228809 18.08.08 16.10.08 224978 Completed
ELECT E-I 30.05.08 22.05.08 339950 18.08.08 17.10.08 326146 Completed
ELECT E-I 23.06.08 23.05.08 563107 13.09.08 12.09.08 549484 Completed
ELECT E-I 23.07.08 09.05.08 109635
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Expenditure
Present Position
1 Prov. of Tubewell in park at C-Block Raghubir Ngr.(25Gaj)under WZ
368/06.08.08/EE(E)-III(Hort.)
M/s Modern Elect.
2 Prov.of post top lantern fitting in park of F-9 Block Rajori Garden in C-105 under WZ
66/11.07.08/EE(E)-III
M/s S. Gee Entp.
3 Prov.of post top lantern fitting in park at RED Appartment infrontof h.no.176-A, Rajori Garden in C-105 under WZ
98/12.08.08/EE(E)-III
M/s Ankur Entp.
4 Prov.of post top lantern fitting in park infrontof Sanatan Dharam Mandir J-3 and G-19 Rajori Garden in C-105 under WZ
97/12.08.08/EE(E)-III
M/s Rai Elect.
5 Prov.of post top lantern fitting arrangement in Chameli park Raghubir Ngr.under WZ
127/EE(E)-III
M/s Super Shine Assos.
6 Prov.of lighting fitting arrangement in park of J-3 Rajori Garden in C-105 under WZ
CIVIL M-I 31.07.08 19.05.08 199394 05.09.08 03.11.08 197556 Completed
CIVIL M-I 31.07.08 19.05.08 197895 03.09.08 03.11.08 197828 Completed
CIVIL M-I 31.07.08 05.06.08 477589 30.01.09 27.02.09 454480 Completed
CIVIL M-I 31.07.08 19.05.08 198521 05.09.08 24.01.09 198092 Completed
CIVIL M-I 31.07.08 19.05.08 92757 03.09.08 30.10.08 91856 Completed
CIVIL M-I 31.07.08 05.06.08 285600
CIVIL M-I 31.07.08 05.06.08 299500 19.12.08 24.03.08 299500 Completed
CIVIL M-I 31.07.08 05.06.08 276300 07.01.09 25.02.09 276300 Completed
CIVIL M-I 31.07.08 05.06.08 477316 30.01.09 27.02.09 456068 Completed
CIVIL M-I 26.08.08 19.05.08 598200 08.12.11 P 468466 In Prog.
CIVIL M-I 26.08.08 19.05.08 598000 08.12.11 P 468466 In Prog.
7 Pdg cc pav. from Ghodi Wala Mandir to Subhash Toilet and K-60 to K-11 in Raghubir Ngr. at C-101/WZ
371/28.08.08/EE(M)-I
M/s Parveen Kumar Garg
8 Pdg cc pav. from K-101 to K-372 in Raghubir Ngr. at C-102/WZ
370/28.08.08/EE(M)-I
M/s Gupta Engg.
9 P/L RMC from h.no.WZ-76 to WZ-63 in phirni Road Basai Dharapur at C-101/WZ
664/30.01.09/EE(M)-I
M/s Devender Ved
10 Pdg cc pav. from K-21 to K-343 in Raghubir Ngr. at C-102/WZ
368/28.08.08/EE(M)-I
M/s M.P. Assos
11 Pdg cc pav. from K-41 to K-61 in Raghubir Ngr. at C-102/WZ
372/28.08.08/EE(M)-I
M/s Aman Const.
12 C/O Hut in Madhav Parl in Rajori Garden at C-105/WZ
13 C/O Designer gate in park opp.h.no.B-270 in Raghubir Ngr.in C-101/WZ
575/17.12.08/EE(M)-I
M/s R.P. Garg Const.
14 C/O Designer gate in park near h.no.A-1/1 in Bhagat Singh Colony in C-101/WZ
576/17.12.08/EE(M)-I
M/s R.P. Garg Const.
15 P/L RMC from h.no.WZ-80 to WZ-76 and WZ-480 to WZ-47A in Phirni Raod Basai Dharapur at C-101/WZ
658/30.01.09/EE(M)-I
M/s Devender Ved
16 Stg of road by pdg dense carpetting from WZ-494 to Ramesh Ngr.drain in basai Darapur in C-101/WZ
414/31.05.11/M-I/WZ
M/s Sanjeev Kumar & Bros. (Dense Carpet)
17 Stg of road by pdg dense carpetting from Shitla Mata mandir to N.G.Road in Basai Darapur in C-101/WZ
414/31.05.11/M-I/WZ
M/s Sanjeev Kumar & Bros. (Dense Carpet)
CIVIL M-I 26.08.08 19.05.08 597200 08.12.11 P 468466 In Prog.
CIVIL M-I 26.08.08 19.05.08 593700 08.12.11 P 468466 In Prog.
CIVIL M-I 26.08.08 17.07.08 653500 14.02.09 19.05.09 594850 Completed
CIVIL M-I 26.08.08 17.07.08 657200 14.02.09 19.05.09 592952 Completed
CIVIL M-I 26.08.08 07.08.08 595700 20.02.09 14.09.09 592052 Completed
CIVIL M-I 26.08.08 07.08.08 317100 07.01.09 14.09.09 301400 Completed
CIVIL M-I 26.08.08 07.08.08 489500 08.12.11 P 468466 In Prog.
CIVIL M-I 26.08.08 07.08.08 496100 08.02.09 14.09.09 477742 Completed
CIVIL M-I 26.08.08 07.08.08 461800 07.01.08 02.04.09 445672 Completed
CIVIL M-I 26.08.08 07.08.08 573800 20.02.09 P 566162 In Prog.
CIVIL M-I 26.08.08 07.08.08 390500 09.02.09 03.08.09 364619 Completed
18 Stg of road by pdg dense carpetting from WZ-271 to WZ-407A/1 and 508 to WZ-523/10 in Basai Darapur in C-101/WZ
414/31.05.11/M-I/WZ
M/s Sanjeev Kumar & Bros. (Dense Carpet)
19 Stg of road by pdg dense carpetting from WZ-523/24 to WZ-485/1 in Basai Darapur in C-101/WZ
414/31.05.11/M-I/WZ
M/s Sanjeev Kumar & Bros. (Dense Carpet)
20 P/L RMC from C-246 to Barat Ghar Raghubir Ngr. 80 Sq,Yard in C-101/WZ
772/12.02.09/EE(M)-I
M/s L.Gee Const.
21 P/L RMC from C-137 to C-228 in D/Story in Raghubir Ngr.in C-101/WZ
771/12.02.09/EE(M)-I
M/s L.Gee Const.
22 P/L RMC from A-15 to A-31 in Rajori Garden in C-105/WZ
768/1.02.09 EE(M)-I
M/s A.K. & Co.
23 P/L RMC infront of Mother Dairy Road MIG Rajori Garden in C-105/WZ
599/29.12.08 EE(M)-I
M/s Shri Ji Const.
24 Stg of road by dense carpetting from J-11 to Desu Office Rajori Garden in C-105/WZ
414/31.05.11/M-I/WZ
M/s Sanjeev Kumar & Bros. (Dense Carpet)
25 P/L RMC from A-36 to A-44 and A-39 to A-42 in Rajori Garden in C-105/WZ
675/30.01.09 EE(M)-I
M/s Shri Ji Const.
26 P/L RMC from J-3/70 to J-3/76D and J-3/74 to Arya Samaj Mandir in Rajori Garden in C-105/WZ
638/29.12.08/EE(M)-I
M/s Shri Ji Const.
27 P/L RMC from J-3/16 to J-3/21 and J-3/52 to J-3/57,J-3/64 to J-3/69 in Rajori Garden in C-105/WZ
769/11.02.09/EE(M)-I
M/s A.K. & Co.
28 P/L RMC from A-62 to A-65 and A-65 to A-71 in Rajori Garden in C-105/WZ
677/30.01.09/EE(M)-I
M/s Shri Ji Const.
CIVIL M-I 26.08.08 07.08.08 503900 08.12.11 P 468466 In Prog.
CIVIL M-I 26.08.08 07.08.08 411400 07.01.09 06.06.09 322011 Completed
CIVIL M-I 26.08.08 22.07.08 749400 08.12.11 P 468466 In Prog.
CIVIL M-I 26.08.08 22.07.08 757400 08.12.11 P 468466 In Prog.
CIVIL M-I 26.08.08 22.07.08 657000 25.02.10 P 651687 In Prog.
CIVIL M-I 26.08.08 01.08.08 299300 26.12.08 28.08.09 295405 Completed
CIVIL M-I 26.08.08 01.08.08 299100 21.10.08 15.04.09 296164 Completed
CIVIL M-I 26.08.08 01.08.08 296000 06.01.09 24.03.09 293044 Completed
CIVIL M-I 26.08.08 01.08.08 299200 20.10.08 18.05.09 296268 Completed
29 Stg of road by pdg dense carpetting from D-1/19 to D-1/9 and D-1/8 to D-1/1 in Rajori Garden in C-105/WZ
414/31.05.11/M-I/WZ
M/s Sanjeev Kumar & Bros. (Dense Carpet)
30 P/L cc pav. from R-43 to R-40,S-55 to S-37 and J-3/137A to J-3/137A(back lane)in Rajori Garden in C-105/WZ
805/29.12.08/EE(M)-I
M/s Vashisth Const.
31 Stg of road from A-120 to A-28,A-104 to A-111 and A-74 to A-84 in Vishal Enclave in C-101/WZ
414/31.05.11/M-I/WZ
M/s Sanjeev Kumar & Bros. (Dense Carpet)
32 Stg of road from Bhagwan Ram Park to A-195 ion Sudarshan Park at C-101/WZ
414/31.05.11/M-I/WZ
M/s Sanjeev Kumar & Bros. (Dense Carpet)
33 P/L RMC from C-219 to C-245 in Raghubir Ngr.80 Sq,Yard at C-101/WZ
644/22.02.10/EE(M)-I
M/s L.Gee Const.
34 C/O Designer gate in Park of LIG Flats main Road at Rajori Garden in C-105/WZ
589/17.12.08/EE(M)-I
M/s Vashisth Const.
35 C/O Designer Gate in J-Block Park near Super Bazar at Rajori Garden in C-105/WZ
544/13.10.08/EE(M)-I
M/s Vashisth Const.
36 C/O Designer Gate in Park of Red MIG Flats N.G.Main Road at Rajori Garden in C-105/WZ
590/17.12.08/EE(M)-I
M/s Vashisth Const.
37 C/O Designer Gate in J-3 Block(Tikona)Park at Rajori Garden in C-105/WZ
542/13.10.08/EE(M)-I
M/s Vashisth Const.
CIVIL M-I 26.08.08 01.08.08 291100
CIVIL M-I 26.08.08 01.08.08 292800
CIVIL M-I 26.08.08 01.08.08 279500 22.10.08 23.04.09 274943 Completed
CIVIL M-I 26.08.08 01.08.08 289500 05.01.09 21.06.09 289500 Completed
CIVIL M-I 26.08.08 01.08.08 287600 02.03.09 12.10.09 287279 Completed
ELECT E-I 01.09.08 01.07.08 526128 30.01.09 26.07.09 499772 Completed
CIVIL M-I 30.09.08 30.07.08 991800
38 C/O Hut in park opp.Arya Samaj mandir J-3 Block at Rajori Garden in C-105/WZ
39 C/O Hut in park opp.h.no.25A Red MIG Flats at Rajori Garden in C-105/WZ
40 C/O Designer Gate in Park opp.h.no.92A Red MIG Flats at Rajori Garden in C-105/WZ
543/13.10.08/EE(M)-I
M/s Vashisth Const.
41 C/O Hut in Park opp.h.no.90 Red MIG Flats at Rajori Garden in C-105/WZ
594/29.12.08/EE(M)-I
M/s R.P. Garg Const.
42 C/O Hut in Park J-3 Block Road Jhoda Singh Park at Rajori Garden in C-105/WZ
823/23.02.09/EE(M)-I
M/s Aditya Bansal
43 P/O Post Top Lentern Fitting in the Park of Shivaji Enclave under WZ
339/21.01.09/EE(E)-III
M/s Perfect Elect.
44 Stg. of road by pdg dense carpeting J-13/1 to T-69 in Rajouri garden C-105/WZ
Status Report of MLA,Sh.Mala Ram GangwalAC No. 16,2008-09
S.No.
Name of Work deptt. Div. D.O.S D.O.C
CIVIL M-I 30.05.08 26.05.08 498972 07.08.08 31.10.08 498594 Completed
CIVIL M-I 30.05.08 26.05.08 497010 06.08.08 30.01.09 301927 Completed
CIVIL M-I 30.05.08 26.05.08 197563 07.08.08 29.12.08 197297 Completed
CIVIL M-I 30.05.08 26.05.08 499082 21.08.08 07.11.08 496351 Completed
CIVIL M-I 30.05.08 26.05.08 498343 15.08.08 24.12.08 488269 Completed
CIVIL M-I 30.05.08 26.05.08 497488 16.08.08 P 454044 In Prog.
CIVIL M-I 20.06.08 26.05.08 497892 06.08.08 01.10.09 595548 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Expenditure
Present Position
1 Dev of road by pdg RMC from h.no.1/49 to 15/49 on road no.49 West Punjabi Bagh C-103/WZ
171/29.07.08/EE(M)-I
M/s A.B. builders
2 Dev of lane by pdg cc pav. from h.no.WZ-206 to 207,171A to 171, 244 to 233, 511 to 513, 327 to 575, 321A to 324, 524 to 529, 529 to 528, 310 to 308, 285 to 285A and infront of 293A in Modipur Village in C-103/WZ
152/28.03.08/EE(M)-I
M/s Arjun Entp.
3 Dev of B/Wall of park infront of flat no. B-6A and B-23A in New Slum Outer Punjabi Bagh C-103/WZ
173/25.07.08/EE(M)-I
M/s A.B. builders
4 Dev of road by pdg RMC from h.no.1/48 to 15/48 on road no.48 and h.no.15/49 to 19/49 on road no.49 West Punjabi Bagh C-103/WZ
261/11.08.08/EE(M)-I
M/s Honey Const.
5 Dev of road by pdg RMC from corner of Dairy yo WZ-257,WZ-257 to Shiv Mandir Road,WZ-249A to 270 and WZ-249 to corner of Dairy in Modipur Village C-103/WZ
218/06.08.08/EE(M)-I
M/s M.P. Assos
6 Pdg RMC infront of flat no. A-40A,A-1A,B-6A,A-23A,B-24A,A-22A,B-26A,B-18A and Chowk in New Slum Outer Punjabi Bagh C-103/WZ
229/06.08.08/EE(M)-I
M/s Praveen Kumar Const.
7 Dev of B/Wall of park infront of flat no.A-1A,A-40A,A-22A and B-24A in New Slum Qtrs. Punjabi Bagh C-103/WZ
157/28.07.08M-I
M/s Prence enterp.
CIVIL M-I 20.06.08 28.05.08 366438 12.08.08 22.06.10 365665 Completed
CIVIL M-I 20.06.08 28.05.08 199207 20.08.08 12.11.08 198097 Completed
CIVIL M-I 20.06.08 28.05.08 373192 11.08.08 19.11.08 361350 Completed
CIVIL M-I 20.06.08 28.05.08 295455 07.08.08 04.11.08 294712 Completed
CIVIL M-I 20.06.08 28.05.08 399464 06.08.08 24.10.08 392951 Completed
CIVIL M-I 20.06.08 26.05.08 171090 26.08.08 P 169949 In Prog.
CIVIL M-I 20.06.08 26.05.08 197900 18.08.08 08.10.08 195938 Completed
CIVIL M-I 20.06.08 26.05.08 450800 27.08.08 06.10.08 448062 Completed
CIVIL M-I 20.06.08 26.05.08 199413 05.09.08 01.10.08 195931 Completed
CIVIL M-I 20.06.08 26.05.08 199255 20.08.08 10.12.08 197825 Completed
CIVIL M-I 06.08.08 28.07.08 198259 01.09.08 20.05.09 197425 Completed
8 C/O flower space in beck side of flat no. 55,77,73,57,61,13,17,25,41,121,125,133,129,109,105,81,149 and 137 in SFS Flats Modipur C-103
147/25.07.08/EE(M)-I
M/s Som Const
9 Pdg RMC infront of flat no. 73 to 77 in SFS Flat Modipur C-103
256/11.08.08/EE(M)-I
M/s Neel Const.
10 Pdg RMC in lane around park infront of flat no. 9 to 29,9 to 49, 49 to 69 and 29 to 69 in SFS Flat Modipur C-103
25/11.08.08/EE(M)-I
M;/s Manish Nayar
11 Pdg RMC in lane around park infront of flat no. 121 to 125,89 to 109 and 109 to 129 in SFS Flat Modipur C-103 in WZ
172/29.07.08/EE(M)-I
M/s Lee Gee Const.
12 Pdg RMC in lane around park infront of flat no. 81 to 85,89 to 149 and 129 to 149,41 to 45 in SFS Flat Modipur WZ
158/28.07.08/EE(M)-I
M/s Bhutani Entp.
13 Pdg MS grill on chabutra near h.no.D-159 and missing grills in B to F Block chabutra in R/C Madipur C-104/WZ
252/11.08.08/EE(M)-I
M/s A.K. Enterprises
14 C/O drain from h.no.A-1A to Community Center and side of Pump house and park in A-Block of Shivaji Kunj Madipur C-104/WZ
214/06.08.08/EE(M)-I
M/s M.P. Assos
15 Dev of lane around the park of colont nallah and adj lanes in A and B Block of Shivaji Kunj Madipur C-104/WZ
287/18.08.08/EE(M)-I
M/s Aman builders
16 Dev to lane by pdg RMC between flat no. 19 and 54 in D/S of Pkt.-II Pachimpuri C-104/WZ
220/06.08.08/EE(M)-I
M/s A.K. & co
17 Dev to lane by pdg RMC between flat no. 1 to 59 and park in D/S of Pkt.-II Pachimpuri C-104/WZ
244/11.10.08/EE(M)-I
M/s Harinder Singh
18 Dev of drainage system from h.no.WZ-217 to 193 Janta Flat and 193 to 513 on Main Road in Janta Flat in Madipur C-103/WZ
316/22.08.08/EE(M)-I
M/s Rajan builders
CIVIL M-II 08.08.08 04.08.08 507100 22.10.08 26.05.09 493686 Completed
CIVIL M-II 08.08.08 04.08.08 452500 19.10.08 06.04.09 452372 Completed
CIVIL M-II 08.08.08 04.08.08 502100 22.10.08 12.06.09 341836 Completed
CIVIL M-II 08.08.08 04.08.08 494200 01.01.09 16.02.09 343652 Completed
CIVIL M-II 08.08.08 04.08.08 502800 18.10.08 P 384510 In Prog.
ELECT E-I 12.08.08 03.07.08 345830 17.10.08 12.11.08 334426 Completed
CIVIL M-I 12.08.08 28.07.08 262355 22.10.08 P 151968 In Prog.
CIVIL M-I 12.08.08 28.07.08 397580 22.10.08 P 339149 In Prog.
CIVIL M-I 12.09.08 28.07.08 433400 04.03.09 01.06.09 398773 Completed
CIVIL M-I 14.08.08 01.08.08 484300
19 Covering of drain infront of St.martin School on Major Ashwani Marg in A-2 Block Paschim Vihar C-57/WZ
182/13.08.08/EE(M)-II
M/s J.M. Const
20 Dev of B/Wall of park between BG-7 and Desu Service Station on Outer Periphenal Road in C-57/WZ
174/10.10.08/EE(M)-II
M/s Som Const
21 Dev of backlane by pdg cc pav.in back lane from h.no.302 to 311,185 to 201 and 168 to 180 in A-4 Block Paschim Vihar in C-58/WZ
183/13.10.08/EE(M)-II
M/s Nayar Bros.
22 Dev to park by pdg walkway between B-2 and B-4 Block Remaining Portion in Paschim Vihar C-57/WZ
329/22.12.08/EE(M)-II
M/s J.P. Const
23 Dev of raod by pdg RMC from h.no.265 to Corner of park near B-1/271 in B-1 Block in Paschim Vihar
169/10.10.08/EE(M)-II
M/s Devender Kr.
24 P/O post top lantern fitting in Ram Lila Park Madipur J.J.Colony under WZ
195/17.010.08/EE(E)-III
M/s MS Trading Co.
25 Pdg Marbel Wash and Sand Stone along ring road side and along WA Road side of Sant Harchand Gangwal Park in W.P.Bagh in C-103/WZ
501/13.10.08/EE(M)-I
M/s Ram Const.
26 Pdg Marbel Wash and Sand Stone along Station side and al;ong road no.41 of Sant Harchand Gangwal Park in W.P.Bagh in C-103/WZ
524/13.10.08/EE(M)-I
M/s Ram Const.
27 Pdg cc interlocking tiles on berms on road by precast rcc salb on drain from plot no.6A to 107A in LIG Plots in Madipur C-103/WZ
812/23.02.09/EE(M)-I
M/s LG Const
28 C/O footpath from flat no.C-10A New Slum Qtrs.to Murti Sweets Pkt.-III Paschimpuri C-104/WZ
CIVIL M-I 14.08.08 01.08.08 391100 08.06.09 27.07.09 346712 Completed
CIVIL M-I 14.08.08 01.08.08 499200 08.06.09 P 344766 In Prog.
CIVIL M-I 14.08.08 01.08.08 499000 07.01.09 08.04.09 414607 Completed
CIVIL M-II 28.08.08 27.08.08 502400 22.10.08 06.04.09 476918 Completed
CIVIL M-II 28.08.08 27.08.08 198100 23.10.08 22.12.08 155133 Completed
CIVIL M-II 28.08.08 27.08.08 519700 31.12.08 P 463879 In Prog.
CIVIL M-II 23.09.08 25.09.08 198300 09.01.09 02.03.09 198112 Completed
CIVIL M-II 23.09.08 20.09.08 499700 16.01.09 31.03.09 488156 Completed
29 C/O road berm by pdg interlocking tiles from flat no.C-10A New Slum Qtrs.to Mutti Sweets in Pkt.-III Paschimpuri C-104/WZ
70/30.05.09/EE(M)-I
M/s Shanti builders
30 C/O drain by Razing and Covering from New Slun Qtrs. to Park near Murty Sweets in Pkt.-III Pachimpuri C-104/WZ
58/30.05.09M-I
M/s Banwari Lal
31 C/O drain and imp to road berm from infront of Murti Sweets to prk in PKt.-III Paschimpuri C-104/WZ
606/29.12.08/EE(M)-I
M/s Vashisth const
32 Dev of lane by pdg RMC between SBI and Meera Bagh B-Block C-57/WZ
273/13.10.08/EE(M)-II
M/s Som Const
33 C/O B/Wall of open space in A-6 Block janta Flat C-58/WZ
305/13.10.08/EE(M)-II
M/s Praveen Kumar Const.
34 Dev to park of h.no.175 and side of h.no.175 in A-5B Block C-58/WZ
330/22.12.08/EE(M)-II
M/s Mahinder Dabas
35 Dev to park by pdg marble wash and ms grill infront of h.no.36 ti BG-5A block Pashchim Vihar C-57/WZ
359/31.12.08/EE(M)-II
M/s Som Const
36 Dev of road from h.no.86 to BSES office J block RBI cly. Pashchim Vihar C-57/WZ
377/09.01.09/EE(M)-II
M/s Som Const
Status Report of MLA,Sh.Anil BhardwajAC No. 17,2008-09
S.No.
Name of Work deptt. Div. D.O.S D.O.C
CIVIL M-II 23.06.08 23.05.08 498731 24.07.08 25.03.09 498297
Completed
CIVIL M-II 23.06.08 23.05.08 426911 25.07.08 24.11.08 426638
Completed
CIVIL M-II 23.06.08 23.05.08 462428 18.07.08 06.03.09 462428
Completed
CIVIL M-II 23.06.08 23.05.08 438437 25.07.08 10.10.08 433658
Completed
CIVIL M-II 23.06.08 23.05.08 497782 25.07.08 25.11.08 496310Completed
CIVIL M-II 23.06.08 22.05.08 448506 26.07.08 19.01.10 448156 Completed
CIVIL M-II 23.06.08 22.05.08 499603 25.07.08 25.11.08 498725
Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Expenditure
Present Position
1
Dev. of lane by pdg. CC from gate no.2 entry to h.no.62 in Ashoka Park in C-62/RZ
114/17.07.08/EE(M)-II
M/s MK Gupta
2
Dev. of road by pdg. CC from h.no.2550(Vardhman Vatika) corner to h.no.2546(Super Bazar) along Vardhman vatika in Tri Nagar in C-61/RZ
120/17.07.08/EE(M)-II
M/s Supreme const.
3 Dev. of lane by CC pav. from h.no.13 to h.no.30 in Ashoka Park in C-62/RZ
115/17.07.08/EE(M)-II
M/s Singhal Builders
4
Dev. of lane by P/L CC in gali no.3,4,6,Onkar Nagar-B Tri NAgar in C-61/RZ
118/17.07.08/EE(M)-II
M/s JMD Const.Co.
5 Dev. of lane by P/L CC in gali no.6 Kanhiya Nagar in C-61/RZ
119/17.07.08/EE(M)-II
M/s DB Ent.
6 Dev. of road by CC pav. from h.no.53 to h.no.60 in Ashoka Park in C-62/RZ
116/17.07.08EE(M)-II
M/s Manish Ent.
7
Dev. of lane by P/L CC from h.no.4649 to h.no.4645 gali no. 15 Jai Mata Mkt. Tri Ngr. C-61/RZ
129/22.07.08/EE(M)-II
M/s Vivek Associates
CIVIL M-II 23.06.08 22.05.08 495425 29.07.08 31.12.08 495425
Completed
CIVIL M-II 23.06.08 22.05.08 381124 29.07.08 18.02.08 379518
Completed
ELECT E-I 24.07.08 21.05.08 264827 17.09.08 10.10.08 249838
Completed
ELECT E-I 01.08.08 17.05.08 215636 16.12.08 23.01.09 215487
Completed
ELECT E-I 01.08.08 19.05.08 213004 17.12.08 14.01.09 210419
Completed
ELECT E-I 01.08.08 15.05.08 437034 16.12.08 30.12.08 406012
Completed
CIVIL M-II 20.08.08 08.08.08 479002 24.09.08 12.01.09 478252Completed
CIVIL M-II 20.08.08 08.08.08 406472 15.12.08 06.03.09 404739Completed
ELECT E-I 26.08.08 20.05.08 513951
CIVIL M-II 27.08.08 14.08.08 338428 18.10.08 29.12.08 337415
Completed
CIVIL M-II 27.08.08 18.08.08 489798 22.10.08 p 487525 In Prog.
CIVIL M-II 27.08.08 18.08.08 409010 21.10.08 P 406810 In Prog.
8
Dev. of lane by Pdg CC from gate no.1 entry to h.no.52 in Ashoka Park in C-62/RZ
127/22.07.08/EE(M)-II
M/s R.S. buiding material supp.
9
Dev. of road P/L CC in gali no. 95,105 and 166 in Ganesg Pura Tri Ngr. C-61/RZ
125/22.07.08/EE(M)-II
M/s Satyam Const.
10
P/o lighting arrangement in Mpl park opp. Mother dairy C-7, keshav Puramin C-61/RZ
79/12.09.08/EE(E)-VII
M/s Super Shine Assos.
11
P/O semi high mast lights at Char Khamba Chowk Shakurpur Village in C-62/RZ
161/17.10.08/EE(E)-VII
M/s Forward Engg.
12
P/O semi high mast pole with lights in Lawrance Road Industrial State in C-62/RZ
154/17.10.08/EE(E)-VII
M/s Malhotra Elect.
13
P/O semi high mast pole with lights in MPL Park opp. SDM office Rampura in C-62/RZ
153/17.10.08/EE(E)-VII
M/s Shri Om Traders
14 C/o Bairam Khan Marg by P/L cc in Tri nagar in C_61 RZ
227/18.09.08/EE(M)-II
M/s Tokas & Co.
15 C/o gali no.5 by P/L cc in Jai Mata Mkt. Tri nagar in C_61 RZ
223/18.09.08/EE(M)-II
M/s Har Const Co.
16
P/o 100 nos HPSV street light arrangement in Sri nagar, Shakurpur village Rampura in w.no.66/RZ
17
C/o School by P/L cc from SDM office road to park corner at Rampura in C-62/RZ
262/13.10.08/EE(M)-II
M/s Nishant Const Co.
18
C/o B/wall along Shkur Basti drain near Janta flats MAndir from Tranformer to Mandir corner in Rampura in C-62/RZ
259/13.10.08/EE(M)-II
M/s S. S. Cont.
19
Dev of road by P/L cc from MIG flats gate to park corner on School road Rampura in C-62/RZ
261/31.10.08/EE(M)-II
M/s Har Const Co.
CIVIL M-II 27.08.08 18.08.08 356244 22.10.08 30.06.09 355861
Completed
CIVIL M-II 27.08.08 08.08.08 427167 27.09.08 21.01.10 425921 Completed
CIVIL M-II 27.08.08 08.08.08 198635 03.10.08 06.01.09 197950
Completed
CIVIL M-II 27.08.08 08.08.08 455033 26.09.08 26.12.08 385115Completed
CIVIL M-II 01.09.08 08.08.08 360400 24.10.08 23.01.09 360004
Completed
CIVIL M-II 22.09.08 14.08.08 496800 10.03.09 06.05.09 463566
Completed
CIVIL M-II 22.09.08 14.08.08 498406 01.01.09 30.03.09 498272
Completed
CIVIL M-II 30.09.08 15.09.08 472750 14.02.09 07.07.09 411487
Completed
CIVIL M-II 30.09.08 15.09.08 565300 13.02.09 29.11.09 542403 Completed
CIVIL M-II 30.09.08 15.09.08 404000 08.04.09 25.08.09 356480
Completed
CIVIL M-II 30.09.08 15.09.08 406000 02.03.09 09.04.10 355376 Completed
20
Dev of footpath along MIG flats B/wall from SDM park gate to Rampura drain in Rampura in C-62/RZ
263/13.06.08/EE(M)-II
M/s Vinod Const Co.
21 C/o gali no.221 by P/L cc in Chander Nagar w.no.61/Tri nagar RZ
229/04.03.10/EE(M)-II
M/s Har Const Co.
22
C/o lane by P/L cc in gali no.14 (Mandir Side) Jai Mata mkt. Tri nagar w.no.61/RZ
239/29.09.08/EE(M)-II
M/s Shri Balaji Const Co.
23 C/o gali no.164 by P/L cc at Ganeshpura in Tri nagar w.no.61/RZ
230/18.09.08/EE(M)-II
M/s Tokas & Co.
24 C/O gali no.185 and gali no.87(Gsnesh Pura)by P/L cc in Tri Ngr. in C-61/RZ
275/13.10.08/EE(M)-II
M/s Naresh Entp.
25
C/o drain (Builtup section) from LIG flats gate no.1 to gate no.4 in Rampura in w.no.62/RZ
416/02.03.09/EE(M)-II
M/s Rajeev Kumar Gupta
26
C/o lane by P/L cc from Ram Rikh Yadav School corner to Char Khamba Chowk Phirni road in shakurpur at Rampura w.no.62/RZ
322/23.12.08/EE(M)-II
M/s Ajit Dabas
27
P/L cc road from h.no.1537 to gali no.113 at Anaj Mandi in Tri Ngr. in C-61/RZ
357/10.02.09/EE(M)-II
M/s Dinesh Sethi
28 P/L cc in gali no.7, Jai Mata Mkt. in Tri Ngr. in C-61/RZ
360/10.02.09/EE(M)-II
M/s Dinesh Sethi
29 P/L cc road in gali no.8, Jai Mata Mkt. in Tri Ngr. in C-61/RZ
385/02.03.09/EE(M)-II
M/s Kutumb Cont. & Assos.
30
P/L cc road in Anaj Mandi from gali no.160 to Tota Ram Bazar in Tri Ngr. in C-61/RZ
386/02.03.09/EE(M)-II
M/s Kutumb Cont. & Assos.
CIVIL M-II 30.09.08 15.09.08 420800 18.02.09 21.01.10 364637 Completed
CIVIL M-II 30.09.08 15.09.08 519275 14.02.09 09.06.09 366370
Completed
33 CIVIL M-II 08.10.08 07.10.08 1E+06 19.01.09 10.04.09 1233544 Completed
31
P/L cc road in Anaj Mandi road from Aggarsen Marg to gali no.160(h.no.2040) in Tri Ngr. in C-61/RZ
359/10.02.09/EE(M)-II
M/s Dinesh Sethi
32
P/L cc road at Anaj Mandi road from gali no.113 to Parsuram Marg in Tri Ngr. in C-61/RZ
358/10.02.09/EE(M)-II
M/s Dinesh Sethi
Imp to road behind UCO bank near C-7 block Lawrance road Industrial area
w.no. 62/RZ65/12.01.09/EE(Pr.)/RZ
M/s Manoj Kumar Gupta
Status Report of MLA,Sh.S.C. VatsAC No. 18,2008-09
S.No.
Name of Work deptt. Div. D.O.S D.O.C
ELECT E-I 23.06.08 16.05.08 98871 17.12.08 22.01.09 93594
Completed
ELECT E-I 23.06.08 16.05.08 99695 17.10.08 23.12.08 92841
Completed
ELECT E-I 23.06.08 16.05.08 477461 06.10.08 15.10.08 352248
Completed
ELECT E-I 23.06.08 16.05.08 184222 06.10.08 15.10.08 134553
Completed
ELECT E-I 23.06.08 16.05.08 206829 06.10.08 15.10.08 152148
Completed
ELECT E-I 23.06.08 16.05.08 173539 16.12.08 24.12.08 168234
Completed
CIVIL M-I 18.07.08 27.06.08 257430 20.09.08 08.11.08 255373Completed
CIVIL M-I 18.07.08 27.06.08 323350 09.09.08 18.02.09 323350
Completed
CIVIL M-I 18.07.08 27.06.08 499074 20.09.08 16.12.08 497026Completed
CIVIL M-I 18.07.08 27.06.08 214426 06.09.08 14.11.08 213860
Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Expenditure
Present Position
1
P/O lighting arrangememt near G-300, J.j.Colony Shakur Pur under Rohini Zone
194/16.12.08/EE(E)-VII
M/s Amit Electric Service
2
P/O lighting arrangement in Ram Lila Park in G-Block j.j.colony Shakur Pur under Rohini Zone
159/17.10.08/EE(E)-VII
M/s S.T. Electric Co.
3
P/O lighting arrangement in Phoola Ram Park in Rishi Ngr.under Rohini Zone
109/06.10.08/EE(E)-VII
M/s Bansal Electric Store
4
P/O lighting arrangement in Municipal Park near h.no.49 in Sandesh vihar under Rohini Zone
111/06.10.08/EE(E)-VII
M/s Bansal Electric Store
5
P/O lighting arrangement in Municipal Park near h.no.64 in Rohit Kunj under Rohini Zone
108/06.10.08/EE(E)-VII
M/s Master Electric Store
6
P/O Tubewell with sub.pump set at Jan Suvidha Parisar at E-Block J.J. Colony Shakurpur under Rohini Zone
136/13.10.08/EE(E)-VII
M/s Electra Fusion Tech.
7 C/o foot path park near h.no. B-18 Pushpanjali Enclave in C-60/RZ
264/10.09.08/EE(M)-I
M/s Bhatia & Co.
8
C/o foothpath of park along vidhya vihar near CNG filling station Saraswati Vihar in w.no. 60/RZ
220/29.08.08/EE(M)-I
M/s Singal builders
9 Dev of back lane from h.no. 199 to 139 at Anand Vihar, w.no. 60/RZ
267/10.09.08/EE(M)-I
M/s Har Const.
10 Dev of back lane from h.no. 24 to 31 in Deepali in w.no. 60/RZ
221/29.08.08/EE(M)-I
M/s Mahesh Entp.
CIVIL M-I 23.07.08 27.06.08 205810 13.08.08 15.10.08 205750
Completed
ELECT E-I 23.07.08 24.06.08 215419 13.10.08 17.10.08 207796
Completed
ELECT E-I 28.07.08 24.06.08 173539 16.12.08 20.01.09 168801
Completed
ELECT E-I 28.07.08 28.06.08 281757 15.10.08 24.10.08 267821
Completed
ELECT E-I 28.07.08 28.06.08 195522 13.10.08 17.10.08 188029
Completed
ELECT E-I 28.07.08 30.06.08 697934 17.12.08 07.01.09 691514
Completed
ELECT E-I 28.07.08 30.06.08 223372 17.12.08 24.12.08 220773
Completed
ELECT E-I 28.07.08 30.06.08 320600 17.12.08 23.04.09 305708Completed
ELECT E-I 28.07.08 30.06.08 320295 22.12.08 19.01.09 306724
Completed
ELECT E-I 28.07.08 21.07.08 97222 13.10.08 17.11.08 94017Completed
ELECT E-I 28.07.08 30.06.08 98871 09.02.09 19.06.09 92092
Completed
CIVIL M-I 31.07.08 10.05.08 412493 13.09.08 09.10.08 412493Completed
11 Dev of lane from Gurudwara to 1052 in Rani bagh in C-59/RZ
201/18.08.08/EE(M)-I
M/s Laxman Const Co.
12
P/o lighting arrangement in the Mpl park near C-450, Saraswati Vihar C- /RZ
129/13.10.08/EE(E)-VII
M/s Kamal Electricals
13 Installation of tubewell at Pitampura Chopal in C-66/RZ
137/13.10.08/EE(E)-VII
M/s Modern Electricals
14 P/o lighting arrangement in mpl park near h.no. 179, Harsh Vihar C- /RZ
134/13.10.08/EE(E)-VII
M/s Bindra Motors & Eletricals
15 P/o lighting arrangement in mpl park near h.no.207, Harsh Vihar.
133/13.10.08/EE(E)-VII
M/s Saksham Electricals & Electronics
16
P/o lighting arrangement in mpl park near h.no.D-816, HSaraswati Vihar C-66/RZ
189/16.12.08/EE(E)-VII
M/s M.J. Electricals & Electronics
17
P/o lighting arrangement in mpl park near h.no.129, Engineers enclave C-/RZ
150/17.10.08/EE(E)-VII
M/s Shri Balaji Elect.
18 P/o lighting arrangement in mpl park near h.no.91, Engineers enclave C-/RZ
163/17.10.08/EE(E)-VII
M/s U.V. Entp.
19
p/o lighting arrangement in the MPL. park near H no. 303 rajdhani enclave C- /RZ
135/13.10.08/EE(E)-VII
M/s Ankur Entp.
20 P/o lighting arrangement in Kor nala park in Pitampura village C-/RZ
130/13.10.08/EE(E)-VII
M/s S.K. Entp.
21 P/o lighting arrangement in the park near h.no.72, Deepali enclave C-60/RZ
250/03.02.09/EE(E)-VII
M/s Perfect Elct. Works
22 Dev of lane by pdg cc pav.in Chaupal in Pitempura Village in C-63/RZ
262/10.09.08/EE(M)-I
M/s JMD Const
CIVIL M-I 13.08.08 10.06.08 564700 05.01.09 03.03.09 408741
Completed
CIVIL M-I 13.08.08 10.06.08 239104 16.10.08 P 184935 In Prog.
CIVIL M-I 13.08.08 10.06.08 498745 17.10.08 20.04.09 498700
Completed
CIVIL M-I 13.08.08 10.06.08 433790 07.10.08 30.10.09 432503 Completed
CIVIL M-I 13.08.08 28.05.08 474362 17.10.08 10.06.09 473552Completed
ELECT E-I 26.08.08 30.05.08 600000 22.12.08 19.01.09 598895
Completed
ELECT E-I 26.08.08 30.06.08 600000 13.10.08 20.03.09 598419
Completed
ELECT E-I 26.08.08 20.07.08 600000 14.10.08 10.02.09 599451
Completed
CIVIL M-I 29.08.08 11.08.08 105813
CIVIL M-I 29.08.08 11.08.08 448340 17.10.08 12.04.09 448230Completed
CIVIL M-I 29.08.08 11.08.08 331624 17.10.08 20.12.08 330855Completed
CIVIL M-I 10.09.08 04.09.08 79783 17.10.08 20.11.08 79501
Completed
ELECT E-I 18.09.08 20.08.08 98871 03.02.09 11.02.09 92795
Completed
23 Dev of SW drain from h.no. 74 to 91 in Sandesh Vihar in C-63/RZ
435/26.12.08/EE(M)-I
M/s Sherawat Const Co,.
24 C/O Umbrella in park in N.H.8 in Kapila Vihar in C-63/RZ
312/07.10.08/EE(M)-I
M/s Tokas & Co.
25
Dev of SW drain from Samrat Enclave to h.no. 64 in Samrat Enclave in C-63/RZ
314/07.10.08/EE(M)-I
M/s Ajit Dabas
26 Dev of road by pdg cc from h.no. 194 to 207 in Harsh Vihar in C-63/RZ
309/07.10.08/EE(M)-I
M/s Har Const.
27 Dev of backlane from h.no. 89 to 106 in Chandar Lok in C-63/RZ
303/07.10.08/EE(M)-I
M/s S.A.S Const Co.
28 P/o lighting arrangement in Municipal park in Vidya vihar w.no.60/RZ
164/17.10.08/EE(E)-VII
M/s Sachdeva Electricals
29
P/o lighting arrangement in Municipal parks of Maharana Pratap Enclave in w.no.63/RZ
142/13.10.08/EE(E)-VII
M/s Kawatra Elec. Works
30 p/o lighting arrangement in NHP Central park, Kapil Vihar in w.no.60/RZ
116/06.10.08/EE(E0-VII
M/s Master Electric Store
31
Stg existing Lav.Block near Rang Mahal Socity Cluster CTC at Saraswati Vihar in C-60/RZ
32 Dev of backlane from E-934 to E-945 in Saraswati Vihar in C-60/RZ
304/07.1008/EE(M)-I
M/s SAS Const CO.
33 Dev of backlane from E-946 to E-961 in Saraswati Vihar in C-60/RZ
302/07.10.08/EE(M)-I
M/s SS contractors
34
C/O Flower bed and Satties at main Mkt. E-Block Park Saraswati Vihar in C-60/RZ
335/15.10.08/EE(M)-I
M/s Singhal builders
35
P/O Lighting arragment in the Mpl Park near F. Block Mandir J.J colony shakurpur in C-63/RZ.
253/03.02.09/EE(E)-VII
M/s Repair Shop
ELECT E-I 18.09.08 21.08.08 98871 03.02.09 12.02.09 91738
Completed
CIVIL M-I 20.06.08 02.05.08 205994 31.07.08 17.10.08 205906
Completed36
P/o lighting arrangemt in the Municipal park near E block Mandir JJ cly. Shakurpur in w.no. 64/RZ
252/03.02.09/EE(E)-VII
M/s Sheela Electric Works
37 C/O Walkway in park back of h.no.38 in Rajdhani Enclave C-63/RZ
145/21.07.08/EE(M)-I
M/s Parkash Khanna
Status Report of MLA,Sh Ravindra Nath BansalAC No. 19,2008-09
S.No.
Name of Work deptt. Div. D.O.S D.O.C
CIVIL M-I 11.07.08 28.05.08 348000 25.09.08 22.01.09 303656
Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Expenditure
Present Position
1
Dev of lane and drainage system from h.no. 24/5 to Gupta Glass, main orad to h.no. 56, h.no. SP-10 to SP-8 in Solapur village in Shalimar bagh in C-55/RZ
286/25.09.08/EE(M)-I
M/s Mahinder Singh
CIVIL M-I 11.07.08 28.05.08 587500 10.01.09 21.11.09 587500 Completed
CIVIL M-I 11.07.08 08.07.08 306120 11.09.08 P 285943 In Prog.
CIVIL M-I 15.07.08 11.07.08 496700 25.08.08 16.01.09 495902
Completed
CIVIL M-I 15.07.08 11.07.08 575500 15.12.08 14.03.09 499700
Completed
CIVIL M-I 15.07.08 11.07.08 593000 15.12.08 30.06.09 499996
Completed
CIVIL M-I 17.07.08 15.07.08 387300 17.10.08 20.01.09 293218
Completed
CIVIL M-I 18.07.08 05.07.08 597700 15.12.08 16.03.09 592184
Completed
ELECT E-I 28.07.08 07.07.08 449607 17.12.08 24.12.08 422017
Completed
ELECT E-I 28.07.08 09.07.08 306898 25.02.09 24.03.09 256669
Completed
ELECT E-I 28.07.08 19.05.08 483227 14.10.08 10.11.08 437684
Completed
2
Dev of lane from h.no. 60 to main road and side berms from Police station road to Kababi shop (along NDPL office) in Shahipur village in Solapur village in Shalimar bagh in C-55/RZ
428/26.10.08/EE(M)-I
M/s Satish Gupta & Co.
3
Dev of walkway of park opp. h.no. 179 in BU block Pitampura (North) in C-54/RZ
245/03.09.08/EE(M)-I
M/s S.S. Constractor
4
Dev of side lane by pdg drainage of RMC along flat no. 6, 19, 28, 48, and 61 in AC block in Shalimar BAgh (South) in C-56/RZ
192/18.08.08/EE(M)-I
M/s J.M.D Const Cio.
5
Dev of side lane by pdg drainage from h.no. 69 to 78 and 139 to 148 and berms near flat no. 98 to 119 in block BK-I in Shalimar BAgh (South) in C-56/RZ
366/08.12.08/EE(M)-I
M/s Singhal builders
6
Dev of lane and berms pdg RMC and drainage along h.no. 24 to 19, 27 to 25, 25 to 30 and 31 to 34 in AC block in Shalimar BAgh (South) in C-56/RZ
357/08.12.08/EE(M)-I
M/s Singhal builders
7
Remodling to drainage system along the B/wall of Guru Govind Singh College of Commerce on TV Tower road i Pitam Pura (south) in C-53/RZ
320/10.10.08/EE(M)-I
M/s Kuhar Const Co.
8
Dev of back lane by pdg RMC and drainage from h.no. 1 to 6 and 7 to 16 in AE block in Shalimar bagh C- /RZ
368/08.12.08/EE(M)-I
M/s Singhal builders
9
P/o street lighting arrangment in MCD park in B block 9west0 to CA block Shaimar bagh C- /RZ
155/17.10.08/EE(E0-VII
M/s Pee Kay Elect. Works
10
P/o strret lighting arrangemt in MCD park opp. 69/A in BW block Shalimar bagh in C /RZ
279/20.02.09/EE(E)-VII
M/s Amit Elevator Services
11
P/o lighting arrangment in MCD park situated in KU and HU block in Pitam pura w.no. /RZ
138/13.10.08/EE(E)-VII
M/s Gyan Entp.
CIVIL M-I 04.08.08 05.07.08 805500 10.09.09 08.01.10 805500 Completed
CIVIL M-I 04.08.08 11.07.08 993200 06.10.09 15.12.09 993200 Completed
CIVIL M-I 08.08.08 18.07.08 688960 09.09.09 P 688960 In Prog.
ELECT E-I 26.08.08 30.07.08 99968 17.12.08 22.01.09 98646
Completed
ELECT E-I 26.08.08 15.07.08 219824 29.12.08 12.01.09 190925
Completed
ELECT E-I 26.08.08 29.07.08 447690 17.12.08 19.02.09 427853
Completed
ELECT E-I 26.08.08 29.07.08 513764 16.12.08 22.01.09 499608
Completed
CIVIL M-I 28.08.08 22.07.08 489275 17.10.08 26.12.08 420195
Completed
CIVIL M-I 28.08.08 28.07.08 246958 15.10.08 14.01.09 246866
Completed
12
Dev of lane by pdg RMC and drain in the lane of h.no.100 to 109 in AE-block in Shalimar Bagh(South) in C-56/RZ
129/07.09.09/EE(M)-I
M/s Friends Const. & Bldg. Material Supplier
13
Dev of lane by RMC and drain from h.no.11 to 21 and 22 to 32 in AE-Block in Shalimar Bagh (South) in C-56/RZ
174/06.10.09/EE(M)-I
M/s Friends Const. & Bldg. Material Supplier
14
Dev of park B/Wall from flat no.36A to 37A and 69A to 73A in U and V -Block in Shalimar Bagh(North)in C-56/RZ
124/01.09.09/EE(M)-I
M/s Friends Const. & Bldg. Material Supplier
15
P/o lighting arangement in MCD park opp. h.no. 82 to 83 BU block Pitam pura w.no.53 RZ
193/16.12.08/EE(E)-VII
M/s Modern Electricals
16
P/o SHM pole with lights infront of Gurudwara in BC- block (west), Shalimar bagh w.no.56/RZ
220/31.12.08/EE(E)-VII
M/s Paras Const.Co.
17 P/o 50 nos. MS Tube poles in Shalimar Bagh and Pitampura w.no. 56/RZ
165/17.10.08/EE(E)-VII
M/s Forward Engineers
18
P/o 100 nos HPSV street lights arrangement in Shalimar Bagh in pitam Pura in C-56/RZ
166/17.10.08/EE(E)-VII
M/s Sri Balaji Electricals
19
Pdg RMC in the front portion of CU-Block Mkt.opp.EU-Block in Pitampura (North)in C-54/RZ
307/07.10.0/EE(M)-I
M/s Bhatia & Co.
20
Pdg Red Sand Stone on the Planters(Front Portion)of CU-Block Mkt. in Pitampura(North)in C-54/RZ
313/07.10.08/EE(M)-I
M/s Tokas & Co.
Addl. CIVIL M-I 10.09.08 09.09.08 2E+06 15.10.08 18.04.09 2358008
Completed
21 ELECT E-I 24.09.08 19.09.08 149177 18.12.08 31.12.08 124332
Completed
C/O hall, under ground Water Tank, Septic Tank, Plaing Courts and Passage etc. in MC Pry School Sahipur Village Shalimar Bagh in C-55/RZ
50/10.10.08/EE(Pr.)/RZ
M/s Sarthak Const Co.
P/P lighting arrangement in MCD Park in B-I-Block, Salimar Bagh, in RZ
171/17.10.08/EE(E)-VII
M/s Sheela Elect. Works
Status Report of MLA,Sh.Jai Bhagawan AggarwalAC No. 20,2008-09
S.No.
Name of Work deptt. Div. D.O.S D.O.C
CIVIL M-IV
23.06.08 25.05.08 354400 01.09.08 05.12.08 351917
Completed
CIVIL M-IV07.08.08 04.08.08 194970
CIVIL M-IV
07.08.08 04.08.08 494750 06.02.09 23.03.10 456426 CompletedCIVIL M-IV
12.08.08 03.07.08 320767 30.09.08 26.12.08 318954
Completed
CIVIL M-IV
12.08.08 03.07.08 198935 02.03.09 22.10.09 198707 CompletedCIVIL M-IV
14.08.08 25.07.08 499350 06.02.09 03.11.09 344366 CompletedCIVIL M-IV
14.08.08 04.08.08 296450 28.01.09 29.04.09 184983
Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Expenditure
Present Position
1
Dev of lane from Chajju Pardhan hs. to Banni Singh hs. in Siraspur Vill. in C-18/CLZ
146/25.08.08/EE(M)-IV
M/s Gaurav Mehta
2 Dev of lane by pdg RMC near h.no.60 to 71 in pkt.A-1 Sec-8 in C-51/RZ
3 C/O Umbrella in park of pkt.A-1 near plot no.73 of Sec-8 in C-51/RZ
592/28.01.09/EE(M)-IV
M/s Prakash Const. Co.
4
Imp of road side berms by pdg interlocking tiles from h.np.1 to 249 and cc in parking area infront of h.no.495 and main entry gate in Millanium Appartment in Sec-18 and backlane from C-9/31 to C-9/36 in Sec-15 C-49/RZ
413/19.09.0/EE(M)-IV
M/s J.D. Const Co.
5
P/F barbad wire fancing on the B/Wall from h.no.426 along Canal side in C-Block Sec-18 in Millanium Appartment in C-49/RZ
415/19.09.08/EE(M)-IV
M/s Kishore
6
C/O passage near h.no.417,434 to 307,312,418,433,580,596 by pdg chequered terrazo tiles floring in pkt.C-8 Sec-8 in C-51/RZ
584/28.01.09/EE(M)-IV
M/s A.D. Const Co.
7 C/O walkway in park near h.no.80 in pkt.A-1 Sec-8 in C-51/RZ
564/13.01.09/EE(M)-IV
M/s Shri Bhagwan Const Co.
CIVIL M-IV
14.08.08 25.07.08 499500 24.02.09 06.04.09 498445
Completed
CIVIL M-IV
14.08.08 25.07.08 488000 07.02.09 06.05.09 462246
Completed
CIVIL M-IV
14.08.08 25.07.08 329000 15.01.09 30.03.09 314040
Completed
CIVIL M-IV
14.08.08 25.07.08 360000 23.01.09 05.05.09 260725
Completed
CIVIL M-IV
14.08.08 25.07.08 349000 16.01.09 31.03.09 332035
Completed
CIVIL M-IV
14.08.08 25.07.08 478000 12.02.09 29.04.09 435341
Completed
CIVIL M-IV
14.08.08 25.07.08 444000 07.02.09 04.05.09 416917
Completed
CIVIL M-IV
14.08.08 25.07.08 499960 30.03.09 12.08.09 336033
Completed
CIVIL M-IV
14.08.08 25.07.08 348000 29.09.08 24.12.08 348000
Completed
CIVIL M-IV
14.08.08 25.07.08 439950 22.01.09 06.10.09 338112
Completed
8
C/O lane by pdg RMC and O/S drain from h.no.1 to 26 in pkt.D-12 Sec-8 C-51/RZ
627/24.02.09/EE(M)-IV
M/s Birender Singh Dabas
9 D/O lane by pdg RMC from h.no.31 to 120 in pkt.B-4 Sec-8 C-51/RZ
583/28.01.09/EE(M)-IV
M/s Shri Bhagwan Const Co.
10 D/O lane by pdg RMC from h.no.91 to 120 in pkt.B-4 Sec-8 C-51/RZ
546/13.01.09/EE(M)-IV
M/s Birender Singh Dabas
11 C/O B/Wall and path in park near h.no.F-19/24 Sec-8 C-51/RZ
563/13.01.09/EE(M)-IV
M/s Shri Bhagwan Const Co.
12 Dev of lane by pdg RMC from h.no.361 to 390 in Pkt.B-4 Sec-8 in C-51/RZ
547/13.01.09/EE(M)-IV
M/s Birender Singh Dabas
13 Dev of lane by pdg RMC from h.no.121 to 210 in Pkt.B-4 Sec-8 in C-51/RZ
596/03.02.09/EE(M)-IV
M/s Shri Bhagwan Const Co.
14 Dev of lane by pdg RMC from h.no.121 to 210 in Pkt.B-6 Sec-8 in C-51/RZ
582/28.01.09/EE(M)-IV
M/s Shri Bhagwan Const Co.
15
C/O Ahatas by pdg interlocking prefeb pavers from h.no.140 to 146,147 to 154,155 to 16,169 to 178 and 181 to 198 in pkt.E-16,Sec-8 in C-51/RZ
573/13.01.09/EE(M)_IV
M/s A.D. Const Co.
16
Imp to drainage system and lane by pdg cc pav.near h.no.F-138 and near C-270 in Prashant Vihar in C-51/RZ
416/19.09.08/EE(M)-IV
M/s J.D. Const Co.
17
Dev of park by pdg marble washed plaster etc near h.no.26,361,369 and 324 in pkt.B-5 Sec-8 in C-51/RZ
560/13.01.09/EE(M)-IV
M/s Shri Bhagwan Const Co.
CIVIL M-IV
14.08.08 25.07.08 371000 06.02.09 29.04.09 368132
Completed
CIVIL M-IV
14.08.08 25.07.08 439950 12.02.09 06.10.09 333281
Completed
CIVIL M-IV
20.08.08 04.08.08 239900 20.01.09 18.03.09 237728
Completed
CIVIL M-IV
20.08.08 03.07.08 498887 14.10.08 03.02.09 498250
Completed
CIVIL M-IV
20.08.08 19.08.08 497803 16.02.09 15.05.09 497567
Completed
CIVIL M-IV
20.08.08 19.08.08 448000 28.09.08 01.12.08 447960
Completed
CIVIL M-IV
08.09.08 02.09.08 400000CIVIL M-IV
08.09.08 02.09.08 442700CIVIL M-IV
08.09.08 02.09.08 346000
18
Dev of park by pdg marble washed plaster etc near h.no.20 and side wall towards School in pkt.B-5 Sec-8 in C-51/RZ
590/28.01.09/EE(M)-IV
M/s Subash Chander_III
19
Dev of park by pdg marble washed plaster etc near h.no.134,174,238 and 91 in pkt.B-5 Sec-8 in C-51/RZ
597/03.02.09/EE(M)-IV
M/s Shri Bhagwan Const Co.
20
C/O Chatrinuma Shelter in C-Block Park Millanium Appartment in Sec-18 in C-49/RZ
556/13.01.09/EE(M)-IV
M/s Vikas Bansal
21
Imp of road side berms by pdg interlocking tiles from h.no.175 to 531,531 to 426,426 to 410 and 410 to 316(One Side)in C-Block Millanium Appartment Sec-18 in C-49/RZ
412/19.09.08/EE(M)-IV
M/s Tokas & co.
22
C/O road side berms (both sides)and parking area by pdg cc pav from h.no.pkt.3/2 to DESU Office,DESU Office to Mkt.(near shop no.4),pkt.3/1 to 3/23 and parking area infront of pkt.5/42 in E-2 Block Sec-15 in C-49/RZ
414/19.09.08/EE(M)-IV
M/s Ram Kishore Bairwa
23
Imp of parking area by pdg cc pav.at infront of h.no.1/17,2/17,2/57,3/34 and near (shop no.16)in pkt. 1,2 and 3 in E-2 Block Sec-15 in C-49/RZ
421/19.09.08/EE(M)-IV
M/s S.S. builders & Contractors
24
C/O road by pdg dense carpetting in H-19 pkt. from h.no. H-19/120 to H-19/136 and H-19/86 to H-19/102 in Sec-7 in C-52/RZ
25
C/O road by pdg dense carpetting in B-6 pkt. from h.no.B-6/31 to B-6/182 and B-6/91 to B-6/290 in Sec-7 C-52/RZ
26
C/O road by pdg dense carpetting in H-19 pkt. from h.no.H-19/17 to H-19/154 in Sec-7 in C-52/RZ
ELECT E-I
16.09.08 12.09.08 496826 06.10.08 15.10.08 481960
Completed
CIVIL M-IV
18.09.08 10.09.08 399176 01.12.09 07.04.10 397050 CompletedCIVIL M-IV
18.09.08 10.09.08 398316 17.10.08 16.12.08 396454
Completed
CIVIL M-IV
18.09.08 10.09.08 299882 10.11.08 04.12.08 297465
Completed
ELECT M-IV
25.09.08 18.09.08 489968 13.10.08 21.10.08 488166
Completed
ELECT E-I
25.09.08 17.09.08 479616 13.10.08 21.10.08 465923
Completed
ELECT E-I
25.09.08 20.09.08 419688 17.12.08 23.01.09 394955
Completed
CIVIL M-IV
29.09.08 02.09.08 499000 24.10.08 20.01.09 498995
Completed
CIVIL M-IV29.09.08 02.09.08 98000 15.12.08 19.01.09 83784
Completed
27
P/O lighting arrangement in the MPL Parks of A and B Block Sec-7, C and D Block of Sec-8, near New Swastick Appartment Sec-9, D-Block Prashant Vihar, near Jung Appartment Sec-13,B and C-Block Park Sec-15, B-Block Park Sec-18 in C-50 and 51/RZ
117/06.10.08/EE(E)-VII
M/s S.T. Electric Co.
28
C/O Road By RMC in the lane of Gulab singh house And Pujari hs. and jai kishan hs. in village Naharpur in C-52/RZ.
350/23.11.09/EE(M)-IV
M/s Tokas & co.
29
C/O Road by RMC in the lane of lala Narayan singh hs. gali and apporach and adj. lane in village Naharpur in C-/52/RZ.
476/13.10.08/EE(M)-IV
M/s Ram Swaroop
30
Raising of road from main road to Rani Satee Mandir and adj lane in village Naharpur in w.no.52/RZ
464/13.10.08/EE(M)-IV
M/s Ishwar Singh
31
P/O lighting arrangement in the MPL. Park in G-6 Sec-16,A-Block Sec-17,B-Block Sec-15,A-Block Sec-18,C-Block Sec-19 in C-21/RZ
128/13.10.08/EE(E)-VII
M/s Kawatara Elect. Works
32
P/O lighting arrangement at the Chowk and Park of C,D,E, Block, Sec-7 Rohini, B-Block Sec-5, A-1 Block Sec-6, D-Block Prashant Vihar in C-22/RZ
126/13.10.08/EE(E)-VII
M/s Prince Engg. Works
33
P/O 2 nos. semi high mast lights with poles at Chowk near C-Block Sec-19 Rohini and near Chowk at Arawali Kunj Sec-13 in C-49,50 RZ
124/13.10.08/EE(E)-VII
M/s Aman Elect.
34
Imp of Boundary/Walkway in park opp. DAV Public School in E-4 Pkt.in Sec-7 in C-52/RZ
512/13.10.08/EE(M)-IV
M/s JMD Const Co.
35 C/O Ahata by Pdg RMC in B-5 Pkt.h.no.59 to 67 in Sec-7 in C-52/RZ
510/13.10.08/EE(M)-IV
M/s Tokas & co.
CIVIL M-IV
29.09.08 26.09.08 491638 24.10.08 31.07.09 491638
Completed
CIVIL M-IV
29.09.08 26.09.08 488915CIVIL M-IV
29.09.08 26.09.08 95963 16.10.08 18.12.08 95054
Completed
CIVIL M-IV06.06.08 05.05.08 190759 21.08.08 08.10.08 190669
Completed
CIVIL M-IV
06.06.08 05.05.08 193122 14.11.08 18.02.09 192744
Completed
CIVIL M-IV
06.06.08 05.05.08 191101 26.08.08 08.10.08 191024
Completed
CIVIL M-IV
06.06.08 05.05.08 197356 09.08.08 P 195356 In Prog.CIVIL M-IV
18.06.08 21.05.08 324100 07.10.08 10.11.08 323594
Completed
CIVIL M-IV
18.06.08 21.05.08 465400 21.10.08 10.11.08 459087
Completed
CIVIL M-IV
18.06.08 21.05.08 485750 12.09.08 10.10.08 474527
Completed
CIVIL M-IV
18.06.08 21.05.08 498600 10.09.08 20.11.08 498506
Completed
36
C/O road by pdg RMC from J.K.Tailor to near Shiv Charan Saini hs in Village Naharpur in C-52/RZ.
499/13.10.08/EE(M)-IV
M/s Rameshwar Dayal
37
C/O road by pdg RMC near Rohini Public School to Yadav Mkt.(near road)and main road in Village Naharpur in C-52/RZ.
38 Dev of Chaupal in Village Naharpur in C-52/RZ.
500/13.10.08/E(M)-IV
M/s Rameshwar Dayal
39 C/O B/Wall of park infront of F-1/12 in F-Block,Sec-15 in w.no.49/Rohini
269/31.07.08/EE(M)-IV
M/s Dee Pee Entp.
40 C/O B/Wall of park infront of F-2/28 in F-Block,Sec-15 in w.no.49/Rohini Zone
268/31.07.08/EE(M)-IV
M/s Ishwar Singh
41 C/o B/WAll of park infront of F-2/20 Sec-15,in w.no.49/Rohini Zone
270/31.07.08/EE(M)-IV
M/s Sanjay Gupta
42 C/o B/Wall of park infront of G-1/51 in G-Block,Sec-15 in w.no.49/Rohini Zone
266/31.07.08/EE(M)-IV
M/s Har Const Co.
43
C/O Ahatas by pdg interlocking prefeb.pavers in D-11 Pkt h.no.9 to 22 and 151 to 164 in Sec-7 w.no.52/Rohini Zone
348/08.08.08/EE(M)-IV
M/s Ishwar Singh
44
C/O road by pdg RMC in E-4 pkt. h.no.134 to 150 and infront of park in Sec-7 w.no.52/Rohini Zone
289/01.08.08/EE(M)-IV
M/s Satyam Const.
45
C/O road by pdg RMC from Shiv Chran Sharma to Ramavtar yadav and Bishan Yaday to Bhopal Yadav wali gali in Naharpur village w.no.52/Rohini Zone
287/01.08.08/EE(M)-IV
M/s Sanjay Gupta
46
C/o Ahatas by pdg interlocking prefeb. pavers in B-6 pkt. h.no.69-82,127 to 144,199 to 210, 267-284 in Sec-7 w.no.52/Rohini Zone
410/09.09.08/EE(M)_IV
M/s Sanjay Gupta
CIVIL M-IV18.06.08 21.05.08 227550 11.0.08 11.12.08 227370
Completed
CIVIL M-IV
18.06.08 21.05.08 270000 08.08.08 29.09.08 269284
Completed
CIVIL M-IV
18.06.08 21.05.08 456000 05.08.08 10.04.09 453874
Completed
CIVIL M-IV
18.06.08 21.05.08 227500 10.11.08 P 226296 In Prog.
CIVIL M-IV
18.06.08 28.05.08 441150CIVIL M-IV
18.06.08 28.05.08 385450 16.02.09 11.07.09 187827
Completed
CIVIL M-IV
18.06.08 28.05.08 348100 12.02.09 14.07.09 156720
Completed
CIVIL M-IV
18.06.08 28.05.08 256328 11.08.08 26.11.08 247256
Completed
CIVIL M-IV
18.06.08 28.05.08 364250 10.09.08 10.10.08 364226
Completed
CIVIL M-IV
18.06.08 28.05.08 480800 20.08.08 10.10.08 476659
Completed
47 C/O backlane from E-4/82 to 90 in Sec-7 w.no.52/Rohini Zone
285/01.08.08/EE(M)-IV
M/s Nisant Const Co.
48
C/O Backlane by pdg RMC in E-4 pkt. h.no.139 to 146 and 138 to 135 along park in Sec-7 w.no.52/Rohini Zone
286/01.08.08/EE(M)-IV
M/s Vivek Assos.
49
C/O ahatas by pdg interlocking prefeb pavers in B-4 pkt. h.no.30 to 38,39 to 58 and 59 to 67 in Sec-7 w.no.52/Rohini Zone
290/01.08.08/EE(M)-IV
M/s Vinod Const co.
50
C/O backlane by pdg RMC in E-4 pkt. h.no.121 to 134 in Sec-7 w.no.52/Rohini Zone
288/01.08.08/EE(M)-IV
M/s Har Const Co.
51
Dev of drain in Prashant Vihar from A-219 to B-208 And C-257 to C-247 in w.no.51/Rohini Zone
52
Dev to drain from h.no.56 to 23, 61 to 70, 71 to 80 in pkt. A-1 in Sec-8 w.no.51/Rohini Zone
420/19.09.08/EE(M)-IV
M/s Konark Const.
53
Dev to drain from h.no.93 to 107 and 53 to 57 in pkt.A-1 in Sec-8 w.no.51/Rohini Zone
419/19.09.08/EE(M)-IV
M/s Konark Const.
54
C/O backlane from h.no.1 to 10 in Block C-3 in Prashant Vihar w.no.51/Rohini Zone
275/01.08.08/EE(M)-IV
M/s Birender Singh Dabas
55
Dev to road berms from h.no.238 to 239 pkt.C-9, Sec-7 Rohini And ahatas from h.no.1 to 8, 384 to 390,pkt.B-4,Sec-8 from h.no.61 to 72 pkt.A-3,Sec-7 by interlocking tiles in w.no.51/Rohini Zone
274/01.08.08/EE(M)-IV
M/s M.K. Gupta
56
Dev to ahatas by pdg interlocking tiles from h.no.1 to 9, 10 to 18, 71 to 82, 134 to 145, 188 to 196 and 209 to 217 in pkt.A-2 Sec-8 w.no.51/Rohini Zone
276/01.08.08/EE(M)-IV
M/s Parkash Khanna
CIVIL M-IV
18.06.08 23.05.08 499234 09.09.08 P 461446 In Prog.
CIVIL M-IV
18.06.08 23.05.08 452300 09.09.08 08.11.08 449892
Completed
CIVIL M-IV
18.06.08 23.05.08 179183 25.09.08 20.10.08 179183
Completed
CIVIL M-IV
18.06.08 23.05.08 446520 23.09.08 10.11.08 423960
Completed
CIVIL M-IV
18.06.08 23.05.08 342465 11.08.08 29.10.08 342465
Completed
CIVIL M-IV
18.06.08 23.05.08 498187 11.08.08 27.01.09 497753
Completed
CIVIL M-IV
18.06.08 23.05.08 498187 11.08.08 09.02.09 490039
Completed
CIVIL M-IV
18.06.08 23.05.08 498187 11.08.08 22.01.09 496501
Completed
57
Dev to road by pdg RMC And open surface drain from A-1/39 to A-1/52 in Sec-8 w.no.51/Rohini Zone
277/01.08.08/EE(M)-IV
M/s Har Const Co.
58
Dev to lane by pdg RMC from h.no.A-1/12 to A-1/22 in Sec-8 w.no.51/Rohini Zone
278/01.08.08/EE(M)-IV
M/s Dee Pee Entp.
59
Dev to park near Ram Mandir in D-Block Prashant Vihar by pdg walkway and raising of B/Wall in w.no.51/Rohini Zone
283/01.08.08/EE(M)-IV
M/s Ram Kishore Bairwa
60
Dev to lane of pkt. A-1 Sec-7 Rohini by pdg RMC from h.no.42 to 81, 81 to 82 to 41, 41 to 17, 81 to 101, 10 to 1, 121 to 113 in w.no 51/Rohini Zone
280/01.08.08/EE(M)-IV
M/s Rameshwar Dayal
61
Dev to lane by pdg RMC from h.no.c-269 to C-283 in Prashant Vihar w.no.51/Rohini Zone
303/02.08.08/EE(M)-IV
M/s Vinod Const co.
62
Dev to lane in Prashant Vihar from h.no.B-208 to B-183 by pdg RMC and open surface drain in w.no.51/Rohini Zone
279/01.08.08/EE(M)-IV
M/s Mukesh Kumar Bansal
63
Dev to lane in prashant Vihar from h.no.A-190 to A-136 by pdg RMC open surface drain in w.no.51/Rohini Zone
282/01.08.08/EE(M)-IV
M/s Ram Kishore Bairwa
64
Dev of lane in Prashant Vihar from h.no.A-274 to B-260by pdg RMC and open surface drain in w.no.51/Rohini Zone
281/01.08.08EE(M)-IV
M/s Vivek Assos.
0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Liabilities Rs.lacs
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0
0.00
0.00
0.00
0.26
0.35
0.38
1.65
0.96
0.96
0.96
0.64
0.67
0.61
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.04
0.00
0.00
0.00
4.78
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.03
0.03
0.69
0.74
0.42
0.45
0.48
0.28
0.00
0.00
0.00
0.00
0.02
0.00
0.14
0.00
0.00
0.00
0.00
0.00
0.00
0.33
0.00
0.00
0.03
0.00
0.43
0.35
0.00
0.40
0.00
0.51
0.02
0.00
0.00
0.52
0.36
0.83
0.71
1.18
0.74
0.63
0.00
0.00
0.06
0.00
0.000.00
22.66
0.00
0.10
1.70
0.00
0.00
0.00
0.00
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
1.40
1.25
0.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.67
0.00
0.00
0.05
0.02
0.03
0.07
0.03
0.00
1.65
0.00
0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
8.26827
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.34
0.00
0.33
3.12
3.14
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.02
0.03
0.00
0.00
0.00
0.00
0.00
3.00
0.00
3.88
0.00
2.14
0.00
2.77
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.00
20.75853
Remarks0.00
0.00
0.00
0.00
0.00
1.10
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
2.86
0.00
0.00
0.00
1.30
1.30
consolidate tender for S.No. 16,17,18,19,24,29,31 & 32
consolidate tender for S.No. 16,17,18,19,24,29,31 & 32
1.29
1.25
0.00
0.00
0.00
0.00
0.21
0.00
0.00
0.08
0.00
consolidate tender for S.No. 16,17,18,19,24,29,31 & 32
consolidate tender for S.No. 16,17,18,19,24,29,31 & 32
consolidate tender for S.No. 16,17,18,19,24,29,31 & 32
0.35
0.00
2.81
2.89
0.05
0.00
0.00
0.00
0.00
consolidate tender for S.No. 16,17,18,19,24,29,31 & 32
consolidate tender for S.No. 16,17,18,19,24,29,31 & 32
consolidate tender for S.No. 16,17,18,19,24,29,31 & 32
2.91
2.93
0.00
0.00
0.00
0.00
9.92
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
31.23458
0.00
0.00
0.00
0.00
0.00
0.43
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.18
0.00
1.10
0.58
0.00
4.84
0.00
1.54
0.00
0.00
0.00
0.56
0.00
0.00
0.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.00
10.26
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.14
0.00
0.02
0.02
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.005.18
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.54
0.00
0.00
0.00
0.00
0.00
0.00
1.06
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.001.60
0.00
Liabilities Rs.lacs
0.00
0.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.20
0.00
1.95
0.00
0.00
0.00
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
4.43
3.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.89
0.00
0.00
0.00
0.00
0.02
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.01
4.41
0.00
0.00
0.00
0.00
0.00
0.38
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
23.55
deptt. deptt. deptt. deptt.Div. Div. Div. Div. Div. Div.
civil elect hort cse M-I M-II M-III M-IV E-I EE(Pr.)
Status Report of MLA,Sh.Kulwant RanaAC No. 21,2008-09
S.No.
Name of Work deptt. Div. D.O.S D.O.C
ELECT E-I23.06.08 12.05.08 595830 31.12.08 12.01.09 444411
ELECT E-I23.06.08 12.05.08 595091 08.05.09 22.05.09 500433
ELECT E-I23.06.08 12.05.08 595506 03.02.09 P 512028
ELECT E-I23.06.08 12.05.08 595091 16.12.08 19.12.08 494732
ELECT E-I23.06.08 12.05.08 595091 08.05.09 04.06.09 498252
CIVIL M-IV23.06.08 28.05.08 473000 M/s D.B. Entp. 11.08.08 05.01.09 472540
CIVIL M-IV23.06.08 28.05.08 499300 03.11.08 08.01.09 499236
CIVIL M-IV23.06.08 28.05.08 499300 03.11.08 17.12.08 497393
CIVIL M-IV23.06.08 28.05.08 496800 08.09.08 26.02.09 496735
CIVIL M-IV23.06.08 28.05.08 492900 10.11.08 18.12.08 491201
CIVIL M-IV23.06.08 28.05.08 485700 M/s M.K. Gupta 25.08.08 15.11.08 485667
CIVIL M-IV23.06.08 28.05.08 441550 M/s M.K. Gupta 20.08.08 29.12.08 441060
CIVIL M-IV23.06.08 28.05.08 467550 25.08.08 26.11.08 443290
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Expenditure
1 P/O HPSV street light arrangement at vill. Rithala(west Portion)C-22/RZ
243/31.12.08/EE(E)-VII
M/s Sant Gian Corp.
2 P/O HPSV street light arrangement at vill. Mangolpur Khurd(East Portion)C-47/RZ
427/02.03.09/EE(E)-VII
M/s Saturn Elect.
3 P/O HPSV street light arrangement at vill. Mangolpur Khurd(West Portion)C-47/RZ
264/03.02.09/EE(E)-VII
M/s Ankur Entp.
4 P/O HPSV street light arrangement at vill. Mangolpur Khurd(South Portion)C-47/RZ
188/16.12.08/EE(E)-VII
M/s Super Shine Assos.
5 P/O HPSV street light arrangement at vill. Rithala (North Portion)C-22/RZ
452/02.03.09/EE(E)-VII
M/s Utsav Engineers
6 P/L RMC and dev.of drainage system from h.no.84 to 559 in pkt.C Sec-1,in C-24/RZ
341/07.08.08/EE(M)-IV
7 P/L RMC and dev.of drainage system from h.no.01 to 642 in pkt.D Sec-1,in C-24/RZ
336/07.08.08/EE(M)-IV
M/s Vinod Const Co.
8 P/L RMC and dev.of drainage system from h.no.01 to 82 in pkt.D Sec-1,in C-24/RZ
335/07.08.08/EE(M)-IV
M/s Vinod Const Co.
9 P/L RMC and dev.of drainage system from h.no.01 to 84 in pkt.C Sec-1,in C-24/RZ
372/20.08.08/EE(M)-IV
M/s Sanjay Gupta
10 P/L RMC and dev.of drainage system from h.no.255 to 336 in pkt.D Sec-1,in C-24/RZ
332/07.08.08/EE(M)-IV
M/s JMD Const Co.
11 P/L RMC and dev.of drainage system from h.no.253 to 334 in pkt.C Sec-1,in C-24/RZ
338/07.08.08/EE(M)-IV
12 P/L RMC and dev.of drainage system from h.no.1041 to 1122 in pkt.B Sec-1,in C-24/RZ
339/07.08.08/EE(M)-IV
13 P/L RMC and dev.of drainage system from h.no.10 to 56 in pkt.E Sec-1,in C-24/RZ
333/07.08.08/EE(M)-IV
M/s Ishwar Singh
CIVIL M-IV23.06.08 28.05.08 400850 27.10.08 16.01.09 400326
CIVIL M-IV23.06.08 28.05.08 453650 18.08.08 02.04.09 453588
CIVIL M-IV23.06.08 28.05.08 367200 M/s GargEntp. 29.09.08 27.11.08 366250
CIVIL M-IV
23.06.08 28.05.08 492300 03.11.08 29.12.08 490521CIVIL M-IV
23.06.08 28.05.08 427450 18.09.08 10.11.08 421069CIVIL M-IV
23.06.08 28.05.08 497050 26.11.08 P 305346CIVIL M-IV
23.06.08 28.05.08 495350 03.10.08 31.12.08 491724CIVIL M-IV
23.06.08 28.05.08 483650 20.08.08 29.06.09 483606ELECT E-I
18.08.08 14.08.08 594255 08.05.09 27.05.09 590020ELECT E-I
18.08.08 14.08.08 279580ELECT E-I
18.08.08 14.08.08 593555ELECT E-I
23.08.08 14.08.08 593555 20.02.09 04.03.09 593555ELECT E-I
18.08.08 14.08.08 593905 08.05.09 27.05.09 593270ELECT E-I
18.08.08 14.08.08 593909 06.11.09 22.03.10 593549ELECT E-I
18.08.08 14.08.08 594255 02.03.09 10.04.09 585330
14 P/L RMC and dev.of drainage system from h.no.33 to 44 in pkt.E Sec-1,in C-24/RZ
370/20.08.08/EE(M)-IV
M/s Ram Kishore Bairwa
15 P/L RMC and dev.of drainage system from h.no.69 to 83 in pkt.E Sec-1,in C-24/RZ
330/07.08.08/EE(M)-IV
M/s Ishwar Singh
16 P/L RMC and dev.of drainage system from h.no.60 to 68 in pkt.E Sec-1,in C-24/RZ
371/20.08.08/EE(M)-IV
17
P/L RMC and dev.of drainage system from h.no.30 to 159,202 to 368,664 to 721,31 to 154 and along park in pkt.B Sec-1,in C-24/RZ
340/07.08.08/EE(M)-IV
M/s Parkash Khanna
18 P/L RMC and dev.of drainage system from h.no.01 to 20, to 11 in pkt.E Sec-1,in C-24/RZ
334/07.08.08/EE(M)-IV
M/s Sanjay Gupta
19
Dev of Ahatas infront of/adj. to h.no. 292,477,330,436,426,414,336,382,628,534,526,693,708,792,in pkt-B Sec-1 C-24/RZ
337/07.08.08/EE(M)-IV
M/s Har Const Co.
20
Dev of Ahatas infront of/adj. to h.no. 745,945,935,901,896,1015,876,1026,1027,1038,1044,1053,in Block-B and C-26.C-51 in block-C Sec-1 C-24/RZ
329/07.08.08/EE(M)-IV
M/s Ram Kishore Bairwa
21
Dev of Ahatas infront of/adj. to h.no.C-64,78,108,13,33,217,213,307,382,409,437,474,576,476,in pkt-C Sec-1 C-24/RZ
342/07.08.08/EE(M)-IV
M/s Birender Singh Dabas
22
P/o HPSV Street light arrangement along approach road from Cremation ground Avantika to Khanzhawla road w.no.24/RZ
426/03.02.09/EE(E)-VII
M/s Amit Elevator Services
23 P/o Semi High Mast light/Pole at park between pkt-23 and 24 Sec -24 w.no.24 RZ
24 P/o HPSV Street light arrangement from village Pansoli to Karala road w.no.26/RZ
25 P/o lighting arrangement at village Shahbad Daulatpur from Ochandi road to Sec-17 water filling points w.no.26/RZ
312/20.02.09/EE(E)-VII
M/s Seth Const Co.
26 P/o lighting arrangement from Prahladpur Boys School to Khera Khurd road upto Triple bend in C-26/RZ
451/02.03.09/EE(E)-VII
M/s Forward Engineers
27
P/o Street light arrangement from main Ochandi road to Sec-26 JJ Rc cly. sent St. Zaviour School Shahbad Daulatpur w.no.26/RZ
202/05.11.09/EE(E)-VII
M/s Utsav Engineers
28
P/o lighting arrangement along Supplementary drain on Bed road from Sec-24, 60mtr vide road to sec-26 bridge w.no.26/RZ
428/02.03.09/EE(E)-VII
M/s Ram Gopal & Co.
CIVIL M-IV
04.09.08 11.08.08 584000 23.01.09 P 131237CIVIL M-IV
04.09.08 11.08.08 587750 22.01.09 P 216748CIVIL M-IV
04.09.08 11.08.08 587750 23.01.09 P 124502CIVIL M-IV
04.09.08 11.08.08 586000 23.01.09 P 125189CIVIL M-IV
04.09.08 11.08.08 587750 23.01.09 P 128790CIVIL M-IV
04.09.08 11.08.08 587750 22.01.09 P 144302CIVIL M-IV
04.09.08 11.08.08 586000 23.01.09 P 221466CIVIL M-IV
10.09.08 24.07.08 199986 14.10.08 15.06.09 199986CIVIL M-IV
10.09.08 24.07.08 211167CIVIL M-IV
10.09.08 24.07.08 276022 28.10.08 14.01.09 276022CIVIL M-IV
10.09.08 24.07.08 175032 14.12.08 P 170032CIVIL M-IV
16.09.08 24.07.08 493000 20.10.08 19.03.09 488127CIVIL M-IV
16.09.08 24.07.08 277000 24.10.08 15.01.09 274521CIVIL M-IV
16.09.08 24.07.08 479000 02.12.09 25.02.10 375190
29
C/O Common area of Shaft near/adjoining h.no.723,707,708,691,724,738,776,747,625,627,611,643,563,674 in Pkt.6-II in Sec-3 Rohini in C-45/RZ
570/13.01.09/EE(M)-IV
M/s A.D. Const. Co.
30
C/O Common area of Shaft near/adjoining h.no.145,243,274,763,778 in Pkt.6-I and h.no.547,531,562,595,580,594,467, in Pkt.6-II in Sec-2 Rohini in C-45/RZ
566/13.01.09/EE(M)-IV
M/s A.D. Const. Co.
31
C/O Common area of Shaft near/adjoining h.no.1,3,17,20,33,83,113,186,170,155,197,154,129,115 in Pkt.-III Sec-2 Rohini in C-45/RZ
572/13.01.09/EE(M)-IV
M/s A.D. Const. Co.
32
C/O Common area of Shaft near/adjoining h.no.211,227,228,260,842,851,859,867,875,786,818,819,804,762 in Pkt.6-I in Sec-2 Rohini in C-45/RZ
568/13.01.09/EE(M)-IV
M/s A.D. Const. Co.
33
C/O Common area of Shaft near/adjoining h.no.100,67,65,52,49,187,202 in Pkt.-III and 412,403,371,369 in Pkt.-IV and h.no.211,20,195 in Pkt.-VII in Sec-2 Rohini in C-45/RZ
571/13.01.09/EE(M)-IV
M/s A.D. Const. Co.
34
C/O Common area of Shaft near/adjoining h.no.394,212,244,258,260,275,306,292,322,324,353,355,363 in Pkt.-IV in Sec-2 Rohini in C-45/RZ
567/13.01.09/EE(M)-IV
M/s A.D. Const. Co.
35
C/O Common area of Shaft near/adjoining h.no.129,170,116,171,179,99,98,114,131,66,67,35,34,18 in Pkt.-VII in Sec-2 Rohini in C-45/RZ
569/13.01.09/EE(M)-IV
M/s A.D. Const. Co.
36 C/O lane by cc from Dharampal hs to Meghraj hs and Shiv hs to Bheecha hs in Village Rithala in C-22/RZ
470/13.10.08/EE(M)-IV
M/s JMD Const Co.
37 C/O lane by cc from Shrichand hs to Thakur uday Singh Rana hs in Village Rithala in C-22/RZ
38
C/O lane by cc from Ramesh Kumar hs to Rameshwar Singh Rana hs and Pt.Bhagwan Dayal Sharma hs to Dhola Pandit hs in Village Rithala in C-22/RZ
459/13.10.08/EE(M)-IV
M/s Ishwar Singh
39 P/F MS Sign Boards in Village Rithala, Sec-5 and 6 in Rohini in C-22/RZ
503/13.10.08/EE(M)-IV
M/s Har Const Co.
40 C/O lane by cc from Ganga Ram hs to Temple and Kalu Ram hs to Dharam Kanta in Village Rithala in C-22/RZ
490/13.10.08/EE(M)-IV
M/s Tokas & Co.
41
C/O lane by cc from Hansraj hs to Bharampal Singh hs, Shukla hs to Satpal Singh hs and Satpal hs to Sateesh hs in Village Rithala in C-22/RZ
460/13.10.08/EE(M)-IV
M/s Ishwar Singh
42 Dev of drain and C/O berms from Supplementry drain to kasra no.1108/h.no.27/2 in Village Rithala in C-22/RZ
356/30.11.09/EE(M)-IV
M/s Himanshu Const Co.
CIVIL M-IV16.09.08 24.07.08 484900 25.06.09 17.08.09 343285
CIVIL M-IV16.09.08 24.07.08 320000 23.10.08 16.01.09 319314
CIVIL M-IV16.09.08 24.07.08 304900 16.03.09 30.04.09 223245
CIVIL M-IV22.09.08 19.09.08 451150
CIVIL M-IV22.09.08 19.09.08 451400 23.10.08 17.01.09 451400
CIVIL M-IV22.09.08 19.09.08 495610 03.11.08 25.03.09 495610
43 C/O drain from PWD road to gali no.18 infront of Hero honda Showroom in Village Rithala in C-22/RZ
167/23.06.09/EE(M)-IV
M/s Himanshu Const Co.
44 C/O lane by cc drainage system from main Rithala road to Baba Begraj hs in Village Rithala in C-22/RZ
457/13.10.08/E(M)-IV
M/s Ram Swaroop
45 Covering of drain from gali no.15 to gali no.18 in Village Rithala in C-22/RZ
666/26.02.09/EE(M)-IV
M/s Shiv Shanker Gupta
46 C/o lane by RMC from outer Phirni to jai Prakash house in village Rithala in C-22/RZ
47 C/o lane by RMC from outer Phirni to Hukam singh house in village Rithala in C-22/RZ
456/13.10.08/EE(M)-IV
M/s Ram Swaroop
48 C/o lane by RMC from Suresh house to Kali Ram MAster house along nallah in village Rithala in C-22/RZ
469/13.10.08/EE(M)-IV
M/s JMD Const Co.
Status Report of MLA,Sh.Surendra KumarAC No. 22,2008-09
S.No.
Name of Work deptt. Div. D.O.S D.O.C
CIVIL EE(Pr.) 17.06.08 09.04.08 472000 12.09.08 P 350939
CIVIL EE(Pr.) 17.06.08 27.05.08 160000 27.10.08 P 126898
CIVIL 08.07.08 12.06.08 359800 M/s A.R. Entp. 08.09.08 P 332920
CIVIL 08.07.08 12.06.08 341600 M/s A.R. Entp. 01.10.08 P 318297
CIVIL 08.07.08 12.06.08 230000 M/s V.R. Const. 08.09.08 24.03.09 199589
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Expenditure
1 Pdg cc and c/o drain in lane Baljit, Rajinder Jile and Ramphal in Village Daryapur
47/05.09.08/EE(Pr.)
M/s Anand Mathur mpl Contractor
2 Pdg brick florring from Surrte house/flat to Cannal in village Nangal Thagran
30/21.08.08/EE(Pr.)
M/s D&G Const Co.
3 Pdg brick flooring in lane Tarif , sri Bhagwan , Lak Ram and Rameshwar in village Sultanpur
EE(Pr.)
48/05.09.08/EE(Pr.)
4 Pdg brick floring in the lane Tarif Sri Bhagwan,Lekhram and Rameshwar in Village Sultqanpur Dabas
EE(Pr.)
59/25.09.08/EE(CWG-VI)
5 Pdg cc from Dayanand Dharamshala to Sat narayan house in Village Pooth Khurd
EE(Pr.)
49/05.09.08/EE(Pr.)
CIVIL M-II 15.07.08 16.06.08 491700 29.09.08 16.03.09 404914
CIVIL M-II 15.07.08 16.06.08 132400 M/s Atul Gupta 10.10.08 27.11.08 108010
CIVIL M-II 29.07.08 09.07.08 499680 06.09.08 10.12.08 499536
CIVIL M-II 29.07.08 09.07.08 364088 25.08.08 20.10.08 363938
CIVIL M-II 29.07.08 09.07.08 210800 M/s A.R. Entp. 15.09.08 27.11.08 186281
CIVIL M-II 29.07.08 09.07.08 425500 08.10.08 30.12.08 353466
CIVIL M-I 29.07.08 09.07.08 434500 04.10.08 31.12.08 366959
CIVIL M-II 29.07.08 09.07.08 383200 M/s Prem Bros. 16.10.08 05.03.09 316588
CIVIL M-II 27.08.08 05.08.08 99800 16.10.08 29.11.08 99652
CIVIL M-II 29.09.08 16.06.08 254000 18.10.08 18.12.08 215198
CIVIL M-IV 04.09.08 02.09.08 199800 30.09.08 24.11.08 192788
CIVIL M-IV 04.09.08 02.09.08 199700 30.09.08 24.11.08 193063
CIVIL M-IV 04.09.08 02.09.08 199700 30.09.08 24.11.08 193745
CIVIL M-II 04.09.08 29.08.08 191684 04.10.08 20.12.08 191555
CIVIL M-II 04.09.08 29.08.08 450000 04.10.08 21.12.08 449895
ELECT M-II 06.10.08 17.09.08 80000 M/s A.K. Elect. 13.02.09 04.03.09 69364
CIVIL EE(Pr.) 17.06.08 09.04.08 419919 22.10.08 10.06.09 418927
6 Pdg cc pav.and drain from Raj Singh house to Randhir house and Kartar Singh house to Mukhtyar Singh house in Village Boodanpur Majra Dabas in C-27/NZ
97/19.09.08/EE(M)-II
M/s Satish Const Co.
7 Pdg cc pav.from Satish house to Jaipal house in Jat Khore in C-27/NZ
105/26.09.08/EE(M)-II
8 Pdg cc pav.from Mandir to Sardar house in Village Nangal Thakran in C-28/NZ
48/22.08.08/EE(M)-II
M/s Dharam Pal Gupta
9 Pdg cc pav.from Bridge to Deshraj house and along park in Village Nangal Thakran in C-28/NZ
47/22.08.08/EE(M)-II
M/s Vidya Const Co.
10 Pdg cc pav.and c/o o/s drain from Hari Singh house to Dalbir house in Village Bajitpur in C-28/NZ
96/19.09.08/EE(M)-I
11 Pdg cc pav.and c/o o/s drain from Pappu Shop to Prem house in Village Bawana in C-28/NZ
107/30.09.08/EE(M)-I
M/s Surender Kumar Verma
12 Pdg cc pav.and c/o o/s drain from Meer Singh house to Prakash house and side lane in Village Bawana in C-28/NZ
101/26.09.08/EE(M)-I
M/s Surender Kumar Verma
13 Pdg cc pav.and drain from Tek Chand house to Krishan house and side lane in Village Bawana in C-28/NZ
177/10.10.08/EE(M)-II
14 Pdg cc pav.and drain from Tek Chand house to Mangeram house and Sukhvir house to Delhi road in Village Pooth Khurd in C-27/NZ
112/10.10.08/EE(M)-II
M/s Vidya Const Co.
15 Pdg cc pav. & drain from Rajinder Singh Joon house to Bijor park in village Pooth khurd w.no27 Narela
176/10.10.08/EE(M)-II
M/s Om Conmst Co.
16 Dev of lane by pdg b/f from main road to Randhir house in village Mangeshpur in Narela Zone
62/25.09.08/EE(M)-VI
M/s Bhardwaj Const Co.
17 Dev to lane by pdg b/f from Lakki house to Prem Patwari house in village Mangeshpur in narela
61/25.09.08/EE(M)-VI
M/s Shiv Narain
18 Dev of lane by pdg b/f from drain to Balwan house in village Mangeshpur in Narela Zone
60/25.09.08/EE(M)-VI
M/s Shiv Narain
19 Making easy spead breaker and culvet from bawana chowk to Bawana in C-28 Narela Zone
110/30.09.08/EE(M)-II
M/s Anand Mathur mpl Contractor
20 making easy spead benches and culvert from Rajiv Gandhi Stadium Auchandi Border in C-28 Narela Zone
111/30.09.08/EE(M)-II
M/s Raj Roop Mathur mpl Contractor
21 pdg lighting arrangement in village Bawana under AC-22 Narela Zone
275/04.02.09/EE(E)-II
22 Dev of lane from Rajvir Ramchander NAresh Nanak and Rambir by pdg cc and drain in village Katewara
38/22.08.08/EE(Pr.)
M/s D&G Const Co.
CIVIL EE(Pr.) 17.06.08 09.04.08 314742 09.01.09 02.05.09 301183
CIVIL EE(Pr.) 17.06.08 09.04.08 324998 29.08.08 29.05.09 324822
CIVIL EE(Pr.) 17.06.08 09.04.08 383865 06.10.08 12.06.09 379192
CIVIL EE(Pr.) 17.06.08 09.04.08 419985 12.09.08 22.01.09 370946
CIVIL EE(Pr.) 17.06.08 09.04.08 396183 29.08.08 08.05.09 361052
CIVIL EE(Pr.) 17.06.08 09.04.08 295314 29.08.08 05.05.09 271117
CIVIL EE(Pr.) 17.06.08 09.04.08 442444 29.08.08 20.10.08 441363
CIVIL EE(Pr.) 17.06.08 09.04.08 246994 27.08.08 15.10.08 246198
CIVIL EE(Pr.) 17.06.08 09.04.08 453960 08.10.08 22.12.08 441884
CIVIL EE(Pr.) 15.07.08 09.06.08 317167 11.09.08 12.12.08 315341
CIVIL EE(Pr.) 15.07.08 09.06.08 485177 12.09.08 12.12.08 474308
CIVIL EE(Pr.) 15.07.08 09.06.08 361357 15.09.08 12.12.08 359167
CIVIL EE(Pr.) 15.07.08 09.06.08 264373 10.09.08 12.12.08 250088
CIVIL EE(Pr.) 15.07.08 09.06.08 251849 11.09.08 13.12.08 231891
CIVIL EE(Pr.) 15.07.08 09.06.08 243299 12.09.08 10.12.08 234393
23 Dev of lane Prem chand Rampat Sukhbir Dharam Ishwar Mange and Sher singh by pdg cc pavment and drain in village Katewara
33/22.08.08/EE(Pr.)
M/s D&G Const Co.
24 Pdg cc and and c/o drain in lane Tek Chand and Ram kumar in village Nangal Thakran w.no.28
32/22.08.08/EE(Pr.)
M/s D&G Const Co.
25 Pdg cc and and c/o drain in lane Dhare and Rohtas in in village Nangal Thakran w.no.28
31/22.08.08/EE(Pr.)
M/s D&G Const Co.
26 Pdg cc pav and c/o drain from main road to Rajesh house in village Mangeshpur
46/03.09.08/EE(Pr.)
M/s Raj Roop Mathur mpl Contractor
27 Pdg cc pav and c/o drain in lane Jaswant house to Rajesh house and side lanes Raj Joginder Rampal Ajit in village Mangeshpur w.no.28/
37/22.08.08/EE(Pr.)
M/s D&G Const Co.
28 Pdg cc pav and c/o drain in lane Dalip Hawa singh Ram phal and Jai chand in village Mangeshpur w.no.28/
39/22.08.08/EE(Pr.)
M/s D&G Const Co.
29 Dev of side berms by Pdg RMC from transformer to Bhushan house and lane Ramphal in village Daryapur w.no.28/
36/22.08.08/EE(Pr.)
M/s A.K. builders
30 Pdg cc pav and c/o drain in lane Sahib and Anup in village Daryapur w.no.28/
35/22.08.08/EE(Pr.)
M/s D&G Const Co.
31 dev of road/lane by pdg RMC Ajit Ramchander Anil and Jagdish in village Chandpur w.no.28
34/22.08.08/EE(Pr.)
M/s Anand Mathur mpl Contractor
32 C/o o/s drain from Hari Pradhan house to MC Pry School in village Harevli w.no.28
59/05.09.08/EE(Pr.)
M/s D&G Const Co.
33 Pdg cc pavment from Dharam house to hari Pradhan house Ram Prasad house to Hari har house and side lane and Ganga Dutt wali gali in village harevali w.no.28
60/05.09.08/EE(Pr.)
M/s Shyam Lal Gupta
34 Pdg cc pav from Manful house to Chadngi house Prabhu to Balbir house Bhim singh to Hari chand house and Run singh to khazana house in village Nangal Thakran w.no.28
64/05.09.08/EE(Pr.)
M/s Shyam Lal Gupta
35 Pdg cc pav from Jai singh house to Pratap house and side lanes and chopal to Dharmvit=r house in village Nangal Thakran w.no.28
61/05.09.08/EE(Pr.)
M/s Devender Kumar
36 Pdg cc pav from Ram kishan houase to chopal in village Bajitpur in w.no.28
63/05.09.08/EE(Pr.)
M/s Devender Kumar
37 Pdg cc pav from Vijender house to Hari singh Baljit house to Anil house and Mandir to Mahavir wali gali in village Bajitpur in w.no.28
62/05.09.08/EE(Pr.)
M/s Devender Kumar
Status Report of MLA,Sh Jai Kishan AC No. 23,2008-09
S.No.
Name of Work deptt. Div. D.O.S D.O.C
CIVIL M-III 08.05.08 08.05.08 599000 02.01.09 23.06.09 599000
CIVIL M-III 08.05.08 08.05.08 599000 02.02.05 24.04.09 599000
CIVIL M-III 08.05.08 08.05.08 599000 02.01.09 13.05.09 599000
CIVIL M-III 08.05.08 08.05.08 599000 02.02.09 29.04.09 599000
CIVIL M-III 08.05.08 08.05.08 600000 11.08.08 23.10.08 487948
CIVIL M-III 08.05.08 08.05.08 553000 12.08.08 11.11.08 492150
Stg. of B/Wall of Ambedkar park in Sultanpuri C-37/RZ CIVIL M-III 08.05.08 08.05.08 371000 03.10.08 28.11.08 328830
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Expenditure
1 C/O hut in A-1 Block park on Mangal Bazar road (Green Belt) in C-37/RZ
542/26.12.08/EE(M)-III
M/s Sanjay Gupta
2 C/O hut in A-3 Block park on Mangal Bazar road (Green Belt) in C-37/Sultanpur RZ
397/13.10.08/EE(M)-III
M/s Nishant Const Co.
3 C/O hut in B-1 Block park on Mangal Bazar road Balmiki Vihar(Green Belt) in C-37/Sultanpur RZ
541/26.12.08/EE(M)-III
M/s Sanjay Gupta
4 C/O hut in C-1 Block park on Mangal Bazar road (Green Belt) in C-37/Sultanpur RZ
396/13.10.08/EE(M)-III
M/s Nishant Const Co.
5 C/O walkway in park infront of h.no.C-1/246 Sultanpuri C-37/RZ
321/08.08.08/EE(M)-III
M/s Puneet Entp.
6 C/O B/Wall of park by pdg marbel wash and MS grill infront of h.no.C-1/240 Sultanpuri in C-37/RZq
322/08.08.08/EE(M)-III
M/s Puneet Entp.
7 361/25.09.08/EE(M)-III
M/s Shiv Kumar Gupta
C/O hut in park opp. h.no.P-4/153 in Sultanpuri in C-39/RZ CIVIL M-III 08.05.08 08.05.08 599000 03.02.09 24.04.09 598120
C/o hut in park opp. h.no. E-3/492 in Sultanpuri in C-39/RZ CIVIL M-III 08.05.08 08.05.08 599000 03.02.09 24.04.09 599000
CIVIL M-III 08.05.08 08.05.08 481000 04.10.08 09.03.09 481000
Imp. of footpath in Ambedkar park in Sultanpuri in C-37/RZ CIVIL M-III 08.05.08 08.05.08 371000 11.08.08 20.10.08 274358
ELECT E-I 20.06.08 16.04.08 200439 26.06.09 25.11.09 198045
ELECT E-I 20.06.08 16.04.08 200439 31.12.08 14.01.09 182726
ELECT E-I 20.06.08 16.04.08 200531 20.12.08 09.01.09 180764
ELECT E-I 20.06.08 16.04.08 201355 17.02.09 28.02.09 198159
ELECT E-I 20.06.08 16.04.08 201355 26.06.09 24.07.09 196664
ELECT E-I 23.06.08 16.04.08 595091 28.05.09 19.02.10 458067
CIVIL M-III 23.06.08 21.05.08 594900 30.12.09 30.04.09 410920
CIVIL M-III 23.06.08 21.05.08 594900 28.01.09 15.05.09 560790
CIVIL M-III 23.06.08 21.05.08 594900 24.12.08 30.09.09 592787
CIVIL M-III 23.06.08 21.05.08 594900 30.12.08 30.04.09 403263
CIVIL M-III 23.06.08 21.05.08 594900 30.12.08 30.04.09 404654
CIVIL M-III 23.06.08 21.05.08 594900 M/s Birendera 30.12.09 30.04.09 410920
CIVIL M-III 23.06.08 21.05.08 263412 13.08.08 30.10.09 262969
CIVIL M-III 23.06.08 21.05.08 189623 M/s Garg Entp. 10.11.08 16.01.09 189599
CIVIL M-III 23.06.08 21.05.08 417604 04.08.08 09.10.08 417248
8 366/25.09.08/EE(M)-III
M/s Bhirender Assos.
9 526/ 22.12.08/EE(M)-III
M/s Nishant Const Co.
10 C/O hut in park opp. E-7 Cummunity Center Sultanpuri in C-39/RZ
365/22.12.08/EE(M)-III
M/s Bhirender Assos.
11 320/08.08.08/EE(M)-III
M/s Puneet Entp.
12 prov. of semi high mast light in Ambedkar park B-3 Block in Sultanpuri (Green Belt) under Rohini WZ
31/18.06.09/EE(E)VII
M/s Paras Const.
13 Prov. of semi high mast light in Valmiki Vatika B-1 Block in Sultanpuri (Green Belt) under Rohini WZ
232/31.12.08/EE(E)-VII
M/s Aman Elect.
14 Prov. of semi high mast light infront of A-3 Block in Sultanpuri (Green Belt) under Rohini WZ
201/16.12.08/EE(E)-VII
M/s Kawaht Ekect. Works
15 Prov. of semi high mast light in C-1 block Mother Dairy Park Sultanpuri under Rohini
270/16.02.09/EE(E)-VII
M/s Sant Gian Corp.
16 Prov. of semi high mast light in P-2 Block in Shastri Park Sultanpuri under Rohini
14/18.06.09/EE(E)-VII
M/s Krishana Elect.
17 Prov. of Street light fitting in Sultanpur Majra Vill.under Rohini
403/27.02.09/EE(E)-VII
M/s Aman Elect.
18 C/O Designer gate in park opp. E-3/492 in Sultanpuri in C-39/Rohini-III
527/22.12.08/EE(M)-III
M/s Bhirender Assos.
19 C/O Designer gate in park behind Gurudwara in P-3 Block in Sultanpuri in C-39/Rohini-III
524/22.12.08/EE(M)-III
M/s Nishant Const Co.
20 C/O Designer gate in park opp.D-1/445 in Sultanpuri in C-39/Rohini-III
533/22.12.08/EE(M)-III
M/s Puneet Ent.
21 C/O Designer gate in park opp.E-7/444 in Sultanpuri in C-39/Rohini-III
529/22.12.08/EE(M)-III
M/s Bijender Singh Dabas
22 C/o designer gate Nursery park in E-7 block in Sultanpuri in C-39/R-III
528/22.12.08/EE(M)-III
M/s Bhirender Assos.
23 C/o designer gate in P-4 block park in Sultanpuri (on main road)in C-39/R-III
527/22.12.08/EE(M)-II
24 Widining of Shami BAzar road by pdg RMC from main road Sultan puri to F-1/493 in Sultan puri C-40/R-III
318/08.08.08/EE(M)-III
M/s Prakash Khanna
25 Widing of road by pdg RMC from H block mkt. to H-2/25 Kirani road in Sultan puri C-39/R-III
296/01.08.08/EE(M)-III
26 Widening of road by pdg RMC from H-block mkt. to H-3/1 in Sultanpuri in C-39/R-III
286/01.08.08/EE(M)-III
M/s Bijender Singh Dabas
CIVIL M-III 23.06.08 22.05.08 434900 03.10.08 06.01.09 434368
CIVIL M-III 23.06.08 22.05.08 263412 09.08.08 30.09.08 263267
CIVIL M-III 23.06.08 22.05.08 434900 13.08.08 29.10.08 434791
CIVIL M-III 23.06.08 22.05.08 499329 09.08.08 19.11.08 499079
ELECT E-I 09.07.08 11.03.08 593910 08.05.09 12.08.09 583370
ELECT E-I 09.07.08 11.03.08 593486 02.03.09 25.07.09 487500
CIVIL M-III 23.07.08 14.07.08 599400 02.12.08 13.07.09 598241
CIVIL M-III 23.07.08 14.07.08 599400 01.12.08 15.07.09 599400
CIVIL M-III 29.08.08 05.08.08 202500 11.12.08 05.02.096 197271
CIVIL M-III 29.08.08 05.08.08 530000 M/s Anil Goel 20.11.08 31.12.08 499062
CIVIL M-III 29.08.08 05.08.08 529300 M/s Anil Goel 21.11.08 09.01.09 498903
CIVIL M-III 29.08.08 05.08.08 369500 M/s Anil Goel 25.11.08 12.01.09 355623
CIVIL M-III 29.08.08 05.08.08 250300 M/s Anil Goel 21.11.08 09.01.09 239643
CIVIL M-III 29.08.08 05.08.08 295200 13.12.08 23.02.09 294779
CIVIL M-III 29.08.08 05.08.08 222500 25.11.08 16.02.09 198536
CIVIL M-III 29.08.08 05.08.08 452200 15.11.08 27.04.09 452161
CIVIL M-III 29.08.08 05.08.08 499203 10.11.08 13.03.09 498412
CIVIL M-III 29.08.08 05.08.08 296600 M/s J.P. Const. 23.10.08 29.12.08 188601
27 Widening of Saini Bazar road by pdg RMC from E-7/park to G-Block near M.C.Pry.School in Sultanpuri in C-39/R-III
316/08.08.08/EE(M)-III
M/s Har Const co.
28 Widening of Saini Bazar road by pdg RMC from main road Sultanpuri to E-7/36 in Sultanpuri in C-39/R-III
317/08.08.06/EE(M)-III
M/s D.B. Const Co.
29 Widening of Saini Bazar road from F-2/288 to to G-Block park in Sultanpuri in C-40/Rohini-III
319/08.08.08/EE(M)-III
M/s Prakash Khanna
30 Widening of road by pdg RMC in G-Block Sultanpuri from Saini Bazar road to Sec-5 Friends Enclave in Sultanpuri in C-40/Rohini-III
295/01.08.08/EE(M)-III
M/s D.B. Const Co.
31 Prov. of HPSV street light fitting at block A,B,C,D,E,in Sultanpuri under Rohini
389/27.02.09/EE(E)-VII
M/s Dsatarn Elect.
32 Prov. of HPSV street light fitting at block F,G,H,P-1 to P-4 in Raj park, Friends Enclave,in Sultanpuri under Rohini
353/27.02.09/EE(E)-VII
M/s Khanna Sales corp.
33 C/O Designer gate near park behind C-1 Block Fish Mkt. Sultanpuri in C-37/Rohini-III
453/24.11.08/EE(M)-III
M/s Puneet Entp.
34 C/O Designer gate in park adjacent to A-1 Block near Sulabh Sauchalaya in Sultanpuri in C-37/Rohini-III
454/24.11.08/EE(M)-III
M/s Puneet Entp.
35 C/O lane by pdg cc opp.F-3/444 F-3 Arora Dairy and F-1/268 in Sultanpuri C-40/R-III
448/19.11.08/EE(M)-III
M/s Puneet Entp.
36 Widening of road by pdg RMC from Ashwariya Vatika to Loha Mkt.on main road Sultanpuri C-40/R-III
449/19.11.08/EE(M)-III
37 Widening of road by pdg RMC from Rialway Xing to Kabari Road on main road Sultanpuri C-40/R-III
446/19.11.08/EE(M)-III
38 Widening of road by pdg RMC from F-4/241 to F-4/288 in Sultanpuri C-40/R-III
447/19.11.08/EE(M)-III
39 Widening of road by pdg RMC from B-52 Raj Park to NDPL Office in Sultanpuri C-40/R-III
450/19.11.08/EE(M)-III
40 C/O B/Wall of M.C.Pry.School in Sultanpuri Majra C-40/R-III
442/19.11.08/EE(M)-III
M/s Puneet Entp.
41 C/O drain along M.C.Pry.School in Sultanpuri Majra C-40/R-III
445/19.11.08/EE(M)-III
M/s Puneet Entp.
42 C/O lane by pdg cc from Ram Swarup house h.no.88 to Bholla General Store and Cross lanes in Sultanpur Majra Village C-40/R-III
422/06.11.08/EE(M)-III
M/s Bala Const Co.
43 Widening of road by pdg RMC from h.no.F-7/36 to main road Sultanpuri(Bhalla Road)in Sultanpuri C-40/R-III
425/06.11.08/EE(M)-III
M/s S.S. Contractor
44 C/O Passage by pdg interlocking tiles and p/l cc in including drainage system in water body in F-1 Block Sultanpuri C-40/R-III
398/22.08.08/EE(M)-III
CIVIL M-III 29.08.08 05.08.08 386400 M/s Garg Entp. 25.11.08 21.02.09 345416
CIVIL M-III 29.08.08 05.08.08 102210 19.04.09 06.08.09 102110
45 Remodeling of drain from M.C.Pry.Schoool to Cremation Ground in Sultanpuri Majra C-40/R-III
444/19.11.08/EE(M)-III
46 C/O road side Urinal near Shiv Steel at Sultanpuri Majra Village C-40/R-III
424/06.11.08/EE(M)-III
M/s Ram Kishore Bairwa
Status Report of MLA,Sh Raj Kumar ChouhanAC No. 24,2008-09
S.No.
Name of Work deptt. Div. D.O.S D.O.C
CIVIL M-III 23.06.08 03.05.08 196600 11.07.08 11.08.08 196543
CIVIL M-III 23.06.08 03.05.08 198900 11.07.08 08.08.08 198410
CIVIL M-III 23.06.08 03.05.08 600000 M/s Ajay Bros. 26.09.08 30.12.08 504279
CIVIL M-III 23.06.08 03.05.08 600000 M/s Ajay Bros. 26.09.08 19.12.08 500343
CIVIL M-III 23.06.08 03.05.08 600000 M/s Ajay Bros. 12.10.09 P 390596
CIVIL M-III 23.06.08 03.05.08 496100 M/s Garg Entp. 02.10.08 04.09.08 496053
CIVIL M-III 04.07.08 30.06.08 494700 04.10.08 20.12.08 494700
CIVIL M-III 04.07.08 30.06.08 424635
CIVIL M-III 04.07.08 30.06.08 497428 M/s Garg Entp. 24.10.08 19.09.08 485400
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Expenditure
1 C/o road by RMC infront of water filling station in Y-block Mangolpuri C-38
200/11.07.08/EE(M)-III
M/s Braniya Bros. & co.
2 C/o road by pdg RMC infront of Y-Block CTC Complex in Mangolputi C-47
199/11.07.08/EE(M)-III
M/s V.K. Const Co.
3 Dev of community Hall by Massanic Tile in Block-S in Mangolpur C-48
381/26.09.08/EE(M)-III
4 Dev of community Hall by Massnic tile in Block-K in Mangolpuri C-47
379/26.09.08/EE(M)-III
5 Dev of community Hall by Massnic tile in Block-N in Mangolpuri C-47
380/26.09.08/EE(M)-III
6 Dev of Punjabi Basti by RMC W.L. and Sewer Line in F-Block Mangolpuri C-47
251/24.07.08/EE(M)-III
7 Dev of park near Divisional office on outer Ring road infront of F2/205 Mangolpuri w.no.46 Rohini
384/30.09.08/EE(M)-III
M/s Harish Entp.
8 Dev of drain by RCC slab at B block road from MAsjid to F block Barat Ghar Mangolpuri w.no.46 Rohini
9 Covering of Nalah from Dustbin on FG road to 810 in w.no. 46 Mangolpuri Rohini
253/24.07.08/EE(M)-III
CIVIL M-III 04.07.08 30.06.08 497500 02.08.08 23.09.08 495705
CIVIL M-III 04.07.08 30.06.08 497128 02.08.08 30.09.08 496520
CIVIL M-III 04.07.08 30.06.08 497900 02.08.08 10.11.08 488293
CIVIL M-III 04.07.08 30.06.08 492200 26.07.08 05.12.08 491045
CIVIL M-III 04.07.08 30.06.08 478800 02.08.08 31.12.08 477302
CIVIL M-III 04.07.08 30.06.08 198700 M/s Garg Entp. 24.07.08 01.09.08 198575
CIVIL M-III 09.07.08 26.06.08 257000 M/s Garg Entp. 20.07.08 14.08.08 255693
CIVIL M-III 11.07.08 01.07.08 197200 05.10.08 01.12.08 164912
CIVIL M-III 07.07.08 01.07.08 197000 29.09.08 10.11.08 196968
CIVIL M-III 11.07.08 01.07.08 199500 04.10.08 23.12.08 158679
CIVIL M-III 11.07.08 01.07.08 188300 03.10.08 10.11.08 161028
CIVIL M-III 11.07.08 01.07.08 401100 M/s Anil Goel 29.09.08 14.11.08 391347
CIVIL M-III 18.08.08 09.08.08 495000 20.09.08 08.12.08 494458
CIVIL M-III 18.08.08 09.08.08 495000 20.09.08 10.12.08 494244
10 Dev of gali by pdg RMC from A-884 to A-661 infront of A block School and behind Hanuman MAndir in A block Mangolpuri in w.no. 46/Rohini
252/24.07.08/EE(M)-III
M/s Bijender Singh Dabas
11 Covering of nallah from F-1/232 to F-587 in w.no. 46 MAngolpuri Rohini
255/24.07.08/EE(M)-III
M/s Sanjay Gupta
12 Dev of gali by pdg RMC from G-217 to G-246, G-168 to G-177, G-329 to G-338, and G-574 to G-546 in G block Mangolpuri in w.no.46 Rohini
249/24.07.08/EE(M)-III
M/s Bijender Singh Dabas
13 Dev of gali by pdg RMC from F-969 to F-992, F-1017 to F-1040 and F-1065 to F-1088 in F block Mangolpuri in w.no.46/Rohini
248/24.07.08/EE(M)-III
M/s Ishwar Singh
14 Dev of walkway in park near D1 opp. A and B block post office and in park in Block near E-237 MAngolpuri in w.no.46/Rohini
254/24.07.08/EE(M)-III
M/s JMD Cost Co.
15 C/o walkway into park near division office on outer ring road in front of house no. F-2/205 in Mangolpuri in w.no.46/Rohini
250/24.07.08/EE(M)-III
16 pdg and laying RMC in gali from F-1 to F-10, F-1 to F-20, F-31 to F-40 and F-51 to F-60 in F block in Mangolpuri w.no.46/Rohini
237/18.07.08/EE(M)-III
17 Pdg ms grill on footpath on Police station road from H block store to J block Xing and LP road in Mangolpuri in w.no. 47 Rohini
382/26.09.08/EE(M)-III
M/s Puneet Entp.
18 Pdg and laying ms gratings in A,B,C,D and E block in MAngolpuri in Mangolpuri in w.no.46 Rohini
372/25.09.08/EE(M)-III
M/s Puneet Entp.
19 Pdg ms grill on footpath on B block road Kali MAndir road PD road from Hanuman mandir to H block Store and Katran raod from Aggarqal sweets to C block School in MAngolpuri in w.no.46 Rohini
370/25.09.08/EE(M)-III
M/s Puneet Entp.
20 Pdg of ms grill on footpath on Hospital road and st road in Mangolpuri in w.no.48 Rohini
371/25.09.08/EE(M)-III
M/s Puneet Entp.
21 Dev of gali by pdg RMC D-780 to D-808 and D-337 to D-359, D block MAngolpuri in w.no. 46 Rohini
373/25.09.08/EE(M)-III
22 Dev of road by A.C.mix infront of Mangolpuri Khurd Village in C-47/Rohini
352/11.09.08/EE(M)-III
M/s Mukesh Assos. Pvt. Ltd.
23 Dev of road by A.C.mix from G-Block Mandir to Avantika Enclave Kanjhawla road Mangolpuri in C-47/Rohini
355/11.09.08/EE(M)-III
M/s Mukesh Assos. Pvt. Ltd.
CIVIL M-III 18.08.08 09.08.08 485500 20.09.08 10.12.08 484647
CIVIL M-III 18.08.08 09.08.08 496900 M/s Garg Entp. 17.09.08 15.12.08 495743
CIVIL M-III 18.08.08 09.08.08 464000 10.09.08 26.09.08 458353
CIVIL M-III 21.08.08 21.08.08 675600 15.10.08 30.04.09 674567
CIVIL M-III 21.08.08 21.08.08 182900 29.09.08 12.11.08 182323
CIVIL M-III 24.09.08 13.08.08 463000 12.12.08 22.01.09 418694
CIVIL M-III 24.09.08 13.08.08 481000 12.12.08 23.01.09 434894
CIVIL M-III 24.09.08 13.08.08 498000 12.12.08 30.01.09 445228
CIVIL M-III 24.09.08 13.08.08 498000 12.12.08 30.01.08 454080
CIVIL M-III 24.09.08 13.08.08 499000 13.12.08 20.01.09 459426
CIVIL M-III 24.09.08 13.08.08 499000 M/s J.D. Const 01.11.08 24.12.08 497800
CIVIL M-III 10.10.08 13.08.08 498000 11.12.08 29.01.09 451660
CIVIL M-III 10.10.08 13.08.08 498000 19.12.08 30.01.09 474627
CIVIL M-III 10.10.08 13.08.08 484000 31.12.08 12.02.09 452506
CIVIL M-III 10.10.08 13.08.08 499000 11.12.08 27.01.09 480874
CIVIL M-III 10.10.08 13.08.08 488000 11.12.08 27.01.09 443009
CIVIL M-III 10.10.08 13.08.08 484000 11.12.08 27.01.09 440631
CIVIL M-III 10.10.08 13.08.08 439000 07.11.08 14.01.09 438537
CIVIL M-III 10.10.08 11.09.08 396800 23.12.08 21.01.09 372880
24 Dev of road by A.C.mix infront of Pole Star School on road no.3 Mangolpuri in C-47/Rohini
351/11.09.08/EE(M)-III
M/s Mukesh Assos. Pvt. Ltd.
25 Dev of footpath and centeral verge on road no.3 infront of Kamdhenu School and near petrol Pump in C-47/Rohini
348/04.09.08/EE(M)-III
26 Dev of lane by RMC from K-373 to 396,1249 to 1272,1201 to 124 in Mangolpuri C-47/Rohini
349/04.09.08/EE(M)-III
M/s Ram Swaroop
27 C/O Hut in Central Park near Lav.Block in F-Block Mangolpuri C-46/Rohini
390/13.10.08/EE(M)-III
M/s Harish Entp.
28 P/F M/S gritings in F,F-1,F-2 and G-Block in mangolpuri in C-46/Rohini
369/25.09.08/EE(M)-III
M/s Puneet Entp.
29 Dev of lane by RMC from L-1186 to 1201, 1224 to park, Surrounding of park in Mangolpuri C-47/RZ-III
472/03.12.08/EE(M)-III
M/s Pawan builders
30 Dev of lane by RMC from L-1044 to 949, 972 to 949, 864 to 841, Mangolpuri C-47/RZ-III
474/03.12.08/EE(M)-III
M/s Pawan builders
31 Dev of lane by RMC from L-1424 to 1401, 516 to 493, 625 to 648 in Mangolpuri C-47/RZ-III
471/03.12.08/EE(M)-III
M/s Pawan builders
32 Dev of lane by RMC from K-996 to 973, 972 to 949 and 904 to 918 in Mangolpuri C-47/RZ-III
473/03.12.08/EE(M)-III
M/s Pawan builders
33 Dev of lane by RMC from N-378 to 364, 409 to 432, 576 to 553 and 253 to 348 in Mangolpuri C-47/RZ-III
495/10.12.08/EE(M)-III
M/s Vinay Const Co.
34 Dev of lane by RMC from L-300 to 277, 348 to 325, 396 to 373 in Mangolpuri C-47/RZ-III
411/23.10.08/EE(M)-III
35 Dev of lane by RMC from S-973 to 996, 1012 to 1026, 1080 to 1057 in Mangolpuri C-48/RZ-III
511/11.12.08/EE(M)-III
M/s Pawan builders
36 Dev of lane by RMC from S-760 to 774, 828 to 805, 876 to 853in Mangolpuri C-48/RZ-III
518/19.12.08/EE(M)-III
M/s Vinay Const Co.
37 Dev of lane by RMC from back side Rain Basera to R-623 in Mangolpuri C-48/RZ-III
521/19.12.08/EE(M)-III
M/s Vinay Const Co.
38 Dev of lane by RMC from U-526 to 503, 574 to 551 and Surrounding park in Mangolpuri C-48/RZ-III
523/16.12.08/EE(M)-III
M/s Vinay Const Co.
39 Dev of lane by RMC from S-625 to 648 673 to 696, 744 to 721in Mangolpuri C-48/RZ-III
513/16.12.08/EE(M)-III
M/s Pawan builders
40 Dev of lane by RMC from S-253 to 276, 205 to 228, 144 to 121in Mangolpuri C-48/RZ-III
505/11.12.08/EE(M)-III
M/s Pawan builders
41 Dev of lane by RMC from S-396 to 373, 427 to 441, 411 to 442 in Mangolpuri C-48/RZ-III
426/06.11.08/EE(M)-III
M/s Tokas & Co.
42 Dev of lane by RMC in gali from 139 to 168, 228 to 256 in f block in Mangolpuri C-46/RZ-III
522/22.12.08/EE(M)-III
M/s Vinay Const Co.
CIVIL M-III 10.10.08 11.09.08 95634 M/s Garg Entp. 09.12.08 06.01.09 95634
C/o Snan Ghar in D block mangol puri w.no.46/RZ CIVIL M-III 10.10.08 11.09.08 500000 M/s K.K. Const. 12.02.09 P 495000
C/o Snan Ghar in U block mangol puri w.no.48/RZ CIVIL M-III 13.10.08 13.08.08 500000 13.12.08 26.12.08 499659
C/o Snan Ghar in M block mangol puri w.no.47/RZ CIVIL M-III 13.10.08 13.08.08 500000 M/s K.K. Const. 10.12.08 27.03.08 499702
CIVIL M-III 13.10.08 13.08.08 480000 M/s B 18.12.09 10.03.10 429373
CIVIL M-III 13.10.08 13.08.08 480000 M/s Brmanand 08.02.10 25.03.10 436606
CIVIL M-III 13.10.08 13.08.08 480000 Brahmanand 14.07.09 20.04.11 436454
CIVIL M-III 13.10.08 11.09.08 338200 10.12.08 29.01.09 267156
CIVIL M-III 13.10.08 11.09.08 350000 M/s Anil Goel 10.12.08 10.02.09 342636
CIVIL M-III 13.10.08 11.09.08 440000 05.12.08 22.10.08 391832
CIVIL M-III 13.10.08 11.09.08 190000 17.12.08 16.03.09 139227
CIVIL M-III 13.10.08 11.09.08 190000 17.12.08 29.08.09 128816
CIVIL M-III 13.10.08 11.09.08 190000 17.12.08 16.03.08 136111
CIVIL M-III 13.10.08 11.09.08 179800 17.12.08 09.03.09 179587
CIVIL M-III 13.10.08 11.09.08 180000 17.12.08 09.03.08 179587
CIVIL M-III 13.10.08 11.09.08 180000 17.12.08 03.03.09 178871
CIVIL M-III 13.10.08 11.09.08 499300 10.12.08 09.01.09 490447
43 Dev of park infront of F-496 and 497in F block in Mangolpuri C-46/RZ-III
488/08.12.08/EE(M)-III
44 507/11.12.08/EE(M)-III
45 504/11.12.08/EE(M)-III
M/s Bhrama Nand
46 469/01.12.08/EE(M)-III
47 C/o Passage of Snan Ghar in D block Mangol puri w.no.46/RZ
421/11.12.09/EE(M)-III
48 C/o Passage of Snan Ghar in U block Mangol puri w.no.48/RZ
443/07.03.10/EE(M)-III
49 C/o Passage of Snan Ghar in M block Mangol puri w.no.47/RZ
51/11.05.09/EE(M)-III
50 Dev of park by raising of B/wall in X block near Balmiki Mandir in Mangolpuri w.no. 47 RZ
468/01.12.08/EE(M)-III
M/s Nirman Const Co.
51 Dev of lane by raising of B/wall in K block near Balmiki Mandir in mangol puri w.no. 47/RZ
464/01.12.08/EE(M)-III
52 Dev of lane by RMC K-589 to 612, 540 to 445 and 541 to 564 in Mangolpuri w.no.47/RZ
459/01.12.08/EE(M)-III
M/s Vinay Const Co.
53 Dev of drain by pdg RCC precast slab nad mainhole cover in block K and L in Mangolpuri C-47/RZ
450/08.12.08/EE(M)-III
M/s R.S. Const Co.
54 Dev of drain by pdg RCC precast slab nad mainhole cover in block M and N in Mangolpuri C-47/RZ
483/08.12.08/EE(M)-III
M/s Bhramanand
55 Dev of drain by pdg RCC precast slab nad mainhole cover in block O and X in Mangolpuri C-47/RZ
481/08.12.08/EE(M)-III
M/s R.S. Const Co.
56 Dev of drain by P/F ms grating in block K and L in Mangolpuri w.no. 47/RZ
484/12.02.08/EE(M)-III
M/s Puneet Entp.
57 Dev of drain by P/F ms grating in block M and N in Mangolpuri w.no. 47/RZ
585/12.02.08/EE(M)-II
M/s Puneet Entp.
58 Dev of drain by P/F ms grating in block O and X in Mangolpuri w.no. 47/RZ
482/08.12.08/EE(M)-III
M/s Puneet Entp.
59 Dev of drain by pdg RCC slab infrnt of Sanjay gandhi Hospital and X block Mangolpuri C-47/RZ
470/01.12.08/EE(M)-III
M/s R.S. Const Co.
Status Report of MLA,Sh Bejinder Singh AC No. 25,2008-09Name of Work deptt. Div. D.O.S D.O.CS.No
.Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Expenditure
civil M-III 23.06.08 693400
civil M-III 23.06.08 699800 19.09.08 P 575784
civil M-II 23.06.08 694800 01.10.08 P 519326
civil M-II 23.06.08 496600 19.12.08 05.03.09 478814
civil M-II 23.06.08 695400
civil M-II 23.06.08 697400
civil M-II 23.06.08 656600 19.09.08 P 575783
civil M-II 23.06.08 655500 01.18.08 P 519326
civil M-II 23.06.08 655200 01.18.08 P 519326
civil M-II 23.06.08 658400 19.09.08 P 499367
civil M-II 23.06.08 591700 19.09.08 P 499367
civil M-II 23.06.08 657200 19.09.08 P 499367
civil M-II 09.07.08 114700 10.09.08 01.12.08 87379
civil M-II 09.07.08 133100 04.08.08 05.09.08 95637
civil M-II 09.07.08 528500 10.09.08 22.10.08 451169
civil M-II 09.07.08 699500 19.09.08 P 651413
civil M-II 09.07.08 699400 19.09.08 P 651413
civil M-II 09.07.08 693300 19.09.08 P 651413
1 Pdg RMC from h.no. 51 to 528 in Nangalrai village in w.no.43
2 Pdg RMC from h.no.697 to 673 and stg. of B/wall opp. site h.no. 885 in GH-13 in Pashchim Vihar in w.no.41
122/12.09.08 M-II
M/s Chemma Builder
3 Covering of drain from h.no. 125 to 769 (both side central park ) in GH-5 and 7 in Pashchim Vihar in w.no.41
164/26.09.08/EE(M)-II
M/s Star Const Co.
4 Pdg RMC from D-40 to D-42,D-22 to C-26,51 to 530/5 to D-629, PNB to 730,D-17 to D-461 in Vishal Colony Nangloi C-43
319/17.12.08/EE(M)-II
M/s Star Const Co.
5 C/O drain from Krishna Mandir to h.no.527 in Village Nangloi Jat in C-43/WZ
6 C/O drain from Ajad Clinic to h.no.50 both side in Village Nangloi Jat in C-43/WZ
7 C/O drain and side berms from h.no.478 to Guru Har Krishan Ngr. in C-41/WZ
122/12.09.08 M-II
M/s Chemma Builder
8 C/O drain from h.no.1025 to 1041,1125 to 1089,149 to 729,581 to 561 in GH-14 in Paschim Vihar in C-41/WZ
164/26.09.08/EE(M)-II
M/s Star Const Co.
9 C/O drain from h.no.777 to 797,929 to 949,705 to 725 and 1129 to 1152 in GH-14 in Paschim Vihar in C-41/WZ
164/26.09.08/EE(M)-II
M/s Star Const Co.
10 C/O drain from h.no.857 to 913,997 to 961 and 1029 to 1049 in GH-13 in Paschim Vihar in C-41/WZ
121/12.09.08EEM-II
M/s Chemma Builder
11 C/O drain from h.no.745 to 709,733 to 813,57 to 41 in GH-13 in Paschim Vihar in C-41/WZ
121/12.09.08EEM-II
M/s Chemma Builder
12 C/O drain from h.no.529 to 541,447 to 508,409 to 389 in GH-13 in Paschim Vihar in C-41/WZ
121/12.09.08EEM-II
M/s Chemma Builder
13 Dev and stg. of B/Wall in park h.no.158 in White Apptt.in GH-6 Paschim Vihar in C-41/WZ
97/04.09.08/EE(M)-II
M/s Amit Const.
14 Stg. of B/Wall in park and h.no.1 in GH-9 Paschim Vihar in C-41/WZ
52/01.08.08/EE(M)-II
M/s Puneet Entp.
15 Stg. of B/Wall in park and h.no.20 in White Apptt.in GH-6 Paschim Vihar in C-41/WZ
102/04.09.08/EE(M)-II
M/s Puneet Entp.
16 Pdg RMC from h.no.153 to 157,h.no.138 to 139 opp.h.no.88 in Village Nangloi Sayeed in C-41/WZ
123/12.09.08EEM-II
M/s Chemma Builder
17 Pdg RMC in chowk opp. sh.Jaggewan house along park and covering of drain opp.dustbin in village Nangloi Sayeed in C-41/WZ
123/12.09.08EEM-II
M/s Chemma Builder
18 Pdg RMC from RZ-96 to Sarwan house and chowk opp. Sheshpal house in village Nangloi Sayeed in C-41/WZ
123/12.09.08EEM-II
M/s Chemma Builder
civil M-II 09.07.08 695300 15.09.08 09.12.08 683104
civil M-II 07.08.08 944700 26.10.09 P 939700
elect E-I 08.09.08 395723 17.10.08 25.11.08 382361
elect E-I 08.09.08 395723 17.10.08 21.10.08 382344
elect E-I 08.09.08 395723 12.02.09 24.06.09 382853
elect E-I 08.09.08 395723 17.10.08 22.10.08 379366
elect E-I 10.09.08 586000 08.10.08 17.10.08 566749
elect E-I 10.09.08 375808
elect E-I 10.09.08 595349 17.10.08 21.10.08 587139
elect E-I 10.09.08 591000 M/s S.G. Entp. 17.10.08 23.10.08 570308
elect E-I 10.09.08 585000 M/s A.K. Elect. 17.10.08 20.10.08 584599
P/o SHM light at bridges Pashchim vihar w.no.41/NGZ elect E-I 10.09.08 395723 17.10.08 25.11.08 381584
P/o SHM light at the xing of Pashchim vihar under WZ elect E-I 10.09.08 197434 12.02.09 24.06.09 190558
elect E-I 10.09.08 595349 17.10.08 01.11.08 580116
elect E-I 23.09.08 595349 17.10.08 20.10.08 578523
19 Pdg RMC opp. h.no.50, h.no.75 to Harnesh house,h.no.111 to 130,h.no. 111 to 56,h.no.155 to 65,h.no. 159 to 48,opp. h.no.167, h.no. 188 to 206,opp.h.no.230,h.no.194 to 228,h.no.230 to 229,h.no.227 to 226, opp h.no. 181 and opp. Vimal Book Depot in village Nangloi Sayeed in C-41/WZ
120/12.09.08/EE(M)-II
M/s Star Const Co.
20 Pdg RMC opp.h.no.525,601,401 c/o b/wall opp mandir and different culverts in GH-8 in C-41 Pashim Vihar in C-41 WZ
53/23.10.09/EE(M)-I
M/s A.K. And Co.
21 P/O semi high mast light at behra Enclave and G.H.9 Paschim Vihar under WZ
217/17.10.08/EE(E)-III
M/s Paras Const Co.
22 P/O semi high mast light at G.H.13,G.H.10 Paschim Vihar under WZ
203/17.10.08/EE(E)-III
M/s Ram Gopal & Co.
23 P/O semi high mast light at Nangloi Village Crossing under WZ
219/17.10.08/EE(E)-III
M/s Krishna Elect.
24 P/O semi high mast light at G.H.12 and G.H.5 and 7 Paschim Vihar under WZ
216/17.10.08/EE(E)-III
M/s Malhotra Elect.
25 P/o SHM light at G.h. 10 shopping centre GH-5 and 7 Pashchim vihar under WZ
183/08.10.08/EE(E)-III
M/s Ram Gopal & Co.
26 P/o lighting arranegemt in Sunder Vihar GH-5 and GH-7, GH-8, GH-9, GH-13 Pashchim vihar
27 P/o lighting arranegemt in Bhera enclave, GH-10, Gh-14, Nagloi Sayeed, LIC, Guru Hari Kishan nagar, Pashchim vihar
214/17.10.08/EE(E)-III
M/s Khanna Sales Corp.
28 P/o post of lantern fitting in Gh-10 Sunder apptt. park, Guru hari kishan park, GH-8 park in Pashchim vihar
212/17.10.08/EE(E)-III
29 P/o designer pole with ornamental light in GH-10 Sunder apptt. park pashchim vihar
211/17.10.08/EE(E)-III
30 218/17.10.09/EE(E)-III
M/s Ankita Ent.
31 220/17.10.09/EE(E)-III
M/s Krishna Elect.
32 P/o street lighting arrangement at diff. xing of Pashchim vihar GH-5 and GH-7 and GH-6, GH-8 and GH_9 and GH-10 Pashchim vihar
215/17.10.08/EE(E)-III
M/s Neeraj Elect.
33 P/o street lighting arrangement at diff. xing of Pashchim vihar GH-12, GH-13, GH-14 and Guru Hari kishan nagar Pashchim vihar
213/17.10.08/EE(E)-III
M/s Seth Const.
P/o post top lantern fitting in park of Pashchim viahr GH-17 elect E-I 23.09.08 598496 17.10.08 27.10.08 577721
civil M-III 26.09.08 480000 20.10.08 10.12.08 430121
civil M-III 26.09.08 567000 26.10.08 P 566000
civil M-III 26.09.08 427000 15.10.08 15.12.08 372629
civil M-III 26.09.08 485000 17.10.08 26.12.08 484435
civil M-III 26.09.08 552000 22.10.08 P 545419
civil M-III 26.09.08 412000 20.10.08 10.12.08 361704
civil M-III 26.09.08 427000 M/s K.K Const 20.10.08 28.08.09 394326
civil M-III 26.09.08 496000 15.10.08 31.12.08 454536
Pdg RMC from h.no. 95 to 106 in Ambika Vihar C-41 civil M-III 26.09.08 499900 20.10.08 30.11.09 474852
civil M-III 26.09.08 496000 20.10.08 05.12.08 486972
civil M-III 26.09.08 314800 16.10.08 20.01.09 277636
civil M-III 26.09.08 597000 20.10.08 11.02.09 557365
civil M-III 26.09.08 386000 20.10.08 16.01.09 357638
civil M-III 26.09.08 387000 M/s KK Const 20.10.08 17.08.09 339805
civil M-III 26.09.08 174500 10.12.08 14.01.10 158542
civil M-III 29.09.08 497000 20.10.08 15.05.09 408922
civil M-III 29.09.08 325000 04.11.09 16.08.09 281390
civil M-III 29.09.08 492700 20.10.08 12.12.08 457887
34 221/17.10.08/EE(E)-III
M/s Bhimaa Elct.
35 Pdg RMC from h.no. 323 to 332 and 368 to 349 in guru Harikishan nagar in C-41
251/13.10.08/EE(E)-III
M/s K.K. Const Co.-II
36 Pdg RMC from h.no. 427 to 416 and 427 to 404 in guru hari Kishan nagar C-41
255/13.10.08/EE(E)-III
M/s Shiv Kumar Gupta
37 Pdg RMC from h.no. 21 to 30 in guru hari Kishan nagar C-41
248/13.10.08/EE(E)-III
M/s K.K. Const Co.-II
38 Pdg RMC from h.no. 549 to 534 in guru hari Kishan nagar C-41
284/13.10.08/EE(E)-III
M/s Shiv Kumar Gupta
39 Pdg RMC from h.no. 368 to 346 and 329 to 369 in guru hari Kishan nagar C-41
256/13.10.08/EE(E)-III
M/s Shiv Kumar Gupta
40 Pdg RMC from h.no. 230 to 211 in guru hari Kishan nagar C-41
249/13.10.08/EE(E)-III
M/s K.K. Const Co.-II
41 Pdg RMC from h.no. 31 to 111 in guru hari Kishan nagar C-41
250/13.10.09/M-V
42 Pdg RMC from h.no. 21 to 29 and 49 to 46 Ambika Vihar C-41
244/13.10.08/EE(E)-III
M/s K.K. Const Co.-II
43 247/13.10.08/EE(E)-III
M/s Trilok Chandra Sharma
44 Pdg RMC from h.no. 70 to 80 and 35 to 39 Ambika Vihar C-41
246/13.10.08/EE(E)-III
M/s Shiv Kumar Gupta
45 Stg and raising of B/wall of park from h.no.45 to BSES office and 153 to 173 in GH-12 in Pashchim vihar in C-41
258/13.10.08/EE(E)-III
M/s Jasvinder Const Co.
46 C/o B/wall of park opp. h.no. 460 and pipal wala park in GH-8 Pashchim viahr C-41
254/13.10.08/EE(E)-III
M/s Jai Const. Co.
47 Imp to side berms and const of drain from h.no. 315 to 563 and 326 to 303 in Behara enclave in c-41
257/13.10.08/EE(E)-III
M/s Yadav & Sons.
48 Imp of seide berms and const of drain from h.no. 550 to 563 in guru Hari kishan Nagar in C-41
253/1310.08M-V
49 Pdg and laying curve stone in parking in Gh-10 pashchim vihar C-41
263/13.10.08/EE(M)-III
M/s Devender Kr.
50 Stg. of raising of B/wall of park from 993 to 1053 in GH-13 in Pashchim viahr C-41
261/13.10.08/EE(E)-III
M/s Mittal Const.
51 Imp of side berms and const of drain from h.no. 429 to 441 in Sunder vihar C-41
296/13.10.09M-II
M/s Eagal Entp.
52 Pdg RMC opp. Shri joginder house in village nagloi sayeed w.no.41
252/13.10.08/EE(E)-III
M/s Shiv Kumar Gupta
civil M-III 29.09.08 318600 20.10.08 20.01.09 258992
civil M-III 29.09.08 383000 20.10.08 17.12.08 379377
civil M-III 29.09.08 442800 M/s K.K Const 20.10.08 28.08.08 407841
civil M-III 29.09.08 408000 15.10.08 24.07.09 342147
civil M-III 29.09.08 305000 04.11.08 16.08.09 260677
civil M-III 29.09.08 356000 04.11.08 16.08.09 308179
P/o SHM light at GH-10 at Pashchim vihar C-41 elect E-I 30.09.08 397232 30.01.09 28.02.09 383798
Stg. of B/wall opp. h.no. 185 to 239 in Ambika Vihar C-41 civil M-II 06.10.08 236400 M/s A.k.& Co 11.02.09 09.09.09 189457
civil M-II 08.10.08 390000 20.02.09 20.03.09 326855
civil M-II 08.10.08 254000 21.03.09 31.03.09 227382
Pdg RMC from h.no. 227 to 238 in Ambika Vihar w.no.41 civil M-II 08.10.08 336000 06.12.08 17.12.09 335753
civil M-II 08.10.08 199100 20.1.09 P 44267
C/o Walk way opp h.no. 401 in GH-14 Pashchim vihar C-41 civil M-II 08.10.08 199000 20.01.09 22.03.10 140374
civil M-II 08.10.08 239300 13.01.09 18.02.09 196309
53 Stg and rainsing of B/wall park from DDA mkt. in h.no.605 in GH-13 in Pashchim viahr C-41
260/13.10.08/EE(E)-III
M/s Jai Bharat Const.
54 Pdg RMC from h.no. 262 to 25 and opp. 268 in Ambka vihar C-41
262/13.10.08/EE(E)-III
M/s Shiv Kumar Gupta
55 Pdg RMC from h.no. 106 to 115 and 126 to 125 in Ambka vihar C-41
245/13.10.08M-V
56 C/o B/wall of park from h.no. 93/149 in Gh-12 Pashchim viahr C-41
259/13.10.08/EE(M)-II
M/s Jasvinder Const Co.
57 Imp to side berms and const of drain from h.no. 390 to 378 in Sunder Vihar C-41
297/1310.08M-II
M/s Eagal Entp.
58 Imp to side berms and const of drain from h.no. 422 to 414 and 414 to 399in Sunder Vihar C-41
295/13.10.08M-II
M/s Eagal Entp.
59 359/21.01.09/EE(E)-III
M/s Siwatels Engg. & Traders
60 325/17.1208 EEM-V
61 Pdg RMC in diff lanes in Ahir mohalla in village Nagloi Jat C-41
397/19.12.09/EE(M)-II
M/s K.K. Const Co.-II
62 premixing of onternal roads opp Community hall in GH-9 Pashchim vihar C-41
396/19.02.09/EE(M)-II
M/s K.K. Const Co.-II
63 320/17.12.08/EE(M)-II
M/s Shiv Kumar Gupta
64 C/o Walk way opp. h.no. 201 in GH-14 Pashchim viahr C-41
381/13.01.09M-V
M/s K.K. Const Co.-II
65 382/13.01.09/EE(M)-II
M/s K.K. Const Co.-II
66 Pdg RMC from MG road to h.no. 730 and connecting lane upto Rohtak road in C-43
380/13.01.09/EE(M)-II
M/s K.K. Const Co.-II
Status Report of MLA,Sh.Dayanand ChandelaAC No. 26,2008-09
S.No.
Name of Work deptt. Div. D.O.S D.O.C
CIVIL M-II 28.08.08 28.08.09 457857 24.09.08 11.02.08 457800
CIVIL M-II 28.08.08 28.08.09 460505 16.09.08 28.11.08 459159
CIVIL M-II 28.08.08 28.08.09 199378
CIVIL M-II 28.08.08 28.08.09 139851 M/s A.K. Entp. 29.09.08 21.11.08 139738
CIVIL M-II 28.08.08 28.08.09 447997 24.09.08 31.03.09 447797
CIVIL M-II 28.08.08 28.08.09 199850 25.09.08 25.03.09 198297
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Expenditure
1 Dev of lane by pdg relaying Kota Stone from Plot.no.382 to 384 and Plot no.324 to 328 in Chand Ngr.in C-107/WZ
140/15.09.08/EE(M)-II
M/s Prince Entp.
2 Dev of lane by pdg cc from Plot.no.404 to 406 and Plot no.1 to 10 in Chand Ngr.in C-107/WZ
147/15.09.08/EE(M)-II
M/s Sahil builders
3 Dev of lane by pdg relaying Kota Stone from 41 to 50 backlane in Chand Ngr.in C-107/WZ
4 Dev of lane by pdg relaying Kota Stone from 272 to 278 back lane in Chand Ngr.in C-107/WZ
136/15.09.08/EE(M)-II
5 Dev of lane by pdg cc from Plot.no.410 to 413 and Plot no.348 to 361 in Chand Ngr.in C-107/WZ
146/15.09.08/EE(M)-II
M/s Manish Nayar
6 Dev of lane by pdg relaying Kota Stone from 101 to 109 and Plot no.12 to 20 in Chand Ngr.in C-107/WZ
161/15.09.08/EE(M)-II
M/s Balaji Const.
CIVIL M-II 28.08.08 28.08.09 493475 29.09.08 03.12.08 493475
CIVIL M-II 28.08.08 28.08.09 434163 25.09.08 16.02.09 434100
CIVIL M-II 29.08.08 28.08.09 357008 24.09.08 09.01.09 356462
CIVIL M-II 29.08.08 28.08.09 496568 20.09.08 05.12.08 496568
CIVIL M-II 29.08.08 28.08.09 299813 20.02.09 27.01.11 298650
CIVIL M-II 29.08.08 28.08.09 494939 25.09.08 13.02.09 493160
CIVIL M-II 29.08.08 28.08.09 456246 18.09.09 22.08.09 456246
CIVIL M-II 29.08.08 28.08.09 243491 24.09.08 21.11.08 243396
CIVIL M-II 29.08.08 28.08.09 498709
CIVIL M-II 04.09.08 28.08.09 496530 14.10.08 28.11.08 495512
CIVIL M-II 04.09.08 28.08.09 497279 22.12.08 10.12.08 497277
CIVIL M-II 04.09.08 28.08.09 432659 M/s Jatin Jaggi 17.10.08 15.12.08 431735
CIVIL M-II 04.09.08 28.08.09 497786 22.10.08 06.04.10 495816
CIVIL M-II 04.09.08 28.08.09 357008 01.01.09 23.02.10 354195
CIVIL M-II 04.09.08 28.08.09 411615 23.10.08 15.05.09 411600
CIVIL M-II 04.09.08 28.08.09 414116 23.10.08 13.03.09 410639
CIVIL M-II 04.09.08 28.08.09 499656
7 Dev of lane by pdg cc from h.no.III-B/25 to III-B/60 and F-60 to F-58 in Vishnu Garden in C-107/WZ
149/15.09.08/EE(M)-II
M/s L.Gee Const.
8 Dev of lane by pdg cc from h.no.III-B/5 to III-B/40 and 111/6 to F-60 in Vishnu Garden in C-107/WZ
156/15.09.08/EE(M)-II
M/s Amar Const Co.
9 Dev of lane by pdg cc from h.no.III-B/120 to III-B/132 in Vishnu Garden in C-107/WZ
160/15.09.08/EE(M)-II
M/s Vijay Kumar Jha
10 Dev of lane by pdg cc from h.no.WZ-16A to WZ-76/1 Navyug Block and C-3 to C-36 in Vishnu Garden in C-107/WZ
155/15.09.08/EE(M)-II
M/s Pawan Kumar Garg
11 Dev of lane by pdg relaying Kota Stone from h.no.WZ-145 to WZ-42 in Ram Ngr.in C-107/WZ
153/15.09.08/EE(M)-II
M/s Anil Kumar Gupta
12 Dev of lane by pdg cc from h.no.Balaknath Mandir to III-B/14 and III-B/15 to III-B/7A in Vishnu Garden in C-107/WZ
148/15.08.08/EE(M)-II
M/s Rajan builders
13 Dev of lane by pdg relaying Kota Stone from WZ-70/A to WZ-15/A and N-15 to N-11 Navyug Block Vishnu Garden in C-107/WZ
145/15.09.08/EE(M)-II
M/s Harinder Singh
14 Dev of lane by pdg relaying Kota Stone from E-3 to E-16 in Vishnu Garden in C-107/WZ
154/15.09.08/EE(M)-II
M/s Rohit Const.
15 Dev of lane by pdg relaying Kota Stone from h.no.III-B/60 to III-B/75 and F-173 to F-179 Vishnu Garden in C-107/WZ
16 Dev of lane by pdg cc from h.no.283/30 to 283/21 in Vishnu Garden in C-108/WZ
215/13.10.08/EE(M)-II
M/s Sahil builders
17 Dev of lane by pdg cc from h.no.283/81 to B-19 in Vishnu Garden in C-108/WZ
198/13.10.08/EE(M)-II
M/s Rohit Const.
18 Dev of lane by pdg cc from h.no.283/267 to 283/276 gali no.8 in Vishnu arden in C-108/WZ
208/13.10.08/EE(M)-II
19 Dev of lane by pdg cc from h.no.B-1/184 to B-1/75 and B-1/83 to B-1/103 in Vishnu Garden in C-108/WZ
217/13.10.08/EE(M)-II
M/s Som & Sons
20 Dev of lane by pdg cc from Gurudwara Wali gali to III-B/143 in Vishnu Garden in C-107/WZ
211/13.10.08/EE(M)-II
M/s Prince Entp.
21 Dev of lane by pdg cc from h.no.III-A/53 to III-A/52 in Vishnu Garden in C-107/WZ
216/13.10.08/EE(M)-II
M/s Mukesh Kumar -II
22 Dev of lane by pdg cc from h.no.III-A/53 to III-A/7 in Vishnu Garden in C-108/WZ
199/13.10.08/EE(M)-II
M/s Harvinder Singh
23 Dev of lane by pdg relaying Kota Stone from F-137 to F-143 and F-240 to F-110 in Vishnu Garden in C-107/WZ
CIVIL M-II 04.09.08 28.08.09 454653
CIVIL M-II 04.09.08 28.08.09 382169 10.11.08 21.01.09 381327
CIVIL M-II 04.09.08 28.08.09 499648 24.10.08 10.12.08 497282
CIVIL M-II 04.09.08 28.08.09 387636 M/s A.K. Const. 21.10.08 24.02.09 387500
CIVIL M-II 04.09.08 28.08.09 496859 24.10.08 29.12.08 494242
CIVIL M-II 05.09.08 28.08.09 498598 06.04.09 P 496598
CIVIL M-II 05.09.08 28.08.09 301364 20.10.08 21.12.09 301364
CIVIL M-II 05.09.08 28.08.09 364195 24.10.08 12.01.08 363859
CIVIL M-II 05.09.08 28.08.09 372044 M/s Kushal Kr. 14.10.08 06.03.10 371414
CIVIL M-II 05.09.08 28.08.09 369372 25.10.08 25.05.10 369032
ELECT E-I 30.09.08 18.08.09 382589 31.01.09 16.11.09 370171
ELECT E-I 30.09.08 20.09.08 390402 M/s Ankur Ent. 16.02.10 28.04.10 366782
24 Dev of lane by pdg relaying Kota Stone from III-A-12/1 to III-A-11/7 to III-A-12/1 and III-A-8 in Vishnu Garden in C-108/WZ
25 Dev of lane by relaying kota Stone from h.no.283/285 to 283/88 gali no.7 in Vishnu Garden in C-108/WZ
214/13.10.08/EE(M)-II
M/s Ashok Bansal
26 Dev of lane by relaying kota Stone from h.no.283/124 to 283/138 gali no.7 in Vishnu Garden in C-108/WZ
197/13.10.08/EE(M)-II
M/s Umda Const Co.
27 Dev of lane by relaying kota Stone from h.no.283/351 to 283/267 gali no.11 in Vishnu Garden in C-108/WZ
201/13/.10.08/EE(M)-II
28 Dev of lane by relaying kota Stone from h.no.283/338 to 283/351 in Vishnu Garden in C-108/WZ
190/13.10.08/EE(M)-II
M/s Rajan builders
29 Dev of lane by relaying kota Stone from h.no.283/276 to B-1/103 gali no.9 in Vishnu Garden in C-108/WZ
204/13.10.08/EE(M)-II
M/s Vijay Kumar Jha
30 Dev of lane by pdg relaying kota Stone from h.no.283/16 to 283/27 in Vishnu Garden in C-108/WZ
210/13.10.0/EE(M)-II
M/s Ghanshyam Dass
31 Dev of lane by pdg cc from h.no.WZ-95 to WZ-217 Khyala Village in Vishnu Garden in C-108/WZ
218/13.10.08/EE(M)-II
M/s A.B. builders
32 Dev of lane by pdg cc from h.no.WZ-48/8A to WZ-83 Khyala Village in Vishnu Garden in C-108/WZ
200/13.10.0//EE(M)-II
33 Dev of lane by pdg cc from h.no.WZ-125 to WZ-125B Khyala Village in Vishnu Garden in C-108/WZ
222/13.10.08/EE(M)-II
M/s Geepee Const.
34 P/o SHM light at Subash nagar more near Police booth and Sr. Sec School Khayala no.1 in w.no. 108/WZ
361/28.01.09/EE(E)-III
M/s Paras Const.
35 P/o SHM light at park Chaukhandi near A-465/in w.no.107/WZ
402/09.02.09/EE(M)-III
Status Report of MLA,Sh.Mukesh SharmaAC No. 27,2008-09
S.No.
Name of Work deptt. Div. D.O.S D.O.C
CIVIL M-IV 20.06.08 26.05.08 499408 M/s Jatin Jaggi 03.08.08 P 486309
CIVIL M-IV 20.06.08 26.05.08 494138 08.08.08 10.09.08 493925
CIVIL M-IV 20.06.08 26.05.08 461034 03.08.08 20.11.08 460807
CIVIL M-IV 20.06.08 26.05.08 461690 M/s Chitter Mal 03.08.08 25.11.08 461528
CIVIL M-IV 20.06.08 26.05.08 498631 04.08.08 10.12.08 497797
CIVIL M-IV 20.06.08 26.05.08 497704 03.08.08 31.10.08 496683
CIVIL M-IV 23.07.08 26.05.08 424188 M/s Jatin Jaggi 03.08.08 01.11.08 423940
CIVIL M-IV 23.06.08 26.05.08 404475 03.08.08 23.10.08 404409
CIVIL M-IV 23.06.08 26.05.08 403872 04.08.08 05.01.09 402140
CIVIL M-IV 23.06.08 26.05.08 477377 24.09.08 28.01.09 477076
CIVIL M-IV 23.06.08 26.05.08 460679 03.08.08 19.11.08 460076
CIVIL M-IV 23.06.08 29.05.08 499403 03.08.08 23.01.09 499239
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Expenditure
1 Pdg RMC in lane from S-5A to S-1A in S-Block Parampuri C-127/WZ
135/25.07.08/EE(M)-IV
2 Pdg RMC in lane from S-7 to S-30 in S-Block Parampuri C-127/WZ
136/25.07.08/EE(M)-IV
M/s Parveen Kumar Garg
3 Pdg RMC and drainage system on both side from RZ-A1 to RZ-A151 in Prajapati Colony C-127/WZ
138/25.07.08/EE(M)-IV
M/s Neel Const & Co.
4 Pdg RMC and drainage system on both side from RZ-127 to RZ-88 in Santosh Park C-127/WZ
133/25.007.08/EE(M)-IV5 Pdg RMC and drainage system on both side from RZ-1 to
RZ-21 in Santosh Park C-127/WZ143/25.07.08/EE(M)-IV
M/s Prince Entp.
6 Pdg drainage system and cc from RZ-98 to G-56 in Panjabi Colony C-127/WZ
139/25.07.08/EE(M)-IV
M/s L. Gee Const.
7 Pdg drainage system on both side and RMC from RZA-59 to RZA-64 in Prajapati Colony C-127/WZ
137/25.07.09/EE(M)-IV
8 Pdg drainage system on both side and RMC from RZ-178 to A-300 in Prajapati Colony C-127/WZ
142/25.07.08/EE(M)-IV
M/s Parveen Kumar Garg
9 Pdg drainage system on both side and RMC from G-166 to RZB-23 in Prajapati Colony C-127/WZ
132/25.07.08/EE(M)-IV
M/s Aman Entp.
10 Pdg drainage system on both side and RMC from RZ-145 to RZ-160 in Prajapati Colony and RMC from RZ-106 to RZ-155 in Santosh Park C-127/WZ
126/25.07.08/EE(M)-IV
M/s Manish Nayar
11 Pdg drainage system on both side and RMC from RZ-139 to RZ-96 in Santosh Park C-127/WZ
140/25.07.08/EE(M)-IV
M/s Mukesh Kumar Const.
12 Pdg drainage system on both side and RMC from A-26 to A-14 in Subhash Park in C-127/WZ
130/25.07.08/EE(M)-IV
M/s Som Const.
CIVIL M-IV 23.06.08 29.05.08 496638 03.08.08 10.09.08 496616
CIVIL M-IV 23.06.08 29.05.08 498791 03.08.08 p 491852
CIVIL M-IV 23.06.08 29.05.08 196624 03.08.08 11.10.08 196624
CIVIL M-IV 23.06.08 29.05.08 439965 03.08.08 19.01.09 439405
17 CIVIL M-IV 23.06.08 29.05.08 199388 03.08.08 08.09.08 198015
CIVIL M-IV 23.06.08 26.05.08 495402 03.08.08 24.09.08 495383
CIVIL M-IV 23.07.08 19.05.08 494447 04.09.08 14.11.08 493798
CIVIL M-IV 23.07.08 19.05.08 431017 04.09.08 19.01.09 429889
CIVIL M-IV 23.06.08 19.05.08 493271 M/s Arujn Entp. 04.09.08 23.01.09 492858
CIVIL M-IV 23.07.08 19.05.08 493628 04.09.08 03.12.08 493557
CIVIL M-IV 23.07.08 19.05.08 496505 04.09.08 24.10.08 496500
CIVIL M-IV 23.07.08 19.05.08 493232 M/s Chitter Mal 04.09.08 28.11.08 493019
CIVIL M-IV 23.07.08 19.05.08 386851 04.09.08 30.10.08 386839
CIVIL M-IV 24.07.08 20.05.08 494760 04.09.08 p 481103
CIVIL M-IV 24.07.08 20.05.08 499820 04.09.08 p 486686
CIVIL M-IV 24.07.08 20.05.08 490141 04.09.08 22.10.08 490120
CIVIL M-IV 30.07.08 30.06.08 468982 04.09.09 23.10.08 468898
13 Pdg RMC in lane from S-23 to S-47 gali no.9 in Parampuri in c-127/WZ
131/25.07.08/EE(M)-IV
M/s Gupta Engg. & Const.
14 Pdg drainage system on both side and RMC from B-25 to B-37 in Subhash Park in C-127/WZ
127/25.07.08/EE(M)-IV
M/s L.Gee Const
15 Pdg RMC in lane from S-11 to S-16 gali no.3 in Parampuri in C-127/WZ
129/25.07.08/EE(M)-IV
M/s Harvinder Singh
16 Pdg drainage system on both side and RMC in lane gali no.8 from S-21 to S-32 in Parampuri in C-127/WZ
134/25.070.08/EE(M)-IV
M/s Manish Nayar
Pdg RMC in lane from S-9 to S-5 gali no.2 in Parampuri in C-127/WZ
128/25.07.08/EE(M)-IV
M/s Honey Const.
18 Pdg RMC in lane from S-34 to S-53 in S-Block in Parampuri in C-127/WZ
141/25.07.08/EE(M)-IV
M/s Gupta Engg. & Const.
19 Pdg RMC in lane from A-1 Sanjay Enclave to RZ-50 T-Extn.on Bindapur matiayala Road in C-127/WZ
285/26.08.08/EE(M)-IV
M/s Mahesh Const.
20 Dev of drainage system from RZ-27 Subhash Park Extn.-II to RZ-T-214 in T-Block Uttam Ngr.(both sides) on Bindapur to Matiayala Road in C-127/WZ
293/26.08.08/EE(M)-IV
M/s L.Gee Const
21 Pdg RMC in lane from U-121 Subhash Park to near T-28 Bindapur to Matiayala Road in C-127/WZ
284/26.08.08/EE(M)-IV
22 Dev of drainage system from S-156,Parampuri to RZ-14,Subhash Park Extn.-II(both side)on Bindapur to Matiayala Road in C-127/WZ
287/26.08.08/EE(M)-IV
M/s Sahil builders
23 Pdg RMC in lane from RZ-73-T Extn.U-12 Subhash Park on Bindapur to Matiayala Road in C-127/WZ
288/26.08.08/EE(M)-IV
M/s Gupta Engg. & Const.
24 Pdg RMC in lane from U-13 Subhash Park U-6 Subhash Park on Bindapur to Matiayala Road in C-127/WZ
289/26.08.08/EE(M)-IV
25 Pdg RMC on road from T-3 to T-12 in T-Block Sukar Bazar Uttam Ngr.C-127/WZ
295/26.08.08/EE(M)-IV
M/s Kushal Kumar Bhatia
26 Dev of U/R Colony in C-127/WZ SH: Pdg drasinage system on both side and cc from RZ-A74 to RZ-A133 in Prajapati Colony C-127/WZ
212/26.08..08/EE(M)-IV
M/s Amar Const.
27 Dev of U/R Colony in C-127/WZ SH: Pdg drasinage system on both side and RMC from RZ-A31 to RZ-A36 in Prajapati Colony C-127/WZ
291/26.08.08/EE(M)-IV
M/s Rajan builders
28 Dev of U/R Colony in C-127/WZ SH: Pdg drasinage system on both side and cc from RZ-A108 to RZ-A135 in Prajapati Colony C-127/WZ
290/26.08.08/EE(M)-IV
M/s Vijay Kumar Jha
29 Pdg RMC on road from B-45 to B-1/57 in Sewak Park in C-127/WZ
286/26.08.08/EE(M)-IV
M/s Rohit Const
CIVIL M-IV 30.07.08 30.06.08 274861 04.09.08 p 264860
P/F Streert Name Board in Uttam Ngr. C-127/WZ CIVIL M-IV 30.07.08 30.06.08 197536 29.08.08 28.10.08 197536
CIVIL M-IV 27.08.08 22.07.08 199190 M/s Chitter Mal 22.10.08 21.12.08 198685
CIVIL M-IV 28.08.08 22.07.08 199409 09.11.08 22.11.08 198154
CIVIL M-IV 05.09.08 22.07.08 484875 10.10.08 08.12.08 484591
CIVIL M-IV 05.09.08 22.07.08 498925 10.10.08 08.12.08 497417
CIVIL M-IV 05.09.08 22.07.08 350036 10.10.08 27.11.08 349842
CIVIL M-IV 05.09.08 22.07.08 498818 10.10.08 03.12.08 498522
CIVIL M-IV 05.09.08 22.07.08 499605 10.10.08 08.12.08 497417
CIVIL M-IV 05.09.08 22.07.08 478745 M/s Y.K. Sahni 10.10.08 16.01.09 478303
CIVIL M-IV 05.09.08 22.07.08 424491 M/s Y.K. Sahni 10.10.08 09.03.09 423471
CIVIL M-IV 05.09.08 22.07.08 499431 09.11.08 22.11.08 499059
CIVIL M-IV 05.09.08 22.07.08 499883 10.10.08 09.12.08 499470
CIVIL M-IV 05.09.08 22.07.08 318032 M/s Y.K. Sahni 10.10.08 04.12.08 317297
CIVIL M-IV 05.09.08 22.07.08 354415 10.10.08 08.12.08 353487
CIVIL M-IV 05.09.08 22.07.08 499106 10.10.08 10.12.08 498904
30 Pdg RMC on road from Durga MAndir to C-5 in Sewak Park in C-127/WZ
294/26.08.08/EE(M)-IV
M/s Gupta Engg. & Const.
31 186/26.08.08/EE(M)-IV
M/s Manish Nayar
32 Dev of lane by pdg RMC from RZ-135 to RZ-142 in Manas Kunj in C-128/WZ
386/13.10.08/EE(M)-IV
33 Dev of lane by pdg RMC from A-106 to A-111 Nand Ram Park n C-128/WZ
385/13.10.08/EE(M)-IV
M/s Manish Nayar
34 Dev of lane by pdg RMC from h.no.RZ-81 to RZ-87,RZ-89 to RZ-96 and RZ-134 to RZ-128 Manas Kunj in C-128/WZ
358/01.10.08/EE(M)-IV
M/s Bhutani Entp.
35 Dev of lane by pdg RMC from h.no.RZ-116 to RZ-80 and RZ-81 to RZ-87 in Manas Kunj C-128/WZ
346/01.10.08/EE(M)-IV
M/s Harinder Singh
36 Dev of lane by pdg RMC from N-66 to N-56 in Vijay Vihar in C-128/WZ
347/01.10.08/EE(M)-IV
M/s Pawan Kumar Garg
37 Dev to road by Pdg RMC from h.no.RZ-6 to RZ-92 in Rajapuri Road in Manav Kunj in C-128/WZ
350/01.10.08/EE(M)-IV
M/s Neel Traders
38 Dev to road by pdg RMC from h.no.RZ-50 to RZ-36 in New Uttam Ngr.in C-128/WZ
353/01.10.08/EE(M)-IV
M/s Balaji Const.
39 Dev of lane by pdg RMC from h.no.RZ-69 to RZ-82 and RZ-68 to RZ-64 in New Uttam Ngr.C-128/WZ
352/01.10.08/EE(M)-IV
40 Dev of lane by pdg RMC from h.no.RZ-16 to RZ-28 and RZ-16 to RZ-13 in New Uttam Ngr.in C-128/WZ
359/01.10.08/EE(M)-IV
41 Dev of lane by pdg RMC from h.no.RZ-17 to RZ-19,RZ-28 to RZ-26 and RZ-1 to RZ-6 in New Uttam Ngr.in C-128/WZ
345/01.10.08/EE(M)-IV
M/s Harinder Singh
42 Dev of road by pdg RMC from h.no.RZ-13 to RZ-69 in Rajapuri Road in New Uttam Ngr.in C-128/WZ
351/01.10.08/EE(M)-IV
M/s Honey Const.
43 Dev of road by pdg RMC from h.no.RZ-93A to RZ-98 in New Uttam Ngr.in C-128/WZ
354/01.10.08/EE(M)-IV
44 Dev of lane by pdg RMC from h.no.RZ-84 to RZ-92 and RZ-83 to RZ-85 in New Uttam Ngr.in C-128/WZ
348/01.10.08/EE(M)-IV
M/s Aman builders
45 Dev of road by pdg RMC from h.no.RZ-83 to RZ-92 in New Uttam Ngr.in C-128/WZ
349/01.10.08/EE(M)-IV
M/s G.Pee Const
Status Report of MLA,Sh Ranbir KharbAC No. 28,2008-09
S.No.
Name of Work deptt. Div. D.O.S D.O.C
CIVIL M-I 16.07.08 23.06.08 498100 M/s M.K Anand 27.08.08 25.10.08 498100
CIVIL M-I 16.07.08 23.06.08 496300 M/s M.K Anand 28.08.08 24.10.08 498248
CIVIL M-I 16.07.08 23.06.08 498200 27.08.08 02.12.08 498200
CIVIL M-I 16.07.08 23.06.08 199000 22.08.08 18.11.08 198983
CIVIL M-I 16.07.08 23.06.08 219700 29.08.08 18.10.08 219700
P/L RMC from park to Vishnu Textile in Nejafgarh in C-138 CIVIL M-I 16.07.08 23.06.08 497300 20.02.09 27.03.09 135858
CIVIL M-I 16.07.08 23.06.08 198300 26.08.08 10.10.08 198364
CIVIL M-I 16.07.08 23.06.08 198400 15.09.08 22.11.08 198336
CIVIL M-I 16.07.08 23.06.08 198400 10.10.08 02.12.08 198670
CIVIL M-I 16.07.08 23.06.08 198700 26.08.08 24.11.08 198866
CIVIL M-I 16.07.08 23.06.08 199000 12.09.08 18.12.08 498195
CIVIL M-I 16.07.08 23.06.08 498300 27.08.08 21.10.08 198995
CIVIL M-I 16.07.08 23.06.08 199000 M/s A.R. & Co. 22.08.08 29.10.08 199000
CIVIL M-I 16.07.08 23.06.08 199000 05.09.08 30.10.08 199000
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Expenditure
1 P/L RMC and drain from h.no.27A to 2A and Laxmi Narayan Wali gali in Dharampura in C-138
606/01.09.08/EE(M)-I
2 P/L RMC and drain from h.no.96A to 113/1A and 18A/2 Nand Vihar house in Dharampura in C-138
550/21.08.08/EE(M)-I
3 Pdg cc and drain from house of Arora Departmental Store to V.P.Jain in Dharampura in C-138
588/26.08.08/EE(M)-I
M/s Nishant Const Co.
4 P/L RMC and drain from h.no.32A to Malik Bhawan in Dharampura in C-138
490/19.08.08/EE(M)-I
M/s Ohlan Entp.
5 P/L cc in lane from Sai Coaching Center to Ali gali in Dharampura in C-138
547/21.08.08/EE(M)-I
M/s Jai Dada Bhalla Const Co.
6 517/20.08.08/EE(M)-I
M/s Sachin Kumar Gupta
7 P/L Kota Stone from Geeta Bhawan to Dinesh House in Kamla Park in C-138
1585/17.02.09/EE(M)-I
M/s Sunder Lal & co.
8 P/L RMC from M-10 to Ram kumar House in Dharampura in C-138
499/19.08.08/EE(M)-I
M/s Shokeen Entp.
9 P/L RMC in lane from h.no.26A to Sidharth Diparumental Store in Dharampura in C-138
657/12.09.08/EE(M)-I
M/s Marshal Const Co.
10 P/L cc from Khajan house to Vashist house and h.no. 98 to PP no.414 in Dharampura in C-138
849/06.10.08/EE(M)-I
M/s Rajeev Const Co.
11 P/L cc from Dinesh house to J.N.Sexena house in Dharampura and Rajesh house to hari Singh house in Dharampura in C-138
492/19.08.08/EE(M)-I
M/s Sushil Bansal
12 P/L RMC and laying from jain house to Mahavir house in Naya Bazar in C-138
637/11.09.08/EE(M)-I
M/s Rajeev Kumar
13 P/L RMC and drain from Harish Tent house to End of lane in Muqsudabad in C-138
532/20.08.08/EE(M)-I
14 P/L cc from h.no.1506/18C to 1506/4 in Maqsudabad in C-138
497/19.08.08/EE(M)-I
M/s Sehrawat Const Co.
P/L cc from Bala houst to Amit Niwas in C-138 CIVIL M-I 16.07.08 23.06.08 199000 23.08.08 18.10.08 219454
CIVIL M-I 16.07.08 23.06.08 219500 28.08.08 31.10.08 495729
P/L RMC from B.S.Girdhar in Najafgarh in C-138 CIVIL M-I 16.07.08 23.06.08 199000 22.08.08 31.10.08 198334
CIVIL M-I 16.07.08 23.06.08 198800 04.10.08 26.11.08 198737
CIVIL M-I 16.07.08 23.06.08 499300 M/s Jain Entp. 23.08.08 22.10.08 498562
CIVIL M-I 16.07.08 23.06.08 199000 20.08.08 24.11.08 199000
CIVIL M-I 16.07.08 23.06.08 198400 23.08.08 30.10.08 198368
CIVIL M-I 16.07.08 23.06.08 199000 M/s M.K Anand 27.08.08 25.10.08 198743
CIVIL M-I 16.07.08 23.06.08 199000 22.08.08 24.10.08 198958
CIVIL M-I 16.07.08 23.06.08 382600 26.08.08 26.09.08 382189
CIVIL M-I 16.07.08 23.06.08 487100 18.02.09 25.03.09 486461
CIVIL M-I 16.07.08 23.06.08 449600 M/s Ravi Kant 28.08.08 21.10.08 449310
CIVIL M-I 16.07.08 23.06.08 309500 10.09.08 10.12.08 399794
CIVIL M-I 16.07.08 23.06.08 451600 25.08.08 04.11.08 451543
CIVIL M-I 16.07.08 23.06.08 198900 25.08.08 21.10.08 198871
CIVIL M-I 17.07.08 09.07.08 499700 29.08.08 30.10.08 497520
CIVIL M-I 17.07.08 09.07.08 499900 24.08.08 16.09.08 499471
CIVIL M-I 17.07.08 09.07.08 464600 22.08.08 17.09.08 464039
15 609/01.09.08/EE(M)-I
M/s Puneet Const Co.
16 P/L RMC from Radhey Cycle Shop to Kaushik Photo Shop in Najafgarh in C-138
515/20.08.08/EE(M)-I
M/s Ram Chander Dingon
17 501/19.08.08/EE(M)-I
M/s Ajay Kumar & Co.
18 P/L cc from Sant Bhawan to internal Kafe in Najafgarh in C-138
810/03.10.08/EE(M)-I
M/s Jain Const Co.
19 P/L RMC from Prakash Electricals to B.B.Jewellers in Najafgarh in C-138
545/21.08.08/EE(M)-I
20 P/L RMC from Sheetal Jewellers to Nishant Jewellers in Najafgarh in C-138
495/19.08.08/EE(M)-I
M/s Hardwari Lal Gupta
21 P/L RMC from Anil house to Balbir house and side lane in Najafgarh in C-138
537/28.08.08/EE(M)-i
M/s Md. Cash & Co./
22 P/L RMC from Om Prakash house to Prem Gupta house in Najafgarh in C-138
496/19.08.08/EE(M)-i
23 P/L RMC from Lalit house to Atul house and Shiv house to Manoj house in Najafgarh in C-138
521/20.08.08/EE(M)-I
M/s Shri Ram Const Co.
24 P/L RMC and drain from Daya house to h.no.38 in Gopal Ngr. in C-139
485/19.08.08/EE(M)-I
M/s Rana Const co.
25 P/L RMC in lane from RZ-8 to D-37 and Komal Balika to End of Lane in Gopal Ngr. in C-139
1584/17.02.09/EE(M)-I
M/s Sachin Kumar Gupta
26 P/L RMC and drain from h.no.31A/15D to PP 1794 and backlane in Gopal Ngr.in C-139
585/26.08.08/EE(M)-I
27 P/L RMC and drain from h.no.30D to National Open School Daya in Gopal Ngr. in C-139
616/03.09.08/EE(M)-I
M/s Hardwari Lal Gupta
28 P/L RMC and drain from D-26 to Mukesh Electronic in Gopal Ngr.in C-139
528/20.08.08/EE(M)-I
M/s Dabas Const Co.
29 P/L RMC from h.no.14A to RZ-24/D-14 and milan Photo Shop to End of lane and Amba Mata Wali gali in C-139
498/19.08.08/EE(M)-I
M/s Jai Dada Bhalla Const Co.
30 Dev of lane by pdg mettling and RMC and const.of drain from Mehtab Singh house to Om Prakash house in Samaspur in C-140/NGZ
526/20.08.08/EE(M)-I
M/s Ashok Kumar
31 Dev of lane by pdg mettling and RMC from main road to Harujan Chaupal in Village Samaspur in C-140/NGZ
514/20.08.08/EE(M)-I
M/s Dev Const Co.
32 Dev of lane by pdg RMC from Ram Singh house to Om Prakash house in Village Samaspur in C-140/NGZ
543/21.09.08/EE(M)-I
M/s Flushwal& Co.
CIVIL M-I 17.07.08 09.07.08 428200 23.09.08 26.02.09 427524
CIVIL M-I 17.07.08 09.07.08 431900 M/s jain Entp. 29.08.08 13.10.08 431282
CIVIL M-I 17.07.08 09.07.08 495900 28.08.08 04.10.08 494053
CIVIL M-I 17.07.08 09.07.08 412500 29.08.08 27.11.08 411900
CIVIL M-I 17.07.08 09.07.08 488900 29.08.08 28.11.08 487973
CIVIL M-I 17.07.08 09.07.08 368200 14.10.08 28.03.09 367665
CIVIL M-I 17.07.08 09.07.08 498500 27.08.08 19.11.08 497844
CIVIL M-I 17.07.08 09.07.08 498500 29.08.08 01.10.08 497214
CIVIL M-I 17.07.08 09.07.08 488900 27.08.08 24.09.08 487474
CIVIL M-I 17.07.08 09.07.08 499000 27.08.08 23.10.08 498412
CIVIL M-I 27.08.08 09.07.08 499500 13.10.08 30.06.09 499643
CIVIL M-I 27.08.08 09.07.08 491900 07.11.08 07.01.09 491063
CIVIL M-I 27.08.08 09.07.08 486500 04.10.08 21.10.08 486443
CIVIL M-I 27.08.08 19.08.08 418300 05.10.08 10.11.08 418239
CIVIL M-I 27.08.08 19.08.08 403800 16.10.08 15.12.08 402609
33 Dev of lane by pdg mettling and premixing from Community Center to Satish house in Village Samaspur in C-140/NGZ
668/03.09.08/EE(M)-I
M/s Nirban Const Co.
34 Dev of lane by pdg mettling and RMC from Suraje house to Satish house in Village Samaspur in C-140/NGZ
542/21.08.08/EE(M)-I
35 Dev of lane by pdg mettling and RMC and raising of drain from Kitab Singh house to Raj Pal house and upto Ashok house in Village Samaspur in C-140/NGZ
538/21.08.08/EE(M)-I
M/s Shri Ram Const Co.
36 Dev of lane by pdg mettling and premixing from Om Prakash house to Randhir house in Village Samaspur in C-140/NGZ
527/20.08.08/EE(M)-I
M/s B.P. Dabas & Co.
37 Dev of lane by pdg mettling and RMC and const.of drain from Anoop house to Ranbir house in Village Samaspur in C-140/NGZ
541/21.08.08/EE(M)-I
M/s Kiara Intl. Ser.
38 Dev of lane by pdg mettling and RMC and const.of drain from Rattan(Villo)house to Sahib Singh house in Village Samaspur in C-140/NGZ
540/21.08.08/EE(M)-I
M/s Marshal Const Co.
39 Dev of lane by pdg RMC from Panchayat Ghair to Chobdar house in Village Samaspur in C-140/NGZ
516/20.08.08/EE(M)-I
M/s P.K. Solanki
40 Dev of lane by pdg RMC from Ram Chander house to Mahabir house in Village Samaspur in C-140/NGZ
539/21.08.08/EE(M)-I
M/s Harish Kumar
41 Dev of lane by pdg RMC and drain from Mandir to Panchayat Ghair in Village Samaspur in C-140/NGZ
535/20.08.08/EE(M)-I
M/s Dada Dev Const.
42 Dev of lane by P/L RMC and drain from Sadhu Ram and Chaupal upto Pappu pandit house in Samaspur Village in C-140/NGZ
529/20.08.08/EE(M)-I
M/s Dabas builders
43 Dev of road by MP and drain from Transfarmer to infront of Plot 331 in Nangloi Sakrawati in C-134
832/06.10.08/EE(M)-I
M/s P.K. Solanki
44 Dev of lane by pdg M/P and drain from Sultan Numbardar to Tehlan Niwas in Nangloi Sakrawati in C-134/NGZ
1084/05.11.08/EE(M)-I
M/s Parked Const Co.
45 Dev of lane by RMC from h.no.86 to Ravinder hs to Suresh hs to Phirni in Ghosipura in C-134/NGZ
797/03.10.08/EE(M)-I
M/s Shokhanda builders
46 Dev of lane by pdg RMC and drain from Shiv Shakti Medical Store to Khushi Ram hs in Deenpur Village in C-134/NGZ
780/03.10.08/EE(M)-I
M/s Dada Dev Const.
47 Dev of lane by pdg cc from Bhoop Singh hs to Zile Singh hs in Village Deenpur in C-134/NGZ
856/07.10.08/EE(M)-I
M/s Sanjay Const co.
CIVIL M-I 27.08.08 19.08.08 431600 08.10.08 31.10.08 431583
CIVIL M-I 27.08.08 19.08.08 417900 07.10.08 30.10.08 417622
CIVIL M-I 04.09.08 04.09.08 249600 30.10.08 19.11.08 248600
48 Dev of lane by pdg RMC and drain from Raj Kumar hs to Narendar hs in Kharkri Nahar in C-134/NGZ
827/06.10.08/EE(M)-I
M/s Paradise Entp.
49 Dev of lane by pdg RMC and drain from Ram Kishan hs to Dispencary in Nangli Sakrawati in C-134/NGZ
800/03.10.08/EE(M)-I
M/s Ajay Kumar & Co.
50 P/L RMC from Shyam General Store to Shiv Mandir Road in New Roshan Pura Village in C-137/NGZ
969/21.10.08/EE(M)-I
M/s Paradise Entp.
Status Report of MLA,Sh. Mahabal MishraAC No. 29,2008-09
S.No.
Name of Work deptt. Div. D.O.S D.O.C
CIVIL M-II 17.06.08 28.05.08 464457 12.08.08 30.10.08 464199
CIVIL M-II 17.06.08 28.05.08 473804 26.07.08 25.10.08 472186
CIVIL M-II 17.06.08 28.05.08 189538 31/17/07/08 26.07.08 25.09.08 189538
CIVIL M-II 17.06.08 28.05.08 189538 11.08.08 25.11.08 189534
CIVIL M-I 17.06.08 28.05.08 360047 30.07.08 21.11.08 359980
CIVIL M-II 19.06.08 12.05.08 499875 02.08.08 23.10.08 499875
CIVIL M-II 19.06.08 12.05.08 493650 31.07.08 10.10.08 489750
CIVIL M-II 19.06.08 12.05.08 481900 01.08.08 27.10.08 481888
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Expenditure
1 Dev of Palam Dabri road from Mandir to Megic Auto in palam Dabri road in C-129/NGZ
198/28/07/07M-II
M/s Nikhil Enterprises
2 Dev of Palam Dabri road from Nasirpur turning point to Mandir in Palam Dabri road in C-129/NGZ
92/17/7/07 M-II
M/s Jai Dadu Budha Const co
3 Dev of road by pdg m/p on Palam Dabri road infront of Desu Sub Station in C-129/NGZ
M/s Tanya Const Co
4 Dev of road by m/p on Palam Dabri road infront of Relaince Fresh in C-129/NGZ
197/28/07/08 M-II
M/s Sachin Kumar Gupta
5 Pdg RMC from Sakuntla Nursing house to Nallah in gali no.2 in Vashist in C-129/NGZ
107/21/07/000008 M-I
M/s Vikaram Asso.
6 P/L RMC and drain in lane from RZ-20C/1 to RZ-20D/3A,RZ-20C/5A to RZ-20C/6,C/4(RZ-55)and RZ-20C/5F/1 ro RZ-20D/1 to RZ-20C/5B(RZ-44)in C-131/NGZ
110/21/07/000008 M-II
M/s Sanjay Const
7 P/L RMC and drain in lane from RZ-30 to RZ-32,RZ-32C to RZ-59 and RZ-29/1 to RZ-54C in Kamal Park in C-131/NGZ
120/21/07/08 M-II
M/s Ajay Kumar and Co
8 P/L RMC and drain in lane from RZ-88C to RZ-43C,RZ-35C to RZ-48C and RZ-55C to RZ-29C in Kamal Park in C-131/NGZ
112/21/07/08 M-II
M/s Ashok Kumar
CIVIL M-II 19.06.08 12.05.08 434800 24.07.08 18.10.08 434762
CIVIL M-II 19.06.08 12.05.08 468000 31.07.08 13.10.08 467954
CIVIL M-II 19.06.08 12.05.08 456600 M/s Sukhwah 23.07.08 24.09.08 456291
CIVIL M-II 19.06.08 12.05.08 472500 05.08.08 23.08.08 472488
CIVIL M-II 19.06.08 12.05.08 472500 23.07.08 30/096/08 472488
CIVIL M-II 19.06.08 12.05.08 472500 04.08.08 25.11.08 472158
CIVIL M-II 19.06.08 12.05.08 499850 06.08.08 17.12.08 499819
CIVIL M-II 19.06.08 12.05.08 499300 23.07.08 29.08.08 499140
CIVIL M-II 19.06.08 12.05.08 499700 05.08.08 10.09.08 499429
CIVIL M-II 19.06.08 12.05.08 490820 22.07.08 15.10.08 490820
CIVIL M-II 19.06.08 12.05.08 498900 22.07.08 15.10.08 498900
CIVIL M-II 20.06.08 12.05.08 356123 01.08.08 22.09.08 355998
CIVIL M-II 23.06.08 12.05.08 360000 08.08.08 03.11.08 359969
CIVIL M-II 23.06.08 12.05.08 350000 10.08.08 02.08.08 349972
CIVIL M-II 23.06.08 12.05.08 400053 08.08.08 23.10.08 399973
CIVIL M-II 23.06.08 12.05.08 440058 08.08.08 07.11.08 439976
CIVIL M-II 23.06.08 15.05.08 498200 20.08.08 07.11.08 498199
9 P/L RMC and drain in lane from RZ-98C to RZ-80/3 and RZ-78C to RZ-81C in Kamal Park in C-131/NGZ
108/21/07/08M-II
M/s Sonu Const Co
10 P/L RMC and drain in lane from RZ-47 to RZ-C-80/2,RZ-47 to RZ-55 and RZ-K-46 to RZ-K-48C in Kamal Park in C-131/NGZ
118/21/07/08 M-II
M/s Manghal Const Co
11 P/L RMC and S.W.drain in lane from RZ-81C to RZ-28C in Kamal Park in C-131/NGZ
106/21/07/08 M-II
12 P/L RMC and S.W.drain in lane from RZ-30 to RZ-15A in Kamal Park in C-131/NGZ
115/21/07/08
M/s YuvrajConst
13 P/L RMC and drain in lane from RZ-28C to RZ-29C in Kamal Park in C-131/NGZ
116/21/07/08 M-II
M/s J.K. Const Co
14 P/L RMC and drain in lane from RZ-K-1 to RZ-80/1 in Kamal Park in C-131/NGZ
117/21/07/08 M-Ii
M/s Dabuash Cont Co
15 P/L RMC and drain in lane from RZ-30 to RZ-16B,RZ-49C to RZ-15A and RZ-32C to RZ-53C in Kamal Park in C-131/NGZ
111/21/07/08 M-II
M/s Amar Const Co
16 P/L RMC and drain in lane from RZ-634 to RZ-18 and RZ-16 to RZ-605 in main Sagarpur in C-131/NGZ
119/21/07/08 M-II
M/s Rana Const Co
17 P/L RMC and drain in lane from RZ-20C to RZ-16,RZ-66A to RZ-72C and RZ-K-104 to RZ-K-70 in Kamal Park in C-131/NGZ
109/21/07/8 M-II
M/s Kikhil Enterp.
18 P/L RMC and drain in lane from RZ-121A to RZ-123/313 in Geetanjali Park in C-131/NGZ
114/21/07/08M-II
M/s Harish Kumar
19 P/L RMC and drain in lane from RZ-617 to RZ-623,Mahavir wali gali in main Sagarpur in C-131/NGZ
113/21/07/08
M/s Paradise Enterprises
20 Pdg drainage system from h.no.A3/100 to A3/133 and 132 to 126 and RZ-3/122 to 3/20 and A3/105 to 108 and 103A to 103/3D in C-129/NGZ
144/23/07/08 M-II
M/s Dabas Builder
21 P/L RMC from Nallah tob RZ-158 in Raghu Ngr.in C-129/NGZ
210/30/07/08
M/s Sunil Tandar
22 Pdg RMC from main road Nasirpur to RZ-172/12 in Durga Park in C-129/NGZ
208/30/0708/
M/s Ohfan Enterp
23 Pdg RMC fromk house of Surinder Tanwar to RZ-184 in Durga park in C-129/NGZ
209/30/07/08
M/s Parvesh Const Co
24 Pdg RMC from RZ-43 to Nallah in Durga park in C-129/NGZ
211/30/07/08 M-Ii
M/s Harish Kumar
25 P/L RMC and drain in lane from h.no.RZ-44A to RZ-44D/1022 in main Sagarpur in C-131/NGZ
202/30/07/08 M-II
M/s Kocishnu Builder
CIVIL M-II 23.06.08 15.05.08 499960 11.08.08 30.10.08 499960
CIVIL M-II 23.06.08 15.05.08 499000 12.08.08 07.11.08 498668
CIVIL M-II 23.06.08 15.05.08 494650 01.08.08 05.09.08 494556
CIVIL M-II 29.07.08 10.07.08 195700 10.12.08 28.02.09 184275
CIVIL M-II 29.07.08 10.07.08 199700 02.12.08 23.12.08 157655
CIVIL 29.07.08 10.07.08 498900 27.12.08 05.12.05 431466
CIVIL 29.07.08 10.07.08 498000 02.12.08 20.12.08 408550
C/O B/Wall in Manglapuri Kabristan at C-130/NGZ CIVIL M-II 29.07.08 10.07.08 498400 M/s Sehnuwat 24.10.08 12.02.08 474320
CIVIL M-II 12.08.08 27.05.08 294700 11.09.08 29.09.08 293958
CIVIL M-II 12.08.08 27.05.08 197600
CIVIL M-II 18.08.08 18.08.08 313500 13.09.08 21.11.08 313451
CIVIL M-II 18.08.08 18.08.08 481700 15.09.08 10.12.08 481700
CIVIL M-II 18.08.08 18.08.08 499000 19.09.08 29.05.08 498937
CIVIL M-II 18.08.08 18.08.08 451000 13.09.08 03.12.08 450706
CIVIL M-II 18.08.08 18.08.08 443000 02.09.08 15.10.08 442716
CIVIL M-II 18.08.08 18.08.08 487000 02.09.08 15.10.08 487000
CIVIL M-II 18.08.08 18.08.08 488900 03.09.08 05.01.08 488699
26 P/L RMC and drain in lane from h.no.RZ-91A to RZ-17/59 in East Sagarpur in C-131/NGZ
205/30/07/08 M-Ii
M/s J.K. Const Co
27 P/L RMC and drain in lane from h.no.9M to RZ-122 in Sagarpur in C-131/NGZ
203/30/07/08 M-II
M/s Amot & Bross Const Co
28 P/L RMC and drain in lane from h.no.RZ-44A/1A to(1006)RZ-1076 in Sagarpur in C-131/NGZ
200/ 30/07/08
M/s Dev Const co
29 Dev of side berms from DDA Office to Solanki Chowk along Manglapuri Sagarpur road in C-130/NGZ
124/01/12/08 M-Ii
M/s Aarkay Engg.
30 Raising of mainholes cover and from Raghu Ngr.and Durga Park along in C-129/NGZ
121/01/12/08 M-Ii
M/s Satish Kumar & Co
31 Dev of damaged road surface by pdg M/P from gali no.3 main Sagarpur to gali no.6 main Sagarpur on main road C-131/NGZ
EE(Pr.)
137/23/12/08 Project
M/s Aarkay Engg.
32 C/O drain and pdg RMC from J.R.Public School to gali no.9 Madanpuri in West Sagarpur in C-132
EE(Pr.)
119/1/12/08 Project
M/s Neering Builder
33 257/29/08/08 M-II
34 Dev of lane by pdg M/P from Nallah to shop to Bata in C-129/NGZ
261/01/09/08 M-II
M/s Ohfan Enterp
35 Dev of drainage system from 25C to culvert in Durga Park in C-129/NGZ
36 P/l RMC and drain in lane from RZ-56 to RZ-64 in Hans park in C-131/NGZ
288/02/09/08 M-Ii
M/s A.K. Builder
37 P/l RMC and drain in lane from RZ-56 to RZ-64 in Hasn park in C-131/NGZ
289/02/09/08 M-II
M/s Dagur and Sons const Co
38 P/l RMC and drain in lane from RZ-37 to RZ-23 Hans park in C-131
287/02/09/08 M-II
M/s Solanki Bros.
39 P/l RMC and drain in lane from RZ-38 to RZ-22 Hans park in C-131
276/01/09/08 M-II
M/s Rajiv Kumar
40 P/l RMC and drain in lane from RZ-13 to RZ-22 Geetanjali park (near Babu Balak) Nath Mandir in C-131
281/01/09/08 M-II
M/s Mohini Consts & Co
41 P/l RMC and drain in lane from RZ-15 to RZ-23A and RZ-23 A to RZ-16 in Geetanjali park (near Babu Balak) Nath Mandir in C-131
278/01/09/08 M-II
M/s Sada Ram Yadav
42 P/l RMC and drain in lane from RZ-132 to RZ-128 and RZ-127/4 to RZ-128 in East Sagarpur in C-131
280/01/09/08 M-II
M/s Jai Dadu Budha Const co
CIVIL M-II 18.08.08 18.08.08 471700 03.09.08 21.11.08 471272
CIVIL M-II 18.08.08 18.08.08 498000 M/s A.R.M Co 15.09.08 25.11.08 498000
CIVIL M-II 18.08.08 18.08.08 499900 15.09.08 29.11.08 499900
CIVIL M-II 18.08.08 18.08.08 499000 13.09.08 01.12.08 499000
CIVIL M-II 18.08.08 18.08.08 378000 17.10.08 26.04.09 377791
CIVIL M-II 18.08.08 18.08.08 441000 05.10.08 25.11.08 440805
CIVIL M-II 18.08.08 18.08.08 432800 13.09.08 25.11.08 432510
CIVIL M-II 18.08.08 18.08.08 325300 16.09.08 26.11.08 325187
CIVIL M-II 18.08.08 18.08.08 413000 02.09.08 15.10.08 413000
CIVIL M-II 18.08.08 18.08.08 448000 03.09.08 31.10.08 448000
CIVIL M-II 18.08.08 18.08.08 497600 01.01.08 20.01.09 497082
CIVIL M-II 18.08.08 18.08.08 252700 02.09.08 15.10.08 252499
CIVIL M-II 30.09.08 22.09.08 498500 08.01.08 04.04.09 498363
CIVIL M-II 30.09.08 22.09.08 475900 M/s M.K. Arorra 02.01.09 07.03.09 475892
P/l RMC in from RZ-56 to 63 in Raghu nagar in C-129 NGZ CIVIL M-II 30.09.08 22.09.08 300000 30.12.09 07.08.09 299761
CIVIL M-II 30.09.08 22.09.08 399300 08.01.09 13.02.09 399187
CIVIL M-II 08.10.08 10.09.08 481200
43 P/l RMC and drain in lane from RZ-117/79 to RZ-29A/79 to RZ-55/79 to 77A in East Sagarpur in C-131
285/01/09/08 M-II
M/s Nikhal Enterp
44 P/l RMC and drain in lane from RZ-127 to RZ-62/10 to RZ-73 to 126 in East Sagarpur in C-131
290/ 02/09/08 M_II
45 P/l RMC and drain in lane from RZ-262/60 to RZ-129/60 in East Sagarpur in C-131
295/2/09/08 M-II
M/s Vijay Singh & Co
46 P/l RMC and drain in lane from RZ-129 to RZ-132/60 in East Sagarpur in C-131
296/02/09/08 M-II
M/s V.K. Chrudhery
47 P/l RMC and drain in lane in gali no. 5AC back lane of gali no. 5 in East Sagarpur in C-131
291/02/09/08 M-II
M/s Solanki Bros.
48 P/l RMC and drain in gali no.6 back lane of gali no.6 in East Sagarpur in C-131
283/01/09/08 M-II
M/s D.S Kharab
49 P/l RMC and drain in gali no.7 back lane of gali no.7 in East Sagarpur in C-131
292/02/09/08 M-II
M/s Vikram Asso
50 P/l RMC and drain in lane from RZ-119/59 to RZ-90 in East Sagarpur in C-131
293/02/9/08M-II
M/s Dabash Const co
51 P/l RMC and drain in lane from RZ-25(404-405) to RZ-20P in East Sagarpur in C-131
277/01/09/08 M-II
M/sBaba Builder
52 P/l RMC and drain in lane from RZ-6/404 to RZ-20/2 and RZ-11A to RZ-120B in East Sagarpur and RZ-34E/1 to RZ-21 in main Sagarpur in C-131
294/02/09/8 M-II
M/s Rakesh Const & Co
53 P/l RMC and drain in lane from WZ-405A to WZ-386 in Sadhnagar in C-146
393/22/12/08 M-II
M/s Rajesh kumar
54 P/l RMC and drain in lane from RZ-46A/15D to RZ-46A/15E in main Sagarpur in C-131 in Nagi house in NGZ
284/01/09/08
M/s Sunny Consts
55 P/l RMC from Shri. Ram Hospital to RZ-56A in Raghu nagar in C-129 NGZ
438/30/12/08 M-II
M/s Rakesh Const & Co
56 P/l RMC in lane from house of Sheela to main road Sagarpur in mehar nagar in C-129 NGZ
435/ 30/12/08 M-II
57 436/ 30/12/08 M-II
M/s H.B.Sharma
58 P/l RMC in from RZ-14 to Pankha road and RZ-48 to RZ-49C in Basant park in C-129 NGZ
437/30/07/08 M-II
M/s Ved Const & Co
59 Dev of side berms from Bikaner Sweets to govt. dispensary near mangol puri chowk in C-130 NGZ
Status Report of MLA,Sh.Dharam Dev SolankiAC No. 30,2008-09
S.No.
Name of Work deptt. Div. D.O.S D.O.C
CIVIL M-I 18.06.08 16.05.08 473000 11.07.08 16.10.08 473000
CIVIL M-I 18.06.08 16.05.08 473000 12.06.09 P 460108
CIVIL M-I 18.06.08 16.05.08 469000 21.07.08 31.12.08 468998
CIVIL M-I 18.06.08 16.05.08 475000 16.07.08 15.09.08 475700
CIVIL M-I 18.06.08 16.05.08 472000 18.07.08 14.04.09 471918
CIVIL M-I 18.06.08 16.05.08 472000 22.01.01 16.09.09 471018
CIVIL M-I 18.06.08 16.05.08 474000 18/07/08 23.08.08 474000
CIVIL M-I 18.06.08 16.05.08 475000 25.07.08 10.10.08 474976
CIVIL M-I 18.06.08 16.05.08 470000 15.07.08 17.12.08 470000
P/O semi high mast light at Goala Vill. chowk under NZ ELECT E-I 20.06.08 24.05.08 234302 10.09.08 12.11.08 194216
P/O semi high mast light at Tajpur Vill. under NZ ELECT E-I 20.06.08 24.05.08 234302 12.09.08 13.10.08 200846
P/O street light at Tajpur Vill.under NZ ELECT E-I 20.06.08 24.05.08 507476 11.09.08 10.10.08 504279
P/O street light in Goela Vill.under NZ ELECT E-I 20.06.08 24.05.08 538018 20.08.08 18.11.08 537582
CIVIL M-I 10.07.08 24.05.08 490000 01.10.08 17.12.08 466477
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Expenditure
1 Pdg RMC and drain from h.no.659 to 663 and 644,663 and 644 to 641 and 600 to 611 in Kakrola housing Complex W.no.135/NZ
240/10/07/08
M/s Aweti Builder
2 Pdg RMC and drain from h.no.631 to 630 and from road to 630 and 584 to 588 and 583 to 580 in Kakrola housing Complex W.no.135/NZ
310/23/07/08/M-I
M/s P.K. Solanki
3 Pdg RMC and drain from h.no.455 to 464 and 419 to 428 in Kakrola housing Complex W.no.135/NZ
253/10/07/08 M-I
D.S. Kharab Consts Co
4 Pdg RMC and drain from h.no.46 to 59 to park and 60 to 69 to park and 79 to 74 to park in Kakrola housing Complex W.no.135/NZ
260/11/07/08
M/s A.K. Builder
5 Rasing of drain from Dharam Hood to Chudhari Lal and Shadi Lal to Sher Singh on both Side in Kakrola Vill. w.no.135/NZ
259/11/07/08 M-I
M/s B.P. Dabar and Bros
6 Pdg Metline on road from Harbands to Chadhari Lal and Subhash to CSC office and Subhash to Public School in Kakrola Vill. w.no.135/NZ
247/05.08.08/EE(M)-ING.
M/s Amt and Brodrs const Co
7 Pdg culvert on crossing on lanes and drain from Dhram Hooda to Chaudhari Lal and Shadi Lal to harish Kumar in Kakrola w.no.135/NZ
258/16/07/08 M-I
M/s M.K. Anand & Co
8 Pdg RMC and drain in the lanes of Babu and Satnam in Kakrola w.no.135/NZ
276/178/07/08 M-I
M/s Dadar Dev Const Co
9 Pdg RMC and drain in the lane R.L. Chopra and V.C. Malhotra Kakrola w.no.135/NZ
250/10/07/08
M/s Rajesh Kumar
10 135/04/9/08 Elect
M/s Satunn Ekectrucal
11 139/11/09/08
M/s Bharat Trading Consts
12 82/05/08/08 M/s Seth Const
13 94/12/08/08 E-III
M/s S.T. Electrical Co
14 Pdg RMC and drain from Prahlad house to Phirini in Village Pindwala Kalan in C-133/NGZ
683/18/09/08 M-II
M/s Sunny Const
CIVIL M-I 10.07.08 24.05.08 198000 21.08.09 20.07.09 187705
CIVIL M-I 10.07.08 24.05.08 199000 01.10.08 18.11.08 188333
CIVIL M-I 10.07.08 24.05.08 480000 06.09.08 10.10.08 456924
CIVIL M-I 10.07.08 24.05.08 498000 01.09.08 03.09.08 473842
CIVIL M-I 10.07.08 24.05.08 496000 01.09.08 31.10.08 471956
CIVIL M-I 10.07.08 24.05.08 498000 26.08.08 31.10.08 474349
CIVIL M-I 10.07.08 24.05.08 495000 M/s Rana Entp. 29.08.08 10.09.08 470260
CIVIL M-I 10.07.08 24.05.08 490000 M/s J.K. Consts 31.08.08 06.09.08 466412
CIVIL M-I 12.08.08 09.08.08 429000 05.10.08 24.12.08 498429
CIVIL M-I 12.08.08 09.08.08 499800 12.10.08 11.12.08 499406
CIVIL M-I 08.10.08 01.07.08 495000 20.01.09 24.02.09 471241
CIVIL M-I 08.10.08 01.07.08 480000 07.01.09 03.04.09 456863
CIVIL M-I 08.10.08 01.07.08 498000 30.01.09 10.08.09 474242
CIVIL M-I 08.10.08 01.07.08 480000 03.01.09 03.03.09 479898
CIVIL M-I 08.10.08 01.07.08 475000 01.01.09 07.03.09 473791
CIVIL M-I 08.10.08 01.07.08 490000 15.10.08 13.12.08 489582
15 Pdg RMC and drain from Pt.Tara Chand to K.H.105/55 house to Mahaender house in Village Pindwala Kalan in C-133/NGZ
503/19/07/08 M-I
M/s V.K. Choudary
16 Pdg RMC and drain from Sunil house to Somdutt house in Village Pindwala Kalan in C-133/NGZ
494/19/08/08 M-i
M/s Nardwari Lal Gupta
17 Pdg RMC and drain from Dulli Chand house to Yadav Chaupal in Village Pindwala Kalan in C-133/NGZ
584/26/08/08 M-i
M/s Rani Kant & Co
18 Pdg RMC and drain from Chaupal to MC.Pry. School in Village Pindwala Kalan in C-133/NGZ
608/01/09/08 M-I
M/s Shri Ram Const Co
19 Pdg RMC and drain from MPL.Pry.School to Nathu Ram house in Village Pindwala Kalan in C-133/NGZ
593/27/08/08 M_I
M/s P.K. Consts Co
20 Pdg RMC and drain from Chhoto Lal house to Dulli Chand house in Village Pindwala Kalan in C-133/NGZ
533/20/08/08 M-i
M/s Subhash consts & Co
21 Pdg RMC and drain from Prahald house to Fetah Singh house in Village Rawata in C-133/NGZ
486/ 19/08/08M-I
22 Pdg RMC and drain from Rajander house to Jai Narayan house in Village Paprawat in C-133/NGZ
596/ 01/09/08 M-I
23 Dev of lane by pdg brick pav.and drain from man Chand Dairy to End and Ramesh Dairy to Nilu Dairy in Goyala Dairy in C-134/NGZ
816/ 03/10/08 M-I
M/s Rajeev consts Co
24 Dev of lane by pdg Brick pav.and drain from Jai Dayal to Thakur Dairy and Raju Sikka Dairy to Rinki Dairy in Goyla Dairy in C-134/NGZ
889/10/10/08 M-i
M/s Vijay Singh& Co
25 Pdg RMC and drain from phirni to Ram Niwas house in village Paprawat w.no.133/NGZ
1318/02/01/08 M-i
M/s Nirban Consts Co
26 Pdg RMC and drain from Gullu house to Devender house in village Paprawat w.no.133/NGZ
1299/30/12/08 M-i
M/s R.S.Consts Co
27 Pdg RMC and drain from madan house to Mohan Lal house and Pappu house to Satish house and Chandra house to mahavir house in village Paprawat w.no.133/NGZ
1319/02/01/09 M-I
M/s Vikram Asso
28 C/o drain from Mukesh house to ravinder Pandit house in village Ghuman hera in C-133 NGZ
1231/29/12/08 M-I
M/s Sehrawat Const Co
29 C/o drain from Ram niwas to phirni in village Ghumann hera w.no.133/NGZ
1233/ 29/12/08M-I
M/s P.K. Consts Co
30 Pdg RMC from Balmiki chopal to phirni in village Ghumann hera w.no.133/NGZ
896/12/10/08 M-i
M/s A.K. Builder
CIVIL M-I 08.10.08 01.07.08 495000 05.01.09 24.01.09 494558
CIVIL M-I 08.10.08 01.07.08 498000 26.01.09 31.01.09 497359
CIVIL M-I 08.10.08 01.07.08 498000 03.01.09 02.02.09 497731
CIVIL M-I 08.10.08 01.07.08 498000 1268 07.01.09 18.02.09 472839
CIVIL M-I 08.10.08 01.07.08 490000 M/s A.R.& Co 15.01.09 17.02.09 489709
CIVIL M-I 08.10.08 01.07.08 495000 06.01.09 02.04.09 494710
CIVIL M-I 08.10.08 01.07.08 495000 07.01.09 23.02.09 494731
CIVIL M-I 08.10.08 01.07.08 490000 07.01.09 27.02.09 466200
CIVIL M-I 08.10.08 01.07.08 496000 02.10.09 10.07.09 495615
CIVIL M-I 08.10.08 01.07.08 498000 M/s Sunder Pal 05/018/09 29.01.09 473906
CIVIL M-I 08.10.08 01.07.08 475000 02.01.09 28.02.09 474540
CIVIL M-I 08.10.08 01.07.08 499000 06.01.09 13.02.09 499000
CIVIL M-I 08.10.08 01.07.08 499000 06.01.09 28/020/09 498719
CIVIL M-I 08.10.08 01.07.08 495000 15.10.08 14.12.08 494946
31 Pdg RMC from ram chander house to Ganesh house to Khaber singh house in village Ghumman hera w.no.133/NGZ
1190/26/12/08 M-I
M/s Ishwar Singh Dagar
32 Pdg RMC from dadi MAndir to phirni and dadi mandir to balraj house in vill. Daulatpur in c-133/NGZ
1248/30/12/08 M-I
M/s Krishna Builders
33 Pdg RMC from ram kumar house to phirni and Duli chand master house to Sultan house in vill. Daulatpur in c-133/NGZ
1278/30/12/08 M-I
M/s R.S Consts Co
34 Pdg RMC and drain from raghubir house to hansraj house in vill. Daulatpur in c-133/NGZ
M/s Dalber Singh & Co
35 Pdg RMC from oil depot to Prem Yadav house in in vill. Daulatpur in c-133/NGZ
1340/06/10/9
36 Pdg RMC from Imrat house to Mandir in vill. Daulatpur khurd in c-133/NGZ
1286/30/12/08 M-i
M/s Panwar Const co
37 Pdg RMC from Shiv charan house to phirni in village Daryapur khurd in c-133/NGZ
1288/30/12/08 M-I
M/s Krishna Builders
38 Pdg RMC and drain from mahender house to Prempal house and jeetpal house to Suresh house in villag Daurala in c-133/NGZ
1284/ 30/12/08 M-i
M/s Panwar Const co
39 Pdg RMC from harijan chopal to Azad Sigh house in village Galibpur in c-133/NGZ
1220/26/12/08 M-i
M/s Garover Gaur Builders
40 Pdg RMC abd drain from Raju house to Rambir house, Vikram jeet house to phirni and Tekram house to dharampal house in vilage Galibpur in c-133/NGZ
1217/026/12/08 M-II
41 Pdg RMC and drain from Ram kishan house to Bhim singh house in vill. Pinwala khurd in c-133/NGZ
1208/26/12/08 M-I
M/s Shree Shyam Ji Enterp
42 Pdg RMC and drain from Dharambir house to Shiv Mandir in vill. Pindwala khurdin c-133/NGZ
1184/26/12/08 M-i
M/s Krishna Builders
43 Pdg RMC and drain from Bus stand to phirni in vill. Pindwala khurdin c-133/NGZ
1285/30/12/08 M-i
M/s Panwar Const co
44 Pdg RMC and drain from jai Kishan house to MC Pry School in vill. Jhuljhuli in c-133/NGZ
895/13/10/08 M-i
M/s A.K. Builder
Completed0.00
Completed0.00
Completed 0.00
Completed0.00
Completed0.00
Completed0.00
Completed0.00
Completed0.00
Completed0.00
Completed0.00
Completed0.00
Completed0.00
Completed0.00
Present Position
Liabilities Rs.lacs
Completed0.00
Completed0.00
Completed0.00
Completed
0.00
Completed0.00
In Prog. 1.92
Completed
0.00
Completed
0.00
Completed
0.00
2.80
5.94
Completed
0.00
Completed0.00
Completed 0.00
Completed
0.00
In Prog. 4.53
In Prog. 3.71
In Prog. 4.63
In Prog. 4.61
In Prog. 4.59
In Prog. 4.43
In Prog. 3.65
Completed0.00
2.11
Completed
0.00
In Prog. 0.05
Completed0.00
Completed
0.00
Completed 0.00
Completed0.00
Completed0.00
Completed0.00
4.51
Completed0.00
Completed0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
47.47
In Prog. 1.21
In Prog. 0.33
In Prog. 0.27
In Prog. 0.23
Completed 0.00
Present Position
Liabilities Rs.lacs
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
In Prog. 0.49
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.002.53
Completed0.00
Completed0.00
Completed0.00
Completed0.00
Completed0.00
Completed0.00
Completed0.00
Present Position
Liabilities Rs.lacs
Completed0.00
Completed
0.00
Completed0.00
Completed0.00
Completed0.00
Completed0.00
Completed0.00
Completed0.00
Completed0.00
Completed0.00
Completed0.00
Completed0.00
Completed0.00
Completed0.00
Completed0.00
Completed0.00
Completed0.00
Completed0.00
Completed0.00
Completed0.00
Completed0.00
Completed0.00
Completed
0.00
Completed0.00
Completed0.00
Completed0.00
Completed0.00
Completed0.00
Completed0.00
Completed0.00
Completed0.00
Completed0.00
Completed0.00
Completed0.00
Completed
0.00
Completed0.00
Completed
0.00
Completed0.00
Completed0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
In Prog. 2.09
Completed 0.00
Completed 0.00
4.25
Completed 0.00
Present Position
Liabilities Rs.lacs
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
In Prog. 0.05
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
0.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.006.39
Present Position
Liabilities Rs.lacs
6.93
In Prog. 1.24
In Prog. 1.75
Completed 0.00
6.95
6.97
In Prog. 0.81
In Prog. 1.36
In Prog. 1.36
In Prog. 1.59
In Prog. 0.92
In Prog. 1.58
Completed 0.00
Completed 0.00
Completed 0.00
In Prog. 0.48
In Prog. 0.48
In Prog. 0.42
Completed 0.00
In Prog. 0.05
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
3.76
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
In Prog. 0.01
Completed 0.00
Completed 0.00
In Prog. 0.07
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
In Prog. 1.55
Completed 0.00
Completed 0.00
0.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
38.29
Completed 0.00
Completed 0.00
1.99
Completed 0.00
Completed 0.00
Completed 0.00
Present Position
Liabilities Rs.lacs
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
4.99
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
5.00
4.55
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
In Prog. 0.02
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.00
16.54396
In Prog. 0.13
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Present Position
Liabilities Rs.lacs
Completed 0.00
In Prog. 0.07
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
In Prog. 0.14
In Prog. 0.13
Completed 0.00
Completed 0.00
In Prog. 0.10
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
0.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.57
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Present Position
Liabilities Rs.lacs
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.00
0
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Present Position
Liabilities Rs.lacs
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
1.98
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
4.81
0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.006.79
Completed 0.00
In Prog. 0.13
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Present Position
Liabilities Rs.lacs
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
0.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.13
deptt. deptt. deptt. deptt.Div. Div. Div. Div. Div. Div.
civil elect hort cse M-I M-II M-III M-IV E-I EE(Pr.)
Status Report of MLA,Sh Vijay LochavAC No. 31,2008-09
S.No.
Name of Work deptt. Div. D.O.S D.O.C
civil M-III 16.06.08 23.05.08 198300 23.07.08 29.08.08 197287 Completed
civil M-III 16.06.08 23.05.08 197500 22/2/08 12.08.08 197380 Completed
civil M-III 16.06.08 23.05.08 197900 02.10.08 29.12.08 197875 Completed
civil M-III 16.06.08 23.05.08 197100 11.10.08 27.10.08 196958 Completed
civil M-III 16.06.08 23.05.08 198700 30.07.08 20.08.08 198659 Completed
civil M-III 17.06.08 23.05.08 163100 26.11.08 22.12.08 162974 Completed
civil M-III 17.06.08 04.06.08 198900 10.07.08 30.07.08 198820 Completed
civil M-III 17.06.08 04.06.08 199300 22.07.08 20.12.08 198678 Completed
civil M-III 17.06.08 04.06.08 198100 M/s Sunil 10.07.08 05.08.08 197587 Completed
civil M-III 17.06.08 15.05.08 273400 15/10/08 22.10.08 273001 Completed
civil M-III 17.06.08 15.05.08 198200 20.11.08 05.12.08 197982 Completed
civil M-III 17.06.08 15.05.08 426900 17.02.08 25.03.09 425993 Completed
civil M-III 17.06.08 15.05.08 279500 10.10.08 24.10.08 278949 Completed
civil M-III 17.06.08 15.05.08 495900 30.07.08 30.08.08 495394 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Expenditure
Present Position
1 Pdg drain from MLA house to End of Pond in MLA gali in Village Bamnoli in C-141/NGZ
165/07/07/08 M-III
M/s Rajiv Kumar
2 C/O drain near Shyam Mandir towards and Chowk near Pond in Dhool Siras in C-141/NGZ
159//09/07/08 M_III
M/s Jai Dada Dudha Consts Co
3 C/O drain near PNB Bank to Rohtash house in Village Dhool Siras in C-141/NGZ
173/21/07/08 M_III
M/s M.B Sunuha
4 C/O drain from Jagdish Plot near Pond to Phirni in Village Bamnoli in C-141/NGZ
172/21/07/08 M_III
M/s Manshaul Const & Co
5 C/O drain from Mahendar Pradhan house to Surjeat house in Dharamshala Wali gali in Dhool Siras in C-141/NGZ
182/21/7/08 M-III
M/s B.P. Dabush and Brother
6 Dev of wall at Chowk near Harijan Basti in Bamnoli in C-141/NGZ
166/09/07/08 M-III
M/s Balwari Singh
7 P/L RMC and drain from mahender house to Rana house in Village Bijwasan in C-141/NGZ
154/09/07/08 M_III
M/s N.S Shokar Const co
8 P/L RMC and drain from Sarjeet house to Partap Plot in Village Bijwasan in C-141/NGZ
183/21/07/08 M_III
M/s Dabas Consts Co
9 P/L RMC and drain from Satveer house to Sube house in Village Bijwasan in C-141/NGZ
164/09/07/08 M_III
10 Dev of Chowk Harijan Basti in Village Samalka in C-143/NGZ
211/23/07/08 M-Ii
M/s Ved Const Co
11 P/L RMC and drain from Mata Deen Plot to main road in Village Kapashera in C-143/NGZ
176/21/07/08 M-III
M/sNikhil Enterp
12 P/L RMC and drain from Kartar Singh house to Phirni in Village Kapashera in C-143/NGZ
206/23/07/09 M_III
M/s Yuvraj Consts Co
13 P/L RMC and drain from Chaupal to Haweli in Village Shahbad Mohammadpur in C-143/NGZ
186/23/07/08 M-III
M/s Panwar Const Co
14 P/L RMC from Bhoopender Singh Lamba house to Mahinder Singh house in Village Shahbad Mohammadpur in C-143/NGZ
209/23/07/08 M_III
M/s D.S. Kharb Const & Co
civil M-III 17.06.08 15.05.08 198600 21.08.08 10.09.08 198256 Completed
civil M-III 17.06.08 15.05.08 198000 19.08.08 26.09.08 197485 Completed
civil M-III 17.06.08 15.05.08 196400 10.08.08 29.08.08 196169 Completed
civil M-III 17.06.08 15.05.08 195300 25.07.08 29.08.08 194020 Completed
civil M-III 17.06.08 15.05.08 198900 11.07.08 31.07.08 198613 Completed
civil M-III 17.06.08 15.05.08 198900 09.07.08 23.07.08 197447 Completed
civil M-III 17.06.08 15.05.08 196900 30.07.08 19.09.08 196299 Completed
civil M-III 17.06.08 15.05.08 199400 M/s Arti Builder 09/07/08 26.07.08 198436 Completed
civil M-III 17.06.08 15.05.08 491400 30.07.08 18.09.08 490180 Completed
civil M-III 17.06.08 15.05.08 426700
civil M-III 23.06.08 03.05.08 483000 04.08.08 10.09.08 482277 Completed
civil M-III 23.06.08 03.05.08 492200 210/23/07/08 06.08.08 26.09.08 490170 Completed
civil M-III 23.06.08 03.05.08 488500 185/23/07/08 26.07.08 22.10.08 487542 Completed
civil M-III 23.06.08 03.05.08 494500 04.08.08 12.09.08 493141 Completed
civil M-III 23.06.08 15.05.08 470500 22.08.08 29.10.08 470017 Completed
civil M-III 23.06.08 15.05.08 471000 14.02.09 12.03.09 469733 Completed
15 P/L RMC and drain from STD Shop to Khati Mohalla road in Village Kapashera in C-143/NGZ
179/21/03/08 M_III
M/s P.K. Sehrawat Const Co
16 P/L RMC and drain from Tali ram house to main road in Village Kapashera in C-143/NGZ
167/21/01/08 M-III
M/s Amit and Brothers Const Co
17 P/L cc interlocking tiles and drain from Ballu wali Haweli to Ram Chander house and Mange house to Pirthi house in Village Kapashera in C-143/NGZ
155/09/07/08 M_III
M/s Sehrawart Const Co
18 P/L RMC and drain from Amar Singh house to Ramesh Sharma house in Village Shahbad Mohammadpur in C-143/NGZ
174/21/07/08 M_III
M/s Suresh Kumar & Co
19 P/L RMC and drain from Ajit Solanki house to Zile house in Village Shahbad Mohammadpur in C-143/NGZ
162/09/07/08 M-III
M/s Sehrawat Const Co
20 Pdg RMC and drain from Damodar marg to High Tension Wali gali in Village Kapashera in C-143/NGZ
163/09/07/08 M_III
M/s Dev Const & Co
21 Pdg cc interlocking tiles and drain from Mahendar house Hari Singh house in Village Kapashera in C-143/NGZ
169/21/07/08 M-III
M/s Flush Wall & Co
22 Pdg RMC and drain from Ramvir house to Joginder in Village Kapashera in C-143/NGZ
161/09/07/08 M-III
23 C/O drain from back side of MC.Pry.School to Shiv Mandie and RMC from Ranbir house to main road in Village Shahbad Mohammadpur in C-143/NGZ
204/23/07/08 M-III
M/s Rajesh Kumar
24 Raising of B/Wall of Pkt.C-6 and 7 in Vasant Kunj in C-144/NGZ
25 P/L RMC and drain from Ram Kumar hs to Milk Dairy in Harijan gali in Bijwasan in C-141/NGZ
210/23/07/098 M_III
M/s Nirman Const & Co
26 Pdg RMC and drain from Sarjeet hs to Rana hs near Rly.Station Village Bijwasan in C-141/NGZ
M/s Rajesh Kumar
27 Pdg RMC and drain near Shyam Manndir and Chaupal in Village Dhool Siras in C-141/NGZ
M/s Shree Shyam ji Enterp,
28 P/L RMC and drain from Purani Harijan Wali gali to Rashan Shop in Village Bijwasan in C-141/NGZ
200/23/07/08 M-III
M/s P.K. Const Co
29 Pdg RMC in lane approaching to Crematoin Ground in Village Mahipalpur in C-144/NGZ
544/21/08/08 M-II
M/s Jain Enterp.
30 Dev of D/S by pdg SW drain and RMC in lane of Village Rang Puri in C-144/NGZ from Pram hs to (Himalaya Public School)
1502/09/02/09 M-II
M/s Nikhil Enterp
civil M-III 23.06.08 04.06.08 463700 15.09.08 20.10.08 463353 Completed
civil M-III 23.06.08 04.06.08 347100 10.09.08 30.10.08 345038 Completed
civil M-III 23.06.08 04.06.08 325800 12.09.08 15.10.08 325199 Completed
civil M-III 10.07.08 22.05.08 498900 60/30/9/08 09.10.08 27.11.08 498493 Completed
civil M-III 27.08.08 01.08.08 497529 66/30/9/08 10.10.08 08.12.08 497397 Completed
civil M-III 27.08.08 01.08.08 497000 59/30/09/08 16.10.08 01.12.08 496103 Completed
civil M-III 27.08.08 01.08.08 498976 62/30/09/08 16.10.08 02.12.08 497623 Completed
civil M-III 27.08.08 01.08.08 498000 64/30/09/08 16.10.08 03.12.08 497784 Completed
civil M-III 27.08.08 01.08.08 498000 68/30/9/08 01.10.08 30.10.08 496917 Completed
civil M-III 27.08.08 01.08.08 499000 71/30/10/08 16.10.08 05.12.08 498692 Completed
civil M-III 27.08.08 01.08.08 499000 72/30/09/08 16.10.08 25/11/078 498599 Completed
civil M-III 27.08.08 01.08.08 499560 70/30/10/08 03.10.08 28.11.08 499406 Completed
civil M-III 30.09.08 01.07.08 Closed
civil M-III 06.10.08 23.05.08 186500 06/0808 P 175263 In Prog.
civil M-III 17.06.08 04.06.08 198500 02.08.08 29.09.08 198219 Completed
31 Covering of drain from main road near MC.Pry.School to F.C.Farm in drain in Village Bijwasan in c-141/NGZ
218/23/7/08 M-III
M/s GLOBE Builder
32 Pdg RMC and drain from Cement Godown to Gully Pandit plot in Village Bijwasan in C-141/NGZ
188/23/07/08 M-III
M/s Krishna Builders
33 Pdg RMC and drain from main raod near Radhika tyre Shop to Rajesh hs in Village Bijwasan in C-141/NGZ
216/23/07/08 M-III
M/s Dada Dev Consts Co
34 C/O One Room,raising of B/Wall,pdg floring,Glazed tiles in Dispensary in Village bamnoli in C-141/NGZ
M/s Sharma Const & Co
35 Pdg interlocking tiles on side berms from gali no.1 to Community Hall in Pkt.C-8 Vasant Kunj C-144/NGZ
M/s Akshila Builder
36 Pdg interlocking on side berm from gate no.15 to Flat no.8182 in Pkt.C-8 in Vasant Kunj in C-144/NGZ
M/s Sehrawat Const Co
37 Pdg RMC in parking of Pkt.C-8 Vasant Kunj C-144 (Near Parking Gate no.4 gali no.9 near 8561,near 8301 parking near 8261 in NGZ)
M/s Rydani Const
38 Pdg interlocking on side berm from Flat no.9686 to 9463 and pdg RMC in Parking near Flat no.9462 in Pkt.C-9 in Vasant Kunj in C-144/NGZ
M/s Nikhil Enterp
39 Pdg RMC in parking near Flat no.9438 in Pkt.C-9 in Vasant Kunj in C-144/NGZ
M/s Sunil Trader
40 Pdg RMC in side berms and parking near Flat no.9735,9558 Parking opp.9438 and from 9439 to 9510 in Pkt.C-9 in Vasant Kunj in C-144/NGZ
M/s Nirbun Consts Co
41 Pdg interlocking on side berm from gate no.10 to Flat no.9343 in Pkt.C-9 in Vasant Kunj in C-144/NGZ
M/s Ram Chander Dagar
42 Pdg RMC in parking near flat no.8386 and parking near gate no.6 near 8456 in Pkt.C-8 Vasant Kunj C-144/NGZ
M/s Sehrawat Const Co
43 Dev of side berms by pdg RMC in pkt- C-8 Basant kunj C-144 in Najafgarh from gate no.15 to plot no 8001 C-144 NGZ
44 Pdg cc interlocking tiles and drain from Naresh house to Rajinder house in village Smalkha C-143/NGZ
339/04/03/08 M-III
M/s baba Builder
45 P/L RMC and drain from ved house to narayan house in village Bijwasan in C-141 NGZ
181/21/074/08 M-III
M/s Engineer Const
civil M-III 23.06.08 03.05.08 492700 04.08.08 24.10.08 492284 Completed46 Pdg RMC and drain Dubey house to Ram singh house near village Bijwasan C-141 NGZ
217/23/07/08M-III
M/s ishwar Singh Dangar
Status Report of MLA,Sh. Balram TanwarAC No. 32,2008-09
S.No.
Name of Work deptt. Div. D.O.S D.O.C
CIVIL M-IV20.06.08 21.05.08 199584 07.10.08 16.09.09 199084
Completed
CIVIL M-IV20.06.08 21.05.08 150157 15.10.08 08.12.08 150038
Completed
CIVIL M-IV20.06.08 21.05.08 192655 01.03.09 30.04.09 192377
Completed
CIVIL M-IV20.06.08 21.05.08 499188 30.09.08 30.10.08 498842
Completed
CIVIL M-IV20.06.08 21.05.08 197830 06.10.08 26.11.08 196656
Completed
CIVIL M-IV07.07.08 21.05.08 288310 05.12.08 02.04.09 287831
Completed
CIVIL M-IV07.07.08 21.05.08 495374 01.12.08 16.01.09 494997
Completed
CIVIL M-IV07.07.08 21.05.08 499008 21.10.08 24.12.08 499008
Completed
CIVIL M-IV07.07.08 21.05.08 493053
CIVIL M-IV
07.07.08 21.05.08 485550CIVIL M-IV
07.07.08 21.05.08 490484CIVIL M-IV
07.07.08 21.05.08 333918 11.10.08 03.12.08 333182
Completed
CIVIL M-IV
07.07.08 21.05.08 497306 M/s M.K. Entp. 11.10.08 12.12.08 496831
Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Expenditure
Present Position
1 Remodeling of different crossings/drains in Village Chattarpur in ward 174/SZ
100/29.09.08/EE(M)-IV
M/s K. B. Tanwar
2 Prov. RMC and drain in Suresh and adj lane in Village Chattarpur in ward 174/SZ
104/29.09.08/EE(M)-IV
M/s Sushil Kumar Gupta
3 covering of drain along and infront of Rampal SI house,60 feet wide road Chattarpur in ward 174/SZ
103/29.09.08/EE(M)-IV
M/s Mangal Singh
4 Pdg RMC from Ranveer house to Subash house in Village Chattarpur in ward 174/SZ
120/30.09.08/EE(M)-IV
M/s National Const Co.
5 Pdg RMC in lane from Goenka Traders to Dinesh Khari house in Village Sultanpur in ward 174/SZ
122/30.09.08/EE(M)-IV
M/s Sachin Gupta
6 Pdg RMC and drain in lane among Devendre hs and Kiran Singh hs in Village Asola in C-176/SZ
132/30.09.08/EE(M)-IV
M/s Ravi Gupta
7 Pdg RMC from Chahat hs towards Begraj hs in Village Asola in C-176/SZ
131/30.09.08/EE(M)-IV
M/s Kuldeep Const Co.
8 Pdg RMC and drain from Cheta shop to Rajpal hs in Village Mandi in C-175/SZ
116/30.09.08/EE(M)-IV
M/s J.P. Const Co.
9 Pdg Premixing Carpet on road approaching to Jawahar Colony in Village Mandi in C-175/SZ
10
Pdg Premixing from main road towards Sr.Sec.School Zorapur in Village Zorapur in C-175/SZ
11 Pdg Premixing from Rishipal Ambawata Farm towards Mandi road in Village Zorapur in C-175/SZ
12
Pdg cc from Ram Singh Shop,Rupi Pehalwan,Dharam Singhhouse upto Chowk near Pratap Singh house in Village Mandi in C-175/SZ
133/30.09.08/EE(M)-IV
M/s Jha & Jha & Const Co.
13
Pdg RMC and drain from Dharamveer house,Leelu Ram house and lane infront of Rajender house to Bangali house in Village Zorapur in C-175/SZ
119/30.09.08/EE(M)-IV
CIVIL M-IV
07.07.08 21.05.08 340335 13.10.08 02.12.08 339833
Completed
CIVIL M-IV
07.07.08 21.05.08 355398 11.10.08 20.12.08 354960
Completed
CIVIL M-IV
07.07.08 21.05.08 199027 11.10.08 12.12.08 198908
Completed
CIVIL M-IV
07.07.08 21.05.08 499107 25.10.08 06.01.09 498799
Completed
CIVIL M-IV07.07.08 21.05.08 163919 22.10.08 05.12.08 163116
Completed
CIVIL M-IV
07.07.08 21.05.08 499791 M/s Ramkesh 22.10.08 09.07.09 498821
Completed
CIVIL M-IV07.07.08 21.05.08 195940 17.11.08 03.02.09 195528
Completed
CIVIL M-IV28.08.08 12.08.08 197179 22.12.08 P 191835
In Prog.
CIVIL M-IV
28.08.08 12.08.08 199459 03.11.08 20.12.08 199103
Completed
CIVIL M-IV18.09.08 01.09.08 446982 12.08.09 10.09.09 400321
Completed
14
C/O drain and pdg RMC from Mangal Bhagat house to LLate Leelay Pradhan house and Charna house to Raju house in Village Asola in C-176/SZ
121/30.09.08/EE(M)-IV
M/s Hawks Const Co.
15
Pdg RMC and drain from Radhey house to Rajpal house,Bega house,Jodha house,Balram house in Village Bhatti Kalan in C-176/SZ
130/30.09.08/EE(M)-IV
M/s Hira Const. Co.
16
Pdg RMC and drain in lane from Parmanand Sharma house to Mandir in Village Zorapur in C-175/SZ
102/29.09.08/EE(M)-IV
M/s Bansal Brothers
17 Pdg RMC from Sunil Genral Store to Zilley Singh Farm in Village Mandi in C-175/SZ
118/30.09.08/EE(M)-IV
M/s Amar Engg. & Contct.
18 Pdg RMC and drain from Chopal to Narendra house in Village Zorapur in C-175/SZ
99/29.09.08/EE(M)-IV
M/s Shalab Gupta
19
Pdg RMC in lane from Ramesh Sharma shop to Aruna Public School and Devia pradhan house to Rishipal house in Village Zorapur in C-175/SZ
117/30.09.08/EE(M)-IV
20 Remodeling of different Crossing/drain in Village Aya Ngr.in C-175/SZ
101/29.09.08/EE(M)-IV
M/s R.K. Const Co.
21 Pdg RMC from Masjid to gali infront of Naresh Sharma house in Village Chattarpur in C-174/SZ
156/13.10.08/EE(M)-IV
M/s Kanak Ent.
22
Pdg Premixing Carpet near Dharamshala E-Turnning of 60ft road at 100ft wide road in Village Chattarpur in C-174/SZ
157/13.10.08/EE(M)-IV
M/s R.D. Const. Co.
23 Pdg RMC from Chaupal to Tejpal and Rishi house in village Fatehpur Beri in w.no.176/SZ
156/06.07.09/EE(M)-IV
M/s Balaji Const Co.
Status Report of MLA,Sh Vijay JollyAC No. 33,2008-09
S.No.
Name of Work deptt. Div. D.O.S D.O.C
P/L cc adj Kh.no.396,Devli Village w.no.178/SZ
CIVIL M-III
20.06.08 20.05.08 188250 07.08.08 28.09.09 188200
Completed
CIVIL M-III20.06.08 20.05.08 199950 06.08.08 02.09.08 199034
Completed
CIVIL M-III20.06.08 20.05.08 85000 17.07.08 12.02.09 85000
Completed
ELECT E-I23.06.08 18.04.08 448493 25.12.08 22.01.09 447938
Completed
ELECT E-I
23.06.08 18.04.08 449873 11.01.09 10.02.09 449618
Completed
CIVIL M-III07.07.08 20.05.08 478670 28.08.08 15.10.08 477001
Completed
CIVIL M-III07.07.08 20.05.08 498600 08.09.08 24.10.08 402173
Completed
P/L RMC adj h.no.592 Devli Village in C-178/SZCIVIL M-III
07.07.08 20.05.08 404290 M/s M.K. Entp. 26.09.08 13.10.08 498475Completed
CIVIL M-III
30.07.08 04.07.08 483800CIVIL M-IV
30.07.08 15.07.08 334500 20.01.09 23.02.09 330768Completed
CIVIL M-IV30.07.08 15.07.08 378200 13.02.09 28.03.09 313810
Completed
CIVIL M-IV30.07.08 02.07.08 344200 16.02.09 15.04.09 288285
Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Expenditure
Present Position
1 81/25.07.08/EE(M)-III
M/s Gyan Dass Const Co.
2 P/L cc from h.no.600 to 610 and 600 to 466 in Devli Village w.no.178/SZ
80/25.07.08/EE(M)-III
M/s Deepak Kumar
3 P/L culverts adj h.no.491 and Gram Mkt. Nai Basti,Devli village w.no.178/SZ
64/07.07.08/EE(M)-III
M/s S.K. Const Co.
4 P/O street lighting arrangement in various colonies in Saket And Pushp vihar under SZ
140/16.12.08/EE(E)-IV
M/s Illuminator & Cont.
5
P/O street lighting arrangement in various colonies Deoli road,Raju Park, krishna Park, Khanpur Extn.,Tigri etc under SZ
268/02.01.09EE(E)-IV
M/s Grover Electricals
6 P/L RMC from h.no.692/2 to 677/22 Nai Basti Devli Village in C-178/SZ
138/18.08.08/EE(M)-III
M/s Heera Const Co.
7 P/L RMC from h.no.554 to 540/2 Devli Village in C-178/SZ
139/18.08.08/EE(M)-III
M/s R.,K. Const Co.
8 137/18.08.08/EE(M)-III
9
Dev of road berm along RHS of road opp.M-Block Saket from Amity international to h.no. M-I in C-169/SZ
10 Dev of back lane by pdg interlocking tiles from D-94 to D-106 in D-Block Saket in C-169/SZ
183/05.0109/EE(M)-IV
M/s Sadhna Assos.
11 C/O Projection Wall along M-Block Nallah Saket opp. M-7 to M-10 in C-169/SZ
184/05.01.09/EE(M)-IV
M/s Sadhna Assos.
12 Dev of lane in L-Block Saket by pdg cc and drain from h.no.83 to h.no.96 in C-169/SZ
186/05.01.09/EE(M)-IV
M/s Sadhna Assos.
CIVIL M-IV
30.07.08 02.07.08 366700 16.02.09 26.04.09 306584
Completed
CIVIL M-IV
30.07.08 02.07.08 391900 29.06.09 17.08.09 327912
Completed
CIVIL M-IV30.07.08 22.06.08 375300 11.02.09 09.03.09 339400
Completed
CIVIL M-IV30.07.08 22.06.08 199860 27.01.09 04.03.09 199786
Completed
CIVIL M-IV30.07.08 22.06.08 303300 27.01.09 04.03.09 303280
Completed
CIVIL M-IV
30.07.08 22.06.08 489200 14.01.09 23.02.09 489200
Completed
CIVIL M-IV
30.07.08 22.06.08 477400 19.01.09 23.03.09 301081
Completed
CIVIL M-IV30.07.08 22.06.08 199100 08.12.08 20.01.09 199100
Completed
CIVIL M-IV30.07.08 22.06.08 199428 21.11.08 20.12.08 198517
Completed
CIVIL M-IV20.08.08 18.07.08 175500 04.11.08 21.12.08 175464
Completed
CIVIL M-III26.08.08 08.08.08 469300 30.09.08 28.12.08 469232
Completed
CIVIL M-III26.08.08 08.08.08 491200 M/s M.K. Entp. 17.01.09 18.03.09 491197
Completed
CIVIL M-III26.08.08 08.08.08 498650 27.02.09 20.05.09 498605
Completed
CIVIL M-III26.08.08 08.08.08 497400 15.06.09 12.08.09 346671
Completed
CIVIL M-II26.08.08 06.08.08 199680 18.01.09 07.02.09 164723
Completed
CIVIL M-II26.08.08 06.08.08 199707 18.12.08 30.01.09 182302
Completed
CIVIL M-II26.08.08 06.08.08 199659 22.12.08 06.02.09 184387
Completed
CIVIL M-II
26.08.08 06.08.08 199659 20.12.08 18.01.09 184481
Completed
13
Dev of lane in L-Block Saket by pdg cc and drain from h.no.76B to h.no.66B,51A to 47A and upto Chowk in C-169/SZ
182/05.01.09*/EE(M)-IV
M/s Sadhna Assos.
14
Dev of lane in L-Block Saket by pdg cc and drain from h.no.43A to h.no.42B,21A to Chowk,9 to 12 and near gate in C-169/SZ
181/05.01.09/EE(M)-IV
M/s Sadhana Associates
15 Pdg RMC for development of front lane fron J-165 to J-38 in J-Block Saket in C-169/SZ
185/05.01.09/EE(M)-IV
M/s Sadhna Assos.
16 Dev of backlane by pdg interlocking tiles from J-152 to J-168 in J-Block Saket in C-169/SZ
153/13.10.08/EE(M)-IV
M/s Sadhna Assos.
17 Dev of backlane by pdg interlocking tiles frpm J-124 to J-136 in J-Block Saket in C-169/SZ
188/05.01.09/EE(M)-IV
M/s Sadhna Assos.
18
Dev of front lane in D-Block Saket from D-30 to D-37 by pdg interlocking tiles and dev of the drainage system in C-169/SZ
180/05.01.09/EE(M)-IV
M/s Gopal Goyal
19
Dev of front lane in D-Block Saket from D-46 to D-53 by pdg interlocking tiles and dev of the drainage system in C-169/SZ
187/05.01.09/EE(M)-IV
M/s Sadhna Assos.
20 Dev of back lane by pdg interlocking tiles from D-30 to D-37 in D-Block Saket in C-169/SZ
152/13.10.08/EE(M)-IV
M/s Goel Const Co.
21 Dev of back lane by pdg interlocking tiles from D-38 to D-45 in D-Block Saket in C-169/SZ
155/13.10.08/EE(M)-IV
M/s Mangal Singh
22 Dev of park in L-Block Saket by pdg Walking Track in C-169/SZ
155/13.10.08/EE(M)-IV
M/s Uttam Const Co.
23 C/O B/Wall of park adj to h.no.337 in DDA Flat Tigri in C-179/SZ
199/19.09.08/EE(M)-III
M/s Sushil Kumar Gupta
24 pdg RMC and its drainage system from h.no.34 to 27 in DDA Flats Tigri in C-179/SZ
281/07.01.09/EE(M)-III
25 Pdg paralel storm water pipe line from Kumhar Mohalla Deoli to Hanuman Temple in C-181/SZ
340/17.02.09/EE(M)-III
M/s Naresh builders
26 Pdg paralel storm water pipe line from Masjid to A-Block Raja Park in C-181/SZ
101/05.06.09/EE(M)-III
M/s Deepak Kumar
27 P/L RMC in lane Chowk near Block no.65 Sec.-I Pushp Vihar C-184/SZ
191/16.12.08/EE(M)-II
M/s Mukesh Jorwal
28 Remodeling of drain along park Sec.-I Pushp Vihar in C-184/SZ
188/16.12.08/EE(M)-II
M/s Mukesh Jorwal
29 Remodeling of drain along Sarvodya Vidhyalaya Sec.-I Pushp Vihar in C-184/SZ
184/16.12.08/EE(M)-II
M/s Mukesh Jorwal
30
Remodeling of drain near block no.52 to main road opp.Sarvodya Vidhayalaya Sec.-I Pushp Vihar in C-184/SZ
186/16.12.08/EE(M)-II
M/s Mukesh Jorwal
CIVIL M-II
26.08.08 06.08.08 199395 18.12.08 20.01.09 184569
Completed
CIVIL M-II26.08.08 06.08.08 199094 18.12.08 21.01.09 184829
Completed
ELECT E-I10.09.08 11.07.08 415088 16.12.08 15.01.09 403851
Completed
ELECT E-I
10.10.08 11.07.08 414153 25.12.08 23.01.09 404191
Completed
ELECT E-I
10.10.08 11.07.08 413685 16.12.08 14.01.09 400432
Completed
ELECT E-I
10.09.08 11.07.08 425142 16.12.08 12.01.09 413613
Completed
ELECT E-I
10.09.08 11.07.08 409243 02.01.09 30.01.09 362370
Completed
ELECT E-I
10.09.08 11.07.08 412282 25.12.08 23.01.09 401978
Completed
ELECT E-I
10.09.08 11.07.08 414854 17.10.08 25.11.09 402701
Completed
ELECT E-I10.09.08 11.07.08 415789 25.12.08 23.01.09 404904
Completed
ELECT E-I10.09.08 11.07.08 411815 16.12.08 15.01.09 400487
Completed
ELECT E-I
10.09.08 11.07.08 413685 16.12.08 05.01.09 402506
Completed
ELECT E-I
10.09.08 11.07.08 411815 07.01.09 06.02.09 401214
Completed
ELECT E-I
10.09.08 11.07.08 411347 16.12.08 16.01.09 400786
Completed
ELECT E-I
10.09.08 11.07.08 411347 25.12.08 24.01.09 401147
Completed
31
Remodeling of drain from Mother Dairy Booth to opp.Old Police Chowki Sec.-IV Pushp Vihar in C-184/SZ
192/16.12.08/EE(M)-II
M/s Mukesh Jorwal
32 Remodeling of drain block no.53 to near block no.57 Sec.-I Pushp Vihar in C-184/SZ
190/16.12.08/EE(M)-II
M/s Mukesh Jorwal
33 P/o SHM light at G block Saket and E block Saket under SZ
103/16.12.08/EE(E)-IV
M/s Sri Balaji Elect.
34
P/o SHM light at D block Saket near Bansi Lal house and D block near Tanya park Saket under SZ
154/16.12.08/EE(E)-IV
M/s Illuminator & Cont.
35 P/o SHM light at main park opp. L block Saket and main gate press Enclave cly. under SZ
158/16.12.08/EE(E)-IV
M/s Best Elect. & Electro.
36
P/o SHM light at main gate opp. college of Pharmacy MB road Khanpur and at main gate Carriappa marg Khirki extn. near Bangkok under SZ
152/16.12.08/EE(E)-IV
M/s Vivek Elect.
37
P/o SHM light at park Pushp vihar sec-2 c/o/ K.K. Rathore and c/o N.R. Patnaik Pushp Vihar section SZ
206/24.12.08/EE(E)-IV
M/s Electra Fusion Techn.
38
P/o SHM light at Block L part-I gali no.7 chowk near Jai Bhagwan STD Deoli and at M-III block DJB T/well temple Deoli under SZ
155/16.12.08/EE(E)-IV
M/s Illuminator & Cont.
39
P/o SHM light at Police post chowki near Dr. Sahib Singh Vishnu marg and New Tiraha Police booth Durga Vihar Deoli under SZ
54/17.10.08/EE(E)-IV
M/s Unique Elect.
40 P/o SHM light at infront of Savitri barat Ghar Deoli and Asthal mandi road Entrance Deoli under SZ
91/16.12.08/EE(E)-IV
M/s Illuminator & Cont.
41 P/o SHM light at Creamation ground complex Deoli and Asthal Mandir Complex Deoli under SZ
102/16.12.08/EE(E)-IV
M/s Sri Balaji Elect.
42 P/o SHm light at DDA flat Tigri and at C-1211 Tigri cly. under SZ
87/16.12.08/EE(E)-IV
M/s Technoview Electricals
43
P/o SHM light at near h.no. 865 Mangal Bazar road Deoli and naer Tiraha entrance Mangal Bazar road near F-3 corner Deoli under SZ
264/29..12.08/EE(E)-IV
M/s Perfect Electricals Works
44
P/o SHM light at G block Tiraha near Rohtas goel shop Holi chowk Deoli and L-1011 gali no. 15 Shiv Balaji temple Deoli under SZ
171/16.12.08/EE(E)-IV
M/s Technoview Electricals
45
P/o SHM light at entrance of Pramod Mahajan marg from MB road Saket and at main gate Duggal colony Deoli road near Devinder Bansal Property under SZ
135/16.12.08/EE(E)-IV
M/s Forward Engg.
ELECT E-I10.09.08 11.07.08 409009 13.12.08 12.01.09 397699
Completed
CIVIL M-III
20.06.08 20.05.08 193900 07.08.08 01.10.08 193783
Completed46
P/o SHM light at Pushp Vihar sector-I Central park under SZ
157/04.12.08/EE(E)-IV
M/s Grover Eclect.
47
P/L cc from h.no.677/22 to 677/09,677/22 to 677/24 and 677/08 to 677/09 Nai Basti, Devli Village w.no.178/SZ
76/23.07.08/EE(M)-III
M/s Salabh Gupta
Status Report of MLA, Sh.Prem SinghAC No. 34,2008-09
S.No.
Name of Work deptt. Div. D.O.S D.O.C
CIVIL M-III 23.06.08 05.06.08 199760 04.08.08 15.09.08 198873 Completed
CIVIL M-III 03.07.08 05.06.08 498793 M/s J.P. Const. 28.08.08 24.09.08 498696 Completed
CIVIL M-III 03.07.08 05.06.08 464382 28.08.08 24.09.08 463079 Completed
CIVIL M-III 23.07.08 26.05.08 454200 14.01.09 27.02.09 450320 Completed
CIVIL M-III 23.07.08 09.04.08 199945 10.09.08 03.11.08 198879 Completed
CIVIL M-III 22.09.08 04.09.08 599800 24.12.08 23.03.09 553845 Completed
CIVIL M-III 22.09.08 04.09.08 599900 25.12.08 30.03.09 552888 Completed
CIVIL M-III 26.09.08 04.09.08 499600 M/s Jagdish 31.12.08 05.02.09 466220 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Expenditure
Present Position
1 C/O culvert near School and Community Centre and dev. of road berms near Church by P/L cc in Block no.18 Dakshinpuri Extn. in C-183/SZ
103/25.07.08/EE(M)-III
M/s Amar Engg. & Contractor
2 C/O road surface by P/L RMC from M.C. Pry.School Madangir Village to Raja Ram marg in Madangir Village in C-180/SZ
148/18.08.08/EE(M)-III
3 C/O B/Wall of park near h.no.18 in CPO-Block Madangir Ph-I in C-183/SZ
147/18.08.08/EE(M)-III
M/s Sadh na Assos.
4 C/O drainage system from Durbal Nath Mandir to F-37 Dakshinpuri in C-182/SZ
275/07.01.09/EE(M)-III
M/s Jha & Jha Const.
5 C/O Park in L-Block Madangir PH.-II C-182/SZ SH: B/Wall,grit wash plaster and M.S. grills etc.
191/08.09.08/EE(M)-III
M/s Bahadur Singh Contractor
6 Dev of lanes by p/l RMC from h.no. 199 to 220 in D-1 Madangiri in C-183/SZ
253/15.12.08/EE(M)-III
M/s Sadh na Assos.
7 Dev of lanes by p/l RMC from h.no. 67 to 88, 23 to 44, 111 to 132 and 155 to 176 in D-I MadangiriC-183/SZ
255/15.12.08/EE(M)-III
M/s Sadh na Assos.
8 C/o drain from F-600 to RPS Nallah in Dakshinpuri in w.no. 182/SZ
271/29.12.08/EE(M)-III
Status Report of MLA, Sh.Ramesh BidhuriAC No. 35,2008-09
S.No.
Name of Work deptt. Div. D.O.S D.O.C
CIVIL M-III 15.07.08 04.04.08 335744 15.09.08 15.11.08 329658 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Expenditure
Present Position
1 P/L Outfall drainage line near Tubewell(Satan House)in Kuan Mohalla in Village Tughlakabad in C-197/CZ
10/25.08.08/EE(M)-III
M/s Kunwar Pal Singh
CIVIL M-III 29.08.08 26.05.08 557600 15.01.09 P 536241 In Prog.
CIVIL M-III 29.07.08 26.05.08 760600 Bansal Ent. 30.09.09 P 748600 In Prog.
CIVIL M-III 29.07.08 26.05.08 470800 13.10.08 04.12.08 468803 Completed
CIVIL M-III 29.07.08 14.05.08 518500 28.01.09 30.04.09 499593 Completed
CIVIL M-III 29.07.08 14.05.08 255000 13.10.08 25.11.08 253615 Completed
CIVIL M-III 29.07.08 27.05.08 605900 04.02.09 25.07.09 600000 Completed
CIVIL M-III 29.07.08 15.05.08 357500 07.01.09 06.05.09 357500 Completed
CIVIL M-III 29.07.08 14.05.08 349600 09.01.09 08.02.10 336268 Completed
CIVIL M-III 29.07.08 20.05.08 564300 15.01.09 05.03.09 381649 Completed
CIVIL M-III 01.10.08 06.08.08 419500 04.12.08 03.02.09 417911 Completed
CIVIL M-III 01.10.08 06.08.08 382000 26.12.08 23.02.09 379945 Completed
CIVIL M-III 01.10.08 06.08.08 366200 21.12.08 03.02.09 365359 Completed
CIVIL M-III 01.10.08 07.08.08 232100 07.01.09 06.05.09 232100 Completed
CIVIL M-III 01.10.08 07.08.08 458300 23.12.08 01.01.09 457351 Completed
CIVIL M-III 01.10.08 07.08.08 407600 26.12.08 23.02.09 406950 Completed
CIVIL M-III 01.10.08 07.08.08 427200 28.12.08 23.02.09 426592 Completed
CIVIL M-III 01.10.08 07.08.08 459700 19.01.09 09.03.09 459592 Completed
CIVIL M-III 01.10.08 07.08.08 367000 16.12.08 03.02.09 360022 Completed
2 P/L RMC in Janta Flats no.499 to 579 Pul Pehladpur in C-198/CZ
33/03.12.08/EE(M)-III
M/s Pankaj builders
3 P/L RMC in Janta Flats no.136 to 315 Pul Pehladpur in C-198/CZ
32/19.08.09/EE(M)-III
4 P/L RMC in Janta Flats no.25 to 34 and 13(L.I.G)and Janta Flats no.354 to 444 Pul Pehladpur in C-198/CZ
25/13.10.08/EE(M)-III
M/s Pankaj builders
5 P/L RMC in Janta Flats no.585 to 723 Pul Pehladpur in C-198/CZ
45/15.12.08/EE(M)-III
M/s Pankaj builders
6 C/O Protection wall near h.no.396 and near 723 in Janta Flats Pul Pehladpur in C-198/CZ
25/13.10.08/EE(M)-III
M/s Pankaj builders
7 P/L cc in F-Block 81 to 148,35 to 93,F-151 to 155,F-155 to 159 and 159 to F-121 Lal Kuan in C-198/CZ
79/02.01.09/EE(M)-III
M/s Happy Const. Company
8 C/O Protection wall near h.no.F-69 and E-176 Lal Kuan in C-198/CZ
64/02.01.09/EE(M)-III
M/s Happy Const. Company
9 C/O S.W.drain and culvert from h.no.A-341 to Kaver Mandir in Lal Kuan in C-198/CZ
86/02.01.09/EE(M)-III
M/s R.K. Const Co.
10 C/O S.W.drain and culvert from h.no.A-202 to A-384 Lal Kuan in C-198/CZ
55/31.12.08/EE(M)-III
M/s R.K. Const Co.
11 P/L cc and drain A-24 to A-10 and A-17A HR-6 Pul Pehladpur in w.no. 198 CZ
29/03.12.08/EE(M)-III
M/s Pankaj builders
12 P/L cc adn culvert gali no.2 Om Shanti Bhawan to HR-36A Pul Pehladpur in w.no. 198 CZ
46/15.12.08/EE(M)-III
M/s Pankaj builders
13 P/L cc and culvert house no. HR-27/B-10 to HR-29B and HR-29B to HR-27D Pul Pehlad w.no. 198 CZ
30/03.12.08/EE(M)-III
M/s Pankaj builders
14 C/o Protection wall near h.no. E-216 Lal Kuan in w.no. 198 CZ
78/02.01.09/EE(M)-III
M/s Happy Const. Company
15 P/l RMC near mazar and near Laxmi store lal kuan w.no. 198/CZ
36/03.12.08/EE(M)-III
M/s Pooja Const Co.
16 P/L RMC and drain I-115 to I-110 and back side petrol pump Lal Kuan in w.no. 198/CZ
50/15.12.08/EE(M)-III
M/s Pankaj builders
17 P/L RMC and drain _-164 to Bharon Mandor and I-164 to I-115 Lal Kuan in w.bno. 198/CZ
51/15.12.08/EE(M)-III
M/s Pankaj builders
18 P/L RMC on road side berms petrol pump Lal Kuan in w.no. 198/CZ
80/02.01.09/EE(M)-III
M/s Suman Assos.
19 P/L Cement concrete from h.no. 14 and 15 to R-36 in Pul Pehlad pur village in w.no. 198/CZ
37/03.12.08/EE(M)-III
M/s Bansal Entp.
CIVIL M-III 01.10.08 07.08.08 397700 08.12.08 12.01.09 396775 Completed
CIVIL M-III 13.10.08 07.08.08 238500 07.01.09 06.05.09 238500 Completed
CIVIL M-III 13.10.08 07.08.08 556600 07.01.09 06.05.09 556600 Completed
CIVIL M-III 13.10.08 07.08.08 595600 11.01.09 05.05.09 595600 Completed
CIVIL M-III 13.10.08 07.08.08 592000 09.01.09 05.05.09 592000 Completed
CIVIL M-III 13.10.08 07.08.08 609000
CIVIL M-III 13.10.08 07.08.08 680100 18.09.09 P 674919 In Prog.
CIVIL M-III 13.10.08 07.08.08 602000 04.03.09 06.05.06 600000 Completed
CIVIL M-III 13.10.08 07.08.08 420900 17.08.09 P 350057 In Prog.
CIVIL M-III 13.10.08 07.08.08 248600 13.02.09 09.03.09 248441 Completed
20 P/L RMC and const. of culvert from h.no. A-40 to A-38 and A-38 to T-11A in Pul Pehladpur village in w.no. 198/CZ
35/03.12.08/EE(M)-III
M/s Sanjeev Const Co.
21 Imp of lane by pdg cc pavment from Firey Singh house to Sh. Rambir singh (MLA) house in Jalim Mohalla, Tuglakabad village in w.no. 197 CZ
77/02.01.09/EE(M)-III
M/s Happy Const. Company
22 Imp to street by pdg RMC near h.no. R-36 to MB road in Pul Pehladpur village in w.no. 198/CZ
60/02.01.09/EE(M)-III
M/s Happy Const. Company
23 Imp to road by pdg RMC near Rajinder house in Chhuria mohalla in vilaghe Tuglakabed in w.no. 197/CZ
59/02.01.09/EE(M)-III
M/s Happy Const. Company
24 Imp to road from pump house to Balmiki Mandir in Chhuria mohalla in village Tuglakabed in w.no. 197/CZ
57/02.01.09/EE(M)-III
M/s R.K. Const Co.
25 Imp of lane by pdg cc pavment and drain from Shiv Mandir house to Arya Samaj Mandir in tuglakabed village in w.no. 197/CZ
26 Imp of road from Tuglakabed Extn. towards Karmveer house in village Tuglakabad in w.no. 197/CZ
31/19.08.09/EE(M)-III
M/s Happy Const. Company
27 Imp to road near Vidya Jyoti Public School in village Tuglakabad (master cly.) in w.no. 197/CZ
85/02.01.09/EE(M)-III
M/s R.K. Const Co.
28 Imp of lane by pdg cc pav. and drain along mamchand, Tejram Papu and along Papu house in Kuan mohalla Tuglakabad village w.no. 197/CZ
14/21.05.09/EE(M)-II
M/s K.B. Tanwar
29 Imp to lanes by P/L pavment from Pappu house to School gate in Parjapati mohalla in Tuglakabad village in w.no. 197/CZ
83/02.01.09/EE(M)-III
M/s Prashant Const Co.
Status Report of MLA,Sh.Ram Vir Singh BidhuriAC No. 36,2008-09
S.No.
Name of Work deptt. Div. D.O.S D.O.C
CIVIL M-IV 03.09.08 31.07.08 484800 01.12.08 27.01.09 484786 Completed
CIVIL M-IV 03.09.08 31.07.08 480300 01.12.08 27.01.09 478686 Completed
CIVIL M-IV 03.09.08 31.07.08 523500
CIVIL M-IV 03.09.08 31.07.08 524600 03.12.08 17.02.09 463590 Completed
CIVIL M-IV 03.09.08 31.07.08 412600 08.12.08 02.12.09 388972 Completed
CIVIL M-IV 03.09.08 31.07.08 475800 11.12.08 17.02.09 451139 Completed
CIVIL M-IV 03.09.08 31.07.08 374600 13.12.08 16.02.09 354813 Completed
CIVIL M-IV 03.09.08 31.07.08 280400 08.12.08 04.02.09 271543 Completed
CIVIL M-IV 03.09.08 31.07.08 506900 05.12.08 16.02.09 482714 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Expenditure
Present Position
1 Pdg drainage system and RMC from F.no.532 to F.no.387 in DDA Janta Flats Badarpur in C-203/CZ
36/10.10.08/EE(M)-IV
M/s Prakash Entp.
2 Pdg drainage system and RMC from F.no.435 to F.no.177 in DDA Janta Flats Badarpur in C-203/CZ
39/10.10.08/EE(M)-IV
M/s Dinesh Entp.
3 Pdg drainage system and RMC from F.no.42 to F.no.205 in DDA Janta Flats Badarpur in C-203/CZ
4 Pdg drainage system and RMC from F.no.5 to F.no.115 in DDA Janta Flats Badarpur in C-203/CZ
37/10.10.08/EE(M)-IV
M/s K.S. builders
5 Pdg drainage system and RMC from F.no.538 to F.no.571,F.no.616 to F.no.581 and F.no.662 to F.no.655 in DDA Janta Flats Badarpur in C-203/CZ
41/10.10.08/EE(M)-IV
M/s Prakash Entp.
6 Pdg drainage system and RMC from F.no.202 to F.no.235,F.no.276 to F.no.241 and F.no.242 to F.no.331 in DDA Janta Flats Badarpur in C-203/CZ
35/10.10.08/EE(M)-IV
M/s Prakash Entp.
7 Pdg drainage system and RMC from F.no.368 to F.no.341 and F.no.374 to F.no.423 in DDA Janta Flats Badarpur in C-203/CZ
38/10.10.08/EE(M)-IV
M/s Sunlight Const.
8 Pdg drainage system and RMC from F.no.2 to F.no.27 and F.no.60 to F.no.33 in DDA Janta Flats Badarpur in C-203/CZ
43/10.10.08/EE(M)-IV
M/s Sunlight Const.
9 Pdg drainage system and RMC from F.no.176 to F.no.125 and 171 to F.no.122 in DFDA Janta Flats Badarpur in C-203/CZ
40/10.10.08/EE(M)-IV
M/s Dinesh Entp.
CIVIL M-IV 03.09.08 31.07.08 496500 01.02.09 P 493550 In Prog.
CIVIL M-IV 03.09.08 31.07.08 495700 17.10.09 p 491800 In Prog.
CIVIL M-IV 03.09.08 31.07.08 376000 02.06.09 P 274600 In Prog.
CIVIL M-IV 03.09.08 31.07.08 452900 02.01.09 12.08.09 452323 Completed
CIVIL M-IV 03.09.08 31.07.08 423400 29.01.09 19.03.09 423056 Completed
CIVIL M-IV 03.09.08 23.08.08 455300 16.12.08 13.01.09 407406 Completed
CIVIL M-IV 03.09.08 23.08.08 396000 16.12.08 31.01.09 357751 Completed
CIVIL M-IV 03.09.08 23.08.08 401000 16.12.08 16.01.09 396107 Completed
CIVIL M-IV 03.09.08 23.08.08 433600 16.12.08 30.03.09 426099 Completed
CIVIL M-IV 03.09.08 23.08.08 403000 16.12.08 04.02.09 375601 Completed
CIVIL M-IV 03.09.08 23.08.08 478900 16.12.08 05.09.09 463513 Completed
CIVIL M-IV 03.09.08 23.08.08 512000 29.08.09 08.10.09 511964 Completed
CIVIL M-IV 03.09.08 31.07.08 490300 01.02.09 14.02.09 489355 Completed
CIVIL M-IV 29.09.08 31.07.08 198500 10.01.09 15.06.09 178277 Completed
10 Pdg Bituman Mastic near Dustbin in DDA Janta Flats in Badarpur in C-203/CZ
67/10.10.08/EE(M)-IV
M/s Bansal Const Co.
11 Pdg Bituman Mastic near MCD School in DDA Janta Flats Badarpur in C-203/CZ
42/10.10.08/EE(M)-IV
M/s Bansal Const Co.
12 C/O drain from kalu hs to Lata hs in Village Badarpur in C-203/CZ
231/28.02.09/EE(M)-IV
M/s Garg Const.
13 P/L RMC from Shyam Begai Shop to Ch. Bheem Singh in Village Badadpur in C-203/CZ
93/24.12.08/EE(M)-IV
M/s Sunlight Const.
14 Pdg drainage system and RMC in Dharamdav Bhagatji Pappu and Sonu hs gali in Village Badarpur in C-203/CZ
94/24.12.08/EE(M)-IV
M/s Sunlight Const.
15 Pdg RMC on road from Jeet hs to Bhulley Chauhan hs in madanpur Khadar in C-207/CZ
46/10.10.08/EE(M)-IV
M/s Inder Const. Co.
16 Pdg RMC drainage system in Yad Ram wali gali,Trector Workshop wali gali,Bhim Singh Chauhan wali gali and link in Chauhan Mohalla in Madanpur Khadar in C-207/CZ
45/10.10.08/EE(M)-IV
M/s Inder Const. Co.
17 Pdg RMC on road from Khajan Singh Chauhan to Chaupal in Madanpur Khadar in C-207/CZ
44/10.10.08/EE(M)-IV
M/s Inder Const. Co.
18 Pdg RMC in Mahander Chauhan wali gali and its links in Chauhan Mohalla in Madanpur Khadar in C-207/CZ
69/10.10.08/EE(M)-IV
M/s Inder Const. Co.
19 Pdg RMC and drainage system from Chaupal to Pappu hs and kartar wali gali,Jai Kishan wali gali in Madanpur Khadar in C-207/CZ
68/10.10.08/EE(M)-IV
M/s Inder Const. Co.
20 Pdg drainage system and RMC Rajesh wali gali,Partap Spngh wali gali,Mool Chand wali gali,Mahipal wali gali in Chauhan Mohalla in Madanpur Khadar in C-207/CZ
47/10.10.08/EE(M)-IV
M/s Inder Const. Co.
21 Pdg RMC on road Sapera Basti to Rajendra hs in Chauhan Mohalla Madanpur Khadar in C-207/CZ
06/01.06.09EE(M)-IV
M/s Inder Const. Co.
22 Pdg biyuman mastic near Satpal house in DDA Janta Flats Badarpur in C-203/CZ
66/10.10.08/EE(M)-IV
M/s Bansal Const Co.
23 P/L RMC in Prem Sagar shop gali and Khanna house gali in village Badarpur w.no. 203/CZ
102/24.12.08/EE(M)-IV
M/s Aditya Bhardwaj
Status Report of MLA, Sh.Brahm PalAC No. 37,2008-09
S.No.
Name of Work deptt. Div. D.O.S D.O.C
CIVIL M-III 23.06.08 13.06.08 1E+06 06.03.09 30.04.09 1185897 Completed
CIVIL M-III 23.06.08 13.06.08 2E+06 01.01.00 14.05.09 1789468 Completed
CIVIL
M-II
10.08.08 10.09.08 982200 M/s MC Const. 24.07.09 03.10.09 765443 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Expenditure
Present Position
1 Dev of lane by pdg drainage system and ccfrom h.no.481 to 500,small parl to 431,411 to 430,410 to 391,376 to small park,375 to small park, small park to 181,small park to 311,281 to 310 and /links in block-18 Trilok Puri AC-37/210 SH(S)Zone
336/27.02.09
M-III
M/s Shahi
Const co2 Imp of lane by pdg drainage system and cc pav
from h.no.310 to 281 360 to park 391 to 410 430 to 411 461 to 480 Block no.20 Trilokpuri w.no.209/Sh(S)Zone
312/05/01/09
M-III
M/s Shahi
Const co3 Covering of drain by SFRC slab after raising of wall
from block no. 112 to 117 and block no. 181 to 264 (Ganga marg) in pkt-I Mayur Vihar ph-1 w.no.203/37 Sh(S) Zone
16/11.06.09/
EE(M)-II/
Sh(S)
CIVIL
M-III
23.06.08 13.06.08 995050 M/s J.P. Mittal 10.07.09 16.10.09 969069 Completed
CIVIL
M-III
10.08.08 10.09.08 943700 M/s J.P Mittal 04.01.10 06.04.10 912276 Completed
CIVIL
M-III
10.08.08 10.09.08 984200 M/s J.P. Mittal 28.02.09 19.06.09 859789 Completed
elect
E-I
10.08.08 10.09.08 598474 103/15.10.08 15.10.08 12.11.08 582020 Completed
elect
E-I
10.10.08 27.06.08 598474 117/15.10.08 15.10.08 23.11.08 559300 Completed
electE-I
10.10.08 09.09.08 400000 140/02.02.09 02.02.09 P 292650In Prog.
CIVIL
M-III
23.06.09 13.06.08 2E+06
CIVIL
M-III
11.06.09 02.09.08 1E+06 05.06.09 08.07.09 1090473 Completed
4 Dev of lane by pdg cc pavment from house no. 27/480 to 27/31, 27/186 to 110, 27/375 to 360 and near 141 in block no.27 Himatpuri w.no. 211/37 Sh(S) Zone
22/11.06.09/
EEM-III5 Dev of lane by pdg cc pavment from hno. 32/45 to
46, 32/60 to 31, 32/141 to 161 and near 31/265and near 30/411 to 430 in Trilokpuri/Himatpuri in w.no. 211/37 Sh(S) Zone.
154/16/12/10
/EE(M)-III6 Dev of lane by pdg cc pavment and covering of
drain by pdg SFRC slab from hno. 21C to 17B near 11D, 27D to 35C 31A to 35D9-49A to 51D in Chilla Janta flats in w.no. 211/37 Sh(S) Zone.
332/18.02.09
M-III7 P/o SHm light near MC Pry School Kotla village,
chowk kotla vilaage and opp. Idgah Kotla road Mayur Vihar ph-I in AC-37/under Sh(S)
M/s Sushma
Electrical8 P/o SHM light opp. T-point main chowk block-13
Trilokpuri, near chowk block 139-25 Trilokpuri opp. Dev Complex Sanchar Mayur Vihar ph-I in AC-37/under Sh(S)
M/s Tyagi
Electircal9 Pdg lighting arrangement in Municipal park at
Mayur Vihar part-I M/s Electra technologies
10 Dev of centrak works from block-13 Chowk to Kondli point Kotla road Trilok Puri AC-37/210/SH(S)
11 Dev of lane by pdg drainage system and cc from h.no.280 to 251,281 to 310,335 to 360 and 390 to 375 near School and links in block-6,Trilok Puri in AC-37/210/SH(S)
17/11.06.09
M-III
M/s Shahi
Const co
Status Report of MLA, Sh.Amrish Singh GautamAC No. 38,2008-09
S.No.
Name of Work deptt. Div. D.O.S D.O.C
CIVIL M-III 19.06.08 16.05.08 499514 197/29.08.08 09.08.09 11.06.09 499514 Completed
CIVIL M-III 19.06.08 16.05.08 499897 201/4.09.09 14.09.08 25.05.10 499897 Completed
CIVIL M-III 19.06.08 16.05.08 498666 198/29/08/08 09.08.08 30.05.09 498666 Completed
CIVIL M-III 19.06.08 16.05.08 499977 199/29/08/08 09.08.08 06.11.08 499907 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Expenditure
Present Position
1 Dev of lane by pdg rmc M-20 from h.no.11/271 to 11/320 in block no.11 Kalyanpuri w.no.213/SH(South)Zone
M/s M.K. Const co
2 Dev of lane by pdg rmc M-20 from h.no.11/16 to 11/100 in block no.11 Kalyanpuri w.no.213/SH(South)Zone
M/s Tomar Const Co
3 Dev of lane by pdg rmc M-20 from h.no.12/186 to 12/230 in block no.12 Kalyanpuri w.no.213/SH(South)Zone
M/s Suraj Const Co
4 Dev of lane by pdg rmc M-20 from h.no.12/271 to 12/320 in block no.12 Kalyanpuri w.no.213/SH(S)Zone
M/s Alankar Builder
CIVIL M-III 19.06.08 16.05.08 499773 200/29.08.08 09.08.08 10.10.08 499773 Completed
CIVIL M-III 19.06.08 16.05.08 498845 196/29/08/08 09.08.08 11.10.08 498676 Completed
CIVIL M-III 20.06.08 02.06.08 2E+06 86/15/10/08 15.12.08 21.01.09 2393000 Completed
ELECT E-I 20.06.08 02.06.08 652313 91/06.07.08 13.10.08 12.12.08 512599 Completed
ELECT E-I 20.06.08 14.05.08 651344 69/03.09.08 10.09.08 10.11.08 515966 Completed
ELECT E-I 20.06.09 12.05.08 652513 113/15/10/08 23.10.08 23.12.08 545320 Completed
ELECT E-I 20.06.08 07.05.08 653682 68/3.09.08 11.09.08 10.11.08 505134 Completed
CIVIL M-III 12.08.08 18.06.08 496708 225/01.10.08 05.12.08 15.05.08 496708 Completed
CIVIL M-III 12.08.08 21.06.08 499858 243/6/10/08 17/10/08 16/05/09 499858 Completed
CIVIL M-III 12.08.08 19.06.08 499467 237/6/10/08 20.10.08 28.05.09 499467 Completed
CIVIL M-III 12.08.08 20.06.08 498785 247/6/10/08 11.10.08 23/04/09 498785 Completed
CIVIL M-III 12.08.08 21.06.08 498751 19/11/08 25/05/09 498751 Completed
CIVIL M-III 20.08.08 20.06.08 498931 11.10.08 06.02.08 497228 Completed
CIVIL M-III 4.09.08 30.08.08 499029 24/10/08 24/12/08 496679 Completed
5 Dev of lane by pdg rmc M-20 from h.no.14/110 to 14/125 in block no.14 Kalyanpuri w.no.213/SH(S)Zone
M/s Suresh Enterp.
6 Dev of lane by pdg rmc M-20 from h.no.11/96 to 11/260 in block no.11 Kalyanpuri w.no.213/SH(S)Zone
M/s Rajesh Assoc
7 Dev of road by dense carpetting from block no.1(Dispencary)to block no.6 Khicharipur in AC-38/SH(S)Zone
M/s Arjun Serfacing agency
8 P/O semi high mast light at chowk between pkt. A and B,SFS Flats Mayur Vihar ph-III and MPL. park D-1 and D-2 Janta Flats in AC-38/SH(S)Zone
M/s Perfect Elet. Const
9 P/O 12m semi high mast light at 14 Block Kalyanpuri near gate of Lal bahadur Hospital Chowk 9,10 and 4 and chowk block no.5 Khicharipur near Transformer in AC-38/SH(S)
M/s Perfect Elect.
10 P/O 12m semi high mast light at MPL.park SFS flats between C and D Kondli road near State Bank of Patiyala and Block no.9 Khicharipur near h.no.9/215 in AC-38/SH(S)
M/s Illuminater Circuit
11 P/O 12m semi high mast light at Chowk block 9 and 2 near Sulabh Sauchalaya and A-1 and A-2 block Mayur vihar Ph-III in AC-38/SH(S)
M/s Perfect Elect.
12 Dev of road by pdg M/P from h.no.800 to 1257 (DDA Road End)Gharoli Dairy Farm A-Block in C-215/SH(S)Z
M/s New Aditya Bldres
13 Dev of road by pdg M/P from h.no.305 to 472 in Gharoli Dairy Farm A-Block in C-215/SH(S)Z
M/s Shiv Bldres
14 Dev of road by pdg M/P opp.park near h.no.6220 and 777 Ghorali Dairy Farm A-Block in C-215/SH(S)Z
M/s Manishconst
15 Dev of road by pdg M/P from h.no.800 to 628 in Ghirali Dairy Farm A-Block in C-215/SH(S)Z
M/s Vinay Const co
16 Dev of road by pfg M/P from h.no.76 to 160 in Ghorali Dairy Farm in A-Block C-215/SH(S)Z
242/6/10/08M-III
M/s Suraj Const Co
17 Dev of Central park by Fancing of Wicket Gate opp.h.no.88 and 322 in Ghorali Dairy Farm in A-Block C-215/SH(S)Z
231/01/10/08M-III
M/s Tomar Const Co
18 Dev of road by pdg RMC on dividing road of group X and XI in pkt.-A-2,from main gate to MC pry.School,MV Ph.III in C-216/AC-38/SH(S)Z
277/16/10/08 M_III
M/s Singlaji Const Co
CIVIL M-III 4.09.08 30.08.08 499295 24/10/08 28/11/08 496431 Completed
CIVIL M-III 4.09.08 30.08.08 499010 25/10/08 17/12/08 499010 Completed
CIVIL M-III 08.09.09 30.09.09 487175 28/12/08 23/03/09 486357 Completed
CIVIL M-III 10.09.08 25.08.08 480000 12.11.08 14/02/09 477716 Completed
CIVIL M-III 1.10.08 4.09.08 483500 10.06.09 17.07.09 400200 Completed
CIVIL M-III 1.10.08 4.09.08 642600 19.06.09 11.12.09 514092 Completed
CIVIL M-III 1.10.08 4.09.08 574500 23.05.09 21.09.09 469887 Completed
19 Dev of lanes by pdg RMC and drain from flat no.23A to 17B in dividing lanes around the park in pkt.-A-1 in MV Ph-III in C-216/AC-38/SH(S)Z
275/16/10/08M-III
M/s Bhagwan Dass
20 Dev of lanes by pdg RMC around the park opp.flat no.98A and its adj qublanes of group-IV in pkt.-A-2 in MV Ph-III in C-216/AC-38/SH(S)Z
279/16/10/08M-III
M/s Singhla const Co
21 Dev of lane by pdg RMC around the Park opp.flat no.174B and its nearly area in group-XIII pkt.A-3 MV ph.-III in C-216/AC-38/SH(S)Z
303/18/12/08 M-III
M/s Shiv Bhagwan
22 Dev of road/lane from road of block no.10 Khicharipur to house of Rajpal Bharti in Village Khicharipur in AC-38/219/SH(S)Z imp by pdg RMC
211/02/12/08 M-IV
m/s Bhagwati Const co
23 Dev of lanes by pdg RMC (M-20) from F no. 182A to 173A in group -XIII pkt-A-3 Mayur Vihar ph-III, w.no.216/38 Sh(S)
1/02.06.09/EE*M)-III
M/s Suman Assos.
24 Dev of lanes by pdg RMC from F no. 107B to 113B around park and open surface near Dutbin in group-IV pkt-A-2 Mayur Vihar ph-III, w.no.216/38 Sh(S)
02/10.06.09/EE(M)-III SH(S) Zone
M/s Bhati Const. Co.
25 Dev of lanes by pdg RMC from F no. 92B to 81B in group -IV pkt-A-2 Mayur Vihar ph-III, w.no.216/38 Sh(S)
27/12.06.09 EE(M) Shah (S)-III
M/s Sharma & Sharma Const
Status Report of MLA, Smt.Meera BhardawajAC No. 39,2008-09
S.No.
Name of Work deptt. Div. D.O.S D.O.C
ELECT E-I 23.06.09 26.05.08 199207 93/10.10.08 18/11/08 P 165000
In Prog.CIVIL M-IV 27.08.08 05.08.08 440302 10.04.08 11.03.08 440127 Completed
CIVIL M-IV 27.08.08 05.08.08 302417 15.10.08 20.08.09 302417 Completed
CIVIL M-IV 27.08.08 05.08.08 255872 10.05.08 13/12/08 255724 Completed
CIVIL M-IV 03.09.08 31.07.08 405770 M/s Wadhwa 01.09.09 03.09.09 399938 Completed
CIVIL M-IV 03.09.08 31.07.08 690000 02.10.09 05.11.09 605962 Completed
CIVIL M-IV 03.09.08 29.07.08 466470 01.07.09 29/04/09 460836 Completed
CIVIL M-IV 03.09.08 31.07.08 499871 20.10.08 08.07.09 498712 Completed
CIVIL M-IV 03.09.08 28.07.08 697500 03.09.09 P 692500 In Prog.
CIVIL M-IV 03.09.08 25.07.08 499406 19/02/09 16/05/09 499183 Completed
CIVIL M-IV 03.09.08 25.07.08 404295 19.02.09 09.11.09 403423 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Expenditure
Present Position
1 Prov. of street light fitting HPSV 150 watt at Westm
Vinod Ngr. w.no.72/AC-39/SH(S)
M/s Illumination Circurt
2 Pdg cc pav.and c/o drain near Chaudary Dhiraj and Lakhi Public School in Mandawali Fazalpur in C-218/AC-39/SH(S)Z
169/25/09/08
M-IV
M/s Man Mohan singh Washwa
3 Pdg cc pav and c/o drain in link gali from h.no.130 gali no.7 to gali no.1 in Sarpanchwara Mandawali Fazalpur in C-218/AC-39/SH(S)Z
174/26.09.08
/EE(M)-IV
M/s Bhagwati
Const Co.4 Pdg cc pav and c/o drain in link gali to Budha Marg
Mandawali Fazalpur in C-218/AC-39/SH(S)Z
181/26/08/08
M-IV
M/s Sharma & Sharma const co
5 Dev of lanes by pdg cc pav. near h.no. 4-70,4/50 and 4/47 in Upadhaya Block in Shakarpur in C-224/AC-39/SH(S)Z
234/01/01/09
M-IV6 Covering of Nalla near Mother Dairy Booth in
School Block Shakarpur in C-224/AC-39/SH(S)Z267/03/02/09 M-IV
M/s Bagwati Const Co
7 Dev of lanes by pdg cc pav. near h.no.4-69 in Upadhaya Block Shakarpur in C-224/AC-39/SH(S)Z
235/01/01/09
M_III
M/s Rajesh
Assicates8 Dev of Gurudwara Wali gali by pdg cc. pav. in
Upadhaya Block Shakarpur in C-224/AC-39/SH(S)Z
201/13/10/08
M-IV
M/s Kirit
Assocat9 Stg. of road from ROB side towards Bus stop by
pdg mastic in Mandawali Fazalpur in w.no. 218/AC-39 Sh(S)
26/25/08/09/
M-IV
M/s A.K.
Enterprices10 Pdg cc pavment and drain to gali no.3 from .no.
228 Railway cly. to kalyan marg in Mandawali Fazalpur in w.no. 218/AC-39/Sh(S)
307/10.02.09
M-IV
M/s Bachan
const Co11 Pdg cc pav. and drain in gali no.6 Shanker marg
near h.no.215/4 and link in Mndawali Fazalpur w.no.218 Sh(S)
303/10.02.09
/EE(M)-IV
M/s Singhlaji
Const. Co.
CIVIL M-IV 10.10.08 3.10.08 497015 326/19.02.09 28.02.09 02.04.10 496899 Completed
CIVIL M-IV 10.10.08 15.09.08 340300 25.02.09 18.04.09 336595 Completed
CIVIL M-IV 10.10.08 15.09.08 821852 318/17/02/09 20.02.09 15/05/09 809090 Completed
CIVIL M-III 10.10.08 15.09.08 737616 19/2/09 23/05/09 736033 Completed
CIVIL M-IV 10.10.08 15.09.08 560746 233/31.12.08 06.01.09 05.01.00 559261 Completed
12 Dev of approach road to Kalyan marg from Preet Vihar side upto gali no.9 by pdg cc pavment in Railway ly. Mandawali Fazalpur w.no.218 AC-39
M/s United
const. co13 Dev of lane by pdg cc pavment near Car workshop
and J-I in East Vinod nagar in w.no.218 AC-39298/10/02/09 M_IV
M/s Vijay Const co
14 Covering of nallah opp. Sr. Sec. school in School block Skarpur in w.no.224 Sh(S)
M/s Singhla Const co
15 C/o nallah near h.no. S-380 in School block Skarpur w.no.224/Sh(S)
317/17/02/09 M_III
M/s Singhla Const co
16 Covering of nallah near h.no. S-371 in School block Shakarpur in w.no. 224/Sh(S)
M/s Singhla Const co
Status Report of MLA, Sh.Ashok Kumar WaliaAC No. 40,2008-09
S.No.
Name of Work deptt. Div. D.O.S D.O.C
CIVIL M-I 23.06.08 24.05.08 500000 29/08/09 P 488469 In Prog.
CIVIL M-I 23.06.08 24.05.08 449791 M/s JP Mittal 18/08/08 30.09/08 449163 Completed
CIVIL M-I 28.07.08 24.05.08 349632 12.08.08 20.10.08 349632 Completed
CIVIL M-I 28.07.08 24.05.08 485000 M/s K.K.Const 18.08.08 30.09.08 483720 Completed
CIVIL M-I 07.08.08 24.05.08 379500 13.08.08 25/09/08 379442 Completed
CIVIL M-I 07.08.08 15.07.08 299982 21.08.08 20.10.08 299982 Completed
CIVIL M-I 11.08.08 15.07.08 329792 21.08.08 20.10.08 329792 Completed
CIVIL M-I 11.08.08 07.07.08 179943 14/07/08 30.08/08 179825 Completed
CIVIL M-I 11.08.08 07.07.08 199718 21/07/08 23/08/08 199172 Completed
CIVIL M-I 11.08.08 07.07.08 700000 M/s JP Mittal 25/08/08 11.08.08 588186 Completed
ELECT E-I 11.08.08 07.07.08 497624 83/27/09/08 30.10.08 P 422247 In Prog.
CIVIL M-I 21.08.08 11.07.08 400000 188/12/08/08 14.08/.08 20.10.08 397621 Completed
CIVIL M-I 21.08.08 11.07.08 270000 14.08.08 26.09.08 267331 Completed
CIVIL M-I 26.08.08 07.07.08 250000 180/12.08.08 14.08.08 10.10.08 250000 Completed
CIVIL M-I 26.08.08 07.07.08 399017 183/12.08.08 15.08.08 15.10.08 396826 Completed
CIVIL M-I 26.08.08 15.07.08 378100 M/s J.P.Mittal 28.09.08 05.12.08 376105 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Expenditure
Present Position
1 Prov. mastic asphalt on main road and intersection in gali no.4 I-Block w.no.221/AC-40
230/21/08/09 M_I
M/s Bansal Const co
2 Dev of lane prependicular to M.C. park by pdg rmc in Vishvkarma park in AC-40/221
169/12.08.09 M-I
3 Dev of lane adj to h.no.L-30 by pdg rmc and D/S in
L-Block in AC-40/222
176/12.08.08
M-I
M/s Jai Chanda Associate
4 Dev of lane of H-Block near h.no.90 by pdg rmc in Garhwali Mohalla AC-40/221
168/12.02.08 M-I
5 Dev of lane of by pdg rmc and D/S near h.no.35 and 7 in Kishan Kunj Laxmi Ngr. AC-40/222
177/12/08/08 M-I
M/s shiov Shakti Const
6 Dev of lane by pdg rmc and D/S near h.no.689 and link in West ghuru Angad ngr. AC-40/222
178/ 12.08.08 M-i
M/s Shakers Const co
7 Dev of lane by pdg rmc and D/S near h.no.B-237 in B-Block PD Vihar AC-40/222
179/12.08.08 M-I
M/s Shakers constco
8 Pdg rmc in PP-block near h.no PP-7 in Laxmi Ngr. AC-40/222
135/15/07/08 M-I
M/s Kapil Kumar puri
9 Dev of drainage system and pdg rmc in lanr near h.no.9 Krishan Kunj Extn. part-II AC-40/221
136/15.07/08 M-I
M/s Bhagwati Dass
10 Dev of D/S of PD Vihar from LPS School to outfall drain AC-40/222
229/21/08/08 M-I
11 P/o semi high mast light near underground water reservair,Bank Enclave and near School West Guru Angad Ngr. AC-40
M/s Illuminater& Circuters
12 Pdg rmc and drain from h.no.2187 to 2197 and its link in RP-1 AC-229/40
M/s Manish Const Co
13 Pdg rmc and drain from h.no.2209 to 2218 and its link in RP-1 AC-229/40
184/12.8.08 M_i
M/s Kapil Kumar puri
14 Dev of lane infront of h.no.8A/44 Geeta Colony AC-229/40
M/s Dawer Assiciate
15 DEv of lane infront of h.no.D-23 and links in jheel in AC-229/40
M/s Hari Kumar
16 Covering of drain by pdg RCC slab in B block PD Vihar from Lovely Public sr.sec. School towards master plan road in AC-40
228/4.09.08
M-I
CIVIL M-I 29.09.08 02.08.08 496372 16.10.08 18.12.08 366112 Completed
CIVIL M-I 11.08.08 02.08.08 250000 346/8.10.08 17.10.08 18.12.08 196133 Completed
CIVIL M-I 29.08.08 17.07.08 250000 10.07.08 11.12.08 214078 Completed
Dev of lane 1A and link in Aram park in C-230/40 CIVIL M-I 29.08.08 19.07.08 416000 17/10/08 18/12/08 314327 Completed
CIVIL M-I 29.08.08 17.07.08 250000 10.07.08 11.12.08 208855 Completed
CIVIL M-I 29.08.08 19.07.08 262700 M/s Deepak 29/10/08 18/12/08 212140 Completed
CIVIL M-I 29.08.08 17.07.08 197039 10.09.08 09.11.08 195074 Completed
CIVIL M-I 29.08.08 19.07.08 298300 30.09.08 01.12.08 240738 Completed
CIVIL M-I 29.08.08 19.07.08 248200 26/12/08 18/04/09 208668 Completed
CIVIL M-I 29.08.08 17.07.08 396600 29.4.09 27.04.09 396600 Completed
CIVIL M-I 04.09.08 17.07.08 857000 31.12.08 27.02.05 629356 Completed
CIVIL M-I 22.09.08 15.07.08 154391 M/s Sangala 26.12.08 26.02.08 154352 Completed
CIVIL M-I 22.09.08 15.07.08 219500 M/s Deepak 12.01.09 09.03.09 180013 Completed
CIVIL M-I 25.09.08 19.07.08 327500 27.12.08 08.04.09 264532 Completed
CIVIL M-I 25.09.08 19.07.08 395000 26/12.08 27.03.09 321732 Completed
CIVIL M-I 03.10.08 19.07.08 700000 06.11.09 07.01.10 651801 Completed
CIVIL M-I 28.07.08 02.08.08 695300 14.01.10 P 657000 In Prog.
CIVIL M-I 28.07.08 02.08.08 230000 19.01.09 19.03.09 190397 Completed
CIVIL M-I 28.07.08 02.08.08 300000 14.01.09 24.03.09 248276 Completed
CIVIL M-I 28.07.08 02.08.08 550000 27.12.08 26.03.09 364457 Completed
17 Dev of lane infront of Astha Public School Rani Garden in C-230/40
347/810/08 M-I
M/s Guru Kirpa Enterp
18 Dev of lane infront of h.no. 70A New Lahore Shastri Nagar in C-230/40
M/s Guru Kirpa Enterp
19 Dev of lane infront of h.no. 12/70 Geeta colony in C-230/40
320/29/09/08 M-I
M/s Guru Kirpa Enterp
20 348/8/10/08 M-I
M/s Guru Kirpa Enterp
21 Dev of lane along park near h.no. 16/80 Geeta colony in C-230/40
319/29/09/08 M-I
M/s Guru Kirpa Enterp
22 Dev of lane infront of h.no. 12/24 Geeta colony in C-230/40
307/08/07/09 M-I
23 Dev on culvert at different location in block 12 & 13 Geeta colny in C-230/40
255/01/09/08 M-i
m/s Vijay Const
24 Dev of lane infront of h.no. 12/137 Geeta colony in C-230/40
310/23/09/08 M-I
M/s Riya Const
25 Dev of lane infront of h.no.2/18 Geeta Colony in C-229/40
436/09/12/08 M-I
M/s Parveen & Bor.
26 Dev of Culver at police Station Geeta Colony and Raja Ram Kohli Marg in C-229/40
468/19.01.09 M-I
M/s Saraswati Const co
27 Dev of lane infront of h.no.92(along mastar plan road)in Sarojini Park in C-230/40
403/17.12.08 M-I
M/s Bhagwati Dass
28 Covering of drain by pdg SFRC slab in PD Vihar A block adj. to park near h.no. A-110 in AC-40
437/19.12.08 M-I
29 Dev of lane by pdg RMC adj. to h.no. J-3/141 and J-3/109 in J Extn. AC-40/221
440/05.01.09 M-I
30 Dev of lane by pdg RMC and D/S in lane adj. to h.no. F-66 in West Jwahar park AC-40/221
431/19.12.08M-i
M/s Bachan Const Co
31 Dev of lane by adj. to h.no. 51A to 124A in Kishan Kunj Extn. by pdg RMC in AC-40/221
430/19/12/08 M-I
M/s Bachan Const Co
32 Dev of road and adj. intersection by pdg mastic asphalt in the lane opp. transformer in Vishkarma park AC-40/221
186/03.11.09
/M-I
M/s Prdeep Kr.
Goal33 Dev of road by intersection by pdg mastic asphalt
from Tikona park to Palwal road in F.F block Laxmi nagar in AC-40/221
238/06.01.10
/EE(M)-I
M/s Bansal
Const. Co.34 Dev of lane by pdg RMC near h.no. 58 and 21 in
Vijay Block in Laxmi nagar in AC-40/221442/05.01.09 M-I
M/s Bachan Const Co
35 Dev of lane by pdg RMC near 6-7 and 6-38 6 block Laxmi nagar AC-40/221
439/05.01.09 M-i
M/s Deepak Const co
36 Dev of road berms of Paliwal road by pdg interlocking tiles from h.no. F-190/663 to PP Ganj road in Laxmi nagar AC-40/221
433/14.12.09
M-i
M/s Bachan
Const Co
CIVIL M-I 28.07.08 02.08.08 299200 30.12.08 26.03.09 224099 Completed
CIVIL M-I 28.07.08 02.08.08 199500 12.01.09 12.03.09 166050 Completed
CIVIL M-I 28.07.08 02.08.08 628000 365/24.10.08 25.02.09 P 624000 In Prog.
CIVIL M-I 28.07.08 02.08.08 516404 19.08.08 03.11.08 516404 Completed
CIVIL M-I 28.07.08 02.08.08 683986 352/08.10.08 16.10.08 p 649787 In Prog.
CIVIL M-I 28.07.08 02.08.08 456865 20.08.08 20.11.08 456865 Completed
CIVIL M-I 28.07.08 02.08.08 467691 18.08.08 18.10.08 467691 Completed
CIVIL M-I 28.07.08 02.08.08 417206 09.05.08 06/011/08 417206 Completed
45 ELECT E-I 28.07.08 02.08.08 388096 15.02.09 12.03.09 355356 Completed
46 ELECT E-I 28.07.08 02.08.08 404714 154/06.02.09 15.02.09 12.03.09 378984 Completed
47 ELECT E-I 01.09.09 17.09.08 399335 10.04.09 05.10.09 387415 Completed
48 ELECT E-I 28.07.08 02.08.08 621131 10.04.09 27.03.09 599964 Completed
49 ELECT E-I 01.01.09 12.09.08 388096 15.02.09 26.05.10 361782 Completed
37 Dev of lane by pdg RMC near Sanatan Dharam Mandir in F block Laxmi Nagar AC-40/221
434/19.12.09 M-i
M/s Bachan Const Co
38 Dev of D/S of Vishwkarma park L shpae lane and pdg RMC in link lane connecting SDm office and Vishkarma park in AC-40/221
443/05.01.09
M-i
M/s Bachan
Const Co39 Pdg Mastic ashpalt on Gurudwara road and
intersaction in B block Guru Ram Das nagar in AC-40/w.no.222
M/s Bansal
Const. Co.40 Dev of lane by pdg RMC on berms of road
connecting Vishkarma park to Kishan Kunj road w.no.221
204/12.08.08
M-i
M/s Bhgwati
const co41 Dev of D/S of CR road from gali no.11 D block to
main Lalita park road in w.no.221
M/s jai Bhagwan Const Co
42 Dev of road berms by pdg RMC in Shastri gali and link in F block w.no.222 Sh(S)
206/12.8.08 m-I
M/S Bhagwati Const Co
43 Dev of berms of old Thana road by pdg RMC in Laxmi nagar w.no. 222 Sh(S)
205/12.08.08M-I
M/S Bhagwati Const Co
44 Dev of berms in the lane near h.no.214 and lane along MC Pry School Mangal Bazar by pdg RMC in w.no. 222 Sh(S)
267/04/09/08
M-i
M/s Bhagwati
Dass P/o Semi HML in f block Laxmi Nagar AC_40 Sh
(S) Zone.
156/06.02.09 M/s Electra Eusion Technologies
P/o SHML in PD Yehar lalita Park Laxmi Nagar AC-
40 under Sh (S) Zone
M/s Electra Eusion Technologies
P/o Lighting arrangement in Existing pall 150 w watt HPSV fitting in w No 230/AC-40 Sh (S) Zone
211/Krishan Electical
M/s Krishana Elect.
P/o lighting arrangement in Existing pall 150 w watt
HPSV fitting in AC-40 Sh (S) Zone
251/
02.03.08
M/s Illuminater& Circuters
P/o SHML in D& E block Lzxmi Nagar AC_40 Sh (S
) Zone
153/
06.02.09
M/s Electra Eusion Technologies
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.27
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.11
0.00
0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.004.38
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.93
4.86
4.90
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.05
0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.00
14.74
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.84
0.00
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.004.84
0
0
0
0
0
0
0
0
000000000
Liabilities Rs.lacs
00000000000000000000000000000000000000000000
00000000000000000000000000000000
0.00
Liabilities Rs.lacs
0.21
0.12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.09
0.05
0.00
0.71
0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.007.18
0.00
0.00
5.24
0.00
0.00
0.00
0.00
0.00
0.00
Liabilities Rs.lacs
0.03
0.04
1.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.006.32
0.00
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
1.07
15.60
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
16.67
0.00
0.00
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.05
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.39
0.12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.75
0.00
0.00
0.00
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.38
0.00
0.00
0.00
0.00
0.00
0.04
0.00
0.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.001.63
deptt. deptt. deptt. deptt.Div.
civil elect hort cse M-I
Status Report of MLA,ShArvindra Singh LovelyAC No. 41,2008-09
S.No.
Name of Work deptt. Div.
CIVIL M-II 20.06.08 21.05.08 299953
CIVIL M-II 20.06.08 21.05.08 199885
CIVIL M-II 20.06.08 21.05.08 199977
CIVIL M-II 20.06.08 21.05.08 299644
CIVIL M-II 20.06.08 21.05.08 399655
CIVIL M-II 20.06.08 21.05.08 199828
CIVIL M-II 20.06.08 21.05.08 199968
CIVIL M-II 20.06.08 21.05.08 199905
CIVIL M-II 20.06.08 21.05.08 199828
CIVIL M-II 20.06.08 21.05.08 199664
CIVIL M-II 20.06.08 21.05.08 199516
CIVIL M-II 20.06.08 21.05.08 199565
CIVIL M-II 20.06.08 21.05.08 199752
CIVIL M-II 20.06.08 21.05.08 494903
CIVIL M-II 20.06.08 21.05.08 498827
Date of Booking
Date of Consen
t
Amount booked
1 Dev of lane by pdg rmc and drainage system from h.no.4965 to 4972 in Kaushick Puri C-235/41
2 Pdg rmc and drainage system from h.no.5035 to 4091 in gali no.4 Kaushick Puri C-235/41
3 Dev of lane by pdg rmc and drainage system from h.no.5134 to 5137 in gali no.3 Kaushick Puri C-235/41
4 Dev of lane by pdg rmc and drainage system from h.no.5057 to 5084 Kaushick Puri C-235/41
5 Dev of lane by pdg rmc and drainage system from h.no.5084 to 5139 in gali no.1 Kaushick Puri C-235/41
6 Dev of lane by pdg rmc and drainage system from h.no.5025 to 5027 Kaushick Puri C-235/41
7 Dev of lane by pdg rmc and drainage system near h.no.5099 in Kaushick Puri C-235/41
8 Dev of lane by pdg rmc and drainage system from h.no.X-3667A to h.no.3710 Shanti Mohalla C-236/41
9 Dev of lane by pdg rmc and drainage system from h.no.X-3666 to h.no.X-3664/C Shanti Mohalla C-236/41
10 Dev of lane by pdg rmc and drainage system from h.no.X-3668 to h.no.3700B Shanti Mohalla C-236/41
11 Dev of lane by pdg rmc and drainage system from h.no.X-3700/3 to h.no.B-17/A Shanti Mohalla C-236/41
12 Dev of lane by pdg rmc and drainage system from h.no.3911 to h.no.3904, Shanti Mohalla C-236/41
13 Dev of lane by pdg rmc and drainage system near h.no.3720/E1 and h.no.X-3774 Shanti Mohalla C-236/4114 Dev of Multani Mohalla road from Subhash road to Prem gali by pdg rmc in C-234/41
15 Dev of main road Gandhi Ngr. near Ser. Sec. School by pdg rmc in Kailash Ngr. in C-234/41
CIVIL M-II 20.06.08 21.05.08 499684
CIVIL M-II 20.06.08 21.05.08 499386
CIVIL M-II 20.06.08 21.05.08 435000
CIVIL M-II 20.06.08 21.05.08 499788
CIVIL M-II 20.06.08 21.05.08 497648
CIVIL M-II 20.06.08 21.05.08 300000
CIVIL M-II 20.06.08 21.05.08 380278
CIVIL M-II 20.06.08 21.05.08 497963
CIVIL M-II 20.06.08 21.05.08 481983
CIVIL M-II 20.06.08 21.05.08 199574
CIVIL M-II 20.06.08 21.05.08 199846
CIVIL M-II 20.06.08 21.05.08 199388
CIVIL M-II 20.06.08 21.05.08 199944
CIVIL M-II 20.06.08 21.05.08 199783
CIVIL M-II 20.06.08 21.05.08 199764
CIVIL M-II 20.06.08 21.05.08 199728
CIVIL M-II 07.08.08 09.07.08 199920
CIVIL M-II 07.08.08 09.07.08 199920
16 Dev of gali no.9 Raghubarpura-II by pdg rmc in Dharampura C-233/41
17 Dev of main road Ghandhi ngr. near Hanuman Mandir by pdg rmc in C-234/41
18 Dev pf lane near Shambhunath Building by pdg rmc in Ghandhi Ngr. C-234/41
19 Dev of Multani Mohalla road from P.O.road to Prem gali 3E by pdg rmc in C-234/41
20 Dev of Dharampura Extn. road by pdg rmc in Ghandhi Ngr. C-234/41
21 Dev of lane near Banarsidass Building by pdg rmc in Dharampura C-233/41
22 Dev of Ajeet Ngr. gali no.9 by pdg rmc in Dharampura C-233/41
23 Dev of gali no.8 RAghubarpura-II by pdg rmc in C-233/41
24 Dev of Subhash Mohalla gali no.4 by pdg rmc in C-233/41
25 Dev of Jai Mata Wali gali by pdg rmc and D/S from h.no.549 to 5490 Raghubarpura-I C-236/41
26 Dev of Badi gali by pdg rmc and D/S from h.no.X-502 to X-499 and near h.no. X-551A Raghubarpura-I C-236/41
27 Dev of lane by pdg rmc and D/S from h.no.X-1183 to X-1189 Rajgarh Colony C-236/41
28 Dev of lane by pdg rmc and D/S from h.no.X-970 to X-976 Chand Mohalla C-236/41
29 Dev of lane by pdg rmc and D/S from h.no.X-64 and X-68 Raghubarpura-I C-236/41
30 Dev of lane by pdg rmc and D/S from h.no.11/191 to 163A Rajgarh Colony C-236/41
31 Dev of lane by pdg rmc and D/S from h.no.A-69 to X-1510 Rajgarh Colony C-236/41
32 Dev of lane by pdg RMC and drainage system from h.no.3911 to 3917 in gali no.13 Shanti Mohalla C-235/41 SH(S)Z
33 Pdg RMC and drainage system from h.no.3921 to 3941 in Shanti Mohalla C-235/41SH(S)Z
CIVIL M-II 07.08.08 09.07.08 199876
CIVIL M-II 26.08.08 09.07.08 299908
36 CIVIL M-II 26.08.08 09.07.08 199919
37 CIVIL M-II 04.09.08 09.07.08 299762
38 CIVIL M-II 04.09.08 09.07.08 399832
39 CIVIL M-II 04.09.08 09.07.08 397000
40 CIVIL M-II 10.10.08 09.07.08 478600
41 CIVIL M-II 10.10.08 09.07.08 480000
42 CIVIL M-II 10.10.08 09.07.08 489600
43 CIVIL M-II 10.10.08 09.07.08 497700
44 CIVIL M-II 10.10.08 09.07.08 470000
45 CIVIL M-II 10.10.08 09.07.08 454900
46 CIVIL M-II 10.10.08 09.07.08 480300
47 CIVIL M-II 10.10.08 09.07.08 394000
48 CIVIL M-II 10.10.08 09.07.08 417000
34 Dev of lane pdg RMC and drainage system from h.no.4928/B-33 to drain in gali 4E Masjid Mohalla East of Seelampur in C-235/41
35 D/O lane by pdg RMC and drainage system from h.no.4928/A-26 to h.no.4928/A/35/1 in Masjid Mohalla East Old Seelampur C-235/AC-41/SH(S)Z
Dev of lane by pdg RMC and drainage system from h.no. 3928 to 3921 in Shanti mohalla SH(S)Dev of lane by pdg RMC and drainage system from h.no. 3928/B-16 Hanuman Mandir in Masjid mohhala east old seelampur SH(S)
Dev of lane pdg RMC and drainage system from h.no.3928/6-B to 4928/B-20 in gali no.4-1 Masjid Mohalla East of Seelampur in C-235/41
Dev of lane by pdg RMC and drainage system from h.no. 4928/A/1 to drain in gali no.3 masjid mohalla in east old Seelampur Sh(S)
Dev of gali no.9 and its link by pdg RMC and D/s Amar mohalla in Sh(S)Dev of main road by pdg RMC and drainage system in Amar Mohalla Sh(S)Dev odf lane by pdg RMC and drainage system from h.no. 5310 to 7533Raghubarpura-II Sh(S)Dev of gali no./2 and its link by pdg CC pav. And dainage system in Nanak Basti in Sh(S)Dev of lane by pdg RMC and D/s nerar h.no. 3106 and 3111 to 3168 Raghubarpura 2 Sh(S)dev of lane pdg RMC and drainage system from h.no. 1280 to gali no.4 Raj Garh cly. Sh(S)Dev of lane by pdg and drainage system from h.no. 3044 Gurudwara Raghubarpura Sh(S)Dev of lane by pdg RMC and D/s near h.no. 2959 an h.no. 3050 and link between gali no.4 & 5 Sh(S)Dev of lane by pdg RMC and D/s near h.no.3775 3864 Shanti mohalla Sh(S)
Status Report of MLA,Sh HarshwardhanAC No. 42,2008-09
S.No.
Name of Work deptt. Div.
CIVIL M-II 23.06.08 24.05.08 497772
CIVIL M-II 23.06.08 24.05.08 498715
Date of Booking
Date of Consen
t
Amount booked
1 covering of drain at E-Block Krishna
Ngr. by pdg rmc in C-229/422 Pdg rmc and drain in gali no.4 and 5
in A-Block krishna Ngr. C-229/42
CIVIL M-II 28.07.08 24.05.08 696400
CIVIL M-II 28.07.08 24.05.08 697400
CIVIL M-II 07.08.08 24.05.08 199848
CIVIL M-II 07.08.08 15.07.08 199888
CIVIL M-II 11.08.08 15.07.08 632000
CIVIL M-II 11.08.08 07.07.08 399600
CIVIL M-I 11.08.08 07.07.08 996000
CIVIL M-I 11.08.08 07.07.08 993300
CIVIL M-I 11.08.08 07.07.08 789900
CIVIL M-I 21.08.08 11.07.08 718600
CIVIL M-I 21.08.08 11.07.08 754500
CIVIL M-II 26.08.08 07.07.08 199775
CIVIL M-I 26.08.08 07.07.08 999657
CIVIL M-I 26.08.08 15.07.08 560600
CIVIL M-I 29.09.08 02.08.08 689600
CIVIL M-II 11.08.08 02.08.08 694620
3 Stg. of road by pdg mastic asphalt
from h.no. F-14/15 to desu office in F
block Krishna NAgar in C-229/424 Stg. of road by pdg mastic aspkalt
from road no.57 to Hari Raj marg & J-5/7 in A block east Krishna Nagar in C-229/42
5 Dev of lane by pdg RMC and drainage system in opp.lane of gali no.7 to gali no.10 Shankar Ngr.Extn. C-235/42 SH(S)Z
6 Dev of lane by pdg RMC and drainage system in gali no.5 Eat of Azad Ngr.C-235/42 SH(S)Z
7 Stg of road by pdg mastic asphalt from h.no.23 to 34 and its link in Gyan Park in C-231/42
8 Dev of lane by pdg RMC and its link along h.no.A-21 and C-4 in Rashid Mkt.in C-231/42 SH(S)Z
9 Stg of road by pdg mastic asphalt
near h.no.63 and 96 in Radheypuri
Extn.-II in C-232/4210 Stg of road by pdg mastic asphalt
near h.no.A-20 and 74A in 33 in Radheypuri Extn.-II in C-232/42
11 Stg of road by pdg mastic asphalt
near h.no.A-11 and B-5/28 in B-Block
Krishna ngr. in C-229/42 SH(S)Z12 Stg of road by pdg mastic asphalt
near h.no.48 pandit park to h.no.244/19 Ghondi in C-231/42
13 Stg of lane no.5 and its link by pdg
mastic asphalt in Rashid Mkt.in C-
231/4214 Dev of lane by pdg RMC and D/S in
gali no.10 Shankar Ngr.Extn.C-235/AC-42/SH(S)Z
15 Stg.of road by pdg Mastic Asphalt on main road Lal Mandir and gali no.3 and 4 Radheypuri in C-229/AC-42/SH(S)Z
16 Stg.of road by pdg Mastic Asphalt
from h.no.K-63 to K-75 in C-229/AC-
42/SH(S)Z17 Imp. of d/s and covering of drain from
h.no. B-1 to B-48 in Jittar Nagar in B block AC-42/232 Shah(S)
18 Stg of road by pdg mastic asphalt
near h.no. A-20 and A-24 in A-Block
Jagatpuri in AC-42/232
CIVIL M-I 29.08.08 17.07.08 693200
CIVIL M-I 29.08.08 19.07.08 997015
CIVIL M-I 29.08.08 17.07.08 685000
CIVIL M-I 29.08.08 19.07.08 610000
CIVIL M-I 29.08.08 17.07.08 792500
CIVIL M-I 29.08.08 19.07.08 983500
CIVIL M-I 29.08.08 19.07.08 653400
CIVIL M-I 29.08.08 17.07.08 666000
CIVIL M-II 04.09.08 17.07.08 399942
CIVIL M-II 22.09.08 15.07.08 373800
CIVIL M-II 22.09.08 15.07.08 660450
CIVIL M-II 25.09.08 19.07.08 556000
CIVIL M-I 25.09.08 19.07.08 700000
CIVIL M-I 03.10.08 19.07.08 900000
CIVIL M-II 28.07.08 02.08.08 776014
19 Imp of D/S and covering of drain near h.no. A-1 to A-46 in A-Block Jittar Ngr. in AC-42/232
20 Stg of road by pdg mastic asphalt near h.no. A-5 and A-22 in Jagatpuri in AC-42/232/SH(S)Z
21 Stg of lane no.1 by pdg mastic
asphalt in Shyam Ngr.in AC-42/23122 Stg of Bhagat Singh road by pdg
mastic asphalt from h.no.6 Satnam Park from h.no.108 Ram Ngr.Ext. in C-231/42
23 Stg of main road by pdg mastic
asphalt from h.no.110 Ram Ngr.Ext.
to link road in C-231/4224 Stg of main road by pdg mastic
asphalt from h.no.E-24 East Chandar Ngr. to h.no. H-11 in East Chandar Ngr. in C-231/42
25 Stg of lane no.2 by pdg mastic
asphalt in Old Govindpura Ext.in C-
231/4226 Stg of lane no.4 and lane along
Ser.Sec. School in Old Govindpura
Ext.in C-231/4227 Dev of lane by pdg RMC and
drainage system in gali no.7 Kanti Ngr.Ext.C-235/AC-42/SH(S)Z
28 Dev of lane by pdg RMC and
drainage system in gali no. 9 Krishna
nagar extn. 235/Shah(S) Zone29 Stg. of road by pdg mastic asphalt
from h.no. B-9/24 to B-17/8 in B block Krishna Nagar w.no.229/Sh(S)
30 Stg. of road by pdg mastic asphalt from Chhochi Bldg Chowk to main road Raghubarpura in C-229/AC-42
31 Stg. of road by pdg mastic asphalt from A-Block Park to B-11/10 in B-Block Krishna Ngr. in C-229/42/SH(S)Z
32 Stg. of road by pdg mastic asphalt
from h.no. F-24/1 to F-6/24 F block
Krishna nagar ni w.no. 229/Sh(S)33 Stg of road by pdg mastic asphalt in
galoi no.1 and 3 old Arjun nagar in
w.no.229
Status Report of MLA, Sh. Naseeb SinghAC No. 43,2008-09
S.No.
Name of Work deptt. Div.
CIVIL M-II 17.06.08 19.05.08 2E+06
CIVIL M-II 17.06.08 19.05.08 2E+06
CIVIL M-II 17.06.08 19.05.08 2E+06
ELECT E-I 18.06.08 23.05.08 446034
ELECT E-I 18.06.08 23.05.08 242937
ELECT E-I 18.06.08 23.05.08 439866
ELECT E-I 18.06.08 23.05.08 248319
ELECT E-I 18.06.08 23.05.08 237748
ELECT E-I 18.06.08 23.05.08 470529
CIVIL M-II 20.06.08 29.04.08 300000
CIVIL M-II 20.06.08 30.05.08 297300
CIVIL M-II 20.06.08 02.06.08 566913
CIVIL M-II 20.06.08 02.06.08 389307
ELECT M-II 26.06.08 29.04.08 389723
CIVIL M-II 26.06.08 29.04.08 2E+06
Date of Booking
Date of Consen
t
Amount booked
1 Imp of road in G-Block Preet vihar C-
2282 Imp of road in C and D Block Preet
vihar and Gagan Vihar h.no.82 to 98, 100 to 1061 C-228
3 Imp/Stg of road in G-Block Preet vihar (H.no.G-22 G-53) Chitra Vihar and Shanker Vihar w.no.228
4 P/O semi high mast pole near choupal in MPL. park opp.h.no.125/2 Kakardooma Vill. AC-43/225
5 P/O semi high mast pole near h.no.B-
43 Preet vihar AC-43/2256 P/O semi high mast pole near
h.no.99 and h.no.289 in Mpl.prak AGCR Enclave AC-43
7 P/O semi high mast pole opp. Kala
Niketan School In Gazipur Vill. AC-43P/O semi high mast pole nar in Municipal park opp. h.no. 225 Karkardooma Village AC-43
9 P/O semi high mast pole at behind Mother dairy in central park C block Nirman Vihar and corner of gali no.3 GAzipur in Ac-43/Sh(S)
10 Dev of Vishwas naghar c/o road by pdg cc and drainage of gali no.6 and half (KDS) in vishwas nagar c-226/AC-40
11 C/o road by pdg RMC from h.no. 131, 107 and 148 back lane to h.no. 158 in saini enclave in C-225/AC-43
12 C/o road by pdg mastic carpeting in back side of delhi Administrative flats in Karkardooma village in C-225/AC-43
13 C/o road by pdg RMC and drain in lane no. 13,12 and link in Karkardooma village w.no. C-225/AC-43
14 Prov.of lighting arrangement in Kasturba Gandhi Park New vihwas Ngr. AC-43
15 Dev/Stg of road by pdg mastic asphalt in gali no.2,4,6 and 8 in New Govindpura in C-228/AC-43
CIVIL M-II 05.08.08 29.04.08 531100
CIVIL M-II 05.08.08 29.04.08 500000
CIVIL M-II 05.08.08 29.04.08 263100
CIVIL M-II 05.08.08 29.04.08 760078
CIVIL M-II 26.08.08 29.04.08 2E+06
CIVIL M-II 26.08.08 29.04.08 2E+06
CIVIL M-II 26.08.08 29.04.08 2E+06
CIVIL M-II 26.06.08 29.04.08 625778
CIVIL M-II 02.09.08 10.04.08 443600
CIVIL M-II 02.09.08 02.06.08 443600
CIVIL M-II 02.09.08 03.07.08 499707
CIVIL M-II 26.06.08 03.07.08 684645
CIVIL M-II 26.06.08 03.07.08 311000
CIVIL M-II 26.06.08 03.07.08 579398
CIVIL M-II 26.06.08 10.04.08 560267
16 P/L cc pav.and dev of sw drain in lane no.B-6 to B-16,A-15 to A-18 in East Arjun Ngr.Visvash Ngr.C-226
17 P/F Name Boards in Anand Vihar
AC-43 Visvash Ngr.in C-22518 P/L cc pav.and dev of sw drain in
lane from h.no.C-25 to C-16,D-23 in East Arjun Ngr.Visvash Ngr.C-226
19 Dev of approved colony- Stg and dev of drainage system from h.no.46 to 62 and 161 to 174 and 233b to 214,215 to 232 in Surya Niketan C-225
20 I/S of road in A and B Block Preet
Vihar C-228/AC-43/SH(S)Z21 I/S of road in Gagan Vihar by pdg
mastic asphalt from h.no. 36 to 41,73 to 69,66 to 59,54 to 47,BSES Office to 349,348 to 333 and 343 to 308 in C-228/AC-43/SH(S)Z
22 I/S of road in Gagan Vihar by pdg mastic asphalt in East Guru Angad Ngr. and East Laxmi Mkt. in C-228/AC-43/SH(S)Z
23 C/O road by pdg mastic carpetting of Kunti Marg from gali no.4 to gali no.10 in Vishwas Ngr. in C-226/AC-43/SH(S)Z
24 Covering and development of Nallah from gali no. 4 Pandav road side Vishwas nagar in w.no.226/Sh(S)
25 Covering and development of Nallah from gali no. 4 and 8 Pandav road side Vishwas nagar in w.no.226/Sh(S)
26 Dev. of 60" road Vishwas nagar by constructing foot path on covering of existing nallah in w.no226/Sh(S) from gali no. 13 to gali no.17 (KDS)
27 C/o road by pdg mastic carpeting in
Daksh road (PRS) in Vishwas nagar
in w.no.226/Sh(S)28 C/O road by pdg cc and imp to
drainage to gali no.8,9 half(RHS) in
Vishwas Ngr. in C-226/AC-43/SH(S)Z29 C/O road by pdg mastic carpetting of
Kunti Marg from gali no.15 to gali no.17 in Vishwas Ngr. in C-226/AC-43/SH(S)Z
30 C/O road by pdg mastic carpetting in gali no.12(KDS)Vishwas Ngr. in C-226/AC-43/SH(S)Z
CIVIL M-II 26.06.08 10.04.08 466376
CIVIL M-II 26.06.08 10.04.08 542253
CIVIL M-II 26.06.08 08.07.08 573421
CIVIL M-II 26.06.08 04.07.08 598462
CIVIL M-II 26.06.08 24.07.08 671218
CIVIL M-II 02.09.08 24.07.08 489707
CIVIL M-II 02.09.08 24.07.08 463399
CIVIL M-II 03.09.08 24.07.08 470372
CIVIL M-II 03.09.08 24.07.08 479700
ELECT E-I 10.10.08 10.10.08 273965
CIVIL M-II 10.10.08 20.08.08 597600
CIVIL M-II 10.10.08 06.09.08 599175
31 C/O road by pdg mastic carpetting in
Siddharth Gali, gali no.10(PRS)in
Vishwas Ngr. in C-226/AC-43/SH(S)Z32 C/O road by pdg mastic carpetting in
Nehru Gali (PRS) in Vishwas Ngr.in C-226/AC-43/SH(S)Z
33 C/O road by pdg mastic carpetting in Karan Gali in (KDS)Vishwas Ngr.in C-226/AC-43/SH(S)Z
34 C/O road by pdg mastic carpetting from gali no.10 to gali no.15 in Vishwas Ngr.in C-226/AC-43/SH(S)Z
35 C/O road by pdg mastic carpetting in gali no.2 (KDS) in Vishwas Ngr.in C-226/AC-43/SH(S)Z
36 Dev of Vishwas Ngr. by covering of existing drain along 60 feet road and c/o footpath from Arjun gali to gali no.2 Vishwas Ngr.in C-226/AC-43/SH(S)(KDS)
37 P/L RMC m-20 grade and d/o SW drain in gali no.6,10(small gali)in Bhisham Singh Colony Vishwas Ngr.in C-226/AC-43/SH(S)
38 Dev of approved colony stg. of road along DMRC wall from h.no.40 to 73 jagriti Enclave in C-225/AC-43/SH(S)Z
39 Stg. of road along DAV Public School
Sresththa Vihar C-225/AC-43/SH(S)Z40 P/O street light fitting at various cly. in
AC-43/under Sh(S) (Anand Vihar, rishab vihar, jagrati enclave, Bahubali enclave, priya enclave, Saini enclave, Shri Ram enclave, Suraj vihar, vivek vihar etc.0
41 C/o road by pdg mastic carpet from h.no.82 to 92 in Vigyan vihar w.no.225/AC-43 Sh(S)_
42 covering of drain in dayanand vihar from School to h.no. 270 and 183 in w.no.228 sh(S)
Status Report of MLA, Sh Narendra NathAC No. 44,2008-09
S.No.
Name of Work deptt. Div.
hort
E-I 20.06.08 29.04.08 136577
hort E-I
20.06.08 29.04.08 135648
hort E-I
20.06.08 29.04.08 135968
Date of Booking
Date of Consen
t
Amount booked
1 Prov. of Tubewell at park J and K h.no.104 Dilshad Garden w.no.240/AC-44
2 Prov. of Tubewell at park J and K h.no.88 Dilshad Garden w.no.240/AC-44
3 Prov. of Tubewell at park J and K h.no.42 Dilshad Garden w.no.240/AC-44
civil M-I
20.06.08 22.05.08 95633
civil M-II
20.06.08 22.05.08 193946
civil M-II
20.06.08 22.05.08 197000
civil M-II
20.06.08 22.05.08 195705
civil M-II
20.06.08 22.05.08 182234
civil M-II
20.06.08 22.05.08 494000
civil M-II
20.06.08 22.05.08 394000
civil M-II
20.06.08 22.05.08 197000
civil M-II
20.06.08 22.05.08 199423
civil M-II
20.06.08 22.05.08 199000
civil M-II
20.06.08 22.05.08 370600
civil M-II
20.06.08 22.05.08 585200
civil M-II
20.06.08 22.05.08 591600
civil M-II
20.06.08 22.05.08 477000
civil M-II
08.07.08 22.05.08 356000
civil M-II
08.07.08 22.05.08 522000
hort E-I
25.07.08 23.07.08 139363
civil M-II
29.08.08 17.07.08 196828
civil M-II
29.08.08 17.07.08 376000
4 P/L rmc in lane near railway line in Bhihari Colony w.no.237/AC-44
5 P/L rmc in lane near Hari Mandir gali in Jawala Ngr. in w.no.238/AC-44
6 P/L rmc in lane adj to Prop. no. 455 in Jawala Ngr. w.no.238/AC-44
7 P/L rmc in in gali no.8 Bhaihari Colony in w.no.237/AC-44
8 P/L rcc culvert and MS jalls at different drain crossing in w.no./44
9 P/L rmc in lane portion from Prop.no.221 towards prop.no. 740 in jawala Ngr.C-238/44
10 P/L rmc in gali no.3 bhihari colony in w.no.237/AC-44
11 P/L rmc in lane near flat no.227 and 236 in Shiva Khand in Vishvkarma Ngr. in w.no.238/AC-44
12 P/L rmc in lane adj to prop.no.346 in Bhola Nath Ngr. in w.no.237/AC-44
13 P/L rmc in lane behind Gaushala in Bhola Nath Ngr. in w.no.237/AC-44
14 P/L rmc in lane and link adj to prop.no.202 in Mohalla Gudai in Shahdra Vill. in w.no.237/AC-44
15 P/L rmc at Church road adj to St. John school in jawala Ngr.in w.no.238/AC-44
16 P/L rmc at Church road starting from Shiv Mandir chowk in jawala Ngr.in w.no.238/AC-44
17 P/L rmc in lane from Kali Mata Mandir chowk to gali no.6 in jawala Ngr.in w.no.238/AC-44
18 P/l RMC in gali masjid wali in Jwala nagar C-238/44
19 P/l RMC in lane adj. to MC Pry School in Jwala nagar C-238/44
20 P/O tube well at 251 Shiva khurd w.no. 238
21 P/L RMC in lane adj to Property no.4/2265 in Behari Colony in C-237/AC-44/SH(S)Z
22 P/L RMC in gali no.12 Mahabir Block Bholanath Ngr.in C-237/AC-44/SH(S)Z
civil M-II
29.08.08 17.07.08 567000
civil M-II
29.08.08 17.07.08 498000
civil M-II
29.08.08 17.07.08 296000
civil M-III
03.09.08 19.07.08 347561
civil M-III
03.09.08 21.07.08 499807
civil M-III
03.09.08 16.06.08 479980
civil M-III
03.09.08 16.06.08 499647
civil M-III
03.09.08 16.06.08 499686
civil M-II
03.09.08 17.07.08 193369
civil M-II
03.09.08 17.07.08 197482
civil M-II
03.09.08 17.07.08 198218
civil M-II
05.09.08 17.07.08 439000
civil
05.09.08 17.07.08 463000
civil M-II
19.09.08 17.07.08 184394
civil M-II
06.10.08 17.07.08 200000
civil M-II
08.10.08 17.07.08 499000
23 P/L RMC in gali no.11 adj to house of Devi Sahey in Bholanath Ngr.in C-237/AC-44/SH(S)Z
24 P/L RMC in gali no.4 Property no.4/2755 in Behari Colony in C-237/AC-44/SH(S)Z
25 P/L cc in lane adj to Property no.278,299 in Mohalla Doorga in Shahdra Village in C-237/AC-44/SH(S)Z
26 Dev of Chowraha/lane adj to flat no.126 to 130,144,197,etc by pdg cc pav in J and K Block Poohit Dilshad Garden in AC-44/SH(S)Z
27 Dev to lane by cc pav near h.no. 181,185,192 in E-Pkt.Dilshad Garden in C-239/AC-44/SH(S)Z
28 Dev to drainage system by perfaraled slab from L-111 to L-95 in L-Pkt.Dilshad Garden in AC-44/SH(S)Z
29 Dev to road by m/premixing from Factory no.2 to 29 DSIDC Sheds in A-Block Jhilmil Industrial Area in AC-44/SH(S)Z
30 Dev ot drainage system adj flat no.133,153,27,43,etc by perfarcoted slab in H-Pkt. Dilshad Garden in AC-44/SH(S)Z
31 P/L RMC in gali no.10 (Rly.line side)in Bihari Colony in C-237/AC-44/SH(S)Z
32 P/L RMC in gali no.9 and 10(from Idgah Road)in Bholanath Ngr. in C-237/AC-44/SH(S)Z
33 P/L RMC in gali no.6(adj to property no.251/2A)in Bholanath Ngr. in C-237/AC-44/SH(S)Z
34 P/L RMC in lanes adj to property no.P-10 and P-28 in Shri Ram Colony, Bihari Colony in C-238/AC-44
35 P/L RMC in lane adj to property no. 4/2720 and P-71 in Shri Ram Colony Bihari Colony in C-238/SH(S)Z
36 P/L RMC in Narrow laneadj to Baburam School in Gajju Katra in C-237/AC-44
37 P/L RMC in lane adj to property no. E-127 and E-129 in jhilmil cly. in w.no. 238 Sh(S)
38 P/l RMC in lane adj to property no. E-84 jhilmil cly. w.no.238/Sh(S)
civil M-II
08.10.08 17.07.08 278853
civil M-II
08.10.08 17.07.08 196365
civil M-II
10.10.08 09.09.08 495000
civil M-II
10.10.08 09.09.08 460000
civil M-II
10.10.08 09.09.08 398000
39 P/L RMC in lane adj to property no. 27/96 and 27/61 in jwala nagar in w.no.238/Sh(S)
40 P/l RMC in lane adj to property no. 28/18A/72 Bholanath nagar w.no.237/Sh(S)
41 P/l RMC in lane adj to property no. P-102 and A-23 in Shri ram cly., Bhihari cly. w.no.237/Sh(S)
42 P/l RMC in lane adj to property no. 4/1644 in Mahavir block w.no.237/Sh(S)
43 Dev of road by Pdg m/p in Shri ram cly., Bhihari cly. w.no.237/Sh(S)
14261087
Status Report of MLA, Sh.Veer Singh DhinganAC No. 45,2008-09
S.No.
Name of Work deptt. Div.
civil M-I 11.07.08 14.05.08 475000
civil M-I 11.07.08 14.05.08 353900
civil M-I 11.07.08 14.05.08 694000
civil M-I 11.07.08 14.05.08 191483
civil M-I 11.07.08 14.05.08 199784
civil M-I 11.07.08 14.05.08 524000
civil M-I 11.07.08 14.05.08 199000
civil M-I 11.07.08 14.05.08 484229
civil M-I 11.07.08 14.05.08 490000
civil M-I 11.07.08 14.05.08 407308
civil M-I 11.07.08 14.05.08 476959
civil M-I 11.07.08 14.05.08 158986
Date of Booking
Date of Consen
t
Amount booked
1 Dev of lane from O- block Dalao to MC Pry School, gali no. 1,2,3 in O block Sunder Nagri w.no. 244/Sh(N)
2 Pdg water connection in safai Karamchari qtrs. at K & L bloc Sunder nagari in w.no. 244/Sh(N)
3 Dev of B wall in K block staff qtrs. in
Sunder nagari w.no. 244/Sh(N)4 C/O B wall near L block MC Pry
Scholl Sunder nagari w.no. 244Sh(N)5 Dev of culvert in Sunder nagari in
w.no. 244 Sh(N)6 Dev of internel lane in L block staff
qtrs. in Sunder nagari w.no. 244 Sh(N)
7 C/o five pressthala on demand of MLA in AC-45 Sunder nagari & Nand nagari Sh(N)
8 Dev of cover drain/sewer in L,K Sunder Nagri and E block Nanad Nagri Staff qtrs. in Sunder Nagri C-244/SH(N)Zone
9 Dev of lane in E-1 block gali no. 1 and 2 in Sunder Nagri C-244/SH(N)Zone
10 Dev of main road in K-Block Safai Karamchari Qtrs. in Sunder Nagri C-244/SH(N)Zone
11 Dev of main road in L-Block Safai Karamchari Qtrs. in Sunder Nagri C-244/SH(N)Zone
12 Dev of berms at Jholkari Bai Marg in
Sunder Nagri C-244/SH(N)Zone
civil M-I 01.08.08 406000
civil M-I 08.08.08 18.07.08 498942
civil M-I 08.08.08 18.07.08 494524
civil M-I 08.08.08 18.07.08 499145
civil M-I 08.08.08 18.07.08 199680
elect E-I 25.08.08 16.07.08 594667
elect E-I 25.08.08 02.08.08 585666
elect E-I 25.08.08 09.08.08 590000
elect E-I 08.09.08 26.08.08 595594
elect E-I 08.09.08 26.08.08 600000
elect E-I 08.09.08 26.08.08 594933
elect E-I 08.09.08 26.08.08 594699
elect E-I 26.09.08 26.08.08 205021
13 C/O 10 no. Prerss Thadas on Demand of MLA Sh. V.S. Dhingan in AC-45 Dilshad Colony Dilshad Garden GTB Enclave Janta Flat Khera Village Tahirpur Village New Seemapuri in SH(N)Zone
19.05.0
814 Dev of Sump Well in E-Block
Nandnagri C-243/SH(N)Z15 Dev of road by pdg RMC along
Akhada Wala Park E-4 Block Nandnagri C-243/SH(N)Z
16 Dev of B/Wall by pdg brick wall grit wash and grill in E-4 Block Sump Well Nandnagri C-243/SH(N)Z
17 Dev of B/Wall of open passage infront h.no.E-4/230 in E-4 Block Nandnagri C-243/SH(N)Z
18 P/o lighting arrangement with 12 mtr. long pole near mpl park F-1/469 Sundernagri near Mc Pry school I block Sunder nagari and O block park Sundernagari Ac-45
19 P/o lighting arrangement with 12 mtr. long pole near J-1 Dilshad cly. F pkt park near Mother Dairy, mpl park near Kabristan New Seemapuri AC-45 Shah(N)
20 P/o lighting arrangement with 12 mtr. long pole near P-25, A-3, O-23, A-3 Dilshad garden near chowk E block New Seemapuri AC-45 Shah(N) Shah(N)
21 P/O lighting arrangement with 12m lone pole in Mpl Park F-1 Sunder Nagri,F-2 Sunder Nagri and E-Block Staff Qtrs. Nand Nagri AC-45/SH(S)Z
22 P/O lighting arrangement with 12m lone pole near Nursary Park GTB Enclave Dalao and pkt. Dilshad Garden Tahirpur Village AC-45/SH(S)Z
23 P/O lighting arrangement with 12m lone pole near h.no.67 Janta Flats GTB Enclave near h.no.C-55XL Dilshad Garden and near D pkt.Community Hall Dilshad Garden AC-45/SH(S)Z
24 P/O lighting arrangement with 12m
lone pole near E-Block Staff Qtrs.Mpl
Park E-1/110 and E-1 Balaji Darbar
Nand Nagri AC-45/SH(S)Z25 P/o lihting arrangement with 12 mtrs
long pole in mpl park near h.no. 59A A pkt. GTB enclave under Sh(N)
Status Report of MLA, Sh.Baljor Singh AC No. 46,2008-09
S.No.
Name of Work deptt. Div.
civil M-IV 23.06.08 04.08.08 471500
civil M-I 08.07.08 30.05.08 465986
civil M-I 08.07.08 30.05.08 402888
civil M-I 08.07.08 30.05.08 450244
civil M-I 08.07.08 30.05.08 409963
civil M-I 08.07.08 30.05.08 491702
civil M-I 08.07.08 30.05.08 353056
civil M-I 08.07.08 30.05.08 425800
civil M-I 08.07.08 30.05.08 374700
Date of Booking
Date of Consen
t
Amount booked
1
Dev/imp road by pdg RMC and drain from Sh. Nathu Singh house to Lalit house and along Pry School in Johreipur village w.no. 261/Sh(S) Zone
2
P/L rmc and dev. of drainage system in gali upto Ravi Dass Mandir Chowk through h.no.213/9 in w.no.264 in Mandoli in SH(N)Zone
3
P/L rmc and dev. of drainage system from Nain Singh to Dallu and link upto Mandir Chowk in w.no.264 in Mandoli in SH(N)Zone
4
P/L rmc and dev. of drainage system from Raju Bansal hs. to Hukam Singh hs. and Guni hs. to Raju hs. and Mahipal hs. to Rameshwar hs. in Saboli in w.no.263 SH(N)Zone
5
P/L rmc and dev. of drainage system from Sri Chand hs. to Pratap Bhawan and Bhim Singh hs. to Shishpal hs. in Saboli in w.no.263 SH(N)Zone
6
P/L rmc and dev. of drainage system from House of Bedpal to Ramlal and Ravi Dutt Sharma to Vakil Ahemad hs.in w.no.264 SH(N)Zone
7
P/L rmc and dev. of drainage system from Anand Bhati to Ishu Bhai and link in w.no.264 SH(N)Zone
8
P/L rmc and dev. of drainage system from Rohitpal Dairy to K.D.Public School in w.no.264 SH(N)Zone
9
P/L rmc and dev. of drainage system from Raghuvie hs. to Krishan hs. and upto rajinder hs. in Mandoli in w.no.264 SH(N)Zone
civil M-I 08.07.08 30.05.08 499620
civil M-I 08.07.08 30.05.08 487902
civil M-I 08.07.08 30.05.08 321378
civil M-I 08.07.08 30.05.08 296596
civil M-I 11.07.08 28.05.08 334977
civil M-I 11.07.08 28.05.08 381274
civil M-I 11.07.08 28.05.08 365645
civil M-I 11.07.08 28.05.08 289519
civil M-I 11.07.08 28.05.08 309284
civil M-I 25.07.08 29.05.08 685000
civil M-I 25.07.08 29.05.08 526000
civil M-I 25.07.08 29.05.08 780000
10
P/L rmc and dev. of drainage system from Daulat hs. to Lekh hs. to Lokesh hs. and yoginder Singh hs. to Pritam Ram hs. and adj Birju hs. and Ramesh and Mandir to Davender hs. in Saboli in w.no.263 SH(N)Zone
11
P/L rmc and dev. of drainage system from Sudesh hs. to Karan Singh hs. and Laxmi hs. to Mahipal hs. in Saboli in w.no.263 SH(N)Zone
12
P/L rmc and dev. of drainage system from Tulsi Ram hs. to Ashok hs.in Saboli in w.no.263 SH(N)Zone
13
P/L rmc and dev. of drainage system from Jagan hs. to manga Ram and Prem Singh to Daulat hs. and Man Singh to Ramsharan hs. and Jairam to Bolli hs. and adj to Delip hs.in Saboli in w.no.263 SH(N)Zone
14
Dev of street National Flower Public School gali by pdg RMC from h.no.857 to h.no. 797 in Mandoli C-264/SH(N)Zone
15
P/L RMC and development of drainage system in gali no. 13 from Sewa Dham road to h.no. 795 in Mandoli C-264/SH(N)Zone
16
P/L RMC and development of drainage system from Ravi Sweets to Shanti Prasad House and gali park to A-83 in Mandoli Extn. C-264/SH(N)Zone
17
P/L RMC and development of drainage system from Ravi Gernal Store to park in Mandoli Extn.C-264/SH(N)Zone
18
C/O Culvert at the entrence of IBP Outlet and develpoment of drain near Jail Boundary in C-264/SH(N)Zone
19
P/L RMC and development of drainage system Jagram House to Shibba House in C-264/AC-46/SH(N)Zone
20
P/L RMC and development of drainage system from Bijender House to Ravi Dass Mandir in Mandoli C-264/SH(N)Zone
21
P/L RMC and development of drainage system from Rajkumar House to Shiv Kumar house and link in C-264/SH(N)Zone
Status Report of MLA, Sh.Ram Babu SharmaAC No. 47,2008-09
S.No.
Name of Work deptt. Div.
CIVIL M-III 19.06.08 17.05.08 383560
CIVIL M-III 19.06.08 01.04.08 450867
CIVIL M-III 19.06.08 01.04.08 560957
CIVIL M-III 19.06.08 01.04.08 318420
CIVIL M-III 19.06.08 01.04.08 256857
CIVIL M-III 19.06.08 01.04.08 564387
CIVIL M-III 19.06.08 01.04.08 301476
CIVIL M-III 19.06.08 01.04.08 275307
CIVIL M-III 23.06.08 01.05.08 495100
CIVIL M-III 23.06.08 01.05.08 361730
CIVIL M-III 23.06.08 01.04.08 495070
Date of Booking
Date of Consen
t
Amount booked
1 Stg. of Acharaya Vinowa Bhawan marg C-245 in Ram nagar Extn. Sh:- P/l Bitumin msatic wearing course
2 Stg. of gali no. 2 Jagatpuuri in C-245/Sh(N) Sh:- P/l mastic wearing course
3 Pdg and laying bitumin mastic wearing course on road from Wazirabad road to h.no. D-611 in D block Ashok nagar C-246
4 Stg. of gali no. 7 Chander lok C-245 Sh(N) Sh:- P/l bitumin mastic wearing course
5 Stg. of gali no. 6 in Durgapuri C-245 Sh(N) Zone Sh:- P/l bitumin mastic wearing course
6 Pdg and laying bitumin mastic wearing course from h.ho. A81 to A-62, A61 to A-54, A-87 to near A100 at A block Ashok nagar C-246 Sh(N)
7 Pdg and laying bitumin mastic wearing course from Mandoli road to h.no. B-69 at lane no.5 in East Nathu colony C-246/Sh(N)
8 Pdg and laying bitumin mastic wearing courseon road from Mandoli road to h.no. B-306 at B block Ashok nagar C-246/Shah(N)
9 Pdg and fixing street name boards in C-245 Sh(N)
10 P/L bituman mastic wearing course on road from Sukra Bazar to M.C.Pry.School and B-347/1 at Ashok Ngr. in C-246/SH(N)Zone
11 Stg. of Ashok marg from Loni road to h.no.1/3787 to 1/4042 by rmc in C-245/SH(N)Zone
CIVIL M-III 23.06.08 01.04.08 332508
CIVIL M-III 23.06.08 01.04.08 188901
CIVIL M-III 23.06.08 03.06.08 559500
CIVIL M-III 23.06.08 03.06.08 197586
CIVIL M-III 23.06.08 03.06.08 187534
CIVIL M-III 23.06.08 03.06.08 198600
CIVIL M-III 23.06.08 03.06.08 187534
CIVIL M-III 23.06.08 03.06.08 199800
CIVIL M-III 23.06.08 03.06.08 451700
CIVIL M-III 23.06.08 03.06.08 455900
CIVIL M-III 23.06.08 03.06.08 344000
CIVIL M-III 23.06.08 03.06.08 451900
CIVIL M-III 03.07.08 01.04.08 480134
CIVIL M-III 08.07.08 15.04.08 312556
CIVIL M-III 27.05.08 03.06.08 529000
12 P/L bituman mastic wearing course from h.no.621 to D-54 and link upto Lalita Mandir road and from h.no.B-789 to D-533/9 and D-533/12 at Ashok Ngr. C-246/SH(N)Zone
13 P/L cc pav. and drainage in lane from h.no.D-672 to D-1016 and its link from h.no.D-727 to D-525/66 at Ashok Ngr. C-246/SH(N)Zone
14 Stg. of road by prov. mastic asphalt from Durga Bhawan to B-1/5 Naveen Shahdra C-248/SH(N)zone
15 P/F sterrt name board in Naveen Shahdra.Mohan Park,West Rohtash Ngr. and Shivaji Park etc. in C-248/SH(N)Zone
16 P/F street name board at Kabool Ngr.Naveen Shahdra.and East Rohtash Ngr.in C-247/SH(N)Zone
17 Stg. of lane by pdg rmc from h.no.1/3723 to 1/2871 in Ram Ngr. w.no.247/SH(N)Zone
18 P/F MS name board at MS park Mordern Shahdra.Ram Ngr. and Ram Ngr.Extn. at C-247/SH(N)Zone
19 Stg. of gali no. 2 and 4 Bhagwanpur Khara from h.no.1/3792 to 1/3903 and 1/3793 to 1/3797 by pdg rmc in C-245/SH(N)Zone
20 P/L rmc in lane from 1/9448 to 1/9446,1/9417 to 1/9392,1/9480 to 1/9386 and 1/1504 to 1/1505 in gali no.7 West Rohtash Ngr. C-248/SH(N)Zone
21 P/L rmc in lane from 1/9475 to 1/9468,1/9477A to 1/9479,1/9218 to 1/9464 and 1/9463 to 1/10398 in Shahi Mohalla West Rohtash Ngr. C-248/SH(N)Zone
22 P/L rmc in lane from 1/9122 to 1/9185, and 1/9185 to 1/9249, and 1/9201 to 1/9193 in gali no.5 West Rohtash Ngr. C-248/SH(N)Zone
23 P/L rmc in lane from B-38 to Pipal Chowk in gali no.3 in Mohan Park in C-248/SH(N)Zone
24 Stg. of Ashok marg by rmc from Mandoli road h.no.1/4368 and 1/4082 in C-245/SH(N)Zone
25 P/F MS Street board in C-246/SH(N)Zone
26 Dev of road from U-18 to U-26 and X-1 to X-6 by pdg RMC in Naveen Shahdra in w.no.248/SH(N)Zone
CIVIL M-III 11.07.08 15.04.08 196055
CIVIL M-III 11.07.08 15.04.08 417600
CIVIL M-III 11.07.08 15.04.08 545000
CIVIL M-III 30.07.08 15.04.08 686300
CIVIL M-III 04.08.08 30.07.08 580985
CIVIL M-III 04.08.08 04.08.08 806400
CIVIL M-III 04.08.08 04.08.08 693000
CIVIL M-III 04.08.08 04.08.08 728300
CIVIL M-III 06.08.08 04.08.08 1E+06
CIVIL M-III 06.08.08 04.08.08 1E+06
CIVIL M-III 06.08.08 04.08.08 1E+06
CIVIL M-III 06.08.08 30.07.08 696300
ELECT E-I 03.09.08 12.08.08 599812
ELECT E-I 03.09.08 10.08.08 600000
CIVIL M-III 18.09.08 01.09.08 529900
27 Stg of gali no.7 from h.no.1/4153 to 1/4166 in Ram Ngr. Extn. Bhagwanpur Khera C-245/SH(N)ZONE
28 Dev of lane from h.no. B-178 to B-165 by pdg cc pav. and drainage at Ashok Ngr. C-246/SH(N)Zone
29 P/L cc pav. and drainage to link lane of gali no. 3 and 4 from h.no. 210,232,85,98,at Durgapuri Extn. C-246/SH(N)ZONE
30 P/L NP-2 class RCC pipe 300 mm dia and drain crossing from Mandoli road to Loni road in lane along 52 Cuaic drain C-245/SH(N)ZONE
31 P/L RMC in lane from h.no. 1/10512 to 24A in gali no. 3 Mohan Park in C-248/SH(N)ZONE
32 Stg of lane by pdg RMC from h.no.G-13 to G-1/1153,h.no. H-56 to 1/1256 and link in MS Park in C-247/SH(N)ZONE
33 Stg of lane by pdg RMC from h.no.1/1412 to h.no. H-53 Mansarovar Park C-247/SH(N)ZONE
34 Stg of lane by pdg RMC from A-6 to Aggarwal Dharamshala and lane between B-8 to B-55 in MS Park C-247/SH(N)ZONE
35 Stg of lane by pdg RMC from 1/1913 to 1/1863,1/2468 to 1/1911 and link in Mprdern Shahdra C-247/SH(N)ZONE
36 Stg of lane by pdg mastic asphalt on Jayaswal Marg from Loni road to Mandoli road C-247/SH(N)ZONE
37 Stg of lane by pdg mastic asphalt from 1/3627 to 1/3225,Ram Ngr. Krishna Marg C-247/SH(N)ZONE
38 Stg of lane by pdg RMC from h.no. B-76 to 1/907 and F-7 to 1/1005B MS Prak C-247/SH(N)ZONE
39 P/o street light arrangement in w.no.245 and 246
40 P/o street light arrangement in w.no.247 and 248 AC-47 Shah(N)
41 Covering of 52 Cusic drain from mandoli Road to h.no.1/4649 in Ram Ngr. Ext. by Wire Mesh in C-245/SH(N)Z
CIVIL M-III 26.09.08 25.09.08 817500
CIVIL M-III 10.10.08 08.10.08 214000
CIVIL M-III 19.06.08 01.04.08 464740
CIVIL M-III 19.06.08 20.04.08 564405
CIVIL M-III 19.06.08 20.04.08 563933
CIVIL M-III 19.06.08 20.04.08 499271
CIVIL M-III 19.06.08 20.04.08 534979
CIVIL M-III 19.06.08 20.04.08 539336
CIVIL M-III 23.06.08 03.06.08 653625
42 Stg of lane by pdg RMC from 1/6943 to Ludhiana building nad Pratap gali in east Rohtas nagar w.no. 247/Sh(N)
43 Dev of Loni road from GT road to Jaiswal marg in C-247/Sh(N) by pdg matrrial premixing
44 P/L bitumin mastic wearing course at west nathu colony from Mandoli road to h.no. A-39 in C-246 Sh(N)
45 Stg. road by pdg RMC from Loni road top gali no. 9 along 52 cusec drain in jagjivan nagar C-245/Sh(N)
46 Stg. of road by pdg RMC from Nehru memorial School to gali no. 9 Chanderlok along 52 Cesce drain C-245 Sh(N)
47 Stg. of lane by pdg RMC from h.no. 1/4507 to 1/4514 and links of gali no. 8 and Ambedkar gali in Ram nagar extn. C-245 Sh(N)
48 Stg. of lane by pdg RMC from h.no. 1/4634 to 1/4595 in Ram nagar extn. C-245 Sh(N)
49 Stg. of lane by pdg RMC from h.no. 1/4585 to 1/4498A in Ram nagar extn. C-245 Sh(N)
50 Stg. of road by pdg mastic asphalt from h.no. 39 to 1501/B Mohan park Navin Shahdara RMC from h.no. 1/4507 to 1/4514 and links of gali no. 8 and Ambedkar gali in Ram nagar extn. C-248 Sh(N)
Status Report of MLA, Sh Vinay SharmaAC No. 48,2008-09
S.No.
Name of Work deptt. Div.
elect E-I 19.06.08 22.01.08 299986
elect E-I 19.06.08 22.01.08 299501
elect E-I 19.06.08 22.01.08 298638
civil M-III 20.06.08 25.01.08 218800
elect E-I 23.06.08 02.06.08 396558
elect E-I 23.06.08 02.06.08 398498
civil M-III 23.06.08 07.06.08 552000
civil M-III 23.06.08 20.05.08 963100
Date of Booking
Date of Consen
t
Amount booked
1 Imp of street light arrangement in New Jafrabad Balbir nagar Ext. Jyoti colony in AC-48/Sh(N)
2 Imp of street light arrangement in Babarpur (east and west) Gorakh park (east and west) Chajjupur in AC-48/Sh(N)
3 Imp of street light arrangement in Sudama puri Subash park, Subash park ext., Janta colony Seelampur ph-III in AC-48/Sh(N)
4 P/l RMC from A-1 to A-2, B-17 to B-24 and B-5 to B-8 (back lane) in Jafrabad C-259 Sh(N)
5 P/O lighting arrangement with 12m long pole near chopal harijan bastikardampuri and near T point 60 feet road Balbeer nagar in A-C 48 SH. (N) zone
6 P/o lighting arrangement with 12 mtr long pole near Masjid 33 feet road kabir Ngr. and near Shanti Bazar Chowk kardampuri in AC-48/SH(N)Z
7 Dev of Rajmata Mandir Marg by pdg RMC in West Gorakh Park C-259 SH(N)Z
8 Pdg RMC on Abhimanyu Marg in Balbir Ngr. Extn. C-260/SH(N)Z
civil M-III 23.06.08 917900
civil M-III 23.06.08 07.06.08 744000
civil M-IV 18.07.08 20.05.08 497000
civil M-IV 18.07.08 20.05.08 187978
civil M-IV 18.07.08 20.05.08 441800
civil M-IV 18.07.08 20.05.08 198351
elect E-I 30.07.08 01.07.08 498900
elect E-I 30.07.08 01.07.08 499694
civil M-III 08.09.08 22.08.08 450505
civil M-III 08.09.08 10.11.97 437511
civil M-III 09.09.08 22.08.08 480932
civil M-III 18.09.08 20.05.08 617700
civil M-III 18.09.08 20.05.08 577500
civil M-III 26.09.08 25.09.08 2E+06
civil M-III 26.09.08 25.09.08 746283
9 Dev and imp of road in link of gali no.1 near Rajmata Mandir by pdg RMC in West Gorakh Park C-259 SH(N)Z SH:Pdg RMC near h.no. 1/10133,1/10164A,1/10166,1/10171,1/10190,1/10098 in West Gorakh Park C-259/SH(N)Z
07.06.308
10 Dev of road from C-38 to C-109 by pdg RMC New Jafrabad West Gorakh Park C-259/SH(N)Z
11 P/L RMC and D/O drainage systwem in gali no.5 B-Block Kabir Ngr. C-258 SH(N)Z
12 P/L RMC and D/O drainage systwem in Krishna gali in gali no.3 C-Block North Chajjupur in C-258 SH(N)Z
13 D/O drainage systwem in gali no.4 linl A-Block Kabir Ngr. C-258 SH(N)Z
14 P/L RMC and D/O drainage systwem in gali no.7A and its link in Jyoti Colony in C-258 SH(N)Z
15 P/O street light arrangement in Babarpur Sudamapuri East and West Gorakh Park Balbir Ngr.Janta Colony and New Jafrabad in AC-48
16 P/O street light arrangement in Kabir Ngr. Kardampuri Chajjupur North Chajjupur and West Jyoti Ngr.in AC-48
17 Dev of lane by pdg RMC and drainage from 100 feet road to Shiv Mandir(h.no.12/29)in East Babarpur in C-260/SH(N)Z
18 Dev of lane by pdg near Chhajupur Stand to Shiv Mandir in Chhajju marg by pdg RMC and drainage in East Babarpur in C-260/SH(N)Z
19 Dev of lane by pdg cc pav. in lane no.8 from h.no.C-6/27 to C-8/11 and its link along h.no.C-8/16,C-8/82 in C-Block Kabir Ngr.in C-260/SH(N)Z
20 Pdg RMC in gali no.7 in Balbir Ngr.Ext.(Nalla Par)in C-260/SH(N)Z
21 Pdg RMC in gali no.8,9 and gali near h.no.1/5655 in Balbir Ngr. Ext in C-260/SH(N)Z
22 Pdg RMC in gali no.3J, 3F and 3H (towards gali no.1) and link in west Gorakh park C-259/Sh(N)
23 Pdg RMC in Govind gali near h.no.44A W-62 and gali near h.no. W-216 and W-126 and gali near h.no. 259 to W-262 in west Babarpur in C-259 Sh(N)
civil M-III 10.10.08 10.10.08 466327
civil M-III 10.10.08 10.10.08 472668
civil M-III 10.10.08 03.10.08 399236
civil M-III 10.10.08 03.10.08 225793
civil M-III 10.10.08 22.08.08 583400
24 Dev link lane of Prem gali by pdg RMC and drainage along h.no.53E 2/51B E-29, E-19, E-74 and E-85 in east Babarpur w.no.260/Sh(N)
25 Pdg RMC drainage in link of Saraswati marg along 25/15 and 28/16 in East Babarpur w.no. 260 Sh(N)
26 const of lane by pdg RMC from h.no. 1/7570 to 1/7593 in gali no.9 East Gorakh park w.no. 259 Sh(N0
27 Const of Nehru gali no.8 and its links by pdg RMC in West babarpur in w.no.259 Sh(N)
28 dev of lane by pdg RMC from sanjay gandhi marg to Babarpr road and itsr link by pdg RMC and drainage in east Babarpur w.no.260 Sh(N)
Status Report of MLA, Sh.Mateen AhmadAC No. 49,2008-09
S.No.
Name of Work deptt. Div.
CIVIL M-III 29.05.08 29.05.08 500000
CIVIL M-I 29.05.08 29.05.08 199000
CIVIL M-I 03.06.08 05.05.08 503000
CIVIL M-I 03.06.08 05.05.08 449000
CIVIL M-I 03.06.08 05.05.08 438000
CIVIL M-I 03.06.08 05.05.08 333000
CIVIL M-I 03.06.08 05.05.08 503000
Date of Booking
Date of Consen
t
Amount booked
1 Dev of Dr.Rajender Prashad Marg from Gokulpur drain to Dr.Anand in Zafrabad in w.no.250/Sh(N)Zone
2 Dev of road from F-82 to Didpencary by pdg RMC in New Seelampur in w.no.250/Sh(N)ZONE
3 P/L RMC and imp of drainage system from h.no.875 to 1117 in Zafrabad in w.no.249/Sh(N)Zone
4 P/L RMC and imp of drainage system from h.no.939 to 1278 in Zafrabad in w.no.249/Sh(N)Zone
5 P/L RMC and imp of drainage system from h.no.962 to 972 in w.no.249/Sh(N)Zone
6 P/L RMC and imp of drainage system from h.no.C-100/4B to C-228 in Chauhan Bangar in w.no.249/Sh(N)Zone
7 P/L RMC and imp of drainage system from h.no.125 to 143 and links in Zafrabad in w.no.249/Sh(N)Zone
CIVIL M-I 03.06.08 05.05.08 106000
CIVIL M-I 03.06.08 05.05.08 93000
CIVIL M-I 23.06.08 28.05.08 360000
CIVIL M-I 23.06.08 28.05.08 464000
CIVIL M-I 23.06.08 28.05.08 386000
CIVIL M-I 23.06.08 28.05.08 367000
CIVIL M-I 23.06.08 28.05.08 586000
CIVIL M-I 23.06.08 28.05.08 512000
CIVIL M-I 23.06.08 28.05.08 499000
CIVIL M-I 23.06.08 28.05.08 665000
CIVIL M-I 23.06.08 28.05.08 605000
CIVIL M-I 23.06.08 28.05.08 500000
CIVIL M-I 23.06.08 28.05.08 698000
CIVIL M-III 21.07.08 01.07.08 409983
8 P/L RMC and imp of drainage system from h.no.398 to Asian Hotel Dhaba in CVhauhan Bangar in w.no.249/Sh(N)Zone
9 P/L RMC and imp of drainage system from h.no.44/27 to 44/09 in Chauhan Bangar in w.no.249/Sh(N)Zone
10 P/o RMC and development of drainage system from h.no.C-182/16 to C-187/12 and C-182/42 to C-185/36 and links in F block in Chauhan Bangar in w.no.249 Sh(N)
11 P/o RMC and development of drainage system from h.no.C-7/29 to C-7/12 and links in Chauhan Bangar in w.no.249 Sh(N)
12 P/o RMC and development of drainage system in Azad gali near Kalyan Cinema wali gali in CB in w.no.249 Sh(N)
13 P/o RMC and development of drainage system in Nehru gali near Kalyan Cinema wali gali in w.no.249 Sh(N)
14 P/o RMC and development of drainage system from h.no.C-217 to C-236 in Chauhan Bangar in w.no.249 Sh(N)
15 P/o RMC and development of drainage system in Matka wali gali from h.no.1251 to 1185 in Chauhan Bangar in w.no.249 Sh(N)
16 P/o RMC and development of drainage system from h.no.1420 to 1431 from h.no.1441 to 1454 and from h.no. 1463 to 1474 in Zafrabad in w.no.249 Sh(N)
17 P/o RMC and development of drainage system in opp. h.no. C-217 on main road Brahmpuri road in CB in w.no.249 Sh(N)
18 P/o RMC and development of drainage system from Yuvraj communication to Sanjay gali in Chauhan Bangar in w.no.249 Sh(N)
19 P/o RMC and development of drainage system from h.no. 1313 to 1324 in gali no.41 Zafrabad in w.no.249 Sh(N)
20 P/o RMC and development of drainage system from h.no.649 to 712 in gali no. 27 and link gali no. 27 and 28 in w.no.249 Sh(N)
21 Dev of lane by cc pav. in between Sarvodya Bal Vidya Mandir and UGR at Gautampuri in w.no.251 Sh(N)
CIVIL M-I 21.07.08 01.07.08 339991
CIVIL M-I 21.07.08 01.07.08 487700
CIVIL M-I 21.07.08 01.07.08 523400
CIVIL M-I 21.07.08 01.07.08 699000
CIVIL M-I 21.07.08 01.07.08 687900
CIVIL M-III 03.09.08 24.07.08 692000
CIVIL M-III 03.09.08 24.07.08 689000
CIVIL M-III 03.09.08 24.07.08 643000
CIVIL M-III 03.09.08 24.07.08 620900
CIVIL M-III 03.09.08 24.07.08 687000
CIVIL M-III 03.09.08 24.07.08 695000
CIVIL M-III 03.09.08 24.07.08 689900
CIVIL M-III 03.09.08 24.07.08 443717
CIVIL M-III 03.09.08 24.07.08 575000
CIVIL M-II 10.10.08 10.10.08 198355
CIVIL M-II 10.10.08 01.09.08 438000
CIVIL M-II 10.10.08 01.09.08 496000
22 Dev of gali by pdg cc pav. in gali no.13/1 and 14 in Gautampuri w.no.251 Sh(N)
23 P/l cc pav in gali no.18 and link in Gautampuri w.no.251 Sh(N)
24 P/l cc pav in gali no.16 and link in Gautampuri w.no.251 Sh(N)
25 C/o road by pdg RMC from culvert near Sulabh Sauchalaya to UGR at Gautampuri in w.no.251 Sh(N)
26 Stg. of road from B-53/1 to A-61 in A block New Usmanpur in w.no.251 Sh(N)
27 Stg. of road by pdg matling premixing from MCD flats gate no.1 to B & c block in w.no. 251 Shah(N) ZOne
28 Stg. of lane by pdg cc pav. frpm A-160 to A-97 and D-104 to A-193 in MCD flats in w.no. 251 Shah(N) ZOne
29 Stg. of lane by pdg cc pav. from D-129 to D-168 and A-193 to A-251 in MCDflats in w.no. 251 Shah(N) ZOne
30 Dev of road by pdg metling premixing from pusta road to B block in New Usmanpur in w.no.251 Shah(N)
31 Stg. of road by pdg bitumin mastic from E-10 to gali no.4 to shahtri park in w.no. 251 Shah(N) Zone
32 Stg. of road by pdg bitumin mastic from A-75 to A-51 New Usmanpur in w.no. 251 Shah(N) Zone
33 Stg. of road by pdg bitumin mastic from A-28 to A-19 in A block New Usmanpur in w.no. 251 Shah(N) Zone
34 Dev of lane by pdg cc pav. in gali no.15 and link in Gautampuri in w.no.251 Shah(N) Zone
35 Dev of lane by pdg cc pav. in gali no.4, 6, 9 in E block Shahstri park in w.no.251 Shah(N) Zone
36 Dev of lane by pdg cc pavment and drainage system from h.no. 1/142 to H-36 New seelampur w.no.236 Sh(S)
37 P/L RMC in galim no.8A block Chauhan Bangar New Seelampur C-250 Sh(N)
38 P/L RMC on lane along Gokulpyr drain Bharampuri road gali no.6 in A block Chauchan bangar New seelampur C-250/Sh(N)
CIVIL M-II 10.10.08 01.09.08 324900
CIVIL M-III 10.10.08 01.09.08 352878
CIVIL M-III 10.10.08 01.09.08 376000
CIVIL M-III 10.10.08 01.09.08 438000
CIVIL M-III 10.10.08 01.09.08 322700
CIVIL M-III 10.10.08 01.09.08 281700
CIVIL M-III 10.10.08 01.09.08 434000
CIVIL M-I 23.06.08 28.05.08 599000
CIVIL M-I 23.06.08 28.05.08 347000
CIVIL M-I 23.06.08 28.05.08 342000
CIVIL M-I 23.06.08 28.05.08 546000
CIVIL M-I 23.06.08 28.05.08 443000
CIVIL M-I 23.06.08 28.05.08 340000
39 P/L RMC in link between gali no. 4 and 15 in A block Chauchan Bangar New seelampur C-250/Sh(N)
40 Dev of road by pdg RMC from C-71 to C-86 and link in new Seelampur C-250 sh(N0
41 Dev of road by pdg RMC from c-44, and C-48 to fruit mkt road and link in New Seelampur C-250/Sh(N)
42 Pdg RMC in gal;i no.11 A block Chauchan bangar New seelampur C-250 Sh(N)
43 P/L RMC in gali no. 16 A block Chauchan bangar new seelampuer C-250 Sh(N)
44 P/L RMC in gali no.15 A block Chauchan bangar in New Seelampur C-250/sh(N)
45 P/L RMC in Agarbatti wali gali in A block chauchan bangar new seelampur C-250 sh(N)
46 P/L RMC and dev of drainage system from h.no. C-39/1 to C-7/02 in Chauchan Banagr in w.no. 249/Sh(N)
47 P/L RMC and dev of drainage system from h.no. 832A to 852 in zafrabad in w.no. 249/Sh(N)
48 P/L RMC and dev of drainage system from h.no. 809 to 828 in zafrabad in w.no. 249/Sh(N)
49 P/L RMC and dev of drainage system from Brahmpuri road to Sanjay Gali at Kalyan Cinema road in Chauchan Bangar in w.no. 249/Sh(N)
50 P/L RMC and dev of drainage system from h.no. 114/1 to Gopalpur in w.no. 249/Sh(N)
51 P/L RMC and dev of drainage system in gali no.21 in zafrabad in w.no. 249/Sh(N)
Status Report of MLA, Sh.Bhishm SharmaAC No. 50,2008-09
S.No.
Name of Work deptt. Div.
CIVIL M-II 09.05.08 13.02.08 465000
CIVIL M-II 19.06.08 12.06.08 500000
CIVIL M-II 19.06.08 12.06.08 503177
CIVIL M-II 19.06.08 12.06.08 600000
CIVIL M-II 19.06.08 12.06.08 600000
CIVIL M-II 19.06.08 12.06.08 632456
CIVIL M-II 19.06.08 12.06.08 500000
Date of Booking
Date of Consen
t
Amount booked
1 Dev of galim no 1 and 2 by pdg RMC near Aggarwal Sweets Kartar Ngr 3/1/2 Pusta W.no.254/Sh(N)Zone
2 Dev of gali pdg cc pav from chopal to kumhar mohalla chowk in village Ghonda w.no.255
3 Dev of pandit Dulli chand wali gali and link by pdg RMC in village Ghonda w.no.255
4 Dev of gali and link pdg cc pav in Rajput mohalla in village Ghonda w.no.255
5 Dev of Indira gali and link pdg cc pav in Gautam vihar w.no.256
6 Dev of lane adj Rajesh pilot chopal by pdg cc pav. in village Ghonda w.no.255
7 Dev of Gyani wali gali and link by pdg RMC in village Ghonda w.no.255 Sh(N)
CIVIL M-II 18.07.08 02.07.08 542000
CIVIL M-II 18.07.08 02.07.08 542000
CIVIL M-II 18.07.08 02.07.08 185000
CIVIL M-II 18.07.08 02.07.08 575000
CIVIL M-II 18.07.08 02.07.08 593000
CIVIL M-II 18.07.08 02.07.08 645000
CIVIL M-II 18.07.08 02.07.08 367000
CIVIL M-II 18.07.08 02.07.08 608000
CIVIL M-II 18.07.08 24.07.08 113000
CIVIL M-II 25.07.08 24.07.08 613000
CIVIL M-II 25.07.08 24.07.08 303000
CIVIL M-II 05.08.08 18.07.08 176000
CIVIL M-II 05.08.08 18.07.08 173000
CIVIL M-II 05.08.08 18.07.08 179000
CIVIL M-II 11.08.08 26.07.08 364415
CIVIL M-II 11.08.08 26.07.08 364415
CIVIL M-II 11.08.08 26.07.08 485002
CIVIL M-II 11.08.08 26.07.08 397610
8 Dev of gali no.13 by pdg RMC in 3.5 Pushta Pratap nagar LHS Vimal wali gali in w.no.254 Sh(N0
9 Dev of Bapu gali adj. E-275 by pdg RMC Jagjeet nagar third pushta w.no.254 sh(N)
10 Dev of gali no.4 by pdg RMC in 3.5 Pushta Kartar nagar in w.no.254 Sh(N)
11 Dev of Shiv Mandir gali by pdg RMC in 3 Pushta Jagjeet nagar in w.no.254 Sh(N)
12 Dev of gali no.15 G block by pdg RMC in Jagjeet nagar in w.no.254 Sh(N) Maa Kali gali
13 Dev of road from Rakesh Done pattal Shop to Chauhan medical centre by pdg RMC in Jagjeet nagar in w.no.254 Sh(N)
14 Dev of gali no.13 by pdg RMC in 3.5 Pushta Kartar nagar RHS in w.no.254 Sh(N0
15 Dev of road from Gokulpur drain to Mittal Bhawan by pdg RMC in 3 Pushta road in w.no.254 Sh(N)
16 Dev of gali of h.no. A-114 gali no.9 near Adhura Mandir by pdg RMC A block Gamrhi in w.no.253 Sh(N)
17 Dev of gali no.9 and link by pdg RMC in A block Bhajan pura in w.no.253 Sh(N)
18 Dev of gali no.3 (h.no.336 to 337) and 4 A-326 by pdg cc pav in A block Gamrhi in w.no.253 Sh(N)
19 Dev of gali no.3 by pdg RMC in 3.5 Pushta Kartar nagar from h.no. J-671 to J-662 in w.no.254 Sh(N)
20 Dev of Indira gali from h.no.594 to E-575 and its link Jagjeet nagar 3 Pushta in w.no.254 Sh(N)
21 Dev of Chaudhary wali gali from h.no. D-231 by pdg RMC Vijay colony Vijay jyoti School road in w.no.254 in w.no.254 Sh(N)
22 Dev of gali no.13 by pdg RMC in Sudamapuri in w.no.253 Sh(N)
23 Dev of gali no.14 by pdg RMC in Sudamapuri in w.no.253 Sh(N)
24 Dev of gali no.10 by pdg RMC in Sudamapuri in w.no.253 Sh(N)
25 Dev of gali no.11 by pdg RMC in Sudamapuri in w.no.253 Sh(N)
CIVIL M-II 12.08.08 25.07.08 411000
CIVIL M-II 12.08.08 25.07.08 408000
CIVIL M-II 12.08.08 25.07.08 249000
CIVIL M-II 12.08.08 25.07.08 380000
CIVIL M-II 12.08.08 25.07.08 282000
CIVIL M-II 12.08.08 25.07.08 211000
CIVIL M-II 12.08.08 25.07.08 205000
CIVIL M-II 12.08.08 25.07.08 283000
CIVIL M-II 12.08.08 25.07.08 389000
CIVIL M-II 12.08.08 25.07.08 305000
CIVIL M-II 12.08.08 25.07.08 427000
CIVIL M-II 12.08.08 25.07.08 496000
CIVIL M-II 12.08.08 25.07.08 308000
CIVIL M-II 12.08.08 25.07.08 218000
CIVIL M-II 12.08.08 25.07.08 301000
CIVIL M-II 12.08.08 25.07.08 308000
Const. of culvert in w.no.253 Shah(N) CIVIL M-II 25.08.08 07.02.08 200000
CIVIL M-II 29.09.08 07.02.08 766000
26 Dev of gali adj h.no. E-556 and h.no. X-31/3 by pdg RMC in Gehlot nallah jagjeet nagar in w.no.254 Sh(N)
27 Dev of link of gali E-401 and E-425 infront og Dr.Raghav Wali gali by pdg RMC Jagjit Ngr. C-254/SH(N)Z
28 Dev to link of gali infront of Vivekanand gali D-91 by pdg RMC Jagjit Ngr.3rd Pusta(LHS) C-254/SH(N)Z
29 Dev of Vivekanand gali and its link by pdg RMC Jagjit Ngr.3rd Pusta(LHS) C-254/SH(N)Z
30 Dev of gali from h.no.J-281/45 and its link by pdg RMC 3.5 Pusta Kartar Ngr.(LHS) C-254/SH(N)Z
31 Dev of gali from h.no. J-298/A to gali no.5 by pdg RMC 3.5 Pusta Kartar Ngr.(LHS) C-254/SH(N)Z
32 Dev to gali from h.no. C-365 by pdg RMC C-Block Usmanpur C-254/SH(N)Z
33 Dev to gali no.8 by pdg RMC 3.5 Pusta Kartar Ngr.(RHS) C-254/SH(N)Z
34 Dev of gali no.4 by pdg RMC 3rd Pusta Jagjit Ngr.(Indira Gali)Fateh Singh Marg C-254/SH(N)Z
35 Dev of gali no.7 link from h.no.D-65A by pdg RMC Vijay Colony C-254/SH(N)Z
36 Dev of gali no.7 and its link by pdg RMC X-Block Bharampuri near Shiv Mandir C-254/SH(N)Z
37 Dev of gali no.6 by pdg RMC X-Block Bharampuri near Shiv Mandir C-254/SH(N)Z
38 Dev of gali no.3 by pdg RMC X-Block Bharampuri near Shiv Mandir C-254/SH(N)Z
39 Dev of gali no.7 link from h.no.D-67/24 by pdg RMC Vijay Colony 3rd Pusta C-254/SH(N)Z
40 Dev of gali no.4 by pdg RMC X-Block Bharampuri near Shiv Mandir C-254/SH(N)Z
41 Dev of gali from h.no.C-315 to Gokulpur drain by pdg RMC C-Block Usmanpur in C-254/SH(N)Z
42
43 Dev of gali no.1 and link by pdg RMC in A-block (near Kartar Nagar) Bhajanpura w.no.253 Shah(N)
CIVIL M-II 03.09.08 14.08.08 306000
CIVIL M-II 03.09.08 14.08.08 387000
CIVIL M-II 03.09.08 14.08.08 243000
CIVIL M-II 03.09.08 14.08.08 189000
CIVIL M-II 03.09.08 14.08.08 297000
CIVIL M-II 05.09.08 28.08.08 199917
CIVIL M-II 05.09.08 28.08.08 67512
44 Dev of gali no.10 (h.no. J-91) and adj. J-150 and J-9/1B by pdg RMc fourth pusta in w.no.254 Shah(N) Zone45 Dev of road from Marginal bandth third pusta to Gokumpur drain in w.no.254 Shah(N) Zone
46 Dev of gali no.1 X-Block(Bharampuri)h.no.V-37 by pdg RMC Feteh Singh Marg in C-254/SH(N)Z
47 Dev of gali no.11 adj C-363 and its link by pdg cc pav.in C-Block Usmanpur in C-254/SH(N)Z
48 Dev of gali of GBN public School by pdg RMC X-Block Bharampuri in C-254/SH(N)Z
49 Dev of Prayas Clinic Wali Gali by pdg RMC in Gautam Vihar in C-255/SH(N)Z
50 P/F MS Street Name Boards in Gautam Vihar in C-255/SH(N)Z
Div. Div. Div. Div. Div.
M-II M-III M-IV E-I EE(Pr.)
D.O.S D.O.C
02.09.08 09.11.08 299887 Completed 0.00
27.08.08 24.10.08 199816 Completed 0.00
01.08.08 07.10.08 199977 Completed 0.00
11.09.08 10.11.08 299610 Completed 0.00
04.09.08 10.12.08 399649 Completed 0.00
05.09.08 31.12.08 199816 Completed 0.00
14.08.08 18.10.08 199958 Completed 0.00
14.08.08 11.09.08 199873 Completed 0.00
30.07.08 13.08.08 199233 Completed 0.00
30.07.08 27.08.08 199664 Completed 0.00
19.08.08 22.10.08 198978 Completed 0.00
14.08.08 22.10.08 199519 Completed 0.00
01.08.08 21.08.08 199694 Completed 0.00
06.09.08 20.10.08 486833 Completed 0.00
16.08.08 18.10.08 495540 Completed 0.00
Work order no. with date
i/c division
Name of agency
Expenditure
Present Position
Liabilities Rs.lacs
136/01.09.08/(M)-II
M/s Jai Chanda Assos.
119/26.08.08/EE(M)-II
M/s Bhati Const Co.
67/29.07.08/EE(M)-II
M/s Kapil Const Co.
135/01.09.08/EE(M)-II
M/s Kapil Kumar Const.
132/01.09.08/EE(M)-II
M/s KK Const.
118/26.08.08/EE(M)-II
M/s Nc & Assos.
95/13.08.08/EE(M)-II
M/s Goswami Aosos.
91/13.08.08/EE(M)-II
M/s Shiv Shaki Const Co.
66/29.07.08/EE(M)-II
M/s Suresh Entp.
62/29.07.08/EE(M)-II
M/s Tomar Const Co.
94/13.08.08/EE(M)-II
M/s JP Mittal
104/13.08.08/EE(M)-II
M/s Rajesh builders
58/29.07.08/EE(M)-II
M/s Dawar Assos.
261/03.09.08/EE(M)-II
M/s Prem Kumar
195/12.08.08/EE(M)-II
M/s Sharwan Const Co.
04.09.08 20.10.08 494014 Completed 0.00
20.08.08 17.09.08 496022 Completed 0.00
18.08.08 20.10.08 430569 Completed 0.00
18.08.08 13.10.08 491493 Completed 0.00
18.08.08 07.10.08 490879 Completed 0.00
20.08.08 20.10.08 300000 Completed 0.00
14.08.08 17.10.08 374492 Completed 0.00
14.08.08 10.10.08 492286 Completed 0.00
16.08.08 20.10.08 477653 Completed 0.00
14.08.08 22.10.08 199503 Completed 0.00
08.08.08 07.10.08 199818 Completed 0.00
01.08.08 07.10.08 198978 Completed 0.00
30.07.08 20.08.08 199844 Completed 0.00
01.08.08 07.10.08 199771 Completed 0.00
14.08.08 22.10.08 199498 Completed 0.00
14.08.08 29.09.08 199661 Completed 0.00
18.09.08 17.11.08 199769 Completed 0.00
18.09.08 17.11.08 199913 Completed 0.00
258/01.09.08/EE(M)-II
M/s Jindal builders
196/12.08.08/EE(M)-II
M/s Goswami Aosos.
19/12.08.08/EE(M)-II
M/s Bhati Const Co.
200/12.08.08/EE(M)-II
M/s Deepak Assos.
201/12.08.08/EE(M)-II
M/s Suresh Entp.
189/12.08.08/EE(M)-II
M/s Vinay Conmsty Co.
197/12.08.08/EE(M)-II
M/s Prem Kumar
193/12.08.08/EE(M)-II
M/s Vijay Const
188/12.08.08/EE(M)-II
M/s Vinay Conmsty Co.
102/13.08.08/EE(M)-II
M/s PS Const Co.
60/29.07.08/EE(M)-II
M/s Bachu Lal Sharma
56/24.09.08/EE(M)-II
M/s Y.P. Goel & Co.
70/29.07.08/EE(M)-II
M/s Shanker Assos.
57/29.07.08/EE(M)-II
M/s Rajesh Assos.
93/13.08.08/EE(M)-II
M/s Vijay Const
99/13.08.08/EE(M)-II
M/s Naresh Dixit Assos.
145/08.09.08/EE(M)-II
M/s PS Const Co.
142/08.09.08/EE(M)-II
M/s Shanker Assos.
16.10.08 24.12.08 199872 Completed 0.00
25.10.08 24.12.08 299908 Completed 0.00
01.10.08 09.12.08 199919 Completed 0.00
16.10.08 24.12.08 299622 Completed 0.00
03.11.08 02.01.09 399802 Completed 0.00
18.12.08 28.08.08 395130 Completed 0.00
15.06.09 P 248940 In Prog. 2.30
08.03.09 07.05.09 478260 Completed 0.00
M/sVipin Ent. 27.08.09 P 278338 In Prog. 2.11
10.08.09 16.07.10 291035 Completed 0.00
M/s Vipin Ent. 27.08.09 P 268387 In Prog. 2.02
15.07.09 29.03.10 265972 Completed 0.00
01.07.09 29.09.09 276852 Completed 0.00
25.06.09 P 212179 In Prog. 1.82
26.06.09 P 225705 In Prog. 1.91
0.000.000.000.000.000.00
230/15.10.08/EE(M)-II
M/s Bhagwati Const Co.
234/15.10.08/EE(M)-II
M/s Vijay Const
197/30.09.08/EE(M)-II
M/s United Const Co.
235/15.10.08/EE(M)-II
M/s MK Const Co.
236/24.10.08/EE(M)-II
M/s Jagdamba Assos.
263/08.12.08/EE(M)-II
M/s NC & Co.
60/05.06.09/EE(M)-I
M/s Guru Kripa Ent.
407/26.02.09/EE(M)-II
M/s Manish Const. Co.
63/05.06.09/EE(M)-II
64/ 05.06.09 M-II
M/s Keycee Const co
61/05.06.09/EE(M)-II
68/05.06.09/EE(M)-II
M/s Tomar Const. Co.
58/05.06.09/EE(M)-II
M/s Guru Kripa Ent.
59/05.06.09/EE(M)-II
M/s Guru Kripa Ent.
57/05.06.09/EE(M)-II
M/s Guru Kripa Ent.
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
10.16
D.O.S D.O.C
21.08.08 20.10.08 493797 Completed
0.00
18.08.08 15.10.08 498715 Completed
0.00
Work order no. with date
i/c division
Name of agency
Expenditure
Present Position
Liabilities Rs.lacs
181/12.08.08/EE(M)-II
M/s Bachu Lala Sharma
182/12.08.08/EE(M)-II
M/s Ahuja
Const.
01.11.08 P 693400 In Prog.
0.03
23.01.09 P 679423 In Prog.
0.18
05.09.08 19.11.08 199843 Completed
0.00
02.10.08 31.12.08 199840 Completed
0.00
02.03.09 16.05.09 631749 Completed
0.00
04.02.09 13.03.09 325697 Completed
0.00
20.02.09 24.07.09 995909 Completed
0.00
13.02.09 P 943635 In Prog.
0.50
08.02.09 P 781134 In Prog.
0.09
08.02.09 18.04.09 716103 Completed
0.00
02.03.09 16.05.09 754167 Completed
0.00
01.10.08 09.12.08 199770 Completed
0.00
06.02.09 P 983643 In Prog.
0.16
20.01.09 P 510431 In Prog.
0.50
06.02.09 23.04.09 665286 Completed
0.00
18.02.09 30.04.09 666060 In Prog.
0.29
377/24.10
.09/M_1
Sh(S)
M/s Pradeep Kumar Goel
375/24.10
.08/
EE(M)-II
M/s Pradeep Kumar Goel
140/01.12
.08/
EE(M)-II
M/s Honda
Assos.178/22.09.08/EE(M)-II
M/s NC &
Co.504/09.02.09/EE(M)-II
M/s Y.K.
builders469/19.01.09/EE(M)-II
M/s Bachu
Const Co.515/17.02
.09/
EE(M)-I
M/s Maman Singh Wadhwa
483/30.01.09/EE(M)-I
M/s Pawan
Bros.476/30.01
.09/
EE(M)-I
M/s Maman Chand Bansal
481/30.01.09/EE(M)-I
M/s M.G. Goel Const Co.
502/09.02
.09/
EE(M)-I
M/s Maman Chand Bansal
186/30.09.08/EE(M)-II
M/s Wadhwa & Co.
477/30.01
.09/
EE(M)-I
M/s Maman Chand Bansal
453/12.01
.09/
EE(M)-I
M/s Roshan Lal Volra & Sons.
459/26.01.09/EE(M)-I
M/s S.G.
Goel & Co.387/01.12
.08/
EE(M)-II
M/s Maman Chand Bansal
24.02.09 04.05.09 693072 Completed
0.00
26.02.09 24.04.09 995900 Completed
0.00
23.01.09 P 682981 In Prog.
0.02
24.02.09 17.04.09 609457 Completed
0.00
02.03.09 23.05.09 792496 Completed
0.00
27.02.09 P 934194 In Prog.
0.49
04.02.09 24.04.09 653039 Completed
0.00
26.02.09 16.05.09 665671 Completed
0.00
18.12.08 17.02.09 399925 Completed
0.00
22.12.08 25.12.08 373712 Completed
0.00
24.03.09 24.09.11 657831 In Prog.
0.03
5.56
23.02.09 23.04.09 700000 Completed
0.00
01.07.09 P 895500 In Prog.
0.05
27.02.09 P 762481 In Prog.
0.140.000.00
506/09.02.09/EE(M)-I
M/s Bachan Const Co.
507/09.02.09/EE(M)-I
M/s Hans
Kumar Jain463/16.01
.09/
EE(M)-I
M/s Maman Chand Bansal
464/16.01
.09/
EE(M)-I
M/s Bansal
Const Co.510/16.02
.09/
EE(M)-I
M/s Maman Chand Bansal
503/09.02
.09/
EE(M)-I
M/s Maman Chand Bansal
462/16.01
.09/
EE(M)-I
M/s Pradeep Kumar Goel
505/09.02
.09/
EE(M)-I
M/s Man Mohan Singh Wadhwa
264/08.12.08/EE(M)-II
M/s NC &
Co.277/16.12
.08/
EE(M)-II
M/s Hans
Kumar Jain457/16.01.09/EE(M)-II
M/s Bansal
Const Co.
511/16.02
.09/
EE(M)-I
M/s Y.K.
builders39/23.06.
09
M/s Maman Chand Bansal
490/04.02
.09/
EE(M)-II
M/s Maman Chand Bansal
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.008.02
D.O.S D.O.C
09.10.08 P 2E+06 In Prog.
2.22
09.10.08 08.12.08 2E+06 Completed
0.00
09.10.08 P 2E+06 In Prog.
2.81
11.10.08 19.09.08 349040 Completed
0.00
08.09.08 06.10.08 168164 Completed
0.00
11.10.08 18.09.08 339232 Completed
0.00
08.09.08 06.10.08 169123 Completed
0.00
11.10.08 19.09.08 172045 Completed
0.00
12.09.08 P 336951 In Prog.
1.34
23.07.08 23.09.08 223574 Completed
0.00
08.09.08 P 279053 In Prog.
0.18
03.09.08 P 561913 In Prog.
0.05
24.07.08 24.10.08 389193 Completed
0.00
22.10.08 21.11.08 353153 Completed
0.00
18.08.08 P 2E+06 In Prog.
0.35
Work order no. with date
i/c division
Name of agency
Expenditure
Present Position
Liabilities Rs.lacs
203/30.09.08/EE(M)-II
M/s Suresh Kumar Goel
202/30.09.08/EE(M)-II
M/s Suresh Kumar Goel
204/30.09.08/EE(M)-II
M/s Suresh Kumar Goel
66/03.09.08/EE(E)-V
M/s Perfect Elect Works
70/03.09.08/EE(E)-V
M/s Perfect Elect Works
65/03.09.08/EE(E)-V
M/s Perfect Elect Works
63/03.09.08/EE(E)-V
M/s Perfect Elect Works
61/03.09.08/EE(E)-V
M/s Perfect Elect Works
67/03.09.
08/EE(E)-
V
M/s Perfect
Elect
Works50/15.07.
08/EE(M)-
II
M/s Guru
Kripa Entp.147/08.09.08/EE(M)-II
M/s Sarawati Const Co.
110/13.08
.08/
EE(M)-II
M/s Sona
Const.47/15.07.
08/EE(M)-
II
M/s
Niranjan
Singh112/15.10.08/EE(E)-V
M/s Maanu
Elect.158/10.09.08/EE(M)-II
M/s Sona
Const.
26.12.08 P 391279 In Prog.
1.40
04.01.09 P 478261 In Prog.
0.22
26.12.08 P 194559 In Prog.
0.69
05.02.09 P 713173 In Prog.
0.47
07.07.09 P 2E+06 In Prog.
0.27
06.03.09 P 2E+06 In Prog.
2.26
02.03.09 P 2E+06 In Prog.
0.75
15.10.08 P 590778 In Prog.
0.35
21.01.09 18.04.09 443600 Completed
0.00
23.01.09 28.02.09 443355 Completed
0.00
08.10.08 08.12.08 499707 Completed
0.00
19.09.08 P 675187 In Prog.
0.09
24.07.08 20.09.08 231627 Completed
0.00
09.10.08 P 554398 In Prog.
0.25
5.60
299/16.12.08/EE(M)-II
M/s Bhagwati Const Co.
320/26.12.08/EE(M)-II
M/s Bhagwati Const Co.
300/16.12.08/EE(M)-II
M/s Bhagwati Const Co.
348/27.01
.09/
EE(M)-II
M/s
Aspiration
builders38/01.06.09/EE(M)-II
M/s Suresh Kumar Goel
399/19/02
/09/
EE(M)-II
M/s Suresh
Kumar
Goel382/16.02
.09/
EE(M)-II
M/s Sona
Const.159/10.09
.08/
EE(M)-II
M/s Sona
Const.334/19.01.09/EE(M)-II
M/s Sanjay Kumar Gupta
333/19.01
.09/
EE(M)-II
M/s Sanjay
Kumar
Gupta190/30.09
.08/
EE(M)-II
M/s Ahuja
Const.160/10.09
.08/
EE(M)-II
M/s Maman Chand Bansal
49/15.07.
08/EE(M)-
II
M/s Guru
Kripa Entp.107/13.08
.08/
EE(M)-II
M/s Sona
Const.
22.08.08 P 456242 In Prog.
0.10
15.09.08 P 524772 In Prog.
0.17
24.09.08 P 556898 In Prog.
0.17
09.10.08 P 315198 In Prog.
2.83
10.10.08 P 654202 In Prog.
0.17
03.01.08 01.01.09 489707 Completed
0.00
01.01.09 09.02.09 462603 Completed
0.00
20.10.08 28.03.09 458648 Completed
0.00
15.10.08 28.08.09 479700 Completed
0.00
02.03.09 25.03.09 244453 Completed
0.00
27.08.09 03.06.10 560954 Completed
0.00
25.02.09 26.05.09 354875 Completed
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
111/13.08
.08/
EE(M)-II
M/s Sona
Const.106/13.08.08/EE(M)-II
M/s Sona
Const.108/13.08.08/EE(M)-II
M/s Sona
Const.105/13.08.08/EE(M)-II
M/s Sona
Const.157/10.09.08/EE(M)-II
M/s Sona
Const.241/24.10
.08/
EE(M)-II
M/s Shiv
Shakti
Const Co.312/26.12
.08/
EE(M)-II
M/s Manish
Const Co.242/24.10
.08/
EE(M)-II
M/s Kapil
Kumar Puri226/07.10.08/EE(M)-II
M/s Swaraj
Const Co.236/02.03
.09/
EE(E)-V
M/s Repair
Shop19/27.05.09/EE(M)-II
M/s Pawan
Bros. 393/19.02.09/EE(M)-II
M/s Bachu Lala Sharma
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
22.74
D.O.S D.O.C
29.07.08 29.08.08 127312 Completed
0.00
30.08.08 06.11.08 133499 Completed
0.00
31.07.08 29.08.08 135646 Completed
0.00
Work order no. with date
i/c division
Name of agency
Expenditure
Present Position
Liabilities Rs.lacs
279/23.07.08/EE(E)Hort
M/s Bharat Elect. & Elect.
278/23.07.08/EE(E)Hort
M/s Sury Lite Entp.
280/23.07.08/EE(E)Hort
M/s Moni Elect.
14.08.08 27.09.08 95580 Completed
0.00
14.08.08 27.09.08 193855 Completed
0.00
18.08.08 21.09.08 197000 Completed
0.00
14.08.08 07.10.08 195688 Completed
0.00
20.08.08 20.10.08 182151 Completed
0.00
10.10.08 15.01.09 376759 Completed
0.00
26.08.08 15.10.08 392971 Completed
0.00
08.10.08 08.11.08 194087 Completed
0.00
16.08.08 06.10.08 199408 Completed
0.00
16.08.08 06.10.08 199000 Completed
0.00
28.09.08 18.11.08 305071 Completed
0.00
18.09.08 10.02.08 479055 Completed
0.00
01.10.08 29.12.08 466457 In Prog.
1.25
18.09.08 25.11.08 389344 Completed
0.00
22.01.09 24.04.09 355579 Completed
0.00
23.01.09 28.05.08 522000 Completed
0.00
25.08.08 13.09.08 138737 Completed
0.00
06.10.08 01.12.08 196828 Completed
0.00
03.10.08 11.11.08 375327 Completed
0.00
86/13.08.08/EE(M)-II
M/s Shiv Bhan Sharma
81/23.08.08/EE(M)-II
M/s M.K. Const Co.
83/13.08.08/EE(M)-II
M/s Jai Bhawani Assos.
82/13.08.08/EE(M)-II
M/s Jindal builders
79/13.08.08/EE(M)-II
M/s Vinay Const/.
207/07.10.08/EE(M)-II
M/s guru Kripa Entp.
113/25.08.08/EE(M)-II
M/s Vijay Const.
218/07.10.08/EE(M)-II
M/s Naresh Dixit Assos.
89/13.08.08/EE(M)-II
M/s Rajesh Assos.
84/13.08.08/EE(M)-II
M/s Jai Chanda Assos.
171/17.09.08/EE(M)-II
M/s Saraswati Const Co.
169/17.09.08/EE(M)-II
M/s Saraswati Const Co.
183/30.09.08/EE(M)-II
M/s Saraswati Const Co.
170/17.09.08/EE(M)-II
M/s Saraswati Const Co.
338/19.01.09/EE(M)-II
M/s guru Kripa Entp.
340/19.01.08/EE(M)-II
M/s Aspiration builders
426/07.08.08/EE(E)-Hort.
M/s Kahiraan Elect.
197/30.09.08/EE(M)-II
M/s Vijay Const.
196/30.09.08/EE(M)-II
M/s Rajesh Assos.
22.01.09 P 419252 In Prog.
1.48
01.10.08 12.12.08 496994 Completed
0.00
21.01.09 19.02.09 295842 Completed
0.00
24.09.08 21.11.08 346322 Completed
0.00
25.09.08 16.01.09 499807 Completed
0.00
24.09.08 26.11.08 478902 Completed
0.00
26.09.08 P 479616 In Prog.
0.20
27.09.08 16.01.09 497454 Completed
0.00
17.10.08 28.11.08 192777 Completed
0.00
11.10.08 10.11.08 196605 Completed
0.00
18.10.08 17.12.08 197951 Completed
0.00
08.11.08 10.12.08 438280 Completed
0.00
10.08.06 26/10/09 462690 Completed
0.00
17.12.08 14.01.09 184329 Completed
0.00
23.12.08 07.02.09 200000 Completed
0.00
17.12.08 24.03.09 498871 Completed
0.00
339/19.01.09/EE(M)-II
M/s guru Kripa Entp.
185/30.09.08/EE(M)-II
M/s Jai Rishab Const & Elect.
337/19.01.09/EE(M)-II
M/s Guru Kripa Entp.
325/19.09.08/EE(M)-III
M/s Vikas Jain
328/19.09.08/EE(M)-III
M/s SK Assos.
334/19.09.08/EE(M)-III
M/s Ashwini Kumar Agg.
323/19.09.08/EE(M)-III
M/s Lalit Sharma
324/19.09.08/EE(M)-III
M/s Mahesh Bansal
227/15.10.08/EE(M)-II
M/s Rajesh Assos.
211/07.10.08/EE(M)-II
M/s Sharma Assos.
228/15.10.08/EE(M)-II
M/s PS Const Co.
223/07.10.08/EE(M)-II
M/s Bachu Lal Sharma
219/07/10/80/EE(M)-II/ Sh (S)
M/s Anand Traders
271/16.12.08/EE(M)-II
M/s Shejada Const
269/16.12.08/EE(M)-II
M/s Prem Const Co.
286/16.12.08/EE(M)-II
M/s Shiv Bhan Sharma
15.12.08 12.02.08 278659 Completed
0.00
18.12.08 27.01.09 196365 Completed
0.00
12.02.09 P 369286 In Prog.
1.26
24.05.09 14.04.09 460000 Completed
0.00
01.06.09 30.10.09 398000 Completed
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
257/08.12.08/EE(M)-II
M/s Naresh Dixit Assos.
270/16.12.08/EE(M)-II
M/s KK Const.
355/10.02.09/EE(M)-II
M/s Nareender Const Co.
366/16.02.09/EE(M)-II
M/s Jindal builders
18/25.05.09/EE(M)-II
M/s guru Kripa Entp.
0.000.000.000.000.00
13439356 4.19
D.O.S D.O.C
27.09.08 10.07.10 303996 Completed 0.00
25.10.08 23.12.08 340456 Completed 0.00
12.10.08 P 547390 In Prog. 1.47
06.08.08 15.12.08 191326 Completed 0.00
11.08.08 10.10.08 187322 Completed 0.00
5.24
23.10.08 20.07.09 199000 Completed 0.00
4.84
04.03.09 P 308408 In Prog. 1.82
26.08.08 03.09.08 406551 Completed 0.00
18.08.08 02.09.08 476543 Completed 0.00
06.08.08 20.08.09 156980 Completed 0.00
Work order no. with date
i/c division
Name of agency
Expenditure
Present Position
Liabilities Rs.lacs
297/26.09.08/EE(M)-I
M/s Ganesh Entp.
324/16.10.08/EE(M-I
M/s Prince
Const Co.304/10.10.08/EE(M)-I
M/s Prince
Const Co.140/28.07.08/EE(M)-I
M/s RS
Const Co.137/28.07.08/EE(M)-I
M/s Parveen & Co.
332/16.10.08/EE(M)-I
M/s U.K.
Gupta
515/31.03.09/EE(M)-I
M/s Ganesh Entp.
135/28.07.08/EE(M)-I
M/s Maspro Const Co.
138/28.07.08/EE(M)-I
M/s Satish Kumar Goel
139/28.07.08/EE(M)-I
M/s Mahaluxmi Const. Co.
01.11.08 02.03.09 406000 Completed 0.00
26.11.08 02.01.09 498942 Completed 0.00
24.09.08 21.11.08 494171 Completed 0.00
22.09.08 26.03.09 493262 Completed 0.00
27.09.08 13.01.09 198934 Completed 0.00
26.09.08 25.03.09 575021 Completed 0.00
15.10.08 26.02.09 579311 Completed 0.00
15.10.08 18.02.09 548059 Completed 0.00
02.01.09 28.01.09 578294 Completed 0.00
01.01.09 31.01.09 562263 Completed 0.00
01.01.09 05.02.09 566219 Completed 0.00
05.01.09 03.02.09 533626 Completed 0.00
28.02.09 02.04.09 145420 Completed 0.00
0.00
353/23.10
.08/
EE(M)-I
M/s K-3
Infrastrucut
ure271/18.09.08/EE(M)-I
M/s Love
Kesh Entp.281/18.09.08/EE(M)-I
M/s Tomar
Const Co.276/18.09.08/EE(M)-I
M/s Gajender Kumar
285/18.09.08/EE(M)-I
M/s Arun
Const Co.58/19.09.
08/EE(E)-
VI
M/s Bharat
Trading
Co.106/15.10
.08/
EE(E)-VI
M/s Super
Elect.131/15.10
.08/(E)-VI
M/s Suneja
Lite Engg.158/31.12
.08/
EE(E)-VI
M/s Super
Elect.163/13.12
.08/
EE(E)-VI
M/s Paras
Const Co.164/13.12
.08/
EE(E)-VI
M/s Ankur
Entp.161/13.12
.08/
EE(E)-VI
M/s
Cheena &
Co.196/27.02.09/EE(E)-VI
M/s Bharat Trading Co.
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.00
13.36
D.O.S D.O.C
08.09.08 06.10.09 465753 Completed
0.00
07.08.08 13.09.08 465652 Completed
0.00
23.08.08 16.09.08 402674 Completed
0.00
01.08.08 05.09.08 448788 Completed
0.00
06.08.08 11.09.08 409486 Completed
0.00
07.08.08 29.09.08 491702 Completed
0.00
12.09.08 P 348056 In Prog.
0.05
06.02.09 16.07.09 350135 Completed
0.00
16.02.09 16.07.09 309407 Completed
0.00
Work order no. with date
i/c division
Name of agency
Expenditure
Present Position
Liabilities Rs.lacs
110/06.08.08/EE(M)-IV
M/s Darshan Const.
168/28.07.08/EE(M)-I
M/s Mahesh Bansal
169/28.07.08/EE(M)-I
M/s Appar Const & engg.
166/28.07.08/EE(M)-I
M/s Kushwah Const Co.
164/28.07.08/EE(M)-I
M/s Rakesh Kumar Tomar
124/28.07.08/EE(M)-I
M/s Satish Kumar Const.
253/02.09.08/EE(M)-I
M/s R.S. Const.
202/22.08.08/EE(M)-I
M/s Ved Pal Singh
203/22.08.08/EE(M)-I
M/s Ved Pal Singh
13.08.08 04.10.08 498691 Completed
0.00
14.08.08 03.10.08 486618 Completed
0.00
05.10.08 05.01.09 321109 Completed
0.00
06.08.08 08.09.08 296201 Completed
0.00
04.08.08 13.09.08 334977 Completed
0.00
06.10.08 10.09.08 380966 Completed
0.00
04.08.08 03.10.08 365386 Completed
0.00
04.08.08 30.03.09 289519 Completed
0.00
02.08.08 04.11.08 309284 Completed
0.00
03.07.09 09.11.09 382028 Completed
0.00
03.07.09 09.11.09 335314 Completed
0.00
04.10.08 22.12.09 442918 Completed
0.00
0.000.000.000.000.000.00
162/28.07.08/EE(M)-I
M/s Lalit Sharma
161/28.07.08/EE(M)-I
M/s Lalit Sharma
165/28.07.08/EE(M)-I
M/s Anil Sharma
163/28.07.08/EE(M)-I
M/s Paras Nath Const Co.
131/28.07.08/EE(M)-I
M/s Good Well Const Co.
134/28.07.08/EE(M)-I
M/s Rakesh Rawat
133/28.07.08/EE(M)-I
M/s Dharam Const Co.
132/28.07.08/EE(M)-I
M/s Maha Laxmi Const Co.
30/28.07.08/EE(M)-I
M/s Anil Sharma
509/31.03.09/EE(M)-I
M/s Gaurav Const Co.
508/31.03.09/EE(M)-I
M/s Gaurav Const Co.
294/26.09.08/EE(M)-I
M/s Gaurav Const Co.
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.05
D.O.S D.O.C
01.11.08 13.12.08 383361 Completed 0.00
19.09.08 10.10.08 447511 Completed 0.00
11.08.08 22.10.08 557800 Completed 0.00
10.09.08 25.09.08 317784 Completed 0.00
08.09.08 11.10.08 255092 Completed 0.00
01.09.08 23.10.08 557699 Completed 0.00
11.08.08 20.10.08 299560 Completed 0.00
11.08.08 24.10.08 257343 Completed 0.00
10.09.08 09.03.09 495089 Completed 0.00
01.09.08 22.10.08 357810 Completed 0.00
12.09.08 27.02.09 495069 Completed 0.00
Work order no. with date
i/c division
Name of agency
Expenditure
Present Position
Liabilities Rs.lacs
264/12.08.08/EE(M)-III
M/s Sona Const & Cont.
189/18.07.08/EE(M)-III
M/s Y.K. buiders
179/18.07.08/EE(M)-III
M/s A.K.Entp.
180/18.07.08/EE(M)-III
M/s A.K.Entp.
183/18.07.08/EE(M)-III
M/s A.K.Entp.
181/18.07.08/EE(M)-III
M/s A.K.Entp.
185/18.07.08/EE(M)-III
M/s Y.K. buiders
191/18.07.08/EE(M)-III
M/s Y.K. buiders
279/02.09.08/EE(M)-III
M/s Gajendra Kumar
187/18.07.08/EE(M)-III
M/s Y.K. buiders
232/11.08.08/EE(M)-III
M/s Ved Pal Singh
01.09.08 26.11.08 328999 Completed 0.00
14.08.08 29.10.08 187960 Completed 0.00
26.07.08 25.10.08 522896 Completed 0.00
26.07.08 25.09.08 197520 Completed 0.00
04.09.08 16.02.09 187534 Completed 0.00
31.07.08 18.09.08 198544 Completed 0.00
31.07.08 26.12.08 187534 Completed 0.00
15.07.08 04.09.08 198789 Completed 0.00
26.07.08 24.10.08 376921 Completed 0.00
21.07.08 26.09.08 407848 Completed 0.00
26.07.08 27.09.08 308681 Completed 0.00
26.07.08 22.09.08 395824 Completed 0.00
18.08.08 07.11.08 478966 Completed 0.00
22.12.08 09.04.09 312556 Completed 0.00
12.07.08 27.08.09 528432 Completed 0.00
196/18.07.08/EE(M)-III
M/s Ved Pal Singh
199/18.07.08/EE(M)-III
M/s Satish & Bros.
184/18.07.08/EE(M)-III
M/s A.K.Entp.
193/18.02.08/EE(M)-III
M/s Aman builders
175/10.07.08/EE(M)-III
M/s Maha Laxmi Const Co.
192/18.07.08/EE(M)-III
M/s R.A Assos.
194/18.07.08/EE(M)-III
M/s Anil Kumar
194/10.07.08/EE(M)-III
M/s RS Const
194/18.07.08/EE(M)-III
M/s Ved Pal Singh
194/18.07.08/EE(M)-III
M/s Satish & Bros.
201/18.07.08/EE(M)-III
M/s Satish & Bros.
197/18.07.08/EE(M)-III
M/s Satish & Bros.
261/11.08.08/EE(M)-III
M/s Sharma Const Co.
306/04.09.08/EE(M)-III
M/s Mani builders
172/04.07.08/EE(M)-III
M/s Ganesh Entp.
26.09.08 28.11.08 195990 Completed 0.00
26.09.08 08.12.08 374151 Completed 0.00
27.01.09 P 269204 In Prog. 2.76
24.12.08 03.03.09 686300 Completed 0.00
04.09.08 31.10.08 580985 Completed 0.00
27.10.09 25.05.09 799668 Completed 0.00
10.10.08 27.11.08 693000 Completed 0.00
03.01.09 25.03.09 728300 Completed 0.00
18.11.08 31.03.09 1E+06 Completed 0.00
10.11.08 22.12.08 1E+06 Completed 0.00
05.12.08 10.01.09 1E+06 Completed 0.00
10.10.08 03.12.08 696245 Completed 0.00
16.10.08 08.02.09 579627 Completed 0.00
16.10.08 22.11.08 580155 Completed 0.00
20.08.09 P 519162 In Prog. 0.11
341/19.09.08/EE(M)-III
M/s Maspro Const Co.
346/19.09.08/EE(M)-III
M/s Rajeev & Co.
344/19.09.08/EE(M)-III
M/s Ved Pal singh
447/23.12.08/EE(M)-III
M/s Satish & Bros.
293/02.09.08/EE(M)-III
M/s Satish & Bros.
361/26.09.08/EE(M)-III
M/s Ved Pal Singh
347/19.09.08/EE(M)-III
M/s Bharat Assos.
448/23.12.08/EE(M)-III
M/s Mayur Entp.
362/26.09.08/EE(M)-III
M/s Mayur Entp.
363/26.09.08/EE(M)-III
M/s Maman Chand Bansal
439/10.10.08/EE(M)-III
M/s Maman Chand Bansal
360/26.09.08/EE(M)-III
M/s Bharat Assos.
137/15.10.08/EE(E)-VI
M/s Hitech Elect.
136/15.10.08/EE(E)-VI
M/s Hitech Elect.
40/30.05.09
M/s Jai LaxmiConst Co
02.03.09 30.05.09 811929 Completed 0.00
09.03.09 23.03.09 213957 Completed 0.00
25.02.09 13.04.09 456074 Completed 0.00
12.09.08 12.11.08 562490 Completed 0.00
12.09.08 12.11.08 562970 Completed 0.00
12.09.08 02.03.09 499270 Completed 0.00
03.11.08 27.02.09 534978 Completed 0.00
10.10.08 27.02.09 539336 Completed 0.00
04.11.09 03.02.10 653625 Completed 0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
624/23.02.09/EE(M)-III
M/s Sharma Const Co.
450/23.12.08/EE(M)-III
M/s Maspro Const Co.
626/23.02.09/EE(M)-III
M/s Y.K. buiders
309/04.09.08/EE(M)-III
M/s Love Kush Entp.
308/04.09.08/EE(M)-III
M/s Love Kush Entp.
312/04.09.08/EE(M)-III
M/s Ved Pal Singh
281/02.09.08/EE(M)-III
M/s Ved Pal Singh
282/02.09.08/EE(M)-III
M/s Ved Pal Singh
163/26.10.09/EE(M)-III
M/s Y.K. buiders
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.002.87
D.O.S D.O.C
30.03.09 06.04.09 294304 Completed 0.00
15.10.08 23.11.08 294210 Completed 0.00
15.10.08 23.11.08 294460 Completed 0.00
23.08.08 P 173367 In Prog. 0.45
19.09.08 10.10.08 368906 Completed 0.00
16.10.08 23.11.08 398446 Completed 0.00
20.11.08 18.03.09 411908 Completed 0.00
26.12.08 30.03.09 787077 Completed 0.00
Work order no. with date
i/c division
Name of agency
Expenditure
Present Position
Liabilities Rs.lacs
104/15.10.08/EE(E)-VI
M/s Shivam Elect.
113/15.10.08/EE(E)-VI
M/s Satyam Elect.
87/15.10.08/EE(E)-VI
M/s Tyagi Elect. & Trading Co.
229/21.07.08/EE(M)-III
M/s Ganesh Entp.
59/19.09.08/EE(E)-VI
M/s Bharat Trading Co.
76/15.10.08/EE(E)-VI
M/s Annapurna Engg.
263/11.08.08/EE(M)-III
M/s Pal Const Co.
451/23.12.08/EE(M)-III
M/s Ashwini Kumar Aggarwal
15.09.08 11.12.08 740202 Completed 0.00
27.09.08 18.03.09 564361 Completed 0.00
24.09.08 18.11.08 495249 Completed 0.00
27.09.08 19.12.08 187978 Completed 0.00
24.12.08 14.01.09 441800 Completed 0.00
13.10.08 11.12.08 197594 Completed 0.00
09.01.09 23.06.09 498789 Completed 0.00
03.01.09 06.03.09 499426 Completed 0.00
08.12.08 17.01.09 449686 Completed 0.00
13.10.08 06.02.09 436294 Completed 0.00
10.12.08 01.10.09 480502 Completed 0.00
01.08.09 30.01.10 439422 Completed 0.00
24.11.08 15.03.10 380986 Completed 0.00
06.02.09 11.05.09 2E+06 Completed 0.00
16.03.09 01.10.09 745408 Completed 0.00
287/02.09.08/EE(M)-III
M/s Ashok Const Co.
268/26.08.08/EE(M)-III
M/s Pal Const Co.
155/22.09.08/EE(M)-IV
M/s R.A. Assos.
154/17.09.08/EE(M)-IV
M/s R.S. Const Co.
151/17.09.08/EE(M)-IV
M/s Aziz builders
167/08.10.08/EE(M)-IV
M/s Manoj Kumar
160/31.12.08/EE(E)-VI
M/s Kumar Elect. & Resurfacing Work
174/31.12.08/EE(E)-VI
M/s Amit Elect.
417/10.10.08/EE(M)-III
M/s Rakesh Kumar Tomar
428/10.10.08/EE(M)-III
M/s Kushwaha Const Co.
425/10.10.08/EE(M)-III
M/s Love Kush Entp.
608/0202.09/EE(M)-III
M/s Jai Laxmi Const Co.
373/26.09.08/EE(M)-III
M/s Jai Laxmi Const Co.
603/02.02.09/EE(M)-III
M/s Mayur Entp.
575/02.02.09/EE(M)-III
M/s Aspiration builders
07.01.09 07.03.09 466226 Completed 0.00
16.01.09 05.03.09 471910 Completed 0.00
24.01.09 06.03.09 397981 Completed 0.00
20.02.09 30.10.09 225418 Completed 0.00
05.06.09 15.03.10 582479 Completed 0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
472/31.12.08/EE(M)-III
M/s Kushwaha Const Co.
474/31.12.08/EE(M)-III
M/s Masko Const Co.
485/31.12.08/EE(M)-III
M/s Bijender Singh Entp.
566/31.12.08/EE(M)-III
M/s Dinesh Kumar Sharma-II
11/28.05.09/EE(M)-III
Aspiretion Builders
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.45
D.O.S D.O.C
20.09.08 P 269795 In Prog. 2.30
12.08.08 11.09.08 199000 Completed 0.00
15.08.08 10.09.08 389184 In Prog. 1.14
10.08.08 P 352323 In Prog. 0.97
10.08.08 P 361962 In Prog. 0.76
15.06.09 10.08.09 333000 Completed 0.00
27.08.08 06.10.08 418886 Completed 0.00
Work order no. with date
i/c division
Name of agency
Expenditure
Present Position
Liabilities Rs.lacs
315/12.09.08/EE(M)-III
M/s Jai Laxmi Const Co.
240/11.08.08/EE(M)-I
M/s Satish Bros.
193/05.08.08/EE(M)-I
M/s RS Const Co.
194/05.08.08/EE(M)-I
M/s RS Const Co.
195/05.08.08/EE(M)-I
M/s RS Const Co.
38/12.06.09/EE(M)-I
M/s RS Const Co.
196/05.08.08/EE(M)-I
M/s Ved Pal Singh
19.08.08 23.09.08 106000 Completed 0.00
08.08.08 01.09.08 93000 Completed 0.00
22.08.08 24.09.08 276838 Completed 0.00
28.08.08 30.10.08 372784 Completed 0.00
15.09.08 P 299497 In Prog. 0.87
10.09.08 P 286353 In Prog. 0.81
06.02.09 P 436218 In Prog. 1.50
22.08.08 P 389917 In Prog. 1.22
05.09.08 05.11.08 409188 Completed 0.00
15.09.08 P 507045 In Prog. 1.58
29.08.08 24.09.08 449701 Completed 0.00
30.08.08 P 394690 In Prog. 1.05
30.08.08 12.12.08 513754 Completed 0.00
03.09.09 29.07.10 346409 Completed 0.00
128/28.07.08/EE(M)-I
M/s Dharam Const Co.
125/28.07.08/EE(M)-I
M/s Amar builders
218/22.08.08/EE(M)-I
M/s Princple Const Co.
210/22.08.08/EE(M)-I
M/s RS Const Co.
209/22.08.08/EE(M)-I
M/s RS Const Co.
208/22.08.08/EE(M)-I
M/s RS Const Co.
423/27.01.09/EE(M)-I
M/s Princple Const Co.
216/22.08.08/EE(M)-I
M/s RS Const Co.
241/29.08.08/EE(M)-I
M/s RS Const Co.
238/29.08.08/EE(M)-I
M/s RS Const Co.
235/29.08.08/EE(M)-I
M/s Princple Const Co.
239/29.08.08/EE(M)-I
M/s RS Const Co.
234/29.08.08/EE(M)-I
M/s Princple Const Co.
41/30.05.09/M-III
M/s Ganesh Ent.
3.40
10.01.09 P 385399 In Prog. 1.02
14.07.09 P 409607 In Prog. 1.14
15.10.08 P 580761 In Prog. 1.18
6.88
20.01.09 30.03.09 692000 Completed 0.00
01.11.08 P 568876 In Prog. 1.20
01.11.08 P 526485 In Prog. 1.17
20.10.08 P 576907 In Prog. 0.44
30.01.09 25.03.09 687000 Completed 0.00
30.01.09 25.03.09 694979 Completed 0.00
30.01.09 28.03.09 689858 Completed 0.00
14.07.09 P 367320 In Prog. 0.76
06.02.10 P 453023 In Prog. 1.22
18.06.09 17.08.09 145336 Completed 0.00
09.01.09 02.03.10 344532 Completed 0.00
4.96
378/06.10.08/EE(M)-III
M/s Ved Pal Singh
602/02.02.09/EE(M)-III
M/s Ved Pal Singh
411/ 10/10/08/EE(M)-III
M/s R.S. Const CO
449/23.12.08/EE(M)-III
M/s Shri Paras Nath Const Co.
431/10.10.08/EE(M)-III
M/s R.S. Const CO
432/10.10.08/EE(M)-III
M/s R.S. Const CO
429/10.10.08/EE(M)-III
M/s R.S. Const.& Co.
444/23.12.08/EE(M)-III
M/s Pawan Const Co.
445/23.12.08/EE(M)-III
M/s Pawan Const Co.
446/23.12.08/EE(M)-III
M/s Pawan Const Co.
409/10.10.08/EE(M)-III
M/s Jai Laxmi Const Co.
410/18.10.08EE(M)-III
M/s Jai Laxmi Const Co.
80/08.06.09/EE(M)-II
M/s Himanshu Builders
524/31.12.08/EE(M)-III
M/s Ganesh Ent.
09.01.09 02.03.10 259745 Completed 0.00
01.01.09 31.03.09 352563 Completed 0.00
10.01.09 29.08.09 376000 Completed 0.00
10.05.09 P 323493 In Prog. 1.15
11.02.09 P 234965 In Prog. 0.88
09.01.09 02.06.10 234636 Completed 0.00
12.06.09 04.05.10 343931 Completed 0.00
23.08.08 17.10.08 440429 Completed 0.00
30.08.08 P 260780 In Prog. 0.86
30.08.08 P 259471 In Prog. 0.83
15.09.08 30.10.08 430753 Completed 0.00
30.08.08 P 330470 In Prog. 1.13
25.08.08 28.10.08 285342 Completed 0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
523/31.12.08/EE(M)-III
M/s Ganesh Ent.
550/31.12.08/EE(M)-III
M/s S.K. Assos.
500/31.12.08/EE(M)-III
M/s Sarvodya Const.
585/02.02.09/EE(M)-III
M/s R.S. const. & Co.
584/02.02.09/EE(M)-III
M/s RS Const Co.
517/31.12.08/M-III
M/s RS Const Co.
78/05.06.09/EE(M)-III
M/s RS Const Co.
219/22.08.08/EE(M)-I
M/s Princple Const Co.
215/22.08.08/EE(M)-I
M/s RS Const Co.
214/22.08.08/EE(M)-I
M/s RS Const Co.
212/22.08.08/EE(M)-I
M/s RS Const Co.
213/22.08.08/EE(M)-I
M/s RS Const Co.
211/22.08.08/EE(M)-I
M/s RS Const Co.
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
40.40
D.O.S D.O.C
28.07.08 17.09.09 344159 Completed 0.00
17.10.08 P 377169 In Prog. 1.23
19.09.08 08.12.08 499466 Completed 0.00
17.10.08 25.11.08 462708 Completed 0.00
17.10.08 25.11.08 431458 Completed 0.00
15.12.08 23.03.09 631696 Completed 0.00
29.09.08 24.11.08 500000 Completed 0.00
Work order no. with date
i/c division
Name of agency
Expenditure
Present Position
Liabilities Rs.lacs
176/24.07.08/EE(M)-II
M/s R.B. Traders
352/05.09.08/EE(M)-II
M/s P.K. Assos.
292/01.09.08/EE(M)-II
M/s Moni builders
223/18.08.08/EE(M)-II
M/s Anuj Entp.
224/18.08.08/EE(M)-II
M/s Anuj Entp.
585/15.12.08/EE(M)-II
M/s Moni builders
291/01.09.08/EE(M)-II
M/s Moni builders
15.01.09 31.12.09 515721 Completed 0.00
18.12.08 P 489548 In Prog. 0.52
01.10.08 28.11.08 185000 Completed 0.00
06.10.08 P 565000 In Prog. 0.10
22.09.08 17.09.09 566182 Completed 0.00
22.01.08 31.08.09 599913 Completed 0.00
17.09.08 17.12.08 336133 Completed 0.00
22.10.08 31.08.09 599946 Completed 0.00
19.09.08 17.11.08 107913 Completed 0.00
19.09.08 17.09.09 549503 Completed 0.00
19.09.08 17.12.08 275737 Completed 0.00
24.04.08 30.10.08 176000 Completed 0.00
06.01.09 21.02.09 172453 Completed 0.00
29.10.08 04.12.08 177281 Completed 0.00
29.10.08 04.12.08 177281 Completed 0.00
01.10.08 29.11.08 364415 Completed 0.00
24.09.08 22.11.08 483509 Completed 0.00
27.09.08 26.11.08 396579 Completed 0.00
389/10.09.08/EE(M)-II
M/s Ajay Const Co.
390/10.09.08/EE(M)-II
M/s Ajay Const Co.
425/23.09.08/EE(M)-II
M/s Sukphal Const. Co.
451/01.10.08/EE(M)-II
M/s Mahesh Bansal
376/10.09.08/EE(M)-II
M/s S.K. Const Co.
388/10.09.08/EE(M)-II
M/s Shiv Raj Sharma
374/10.09.08/EE(M)-II
M/s Shri Satpal Const Co.
387/10.09.08/EE(M)-II
M/s Shiv Raj Sharma
378/10.09.08/EE(M)-II
M/s S.K. Const Co.
377/10.09.08/EE(M)-II
M/s S.K. Const Co.
379/10.09.08/EE(M)-II
M/s S.K. Const Co.
411/18.09.08/EE(M)-II
M/s Ishika Entp.
596/18.12.08/EE(M)-II
M/s Sarvodya Const Co.
501/15.10.08/EE(M)-II
M/s Mahender Const bCo.
403/18.09.10 M-II Sh (N)
M/s Mahender Const Co.
417/22.09.08/EE(M)-II
M/s N.K. Tomar
421/23.09.08/EE(M)-II
M/s Rajeev Const Co.
407/18.09.08/EE(M)-II
M/s Ganesh Enterprise
18.09.08 17.11.08 410254 Completed 0.00
07.01.09 20.02.09 407334 Completed 0.00
29.10.08 04.12.08 248526 Completed 0.00
07.10.08 26.11.08 378792 Completed 0.00
23.09.08 31.10.08 281237 Completed 0.00
20.09.08 24.11.08 210762 Completed 0.00
27.09.08 29.11.08 203811 Completed 0.00
23.09.08 18.11.08 281906 Completed 0.00
22.10.08 13.12.08 389000 Completed 0.00
23.10.08 13.12.08 304123 Completed 0.00
25.09.08 20.10.08 425111 Completed 0.00
27.09.08 25.10.08 495847 Completed 0.00
22.09.08 20.10.08 307550 Completed 0.00
23.09.08 03.11.08 217714 Completed 0.00
08.10.08 15.11.08 300201 Completed 0.00
24.09.08 16.09.09 304493 Completed 0.00
08.10.08 07.01.09 199146 Completed 0.00
06.03.09 10.09.09 617876 Completed 0.00
363/10.09.08/EE(M)-II
Vashistha Const. Co.
594/18.12.08/EE(M)-II
M/s Sarvodya Const Co.
499/15.10.08/EE(M)-II
M/s Mahinder Const Co.
397/1809.08/EE(M)-II
M/s Pawan Const Co.
412/13.09.08/EE(M)-II
M/s Gupta Const.
399/18.09.08/EE(M)-II
M/s Vikas Jain
420/23.09.08/EE(M)-II
M/s K.P. Entp.
409/18.09.08/EE(M)-II
M/s Appar Const & Engg.
457/06.10.08/EE(M)-II
M/s Good Well Const Co.
500/15.10.08/EE(M)-II
M/s Vipin Const Co.
422/23.09.08/EE(M)-II
M/s Mahesh Bansal
401/18.09.08/EE(M)-II
M/s Tomar Const Co.
414/18.09.08/EE(M)-II
M/s Kushwaha Const.
410/18.09.08/EE(M)-II
M/s K. S. Aggarwal
453/01.10.08/EE(M)-II
M/s Dinesh Kumar Sharma-II
418/22.09.08/EE(M)-II
M/s Lalit Sharma
448/01.10.08/EE(M)-II
M/s Bijender Kumar
771/27.02.09/EE(M)-II
M/s Verma Const. Co.
04.12.08 27.12.08 305449 Completed 0.00
06.03.09 25.02.10 387000 Completed 0.00
05.02.09 12.03.09 242409 Completed 0.00
21.10.08 27.12.08 188716 Completed 0.00
09.03.09 29.12.09 296941 Completed 0.00
15.12.08 02.01.09 199311 Completed 0.00
14.01.09 22.01.09 67512 Completed 0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
529/21.10.08/EE(M)-II
M/s Umang Const. Co.
689/16.01.09/EE(M)-II
M/S M. Const.
632/05.01.09/EE(M)-II
M/s Rakesh Kumar Tomar
315/21.10.08/EE(M)-II
M/s Anil Kumar
692/16.01.09/EE(M)-II
M/s Prinkle Const. Co.
476/06.10.08/EE(M)-II
M/s Moni builders
593/18.12.08/EE(M)-II
M/s Sarvodya Const Co.
0.000.000.000.000.001.85
deptt. deptt. deptt. deptt.Div. Div. Div. Div. Div. Div.
civil elect hort cse M-I M-II M-III M-IV E-I EE(Pr.)
Status Report of MLA, Sh Sahib Singh ChauhanAC No. 51,2008-09
S.No.
Name of Work deptt. Div. D.O.S D.O.C Expenditure
civil M-II
19.06.08 466000 15.09.08 30.10.08 465681
Completed
0.00
civil M-II
19.06.08 470000 05.08.08 20.10.08 469783
Completed
0.00
civil M-II
19.06.08 365000 20.08.08 21.11.08 364795
Completed
0.00
civil M-II
19.06.08 495000 22.09.08 21.11.08 494708 Completed 0.00
civil M-II
19.06.08 495487 M/s KP Entp. 10.09.08 20.11.08 495165
Completed
0.00
civil M-II
19.06.08 497718 15.09.08 28.11.08 497474
Completed
0.00
civil M-II
19.06.08 499297 18.09.08 20.11.08 499106
Completed
0.00
civil M-II
23.06.08 497900 29.08.08 21.11.08 496043
Completed
0.00
Date of Booking
Date of Consen
t
Amount booked
Work order no. with date
i/c division
Name of agency
Present Position
Liabilities Rs.lacs
1
Dev of front and side lane by pdg RMC from B-1/312 to B-1/319 and side lane along park B-1 Block Yamuna Vihar
23.05.08
226/18.08.08/EE(M)-II
M/s Mahender Const Co.
2
Dev of front and side lane by pdg RMC from C-6/120 to C-6/111, C-6/141 to C-6/150 in C-6 Block Yamuna Vihar
23.05.08
181/31.07.08/EE(M)-II
M/s Umang Const Co.
3
Dev of front and side lane by pdg RMC from C-6/45 to C-6/54,C-6/41 to C-6/44 in C-6 Block Yamuna Vihar
23.05.08
221/18.08.08/EE(M)-II
M/s RA Assos.
4
Dev of front lane along park and adj back lane by pdg RMC from C-6/276 to C-6/161 in C-6 Block Yamuna Vihar
23.05.08
225/18.08.08/EE(M)-II
M/s Maha Laxmi Const Co.
5
Dev of front lane and back lane by pdg RMC from C-6/306 to C-6/292,C-6/402 to C-6/393 in C-6 Block Yamuna Vihar
23.05.08
216/18.08.08/EE(M)-II
6
Dev of front lane along park and adj back lane by pdg RMC from C-6/431 to C-6/438,C-6/430 to C-6/423,C-6/422 to C-6/413 in C-6 Block Yamuna Vihar
23.05.08
244/22.08.08/EE(M)-II
M/s Vipin Const Co.
7
Dev of front and back lane by pdg RMC from C-6/333 to C-6/347,C-6/382 to C-6/373 in C-6 Block Yamuna Vihar
23.05.08
227/18.08.08/EE(M)-II
M/s Good Well Const Co.
8
C/O walk way and B/Wall in park opp. h.no.B-5/160 B-Block Yamuna Vihar C-256/AC-51 SH(N)Z
18.05.08
17/22.08.08/EE(M)-II
M/s NKG Entp.
civil M-II
23.06.08 668000 6.68
civil M-II
23.06.08 589258 11.09.08 12.12.08 587694
Completed
0.00
civil M-II
23.06.08 596499 11.09.08 12.12.08 596102
Completed
0.00
civil M-II
23.06.08 606154 05.10.08 02.01.09 604774
Completed
0.00
civil M-II
23.06.08 610982 05.10.08 04.01.09 610952
Completed
0.00
civil M-II
23.06.08 598279 11.09.08 12.12.08 592819
Completed
0.00
civil M-II
23.06.08 471041 25.08.08 18.11.08 469436
Completed
0.00
civil M-II
23.06.08 624764 05.10.08 03.01.09 599665
Completed
0.00
civil M-II
23.06.08 473126 11.09.08 28.11.08 472644
Completed
0.00
civil M-II
23.06.08 632074 05.10.08 02.01.09 632074
Completed
0.00
civil M-II
23.06.08 363558 12.09.08 03.11.08 363097
Completed
0.00
civil M-II
23.06.08 608070 05.10.08 P 483599
In Prog.
1.24
9
Pdg Fiber Glass Roof and flooring in huts in park of B-4 and B-5 Block Yamuna Vihar C-256/AC-51 SH(N)Z
20.05.08
10
Pdg Fiber Glass Roof and flooring in huts in park of B-1,B-2 and B-3 Block Yamuna Vihar C-256/AC-51 SH(N)Z
20.05.08
22/04.09.08/EE(M)-II
M/s Mahesh Bansal
11
Pdg Fiber Glass Roof and flooring in huts in park of C-1,C-2 and C-3 Block Yamuna Vihar C-256/AC-51 SH(N)Z
20.05.08
23/04.09.08/EE(M)-II
M/s Mahesh Bansal
12
Pdg Fiber Glass Roof and flooring in huts in park of C-4,C-5 and C-6 Block Yamuna Vihar C-256/AC-51 SH(N)Z
20.05.08
30/26.09.08/EE(M)-II
M/s Mahesh Bansal
13
Pdg Fiber Glass Roof and flooring in huts in park of C-7,C-8 and C-9 Block Yamuna Vihar C-256/AC-51 SH(N)Z
20.05.08
29/26.09.08/EE(M)-II
M/s Mahesh Bansal
14
Pdg Fiber Glass Roof and flooring in huts in park of C-10,C-11 and C-12 Block Yamuna Vihar C-256/AC-51 SH(N)Z
20.05.08
24/04.09.08/EE(M)-II
M/s Mahesh Bansal
15
C/O walkway in Ambedkar Park in C-8 Block Yamuna Vihar C-256/AC-51 SH(N)Z
20.05.08
19/22.08.08/EE(M)-II
M/s NKG Entp.
16
C/O B/wall from Mahila Park to Bapu Asha Ram Park in B-Block Yamuna Vihar C-256/AC-51 SH(N)Z
20.05.08
33/26.09.08/EE(M)-II
M/s Shailender Singh Const
17
C/O walkway in Park opp. h.no. C-8/169 and C-8/179 park in C-8 Block Yamuna Vihar C-256/AC-51 SH(N)Z
20.05.08
21/04.09.08/EE(M)-II
M/s NS Chaudhary
18
R/O B/wall in Bhagat Singh Park in C-9 Block Yamuna Vihar C-256/AC-51 SH(N)Z
20.05.08
32/26.09.08/EE(M)-II
M/s Bhatia Const Co.
19
C/O B/wall in Chitra Gupt Vatika in C-4 Block Yamuna Vihar C-256/AC-51 SH(N)Z
20.05.08
20/04.09.08/EE(M)-II
M/s NS Chaudhary
20
C/O walkway and B/Wall in park back side of Rath Wala Mandir in C-4 Block Yamuna Vihar C-256/AC-51 SH(N)Z
20.05.08
31/26.09.08/EE(M)-II
M/s RA Assos.
civil M-II
23.06.08 364301 25.08.08 18.11.08 363781
Completed
0.00
civil M-II23.06.08 610000 03.01.09 13.03.09 609624
Completed0.00
civil M-II
23.06.08 602135 02.04.09 31.12.09 553797 Completed 0.00
civil M-II
23.06.08 429193 16.09.08 08.12.08 427966
Completed
0.00
civil M-II
23.06.08 459841 01.08.09 24.10.08 459430
Completed
0.00
civil M-II
23.06.08 472741 14.08.08 25.09.08 472446
Completed
0.00
civil M-II
23.06.08 497590 21.08.08 30.09.08 497590
Completed
0.00
elect E-I
16.07.08 471631 16.10.08 23.12.08 459492
Completed
0.00
civil M-II
25.07.08 199653 19.09.08 17.10.08 199149
Completed
0.00
elect E-I
30.07.08 698487 28.02.09 10.07.09 692398
Completed
0.00
civil M-II
26.08.08 496052 11.10.08 28.11.08 495407
Completed
0.00
21
C/O walkway in Park opp. h.no. B-3/76 in B-Block Yamuna Vihar C-256/AC-51 SH(N)Z
20.05.08
18/22.08.08/EE(M)-II
M/s NKG Entp.
22 C/O B/wall in park in B-3 Block Yamuna Vihar C-256/AC-51 SH(N)Z
20.05.08
41/26.12.08/EE(M)-II
M/s RA Assos.
23
Beautification of road side berms opp.Ser.Sec.School C-8 Block Yamuna Vihar C-256/AC-51 SH(N)Z
23.05.08
34/26.09.08/EE(Pr)
M/s Ajay Const co
24
Dev of side berms and bed raising of drain by pdg RMC from h.no.B-5/154 to B-5/138 and bed raising along back lane of School B-5 Block Yamuna Vihar in C-256/SH(N)Z
27.05.08
287/01.09.08/EE(M)-II
M/s Dharam Const. Co.
25
Dev of back lane and side along both sides park by pdg RMC from h.no.B-5/327 to B-5/351 and B-5/386 to B-5/370 and back lane B-5/309 in B-5 Block Yamuna Vihar in C-256/SH(N)Z
27.05.08
182/21.07.08/EE(M)-II
M/s Moni buiders
26
Dev of back lane by pdg RMC from h.no.B-5/139 to B-5/154 and B-5/91 to B-5/118 in B-5 Block Yamuna Vihar C-256/SH(N)Z
27.05.08
208/13.08.08/EE(M)-II
M/s Rajinder Const Co.
27
P/F MS Name Board in Bhajanpura C-Block,K-Block,Gangotri Vihar Subhash Vihar C-256/SH(N)Z
27.05.08
203/17.08.08/EE(M)-II
M/s Amar builders
28
P/O lighting arrangement in MPL Ambedkar Park C-8 Yamuna Vihar C-256/SH(N)Z
27.05.08
124/15.10.08/EE(E)-VI
M/s Hitech Elect.
29
Dev of gali no.2 and link by pdg RMC in K-Block West Ghonda in C-255/SH(N)Z
10.07.08
327/05.09.08/EE(M)-II
M/s Anil Kumar
30
P/O lighting arrangement opp. h.no.B-3/185 Bhajanpura Thana and Bhajanpura Chowk to Dispencary in AC-51/SH(N)Z
08.05.08
212/27.02.09/EE(E)-VI
M/s Unique Elect.
31
Dev of lane adj h.no.21/30 by pdg RMC in K-Blocl West Ghonda in C-255/SH(N)Z
10.07.08
328/05.09.08/EE(M)-II
M/s SK Assos.
civil M-II
26.08.08 499868 24.11.08 12.12.08 499436
Completed
0.00
civil M-II
26.08.08 499513 25.09.08 24.11.08 499184
Completed
0.00
civil M-II
26.08.08 309415 19.09.08 10.11.08 309335
Completed
0.00
civil M-II
26.08.08 410000 03.10.08 28.11.08 409753
Completed
0.00
civil M-II
26.08.08 299000 25.09.08 24.10.08 298366
Completed
0.00
civil M-II
26.08.08 336847 18.09.08 06.11.08 336499
Completed
0.00
civil M-II
26.08.08 498487 4.98
civil M-II
26.08.08 350000 23.09.08 10.12.08 349748
Completed
0.00
civil M-II
26.08.08 364000 18.09.08 10.11.08 363721
Completed
0.00
civil M-II
26.08.08 499947 10.09.08 10.11.08 499876
Completed
0.00
civil M-II
26.08.08 390886 23.09.08 03.11.08 390535
Completed
0.00
32
Dev of Sidharrth gali and link by pdg RMC in K-Block West Ghonda in C-255/SH(N)Z
10.07.08
370/10.09.08/EE(M)-II
M/s Yoginder Singh Tomar
33
Dev of gali no.20 and link by pdg RMC in K-Block West Ghonda in C-255/SH(N)Z
10.07.08
326/05.09.08/EE(M)-II
M/s Adarsh Const Co.
34
Dev of gali no.20 Shiv Mandir gali by pdg RMC in C-Block Bhajanpura in C-256/SH(N)Z
14.07.08
356/10.09.08/EE(M)-II
M/s Vikas Jain
35
Dev of gali no.23 and its link(Arvind Purohit Wali)by pdg RMC in C-Block Bhajanpura in C-256/SH(N)Z
14.07.08
371/10.09.08/EE(M)-II
M/s RS Const
36 Dev of gali no.17 C-Block by pdg RMC in Bhajanpura in C-256/SH(N)Z
14.07.08
367/10.09.08/EE(M)-II
M/s Utkarsh Const Co.
37
Dev of front and backlane by pdg RMC from C-4/113 to C-4/124 and backlane C-4/137 to 4/138 in C-4 Block Yamuna Vihar in C-256/SH(N)Z
14.07.08
364/10.09.08/EE(M)-II
M/s Moni buiders
38
Dev of B/Wall near C-10/131 along Vijay Park in Yamuna Vihar in C-256/SH(N)Z
14.07.08
39
Dev of side lane of MC.Pry.School by pdg RMC from h.no.C-12/541 to C-12/520 and C/O culvert at priya Panchvati Resturent in C-11 Yamuna Vihar in C-256/SH(N)Z
14.07.08
333/05.09.08/EE(M)-II
M/s Vipin Const Co.
40
D/O front lane and side lane by pdg RMC C-4/63 to C-4/72 and side lane C-4/83 to C-4/92 in C-4 Block Yamuna Vihar C-256/SH(N)Z
14.07.08
332/05.09.08/EE(M)-II
M/s Rajinder Const Co.
41
Dev of front lane by RMC from h.no.C-4/262 to C-4/276 and C-4/292 to to C-4/304 and C-4/345 to C-4/352 in C-4 Block Yamuna Vihar in C-256/SH(N)Z
14.07.08
336/05.09.08/EE(M)-II
M/s Mahesh Bansal
42
Dev of side lane by RMC from h.no.C-4/247 to C-4/276 in C-4 Block Yamuna Vihar in C-256/SH(N)Z
14.07.08
355/18.09.08/EE(M)-II
M/s Paras Nath Const Co.
civil M-II
26.08.08 499802 24.09.08 14.11.08 499459
Completed
0.00
civil M-II
26.08.08 443000 25.09.08 16.10.08 442971
Completed
0.00
civil M-II
26.08.08 499856 25.09.08 10.08.09 499668
Completed
0.00
civil M-II
26.08.08 499850 08.09.08 14.10.08 499820
Completed
0.00
civil M-II
26.08.08 499850 05.11.08 02.01.09 499456
Completed
0.00
civil M-II
26.08.08 499851 16.08.09 18.11.08 499591
Completed
0.00
civil M-II
26.08.08 499850 5.00
civil M-II
26.08.08 499850 08.09.08 13.10.08 499524
Completed
0.00
elect E-I
26.08.08 595855 02.01.09 07.03.09 595122
Completed
0.00
elect E-I
05.09.08 396168 09.01.09 18.07.09 363788
Completed
0.00
43
Dev of both side berms and drain on road from h.no.B-4/142 to Subhash Vihar in C-256/SH(N)Z
14.07.08
372/10.09.08/EE(M)-II
M/s RB Traders
44
Dev of side berms and drain on Dispencary road from Dispencary Chowk to MCD Pump House near Bhajanpura Thana in C-256/SH(N)Z
14.07.08
368/10.09.08/EE(M)-II
M/s Arun Const Co.
45
Dev of side berms on main road by pdg RMC from Dividing road to B-4 near MCD Store B-Block Yamuna vihar in C-256/SH(N)Z
14.07.08
335/05.09.08/EE(M)-II
M/s Mahender Const Co.
46
Dev of side berms on main road by pdg RMC from Dividing road to B-3 near MCD Store B-Block Yamuna vihar in C-256/SH(N)Z
14.07.08
339/05.09.08/EE(M)-II
M/s Rajeev Const Co.
47
Dev of side berms on main road by pdg RMC from road no.66 to h.no.C-7/4 C-Block Yamuna vihar in C-256/SH(N)Z
14.07.08
366/10.09.08/EE(M)-II
M/s Manoj Kumar
48
Dev of side berms on main road by pdg RMC from h.no.C-7/4 to Dividing road C-Block Yamuna vihar in C-256/SH(N)Z
14.07.08
329/05.09.08/EE(M)-II
M/s Ganesh Entp.
49
Dev of side berms on main road by pdg RMC from road no.66 to h.no.C-2/340 C-Block Yamuna vihar in C-256/SH(N)Z
14.07.08
50
Dev of side berms on main road by pdg RMC from h.no.C-2/340to Dividing road C-Block Yamuna vihar in C-256/SH(N)Z
14.07.08
337/05.09.08/EE(M)-II
M/s Ishika Entp.
51
Pdg Street Light Arrangement in Subhash Mohalla,Madhuvan Mohalla,Gangotri Vihar and Sanjay Mohalla in AC-51/SH(N)
27.05.08
153/31.12.08/EE(E)-VI
M/s Electra Fusion Technologies
52
P/O 12m pole in Shahid Bhagat Sing Park opp. Gurudwara C-9 Block Yamuna Vihar and gali no.5 k-Block Gangotri Vihar in AC-51
21.08.08
162/31.12.08/EE(E)-VI
M/s Gyan Elec.
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
17.91
Status Report of MLA, Sh Mohan Singh BishtAC No. 52,2008-09
S.No.
Name of Work deptt. Div. D.O.S D.O.C Expenditure
1
civil M-IV
23.06.08 219650 14.08.08 29.08.08 219593
Completed
0.00
civil M-II
30.05.08 428000 19.07.08 17.09.09 427790
Completed
0.00
civil M-II
03.06.08 198000 14.08.08 29.08.08 198000
Completed
0.00
civil M-II
15.07.08 476000 11.08.08 15.11.08 475998
Completed
0.00
civil M-II
15.07.08 493531 11.08.08 20.12.08 492954
Completed
0.00
civil M-II
15.07.08 495870 03.09.08 21.01.09 495335
Completed
0.00
civil M-II
15.07.08 493000 26.09.08 06.12.08 492812
Completed
0.00
civil M-II
15.07.08 493512 28.08.08 08.10.08 493123
Completed
0.00
civil M-II
15.07.08 493000 09.09.08 31.10.08 492629
Completed
0.00
Date of Booking
Date of Consen
t
Amount booked
Work order no. with date
i/c division
Name of agency
Present Position
Liabilities Rs.lacs
P/L rmc from h.no.D-1 to D-6 on Karaval Ngr. road in c-270/SH(N)Zone
16.05.08
111/12.08.08/EE(M)-IV
M/s KK Const Co.
2
Pdg RMC and drain near h.no.53C,66,68 and 79 in Sadatpur Village in w.no.266/Sh(N)Zone
15.05.08
170/15.07.08/EE(M)-II
M/s Mahesh Bansal
3
Prg RMC and drain near along Kamlesh Swing Center in village Karawal Ngr Sh(N)Zone
15.05.08
158/19.06.08/EE(M)-II
M/s KK Const Co.
4
Pdg M/P and drain near Mahavir to Sanjay house in Sabeypur Village in C-271/AC-52
15.05.08
194/08.08.08/EE(M)-II
M/s Umang Const Co.
5
Pdg M/P and drain near Praveen Rana to Shivani house in Sabeypur Village in C-271/AC-52
15.05.08
195/08.08.08/EE(M)-II
M/s Moni builders
6
Pdg M/P and drain near Mahavir to Sanjay house in Sabeypur Village in C-271/AC-52
15.05.08
281/01.09.08/EE(M)-II
M/s KS Aggarwal
7
Pdg M/P near Ratiram house to Rajesh house in Sabeypur Village in C-271/AC-52
15.05.08
398/18.09.08/EE(M)-II
M/s Parveen & Co.
8
Pdg RMC and drain near Phatah Singh house to Mangal Singh house in Sabeypur Chauhan Patti in C-271/AC-52
15.05.08
253/25.08.08/EE(M)-II
M/s Kushwaha Const Co.
9
Pdg RMC and drain near Umashankar Mishra to Karan Singh house in Sabeypur Chauhan Patti in C-271/AC-52
15.05.08
280/01.09.08/EE(M)-II
M/s Adarsh Const Co.
civil M-II
15.07.08 498931 09.09.08 27.01.09 498931
Completed
0.00
civil M-II
15.07.08 491998 02.09.08 29.10.08 491544
Completed
0.00
civil M-II
15.07.08 491895 11.08.08 26.09.08 491457
Completed
0.00
civil M-II
15.07.08 488000 M/s KP Entp. 21.08.08 07.10.08 488000
Completed
0.00
civil M-II
15.07.08 498931 26.11.08 28.01.09 498157 Completed 0.00
civil M-II
15.07.08 492742 02.09.08 27.11.08 492563
Completed
0.00
civil M-II
15.07.08 498758 09.09.08 08.12.08 498758
Completed
0.00
civil M-II
15.07.08 491000 10.09.08 08.12.08 490795
Completed
0.00
civil M-II
15.07.08 498931 13.10.08 19.01.09 498390
Completed
0.00
civil M-II
15.07.08 479542 06.09.08 04.12.08 479243
Completed
0.00
civil M-II
15.07.08 482951 03.09.08 30.10.08 482951
Completed
0.00
civil M-II
15.07.08 488610 09.09.08 24.11.08 487512
Completed
0.00
10
Pdg M/P near Sh. Bijender Singh house to Alim house in Sabeypur Village in C-271/AC-52
15.05.08
284/01.09.08/EE(M)-II
M/s Gajinder Kumar
11
Pdg RMC and drain near Ramphal house to Rajpal house in Sabeypur Chauhan Patti in C-271/AC-52
15.05.08
283/01.09.08/EE(M)-II
M/s RA Assos.
12
Pdg RMC near Umesh Chand house to Ruchi Convent School in Sabeypur Chauhan Patti in C-271/AC-52
15.05.08
193/08.08.08/EE(M)-II
M/s Vashistha Const Co.
13
Pdg RMC and drain near Virender Singh house and Chander Bhan in Sabeypur Chauhan Patti in C-271/AC-52
15.05.08
267/25.08.08/EE(M)-II
14
Pdg M/P near Ratan house to Guptaji house in Sabeypur Village in C-271/AC-52
15.05.08
277/01.09.08/EE(M)-II
M/s RS Const Co.
15
Pdg M/P near Kareef house to Ashok Gupta house in Sabeypur Village in C-271/AC-52
15.05.08
282/01.09.08/EE(M)-II
M/s Ashwini Kumar Aggarwal
16
Pdg M/P near house of Sh. D.D.Binani to Ajit house in Sabeypur Village in C-271/AC-52
15.05.08
272/01.09.08/EE(M)-II
M/s Parveen & Co.
17
Pdg M/P near Sh. Nirmla house to Mukesh house in Sabeypur Village in C-271/AC-52
15.05.08
274/01.09.08/EE(M)-II
M/s Rajinder Const Co.
18
Pdg M/P near Anju Gupta house to Ch.Bharat Singh house in Sabeypur Village in C-271/AC-52
15.05.08
489/10.10.08/EE(M)-II
M/s Vipin Const Co.
19
Pdg RMC and drian near Sh. Gopal house to near Rajender Singh house in Karawal Ngr.Village in C-271/AC-52
15.05.08
278/01.09.08/EE(M)-II
M/s Love Kush Entp.
20
Pdg RMC and drian near Rame house and Rajender house in Karawal Ngr.Village in C-271/AC-52
15.05.08
273/01.09.08/EE(M)-II
M/s Ishika Entp.
21
Pdg RMC and drian in link near Sandeep Kumar and Nagender in Sabaypur Chauhan Patti Village in C-271/AC-52
15.05.08
275/01.09.08/EE(M)-II
M/s Arun Const Co.
civil M-II
15.07.08 477000 05.09.08 31.10.08 477000
Completed
0.00
civil M-II
15.07.08 475812 09.09.08 18.11.08 475163
Completed
0.00
civil M-II
28.07.08 280000 30.09.08 28.01.09 280000
Completed
0.00
civil M-II
11.08.08 222000 10.10.08 10.11.08 222000
Completed
0.00
civil M-II
23.09.08 491000 12.01.09 25.02.09 489981
Completed
0.00
civil M-II
23.09.08 481000 12.01.09 26.02.09 480005
Completed
0.00
civil M-II
23.09.08 480000 16.01.09 06.03.09 480000
Completed
0.00
civil M-II
23.09.08 490000 M/s KP Entp. 11.02.09 20.03.09 489697
Completed
0.00
civil M-II
23.09.08 492000 16.01.09 25.02.09 490735
Completed
0.00
civil M-II
23.09.08 496000 11.02.09 04.09.09 495812
Completed
0.00
civil M-II
23.09.08 485000 11.02.09 08.05.09 485000
Completed
0.00
22
Pdg RMC and drian in link near Bhim Singh house and near Mamta Cosmatic Shop in Sabaypur Chauhan Patti Village in C-271/AC-52
15.05.08
276/01.09.08/EE(M)-II
M/s Adarsh Const Co.
23
Pdg RMC and drian near Shambhu and Ram Babu house in Sabaypur Chauhan Patti Village in C-271/AC-52
15.05.08
279/01.09.08/EE(M)-II
M/s Dharam Const Co.
24
Dev of karawal Ngr. Road by pdg RMC near Salek Mkt. Khadi Gram Udhyog and Aggarwal Electrical in C-270/SH(N)Z
17.07.08
160/22.09.08/EE(M0-II
M/s KK Const Co.
25
Pdg RMC and drain near Ram Prakash house in Karawal Ngr. Village C-271/SH(N)Z
25.07.08
443/01.10.08/EE(M)-II
M/s Rajinder Const Co.
26
Pdg RMC near Sohail electricals to dev Medical in main road Karawal nagar w.no. 271 AC-52 Sh(N)
05.07.08
658/09.01.09/EE(M)-II
M/s Umang Const Co.
27
Pdg RMC near Badal Electronics to Super electronics main road Karawal nagar in w.no. 271/Sh(N)
05.07.08
660/09.01.09/EE(M)-II
M/s Moni builders
28
Pdg RMC near Khushi telecom to near Shri Ram readymate shop Karawal nagar village in w.no. 271/Sh(N)
05.07.08
664/09.01.09/EE(M)-II
M/s Jaina Assos.
29
Pdg RMC near Gupta pethology Lab to near Shalimar Foot wear shop Karawal nagar village in w.no. 271/Sh(N)
05.07.08
699/02.02.09/EE(M)-II
30
Pdg RMC and drain near Shambu house to h.no. A-14 in Shadatpur extn. in w.no. 271/Sh(N)
05.07.08
678/12.01.09/EE(M)-II
M/s Vashistha Const Co.
31
Pdg RMC and drain near gate of MC School near Rahul Bag house in Sabaypur Gujral village in w.no. 271/Sh(N)
05.07.08
713/02.02.09/EE(M)-II
M/s Appar Const. & Engineers
32
Pdg RMC and drain near Smt Bimla Devi house sabaypur village in w.no. 271/Sh(N)
20.07.08
712/02.02.09/EE(M)-II
M/s Principle Const Co.
civil M-II
23.09.08 498000 18.02.09 24.08.09 497323
Completed
0.00
civil M-II
23.09.08 494000 07.02.09 16.03.09 493096
Completed
0.00
civil M-II
06.10.08 496000 15.01.09 28.06.09 495114
Completed
0.00
civil M-II
06.10.08 495000 24.01.09 07.03.09 495000
Completed
0.00
civil M-II
06.10.08 498000 10.01.09 24.08.09 498000
Completed
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
33
Pdg RMC and drain near gate of sr. Sec School to near Mohan Singh shop in Sabaypur gujral village in w.no. 271 Sh(N)
05.07.08
731/09.02.09/EE(M)-II
M/s Mahaluxmi Const. Co.
34
Pdg RMC and drain near Shri yogesh house in sabaypur village in w.no. 271/Sh(N)
20.07.08
702/02.02.09/EE(M)-II
M/s RA Assos.
35
Pdg RMC and drain near Laxmi Genreal store to Khanna Book shop Sabaypur gujral village in w.no. 271/Sh(N)
05.07.08
657/09.01.09/EE(M)-II
M/s Satish Kumar Goel
36
Pdg RMC and drain near h.no.21 to h.no.14 Sabaypur gujral village in w.no. 271/Sh(N)
05.07.08
687/16.01.09/EE(M)-II
M/s Garvit Const Co.
37
Pdg RMC and drain near Kishan house to near Bajrang Rolling centre in Sabaypur gujral village in w.no. 271/Sh(N)
05.07.08
663/09.01.09/EE(M)-II
M/s Dharam Const Co.
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Status Report of MLA, Sh Mange Ram GargAC No. 53,2008-09
S.No.
Name of Work deptt. Div. D.O.S D.O.C Expenditure
ELECT E-I 23.06.08 450707 13.10.08 17.10.08 384751 Completed 0.00
ELECT E-I 23.06.08 568148 15.10.08 12.02.09 554818 Completed 0.00
ELECT E-I 23.06.08 217515 17.12.08 22.01.09 193490 Completed 0.00
ELECT E-I 23.06.08 213560 10.02.09 02.03.09 180774 Completed 0.00
ELECT E-I 23.06.08 217515 2.18
ELECT E-I 23.06.08 566078 05.01.09 04.02.09 565592 Completed 0.00
ELECT E-I 23.06.08 287537 04.09.08 03.10.08 210050 Completed 0.00
ELECT E-I 23.06.08 261787 13.10.08 18.10.08 219275 Completed 0.00
ELECT E-I 23.06.08 279052 24.09.08 16.10.08 252245 Completed 0.00
ELECT E-I 23.06.08 283396 24.09.08 10.10.08 246231 Completed 0.00
Date of Booking
Date of Consen
t
Amount booked
Work order no. with date
i/c division
Name of agency
Present Position
Liabilities Rs.lacs
1 P/O two semi high mast lights with pole near E-73 Ashok vihar Ph-1 w.no.68/RZ
08.05.08
143/13.10.08/EE(E)-VII
M/s Ram Gopal & Co.
2 P/O lighting arrangement in park of Nimri Colony w.no.68/RZ
08.05.08
131/13.10.08/EE(E)-VII
M/s Sheela Electric Works
3 P/O semi high mast lights with pole in the park of Satyawati Colony w.no.66/RZ
08.05.08
184/EE(E)-VII
M/s Sudhir Electricals
4 P/O two semi high mast lights with pole in the park of Ashok vihar Ph-3 w.no.66/RZ
08.05.08
249/03.02.09/EE(E)-VII
M/s Prince Engg. Works
5 P/O semi high mast lights with pole in the park of Ashoka vihar ph.-II,C-66/RZ
08.05.08
6 P/o lighting arrangement in mpl park of Ashok Vihar ph-I, JJ cly Wazirpur, Nimri cly, Bharat Nagar Ashok Vihar ph-II/RZ
08.05.08
222/31.12.08/EE(E)-VII
M/s Sachdeva Electricals
7 P/o lighting arrangement in Radhey-Radhey park Ashok Vihar ph-I under RZ
08.05.08
62/27.08.08/EE(E)-VII
M/s Unique Elect.
8 P/o lighting arrangement in mpl park near Jain MAndir F block Ashok Vihar ph-I/under RZ
08.05.08
132/13.10.08/EE(E)-VII
M/s Sheela Electric Works
9 P/o lighting arrangement in mpl park infornt of house no. H-57 in Ashok Vihar ph-I/under RZ
08.05.08
85/24.09.08/EE(E)-VII
M/s Sri Balaji Elect.
10 P/o lighting arrangement in mpl park infornt of house no. B-160 in Ashok Vihar ph-I C-68/under RZ
08.05.08
86/24.09.08/EE(E)-VII
M/s Saksham Electric & Elect.
ELECT E-I 23.06.08 202023 17.09.08 09.10.08 149551 Completed 0.00
ELECT E-I 23.06.08 215898 27.02.09 03.04.09 186944 Completed 0.00
CIVIL M-II 23.06.08 499350 05.08.08 08.09.08 499208 Completed 0.00
CIVIL M-II 23.06.08 278200 09.09.08 30.10.08 274768 Completed 0.00
CIVIL M-II 23.06.08 497610 12.09.08 P 159500 In Prog. 3.38
CIVIL M-II 23.06.08 350038 22.08.08 25.09.08 350000 Completed 0.00
CIVIL M-II 23.06.08 255944 26.08.08 24.10.08 255858 Completed 0.00
CIVIL M-II 23.06.08 389172 17.07.08 06.10.08 388015 Completed 0.00
CIVIL M-II 23.06.08 417100 09.09.08 08.12.08 310927 Completed 0.00
CIVIL M-II 23.06.08 412806 04.08.08 02.12.08 408760 Completed 0.00
CIVIL M-II 23.06.08 504800 07.11.08 14.11.08 504240 Completed 0.00
11 P/o lighting arrangement in mpl park infornt of house no. B-222 in Ashok Vihar ph-I C-68/under RZ
08.05.08
75/12.09.08/EE(E)-VII
M/s Ram Gopal & Co.
12 P/o semi high mast light with pole near green belt, F block Ashok Vihar ph-I under RZ
08.05.08
356/27.02.09/EE(E)-VII
M/s Utsav Engineers
13 Covering of drain at red light of Mont Ford School Gulab Singh marg w.no. 67/RZ
28.05.08
163/04.08.08/EE(M)-II
M/s Sanjay Gupta
14 wid. of road by pdg RMC at red light of Mont Ford School Gulab Singh marg w.no. 67/RZ
28.05.08
220/18.09.08/EE(M)-II
M/s Singhal builders
15 dev of lane by cc flooring from WP-427 to 426, 545 to 203, 150 to 172, 160 to 164, 156 to 158, 146 to 49, 118 to 116, 128 to 134 in Wazirpur village C-67/RZ
22.05.08
176/02.09.08/EE(M)-II
M/s Har Const Co.
16 P/l cc pav. on berms along B/wall of park C-1 block near h.no. c-1/76 Ashok Vihar ph-II C-66/RZ
22.05.08
121/17.07.08/EE(M)-II
M/s Bhatia & Co.
17 C/o footpath and P/F MS grills in park near C-2/24 in C-2 block Ashok Vihar ph-II C-66/RZ
22.05.08
122/17.07.08/EE(M)-II
M/s Ajit Dabas
18 P/l cc pavment in back lane and side berms and front side from h.no. A-2/21 to A-2/14 Shakti nagar Extn. c-66/RZ
22.05.08
123/17.07.08/EE(M)-II
Laxman Const Co.
19 C/o open surface drain from h.no. 1 to 60 in HArijan basti Sawan park w.no. 66/RZ
22.05.08
192/02.09.08/EE(M)-II
M/s Gujral Const.
20 P/l cc pavment in back lane from h.no. B-1 to B-16 in Shakti nagar Extn. C-66/RZ
22.05.08
113/17.07.08/EE(M0-II
M/s Ishwar Singh
21 P/l mastic wearing course on road around park from h.no. A-80 to A-86, h.no. 79 to 71 and from h.no 58 to 70 in A block Ashok vihar ph-III C-66/RZ
22.05.08
201/02.09.08/EE(M)-II
M/s Ashok Kumar Gupta
CIVIL M-II 23.06.08 440600 21.10.08 18.11.08 440027 Completed 0.00
CIVIL M-II 23.06.08 451100 21.10.08 14.11.08 450853 Completed 0.00
CIVIL M-II 23.06.08 528700 03.1.08 15.12.08 418030 Completed 0.00
CIVIL M-II 23.06.08 407176 04.12.08 P 404365 In Prog. 0.03
CIVIL M-II 23.06.08 468100 05.11.08 20.11.08 466558 Completed 0.00
CIVIL M-II 14.07.08 199900 07.08.08 06.10.08 199878 Completed 0.00
CIVIL M-II 25.07.08 299790 10.09.08 18.03.09 298335 Completed 0.00
CIVIL M-II 25.07.08 485000 03.09.08 P 471484 In Prog. 0.14
CIVIL M-II 25.07.08 394980 02.09.08 10.1.08 394601 Completed 0.00
CIVIL M-II 25.05.08 481704 21.01.08 P 478491 In Prog. 0.03
CIVIL M-II 25.07.08 480000 15.09.08 30.10.08 479529 Completed 0.00
CIVIL M-II 25.07.08 494870 05.09.08 P 491513 In Prog. 0.03
22 P/l mastuic wearing course on T point near C-1/1 in Ashok Vihar ph-II C-66/RZ
22.05.08
195/02.09.08/EE(M)-II
M/s Ashok Kumar Gupta
23 P/l mastuic wearing course at the entrance of Shakti Apptt. in Shakti NAgar Extn.C-66/RZ
22.05.08
179/02.09.08/EE(M)-II
M/s Ashok Kumar Gupta
24 C/o open surface drain from h.no. 64 to 31, 56A to 44A connecting to main drain of Sawan park in Sawan park extn C-66/RZ
22.05.08
191/02.09.08/EE(M)-II
M/s Jasvinder Gulati
25 P/l cc pav. in back lane from h.no. B-2/49 to B-2/59 and along B-2/50 in B-2 block Ashok Vhar ph-II C-66/RZ
22.05.08
177/02.09.08/EE(M)-II
M/s Har Const Co.
26 P/l mastic wearing course at T-point near LB College and Radha Swami Satsang Bhawan in Satyawati Mkt. Ashok Vihar ph-III C-66/Rz
22.05.08
194/02.09.08/EE(M)-II
M/s Bansal Const Co.
27 C/o of walkway in the park opp. h.no. H-57 in H block in Ashok Vihar ph-I w.no.68/RZ
19.04.08
136/30.07.08/EE(M)-II
M/s S. Kumar Const. Co.
28 C/o of back lane from h.no. C-106 to C-114 in Ashok Vihar ph-I w.no.68/RZ
10.05.08
189/02.09.08/EE(M)-II
M/s Tokas & Co.
29 C/o cc from C-58 back lane in Ashok Vihar ph-I w.no.68/RZ
10.05.08
188/02.09.08/EE(M)-II
M/s Har Const Co.
30 C/o of nallah from h.no. C-114 to C-106 in Ashok Vihar ph-I w.no.68/RZ
10.05.08
187/02.09.08/EE(M)-II
M/s Bhatia & Co.
31 C/o of nallah from B-120 to B-102 in Ashok Vihar ph-I w.no.68/RZ
10.05.08
196/02.09.08/EE(M)-II
M/s Mahesh Entp.
32 C/o of nallah from B-130 to B-147 in Ashok Vihar ph-I w.no.68/RZ
10.05.08
190/02.09.08/EE(M)-II
M/s Laxman Const Co.
33 C/o of nallah from B-148 to mkt corner in Ashok Vihar ph-I w.no.68/RZ
10.05.08
198/02.09.08/EE(M)-II
M/s Shri Balaji Const. Co.
CIVIL M-II 25.07.08 459000 08.09.08 P 450770 In Prog. 0.08
CIVIL M-II 25.07.08 199607 14.09.08 29.10.08 199417 Completed 0.00
CIVIL M-II 04.08.08 587950 05.01.08 P 300353 In Prog. 2.88
CIVIL M-II 04.08.08 584600 05.10.08 P 356515 In Prog. 2.28
CIVIL M-II 05.09.08 495067 12.01.09 31.03.09 495067 Completed 0.00
CIVIL M-II 10.09.08 605700 17.06.09 P 584979 In Prog. 0.21
CIVIL M-II 10.09.08 625000 30.06.09 P 593038 In Prog. 0.32
CIVIL M-II 10.09.08 442000 16.03.09 29.07.09 442000 Completed 0.00
CIVIL M-II 10.09.08 480550 12.06.09 24.06.09 475324 Completed 0.00
CIVIL M-II 10.09.08 440500 09.02.09 14.03.09 440500 Completed 0.00
CIVIL M-II 10.09.08 596540 09.02.09 14.03.09 596540 Completed 0.00
34 C/o of nallah from A-91 to A-104 in Ashok Vihar ph-I w.no.68/RZ
10.05.08
197/02.09.08/EE(M)-II
M/s S.S. Contractor
35 C/o of walkway infront of h.no. H-46, park in Ashok Vihar ph-I w.no.68/RZ
10.05.08
185/02.09.08/EE(M)-II
M/s Bhatia & Co.
36 Dev of front open compound of community hall Ashok Vihar ph-II by pdg kota stone flooring in w.no.66 RZ
28.07.08
45/26.09.08/EE(Pr.)RZ
M/s Manish Const Co.
37 C/o B/wall infront of community hall Ashok Vihar ph-II in w.no.66 RZ
28.07.08
46/26.09.08/EE(Pr.)RZ
M/s Manish Const Co.
38 /o of walkway in the park of central park in H-block in Ashok Vihar Ph-I in C-68/RZ.
08.08.08
333/24.12.08/EE(M)-II
M/s SAS Const.
39 C/O road by mastic asphalt wearing course from Budh Mandir to Ram Dev Mandir in J.J.Colony Wazirpur in C-65/RZ
11.08.08
91/12.06.09/EE(M)-II
M/s Ashok Kumar Gupta
40 C/O road by mastic asphalt wearing course from J-2 Dalao to J-2 Mandir and L-113 to L-462 in J.J.Colony Wazirpur in C-65/RZ
11.08.08
89/12.06.09/EE(M)-II
M/s Ashok Kumar Gupta
41 C/O road by mastic asphalt wearing course from near D-1 to C-280 in J.J.Colony Wazirpur in C-65/RZ
11.08.08
346/24.12.08/EE(M)-II
M/s Ashok Kumar Gupta
42 C/O road by mastic asphalt wearing course from Gurudwara to Sanatan Dharam Mandir in J.J.Colony Wazirpur in C-65/RZ
11.08.08
90/12.06.09/EE(M)-II
M/s Ashok Kumar Gupta
43 C/O road by mastic asphalt wearing course from near H-237 to G-258 in J.J.Colony Wazirpur in C-65/RZ
11.08.08
345/24.12.08/EE(M)-II
M/s Ashok Kumar Gupta
44 C/O road by mastic asphalt wearing course from Mehak Restuarent to Corner of Central Park near DDA Mkt. in J.J.Colony Wazirpur in C-65/RZ
11.08.08
347/24.12.08/EE(M)-II
M/s Ashok Kumar Gupta
CIVIL M-II 10.09.08 449700 09.02.09 19.04.09 449700 Completed 0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
45 C/O road by mastic asphalt wearing course from Sanatan Dharam Mandir to Police Chowki in J.J.Colony Wazirpur in C-65/RZ
11.08.08
344/24.12.08/EE(M)-II
M/s Ashok Kumar Gupta
0.000.000.000.000.000.000.000.000.000.00
11.55
Status Report of MLA, Sh.Charan Singh KanderaAC No. 54,2008-09
S.No.
Name of Work deptt. Div. D.O.S D.O.C Expenditure
CIVIL M-I 06.06.08 578200 07.11.08 22.01.09 477430 Completed 0.00
CIVIL M-I 21.07.08 334300 19.03.09 15.05.09 274198 Completed 0.00
CIVIL M-I 21.07.08 399900 08.10.08 P 322246 In Prog. 0.78
CIVIL M-I 21.07.08 486600 30.10.08 17.12.08 413831 Completed 0.00
CIVIL M-I 21.07.08 378500 10.12.08 05.01.09 311343 Completed 0.00
Date of Booking
Date of Consen
t
Amount booked
Work order no. with date
i/c division
Name of agency
Present Position
Liabilities Rs.lacs
1 Pdg cc pav and O/S drain from Sh. Om Prakash house to Ram Phal house in Village Khera Khurd in w.no.3/Narela Zone
29.05.08
111/26.09.08/EE(M)-I
M/s Gupta Assos.
2 Pdg cc pav. from Pandit Mahender to Jai Bhagwan and krishan to om rao singh and sh. Kartar singh to Bake house in Naya Baans C-3
08.05.08
94/23.09.08/EE(M)-I
M/s D&G Const.
3 C/o B/wall from Mukhtyar Singh to Surender house in Kherakalan C-3
08.05.08
90/23.09.08/EE(M)-I
M/s Rakesh Kumar
4 C/o open surface drain from Tara Chand house (Harijan Chopal) to Railway crossing in Kherakalan C-3
08.05.08
88/23.09.08/EE(M)-I
M/s Surender Kumar Verma
5 Pdg cc pav from Rajinder to Sushil Saini house and adj lane in village Holambi kalan C-3
08.05.08
40/26.09.08/EE(M)-I
M/s D&G Const.
CIVIL M-I 21.07.08 394700 05.12.08 04.01.09 316712 Completed 0.00
CIVIL M-I 21.07.08 235000 11.01.10 23.01.10 203240 Completed 0.00
CIVIL M-I 21.07.08 473500 16.01.09 06.04.09 377809 Completed 0.00
CIVIL M-I 21.07.08 460900 07.10.08 26.06.09 370289 Completed 0.00
CIVIL M-I 21.07.08 186700 10.11.08 25.11.08 152678 Completed 0.00
CIVIL M-I 30.07.08 620000 20.09.08 13.12.08 518475 Completed 0.00
CIVIL M-I 30.07.08 498800 30.09.08 27.12.08 398343 Completed 0.00
CIVIL M-I 30.07.08 479900 05.10.08 28.02.09 349297 Completed 0.00
CIVIL M-I 30.07.08 499000 05.10.08 28.02.09 379021 Completed 0.00
CIVIL M-I 30.07.08 493600 29.09.08 27.11.08 345033 Completed 0.00
6 Pdg cc pav from Mata Chowk to Shri Bhagwan house in village Holambi kalan C-3
08.05.08
109/26.09.08/EE(M)-I
M/s D&G Const.
7 Pdg cc pav in the lane of Shri. mahesh tyagi house in village Holambi kalan C-3
08.05.08
93/26.09.08/EE(M)-I
M/s Surender Kumar Verma
8 Pdg cc pav in internal lane in Harijan Basti in Khera Khurd C-3
08.05.08
108/26.09.08/EE(M)-I
M/s D&G Const.
9 Pdg cc pav and open surface drain from umeed singh to Jai Narain, Jile singh to Ajit, Suresh to Jairam and Ram singh Balmiki in Khera Khurd C-3
08.05.08
105/26.09.08/EE(M)-I
M/s Khatri Const Co.
10 Pdg cc pav and open surface drain from Shri Raghuvir singh house to Chopal Raj singh to Basle in Holambi khurd C-3
08.05.08
178/10.10.08/EE(M)-I
M/s Atul Gupta
11 Pdg cc pav and open surface drain from Raghuvir house to Dhamvir Son of Late Muktyar singh house in village Bakner in C-2
08.05.08
76/19.09.08/EE(M)-I
M/s Shyam Lal Gupta
12 Pdg cc pav and open surface drain from Lampur road to Ramphal house landless cly. in village Bakner C-2
08.05.08
78/19.09.08/EE(M)-I
M/s Khatri Const Co.
13 Pdg cc pav and open surface drain from Ramphal house Kartar singh plot and Balwan house to Ramkishan house in landless cly. in village Bakner C-2
08.05.08
79/19.09.08/EE(M)-I
M/s Khatri Const Co.
14 Pdg cc pav and open surface drain from Hariram house to main lane and Lampur road to Ramchander house in landless cly. in village Bakner C-2
08.05.08
80/19.09.08/EE(M)-I
M/s Khatri Const Co.
15 Pdg cc pav and open surface drain from Dharampal house to Lampur road in landless cly. in village
08.05.08
82/19.09.08/EE(M)-I
M/s Khatri Const Co.
CIVIL M-I 30.07.08 360000 24.09.09 28.02.09 271126 Completed 0.00
CIVIL M-I 30.07.08 480000 26.09.08 20.04.09 455083 Completed 0.00
CIVIL M-I 30.07.08 497679 05.09.08 P 496622 In Prog. 0.01
CIVIL M-I 30.07.08 499700 29.09.08 27.11.08 297475 Completed 0.00
CIVIL M-I 01.08.08 598200 02.10.08 30.03.09 488424 Completed 0.00
CIVIL M-I 01.08.08 643300 10.10.08 20.12.08 589043 Completed 0.00
CIVIL M-I 01.08.08 346300 08.10.08 28.11.08 289971 Completed 0.00
CIVIL M-I 01.08.08 599000 08.10.08 14.12.08 489932 Completed 0.00
CIVIL M-I 11.08.08 816900 28.01.09 P 688561 In Prog. 1.28
CIVIL M-I 09.09.08 694600 15.01.09 30.03.09 588696 Completed 0.00
16 Pdg cc pav and open surface drain in left out portion in landless cly. in village
08.05.08
81/19.09.08/EE(M)-I
M/s Khatri Const Co.
17 Pdg m/p from main Lampur road to both side higher Sec. School in village Bakner and side lane in viilage Bakner in C-2 Narela
08.05.08
75/19.09.08/EE(M)-I
M/s Satish Const Co.
18 Pdg cc pav and open surface drain from Chander bhan Khatri house to Via well in village Bakner C-2
08.05.08
69/01.09.08/EE(M)-I
M/s Raj Assos.
19 Dev of lane by Pdg cc pav and open surface drain from Randhi house to back lane Surender house to Mai wala road and back lane in village Bakner C-2
08.05.08
83/19.09.08/EE(M)-I
M/s Khatri Const Co.
20 Pdg cc pav and drain from Sandeep bhawan to Jagat Singh house and Karan Singh house to garden in village Ramjaan pur C-2
22.07.08
101/26.09.08/EE(M)-I
M/s Shyam Lal Gupta
21 Pdg and laying b/p Surajbhan to Karamvir house infront of Chopal in Pachalla Pana in village Tajpur C-4
22.07.08
97/26.09.08/EE(M)-I
M/s Rakesh Kumar
22 C/o drain from Chanderoop to Chothe house house in Panchalla Pana in village Tajpur in C-4
22.07.08
99/26.09.08/EE(M)-I
M/s Atul Gupta
23 dev of lane by pdg cc pav darin from Rama to Prem Parkash to Lek Ram Kaptan Singh to Taken , Gyan house and its adj lanes in village Bakhtawarpur in C-4
22.07.08
142/03.10.08/EE(M)-I
M/s A.K. Const Co.
24 C/o drain from park (Lampur road) in Bawana road in back lane of Swatantra nagar C-2
08.05.08
318/19.01.09/EE(M)-I
M/s Luxmi Narayan Gupta
25 Dev of lane by pdg B/P and OS drain from Joginder to Gowdown, Sunder to Ramphal and Ram kishan to Devi Singh house in village Harridpur in w.no. 4 Narela
08.05.08
312/09.01.09/EE(M)-I
M/s Shyam Lal Gupta
CIVIL M-I 08.10.08 499834 13.10.08 17.12.08 499834 Completed 0.00
CIVIL M-I 21.07.08 283000 30.10.08 20.01.09 233814 Completed 0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
26 Dev of Lampur road (damaged portion) from Bakner railway xing to lampur road in C-2 Narela Zone
08.05.08
177/10.10.08/EE(M)-I
M/s A.R. Entp.
27 Pdg cc pavment and o/s suface drain from Sunder to Karan Singh house and Shri Nafe singh to Ajit singh house in Naya Baans in C-3
08.05.08
112/26.09.08/EE(M)-I
M/s Kamal Const.
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.002.07
Status Report of MLA, Sh.Jile Singh ChauhanAC No. 55,2008-09
S.No.
Name of Work deptt. Div. D.O.S D.O.C Expenditure
civil M-I 23.06.08 376000 22.08.08 10.10.08 360749 Completed 0.00
civil M-I 23.06.08 382600 30.08.08 18.11.08 377420 Completed 0.00
civil M-I 23.06.08 433900 23.08.08 10.11.08 358086 Completed 0.00
ELECT E-I 02.07.08 200102 20.09.08 20.10.08 187170 Completed 0.00
ELECT E-I 02.07.08 214322 20.09.08 20.10.08 204934 Completed 0.00
civil M-I 28.07.08 497400 14.09.08 13.12.08 450561 Completed 0.00
civil M-I 28.07.08 479200 04.09.08 28.05.09 470688 Completed 0.00
civil M-I 28.07.08 489200 02.10.08 22.11.08 488889 Completed 0.00
civil M-II 28.07.08 402500 21.12.08 20.02.09 402500 Completed 0.00
civil M-I 29.07.08 593600 21.10.08 20.05.09 540983 Completed 0.00
Date of Booking
Date of Consen
t
Amount booked
Work order no. with date
i/c division
Name of agency
Present Position
Liabilities Rs.lacs
1 C/o gali no.44 from Premwali house to Shyam LAl house in Hanuman Kunj, Sant nagar in village Burari C-8/CLZ
02.06.08
88/13.08.08/EE(M)-I
M/sSatbir Singh
2 C/o cross gali no. 1 from Ghan Shyam house to Shiv mandir Sant nagar in village Burari in C-8/CLZ
02.06.08
120/21.08.08/EE(M)-I
M/s Satish Const.Co.
3 Dev of lane by pdg brick flooring and drainage system from h.no. B-1169 to 1195 (Sangram singh house) gali no.3 and along Balbir Singh house in Baba cly. Burari C-7/CLz
01.05.08
119/21.08.08/EE(M)-I
M/s Satish Const.Co.
4 P/O semi high mast light pole near Cremation Ground at Burari Village in C-7/CLZ
10.06.08
115/12.09.08/EE(E)-II
M/s Bharat Trading CO.
5 P/O semi high mast light pole near Flood Office at Phirni Road at Jagatpur Village in C-8/CLZ
10.06.08
117/12.09.08/EE(E)-II
M/s Aman Electrical
6 C/O gali no. 9 from RD-110 to Jasvuinder House upto RD-220 in Village Jagatpur in C-8/CLZ
08.07.08
158/05.09.08/EE(M)-I
M/s Shree Prakash
7 C/O lane from Anand House RD-02 to RD-95 in Village Jagatpur in C-8/CLZ
08.07.08
151/25.08.08/EE(M)-I
M/s Sourat Const. Co.
8 C/O lane from Vijaypal House to RD-95 in Village Jagatpur in C-8/CLZ
14.07.08
171/23.09.08/EE(M)-I
M/s Sourat Const. Co.
9 C/O gali no.9 from Teji House to RD-110 in Village Jagatpur in C-8/CLZ
14.07.08
320/12.12.08/EE(M)-II
M/s Hazarika Builders
10 C/O galio no.18 from Sube Singh house to Shyam house and Parmali house to Lokesh house in Manav Kunj Part-II in Village Mukundpur in C-6/CLZ
12.05.08
180/23.09.08/EE(M)-I
M/s Prem & Co.
civil M-I 29.07.08 380400 02.10.08 29.12.08 347290 Completed 0.00
civil M-I 29.07.08 339400 02.10.08 26.12.08 308157 Completed 0.00
civil M-I 19.06.08 603098 02.10.08 30.12.09 391455 Completed 0.00
civil M-I 23.06.08 632127 03.09.08 02.01.09 629257 Completed 0.00
civil M-I 27.08.08 490729 05.10.08 20.11.08 477167 Completed 0.00
civil M-I 27.08.08 434800 26.10.08 12.05.09 432008 Completed 0.00
civil M-I 27.08.08 316382 04.10.08 26.05.09 316104 Completed 0.00
civil M-I 27.08.08 452214 05.10.08 27.1.08 452057 Completed 0.00
civil M-I 27.08.08 496635 05.10.08 03.03.09 495124 Completed 0.00
civil M-I 27.08.08 404200 26.10.08 12.05.09 402312 Completed 0.00
11 C/O link of galio no.16 to 20 along B/Wall from Surender house to Shyam house in Manav Kunj Part-II in Village Mukundpur in C-6/CLZ
12.05.08
181/23.09.08/EE(M)-I
M/s Prem & Co.
12 C/O gali no.19 from Vinod housr to Subhash house to B/Wall in Manav Kunj Part-II in Village Mukundpur in C-6/CLZ
12.05.08
178/23.09.08/EE(M)-I
M/s VK Cauhan
13 C/O lane no.5 and gali linked ti lane no.5 from Subhash house to Ashok house from Mangle house Raje house from Zile Singh house to Jore Singh house and Bharam Prakash in Village Jagatpur C-8/CLZ
21.05.08
174/23.09.08/EE(M)-I
M/s Balkar Singh &Bros.
14 C/O gali no.15 from Kundpal hs to Sriniwas and from TP Sharma hs to Jagdish hs in Village Sant Ngr. Burari in C-8/CLZ
01.05.08
152/25.08.08/EE(M)-I
M/s Sourat Const. Co.
15 C/o gali no.1 from Jile Singh hs. to Kalu Ram hs. and from Gautam hs to Kishan Lal hs. in part-II Surender cly. in village Jhrodha w.no.8/CLZ
14.08.08
195/26.09.08/EE(M)-I
M/s Gaurav Mehta
16 C/o main road from Sudhir hs. to Hari hs. in Bengali cly. Sant nagar w.no.8/CLZ
14.08.08
220/17.10.08/EE(M)-I
M/s Satbir Singh
17 C/o main road from Small Wonders Public School RD0 to RD-40 in village Jharoda in w.no.8/CLZ
14.08.08
185/25.09.08/EE(M)-I
M/s rajesh Const.Co.
18 C/o main road from RD-40 to Phirni road RD-110 in village Jharoda in w.no.8/CLZ
22.08.08
192/26.09.08/EE(M)-I
M/s Shiv Shakti sales Ent.
19 C/o gali no.1 from Amar hs. to Suresh hs., divakar hs to Satpal hs. , Chander hs to Narender hs. and from Ashok hs to Rajkumar hs. in part-II in surender cly. village Jhroda w.o.8/CLZ
22.08.08
213/26.09.08/EE(M)-)
M/s Suresh Pal Rana
20 C/o main road from Hari hs to Ved Prakash hs in Bengali cly. Sant Nagar in w.no.8/CLZ
22.08.08
219/17.10.08/EE(M)-I
M/s Satbir Singh
civil M-I 05.09.08 948400 19.12.08 20.03.09 938865 Completed 0.00
civil M-I 05.09.08 853400 19.12.08 P 680674 In Prog. 1.73
civil M-I 05.09.08 997700 M/s JB Ent. 14.01.09 05.05.09 977581 Completed 0.00
civil M-I 05.09.08 964400 20.06.09 30.09.09 963766 Completed 0.00
civil M-I 05.09.08 948400 19.12.08 28.01.09 948178 Completed 0.00
civil M-I 19.06.08 120600 22.08.08 16.12.08 105022 Completed 0.00
civil M-I 19.06.08 414000 14.09.08 20.1.08 299912 Completed 0.00
civil M-I 19.06.08 450300 04.09.08 10.04.09 357962 Completed 0.00
civil M-I 19.06.08 89600 02.08.08 09.10.08 87723 Completed 0.00
civil M-I 19.06.08 67200 09.08.08 30.09.08 59507 Completed 0.00
civil M-I 19.06.08 57700 22.08.08 03.10.08 45568 Completed 0.00
civil M-I 19.06.08 444900 30.08.08 28.05.09 305148 Completed 0.00
21 C/o main road from Police Booth to Abodh Valley (Vatika) in village Mukandpur in C-6/CLZ.
29.06.08
301/10.12.08/EE(M)-I
M/s Sept.Const.
22 C/O main road from Yogender Chadha hs. to Shiv Mandir on main road in village Mukandpur in C-6/CLZ.
01.07.08
302/10.12.08/EE(M)-I
M/s Sept.Const.
23 C/O lane from Daya Chand hs. to Balaji Properties and Builders in Shamshan road in village Mukandpur in C-6/CLZ
01.07.08
378/12.01.09/EE(M)-I
24 C/O main road from M.C.Primary School to Flood Nala in village Mukandpur in C-6/CLZ.
03.07.08
43/11.06.09/EE(M)-I
M/S Narendra Const. Co.
25 C/O main road from Abode Valley Resturant to Yogender Chadha hs. on main road in village Mukandpur in C-6/CLZ.
03.07.08
303/10.12.08/EE(M)-I
M/s Sept.Const.
26 C/O gali no.31 from Raj Singh house to Ram Chander house in Sant Ngr. in Village Burari w.no.8/CLZ
01.05.08
86/13.08.08/EE(M)-I
M/s VK Cauhan
27 C/O drain in gali no.5 from Gaurv fruit Corner to Som Dutt house in Sant Ngr. village Burari w.no.8/CLZ
01.05.08
159/05.09.08/EE(M)-I
M/s Shree Prakash
28 C/O gali no.22 from S.C. Patel house to Suman House in Sant Ngr. Village Burari w.no.8/CLZ
01.05.08
142/24.09.08/EE(M)-I
M/s VK Cauhan
29 C/o lane from Jagman house to Jai Singh house in Sant Ngr.Village Burari w.no.8/CLZ
01.05.08
79/01.08.08/EE(M)-I
M/s Sourat Const. Co.
30 C/O gali linked to lane no.8 from Abdul Majid to Abdul hs in vill. Jagatpur w.no.8/CLZ
21.05.08
80/04.08.08/EE(M)-I
M/s Satbir Singh
31 C/O gali no.6 from Gyanchand hs to Kalyan Singh hs in vill.jagatpur w.no.8/CLZ
21.05.08
87/13.08.08/EE(M)-I
M/s Satbir Singh
32 C/O lane from h.no.2434 to h.no.2438, M.K.Gupta hs and along Suresh hs in Sant Ngr Vill.Burari w.no.8/CLZ
21.05.08
112/21.08.08/EE(M)-I
M/s Shiv Shakti Const.Co.I
33 civil M-I 23.06.08 2E+06 02.10.08 P 1785912 In Prog. 5.84
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
C/O main road from Part-II main road (Shiv Mandir)to Ved Prakash hs in Vill. Mukundpur in C-6/CLZ
01.05.08
176/23.09.08/EE(M)-I
M/a Oberai Const.Co.
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.007.57
Status Report of MLA, Sh.Mangat Ram SinghalAC No. 56,2008-09
S.No.
Name of Work deptt. Div. D.O.S D.O.C Expenditure
elect E-I 11.07.08 169792 10.10.08 16.11.08 165770 Completed 0.00
civil M-III 29.07.08 352623 19.09.08 15.02.10 351181 Completed 0.00
Date of Booking
Date of Consen
t
Amount booked
Work order no. with date
i/c division
Name of agency
Present Position
Liabilities Rs.lacs
1 P/O lighting arrangement in MPL.Park at A-Block near h.no.1800 Jahangirpuri in C-16/CLZ
28.06.08
148/03.10.08/EE(E)-II
M/s Kamal Electricals
2 C/o B/wall of park near h.no.E-51X and E-68X inSlum Tenaments inC-15/CLZ
03.07.08
322/28.07.09/EE(M)-III
M/s Prakash Khanna
civil M-III 29.07.08 481863 22.09.08 16.02.09 478905 Completed 0.00
civil M-III 29.07.08 491531 10.10.08 16.02.09 491531 Completed 0.00
civil M-III 29.07.08 477786 10.10.08 16.02.09 476205 Completed 0.00
civil M-III 29.07.08 499486 10.10.08 18.02.09 498567 Completed 0.00
civil M-III 29.07.08 477968 22.09.08 16.02.09 477712 Completed 0.00
civil M-III 29.07.08 359834 17.09.08 16.02.09 359834 Completed 0.00
civil M-III 06.08.08 393193 10.10.08 16.02.09 391570 Completed 0.00
civil M-III 06.08.08 499447 19.09.08 29.04.09 499334 Completed 0.00
civil M-III 06.08.08 439495 10.10.08 16.02.09 434645 Completed 0.00
civil M-III 12.08.08 473296 19.09.08 17.02.09 472489 Completed 0.00
civil M-III 12.08.08 375200 26.02.09 P 369404 In Prog. 0.06
3 Dev. of side berms by pdg.RMC (LHS)from POLICE Post (Prayas)to Mahindra Park in Slum Tenaments in C-15/CLZ.
10.07.08
325/10.09.08/EE(M)-III
M/s Tarun Const co.
4 C/O drain and culvert along both sides of Post office road from Police post (Prayas)to Mahinder park in Slum Tenaments in C-15/CLZ
10.07.08
301/10.09.08/EE(M)-III
M/s Tarun Const co.
5 C/O B/wall of park near D-62X in Slum Tenaments in C-15/CLZ
03.07.08
321/10.09.08/EE(M)-III
M/s Jai Kumar
6 C/O of Footpath and MS grill inmain park of Slum Tenaments in block B in C-15/CLZ
10.07.08
305/10.09.08/EE(M)-III
M/s Subash Const Co.
7 Dev of side berms by pdg RMC(RHS)from Police Post(Prayas) to Mahindra Park in Saleem Teramrts in C-15/CLZ
10.07.08
310/10.09.08/EE(M)-III
M/s Tarun Const co.
8 C/O B/Wall of park near h.no. D-37X to D-57X in Slum Tenaments in C-15/CLZ
03.07.08
277/08.09.08/EE(M)-III
M/s vinod kumar
9 Dev of Parking space infront of h.no. 231(near Dal Mill) in Village Sarai Pipal Thala in C-15/CLZ
29.07.08
297/10.09.08/EE(M)-III
M/s Suresh Pal Rana
10 C/O B/Wall of park near Flat no. F-23X in Slum Tenament in C-15/CLZ
19.07.08
304/10.09.08/EE(M)-III
M/s Tarun Const co.
11 Dev of lane by pdg RMC and drainage system from h.no. 1 to 20 and h.no. 41 to 45 in Village Sarai Pipal Thala in C-15/CLZ
28.07.08
323/10.09.08/EE(M)-III
M/s Prakash Khanna
12 Dev of footpath at Ramlila Ground in H-Block Jahangirpuri in C-16/CLZ
26.06.08
295/10.09.08/EE(M)-III
M/s Tarun Const co.
13 Dev of B/Wall of Ramlila Ground at H-Block Jahangirpuri in C-16/CLZ
26.06.08
285/09.09.08 EE(M)-III
M/s Rajesh Const. Co.
civil M-III 01.09.08 495440 4.95
civil M-III 01.09.08 497998 10.10.08 27.02.09 497002 Completed 0.00
civil M-III 01.09.08 497505 29.10.08 23.03.09 494505 Completed 0.00
civil M-III 01.09.08 495362 24.10.08 30.03.09 494091 Completed 0.00
civil M-III 01.09.08 494092 01.10.08 P 488765 In Prog. 0.05
civil M-III 01.09.08 498488 01.10.08 09.02.09 498488 Completed 0.00
civil M-III 01.09.08 484545 27.10.08 23.03.09 484545 Completed 0.00
civil M-III 04.09.08 463410 02.11.08 P 453410 In Prog. 0.10
civil M-III 04.09.08 495209 03.11.08 20.02.09 493632 Completed 0.00
civil M-III 04.09.08 497263 02.11.08 01.12.09 497131 Completed 0.00
civil M-III 04.09.08 499094 01.11.08 18.02.09 499094 Completed 0.00
14 Dev of lane by pdg RMC and drainage system from h.no.2 to h.no.39 in Village Sarai Pipal Thala in C-15/CLZ
30.08.08
15 Dev of lane by pdg RMC and drainage system from NDPL Transfarmer to Dalao in Village Bharola in C-15/CLZ
27.08.08
359/23.09.08/EE(M)-III
M/s Shiv Shakti Sales Entp.
16 Dev of Chowk and lane by pdg RMC and drainage system from h.no.140 to 137 in Village Bharola in C-15/CLZ
27.08.08
409/23.10.08/EE(M)-III
M/s Jai Kumar
17 Dev of lane by pdg RMC and drainage system from h.no.12 to Sweet Shop near Tyagi Mkt. in Village Bharola in C-15/CLZ
27.08.08
408/23.10.08/EE(M)-III
M/s Jai Kumar
18 Dev of lane by pdg RMC and DDA Flats from B-47 to B-37,B-25 to B-36 and B-1 to B-12 in Village Bharola in C-15/CLZ
27.08.08
355/22.09.08/EE(M)-III
M/s vinod kumar
19 Dev of lane by pdg RMC and drainage system from h.no.69 to 86 in Village Bharola in C-15/CLZ
23.08.08
354/22.09.08/EE(M)-III
M/s vinod kumar
20 Dev of lane by pdg RMC and drainage system from M.C.Pry.School to Bari Chaupal in Village Bharola in C-15/CLZ
23.08.08
414/23.10.08/EE(M)-III
M/s Tarun Const co.
21 Dev of lane by pdg RMC and drainage system from h.no.83 to 95 in Village Bhorala in C-15/CLZ
23.08.08
418/24.10.08/EE(M)-III
M/s Shiv Shakti Sales Entp.
22 Dev of Punjabi gali by pdg RMC and drainage system from h.no.236 to 247 in Village Sarai Pipal Thala in C-15/CLZ
30.08.08
419/24.10.08/EE(M)-III
M/s Shiv Shakti Sales Entp.
23 Dev of lane by pdg RMC and drainage system from GTK road to h.no.199/1 and from h.no.220 to Shiv Mandir 247 in Village Sarai Pipal Thala in C-15/CLZ
30.08.08
424/24.10.08/EE(M)-III
M/s Suresh Pal Rana
24 Dev of lane by pdg RMC and drainage system from h.no.2 to h.no.319 in Village Sarai Pipal Thala in C-15/CLZ
30.08.08
407.23.10.08/EE(M)-III
M/s vinod kumar
0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.005.17
Status Report of MLA, Smt..Anjali RaiAC No. 57,2008-09
S.No.
Name of Work deptt. Div. D.O.S D.O.C ExpenditureDate of Booking
Date of Consen
t
Amount booked
Work order no. with date
i/c division
Name of agency
Present Position
Liabilities Rs.lacs
CIVIL M-I 11.07.08 499000 23.08.08 21.10.08 379736 Completed 0.00
CIVIL M-I
11.07.08 499000 23.08.08 20.10.08 380391
Completed
0.00
CIVIL M-I
11.07.08 499000 23.08.08 21.10.08 381051
Completed
0.00
CIVIL M-I
11.07.08 498900 22.08.08 14.01.08 372331
Completed
0.00
CIVIL M-I
11.07.08 499800 22.08.08 22.10.08 381961
Completed
0.00
CIVIL M-I
23.07.08 497057 22.08.08 24.11.08 496315
Completed
0.00
CIVIL M-I
23.07.08 494923 22.08.08 06.10.08 492398
Completed
0.00
CIVIL M-I
23.07.08 490842 23.08.08 25.11.08 489603
Completed
0.00
CIVIL M-I
23.07.08 199931 08.08.08 12.11.08 198536
Completed
0.00
CIVIL M-I
23.07.08 196122 22.08.08 28.11.08 195306
Completed
0.00
CIVIL M-I
23.07.08 197596 12.08.08 12.09.08 196152
Completed
0.00
CIVIL M-I
23.07.08 198340 07.08.08 12.09.08 197083
Completed
0.00
1 Dev by P/L RMC pav. and drainage from Basant road to Bharat ngr. Chowk in C-89/SPZ
08.05.08
457/22.08.08/EE(M)-I
M/s Bajaj Const co.
2 Dev by P/L RMC pav. and drainage in gali Tilak in C-89/SPZ
30.05.08
459/22.08.08/EE(M)-I
M/s Bansal Const.
3
Dev by P/L RMC pav. and drainage from gali school wali to Mata Mandir gali Kesseruwalan in C-89/SPZ
30.05.08
458/22.08.08/EE(M)-I
M/s Bansal Const.
4
Dev by P/L RMC pav. and drainage system in gali no.2 Multani Dhanda in C-89/SPZ
30.05.08
430/21.08.08/EE(M)-I
M/s KK Const.
5
Dev by P/L RMC pav. and drainage system in gali Krishna from main bazar to gali Halwai wali in C-89/SPZ
30.05.08
425/21.08.08/EE(M)-I
M/s Bansal Const.
6
Dev by P/L RMC and drainage system in gali no.11 Chunna Mandi(upper side) in C-89/SPZ
14.07.08
428/21.08.08/EE(M)-I
M/s Gupta Radhey Shyam
7
Dev by P/L RMC and drainage system in gali no.9 Chunna Mandi(upper side) in C-89/SPZ
14.07.08
416/21.08.08/EE(M)-I
M/s Islamuddin
8
Dev by P/L RMC and drainage system in gali no.10 Chunna Mandi(upper side) in C-89/SPZ
14.07.08
450/22.08.08/EE(M)-I
M/s Manoj Kumar Bhatia
9
Dev by P/L cc pav.and drainage system from Saugatrasha road to Ser. Sec. School in C-89/SPZ
14.07.08
326/06.08.08/EE(M)-I
M/s Naveen Const.
10
Dev of road berms by P/L cc pav.and drainage system opp R.K. Mission in C-89/SPZ
14.07.08
407/21.08.08/EE(M)-I
M/s Sethi Entp.
11
Dev of Kesseru Walan lane by P/L cc pav.and drainage system near Ghee mandi school in C-89/SPZ
14.07.08
333/11.08.08/EE(M)-I
M/s Chaudhary Const.
12
Dev of road side berms by P/L cc pav.and drainage system at main bazar near Six Tooti Chowk in C-89/SPZ
14.07.08
302/06.08.08/EE(M)-I
M/s Jupiter Const
CIVIL M-I
25.07.08 499000 04.10.08 16.01.09 372285
Completed
0.00
CIVIL M-I
25.07.08 498800 01.10.08 17.01.09 371475
Completed
0.00
CIVIL M-I
25.07.08 498000 03.10.08 15.01.09 371884
Completed
0.00
CIVIL M-I
04.08.08 492957 11.09.08 06.11.08 492764
Completed
0.00
CIVIL M-I
04.08.08 496730 06.10.08 19.01.09 496358
Completed
0.00
CIVIL M-I
04.08.08 478474 10.09.08 27.11.08 477592
Completed
0.00
CIVIL M-I
04.08.08 490529 01.04.09 06.08.09 490298
Completed
0.00
CIVIL M-I
04.08.08 478474 11.09.08 05.11.08 476609
Completed
0.00
CIVIL M-I
04.08.08 497781 10.09.08 15.12.08 496862
Completed
0.00
CIVIL M-I
04.08.08 192810 10.09.08 03.11.08 191915
Completed
0.00
CIVIL M-I
04.08.08 197602 10.09.08 29.10.08 197055
Completed
0.00
CIVIL M-I
04.08.08 198823 11.09.08 27.11.08 198303
Completed
0.00
13
Dev of P/L RMC and drainage system in gali no. 1 multani Dhanda in C89/SPZ
20.06.08
667/01.10.08/EE(M)-I
M/s KK Const.
14
Dev of P/L RMC pav. and drainage system from Thappar Chember to gali Kessruwalan in C-89/SPZ
20.06.08
666/01.10.08/EE(M)-I
M/s KK Const.
15
Dev of P/L RMC pav. and drainage system in gali no.4 Multani Dhanda in C-89/SPZ
20.06.08
668/01.10.08/EE(M)-I
M/s KK Const.
16
Dev of footpath by P/L RMC and drain of Ajmeri Gate bridge opp Sheela Cinema in C-89/SPZ
22.07.08
625/10.09.08/EE(M)-I
M/s Jatinder builders
17
Dev of lane by P/L cc and drainage system between h.no. 3641 to 3658 in gali Ramnath Patwa in C-89/SPZ
22.07.08
680/03.10.08/EE(M)-I
M/s Jolly Const Co.
18
Dev of lane by P/L cc and drainage system in gali Bhagat Singh from main Bazar to MSW Center in C-89/SPZ
22.07.08
569/09.09.08/EE(M)-I
M/s Ved pal Bhatia
19
Dev of lane by P/L cc and drainage system from Sangtrasha Posice Post to Rajgueru road in C-89/SPZ
22.07.08
1254/30.03.09/EE(M)-I
M/s Soni builders
20
Dev of road side berms by P/L cc and drainage system of Rajgueru road between Gurudwara and D.B. Guptqa road in C-89/SPZ
22.07.08
607/10.09.08/EE(M)-I
M/s Guru Kripa Entp.
21
Dev of lane by P/L RMC and drainage system from Verma Oil Depot to Mother Dairy in C-89/SPZ
22.07.08
570/09.09.08/EE(M)-I
M/s Manoj Kumar Bhatia
22
Dev of lane by P/L cc and drainage system in Shora Kothi near Mandir in C-89/SPZ
22.07.08
541/09.09.08/EE(M)-I
M/s Ganesh Builders
23
Dev of lane by P/L cc and drainage system in Badi Basti between main Bazar and Katra Kristen in C-89/SPZ
22.07.08
566/09.09.08/EE(M)-I
M/s Sajid Khan
24
Dev of road side berms by P/L cc and drainage system in Nehru Bazar in C-89/SPZ
22.07.08
589/10.09.08/EE(M)-I
M/s Kapoor Const.
CIVIL M-I
04.08.08 197522 17.10.08 18.12.08 197200
Completed
0.00
CIVIL M-I
04.08.08 199294 10.09.08 06.11.08 198619
Completed
0.00
CIVIL M-I
15.09.08 498005 18.12.08 17.03.09 497368
Completed
0.00
CIVIL M-I
15.09.08 491847 06.04.09 03.08.09 487779
Completed
0.00
CIVIL M-I
15.09.08 498964 12.12.08 12.02.09 497874
Completed
0.00
CIVIL M-I
15.09.08 498525 30.12.08 25.03.09 497632
Completed
0.00
CIVIL M-I
15.09.08 199412 14.10.08 12.12.08 198689
Completed
0.00
CIVIL M-I
15.09.08 198984 18.12.08 19.02.09 197472
Completed
0.00
CIVIL M-I
15.09.08 199671 04.10.08 25.11.08 199271
Completed
0.00
CIVIL M-I
15.09.08 199719 17.10.08 19.12.08 199431
Completed
0.00
CIVIL M-I
15.09.08 199323 15.10.08 18.12.08 199120
Completed
0.00
CIVIL M-I
15.09.08 496223 16.10.08 20.12.08 495670
Completed
0.00
CIVIL M-I
15.09.08 495439 18.12.08 22.01.09 494954
Completed
0.00
25
Dev of lane by P/L cc and drainage system in Krishna Gali near h.no. 89 in C-89/SPZ
22.07.08
768/13.10.08/EE(M)-I
M/s Shri Vansh Const.
26
Dev of road side berms by P/L cc and drainage system near Chitr Gupta Mandir in C-89/SPZ
22.07.08
542/09.09.08/EE(M)-I
M/s DK Const Co.
27
Dev by P/L RMC pav.and drainage system in gali no.4 Multani Dhanda in C-89/SPZ
02.09.08
857/17.12.08/EE(M)-I
M/s Surbhi Const.
28
Dev by P/L cc pav.and drainage system between h.no. 2205 to 2096 at Chuna Mandi in C-89/SPZ
02.09.08
1251/30.03.09/EE(M)-I
M/s Soni builders
29
Dev by P/L RMC pav. and drainage system from shop no.138 to 210 in Furniture Mkt.in C-89/SPZ
02.09.08
820/11.12.08/EE(M)-I
M/s Rakesh Bansal
30
Dev by P/L RMC pav. and drainage system in gali no.1 Chunna Mandi (down side)in C-89/SPZ
02.09.08
921/29.12.08/EE(M)-I
M/s Malhotra Const Co.
31
Dev by P/L RMC pav. and drainage system near Urinal Block in Nehru Bazar in C-89/SPZ
02.09.08
720/13.10.08/EE(M)-I
M/s Islamuddin
32
Dev by P/L cc pav. and drainage system infront of Sr. Sec. School Kessru Walan in C-89/SPZ
02.09.08
864/17.12.08/EE(M)-I
M/s Deepak Const.
33 Dev by P/L cc pav. and drainage system in gali Nayak in C-89/SPZ
02.09.08
686/03.10.08/EE(M)-I
M/s Deepak Const.
34
Dev of side berms near Mahavir Park by P/L cc pav. and drainage system in C-89/SPZ
02.09.08
727/13.10.08/EE(M)-I
M/s Manoj Kumar Bhatia
35
Dev of side lane near Hotel Relax by P/L cc pav. and drainage system in C-89/SPZ
02.09.08
757/13.10.08/EE(M)-I
M/s Bansal Const.
36
Dev by P/L RMC pav. and drainage system near Tail mandi Dalao in C-89/SPZ
02.09.08
771/13.10.08/EE(M)-I
M/s JP Const Co.
37
Dev by P/L RMC pav. and drainage system in gali no.2 in Chuna Mandi (Down side)in C-89/SPZ
02.09.08
831/17.12.08/EE(M)-I
M/s Kushal Bharat
CIVIL M-I
15.09.08 484325 15.10.08 18.12.08 483393
Completed
0.00
CIVIL M-I
15.09.08 490178 18.12.08 24.03.09 489758
Completed
0.00
CIVIL M-I
15.09.08 495516 12.12.08 24.02.09 494630
Completed
0.00
CIVIL M-I
15.09.08 493582 15.10.08 08.01.09 493105
Completed
0.00
CIVIL M-I
13.05.08 198000 24.07.08 22.11.08 197549
Completed
0.00
CIVIL M-I
30.09.08 498000 12.12.08 26.02.09 496787
Completed
0.00
CIVIL M-I30.09.08 498750 4.99
CIVIL M-I
30.09.08 497650 15.10.08 12.01.09 496648
Completed
0.00
CIVIL M-I
30.09.08 497850 17.10.08 08.01.09 497238
Completed
0.00
CIVIL M-I
30.09.08 497920 15.10.08 13.12.08 497264
Completed
0.00
CIVIL M-I
30.09.08 498580 15.10.08 19.12.08 498058
Completed
0.00
CIVIL M-I
30.09.08 198000 12.12.08 13.02.09 197627
Completed
0.00
38
Dev by P/L RMC pav. and drainage system from h.no.3040 to 3057 in Chuna Mandi in C-89/SPZ
02.09.08
772/13.10.08/EE(M)-I
M/s RP Entp.
39
Dev of different lanes by P/L cc pav. and drainage system near Jain Dharamshala in C-89/SPZ
02.09.08
838/17.12.08/EE(M)-I
M/s Soni builders
40
Dev of different lanes by P/L cc pav. and drainage system in Katra Raiji in C-89/SPZ
02.09.08
798/11.12.08/EE(M)-I
M/s Gupta Radhey Shyam
41
Dev of different lanes by P/L cc pav. and drainage system between h.no. 1017 to 834 in gali Krishna in C-89/SPZ
02.09.08
782/13.10.08/EE(M)-I
M/s Bajaj Const co.
42
Dev. of katra (p} 2504 and 2512 by imp. to lav block and flooring etc. gali nalwa in C-89/SPZ
01.05.08
812/22.07.08/EE(M)-I
M/s Naveen Const.
43 Dev of footpath infront of New Delhi Railway Station in C-89/SPZ
18.09.08
817/11.12.08/EE(M)-I
M/s Balaji Const
44 Dev of footpath opp. Shiela Cinema in C-89/SPZ
18.09.08
45
Dev by P/L RMC pav and drainage system in gali no.1, Chuna Mandi between Sangtrasha and gali Dispensary in C-89/SPZ
18.09.08
736/13.10.08/EE(M)-I
M/s Chaudhary Assos.
46
Dev by P/L RMC and drainage system in gali no.2 in Multani Dhanda in C-89/SPZ
18.09.08
744/13.10.08/EE(M)-I
M/s VK Assos.
47
Dev by P/L RMC and drainage system in gali no.3 in Multani Dhanda in C-89/SPZ
18.09.08
748/13.10.08/EE(M)-I
M/s Sanjiv builders
48
Dev by P/L RMC and drainage system in gali no.4 in Multani Dhanda in C-89/SPZ
18.09.08
752/13.10.08/EE(M)-I
M/s Surender Kumar Jain
49
Dev of road side lane near Mantolla Chowk P/L cc pav and drainage system in C-89/SPZ
19.09.08
808/11.12.08/EE(M)-I
M/s Shri Vansh Const.
CIVIL M-I
30.09.08 198740 18.12.08 18.02.09 198097
Completed
0.00
CIVIL M-I
30.09.08 498000 16.10.08 08.01.09 497078
Completed
0.00
CIVIL M-I
30.09.08 199760 18.12.08 12.03.09 198519
Completed
0.00
CIVIL M-I
30.09.08 198710 15.10.08 18.12.08 197878
Completed
0.00
CIVIL M-I
30.09.08 195000 12.12.08 14.02.09 194839
Completed
0.00
CIVIL M-I
30.09.08 496000 13.12.08 11.02.09 495195
Completed
0.00
CIVIL M-I
30.09.08 497990 20.10.08 10.12.08 491797
Completed
0.00
CIVIL M-I
30.09.08 352680 16.10.08 08.01.09 351986
Completed
0.00
CIVIL M-I
30.09.08 497800 19.10.08 30.12.08 496837
Completed
0.00
CIVIL M-I
30.09.08 199000 15.10.08 08.12.08 198374
Completed
0.00
CIVIL M-I
10.10.08 498400 15.10.08 01.01.09 497927
Completed
0.00
CIVIL M-I
10.10.08 598904 19.01.09 06.07.09 597601
Completed
0.00
50 Dev of lane near Rattan Mkt. by RMC and drainage system in C-89/SPZ
19.09.08
867/17.12.08/EE(M)-I
M/s Guru Kripa Entp.
51 Dev of footpath infront of St. Anthony School in C-89/SPZ
19.09.08
783/13.10.08/EE(M)-I
M/s Narender Singh Dhanker
52
Dev of road side berms near Krishna park P/L cc pav. and drainage system in C-89/SPZ
19.09.08
589/17.12.08/EE(M)-I
M/s Surbhi Const.
53
Dev of road side berms of Chitra Gupta Road near Main Bazar P/L cc pav. and drainage system in C-89/SPZ
19.09.08
729/13.10.08/EE(M)-I
M/s Manoj Kumar Bhatia
54
Dev of lane near M.C.Pry.School Pahar Ganj P/L cc pav. and drainage system in C-89/SPZ
19.09.08
807/11.12.08/EE(M)-I
M/s Jagmohan Kapoor
55
Dev of P/L RMC and drainage system in gali no.5, Miltani Dhanda in C-89/SPZ
19.09.08
832/17.12.08/EE(M)-I
M/s Deepak .Kumar
56
Dev of road surface by M/P at D.B.Gupta Road and Nehru Bazar in C-89/SPZ
19.09.08
746/13.10.08/EE(M)-I
M/s Jain Const.
57
Dev of road side berms by P/L cc pav. and drainage system in gali Pratap in C-89/SPZ
19.09.08
734/13.10.08/EE(M)-I
M/s Manoj Kumar Bhatia
58 Dev of lane by P/L cc pav.behind St.Anthony School in C-89/SPZ
19.09.08
705/13.10.08/EE(M)-I
M/s Rajesh Const Co.
59
Dev of road side berms near Main Bazar by P/L cc pav. and drainage system in C-89/SPZ
19.09.08
710/13.10.08/EE(M)-I
M/s Chaudhary Const.
60
Dev. of road side berms by P/L Pav.And drainage system of Basant road in C-89/SPZ.
19.09.08
730/13.10.08/EE(M)-I
M/s RK Const.
61
Imp. to road surface by Mastic treatment of Sangtrasha road and main bazar T-Point in C-89/SPZ.
18.09.08
1103/12.01.09/EE(M)-I
M/s Ashok Kumar Gupta
CIVIL M-I
10.10.08 592000 06.04.09 12.10.09 590702
Completed
0.00
CIVIL M-I
10.10.08 598000 30.12.08 26.03.09 597746
Completed
0.00
CIVIL M-I
10.10.08 594753 06.03.09 10.11.09 593966
Completed
0.00
CIVIL M-I
10.10.08 583000 20.01.09 08.07.09 582429
Completed
0.00
CIVIL M-I
13.05.08 497900 28.08.08 19.01.09 367984
Completed
0.00
CIVIL M-I
27.05.08 499000 22.08.08 30.12.08 371854
Completed
0.00
CIVIL M-I
28.05.08 498400 24.07.08 22.11.08 373514
Completed
0.00
CIVIL M-I
28.05.08 498700 23.07.08 02.09.08 380238
Completed
0.00
CIVIL M-I
28.05.08 498600 11.07.08 16.10.08 371649
Completed
0.00
CIVIL M-I
28.05.08 498600 25.07.08 05.12.08 372385
Completed
0.00
CIVIL M-I
28.05.08 499000 23.07.08 03.09.08 378342
Completed
0.00
62
Imp. to road Surface by Mastic treatment near police chowki sangtrasha in C-89/SPZ.
18.09.08
1233/30.03.09/EE(M)-I
M/s Ashok Kumar Gupta
63
Dev. of lane by P/L RMC Pav. and drainage system behind R.K.Mission in C-89/SPZ.
18.09.08
918/29.12.08/EE(M)-I
M/s Sajid Khan
64
Imp. of road surface by mastic Treatment of Punchayan road and Chitr Gupta road Crossing inC-89/SPZ.
18.09.08
1202/27.02.09/EE(M)-I
M/s Ashok Kumar Gupta
65
Imp of Surface by Mastic Treatment of Punchyan road and Nehru Bazar Crossing in C-89/SPZ.
18.09.08
1104/12.01.09/EE(M)-I
M/s Ashok Kumar Gupta
66
Dev by pdg/laying RMC pament and drainage system in gali no.5 Miltani Dhanda in w.no. 89/SPZ
01.05.08
427/21.08.08/EE(M)-I
M/s Prem Const. Co.
67
dev by P/L RMC pagment and drainage system from Deshraj Bhatia Marg to main road Bikaner Sweets (gali no. 4) Multani Dhanda C-89/SPZ
01.05.08
426/21.08.08/EE(M)-I
M/s Prem Const. Co.
68
Dev by P/L RMC and drainage system from DB Gupta road to Chowk at Arakasha road 9Bikaner Sweets) C-89/SPZ
01.05.08
213/22.07.08/EE(M)-I
M/s Naveen Const.
69
Dev by P/l RMC PAvemnt and drainage system in gali no.7 Chuna MAndi C-89/SPZ
01.05.08
209/22.07.08/EE(M)-I
M/s Bansal Const.
70
Dev by P/l RMC Pvament and drainage system in Chuna MAndi gali no1 C-89/SPZ
01.05.08
171/10.07.08/EE(M)-I
M/s KK Const.
71
Dev by P/l RMc pavmwent and drainage system backlane of XYZ qtrs. (qtr no. 1 to qtr no.11) in C-89/SPZ
20.12.07
211/22.07.08/EE(M)-I
M/s Naveen Const.
72
Dev by P/L RMC pavment and drainage system from Rajguru road to gali Santrasha galui no.2 Chuna MAndi C-89/SPZ
20.12.07
210/22.07.08/EE(M)-I
M/s Bansal Const.
CIVIL M-I
23.06.08 198141 05.07.08 26.09.08 196899
Completed
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.004.99
Status Report of MLA, Sh.Shoaib IqbalAC No. 58,2008-09
S.No.
Name of Work deptt. Div. D.O.S D.O.C Expenditure
CIVIL M-III
23.09.08 376400 Monu Entp. 06.02.09 24.06.09 373722
Completed
0.00
73
P/L CC pav.and drainage system from main Nehru Bazar road to T-14,General Mkt. in C-89/SPZ
07.05.08
99/30.06.08/EE(M)-I
M/s Arya & Co.
Date of Booking
Date of Consen
t
Amount booked
Work order no. with date
i/c division
Name of agency
Present Position
Liabilities Rs.lacs
1
Dev of Storm Water drainage system from shop no.101 to shop no.K-229, shop no.K-94 to shop no.344 and shop no.232 to shop no.K-89 in C-79/CZ
11.09.08
381/06.02.09/EE(M)-III
CIVIL M-III
23.09.08 691700 6.920.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
2
Dev of storm water drainager system from Subhash Marg to Urdu Bazar in C-79/CZ
11.09.08
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.006.92
Status Report of MLA, Sh.Haroon YushufAC No. 59,2008-09
S.No.
Name of Work deptt. Div. D.O.S D.O.C Expenditure
CIVIL M-II 28.05.08 195072 25.08.08 29.12.08 195072 Completed 0.00
CIVIL M-II 28.05.08 198154 01.08.08 30.08.08 198086 Completed 0.00
CIVIL M-II 28.05.08 485000 25.07.08 16.10.08 478991 Completed 0.00
CIVIL M-II 28.05.08 496500 05.12.08 05.05.09 434431 Completed 0.00
CIVIL M-II 28.05.08 498800 05.12.08 05.05.09 436126 Completed 0.00
Date of Booking
Date of Consen
t
Amount booked
Work order no. with date
i/c division
Name of agency
Present Position
Liabilities Rs.lacs
1 Dev iof gali Mahal Sarai and side lane by pdg RMC in w.no.86/City Zone
22.05.08
48/04.07.08/EE(M)-II
M/s Gupta Builders
2 Dev of gali Khazoor wali and side lane in w.no.86/City Zone
22.05.08
54/04.07.08/EE(M)-II
M/s Aman Const Co.
3 Pdg RMC from h.no.4956 to 5120 main Kucha Rehman road and side lanes in w.no.86/City Zone
22.05.08
71/16.07.08/EE(M)-II
M/s Roop Narain Chaudhary
4 P/L mastic asphalt from shop no 1400 to 1306 in Farash Khana in w.no.85/S.P.Zone
22.05.08
715/13.10.08/EE(M)-II
M/s Ashok Kumar Gupta
5 P/L mastic from shop no 1471 to 1399 in Farash Khana in w.no.85/S.P.Zone
22.05.08
716/13.10.08/EE(M)-II
M/s Ashok Kumar Gupta
CIVIL M-II 28.05.08 438634 12.07.08 12.09.08 437607 Completed 0.00
CIVIL M-II 28.05.08 497700 01.12.08 05.05.09 435559 Completed 0.00
CIVIL M-II 28.05.08 496600 04.12.08 05.05.09 434825 Completed 0.00
CIVIL M-II 07.07.08 155515 02.08.08 18.08.08 155465 Completed 0.00
CIVIL M-II 14.07.08 199367 01.16.08 28.11.08 198433 Completed 0.00
CIVIL M-II 14.07.08 198913 09.09.08 17.11.08 198521 Completed 0.00
CIVIL M-II 14.07.08 199249 22.08.08 22.10.08 198703 Completed 0.00
CIVIL M-II 14.07.08 199000 01.09.08 30.10.08 198823 Completed 0.00
CIVIL M-II 04.09.08 97518 05.12.08 05.12.08 97518 Completed 0.00
CIVIL M-II 04.09.08 99225 02.12.08 12.12.08 99225 Completed 0.00
CIVIL M-II 18.09.08 277352 03.10.08 28.11.08 276794 Completed 0.00
CIVIL M-II 18.09.08 481383 26.12.08 27.01.09 480677 Completed 0.00
CIVIL M-II 29.09.08 498601 28.02.09 24.04.09 498601 Completed 0.00
6 P/L cc in gali Neer Madari from h.no.2353 to 2338 and its link in Rodgran in w.no.85/S.P.Zone
22.05.08
173/10.07.08/EE(M)-II
M/s Jag Mohan Kapoor
7 P/L mastic asphalt from G.B. Road to 1470 in Farash Khana in w.no.85/S.P.Zone
22.05.08
718/13.10.08/EE(M)-II
M/s Ashok Kumar Gupta
8 P/L mastic asphalt from shop no 1307 to Lal Kuan Road in Farash Khana in w.no.85/S.P.Zone
22.05.08
717/13.10.08/EE(M)-II
M/s Ashok Kumar Gupta
9 C/O lane from h.no.1460 to 1454 near Rabia Girls School in gali Qasimjan Ballimaran C-86/CZ
20.06.08
178/01.08.08/EE(M)-II
M/s Aman Const Co.
10 Dev of katra no.1592 and 2165 in gali Chule Wali in C-85/SPZ
05.07.08
397/21.08.08/EE(M)-II
M/s Guru Kripa Const Co.
11 Dev of katra no.1573 Haziwala near Sarai Khalil in C-85/SPZ
05.07.08
360/11.08.08/EE(M)-II
M/s Kapoor Const.
12 Dev of katra no.1559 Pathamwala near Sarai Khalil in C-85/SPZ
05.07.08
393/21.08.08/EE(M)-II
M/s RP builders
13 Dev of Lav. Block at 24 Qtrs. Nawab Road in C-85/SPZ
05.07.08
398/21.08.08/EE(M)-II
M/s Royal Entp.
14 P/L of MS Signal Boards in the area of C-86/CZ
26.08.08
244/02.12.08/EE(M)-II
M/s Sh. Krishna Vashistha
15 Dev of lane/side lanes of Chatta Sira at Ahata kaley Sahab h.no.2013 to 2115 in C-86/CZ
26.08.08
247/02.12.08/EE(M)-II
M/s Ajay Const Co.
16 Const. of B/wall from behind katra bhootparet to Masque in sarai Khalil in w.no. 85/SPZ
26.08.08
691/03.10.08/EE(M)-II
M/s Divine Const Co.
17 P/L of RMC on road from Moter Dairy to main road Sarai Khalil in w.no.85/SPZ
26.08.08
855/17.12.08/EE(M)-II
M/s JP Const.
18 Dev of gali meer Jumla from Lal kua road to h.no. 1709 and other side lane in w.no. 86/City Zone
03.09.08
410/16.07.09/EE(M)-II
M/s Ajay Const Co.
CIVIL M-II 28.05.08 198808 22.08.08 22.06.09 195522 Completed 0.00
CIVIL M-II 28.05.08 195808 12.09.08 05.09.09 195808 Completed 0.00
CIVIL M-II 28.05.08 199629 25.08.08 12.12.08 199629 Completed 0.00
CIVIL M-II 28.05.08 198872 14.08.08 09.09.08 198872 Completed 0.00
CIVIL M-II 28.05.08 197669 24.07.08 28.08.08 197669 Completed 0.00
CIVIL M-II 28.05.08 197024 21.07.08 30.10.09 197024 Completed 0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
19 Dev of gali Batarion from Kharibaoli to naya Bazar by pdg RMC in w.no. 86/City Zone
22.05.08
49/04.07.08/EE(M)-II
M/s Indian Supply Agency
20 Dev of gali Kalyan and side lanes by pdg RMC in w.no.86/City Zone
22.05.08
53/04.07.08/EE(M)-II
M/s Himalya Const Co.
21 Dev of gali Khirkiwali by pdg RMC w.no.86/City Zone
22.05.08
52/04.07.08/EE(M)-II
M/s Mumtaz Ahmed Khan
22 Dev of gali from Lal Masjid to Panjabi Fatak Dalao by pdg RMC in w.no.86/City Zone
22.05.08
51/04.07.08/EE(M)-II
M/s Shokin Entp.
23 Dev of gali Ahata Kale Saheb main from Xing with gali Kasim Jan in w.no.86/City Zone
22.05.08
50/04.07.08/EE(M)-II
M/s Ajay Const Co.
24 Dev of gali Choekidar wali and chowk by pdg RMC in w.no.86/City Zone
22.05.08
55/04.07.08/EE_M-II
M/sAjay Brors
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.00
Status Report of MLA, Sh.Prahlad Singh SawhneyAC No. 60,2008-09
S.No.
Name of Work deptt. Div. D.O.S D.O.C Expenditure
civil M-I 17.04.08 198400 26.12.09 18.04.10 108382 Completed 0.00
civil M-I 25.04.08 536400 01.01.09 P 309246 In Prog. 2.27
civil M-I 25.04.08 195900 01.09.08 08.11.08 195367 Completed 0.00
civil M-I 25.04.08 198200 08.08.08 13.11.08 198200 Completed 0.00
civil M-I 25.04.08 193100 01.09.08 08.11.08 192845 Completed 0.00
civil M-I 25.04.08 314800 3.15
civil M-I 25.04.08 246900 17.10.08 25.12.08 220361 Completed 0.00
civil M-I 20.06.08 497531 10.09.08 01.12.08 495492 Completed 0.00
Date of Booking
Date of Consen
t
Amount booked
Work order no. with date
i/c division
Name of agency
Present Position
Liabilities Rs.lacs
1 C/o urinal block for Khoya Mandi at Mori Gate in w.no.80/City Zone
17.04.08
169/12.10.09/EE(M)-I
M/s Monu Entp.
2 Dev of entry way of Naya Bazar at (Pilli Kothi)in w.no.80/City Zone
25.04.08
167/04.09.10/EE(M)-I
M/s Monu Entp.
3 Dev of entry at G.T.Road entry of Kucha Mahatter Khan in w.no.80/City Zone
25.04.08
83/01.08.08/EE(M)-I
M/s Monu Entp.
4 Dev of entry at gali Gurudwara wali Nickalsan Road Mori Gate in w.no.80/City Zone
25.04.08
85/01.08.08/EE(M)-I
M/s Monu Entp.
5 Dev of entry of at Tanga Stand Road Kucha Mattar Khan in w.no.80/City Zone
25.04.08
84/01.08.08/EE(M)-I
M/s Monu Entp.
6 Dev by pdg stone flooring in katra Mahal Sarai in w.no.80/City Zone
25.04.08
7 Pdg RMC pav in gali Hanuman Prashad in w.no.80/City Zone
25.04.08
208/17.09.08/EE(M)-I
M/s Adbhena Engg. & Contct.
8 Dev of gali Telian and adj lane by pdg rmc in w.no.80/CZ
28.05.08
178/04.09.08/EE(M)-I
M/s Pooja Const.
civil M-I 20.06.08 499404 10.09.08 01.12.08 498887 Completed 0.00
civil EE(Pr.) 23.06.08 203300 20.10.08 P 195202 In Prog. 0.08
civil EE(Pr.) 23.06.08 227650 22.10.08 P 219861 In Prog. 0.08
civil EE(Pr.) 23.06.08 559850 16.10.08 P 558774 In Prog. 0.01
civil EE(Pr.) 23.06.08 2E+06 24.04.11 08.06.11 1562300 Completed 0.00
civil EE(Pr.) 12.05.08 2E+06 17/08/08 P 1595452 In Prog. 1.66
civil EE(Pr.) 23.06.08 2E+06 06.01.09 P 2029774 In Prog. 3.54
civil M-II 23.06.08 2E+06 24.04.11 08.06.11 1784000 Completed 0.00
civil M-II 23.06.08 470100 01.09.08 10.11.08 469902 Completed 0.00
civil M-II 23.06.08 370000 08.10.08 01.12.08 369419 Completed 0.00
civil M-II 23.06.08 499400 4.99
civil M-II 23.06.08 538000 22.08.09 18.09.09 532473 Completed 0.00
civil M-II 23.06.08 195000 10.08.08 30.09.08 167212 Completed 0.00
9 Dev of Chatta Madan Gopal by pdg rmc in w.no.80/CZ
28.05.08
176/04.09.08/EE(M)-I
M/s Aman Const Co.
10 Dev of pvt.katra no.9145 to 9152 and 9176 to 9183 in Nawab Ganj C-78/CLZ by pdg kota Stone
17.05.08
127/13.10.08/EE(Pr.)/CLZ
M/s Shree Builders
11 Dev of pvt.katra no.10169 to 10175 and 10200 to Chowk in Nawab Ganj C-78/CLZ by pdg cc
17.05.08
128/13.10.08/EE(Pr.)/CLZ
M/s Shree Builders
12 Dev to katra Tejab in Nawab Ganj C-78/CLZ by pdg SW drain
17.05.08
130/13.10.08/EE(Pr.)/CLZ
M/s Shree Builders
13 Dev of Library road by dense carpetting from Azad Mkt. Chowk to Sanatan dhram mandir C-78/CLZ
17.05.08
383/02.02.11/EE(M)-II
M/s Sanjeev Kr.& Bros.
14 Dev of court yard and internal lane by pdg cc from 1G to 48G in Sarai Phoas in w.no.78/Civil Line Zone
08.04.08
103/12.08.08EEM_II
M/s Vinod Kumar
15 Dev of passage to Hanuman Temple by UV poly carbonet in C-77/CLZ
30.05.08
175/30.12.08/EE(P)-CLZ
M/s Indian supply Agency
16 Imp/Stg.of Kripa Narain marg,Maharaja Lal lane Rajnath Marg C-77/CLZ
17.05.08
383/02.02.11/EE(M)-II
M/s Sanjeev Kr.& Bros.
17 Dev of approach road to 6 Atour Rehman Lane in w.no.78/CLZ
19.05.08
116/21.08.08/EE(M)-II/CLZ
M/s Shree Builders
18 Dev of Atour Rehman Lane by pdg missing strome water drain in w.no.78/CLZ
19.05.08
213/06.10.08/EE(M)-II
M/s Khanna Const.
19 Prov.rain water harwesting system in battrey lane w.no.78/CLZ
20.05.08
20 Dev of lane in Yamuna Bazar w.no.77/CLZ
20.05.08
114/21.08.08/EE(M)-II
M/s Balkar Singh & Bros
21 Dev to common land near S.I office Arun Ngr. Majnu ka Tilla w.no.78/CLZ
20.05.08
163/05.09.08/EE(M)-II
M/s Vinod Kumar
civil M-II 15.05.08 205000 2.05
civil M-II 15.05.08 313900 M/s RCC 19.08.08 24.09.08 312999 Completed 0.00
civil M-II 21.05.08 341800 21.07.08 24.11.08 242642 Completed 0.00
civil M-II 21.05.08 262450 25.08.08 P 229006 In Prog. 0.33
civil M-II 21.05.08 239200 21.07.08 24.11.08 174839 Completed 0.00
civil M-I 08.07.08 199850 10.08.08 30.09.08 198937 Completed 0.00
civil M-I 08.07.08 199338 16.08.08 15.09.08 199083 Completed 0.00
civil M-I 08.07.08 199153 01.10.08 12.11.08 198962 Completed 0.00
civil M-I 08.07.08 199151 25.08.08 30.09.08 198901 Completed 0.00
civil M-I 08.07.08 198796 11.12.08 18/12/09 198709 Completed 0.00
civil M-I 08.07.08 197952 16.08.08 15.09.08 197952 Completed 0.00
civil M-I 08.07.08 198395 1.98
civil M-I 08.07.08 198609 12.11.08 23.12.09 198239 Completed 0.00
22 Dev of pvt Katra no 9182,9183,9184A,9184B by pdg common flooring and drainage system at Nawab Ganj in w.no.78/Civil Line Zone
20.05.08
23 Dev of Approch Road to Dhobi Lane in Khyber Pass by M/P in w.no.77/Civil Line Zone
12.05.08
46/02.07.08/EE(M)-II
24 Dev of approch and passage to MCW Center Kayber Pass in w.no.78/Civil Line Zone
17.05.08
63/17.07.08/EE(M)-II
M/s Barohi Const.
25 C/o urinal block infront of DDA Mkt. Aruna Ngr Majnu Ka Tila in w.no.78/Civil Line Zone
17.05.08
111/20.08.08/EE(M)-II
M/s Om Prakash Soni
26 Dev of lane behind Church near Army Press Khyber Pass in w.no.78/Civil Line Zone
17.05.08
62/16.07.08/EE(M)-II
M/s Barohi Const.
27 Dev of Chamnwara Road by RMC in C-80/CZ
24.05.08
120/12.08.08/EE(M)-I
M/s Kay Const Co.
28 Dev of gali Hiranand and adj lane by pdg RMC in C-80/CZ
24.05.08
127/12.08.08/EE(M)-I
M/s Monu Entp.
29 Dev of gali Neem wali Chhaghara,Satghara and adj lane by pdg RMC in C-80/CZ
24.05.08
190/04.09.08/EE(M)-I
M/s Yogendra Sachdeva
30 Dev of Bhojpura and adj lane by pdg RMC in C-80/CZ
24.05.08
128/12.08.08/EE(M)-I
M/s Bansal Entp.
31 Dev of main gali of katra Ishwar Dhawan by pdg RMC in C-80/CZ
24.05.08
174/04/09/08/M-I
M/s Sub Const Co
32 Dev of gali Jute wali,gali Lade wali,gali Khanchi,gali Phool ki Bakkal and adj lane by pdg RMC in C-80/CZ
24.05.08
129/12.08.08/EE(M)-I
M/s Suman Assos.
33 Dev of main gali of katra Modgran and adj lanes by pdg RMC in C-80/CZ
24.05.08
34 Dev of katra Tejab and gali Batlan by pdg RMC and stone floaring in C-80/CZ
24.05.08
181/04.04.09/M-i
M/s Kushal Bharat
civil M-I 08.07.08 09.4.08 199470 15.09.08 02.03.09 199167 Completed 0.00
civil M-I 08.07.08 09.4.08 450000 08.09.08 10.11.08 450000 Completed 0.00
civil M-I 08.07.08 481500 09.10.08 08.10.08 478517 Completed 0.00
civil M-I 08.07.08 198900 07.10.08 01.10.08 151520 Completed 0.00
civil M-I 08.07.08 498641 13.09.08 29.04.09 489942 Completed 0.00
civil M-I 08.07.08 488881 01.10.08 09.08.10 488302 Completed 0.00
civil M-I 08.07.08 498765 08.09.08 12.11.08 498765 Completed 0.00
civil M-II 10.07.08 96179 05.08.08 25.08.08 96179 Completed 0.00
civil M-II 10.07.08 97344 05.08.08 22.08.08 97045 Completed 0.00
civil M-II 30.07.08 194000 1.94
civil M-II 30.07.08 128500 11.09.08 10.10.08 128129 Completed 0.00
civil M-II 30.07.08 187600 08.09.08 21.10.08 186632 Completed 0.00
civil M-II 30.07.08 98900 M/s RCC 25.09.08 04.11.08 91808 Completed 0.00
35 Dev of toilet and common places of Katra Ashrfi in w.no.80/CZ
184/04.09.08/EE(M)-I
M/s Vats Const Co.
36 Dev of Khoya Mandi Mori gate by raising the height of B/wall and pdg RMC on footpath in w.no.80/CZ
179/04.09.08/EE(M)-I
M/s Shri Krishna Vashitha
37 Dev of saroundnig of Walled city musiom at Lahori gate in CZ
26.06.08
86/01.08.08/EE(M)-I
M/s Monu Entp.
38 Dev of wall city musiom at Lahori gate CZ
26.06.08
78/30.07.08/EE(M)-I
M/s Monu Entp.
39 Dev of Chirakhana gali from Mali wara to Masjid by pdg RMC in w.no.80/CZ
24.05.08
169/04.09.08/EE(M)-I
M/s Ajay Bros.
40 Dev of Vaidwara and adj lane by pdg RMC in w.no.80/CZ
24.05.08
180/04.09.08/EE(M)-I
M/s K.K. Const.
41 Dev of lane along Church at Church Mission road and lane by pdg RMC in w.no.80/CZ
24.05.08
186/04.09.08/EE(M)-I
M/s S.K. & Co.
42 Dev of intersaction near Nigam Bodh creamation ground and Ring road in w.no. 77/CLZ
08.07.08
91/05.08.08/EE(M)-II
M/s Khanna Const.
43 Dev of intersaction near Gaddi Suthre Shah and road to Old Yamuna Bridge in w.no. 77/CLZ
08.07.08
92/05.08.08/EE(M)-II
M/s Khanna Const.
44 Pdg Duct system from 4A under hill road to 10 nos under hill lane in w.no.78/CLZ
29.07.08
45 Dev to pvt katra at 9F by imp. common lav block and passage in w.no.78/CLZ at Rajpur road
18.07.08
178/09.09.08/EE(M)-II
M/s Khanna Const.
46 Dev to pvt katra at 9H Rajpur road by imp. drainage and cc lane in w.no.78/CLZ
18.07.08
161/05.09.08/EE(M)-II
M/s Khanna Const.
47 Dev of approach of Telephone exchange near Mori gate in w.no.77/CLZ
18.07.08
186/18.09.08/EE(M)-II
civil M-II 30.07.08 99300 M/s RCC 24.09.08 06.11.08 99184 Completed 0.00
civil M-II 30.07.08 98500 18.09.08 18.10.08 98440 Completed 0.00
civil M-II 30.07.08 97800 09.09.08 04.10.08 97255 Completed 0.00
civil M-II 30.07.08 281200 20.10.08 26.10.09 277788 Completed 0.00
civil M-II 14.08.08 198750 07.10.09 08.12.09 197306 Completed 0.00
civil EE(Pr.) 18.08.08 463800 21.10.08 30.01.09 461725 In Prog. 0.02
civil M-II 18.08.08 238000 M/s RCC 24.10.08 20.01.09 230354 Completed 0.00
civil M-II 18.08.08 176100 M/s RCC 20.10.08 22.11.08 162698 Completed 0.00
civil M-II 25.08.08 369800 M/s RCC 07.11.08 28.08.09 369800 Completed 0.00
civil M-II 25.08.08 338900 M/s RCC 07.11.08 28.08.09 334934 Completed 0.00
civil M-II 28.08.08 196900 26.12.08 12.06.09 196900 Completed 0.00
civil M-I 04.09.08 198500 11.02.09 20.03.09 198500 Completed 0.00
civil M-I 04.09.08 190000 23.12.08 20.07.09 190000 Completed 0.00
48 Dev of intersaction of Pull Mithai in w.no.77/CLZ
29..07.08
187/18.09.08/EE(M)-II
49 Dev of intersaction of Khebarpass in w.no.78/CLZ
29..07.08
184/18.09.08/EE(M)-II
M/s Khanna Const.
50 Dev of intersaction of Queen Mary School and Sarai Phoos road in w.no.78/CLZ
29..07.08
151/04.09.08/EE(M)-II
M/s Khanna Const.
51 Dev of open space and passgae at Nicolsan road near 1/783 w.no.77/CLZ
29..07.08
263/13/10/08/M-II
M/s Bansal Cont
53 Pdg drainage system in pv. katra Car Ghar Sarai Phoos in w.no.78/CLZ
04.08.08
156/01.10.09/EE(M)-II
M/s Vinod Kumar
54 Dev of pvt. katra no.17 Boulward road in C-78/CLZ
12.05.08
129/13.10.08/EE(Pr.)/CLZ
M/s Shree Builders
55 Dev of main drainage system at pvt. katra no.3 Atturrehman lane in w.no.78/CLZ
14.08.08
243/13.10.08/EE(M)-II
56 Dev of main passage of ovt. katra no.4 Atturehman lane in w.no.78/CLZ
14.08.08
258/13.10.08/EE(M)-II
57 Dev of entrance near Dada Darbar Yamuna Bazar C-77/CLZ
25.08.08
259/13.10.08/(M)-II
58 Dev of entrance near Sutre Shah Yamuna Bazar C-77/CLZ
25.08.08
257/13.10.08/EE(M)-II
59 Dev of passage at pvt.katra no.32 Sham Nath MArg C-28/CLZ
28.08.08
277/13.10.08/EE(M)-II
M/s Vinod Kumar
60 Dev of foot path katra Jaipuria building by pdg Red Sand Stone in common panel in w.no.80/City Zone
27.08.08
389/13.01.09/EE(M)-I
M/s Monu Entp.
61 Dev of gali parathe wali adj. lane by pdg RMC in w.no.80/City Zone
27.08.08
248/15.10.08/EE(M)-I
M/s Monu Entp.
civil M-I 04.09.08 190100 14.01.09 28.02.09 190100 Completed 0.00
civil M-II 03.09.08 199331 10.12.08 30.01.09 196726 Completed 0.00
civil M-II 03.09.08 199533 29.01.09 29.04.09 199533 Completed 0.00
civil M-II 03.09.08 146917 02.12.08 29.12.08 146917 Completed 0.00
civil M-II 15.05.08 469183 07.01.09 09.04.09 469006 Completed 0.00
civil M-II 17.06.08 498932 4.99
civil M-II 23.06.08 418398 13.10.08 21.07.09 415083 Completed 0.00
civil M-II 23.06.08 526088 24.10.08 24.09.09 513663 Completed 0.00
civil M-II 23.06.08 3E+06 23.10.08 18.02.09 2499038 Completed 0.00
civil M-II 24.09.08 97100 M/s RCC 16.10.08 18.11.08 96923 Completed 0.00
civil M-II 17.06.08 364000 3.64
civil M-II 17.06.08 404000 25.08.08 23.12.09 332173 Completed 0.00
civil M-II 17.06.08 379900 11.08.08 19.09.08 340474 Completed 0.00
62 Dev of flooring drainage system and laboratry block of katra no. 1982 Katra lachhu sing chah Indira in w.no.80/CZ
27.08.08
386/13.01.09/EE(M)-I
M/s Pawan builders
63 Dev of gali Chah Rahat from h.no. 1135 to 1144 in Dariba kalan by p/l RMC in w.no.79/CZ
03.09.08
230/01.12.08/EE(M)-II
M/s Yogendra Sachdeva
64 Dev of gali kucha seth from h.no. 1530 to 1578 in Dariba kalan by pdg lanes by RMC in w.no.79/CZ
03.09.08
302/21.01.09/EE(M)-II
M/s K.K. Const.
65 Dev of gali Krishna in Dariba Kalan from gali Guliyan in 1774 in w.no. 79/CZ
03.09.08
234/01.12.08/EE(M)-II
M/s Gupta builders
66 Dev of Khalil wali gali by pdg RMC and drainage system in Nawabganj C-78/CZ
12.05.08
124/28.08.08/EE(M)-II
M/s Bansal Const.
67 Dev of approach road in pvt katra no.19 Rajniwas Marg by mettaling and premixing in C-78/CZ
30.05.08
68 Dev of pvt katra Mohsin,Kashmiri Gate by improving common latrine and court yard in C-77/CLZ
19.05.08
225/06.10.08/EE(M)-II
M/s Vinod Kumar
69 Dev of gali Mahal Sarai and side lane Kashmiri Gate in C-77/CLZ
20.05.08
183/19.09.09/EE(M)-II
M/s Khanna Const.
70 C/O passage on both side of Bharat Sewak Samaj Khebar Pass and dev of common lav. block in C-77/CLZ
30.05.08
242/13.10.08/EE(M)-II/CLZ
M/s Shree Builders
71 Dev/Imp of Court Yard at Tikona Park Kashmiri Gate in C-77/CLZ
17.09.08
267/13.10.08/EE(M)-II
72 Dev of Racquit road by dense carpetting from Rajpur road to Sham Nath Marg w.no.78/CLZ
17.05.08
73 Dev of lavtory Block Bhargav lane in w.no.78/CLZ
13.05.08
113/20.08.08/M-II
M/s Vinod Kumar
74 Dwv of Footpath infront of Fauzi Jat Dhramshala Jamuna Bazar w.no.77/CLZ
13.05.08
93/05.08.08/EE(M)-II
M/s Khanna Const.
civil M-II 17.06.08 513700 02.08.09 28.01.09 369079 Completed 0.00
civil M-II 17.06.08 206800 M/s RCC 22.10.08 27.02.09 168716 Completed 0.00
civil M-II 17.06.08 199000 17.02.09 06.11.09 198348 Completed 0.00
civil M-II 17.06.08 199700 17.02.09 12.11.09 191913 Completed 0.00
civil M-II 17.06.08 318000 24.07.08 P 274428 In Prog. 0.44
civil M-II 17.06.08 195000 M/s RCC 22.10.08 12.03.09 165987 Completed 0.00
civil M-II 17.06.08 463950 28.02.09 19.06.09 461621 Completed 0.00
civil M-II 17.06.08 261000 M/s RCC 18.09.08 03.10.09 223242 Completed 0.00
civil M-II 17.06.08 255000 M/s RCC 08.12.08 27.02.09 224341 Completed 0.00
civil M-II 17.06.08 199000 M/s RCC 22.10.08 09.03.09 168181 Completed 0.00
civil M-II 17.06.08 95017 0.95
civil M-II 19.06.08 199852 12.11.08 06.02.09 199246 Completed 0.00
75 Dev of open Coutryard in pvt. Katra Cristian colony Sarai Phoos w.no.78/CLZ
13.05.08
59/14.07.08/EE(M)-II
M/s Vinod Kumar
76 Dev of Common Coutryard and Lav. Block in Pvt. Katra no.652 to 656 in gali Nalbandan Kashmeri Gate w.no.77/CLZ
17.05.08
188/18.09.08/EE(M)-II
77 Dev of common courtyard and drainage system in pvt.katra no 1950 Jamna Bazar in w.no.77/CLZ
17.05.08
129/28.08.08/EE(M)-II
M/s Shri Builders
78 Dev of common courtyard and Lav. Block in pvt. no.1949 Jamna Bazar w.no.77/CLZ
17.05.08
128/28.08.08/EE(M)-II
M/s Shri Builders
79 Pdg RMC and drainage system from P-24 to N-68/537 in Aruna Ngr. w.no.78/CLZ
17.05.08
64/17.07.08/EE(M)-II
M/s Aditi Const.
80 Dev of common courtyard and Lav.Block in pvt. Katra no 657 to 670 in galim Nalbadan Kashmeri Gate w.no.77/CLZ
17.05.08
190/18.09.08/EE(M)-II
81 Imp to road from K-Block Dalao to Outer Ringroad in Aruna Ngr. w.no.78/CLZ
17.05.08
65/17.07.08 EE(M)-II
M/s Balkar Singh & Bros
82 C/o Urinal block at Rajendra Mkt. Petrol Pump w.no.78/CLZ
17.05.08
185/18.09.08/EE(M)-II
83 C/O Urinal block near Majnu KA Tilla in w.no.78/CLZ
17.05.08
220/06.10.08/EE(M)-II
84 Dev of common courtyard and lav. Block in pvt.katra no 680 to 684 in gali Nalbadan Kashmeri Gate w.no.77/CLZ
30.05.08
189/18.09.08/EE(M)-II
85 P/F direction Board in CLZ from LG hs to Zonal Office in C-78/CLZ
30.05.08
86 Dev of Dhobi Wada Kinari bazar by pdg RMC w.no.80/CZ
30.05.08
183/04.09.08/EE(M)-II
M/s Roop Narain Chaudhary
civil M-II 19.06.08 199645 10.08.08 28.11.08 199179 Completed 0.00
civil M-II 19.06.08 199536 12.11.08 12.12.09 198131 Completed 0.00
civil M-II 19.06.08 199506 05.09.08 01.10.08 198251 Completed 0.00
civil M-II 19.06.08 199447 12.11.08 12.01.08 199447 Completed 0.00
civil M-II 20.06.08 499851 12.09.08 12.11.08 499786 Completed 0.00
0.000.00
32.13
87 Dev of katra Kacha Tabela and adj lane by pdg drainage and flooring in w.no.80/CZ
28.05.08
124/12.08.08/EE(M)-II
M/s Dinesh Kumar
88 Dev Kucha Mohatter Khan and Mori Gate by pdg drainage line in w.no.80/CZ
28.05.08
182/04.09.08/EE(M)-I
M/s Kushal Bharat
89 Dev of gali Kunjs and adj lane by pdg RMC in w.no.80/CZ
28.05.08
175/04.08.08/EE(M)-II
M/s Himalaya Const Co.
90 Dev of pvt katra no.2183,2158 to 2160 gali Hanuman Prashad and pvt. katra 1921 gali Mata Wali by pdg drainage and flooring in w.no.80/CZ
28.05.08
172/04.09.08/EE(M)II
M/s Ajay Const Co.
91 Dev of Kucha Natwa by pdg RMC in w.no.80/CZ
28.05.08
185/04.09.08/EE(M)-II
M/s Mumtaz Ahmed Khan
deptt. deptt. deptt. deptt.Div. Div. Div. Div. Div. Div.
civil elect hort cse M-I M-II M-III M-IV E-I EE(Pr.)
Status Report of MLA, Sh.Surender Pal Singh BitooAC No. 61,2008-09
S.No.
Name of Work deptt. Div. Name of agency D.O.S D.O.C
1civil M-II
23.06.08 30.05.08 518100 13.09.08 20.11.08 498128Completed
2civil M-II
23.06.08 20.05.08 172000 14.09.08 29.10.08 172000Completed
3civil M-II
23.06.08 20.05.08 248100 18.09.08 22.10.08 248100Completed
4civil M-II
23.06.08 14.06.08 377300 14.09.08 P 368549 In Prog.
5ELECT E-I
30.06.08 27.06.08 188932 19.09.08 20.03.10 178573Completed
6
ELECT E-I
30.06.08 27.06.08 184441 01.09.08 12.09.08 176408
Completed
7ELECT E-I
30.06.08 27.06.08 186779 19.09.08 20.03.10 176563Completed
8
ELECT E-I
30.06.08 27.06.08 188416 17.09.08 15.10.08 182519
Completed
9ELECT E-I
30.06.08 27.06.08 186312 06.09.08 13.09.08 175808Completed
10ELECT E-I
30.06.08 27.06.08 188883 10.09.08 30.04.09 183317Completed
11
civil M-II
03.07.08 01.06.08 592800 05.09.08 29.12.08 590939
Completed
12civil M-II
03.07.08 14.06.08 679800 18.03.09 12.02.10 679242 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Expenditure
Present Position
Dev to park infront of h.no. 526 in West PArmanand cly. C-12/CLZ
106/12.08.08/EE(M)-II
M/s Balkar Singh & Bros.
Dev of back lane by pdg cc from h.no. 672 to 685 in Mukherji nagar C-11/CLZ
156/05.09.08/EE(M)-II
M/s Abhay Const.Co.
Dev of back lane by pdg cc from 950 to 969 in Mukherji nagar C-11/CLZ
176/09.09.08/EE(M)-II
M/s Abhay Const.Co.
Dev. of Internal drain infront of gate no.2 in Mall Apptt. in C-/CLZ
159/05.09.08/EE(M)-II
M/s Balkar Singh & Bros.
P/O semi high mast pole near gali no.5 in Wazirabad inC-10/CLZ
113/12.09.08/EE(E)-II
M/s Cheena & Co.
P/O semi high mast pole at Mpl.park near Allahabad Bank,Luckhnow road Timar pur in C-10/CL.
103/28.08.08/EE(E)-II
M/s Cheena & Co.
P/O semi high mast pole near gali no.17 in Wazirabad in C-10/CLZ
114/12.09.08/EE(E)-II
M/s Cheena & Co.
P/O semi high mast pole in Mpl. park (Tikona Park)near T-point Mukharji Ngr. in C-11/CLZ
116/12.09.08/EE(E)-II
M/s Bhima Electricals
P/O semi high mast pole near Hari Mandir in Mukharji Ngr. in C-11/CLZ
105/04.09.08/EE(E)-II
M/s Cheena & Co.
P/O semi high mast pole near Dhakka Jod infront of MCD Colony,Dhakka in C-11/CLZ
104/04.09.08/EE(E)-II
M/s Super Electricals
Dev to lane by pdg cc and drainage system of Gautam Gali (main road) Malka Ganj to h.no.507 and Chakki wali gali (main road h.no.821/822 to Dr. Rehman Clinic in C-9/CLZ
123/27.08.08/EE(M)-II
M/s Sanjeev Builders
Dev. of road and back lane from h.no.E-3 toE-11 in Vijay nagar S/S inC-12/CLZ
270/13.10.08/EE(M)-II
M/s Balkar Singh & Bros.
13civil M-II
03.07.08 14.06.08 473700 M/s Lamba Bros. 02.09.08 15.11.08 459589Completed
14civil M-II
03.07.08 14.06.08 277000 M/s Lamba Bros. 04.09.08 17.11.08 277000Completed
15
civil M-II
03.07.08 14.06.08 461200 M/s Lamba Bros. 15.09.08 04.12.08 450463
Completed
16
civil M-II
03.07.08 14.06.08 495500 21.08.08 13.09.08 495144
Completed
17civil M-II
16.07.08 16.07.08 174500 08.10.08 08.12.08 146860Completed
18
civil M-II
18.07.08 18.07.08 423385 M/s Lamba Bros. 13.08.08 11.12.08 421395
Completed
19
civil M-II
23.07.08 15.07.08 642900 28.12.08 15.04.09 588097
Completed
20civil M-II
24.07.08 22.07.08 268800 M/s Lamba Bros. 15.10.08 14.01.09 244028Completed
21civil M-II
24.07.08 22.07.08 498000 10.10.08 26.12.08 446626Completed
22civil M-II
24.07.08 22.07.08 348200 15.10.08 31.12.08 332168Completed
23civil M-II
28.07.08 10.06.08 669200 03.12.09 02.03.10 608517Completed
24
civil M-II
06.08.08 19.07.08 872000 M/s Lamba Bros. 26.02.09 P 862000 In Prog.
25
civil M-II
07.08.08 06.08.08 498000 05.09.08 04.12.08 479997
Completed
26civil M-II
07.08.08 07.08.08 421000 13.10.08 30.08.09 421000Completed
27
civil M-II
07.08.08 07.08.08 421000 13.10.08 P 402896 In Prog.
28civil M-II
11.08.08 08.08.08 185600 10.10.08 24.11.08 185600Completed
Dev. of chowk and galies in block no.3 in double storey Vijay Nagar in C-12/CLZ
143/29.08.08/EE(M)-II
Dev. of back lane by pdg. RMC from h.no.2060 to 2075 in Otramline inC-12/CLZ
141/29.08.08/EE(M)-II
Dev. of chowk and galies in block no.6 and infront of h.no.68 in block no.8,D/S in Vijay Nagar in C-12/CLZ
142/29.08.08/EE(M)-II
Dev. of lane by pdg.mastic wearing course from Gauri Shanker Mandir to h. no.578 in West Parmanand Colony in C-12/CLZ
105/12.08.08/EE(M)-II
M/s Balkar Singh & Bros.
Dev of beck lane by pdg RMC from h.no.249 to 262 in Indira Vihar Colony in C-11/CLZ
228/08.10.08/EE(M)-II
M/s Abhay Const.Co.
Dev of branch lane gali no.1 from Ram Ghat in Vijay wali gali in Vill. Wazirabad in C-10/CLZ
85/04.08.08/EE(M)-II
Dev of B/Wall of Mall Apprt. infront of h.no. 110 and 109 to 69 and 70 upto Pump House in Mall Apprt. in C-10/CLZ
342/19.12.08/EE(M)-II
M/s Shiva Const.Co.
Dev of road by pdg RMC from h.no. G-25A to G-27B in Vijay Ngr. S/S in C-12/CLZ
211/06.10.08/EE(M)-II
Dev of road from E-1B to E-2B and E-20 to E-24A in Vijay Ngr.S/S in C-21/CLZ
202/23.09.08/EE(M)-II
M/s Abhay Const.Co.
P/L RMC in backlane from h.no. 1993 to 1980 in Autram Line in C-12/CLZ
201/23.09.08/EE(M)-II
M/s Abhay Const.Co.
P/L RMC from h.no. 2012 to 2032 (Ram Mandir Road)in Autram Line in C-12/CLZ
259/24.11.09/EE(M)-II
M/s Abhay Const.Co.
Dev of lane by pdg RMC from h.no. B-18 to B-35B in Vijay nagar Single SDtorey w.no.12 CLZ
447/16.02.09/EE(M)-II
Dev of lane by pdg mastic wearing course from h.no. 240 to 262 in Mukherji nagar w.no.11 CLZ
122/27.08.08/EE(M)-II
M/s Bansal Const.Co.
Dev/Const. of B/wall of green belt opp. h.no. 1232 in Mukherji nagar w.no.11 CLZ
245/13.10.08/EE(M)-II
M/s Shiva Const.Co.
Dev/Const. of B/wall of green belt between Jal board land to Dalao in Mukherji nagar w.no.11 CLZ
244/13.10.08/EE(M)-II
M/s Shiva Const.Co.
Dev of back lane by pdg RMC from h.no. 758 to 771 in Mukherji nagar w.no.11 CLZ
239/10.10.08/EE(M)-II
M/s Abhay Const.Co.
29civil M-II
14.08.08 02.08.08 427900 M/s Lamba Bros. 23.03.09 22.12.09 351331Completed
30
civil M-II
21.05.08 14.05.08 490800 13.10.08 22.09.09 490505
Completed
31
civil M-II
21.05.08 14.05.08 496000 18.02.09 30/10/09 494984
Completed
32
civil M-II
21.05.08 14.05.08 497900 13.10.08 22.09.09 497330
Completed
33
civil M-II
21.05.08 14.05.08 437000 07.08.08 24.03.09 425256
Completed
34
civil M-II
21.05.08 14.05.08 487000 M/s Lamba Bros. 13.08.08 08.11.08 378474
Completed
35HORT E-I
21.05.08 08.05.08 158181 23.07.08 16.12.08 157804Completed
36HORT E-I
21.05.08 08.05.08 158596 28.07.08 21.08.08 158135Completed
37HORT E-I
21.05.08 08.05.08 157926 30.07.08 21.08.08 147078Completed
38
civil M-II
30.05.08 30.05.08 274100 M/s Mudit Const. 06.08.08 P 239680 In Prog.
39
civil M-II
30.05.08 30.05.08 261000 M/s Mudit Const. 06.08.08 04.12.08 232956
Completed
40
civil M-II
30.05.08 30.05.08 338800 07.08.08 23.10.08 299044
Completed
41ELECT E-I
04.09.08 14.08.08 197652 M/s Gyan Ent. 28.02.09 03.10.09 184004Completed
42
ELECT E-I
04.09.08 14.08.08 195314 04.01.09 30.09.09 187476
Completed
43ELECT E-I
04.09.08 14.08.08 196249 05.01.09 19.01.09 161125Completed
Dev of open drain from Hanuman Mandir to B-35 in Viajy nagar SS w.no.12 CLZ
255/13.10.08/EEM_II
dev to lane by pdg mastic wearing course from h.no.1064 to 1083 in Mukherji Ngr w.no.11/CLZ
273/13.10.08/EE(M)-II/CLZ
M/s Balkar Singh & Bros.
Dev of lane by mastic wearing course from h.no.180 to 382 and one intersection in Mukherji Ngr.in w.no.11/CLZ
271/13.10.08/EE(M)_II
M/s Balkar Singh & Bros.
Dev to lane by pdg mastic wearing course from h.no.1121 to 1137 in Mukherji ngr.in w.no.11/CLZ
272/13.10.08/EE(M)-II/CLZ
M/s Balkar Singh & Bros.
Dev of lane by pdg cc from h.no.253 to 268,225 to 238,301 to 316 and 457 to 468 in Parmand Colony in w.no.11/CLZ
78/30.07.08/EE(M)-II
M/s Malhotra Contractors
Dev of lane by pdg cc from h.no.121 to 138,105 to 120,365 to 380 and 333 to 348 in Parmand Colony in w.no.11/CLZ
83/04.08.08/EE(M)-II
P/O Tubewell in park near h.no.749,Dr.Mukherji Ngr.in w.no.12/CLZ
266/14.07.08/EE(E)-II
M/s Master Electric Store
P/O tubewell in park near h.no.1874 outram line in w.no.12/CLZ
265/14.07.08/EE(E)-II
M/s Mani Electricals
P/O Tubewell in park near h.no.376 Parmanand cvolony in w.no.12/CLZ
264/14.07.08/EE(E)-II
M/s Pee K ay Electricals
Dev to branch lane by pdg brick flooring in gali no.3 Partap Wali gali in Village Wazirabad in w.no.10/CLZ
74/28.07.08/EE(M)-II
Dev to branch lane by pdg brick flooring in gali no.6 Parveen Beauty Parlour Wali gali in village Wazirabad in w.no.10/CLZ
70/28.07.08/EE(M)-II
Dev to gali no.8 Kharaksingh to Jai chand and infront of Ashok house(C-232)in village Wazirabad in w.no.10/CLZ
75/28.07.08/EE(M)-II
M/s Kalra Const.Co.
P/O semi high mast pole at C-Block Vijay Ngr.T-Point Single Storey in C-12/CLZ
297/24.02.09/EE(E)-II
P/O semi high mast pole at A-Block Park/Ground Vijay Ngr.Single Storey in C-12/CLZ
227/31.12.09/ EE(E)-II
M/s Amit Elevater Services
P/O semi high mast lioght at park in D-Block Vijay Ngr.Single Storey in C-12/CLZ
228/31.12.08/EE(E)-II
M/s Bhima Electricals
44civil M-II
16.07.08 16.07.08 755323 31.10.08 31.07.09 755260Completed
45
civil M-II
30.05.08 30.05.08 381900 M/s Mudit Const. 06.08.08 01.12.08 341489
Completed
46
civil M-II
30.05.08 30.05.08 263500 M/s Mudit Const. 06.08.08 03.12.08 235102
Completed
47
civil M-II
30.05.08 30.05.08 275900 M/s Lamba Bros. 13.08.08 11.12.08 232687
Completed
48civil M-II
30.05.08 30.05.08 499000 M/s Mudit Const. 06.08.08 04.12.08 449923Completed
49
civil M-II
30.05.08 30.05.08 496000 07.09.08 05.01.09 379483
Completed
50
civil M-II
02.06.08 30.05.08 374000 25.08.08 14.11.08 247411
Completed
51
civil M-II
02.06.08 30.05.08 373700 25.08.08 14.11.08 246396
Completed
52ELECT
E-I 06.06.08 29.05.08 263000 01.10.08 P 170679 In Prog.
53ELECT
E-I 06.06.08 29.05.08 264000 30.09.08 P 204115 In Prog.
54ELECT
E-I 06.06.08 29.05.08 268000 10.09.08 P 193344 In Prog.
55ELECT
E-I 06.06.08 29.05.08 264000 20.10.08 15.04.11 185790Completed
56
ELECT
E-I 06.06.08 29.05.08 267000 03.10.08 P 164310 In Prog.
57ELECT
E-I 06.06.08 29.05.08 271000 30.09.08 P 168824 In Prog.
58ELECT
E-I 06.06.08 29.05.08 268000 10.10.08 P 167654 In Prog.
59ELECT
E-I 06.06.08 29.05.08 267000 01.10.08 P 163828 In Prog.
raising of B/wall along university land from h.no.69 to 211 in Indira Vihar w.no.11/CLZ
236/10.10.08/EE(M)-II
M/s Balkar Singh & Bros.
Dev to branch lane by pdg brick flooring in gali no.6 flood nala to Ashok house in village Wazirabad in w.no.10/CLZ
72/28.07.08/EE(M)-II
Dev to branch lane of gali no.6 by pdg brick flooring from h.no.F-273 to F-323 in village Wazirabad in w.no.10/CLZ
71/28.07.08/EE(M)-II
Dev to branch lane of gali no.12 from Chap Rana wali gali and Vakil Wali gali in village Wazirabad in w.no.10/CLZ
88/04.08.08/EE(M)-II
Dev to gali no.6 Sangam Vihar Pushta F-378 to F-226 in village Wazirabad in w.no.10/CLZ
73/28.07.08/EE(M)-II
Dev to drainage system on probyn road infrone of gate no.4 Mall Apartments in w.no.10/CLZ
138/29.08.08/EE(M)-II
M/s Narendra Const. Co.
Imp to footpath on Roshanara road(RHS)from Baglow no.10 to Malka Ganj chowk in w.no.9/CLZ
107/13.08.08/EE(M)-II
M/s Sanjeev Builders
Imp to footpath on Roshanara road(RHS)from Petrol Pump to Benglow no.5 in Malka Ganj in w.no.9/CLZ
108/13.08.08/EE(M)-II
M/s Sanjeev Builders
P/O Semi-High Mast Pole on main road near Patrachar,Lucknow road in w.no.10/CLZ
135/26.09.08/EE(E)-II
M/s Kawatra Electricals
P/O semi-high mast pole on main road Sanjay Basti,Timarpur in w.no.10/CLZ
130/26.09.08/EE(E)-II
M/s Kawatra Elect. Works
P/O semi-high mast pole on main road near gali no 8 in Sangam Vihar in w.no.10/CLZ
106/04.09.08/EE(E)-II
M/s Perfect Elct. Works
P/O semi-high mast pole on main road Indra Basti,Timarpur in w.no.10/CLZ
179/17.10.08/EE(E)-II
M/s Perfect Elct. Works
P/O semi-high mast pole on main road Harijan Basti near Shiv Mandir in Wazirabad in w.no.10/CLZ
133/26.09.08/EE(E)-II
M/s Kawatra Electric Works
P/O semi-high mast pole in Indra Vikas Colony in w.no.11/CLZ
132/26.09.08/EE(E)-II
M/s Kawatra Electric Works
P/O semi-high mast pole on main road near gali no.5 Sangam BVihar in w.no.10/CLZ
134/26.09.08/EE(E)-II
M/s Kawatra Electric Works
P/O semi-high mast pole on main road in Munshi Ram Colony in w.no.11/CLZ
131/26.09.08/EE(E)-II
M/s Kawatra Electric Works
60
civil
M-II 03.07.08 14.06.08 548240 16.12.08 30.09.09 548191
Completed
61
civil
M-II 03.07.08 20.05.08 861000 16.12.08 31.12.08 861000
Completed
62
civil
M-II 20.06.08 30.05.08 316432 M/s Lamba Bros. 12.11.08 01.01.10 283552 Completed
63
civil
M-II 20.06.08 30.05.08 512300 M/s Lamba Bros. 08.09.08/ 12.1.08 494503
Completed
Dev of road by pdg mastic wearing course from h.no.2681 to 2673 and 2690 to 2682 in Outram Line in C-12/CLZ
227/06.10.08/EE(M)-II
M/s Ashok Kr.Gupta
Dev of road by pdg mastic wearing course from h.no.72 to CSE Office in Parmanand Colony in C-11/CLZ
315/16.12.08/EE(M)-II
M/s Ashok Kr.Gupta
Dev. of drain by covering of open drains by pdg. precast RCC slabs in Hakikat Nagar inC-12/CLZ
86/04.08.08/EE(M)-II
Dev. of back lane by pdg. RMC h.no.469 to478; 509 to519 559 to568;639to648;579to588 in West pamanand Colony C-12/CLZ
100/06.08.08/EE(M)-II
Status Report of MLA, Sh.Kunvar Karan SinghAC No. 62,2008-09
S.No.
Name of Work deptt. Div. Name of agency D.O.S D.O.C
1 civil M-III 23.06.08 09.06.08 2E+06 06.09.08 16.11.09 1858990 Completed
civil M-III 23.06.08 13.06.08 393800 19.12.08 04.03.09 391200 Completed
civil M-III 23.06.08 22.04.08 247800 14.08.08 04.09.08 247737 Completed
civil M-III 09.07.08 04.10.07 2E+06 15.02.10 P 2132533 In Prog.
civil M-III 09.07.08 30.06.08 320000 30.09.08 28.03.10 317205 Completed
civil M-III 15.07.08 01.05.08 499300 08.08.08 15.03.10 483671 Completed
civil M-III 15.07.08 03.06.08 468300 26.08.08 P 466274 In Prog.
civil M-III 15.07.08 01.05.08 499500 08.08.08 15.03.10 491135 Completed
civil M-III 15.07.08 14.07.08 458100 09.08.08 18.03.10 448201 Completed
civil M-III 15.07.08 14.07.08 484200 07.08.08 18.03.10 479857 Completed
civil M-III 15.07.08 14.07.08 214300 08.08.08 P 212670 In Prog.
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Expenditure
Present Position
Dev of service lane along G.T.road from A-1 to A-22 Gunjrawala Town Part-1 in C-71/CLZ
251/03.09.08/EE(M)-III
M/s Bansal Const.
2 P/F MS steel benches in parks under jurisdiction of w.no.70/CLZ
436/27.10.08/EE(M)-III
M/s Vipin Traders
3 Dev of cc pav near h.no.E-1 to E-1/103,E-2/1 to E-4/20,E-4/10 to E-4/20 to E-4/21A in E-block Model Town, in C-72/CLZ
210/07.08.08/EE(M)-III
M/s Triveni Const & Govt. Supp.
4 Dev of road from H-2/4 to D-12/14 Model Town-II by pdg RMC in C-72/CLZ
423/08.02.10/EE(M)-III
M/s Soun const co
5 P/F M.S. Street name boards in Rana Pratap Bagh Gupta Colony Kalyan Vihar Priya darshi Vihar etdc in C-70/CLZ
227/20.00.08/EE(M)-III
M/s Sharique Entp.
6 Dev of lane by pdg RMC near h.no.T-72, T-158, near Suresh hs, h.no.T-83, T123 and adj lanes in Rajpura Gurmandi in C-70/CLZ
171/30.07.08/EE(M)-III
M/s Balkar Singh & Bros.
7 Dev of B/Wall of park opp. h.no.88 and another park opp h.no.43 to 54 in Priya Darshni Vihar in C-70/CLZ
228/20.08.08/EE(M)-III
M/s Sharique Entp.
8 Dev of lane by pdg RMC near h.no.T-136 to T-46 near Bhagmal Hs.Pali Hs. T-110, T-58 and adj lanes in Rajpura Gurmandi in C-70/CLZ
172/30.07.08/EE(M)-III
M/s Balkar Singh & Bros.
9 Dev of B/Waqll of E-block park of cc Colony in C-70/CLZ
175/30.07.08/EE(M)-III
M/s Balkar singh & Bros.
10 Dev of B /Wall of C-Block park in CC Colony in C-70/CLZ
173/30.07.08/EE(M)-III
M/s Balkar singh & Bros.
11 Dev of Lajpat RAi park of OLd Gupta Colony in c-70/CLZ
174/30.07.08/EE(M)-III
M/s Balkar singh & Bros.
civil M-III 28.07.08 03.07.08 925900
civil M-III 28.07.08 14.07.08 199971
civil M-III 30.07.08 04.07.08 616000 24.04.09 30.09.09 616000 Completed
civil M-III 31.07.08 21.07.08 99900 21.10.08 23.12.08 98900 Completed
civil M-III 01.08.08 04.07.08 520400
civil M-III 21.08.08 01.08.08 791639 17.09.08 P 781272 In Prog.
civil M-III 21.08.08 01.08.08 791883 15.09.08 P 775003 In Prog.
civil M-III 21.08.08 01.08.08 694163 08.09.08 P 680242 In Prog.
civil M-III 29.04.08 28.04.08 198712 M/s Goldy & Co. 02.07.08 P 193126 In Prog.
civil M-III 18.09.08 02.08.08 616000 24.12.08 08.01.10 615973 Completed
civil M-III 18.09.08 02.08.08 616000 18.02.09 08.01.10 615310 Completed
civil M-III 18.09.08 02.08.08 616000 24.12.08 30.01.10 615973 Completed
civil M-III 18.09.08 02.08.08 616000 04.01.09 P 605348 In Prog.
12 Stg of road by pdg dence carpet from h.no. A-12 to A-27 in CC Colony in C-70/CLZ
13 Pdg drainage system from h.no.109 to 132 in Gur Mandi in C-70/CLZ
14 Dev of common facilities in B-Block Sangam Park C-71/CLZ (SH:- Dev of common stairs in B-Block from h.no. B-1 to B-32 in Sangam Park in C-71/CLZ
480/15.12.08/EE(M)-III
M/s Shiva Const Co.
15 Dev of B/Wall and Walkway of chacha Park in Gurmandi in C-70/CLZ
399/15.10.08/EE(M)-III
M/s Sharique Entp.
16 Stg of road by pdg dense carpet from h.no. B-61 to B-48 in CC Colony in C-70/CLZ
17 Dev. of lane by pdg RMC from gate of old Gupata cly to Kaltyan vihar main road along Gym. in Kalyan vihar w.no.70/CLZ
273/05.09.08/EE(M)-III
M/s SK Gupta & Co.
18 Dev of B/wall of park near h.no. B-33, B-34 in cc cly in w.no.70/CLZ
264/05.09.08/EE(M)-III
M/s SK Gupta & Co.
19 Dev of Gurunanak gali by RMC and drainage and interlocking tiles in old Gupta cly. in w.no.70/CLZ
272/05.09.08/EE(M)-III
M/s SK Gupta & Co.
20 Dev of backlane of D-17 to D-60 by pdg M.S. Gratings in Azad Pur Mpl. colony in w.no.72/CLZ
123/25.06.08/EE(M)-III
21 Dev of common facilities in B block Sangam park in c-71/CLZ Sh:- Dev of common stairs in B block from h.no. B-33 to B-64 in Sangam park in C-71/CLZ
482/15.12.08/EE(M)-III
M/s Shiva Const Co.
22 Dev of common facilities in B block Sangam park in c-71/CLZ Sh:- Dev of common stairs in B block from h.no. B-65 to B-96 in Sangam park in C-71/CLZ
485/15.12.08/EE(M)-III
M/s Shiva Const Co.
23 Dev of common facilities in B block Sangam park in c-71/CLZ Sh:- Dev of common stairs in B block from h.no. B-99 to B-128 in Sangam park in C-71/CLZ
483/15.12.08/EE(M)-III
M/s Shiva Const Co.
24 Dev of common facilities in B block Sangam park in c-71/CLZ Sh:- Dev of common stairs in B block from h.no. B-129 to B-160 in Sangam park in C-71/CLZ
481/15.12.08/EE(M)-III
M/s Shiva Const Co.
civil M-III 18.09.08 02.08.08 616000 01.02.09 P 605064 In Prog.
civil M-III 18.09.08 01.08.08 708862 27.06.09 26.10.09 464361 Completed
civil M-III 01.10.08 08.09.08 612743 21.12.08 15.03.10 612739 Completed
civil M-III 03.10.08 03.10.08 463400 M/s Satbir Singh 09.01.09 26.02.10 417302 Completed
civil M-III 03.10.08 03.10.08 596800 M/S Prem Bros. 28.04.09 15.01.10 596648 Completed
civil M-III 03.10.08 18.09.08 2E+06 18.02.11 17.10.11 2498498 Completed
18321232
25 Dev of common facilities in B block Sangam park in c-71/CLZ Sh:- Dev of common stairs in B block from h.no. B-161 to B-192 in Sangam park in C-71/CLZ
484/15.12.08/EE(M)-III
M/s Shiva Const Co.
26 Dev of B/wall of park near h.no. B-55 and lane along park in CC cly. w.no.70/CLZ
69/17.06.09/EE(M)-III
M/s S.K. Gupta & Co.
27 Dev of backlane by P/L interlocking tiles from h.no.255 to 248 in Kalyan Vihar in C-70/CLZ
479/12.12.08/EE(M)-III
M/s Belkar Singh & Bros
28 Dev of lane by pdg RMC from B-3/6 to B-2/6 and B-2/11 to B-3/11 in Rana Pratap Bagh in C-70/CLZ
525/07.01.09/EE(M)-III
29 Dev of B/Wall of Park near Laxmi Narain Mandir in B-Block Rana Pratap Bagh in C-70/CLZ
500/24.12.08/EE(M)-III
30 Stg. of road by pdg bituman mastic wearing course from C-1/1 to C-1/6,C-1 to C-5,Main Road between Sardar Ngr. A-4/6 to Ramlila Ground,A-1 to D-29 and along Mkt. in Sardar Ngr. in C-70/CLZ
615/11.02.11/EE(M)-III
M/s Balaji & Associates
Status Report of MLA, Sh.Shadi RamAC No. 63,2008-09
S.No. Name of Work deptt. Div. Name of agency D.O.S D.O.C
civil M-II 19.06.08 31.05.08 307150 10.09.08 08.12.08 304427 Completed
civil M-II 19.06.08 31.05.08 367400 24.10.08 07.01.09 367270 Completed
civil M-II 19.06.08 16.05.08 199909 20.09.08 10.12.08 194122 Completed
civil M-II 19.06.08 16.05.08 199260 10.09.08 24.10.08 199214 Completed
civil M-II 19.06.08 16.05.08 199973 10.09.08 21.11.08 199973 Completed
civil M-II 19.06.08 16.05.08 107650 10.09.08 19.01.09 107629 Completed
civil M-II 19.06.08 31.05.08 499200 14.10.08 05.12.08 498933 Completed
civil M-II 19.06.08 17.05.08 367700 07.01.09 25.02.09 298420 Completed
civil M-II 19.06.08 16.05.08 303100 07.01.09 02.03.09 245993 Completed
civil M-II 19.06.08 16.05.08 385000 14.01.09 31.03.09 314309 Completed
civil M-II 19.06.08 16.05.08 362700 31.01.09 09.03.09 290857 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Expenditure
Present Position
1 C/o lane by pdg cc pav and drainage system from h.no. 80 to 89 in Anand Nagar C-74/KBZ
242/10.09.08/EE(M)-II/KBZ
M/s Harpreet Arora
2 C/o lane by pdg cc pav from h.no. 107 to 112 and adj lane in Anand Nagar C-74/KBZ
323/13.10.08/EE(M)-II/KBZ
M/s Chimmy Const Co.
3 Pdg cc pavment with drainage in lane and adj lane from h.no. B-3/17 near Dispensary in Inderlok in C-74/KBZ
271/03.09.08/EE(M)-II/KBZ
M/s RP Const. Co.
4 Pdg cc pav. with drainage in lane and adj lanes from h.no. B-5/33 to B-5/40, B block Inderlok C-74/KBZ
265/01.09.08/EE(M)-II/KBZ
M/s JD Const Co.
5 Pdg cc pav. with drainage from h.no. A-18 in Inderlok C-74/KBZ
268/01.09.08/EE(M)-II/KBZ
M/s Sonu builders
6 Dev of side berms by Pdg cc from entrance gate Inderlok to 33/44B -22 in Inderlok C-74/KBZ
266/01.09.08/EE(M)-II/KBZ
M/s Unique Const.
7 C/o road by pdg cc pavment from h.no. 117 to 37 and h.no. 41 to 43A in Anand nagar C-74/KBZ
324/13.10.08/EE(M)-II/KBZ
M/s S. Gupta Const Co.
8 Pdg cc and drainage from h.no. 19/274 to 19/260 to 19/246 and adj lanes in Sarai basti near TB centre C-74/KBZ
417/05.01.09/EE(M)-II/KBZ
M/s United Const co.
9 Pdg cc and flooring from h.no. 19/240 to 19/230, 19/239 to 19/235 and adj lanes in Sarai basti C-74/KBZ
418/05.01.09/EE(M)-II/KBZ
M/s United Const co.
10 Pdg cc flooring from h.no. 313/76C to h.no. 313/90A and adj. in Tulsi nagar C-74/KBZ
420/05.01.09/EE(M)-II/KBZ
M/s United Const co.
11 Pdg cc and draiage from h.no. B-2A to C-1/19A and adj lanes near Dhobi ghat in DDa flats sarai basti C-74/KBz
480/30.01.09/EE(M)-II/KBZ
M/s United Const co.
civil M-II 19.06.08 31.05.08 225500 M/s Pappu Seth 01.09.08 04.11.08 224037 Completed
civil M-II 19.06.08 16.05.08 365000 07.01.09 02.03.09 298779 Completed
civil M-II 19.06.08 16.05.08 487200 15.01.09 16.02.09 398643 Completed
civil M-II 20.06.08 16.05.08 361000 10.01.09 25.03.09 301159 Completed
civil M-II 09.07.08 16.05.08 489000 13.10.08 02.12.08 489000 Completed
civil M-II 09.07.08 16.05.08 445000 16.10.08 28.02.09 444485 Completed
civil M-II 09.07.08 16.05.08 440607 M/s V.K Assos. 05.09.08 18.10.08 440368 Completed
civil M-II 09.07.08 16.05.08 440000 M/s Akriti Const 29.09.08 18.12.08 440000 Completed
civil M-II 09.07.08 16.05.08 489000 28.08.08 05.12.08 489000 Completed
civil M-II 09.07.08 16.05.08 498621 M/s Kunal Tehri 03.09.08 22.11.08 498204 Completed
civil M-II 09.07.08 16.05.08 496627 30.08.08 24.11.08 496339 Completed
civil M-II 09.07.08 16.05.08 498000 18.12.08 17.02.09 497319 Completed
civil M-II 09.07.08 16.05.08 489749 28.08.08 18.10.08 489609 Completed
12 C/oback lane in B-8 block by pdg cc and drainage system in Inderlok C-74/KBz
240/01.09.08/EE(M)-II/KBZ
13 Pdg cc flooring from h.no. 19/200 to 19/185 and adj lanes in sarai basti near Usha MAta MAndir C-74/KBZ
419/05.01.09/EE(M)-II/KBZ
M/s United Const co.
14 dev to road by pdg cc from road no.40 petrol pump to factory no. 308/16 in Shahzada bagh Indl. area C-74/KBZ
421/14.01.09/EE(M)-II/KBZ
M/s Malhotra const Co.
15 Pdg cc and drainage from factory no.82 to plot no.65 and adj in Shahzada bagh extn. C-74/KBZ
411/01.01.09/EE(M)-II/KBZ
M/s United Const co.
16 Imp to lane by pdg RMC pav. and drainage system from gali no.7 in M block Shastri nagar in C-73/SPZ
732/13.10.09/EE(M)-I/SPZ
M/s Vardaan builders
17 Imp to lane by pdg cc pav. and drainage system L-11 to L-20 in Shastri nagar w.no. 73/SPZ
774/13.10.09/EE(M)-I/SPZ
M/s Sonu builders
18 Imp to lane by pdg cc pav. and drainage system from B-1555 to MC Pry School Lalita block in Shastri nagar w.no. 73/SPZ
441/22.08.08/EE(M)-I/SPZ
19 Imp to lane by pdg cc pav. and drainage system from B-1527 to Nand Kishore gupta marg in Shastri nagar w.no. 73/SPZ
655/22.09.08/EE(M)-I/SPZ
20 Imp to lane by pdg RMC pav. and drainage system from Gurudwara to B-1605 in Shastri nagar w.no. 73/SPZ
444/22.08.08/EE(M)-I/SPZ
M/s Bhatia Const Co.
21 Imp to lane by pdg RMC pav. and drainage system from B-1680 to B-1693 in Shastri nagar w.no. 73/SPZ
440/22.08.08/EE(M)-I/SPZ
22 Imp to lane by pdg RMC pav. and drainage system from B-1782 to Sr. Sec. School Lalita block back side in Shastri nagar w.no. 73/SPZ
442/22.08.08/EE(M)-I/SPZ
M/s Manoj Kumar Bhatia
23 Imp to lane by pdg RMC pav. and drainage system from B-1715 to B-1730 in Shastri nagar w.no. 73/SPZ
852/17.12.08/EE(M)-I/SPZ
M/s D.K const Co.
24 Imp to lane by pdg RMC pav. and drainage system from E-204 to road no.40 in Shastri nagar w.no. 73/SPZ
445/22.08.08/EE(M)-I/SPZ
M/s Shivansh Const.
civil M-II 09.07.08 16.05.08 480651 16.08.08 05.12.08 480030 Completed
civil M-II 09.07.08 16.05.08 459000 18.09.08 24.10.08 458895 Completed
civil M-II 09.07.08 16.05.08 403000 28.08.08 17.11.08 402715 Completed
civil M-II 09.07.08 16.05.08 499000 08.09.08 18.11.08 498862 Completed
civil M-II 09.07.08 16.05.08 498975 15.09.08 14.04.09 498013 Completed
civil M-II 09.07.08 16.05.08 383000 27.08.08 10.08.08 383000 Completed
civil M-II 09.07.08 16.05.08 449000 22.10.08 04.12.08 448623 Completed
civil M-II 09.07.08 16.05.08 485689 30.09.08 10.12.08 485345 Completed
civil M-II 09.07.08 16.05.08 389537 M/s Kalra Const. 22.12.08 20.01.09 388933 Completed
civil M-II 09.07.08 16.05.08 497004 16.12.08 22.01.09 496741 Completed
civil M-II 09.07.08 31.05.08 478683 30.07.08 21.10.08 478643 Completed
civil M-II 09.07.08 16.06.08 497088 M/s S.K. entp. 26.08.08 03.10.08 496979 Completed
25 Imp to lane by pdg cc pav. and drainage system from L-1 to L-10 in Shastri nagar w.no. 73/SPZ
346/11.08.08/EE(M)-I/SPZ
M/s Durga builders
26 Dev. of road by pdg RMC pav. and drainage system from L-269 to L-266 and along Shastri nagar w.no. 73/SPZ (along shastri booth park)
230/22.07.08/EE(M)-I/SPZ
M/s Som Dutt Dwevedi
27 Imp to lane by pdg cc pav. and drainage system from L-2/276 to post office in Shastri nagar w.no. 73/SPZ
347/11.08.08/EE(M)-I/SPZ
M/s Rajesh Kumar
28 Imp to lane by pdg RMC pav. and drainage system from E-53 to E-110 in Shastri nagar w.no. 73/SPZ
485/22.08.08/EE(M)-I/SPZ
M/s Chaudhary const.
29 Imp to lane by pdg RMC pav. and drainage system from L-177 to L-168 (front lane) in Shastri nagar w.no. 73/SPZ
573/09.09.08/EE(M)-I/SPZ
M/s Essco Traders
30 Dev to lane by pdg RMC pav. and drainage system from gali no.13 in M block in Shastri nagar w.no. 73/SPZ (RHS)
471/22.08.08/EE(M)-I/SPZ
M/s Jupiter Const.
31 Imp to lane by pdg RMC pav. and drainage system from gali no.12 in M block Shastri nagar w.no. 73/SPZ (LHS)
737/13.10.08/EE(M)-I/SPZ
M/s Arora Const Co.
32 Imp to lane by pdg RMC pav. and drainage system from gali no.12 in M block Shastri nagar w.no. 73/SPZ (RHS)
634/22.09.08/EE(M)-I/SPZ
M/s Kapoor Const.
33 Imp to lane by pdg cc pav. and drainage system from L-2/22 to L-2/30 in Shastri nagar w.no. 73/SPZ (LHS)
86817.12.08/EE(M)-I/SPZ
34 Dev to lane by pdg cc pav. and drainage system from B-1731 to B-1757 (back lane)in Shastri nagar w.no. 73/SPZ (LHS)
799/11.12.08/EE(M)-I/SPZ
M/s J.P. const Co.
35 Dev.of lane by pdg. RMC pav. and draiage system from h. no.A-80 toA-507/1A in Shastri Nagar in C-73/SPZ.
220/22.07.08/EE(M)-I/SPZ
M/s Mohd. Rashid
36 Dev of road by pdg RMC pav. and drainage system from A-721 to A-708 in shastri Ngr.in C-73/SPZ
436/22.08.08/EE(M)-I/SPZ
civil M-II 09.07.08 16.06.08 498803 20.10.08 14.12.08 498676 Completed
civil M-II 09.07.08 16.06.08 498133 16.08.08 08.10.08 498004 Completed
civil M-II 09.07.08 16.06.08 419379 27.02.09 02.05.09 418670 Completed
civil M-II 09.07.08 16.06.08 423825 20.9.08 30.11.08 423503 Completed
civil M-II 09.07.08 31.05.08 498678 M/s Jain Const. 28.08.08 22.10.08 498555 Completed
civil M-II 09.07.08 31.05.08 498983 02.09.08 22.10.08 498430 Completed
civil M-II 09.07.08 31.05.08 498014 M/s Sethi Entp. 30.09.08 22.12.08 497840 Completed
civil M-II 09.07.08 31.05.08 486906 06.10.08 12.12.08 486860 Completed
civil M-II 09.07.08 31.05.08 497745 28.08.08 17.11.08 497686 Completed
civil M-II 09.07.08 31.05.08 495431 18.08.08 04.12.08 495253 Completed
civil M-II 09.07.08 31.05.08 498048 26.08.08 03.10.08 497536 Completed
civil M-II 09.07.08 31.05.08 497951 14.08.08 04.08.09 497382 Completed
civil M-II 09.07.08 31.05.08 496571 M/s R.P. Entp. 15.12.08 19.01.09 495964 Completed
37 Dev of lane by pdg RMC pav. and drainage system from h.no.A-684 to A-695 in Shastri Ngr. C-73/SPZ
703/13.10.08/EE(M)-I/SPZ
M/s Deepali builders
38 Dev of lane by pdg RMC and drainage system from h.no.A-681 to Shiv Mandir in Shastri Ngr. C-73/SPZ
224/22.07.08/EE(M)-I/SPZ
M/s Pawan Const.
39 Dev of lane by pdg cc pav. and drainage system from A-683 to A-707 in Shastri Ngr. C-73/SPZ
1182/24.02.09/EE(M)-I/SPZ
M/s Sonu builders
40 Dev to lane by pdg cc and drainage syustem from h.no.L-177 to L-168(backlane)in Shastri Ngr. C-73/SPZ
455/22.08.08/EE(M)-I/SPZ
M/s Jolly const co.
41 Dev by pdg RMC pav. and drainage system from E-2/103 to E-2/84 in Shastri Ngr. C-73/SPZ
473/22.08.08/EE(M)-I/SPZ
42 Dev by pdg RMC pav. and drainage system from E-2/206 to E-2/189 in Shastri Ngr. C-73/SPZ
474/22.08.08/EE(M)-I/SPZ
M/s Deepak Kumar
43 Dev by pdg RMC pav. and drainage system from E-2/28 to E-2/18 in Shastri Ngr. in C-73/SPZ
660/22.09.08/EE(M)-I/SPZ
44 Dev by pdg cc pav. and drainage system from B-1701 to B-1730 on Shastri Ngr. in C-73/SPZ
536/09.09.08/EE(M)-I/SPZ
M/s Prakash Traders
45 Dev by pdg ARMC pav. and drainage system from A-400/9 to A-437 in Shastri Ngr.C-73/SPZ
366/11.08.08/EE(M)-I/SPZ
M/s Bhatia Const Co.
46 Dev by pdg RMC pav.and drainage system from A-545 to A-609 in Shastri ngr.in C-73/SPZ
345/11.08.08/EE(M)-I/SPZ
M/s Shri Madhav builders
47 Dev by pdg RMC pav. and drainage system from A-730 to Main road in Shastri Ngr. C-73/SPZ
439/22.08.08/EE(M)-I/SPZ
M/s Sanjeev builders
48 Dev of lane by pdg RMC and drainage system from B-1903 to B-1912 in Shastri Ngr. c-73/SPZ
362/11.08.08/EE(M)-I/SPZ
M/s K.K. Consts.
49 Dev by pdg RMC and drainage system from B-1416 to B-1467 in Shastri Ngr. C-73/SPZ
801/11.12.08/EE(M)-I/SPZ
civil M-II 09.07.08 31.05.08 495403 15.09.08 29.11.08 495143 Completed
civil M-II 21.04.08 01.04.08 196067 M/s Royal Entp. 01.07.08 02.08.08 195969 Completed
civil M-II 29.08.08 31.05.08 677300 15.06.09 10.09.09 671169 Completed
50 Dev by pdg RMC pav. and drainage system from B-1084 to B-1073 in Shastri Ngr. C-73/SPZ
437/22.08.08/EE(M)-I/SPZ
M/s Arora Const Co.
51 Dev of drainage system and p/l cc pav in pvt katra no.15/4 in Sakti Ngr in w.no.69/SPZ
94/30.06.08/EE(M)-III
52 C/O road by pdg RMC from Inderlok Gurudwara to h.no.65 in Anand Ngr.C-74/KBZ
18/12.06.09/EE(M)-II/KBZ
M/s United Const co.
Status Report of MLA, Sh.Rajesh JainAC No. 64,2008-09
S.No. Name of Work deptt. Div. Name of agency D.O.S D.O.C
CIVIL M-I 08.07.08 02.07.08 323366 29.08.08 03.02.09 322712 Completed
CIVIL M-I 08.07.08 02.07.08 351480 13.01.09 25.08.09 351059 Completed
CIVIL M-I 08.07.08 02.07.08 498743 30.08.08 16.03.09 498198 Completed
CIVIL M-I 08.07.08 02.07.08 372461 18.09.08 28.01.09 372316 Completed
CIVIL M-I 08.07.08 02.07.08 431371 01.09.08 15.10.08 431320 Completed
CIVIL M-I 08.07.08 02.07.08 307611 28.07.08 27.11.08 307299 Completed
CIVIL M-I 08.07.08 02.07.08 295455 M/s RP Entp. 23.08.08 13.10.08 295345 Completed
CIVIL M-I 08.07.08 02.07.08 487091 M/s Arya & Co. 20.09.08 16.01.08 486551 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Expenditure
Present Position
1 Pdg. and lane by RMC main gali Kumhar wali at RA road in C-76/SPZ.
376/21.08.08/EE(M)-I
M/s Deepak Const Co.
2 Pdg. and lane by RMC from gali no.1,2,3 in Kothi Mem at R.J. road in C-76/SPZ.
1021/06.01.09/EE(M)-I
M/s S.K. Const. Co.
3 Pdg. and lane by RMC main gali Faiz Ganj at B.G.road in C-76/SPZ.
384/21.08.08/EE(M)-I
M/s Chaudhary Const.
4 Pdg. and lane by C.C. pav. in gali Jamun wali,gali Patna wali,gali Masjid wali,gali Neem wali at Beriwala Bagh in C-76/SPZ.
620/10.09.08/EE(M)-I
M/s Bansal Const.
5 Pdg. and lane by RMC from h.no.1751 to Gurudwara and h.no.35 Hathi Khana to h.no.1823 at B.G. in C-76/SPZ.
385/21.08.08/EE(M)-I
M/s Bansal Const.
6 Pdg. and lane by RMC from h.no.1470 to 1565 and adj lanes at Azizi Ganj,Shivaji road in C-76/SPZ
382/21.08.08/EE(M)-I
M/s Vaishali Builders
7 Pdg. and lane by RMC from shop no.4813 to 4804 and urinal to shop no.4583 at Deputy Ganj at B.G. road in C-76/SPZ
381/21.08.08/EE(M)-I
8 Pdg.and lane by RMC from h.no.8936 to 8901 and adj lane at Naya Mohalla at Rani Jhansi road in C-76/SPZ
618/10.09.08/EE(M)-I
CIVIL M-I 08.07.08 02.07.08 208832 28.08.08 08.11.08 207975 Completed
CIVIL M-I 08.07.08 02.07.08 389807 12.09.08 15.10.08 389421 Completed
CIVIL M-I 08.07.08 02.07.08 490261 12.09.08 27.11.08 489678 Completed
CIVIL M-I 08.07.08 02.07.08 428298 23.08.08 17.10.08 428021 Completed
CIVIL M-I 08.07.08 02.07.08 254041 20.08.08 26.09.08 253887 Completed
CIVIL M-I 29.07.08 09.07.08 498534 M/s RK Const. 27.08.08 22.09.08 497895 Completed
CIVIL M-I 29.07.08 09.07.08 498223 M/s VK Asos. 27.08.08 22.09.08 497837 Completed
CIVIL M-I 29.07.08 09.07.08 499894 08.08.08 10.09.08 499245 Completed
CIVIL M-I 29.07.08 21.07.08 258504 12.08.08 09.01.09 258107 Completed
CIVIL M-I 29.07.08 09.07.08 199700 27.08.08 04.10.08 199122 Completed
CIVIL M-I 29.07.08 09.07.08 490803 01.09.08 28.11.08 490221 Completed
CIVIL M-I 29.07.08 09.07.08 498611 15.09.08 27.01.09 498068 Completed
CIVIL M-I 29.07.08 09.07.08 315604 M/s Balaji Const. 30.09.08 16.01.09 315485 Completed
CIVIL M-I 29.07.08 09.07.08 498389 27.08.08 29.11.08 498130 Completed
CIVIL M-I 29.07.08 09.07.08 283535 M/s SK Entp. 21.08.08 16.02.09 283218 Completed
CIVIL M-I 29.07.08 09.07.08 498200 M/s DK builders 02.09.08 06.11.08 497594 Completed
9 Pdg.and lane by cc pav. in gali Prakash and gali Kanya Pathshala wali at Teliwara in C-76/SPZ
386/21.08.08/EE(M)-I
M/s Shivansh Const co.
10 Pdg and lane by RMC from h.no.8979 to h.no.8828 at Naya Mohalla Rani Jhansi road in C-76/SPZ
378/21.08.08/EE(M)-I
M/s Rakesh Bansal
11 Pdg and lane by RMC from h.no.8960 to h.no.8978 and adj lanes at Naya Mohalla Rani Jhansi road in C-76/SPZ
379/21.08.08/EE(M)-I
M/s Sehgal Contractor
12 Pdg and lane by RMC from Bharat Tailor to Aggarwal Sweets in gali Boji at B.G.road in C-76/SPZ
352/11.08.08/EE(M)-I
M/s Deepali builders
13 Pdg and lane by cc pav. in gali Savgtarashan and adj lanes at bara Hindurao in C-76/SPZ
335/11.08.08/EE(M)-I
M/s Prakash Traders
14 P/L cc pav. from shop no.9003 to shop no. 9041 at opp. side Rani Jhansi Road in C-76/SPZ
504/27.08.08/EE(M)-I
15 P/L cc pav. from shop no.9062 to MCD Dalao at opp. side Rani Jhansi Road in C-76/SPZ
503/27.08.08/EE(M)-I
16 P/L cc pav. from shop no.9041 to 9062 at opp. side Rani Jhansi Road in C-76/SPZ
308/06.08.08/EE(M)-I
M/s Ganesh builders
17 Dev of footpath from Library road crossing to Railway Bridge at Qutub road in C-76/SPZ
331/11.08.08/EE(M)-I
M/s Narender Singh Dhanker
18 P/L cc pav. in gali no. 4 Vikrant Ngr. and adj lanes in Bagihi Peerji in C-76/SPZ
383/21.08.08/EE(M)-I
M/s Naveen Const.
19 P/L RMC alonf round about at Deputy Ganj in C-76/SPZ
373/21.08.08/EE(M)-I
M/s Rakesh Bansal
20 P/L RMC from shop no.55 to 36A in Ram Bagh road in C-76/SPZ
380/21.08.08/EE(M)-I
M/s Durga builders
21 Dev of drainage system and P/L cc at Lav. block in gali Kumhar Wali at R.A. road in C-76/SPZ
374/21.08.08/EE(M)-I
22 P/L RMC from shpo no.78 to 56 at Ram Bagh road in C-76/SPZ
377/21.08.08/EE(M)-I
M/s Gupta Radhey Shyam
23 Pdg and lane by RMC from h.no. 8706 to 8643 at Bharghar at R.A. road in C-76/SPZ
387/21.08.08/EE(M)-I
24 P/L RMC from Urinal to shpo no.79 at Ram Bagh road in C-76/SPZ
372/21.08.08/EE(M)-I
CIVIL M-I 01.08.08 21.07.08 499900 20.03.09 27.04.09 480720 Completed
CIVIL M-I 01.08.08 21.07.08 497100 20.03.09 29.04.09 478026 Completed
CIVIL M-I 01.08.08 02.07.08 198111 12.08.08 10.08.09 197701 Completed
CIVIL M-I 21.04.08 02.04.08 198785 04.06.08 15.12.08 198067 Completed
CIVIL M-I 21.04.08 01.04.08 494000 18.09.08 12.12.08 493707 Completed
CIVIL M-I 13.05.08 29.12.07 497500 M/s Wahid 08.07.08 27.09.08 387707 Completed
CIVIL M-I 27.05.08 29.12.07 498800 30.08.08 21.11.08 399955 Completed
CIVIL M-I 03.06.08 29.05.08 198970 M/s KK Const. 25.07.08 30.12.08 198970 Completed
CIVIL M-I 03.06.08 29.05.08 199055 11.07.08 09.10.08 198443 Completed
CIVIL M-I 03.06.08 29.05.08 199872 31.07.08 14.06.09 199292 Completed
CIVIL M-I 18.09.08 18.09.08 326655 22.10.08 13.12.08 326655 Completed
CIVIL M-I 18.09.08 18.09.08 497000 17.10.08 21.01.09 497000 Completed
CIVIL M-I 18.09.08 18.09.08 411885 05.01.09 06.02.09 411663 Completed
CIVIL M-I 18.09.08 01.08.08 497882 M/s Aditi Const. 02.01.09 07.03.09 497662 Completed
CIVIL M-I 18.09.08 01.08.08 498874 01.09.09 28.05.09 473742 Completed
CIVIL M-I 18.09.08 01.08.08 498874 06.01.09 30.05.09 474382 Completed
25 Dev of road surface by pdg mastic treatment from New Community Center to Old Community Center in Gulabi Bagh C-76/SPZ
1185/24.02.09/EE(M)-I
M/s Sudhir Kumar
26 Dev of road surface by pdg mastic treatment from main road Sai Mandir to Central Park in Gulabi Bagh C-73/SPZ
1189/24.02.09/EE(M)-I
M/s Sudhir Kumar
27 Dev of L/B and CC pav. from Jatwara gate to h.no.92 in Jatwara and adj lanes in C-76/SPZ
350/11.08.09/EE(M)-I
M/s S.K. Const. Co.
28 Dev of road side berms by p/l cc pav and drainage system at opposite side of M.C.Pry.School at Partap Ngr.C-75/SPZ
40/02.06.08/EE(M)-I
M/s Essco Traders
29 C/O Hall of Chopal at gali Mata Wali in C-76/SPZ
575/09.09.08/EE(M)-I
M/s Pawan Const.
30 Dev of footpath from Qtr no.428 to 401 in Gulabi Bagh in W.no.73/SPZ
77/25.06.08/EE(M)-I
31 C/O drain coverd Nala from Qtr no.1 to 32 in Gulabi Bagh in w.no.73/SPZ
499/27.08.08/EE(M)-I
M/s Bansal Const.
32 Dev to drainage system and cc pav in pvt katra no.10263,9354,9405,9432 and9564-63 in Tokriwalan in C-76/SPZ
169/10.07.08/EE(M)-I
33 P/L cc pav from h.no.9431 to Lav Block at Tokriwalan in C-76/SPZ
155/08.07.08/EE(M)-I
M/s Essco Traders
34 Dev to pvt katra no.4132,4128 and 4250 in gali Barna at Pahari Dhiraj road in w.no.76/SPZ
253/08.07.08/EE(M)-I
M/s Deepak Const Co.
35 Dev. of lane pdg.c.c.pav.in Maula Bax at Roshanara road in C-75/SPZ.
751/13.10.08/EE(M)-I
M/s Gupta Radhey Shyam
36 P/L RMC from Mother Dairy to Shiv Mandir at Ram Lila Ground in Pratap Nagar inC-75/SPZ.
760/13.10.08/EE(M)-I
M/s Narender Singh Dhanker
37 P/L RMC in main gali Maula Bux at Roshanara Road in C-75/SPZ.
944/29.12.08/EE(M)-I
M/s Sanjay Kumar Jain
38 P/L RMC from P block to Mother Dairy at Ram Lila Ground in Pratap Nagar in C-75/SPZ.
876/24.12.08/EE(M)-I
39 C/o designer gate of Ramleela park at Partap Nagar in C-75/SPZ
845/17.12.08/EE(M)-I
M/s JP Const Co.
40 C/o designer gate of O block park (both side) at Partap Nagar in C-75/SPZ
841/17.12.08/EE(M)-I
M/s JP Const Co.
CIVIL M-I 18.09.08 01.08.08 499772 20.12.08 24.03.09 480287 Completed
CIVIL M-I 18.09.08 01.08.08 499000 20.12.08 24.03.09 472777 Completed
CIVIL M-I 22.09.08 01.08.08 334623 22.10.08 07.08.09 334305 Completed
CIVIL M-I 22.09.08 01.08.08 300000 18.10.08 25.11.08 299660 Completed
CIVIL M-I 22.09.08 01.08.08 199530 M/s Jai Kumar 24.12.08 28.04.09 198680 Completed
CIVIL M-I 22.09.08 01.08.08 306700 02.01.09 20.11.09 306388 Completed
CIVIL M-I 22.09.08 01.08.08 199500 24.10.08 19.01.09 199283 Completed
CIVIL M-I 22.09.08 01.08.08 263000 24.10.08 12.01.09 262953 Completed
CIVIL M-I 25.09.08 09.07.08 499565 02.01.09 18.08.09 499073 Completed
CIVIL M-I 25.09.08 09.07.08 498754 M/s VK Ass 12.01.09 28.02.09 498220 Completed
CIVIL M-I 13.10.08 29.08.08 498405 M/s RP Entp. 21.10.08 19.12.08 498079 Completed
CIVIL M-I 13.10.08 29.08.08 498834 18.10.08 10.12.08 498137 Completed
CIVIL M-I 13.10.08 13.10.08 495896 07.01.09 02.03.09 495896 Completed
CIVIL M-I 13.10.08 13.10.08 496982 02.01.09 12.02.09 496790 Completed
CIVIL M-I 13.10.08 13.10.08 496000 22.10.08 11.12.08 496000 Completed
CIVIL M-I 21.04.08 02.04.08 198275 24.08.08 25.01.09 198275 Completed
41 C/o B/wall and MS grill from Shiv Mandir to Mother Dairy booth at Ramleela ground in Partap Nagar C-75/SPZ
844/17.12.08/EE(M)-I
M/s JP Const Co.
42 C/o B/wall and MS grill from P block to Mother Dairy booth at Ramleela ground in Partap Nagar C-75/SPZ
843/17.12.08/EE(M)-I
M/s JP Const Co.
43 P/L cc pav. from h.no. 7169 to 7102 and gali Fatehpur wali at Beriwala Bagh w.no.76/SPZ
747/13.10.08/EE(M)-I
M/s Deepak Const Co.
44 P/L cc pav. from h.no. 3968 to shop no. 3168 Barwala Chowk and gali Lotan Jaat at Pahari Dheeraj road w.no.76/SPZ
690/03.10.08/EE(M)-I
M/s Pawan Const.
45 P/L cc pav. gali Chowkidar wali and adj lanes at Sadar Nallah road w.no.76/SPZ
836/17.12.08/EE(M)-I
46 P/L cc pav. in gali Mahavir and gali Shyam and adj lanes at Teliwara in w.no.76/SPZ
889/24.12.08/EE(M)-I
M/s Naveen Const.
47 P/L cc pav. in gali Baitwali at Bara Haider Rao w.no.76/SPZ
711/13.10.08/EE(M)-I
M/s Bijender Pal Singh
48 Imp to gate foot path a road berms at F block Paratp Nagar .no.76/SPZ
756/13.11.08/EE(M)-I
M/s Rajesh Kumar
49 P/L RMC from shop no.14A to Dalao at Ram Bagh Road in C-76/SPZ
925/29.12.08/EE(M)-I
M/s Wadhwa Const Co.
50 P/L RMC from shop no.35A to 15A at Ram Bagh Road in C-76/SPZ
939/29.12.08/EE(M)-I
51 Dev. B/Wall and Dev.of C.C. Pav.at Ramlila ground in Baghichi peerji in C-75/SPZ.
758/13.10.08/EE(M)-I
52 Imp. to Footpath and road Berms from gali no1 to urinal block L.S.C complex in gulabi bagh in C-73/SPZ.
754/13.10.08/EE(M)-I
M/s Som Dutt Dviwedi
53 Imp. to road berms by Pdg. C.C. from 1246 to 1157 in gulabi bagh inC-73/SPZ.
987/31.12.08/EE(M)-I
M/s Sonu builders
54 Imp. road berms along sports complex in Gulabi bagh in C-73/SPZ.
949/29.12.08/EE(M)-I
M/s Som Dutt Dviwedi
55 IMp to road berms from 1121 to 1085 in Gulabi bagh in C-73/SPZ.
726/13.10.08/EE(M)-I
M/s Som Dutt Dviwedi
56 Dev of lane by pdg cc pavment in gali no. 12 at Pratap nagar road C-75/SPZ
231/22.07.08/EE(M)-I
M/s Sumit Const Co.
Status Report of MLA,Sh.Subesh SachdewaAC No. 65,2008-09
S.No.
Name of Work deptt. Div. Name of agency D.O.S D.O.C
CIVIL M-I 20.06.08 26.05.08 495289 01.08.08 08.10.08 494779 Completed
CIVIL M-I 20.06.08 26.05.08 450201 M/s A.K & Const 20.08.08 02.01.09 450200 Completed
CIVIL M-I 20.06.08 26.05.08 494544 M/s Som const 03.10.08 08.12.08 495521 Completed
CIVIL M-I 20.06.08 26.05.08 499687 04.08.08 28.10.08 497947 Completed
CIVIL M-I 20.06.08 26.05.08 499513 02.02.08 10.04.08 498408 Completed
CIVIL M-I 20.06.08 26.05.08 198508 08.08.08 08.09.08 198175 Completed
CIVIL M-I 20.06.08 26.05.08 498256 01.08.08 20.01.09 496948 Completed
CIVIL M-I 20.06.08 26.05.08 498112 M/s M.P. Assos 02.08.08 29.08.08 498100 Completed
CIVIL M-I 20.06.08 26.05.08 194985 M/s M.P. Assos 03.08.08 30.09.08 194900 Completed
CIVIL M-I 23.06.08 15.04.08 99500 14.07.08 28.07.08 98273 Completed
CIVIL M-I 23.06.08 15.04.08 500000 12.07.08 31.07.08 499740 Completed
CIVIL M-I 23.06.08 15.04.08 499800 12.07.08 30.07.08 498677 Completed
CIVIL M-I 03.07.08 20.05.08 498276 03.08.08 14.10.08 498083 Completed
CIVIL M-I 03.07.08 20.05.08 496454 26.07.08 01.011.08 495877 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Expenditure
Present Position
1 Pdg Rmc in Chowk opp.E-133 Jain Mandir in Karampura C-100/WZ
139/25/07/08EEM-I
M/s parveen kumar Garg
2 Pdg drainage system from E-243 to E-299 in E-Block and Shop no.73 to Shop no.52 in Bhyana Mkt.in Karampura C-100/WZ
136/25/07/08/EEM-I
3 Pdg Rmc in Chowk opp.E-239 to Hanuman Mandir in Karampura C-100/WZ
130/25/07/08/EEM-I
4 Pdg Rmc in lane from I-397 to I-455 in I-Block in Karampura C-100/WZ
129/25/07/08/EEM-I
M/s Khusal Kumar Bhatia
5 Pdg Rmc from shop no.14 to Koyla Depot and shop no.73 to shop no.52 in Bhyana Mkt. in Karampura C-100/WZ
140/25/07/08/EEM-I
M/s Y.K Saheney
6 Pdg Rmc in lane from F-443 to F-419 in F-Block in Karampura C-100/WZ
199/04/08/08/EEM-I
M/s Parveen kumar Contract
7 Pdg drainage system from H-277 to H-347 in H-Block in Karampura C-100/WZ
128/25/07/08/EEM-I
M/s Ghanshyam Dass
8 Pdg RMC in lane from E-131 to E-85 and E-49 to E-83 in Karampura C-100/WZ
135/25.07.08/EE(M)-I
9 Pdg drainage system from H-229 to H-272 in H-Block in Karampura C-100/WZ
143/25.07.08/EE(M)-I
10 C/O Recreatoin Center (F.F) for Senior Citizen at Ramesh Ngr.WZ SH: Pdg marble wash in external wall
06/11.07.08/EE(M)-I
M/s Manoj Kumar Gupta
11 P/F aluminium door and misc.work at recreation center at Ramesh Ngr.WZ
08/11.07.08/EE(M)-I
M/s Shanker bulinder
12 C/O U.G.S.tank and dev of toilet,back kitchen and compound at recreation center in Ramesh Ngr.WZ
07/11.07.08/EE(M)-I
M/s Manoj Kumar Gupta
13 Pdg RMC in lane around park from G-14 to G-26 in G-Block Extn.in Kirti Ngr. C-97/WZ
134/25.07.08/EE(M)-I
M/s L. Gee Const Co.
14 Pdg premix carpetting on road along park from C-5 to C-20 and C-22 to C-40 in C-Block in Kirti Ngr.and from C-3/27 to C-3/18 in C-Block Rajori Garden in C-97/WZ
122/25.07.08/EE(M)-I
M/s Ghanshyam Dass
CIVIL M-I 03.07.08 20.05.08 499657 M/s Honey Const 03.08.08 15.10.08 499504 Completed
CIVIL M-I 03.07.08 20.05.08 499380 28.08.08 04.09.08 498988 Completed
CIVIL M-I 03.07.08 20.05.08 499658 13.09.08 28.01.09 499093 Completed
CIVIL M-I 03.07.08 20.05.08 335337 M/s Som const 03.08.08 p 330009 In Prog.
CIVIL M-I 03.07.08 20.05.08 499384 28.09.08 20.04.10 499257 Completed
CIVIL M-I 03.07.08 20.05.08 495570 M/s Rohit Const. 23.08.08 12.07.09 495500 Completed
CIVIL M-I 03.07.08 20.05.08 499232 07.08.08 08.10.08 499200 Completed
CIVIL M-I 03.07.08 20.05.08 493351 03.08.08 25.09.09 491974 Completed
CIVIL M-I 10.07.08 27.06.08 199661 11.08.08 25.09.08 199121 Completed
CIVIL M-I 10.07.08 27.06.08 194708 07.08.08 10.10.08 194700 Completed
CIVIL M-I 16.07.08 15.05.08 258000
CIVIL M-I 16.07.08 15.05.08 482674 20.10.08 p 475414 In Prog.
CIVIL M-I 16.07.08 15.05.08 198191 M/s Neel Traders 11.09.08 12.11.08 197925 Completed
15 Pdg premix carpetting on Chowk and adj road infront of B-87,B-105,B-117 in B-Block D/S Ramesh Ngr.and from L-85 to L-100 around park in L-Block in Kirti Ngr.C-97/WZ
124/25.07.08/EE(M)-I
16 Pdg RMC in lane from C-43 to C-52 and C-33 to C-42 in C-Block in M.S.Garden in C-98/WZ
119/25.07.08/EE(M)-I
M/s Parveen Kumar Garg
17 Pdg RMC in lane from D-46 to D-52 and D-42 to D-33 and D-5 to B-12 in Saraswati Garden in C-97/WZ
380/04.09.08/EE(M)-I
M/s Manish Nayyar
18 Pdg premix carpetting on road and chowk infront of I-80 to I-94 in I-Block in Kirti Ngr.chowk infront of H-54 in H-Block in Kirti Ngr.C-97/WZ
133/25.07.08/EE(M)-I
19 Pdg RMC in lane from B-53 to B-72 and B-57 to B-101 in B-Block Shardapuri C-98/WZ
112/24.07.08/EE(M)-I
M/s Prince Enterprises
20 P/F M/S grill on Central Verge of 80 ROW road from F-1 Man Sarovar Garden to E-Block Saraswati Garden C-97/WZ
311/22.08.08/EE(M)-I
21 Pdg premix carpeting on road from G-14 to G-1 in G-Block Extn.in Kirti Ngr.and from around park from A-53 to A-71 and Chowk infront of A-76 in A-Block Kirti Ngr.C-97/WZ
181/29.07/.08EE(M)-I
M/s Aman builders
22 P/F M/S grill on Central Verge of 80 ROW road from E-Block Saraswati Garden to SBI Man Sarovar Garden C-97/WZ
109/24.02.08/EE(M)-I
M/s L.Gee Const Co.
23 W/O road by pdg interlocking tiles and pdg of drainage system from 9/36 to M.C.Pry.School 9-Block Moti Ngr.C-99/WZ
204/04.08.08/EE(M)-I
M/s Ashok Bansal
24 Pdg drainage system and side berms by interlocking tiles from 5/3 to 5/9 Moti Ngr.C-99/WZ
205/04.08.08/EE(M)-I
M/s Parveen Kumar Garg
25 C/o Chhatri in B-Block park karampura in C-100/WZ
26 Pdg RMC in lane from F-71 to F-37 in karampura C-100/WZ
319/22.08.08/EE(M)-I
M/s Baba Ji Const
27 Pdg RMC in lane from F-119 to F-97 in karampura C-100/WZ
386/04.09.08/EE(M)-I
CIVIL M-I 16.07.08 15.05.08 198418 23.10.08 28.11.08 198386 Completed
CIVIL M-I 26.09.08 26.09.08 462984 M/s A.B. builders 26.12.08 20.02.09 462199 Completed
CIVIL M-I 10.10.08 03.09.08 263600 09.02.09 25.03.09 262317 Completed
CIVIL M-I 10.10.08 13.09.08 199000 10.06.09 26.12.09 198713 Completed
CIVIL M-I 10.10.08 13.09.08 496900 07.01.09 10.06.10 470551 Completed
CIVIL M-I 10.10.08 13.09.08 498600 07.01.09 P 474292 In Prog.
CIVIL M-I 10.10.08 13.09.08 397838 M/s Prveen Kr. 14.02.09 03.03.10 397607 Completed
CIVIL M-I 10.10.08 13.09.08 199800 20.07.09 19.12.09 199564 Completed
CIVIL M-I 10.10.08 13.09.08 198900 758/11.02.09 12.02.09 19.05.09 198742 Completed
CIVIL M-I 10.10.08 13.09.08 198900 757/11.02.08 12.02.09 19.05.09 198652 Completed
CIVIL M-I 10.10.08 13.09.08 199900 759/11.02.09 19.02.09 30.03.09 197234 Completed
CIVIL M-I 10.10.08 13.09.08 199500 700/4.02.09 M/s Divine Const 05.02.09 17.03.09 197800 Completed
CIVIL M-I 10.10.08 13.09.08 198023 M/s Raj Const 09.02.09 25.03.09 197369 Completed
28 Pdg RMC in lane from F-37 to F-35 in karampura C-100/WZ
203/04.08.08/EE(M)-I
M/s Vijay Kumar Jha
29 C/o B/wall of park infront of h.no. H-3 at Kailash park in w.no. 99/WZ
582/17.12.08/EE(M)-I
30 P/L RMC from h.no. D-126 to C-131 in D block Mansarovar GArdenn at C-98 WZ
648/30.01.09/EE(M)-I
M/s Bajrang Engg. Components
31 C/o designer gate and P/f grill in park of F block Moti nagar along h.no.34 road in w.no.99/WZ
25/21.05.09/EE(M)-I
M/s Rakesh Enterprises
32 Stg. of rioad by pdg mastic from 9/9 to 9/36 in Moti nagar w.no.99/WZ
600/29.12.08/EE(M)-I
M/s Ashok Kumar Gupta
33 Stg. of road by pdg mastic from 4/28 to 4/36 in Moti nagar w.no.99/WZ
601/29.12.08/EE(M)-I
M/s Ashok Kumar Gupta
34 Pdg interlocking tiles infront of D-39 moti nagar in w.no.99/WZ
709/05.02.09/EE(M)-II
35 Imp of road by pdg premix from 4/1 to 5/6 Moti nagar in w.no.99/WZ
26/21.05.09 EE(M)-I
M/s Rakesh Enterprises
36 C/o Chhatri in park of D block infront of block no.18 Moti nagar w.no.99/WZ
M/s Vikas Builders
37 C/o Chatrri in park infront of h.no.C-152 moti nagar w.no.99/WZ
M/s Vikas Builders
38 Pdg RMC from 1/56 Moti nagar to 1/6 Moti nagar in w.no.99/WZ
M/s Vikas Builders
39 Pdg RMC from C-108 to C-103 Moti nagar in w.no.99/WZ
40 Imp of covering drainage system from C-110 to C-124 Moti nagar w.no.99/WZ
729/05.02.09CC
Status Report of MLA,Sh. Ramakant GosomiAC No. 66,2008-09
S.No.
Name of Work deptt. Div. Name of agency D.O.S D.O.C
CIVIL M-I01.05.08 199700 2.05.08 24.12.08 199700
Completed
CIVIL M-I
22.07.08 498591 M/s S.P. Const. 19.10.08 13.02.08 498517
Completed
CIVIL M-I01.05.08 01.04.08 199400 22.05.08 21.03.09 198912
Completed
CIVIL M-I01.05.08 01.04.08 199600 22.05.08 18.08.09 199081
Completed
CIVIL M-I
31.07.08 28.07.08 198000 24.10.08 16.01.09 197843
Completed
CIVIL M-I
12.08.08 28.07.08 499000 20.10.08 18.01.09 498421
Completed
CIVIL M-I12.08.08 28.07.08 298000 19.10.08 19.01.09 297406
Completed
CIVIL M-I
28.08.08 01.08.08 410000 19.10.08 02.01.09 409823
Completed
CIVIL M-I
10.10.08 22.08.08 499000 24.01.08 09.01.09 499000
Completed
CIVIL M-I
08.10.08 22.08.08 498000 24.10.08 19.01.09 498000
Completed
CIVIL M-I
08.10.08 22.08.08 496818 05.11.08 02.12.08 495467
Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Expenditure
Present Position
1 Dev of lane by pdg cc in lane no.1 Transit camp in Pandav nagar w.no. 150/KBZ
01.04.2008
16/02.02.07/EE(M)-I
M/s Vikas Const. Co.
2
Dev of lane by pdg cc and drain from Katputly Colony flyover to JE store in Pandav Nagar in C-150/KBZ.
01.07.2008
317/10.10.08/EE(M)-I
3 Dev of lane by pdg cc in lane no.2 Transit camp PAndav Nagar C-150/KBZ
18/13.05.08/EE(M)-I
M/s Sandeep Kapoor
4 Dev of Dhobi Ghat by pdg cc in PAndav Nagar C-150/KBZ
17/13.05.08/EE(M)-I
M/s Tanwar Const Co.
5
C/o lanes and by lanes by pdg CC and drainage under Stair case D block in New Ranjeet nagar w.no.96/KBZ
305/10.10.08/EE(M)-I
M/s Sonu builders
6
C/o lanes and by lanes by pdg CC and drainage in Munshi Ram Bagh in New Ranjeet nagar w.no.96/KBZ
308/10.10.08/EE(M)-I
M/s Nikhil builders
7 C/o lanes pdg cc and drainage in D block in New Ranjeet nagar w.no.96/KBZ
306/10.10.08/EE(M)-I
M/s P.R. Const Co.
8
C/O lanes and bylanes by pdg cc and drainage, D-Block in new Ranjit Ngr. C-96/KBZ
307/10.10.08/EE(M)-I
M/s Welcome Assos.
9
C/o lane and by lanes of gali no.18B by pdg.CC pav. and drainage in Prem Nagar in C-94/KBZ.
324/13.10.08/EE(M)-I
M/s Kuldeep Singh
10
C/o lane and by lanes of gali Sthanak wali and its adj.lanesand gali Shiv Nanak wali in Prem Nagar in C-94/KBZ.
329/13.10.08/EE(M)-I
M/s Sanjay builders
11
C/o lane and by lanes of gali no.19B and C by pdg.CC pav.and drainage(upper side)in Prem Nagar C-94/KBZ.
325/03.10.08/EE(M)-I
M/s Deepak Const. Co.
CIVIL M-I
08.10.08 22.08.08 497871 16.10.08 01.12.08 497034
Completed
CIVIL M-I
08.10.08 22.08.08 498000 05.11.08 16.01.09 498000
Completed
CIVIL M-I
08.10.08 22.08.08 498677 30.10.08 05.01.09 497151
Completed
CIVIL M-I
08.10.08 22.08.08 499000 30.10.08 29.12.08 499000
Completed
CIVIL M-I08.10.08 22.08.08 298800 M/s Ragini 16.01.09 20.03.09 298007
Completed
CIVIL M-I
08.10.08 22.08.08 497000 24.10.08 25.11.08 497000
Completed
CIVIL M-I
08.10.08 22.08.08 497000 24.10.08 02.01.09 497000
Completed
CIVIL M-I
08.10.08 22.08.08 498755 05.11.08 17.10.08 497049
Completed
CIVIL M-I
08.10.08 01.09.08 199800 M/s Balaji Const. 16.01.09 17.02.09 198320
Completed
CIVIL M-I
08.10.08 01.09.08 498000 05.01.09 25.02.09 497522
Completed
CIVIL M-I
08.10.08 01.09.08 499000 05.01.09 20.03.09 499000
Completed
CIVIL M-I
08.10.08 01.09.08 198900 26.12.08 20.03.09 198900
Completed
CIVIL M-I
08.10.08 01.09.08 498000 05.01.09 29.01.09 497492
Completed
12
C/o lane and bylanes of gali no.20B(upper side)by pdg.CC and drainage in Prem Nagar in C-94/KBZ.
330/13.10.08/EE(M)-I
M/s Fabcon Engineers
13
C/o lane and bylanes of gali no.22A,B by pdg.CC and drainage in Prem Nagar in C-94/KBZ.
326/13.10.08/EE(M)-I
M/s Aggarwal Assos.
14
C/o gali from h.no.533 to gali no.1 by pdg.CC pav.and drainage in Prem Nagar in C-94/KBZ.
333/13.10.08/EE(M)-I
M/s Sarthak Const Co.
15
C/o lane and bylanes along h.no.2126/2N/78 in gali no.4 and gali no.5 by pdg.CCand drainge in Prem Nagar in C-94/KBZ.
331/13.10.08/EE(M)-I
M/s Fren Const Co.
16 C/o B/Wall of park in gali no.23 and Tikona park in Prem Nagar in C-94/KBZ.
353/16.12.08/EE(M)-I
17 C/o lane and bylanes of gali no.23 by pdg.CC and drainge in Prem Nagar in C-94/KBZ.
332/13.10.08/EE(M)-I
M/s Chinmay Const Co.
18
C/o lane and by lanes of gali no.9 & 10 (Upper site ) by pdg.CC and drainge in Prem Nagar in C-94/KBZ.
327/13.10.08/EE(M)-I
M/s J.D. Const Co.
19
C/o gali no.15B called Mandir wali(upper side) by pdg.CC pav.and drainage in Prem Nagar in C-94/KBZ.
328/13.10.08/EE(M)-I
M/s Jolly Const Co.
20
C/o lane and bylanes by pdg.CC and drainage from V-1to V-14 inWest Patel Nagar in C-94/KBZ.
349/16.12.08/EE(M)-I
21
C/o lane and bylanes by pdg. CC and drainage from 29/113 to 29/158 in West Patel Nagar in C-94/KBZ.
354/16.12.08/EE(M)-I
M/s Naresh Kumar
22
C/O back courtyard and lanes along 28/8 to28/16 to 28/128 in West Patel Nagar in C-94/KBZ.
358/16.12.08/EE(M)-I
M/s Sanjay builders
23
C/o side lane by pdg.CC and drainage along 34/1 to 34/9 in West Patel Nagar in C-94/KBZ.
359/16.12.08/EE(M)-I
M/s Rakesh Entp.
24
C/o back courtyard of B-115 and B-133 by pdg.CC and drainage in West Patel Nagar in C-94/KBZ.
348/16.12.08/EE(M)-I
M/s S. Gupta Const. Co.
CIVIL M-I
08.10.08 01.09.08 499000 16.01.09 12.02.09 499000
Completed
CIVIL M-I
08.10.08 01.09.08 198000 16.01.09 30.03.09 197800
Completed
CIVIL M-I
08.10.08 01.09.08 199000 M/s S.P. Entp. 05.01.09 23.03.09 198383
Completed
CIVIL M-I
08.10.08 01.09.08 498000 22.12.08 11.02.09 497984
Completed
CIVIL M-I
08.10.08 01.09.08 499000 16.01.09 28.02.09 498520
Completed
CIVIL M-I
08.10.08 01.09.08 496000 05.01.09 29.01.09 496000
Completed
CIVIL M-I
20.06.08 28.05.08 498300 M/s Vijay Kumar 30.07.08 22.01.09 498040
Completed
CIVIL M-I
20.06.08 28.05.08 499100 30.07.08 17.12.08 497931
Completed
CIVIL M-I20.06.08 28.05.08 195844 30.07.08 26.12.08 195736
Completed
CIVIL M-I
20.06.08 28.05.08 497600 01.08.08 21.10.08 494628
Completed
CIVIL M-I
20.06.08 28.05.08 498500 29.07.08 20.03.09 497323
Completed
CIVIL M-I
20.06.08 28.05.08 499200 M/s S.K.Verma 29.07.08 28.10.08 492501
Completed
CIVIL M-I
20.06.08 28.05.08 497800 M/s A & N Bros. 09.08.08 06.04.08 496407
Completed
25
C/o road along B-143 to B-255 along Nallah by pdg. CC and drainage in West Patel Nagar in C-94/KBZ.
406/24.12.08/EE(M)-I
M/s Jolly Const Co.
26
C/o side lane of 29/49 to 29/54 by pdg. CC and drainage in West Patel Nagar in C-94/KBZ.
407/24.12.08/EE(M)-I
M/s Shalu builders
27
C/o side lane from 32/1 to 32/9 by pdg. CC and drainage in West Patel Nagar in C-94/KBZ.
351/16.12.08/EE(M)-I
28
C/o lane and bylanes by pdg. CC and drainage along 28/89 to 28/95,28/105 to 28/98 in West Patel Nagar in C-94/KBZ.
357/16.12.08/EE(M)-I
M/s Fabcon Engineers
29
C/o back courtyard of A-Block West Patel Nagar by pdg. CC and drainage in West Patel Nagar in C-94/KBZ.
360/16.12.08/EE(M)-I
M/s S.K. Aggarwal
30
C/o back courtyard of B-39 and B-215 by pdg. CC and draiange in West Patel Nagar in C-94/KBZ.
356/16.12.08/EE(M)-I
M/s Sh. Shanker Gupta
31
C/Olane and by lanes by pdg. RMC and SW drainage from 8A/3 to8A/60 in WEA in C-149/KBZ.
229/23.07.08/EE(M)-I
32
C/O of lane and by lanes by pdg. RMC and drainage from 8A/36 to8A/61 in WEA in C-149/KBZ
224/23.07.08/EE(M)-I
M/s Unique Const.
33 Pdg. C.C.pav. and SW drainage surrounding of park in 14A Block in WEA inC-149/KBZ
225/23.07.08/EE(M)-I
M/s Tajinder Const. Co.
34
C/O of lane and by lanes by pdg.RMC and drainage from 14A/5 to park in WEA in C-149/KBZ
227/23.07.08/EE(M)-I
M/s Sunil Kumar Gulati
35
C/O of lane and by lanes by pdg. RMC and SW drainage from 9A/2 to 9A/47 in WEA in C-149/KBZ.
223/23.07.08/EE(M)-I
M/s Y.S Engineer & Builders
36
C/O of lane and by lanes by pdg. RMC and drainage from 14A/74 to14A/80 WEA in C-149 in KBZ.
228/23.07.08/EE(M)-I
37
C/O of lane and by lanes bypdg. RMC and SW drainage from 9A/31 to9A/48 in WEA in C-149/KBZ.
230/23.07.08/EE(M)-I
CIVIL M-I
20.06.08 28.05.08 498900 29.08.08 23.03.09 497020
Completed
CIVIL M-I
20.06.08 28.05.08 497700 29.07.08 02.01.09 495792
Completed
CIVIL M-I
28.05.08 26.05.08 499365 21.07.08 29.08.08 499062
Completed
CIVIL M-I
28.05.08 26.05.08 499821 21.07.08 27.08.08 499350
Completed
CIVIL M-I01.05.08 26.05.08 199500 22.05.08 20.08.08 199128
Completed
CIVIL M-I
20.06.08 26.05.08 498304 21.07.08 03.10.08 497264
Completed
CIVIL M-I
20.06.08 26.05.08 499463 M/s J.S. Const. 01.08.08 05.05.09 498993
Completed
CIVIL M-I
20.06.08 26.05.08 498417 05.07.08 02.09.08 497551
Completed
CIVIL M-I
20.06.08 26.05.08 499413 M/s Vijay Kumar 25.07.08 30.01.09 499222
Completed
CIVIL M-I
20.06.08 26.05.08 496045 08.07.08 18.10.08 496045
Completed
CIVIL M-I
20.06.08 26.05.08 497890 24.07.08 06.08.08 497349
Completed
CIVIL M-I
20.06.08 26.05.08 499734 21.07.08 28.08.08 499688
Completed
CIVIL M-I
20.06.08 26.05.08 496132 21.07.08 29.08.08 496132
Completed
38
C/O lanes and bylanes by pdg RMC and SW drainage from 9A/8 to 9A/79 in WEA in C-149/KBZ
279/21.08.08/EE(M)-I
M/s Manchanda Const
39
C/O lanes And bylanes by pdg RMC and SW drainage from 9A/24 to 9A/89 in WEA in C-149/KBZ
231/23.07.08/EE(M)-I
M/s Sanjay builders
40
C/o lanes and by lanes by pdg cc and drainage near Sunil Singh and Jile Singh house in gali no. 14 and 12 (Lower Side) in Prem nanage -94/KBZ
112/30.06.08/EE(M)-I
M/s S. Gupta Const Co.
41
C/o of lane and by lanes by pdg cc and drainage near Shri. PAndit ji house in gali no. 16B Prem nagar C-94/KBZ
122/30.06.08/EE(M)-I
M/s Chinmay Const Co.
42 Dev of lane by pdg. cc near Temple in DDA flat Padav nagar w.no. 150/KBZ
14/13.05.08/EE(M)-I
M/s Nikhil builders
43
C/O lanes and bylanes by pdg cc and drianage near Vermaji house in gali no.15 in Prem ngr.C-94/KBZ
106/30.06.08/EE(M)-I
M/s Naresh Kumar
44
C/O lanes and bylanes by pdg cc and drainage near Sh. Narai Mitter house in gali no.17 Prem Ngr. C-94/KBZ
111/30.06.08/EE(M)-I
45
C/O lanes and bylanes by pdg cc and drainage near Sh. Guptaji house in gali no.19 Prem Ngr. C-94/KBZ
114/30.06.08/EE(M)-I
M/s Sanjay builders
46
C/O lanes and bylanes by pdg cc and drainage near Smt. Hemlata house in gali no.17B Prem Ngr. C-94/KBZ
117/30.06.08/EE(M)-I
47
C/O lanes and bylanes by pdg cc and drainage near Sh. Surender Giri house in gali no.21 Prem Ngr. C-94/KBZ
118/30.06.08/EE(M)-I
M/s Sunil Kumar Gulati
48
C/O lanes and bylanes by pdg cc and drainage near Sh. Ram Lal Thakur house in gali no.20 Prem Ngr. C-94/KBZ
107/30.06.08/EE(M)-I
M/s Sarthak Const Co.
49
C/O lanes and bylanes by pdg cc and drainage near Sh. Rajesh Kaushik house in gali no.19 Prem Ngr. C-94/KBZ
115/30.06.08/EE(M)-I
M/s Shiv Shanker Gupta
50
C/O lanes and bylanes by pdg cc and drainage near Sh.Natthu Ram And Prema house in gali no.18 Prem Ngr. C-94/KBZ
121/30.06.08/EE(M)-I
M/s Fabcon Engineers
CIVIL M-I
01.05.08 01.04.08 199300 22.05.08 26.05.09 198806
Completed
51
Dev of lane by pdg cc near Mother Dairy Booth in Trasit Camp in PAndav NAgar w.no. 150/KBZ
15/13.05.08/EE(M)-I
M/s Y.S Engineer & Builders
Status Report of MLA,Sh. P.C. YogiAC No. 67
S.No.
Name of Work deptt. Div. Name of agency D.O.S D.O.C
CIVIL M-I20.06.08 01.05.08 199268 12.08.08 10.09.08 199268
Completed
CIVIL M-I20.06.08 19.05.08 210007 01.08.08 30.01.09 208488
Completed
CIVIL M-I09.07.08 23.06.08 373795 31.08.08 08.11.08 373371
Completed
CIVIL M-I22.09.08 23.08.08 298000 22.12.08 23.03.09 298000
Completed
CIVIL M-I22.09.08 23.08.08 226000 20.12.08 19.01.09 226000
Completed
CIVIL M-I
22.09.08 23.08.08 499000 20.12.08 02.02.09 498964
Completed
CIVIL M-I22.09.08 23.08.08 499800 18.10.08 21.01.09 499278
Completed
CIVIL M-I
22.09.08 23.08.08 335000 09.01.09 06.05.09 334577
Completed
CIVIL M-I
22.09.08 23.08.08 498000 20.12.08 27.01.09 497284
Completed
CIVIL M-I22.09.08 23.08.08 497600 07.01.09 14.02.09 497127
Completed
CIVIL M-I22.09.08 23.08.08 195000 M/S Vijay Kumar 01.01.09 09.04.09 194868
Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Expenditure
Present Position
1 Dev. of lane by pdg. CC and drain near Shiv Mandir in village in C-152/KBZ
253/12.08.08/EE(M)-I
M/s Pankaj Udyog
2 C/O walkway in Tulsi Garden park G-block Naraina vihar in C-152/KBZ
232/23.07.08/EE(M)-I
M/s Maa Bhoomika Entp.
3 Dev. of back lane and road berms from E-82 to E-46 in Naraina Vihar in C-152/KBZ.
297/21.08.08/EE(M)-I
M/S Chimmy Const. Co.
4 Pdg RMC and drainage on Square behind R-888 in R-Block Rajender Ngr.in C-149/KBZ
365/16.12.08/EE(M)-I
M/S Nikhil Builders
5 Imp to lane and bylane of 12-Block from 12/5 to 112/36 in Old Rajender Ngr.in C-149/KBZ
368/16.12.08/EE(M)-I
M/s Herry Const. Co.
6
Imp to lane and bylane by RMC and Drain along M.C.Pry.School New Rajender Ngr.to C-103 in New Rajender Ngr.in C-149/KBZ
364/16.12.08/EE(M)-I
M/s Rakesh Kumar Gupta
7 Imp to back lane and square F-272 in F- Block in New Rajender Ngr.in C-149/KBZ
336/13.10.08/EE(M)-I
M/S K-3 Infrastructure
8
P/F Grills on Square and Footpath near Water Tank in Old Rajender Ngr.in C-149/KBZ
445/02.01.09/EE(M)-I
M/S Sanjay Builders
9
Imp to back lane and side lanes from J-361 to DDA Mkt.in FA-Block in New Rajender Ngr.in C-149/KBZ
363/16.12.08/EE(M)-I
M/S Manoj Kumar Bhatia
10 Pdg Storm Water drain to berms from R-710 to R-738 in R-Block in C-149/KBZ
444/02.01.09/EE(M)-I
M/S Manchada Const.
11 Imp to lanes between J-396 to J-397 in J-Block New Rajender Ngr. in C-149/KBZ
425/14.12.08/EE(M)-I
CIVIL M-I22.09.08 23.08.08 240300 25.12.08 20.02.09 240300
Completed
CIVIL M-I
22.09.08 23.08.08 219000 05.01.09 16.02.09 218648
Completed
CIVIL M-I
25.09.08 03.08.08 766900 M/s Vinod Kumar 12.10.09 04.11.09 766900
Completed
CIVIL M-I
25.09.08 28.07.08 939100 M/s Vinod Kumar 12.10.09 04.11.09 939100
Completed
CIVIL M-I
25.09.08 11.08.08 717850 M/s Vinod Kumar 12.10.09 04.11.09 717850
Completed
CIVIL M-I
25.09.08 04.08.08 760500 M/s Vinod Kumar 12.10.09 04.11.09 757960 CompletedCIVIL M-I
24.04.08 22.04.08 387796 02.07.08 12.09.08 387796Completed
CIVIL M-I24.04.08 22.04.08 388541 08.07.08 10.09.08 378452
Completed
CIVIL M-I24.04.08 22.04.08 240155 04.07.08 20.09.08 239371
Completed
CIVIL M-I
24.04.08 22.04.08 309324 07.07.08 12.09.08 304571
Completed
CIVIL M-I25.09.08 01.05.08 485500 23.10.08 14.01.09 484941
Completed
CIVIL M-I
25.09.08 01.05.08 456200 24.10.08 19.01.09 450997
Completed
CIVIL M-I20.06.08 19.05.08 406806 24.07.08 08.10.08 406806
Completed
CIVIL M-I20.06.08 19.05.08 412943 M/s Tyagi Assos. 24.07.08 23.10.08 412943
Completed
CIVIL M-I20.06.08 19.05.08 406806 23.07.08 19.01.09 406099
Completed
12 Dev of Walkway of Hare Krishna Mandir Park in J-Block New Rajender Ngr. in C-149/KBZ
385/18.12.08/EE(M)-I
M/S Unique Const.Co.
13
Dev of Park by grit wash and grill near DMS Booth in D/S in New Rajender Ngr. in C-149/KBZ
446/02.01.09/EE(M)-I
M/S Manchada Const.
14
Pdg dense carpet surfacing atinterval roads in EF,EA,RA Block in Inderpuri C-151/KBZ (from EF-1R to P.S. Inderpuri,A-1/146 to EA-34,RA-44 to RB-6,EA-101 to WZ-256
54/22.09.09/EE(M)-I
15
Pdg dense carpet surfacing at interval roads in B,A-1 and EA-1/1 Block in Inderpuri C-151/KBZ (from A-1/148 to EA-1/30, EA-1/30 to EA-1/34,EA-1/67 to B-65,A-20 to EA-61
54/22.09.09/EE(M)-I
16
Pdg dense carpet surfacing at interval roads in A,EA, Block in Inderpuri C-151/KBZ (from A-63 to EA-100,RA-32 to EA-48
54/22.09.09/EE(M)-I
17
Pdg dense carpet surfacing at interval roads in RA and B Block in Inderpuri C-151/KBZ (from B-80 to R-46,EA-1/65 to B-65
54/22.09.09/EE(M)-I
18 Pdg drainage and RMC of lane from EA-101 to EA-107 in Inderpuri C-151/KBZ
71/18.06.08/EE(M)-I
M/s Pankaj Const.
19 Pdg drainage and RMC of lane from EA-108 to EA-114 in Inderpuri C-151/KBZ
53/05.06.08/EE(M)-I
M/s Pankaj Const.
20 Pdg drainage and RMC of lane from EF-1R to EF-9R in Inderpuri C-151/KBZ
72/18.06.08/EE(M)-I
M/s Pankaj Const.
21
Pdg drainage and RMC of lane from EG-31 to EG-49 and EF-1 to EF-10 in Inderpuri C-151/KBZ
49/05.06.08/EE(M)-I
M/s Pankaj Const.
22 Pdg RMC from h.no. RB-1 to RB-8 in Inderpuri C-151/KBZ
319/10.10.08/EE(M)-I
M/S Shah Builders
23
Dev of footpath and side berms by pdg cc and drainage from EB-4 to EA-1/78 in Inderpuri in C-151/KBZ
322/10.10.08/EE(M)-I
M/S Sehgal Bros.
24 Dev of open space and bylanes infront of I-290 in Naraina Vihas in C-152/KBZ
164/14.07.08/EE(M)-I
M/s Herry Const. Co.
25 Dev of lane by pdg cc from I-84 to I-91 in Naraina Vihar C-152/KBZ
163/14.07.08/EE(M)-I
26 Dev of lane and bylanes from WZ-358 to WZ-344 in Naraina Vihar C-152/KBZ
165/14.07.08/EE(M)-I
M/s Maa Bhoomika Entp.
CIVIL M-I
20.06.08 19.05.08 406806 21.08.08 20.01.09 404787
Completed
CIVIL M-I20.06.08 19.05.08 199649 M/s S.P. Entp. 18.07.08 19.09.08 199649
Completed
CIVIL M-I
20.06.08 19.05.08 199649 17.07.08 01.09.08 199331
Completed
CIVIL M-I20.06.08 19.05.08 460648 31.08.08 08.11.08 460345
Completed
CIVIL M-I20.06.08 19.05.08 199906 28.07.08 19.01.09 199097
Completed
CIVIL M-I20.06.08 19.05.08 199624 M/s R.K. builders 22.08.08 21.11.08 199624
Completed
CIVIL M-I20.06.08 19.05.08 197170 23.07.08 05.11.08 196853
Completed
CIVIL M-I20.06.08 19.05.08 199649 M/s Jolly Const. 25.07.08 27.12.10 199332 Completed
CIVIL M-I
20.06.08 19.05.08 499602 01.09.08 29.11.08 499128
Completed
CIVIL M-I20.06.08 19.05.08 406806 M/s Tyagi Assos. 25.07.08 22.12.08 406806
Completed
CIVIL M-I20.06.08 19.05.08 400669 18.08.08 21.11.08 400315
Completed
CIVIL M-I
20.06.08 19.05.08 199624 M/s Pappu seth 26.07.08 18.12.08 199618
Completed
CIVIL M-I
20.06.08 19.05.08 199649 M/s R.K. builders 22.10.08 05.11.08 199601
Completed
CIVIL M-I20.06.08 19.05.08 434095 21.08.08 30.01.09 434059
Completed
CIVIL M-I20.06.08 19.05.08 473300 29.07.08 16.12.08 472589
Completed
CIVIL M-I
20.06.08 19.05.08 465600 27.07.08 15.10.08 465192
Completed
27
Dev of lane by pdg cc from WZ-873 near Apna Bazar to WZ-884C in Naraina Vill. C-152/KBZ
264/12.08.08/EE(M)-I
M/s Hariash Kumar
28 Dev of lane and by lanes adj to h.no.WZ-583 in Naraina Vill. in C-152/KBZ
162/14.07.08/EE(M)-I
29
Dev of open space in DDA Flats H-Block Naraina Vihar near Railway Line in C-152/KBZ
202/16.07.08/EE(M)-I
M/s Pankaj Udyog
30 Dev of lane by pdg cc from D-45 to Tagore Public School in Naraina vihar C-152/KBZ
294/21.07.08/EE(M)-I
M/s Fabcon Engineers
31 Dev of park opp. B-108 Naraina Vihar C-152/KBZ
203/16.06.08/EE(M)-I
M/s Tanwar Const Co.
32 Dev of road berms from h.no.B-110 to B-130 in Naraina Vihar C-152/KBZ
268/12.08.08/EE(M)-I
33 Dev of road berms from h.no.B-27 to B-43 in Naraina Vihar C-152/KBZ
167/14.07.08/EE(M)-I
M/s Naresh Entp.
34 Dev of lane and by lanes from h.no.WZ-429A to chintu Park in Naraina vill. C-152/KBZ
201/16.07.08/EE(M)-I
35
Dev of Footpath and road berms from Gurudwara to B-19 in Naraina vihar c-152/KBZ
299/21.08.08/EE(M)-I
M/s Shiv Shanker Gupta
36 Dev of lane by pdg cc from WZ-415B to WZ-403 in Naraina Vihar C-152/KBZ
199/16.07.08/EE(M)-I
37 Dev of lane by psdg cc from WZ-429A to WZ-430E in NAraina Vihar c-152/KBZ
265/12.08.08/EE(M)-I
M/s Rakesh Kumar Gupta
38
Dev of road berms along the B/Wall of park opp. factory no.B-246 to B-248 in Naraina Indl. Area Ph-1 in C-152/KBZ
200/16.07.08/EE(M)-I
39
Dev of opev space and road berms by pdg cc at Dhobi Ghat in C-Block Naraina Vihar C-152/KBZ
166/14.07.08/EE(M)-I
40 Dev to open space near Community Center C-Block Naraina Vihar in C-152/KBZ
267/12.08.08/EE(M)-I
M/s S.Gupta Const Co.
41 Dev to Walkway in Sita Mata Park in R-Block New Rajender Ngr. C-149/KBZ
222/23.07.08/EE(M)-I
M/s Vikas Const Co.
42
Dev of gali from Bazar Marg 4A-1 to Amrit Sarpal Marg by RMC and drianage in Old rajender Ngr. C-149/KBZ
226/23.07.08/EE(M)-I
M/s R.P. Aggarwal
CIVIL M-I27.05.08 01.05.08 199670 M/s Jolly Const. 23.07.08 22.10.08 199670
Completed
CIVIL M-I27.05.08 01.05.08 199240 24.07.08 20.10.08 199240
Completed
CIVIL M-I27.05.08 01.05.08 199730 M/s Amit builders 28.07.08 06.10.08 199137
Completed
CIVIL M-I20.06.08 01.05.08 199800 M/s S.K. Entp. 21.07.08 09.09.08 199800
Completed
CIVIL M-I20.06.08 01.05.08 498900 25.07.08 15.09.08 498900
Completed
CIVIL M-I20.06.08 01.05.08 199500 11.08.08 18.10.08 199168
Completed
CIVIL M-I20.06.08 01.05.08 199600 23.07.08 22.10.08 199117
Completed
CIVIL M-I20.06.08 01.05.08 495900 M/S MK Verma 21.07.08 22.10.08 495542
Completed
CIVIL M-I20.06.08 01.05.08 199700 25.07.08 2.10.08 199700
Completed
CIVIL M-I
20.06.08 05.05.08 198900 01.09.08 19.11.08 197678
Completed
CIVIL M-I20.06.08 05.05.08 246700 17.07.08 24.11.08 245957
Completed
CIVIL M-I20.06.08 05.05.08 409600 M/S SK Verma 21.07.08 22.10.08 404054
Completed
CIVIL M-I
20.06.08 05.05.08 285480 24.07.08 20.11.08 284964
Completed
CIVIL M-I
20.06.08 05.05.08 311300 23.07.08 20.11.08 310899
Completed
43 Dev of lane by pdg cc and drain near WZ-4 in village Dasgherah C-150/KBZ
151/14.07.08/EE(M)-I
44 Dev of lane by pdg cc and druian near WZ-139 in village Dasghera h C-150/KBZ
144/14.07.08/EE(M)-I
M/s Kapoor Bros.
45 Dev of lane by pdg cc and drain near WZ-39 in Village Dasgherha C-150/KBZ
183/16.07.08/EE(M)-I
46 Dev of lane by pdg cc and drian near Dispensary in Vill. Dasghara in C-150/KBZ
147/14.07.08/EE(M)-I
47 Dev of lane by pdg cc and drian near WZ-108 in Vill. Todapur in C-150/KBZ
180/16.07.08/EE(M)-I
M/S Bunty Builders
48 Dev of lane by pdg cc and drian near WZ-121 in Vill. Todapur in C-150/KBZ
150/14.07.08/EE(M)-I
M/S Raghav Consts.
49 Dev of lane by pdg cc and drian near WZ-110 in Vill. Dasghara in C-150/KBZ
145/14.07.08/EE(M)-I
M/S Sunil Kumar Gulati
50 Dev of lane by pdg cc and drian near Police Beat Box in Vill. Dasghara in C-150/KBZ
149/14.07.08/EE(M)-I
51 Dev of lane by pdg cc and drian near WZ-78 in Vill. Todapur in C-150/KBZ
184/16.07.08/EE(M)-I
M/S Tajinder Const.Co.
52
Dev of footpath and lane by cc and drainage from h.no.A-84 to Hanuman mandir in Inderpuri C-151/KBZ
260/12.08.08/EE(M)-I
M/S Guru Kirpa Const. Co.
53 Dev of side bermas from h.no. R-19 to C-104 in Inderpuri C-151/KBZ
189/16.07.08/EE(M)-I
M/S Ved Pal Bhatia
54 Pdg cc and drainagr from h.no.EA-100 to EA-49 in Inderpuri C-151/KBZ
160/14.07.08/EE(M)-I
55
Dev of back lane and bylanes by pdg cc and drainage from h.no.RB-1 to RB-6 in Inderpuri C-151/KBZ
198/16.07.08/EE(M)-I
M/S Unique Const.Co.
56
Dev of footpath and side berms by pdg cc and chequerred tiles from R-5 to C-114 in Inderpuri C-151/KBZ
158/14.07.08/EE(M)-I
M/S Nikhil Builders
Status Report of MLA,Sh S.P. RatawalAC No. 68,2008-09
S.No.
Name of Work deptt. Div. Name of agency D.O.S D.O.C
CIVIL M-II23.06.08 19.05.08 498700 25.08.08 22.09.08 498120
Completed
CIVIL M-II23.06.08 19.05.08 495000 M/s A&N Bros. 25.08.08 19.09.08 487252
Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Expenditure
Present Position
1 Pdg cc pav. with drainage system in gali no.7 in C-92/KBZ
208/25.08.08/EE(M)-II
M/s S Gupta Const Co.
2 Pdg cc pav. with drainage system in gali no.1 in C-92/KBZ
207/25.08.08/EE(M)-II
CIVIL M-II
23.07.08 21.07.08 431600 M/s Amit Cost. 24.10.08 22.01.09 431485
Completed
CIVIL M-II23.07.08 21.07.08 234000 14.11.08 29.12.09 234000
Completed
CIVIL M-II23.07.08 21.07.08 367000 15.01.09 20.04.09 366026
Completed
CIVIL M-II23.07.08 21.07.08 267700 10.11.08 07.01.09 267114
Completed
CIVIL M-II23.07.08 21.07.08 350900 M/s Amit builders 17.10.08 04.12.08 349857
Completed
CIVIL M-II23.07.08 21.07.08 354000 15.10.08 10.12.08 350875
Completed
CIVIL M-II23.07.08 21.07.08 499800 04.11.08 03.12.08 496592
Completed
CIVIL M-II
23.07.08 21.07.08 498800 20.10.08 20.01.09 498363
Completed
CIVIL M-II23.07.08 21.07.08 499900 22.10.08 30.12.08 499815
Completed
CIVIL M-II23.07.08 21.07.08 499000 M/s Akriti Decore 23.10.08 06.01.09 498867
Completed
CIVIL M-II23.07.08 21.07.08 499000 22.10.08 12.01.09 498727
Completed
CIVIL M-II23.07.08 21.07.08 499000 15.10.08 12.12.08 499000
Completed
CIVIL M-II23.07.08 21.07.08 499700 13.10.08 17.11.08 496675
Completed
CIVIL M-II23.07.08 21.07.08 499900 15.10.08 15.12.08 499506
Completed
CIVIL M-II23.07.08 21.07.08 498800 21.10.08 30.03.09 498497
Completed
CIVIL M-II23.07.08 21.07.08 499000 15.10.08 11.12.08 499000
Completed
CIVIL M-II
23.07.08 21.07.08 499710 15.10.08 30.12.08 499705
Completed
3
Pdg cc pav. in gali Kalu Pan Wali,H.S. Road from h.no.16/65-I,16/203-E to 16/189-E(Gali Achar Wali)16/313-E to 16/321-E in Bapa Ngr. in C-92/KBZ
355/13.10.08/EE(M)-II
4 Pdg Kota Stone plate in lane from Sanitary office to H.S. road in Gaffar Mkt. in C-91/KBZ
344/13.10.08/EE(M)-II
M/s unique const.
5 C/O Archer near Ladies Park in Ajmal Khan Park in C-91/KBZ
422/14.01.09/EE(M)-II
M/s Malhotra Const Co.
6 Pdg drainage system in Jheggi lane near Dalao Maharana Pratap Mkt. in C-91/KBZ
357/13.10.08/EE(M)-II
M/s Manchanda Const.
7 Pdg cc pav with drain in gali no.14 Beadonpura in C-91/KBZ
353/13.10.08/EE(M)-II
8 Pdg cc pav with drain in gali no.15 Beadonpura in C-91/KBZ
352/13.10.08/EE(M)-II
M/s Herry Const Co.
9 Pdg cc pav in gali no.72 Regharpura in C-91/KBZ
350/13.10.08/EE(M)-II
M/s Harpreet Arora
10
Pdg cc pav. and berms from xing. A.S.Road to tank Road on Vishnu Mandir Marg in C-91/KBZ
346/13.10.08/EE(M)-II
M/s Fabcon Engineers
11 Pdg cc pav. in gali no.73 in Regharpura in C-91/KBZ
358/13.10.08/EE(M)-II
M/s Malhotra Const Co.
12 Pdg cc pav. in gali no.75 in Regharpura in C-91/KBZ
345/13.10.08/EE(M)-II
13 Pdg cc pav. in gali no.76 in Regharpura in C-91/KBZ
343/13.10.08/EE(M)-II
M/s Deepali builders
14 Pdg cc pav. in gali no.77 in Regharpura in C-91/KBZ
354/13.10.08/EE(M)-II
M/s Bunty builders
15 Pdg cc pav. in gali no.78 in Regharpura in C-91/KBZ
349/13.10.08/EE(M)-II
M/s Kapoor Bros.
16 Pdg cc pav. in gali no.53 in Regharpura in C-91/KBZ
342/13.10.08/EE(M)-II
M/s Vedpal Bhatia
17 Pdg cc pav. with drainage in gali no.1,Rattan Ngr.in C-91/KBZ
359/13.10.08/EE(M)-II
M/s Raghav Const.
18 Pdg cc pav.in gali no.3 and adj area in Christan Colony in C-91/KBZ
348/13.10.08/EE(M)-II
M/s Guru Kripa Const Co.
19
Pdg cc pav.with drainage from h.no.794 to h.no.807 in joshi lane (between D.B. Gupta Road to Khajoor Road)in C-91/KBZ
347/13.10.08/EE(M)-II
M/s Manoj Kumar Bhatia
CIVIL M-II
23.07.08 21.07.08 499710 23.10.08 20.1.08 499341
Completed
CIVIL M-II
23.07.08 21.07.08 499700 15.10.08 04.12.08 499156
Completed
CIVIL M-II23.07.08 21.07.08 499900 24.10.08 10.01.09 499885
Completed
CIVIL M-II23.07.08 21.07.08 499800 M/s S.K Verma 20.10.08 21.01.09 499149
Completed
CIVIL M-II23.07.08 21.07.08 500000 24.10.08 05.01.09 498948
Completed
CIVIL M-II
23.07.08 21.07.08 312700 25.08.08 22.09.08 312354
Completed
CIVIL M-II19.06.08 19.05.08 452600 06.09.08 15.02.08 451677
Completed
CIVIL M-II19.06.08 19.05.08 449700 08.09.08 28.11.08 449456
Completed
CIVIL M-II19.06.08 19.05.08 431300 M/s Tyagi Assos. 06.08.08 06.11.08 431155
Completed
CIVIL M-II19.06.08 19.05.08 423210 01.08.08 12.09.08 423129
Completed
CIVIL M-II19.06.08 19.05.08 427650 06.08.08 16.09.08 427366
Completed
CIVIL M-II19.06.08 19.05.08 432320 22.10.08 30.12.08 431605
Completed
CIVIL M-II19.06.08 19.05.08 434200 12.09.08 22.05.08 431226
Completed
CIVIL M-II19.06.08 19.05.08 425100 05.09.08 31.10.08 424590
Completed
CIVIL M-II19.06.08 19.05.08 396200 05.08.08 23.01.09 395258
Completed
CIVIL M-II19.06.08 19.05.08 392500 19.07.08 29.08.08 391459
Completed
CIVIL M-II
23.06.08 19.05.08 399104 23.09.08 13.02.09 399109
Completed
20
Pdg cc pav.with drainage from h.no.807 to h.no.879 in joshi lane (between D.B. Gupta Road to Khajoor Road)in C-91/KBZ
340/13.10.08/EE(M)-II
M/s Bhatia Const Co.
21
Pdg cc pav.and berms in lanes Pusa Road (between A.S.Road to Road no.29)in C-91/KBZ
341/13.10.08/EE(M)-II
M/s Som Dutt Dwevedi
22 Pdg kota Stone Flooring from shop no.67A to shop no.88 in Ghaffar Mkt. in C-91/KBZ
361/13.10.08/EE(M)-II
M/s S. Gupta Const Co.
23 Pdg kota Stone Flooring from shop no.23 to shop no.44 in Ghaffar Mkt. in C-91/KBZ
360/13.10.08/EE(M)-II
24 Pdg cc pav. with drainage system from h.no.59 on Anand Parbat Road in C-91/KBZ
356/13.10.08/EE(M)-II
M/s Shiv Shanker Gupta
25
Pdg cc pav. from h.no.5704/80 to G.M. Marg in gali no.80 and adj area in Regharpura in C-91/KBZ
209/25.08.08/EE(M)-II
M/s Yuvraj Const Co.
26 Pdg cc pav. with drainage system in gali no.2 Krishna Ngr. in c-91/KBZ
276/05.09.08/E(M)-II
M/s Shiv Shanker Gupta
27 Pdg cc pav. with drainage system in gali no.1 in Krishna Ngr. c-91/KBZ
275/05.09.08/E(M)-II
M/s Naresh Kumar
28 Pdg cc pav. with drainage system in gali no.63 in Regharpura C-91/KBZ
175/28.07.08/EE(M)-II
29 Pdg cc pav. with drainage system in gali no.56 in Regharpura C-91/KBZ
181/28.07.08/EE(M)-II
M/s Rakesh Kumar Gupta
30 Pdg cc pav. with drainage system in gali no.81 in Regharpura C-91/KBZ
180/28.07.08/EE(M)-II
M/s Som Dutt Dwevedi
31 Pdg cc pav. with drainage system in gali no.43 in Regharpura C-91/KBZ
351/13.10.08/EE(M)-II
M/s Gupta Const Co.
32 Pdg cc pav. with drainage system in gali no.48 in Regharpura C-91/KBZ
274/05.09.08/EE(M)-II
M/s Kapoor Bros.
33 Pdg cc pav. with drainage system in gali no.50 in Regharpura C-91/KBZ
248/01.09.08/EE(M)-II
M/s R.P. Aggarwal
34 Pdg cc pav. with drainage system in gali no.38 in Regharpura C-91/KBZ
179/28.07.08/EE(M)-II
M/s Yuvraj Const Co.
35 Pdg cc pav. with drainage system in gali no.34 in Regharpura C-91/KBZ
171/18.07.08/EE(M)-II
M/s Malhotra Const Co.
36
Pdg cc pav. on berms from road no.4 to xing of New Pusa Road in Arya Samaj Road in C-91/KBZ
298/15.09.08/EE(M)-II
M/s Naresh Kumar
CIVIL M-II23.06.08 19.05.08 399400 23.09.08 10.02.09 399106
Completed
CIVIL M-II
23.06.08 19.05.08 399870 29.08.08 01.12.08 399499
Completed
CIVIL M-II23.06.08 19.05.08 342110 30.07.08 05.09.08 341570
Completed
CIVIL M-II23.06.08 19.05.08 340300 M/s Honey Const 06.08.08 08.05.09 339819
Completed
CIVIL M-II23.06.08 19.05.08 336640 12.08.08 10.10.08 336355
Completed
CIVIL M-II23.06.08 19.05.08 333000 25.07.08 05.03.09 332996
Completed
CIVIL M-II23.06.08 19.05.08 333415 05.08.08 20.04.09 333221
Completed
CIVIL M-II
23.06.08 19.05.08 326600 15.08.08 22.09.08 325289
Completed
CIVIL M-II
23.06.08 19.05.08 302840 21.07.08 27.10.08 300182
Completed
CIVIL M-II
23.06.08 19.05.08 301920 25.07.08 22.10.08 301919
Completed
CIVIL M-II23.06.08 19.05.08 297400 M/s Honey Const 04.08.08 25.11.08 296743
Completed
CIVIL M-II23.06.08 19.05.08 279130 M/s Vikas & Co. 01.08.08 15.09.08 278972
Completed
CIVIL M-II23.06.08 19.05.08 274600 28.07.08 16.09.08 274470
Completed
CIVIL M-II23.06.08 19.05.08 273700 M/s Balaji Const. 06.08.08 31.10.08 273196
Completed
CIVIL M-II23.06.08 19.05.08 271850 28.07.08 25.04.09 271527
Completed
CIVIL M-II23.06.08 19.05.08 271900 M/s SK Entp. 25.07.08 20.03.09 271499
Completed
CIVIL M-II23.06.08 19.05.08 267600 01.08.08 25.06.09 266506
Completed
37 Pdg cc pav. near Military road h.no.I-16/552 in Bapa Ngr.in C-92/KBZ
296/15.09.08/EE(M)-II
M/s Chinmay Const Co.
38
Pdg cc pav. on berms from Military road to Guru Nanak road Xing in Pyre Lal Road in C-92/KBZ
206/25.08.08/EE(M)-II
M/s Guru Kripa Const Co.
39 Pdg cc pav. in gali no.24 in Naiwala in C-91/KBZ
186/28.07.08/EE(M)-II
M/s Bunty builders
40 Pdg cc pav. in gali no.28 in Naiwala in C-91/KBZ
177/28.07.08/EE(M)-II
41 Pdg cc pav. in gali no.21 in Naiwala in C-91/KBZ
193/11.08.08/EE(M)-II
M/s Guru Kripa Const Co.
42 Pdg cc pav. in gali no.8 in Naiwala in C-91/KBZ
170/18.07.08/EE(M)-II
M/s Manchanda Const.
43 Pdg cc pav. with drainage system in gali no.2 in Shiv Ngr. in C-91/KBZ
184/28.07.08/EE(M)-II
M/s Deepak Const Co.
44
Pdg Kota Stone and B/Work between gali no. 35 Beadonpura and gali no.14 Ragharpura on Nalla in C-91/KBZ
185/28.07.08/EE(M)-II
M/s Welcome Assos
45
Pdg cc pav. from h.no.E-16/945 to E-16/937E and h.no.H-16/143 to H-16/115 (gali Bansi Wali)in Bapa Ngr. C-92/KBZ
173/18.07.08/EE(M)-II
M/s Pankaj Contractor
46
Pdg cc pav. in gali no.20 from h.no.E-16/1614 to E-16/1641 and h.no.E-16/1641 to E-16/1654 in Bapa Ngr. C-92/KBZ
174/18.07.08/EE(M)-II
M/s Manoj Kumar Bhatia
47 Pdg RMC Pav. of road berms on rpad no.29 in C-91/KBZ
176/28.07.08/EE(M)-II
48 Pdg cc pav. in gali no 66 in Naiwala w.no.91/KBZ
187/28.07.08/EE(M)-II
49 Pdg cc pav. in gali no.2 in Shivaji Street between A.S.road and H.S.road in C-91/KBZ
178/28.07.08/EE(M)-II
M/s Vedpal Bhatia
50 Pdg cc pav. in gali no.34 in Naiwala in C-91/KBZ
189/28.07.08/EE(M)-II
51 Pdg cc pav. in gali no.5 in Naiwala In C-91/KBZ
182/28.07.08/EE(M)-II
M/s Manoj Kumar Bhatia
52 Pdg cc pav. in gali no.22 in Naiwala In C-91/KBZ
168/18.07.08/EE(M)-II
53 Pdg cc pav. with drainage system in gali no.64 in Naiwala In C-91/KBZ
183/28.07.08/EE(M)-II
M/s Sonu builders
CIVIL M-II
23.06.08 19.05.08 265500 25.07.08 24.01.09 264864
Completed
CIVIL M-II23.06.08 19.05.08 264600 01.08.08 20.09.08 264291
Completed54
Pdg cc pav. in gali no.1 in Shivaji Street between A.S. road and H.S. road in C-91/KBZ
172/18.07.08/EE(M)-II
M/s Ma Bhoomika Entp.
55 Pdg cc pav. in gali no.35 in Naiwala in C-91/KBZ
169/18.07.08/EE(M)-II
M/s R.P. Aggarwal
Status Report of MLA,Sh M.L. SodhiAC No. 69,2008-09
S.No.
Name of Work deptt. Div. Name of agency D.O.S D.O.C
CIVIL M-I20.06.08 01.05.08 197615 15.07.08 25.09.08 197232
Completed
CIVIL M-I20.06.08 01.05.08 197405 17.07.08 02.02.09 197239
Completed
CIVIL M-I20.06.08 01.05.08 197637 02.08.08 06.09.08 196841
Completed
CIVIL M-I20.06.08 01.05.08 197917 11.09.08 17.1.08 197527
Completed
CIVIL M-I20.06.08 01.05.08 198787 15.07.08 22.09.08 198285
Completed
CIVIL M-I20.06.08 01.05.08 198715 M/s KK Const. 2.07.08 15.01.09 198383
Completed
CIVIL M-I20.06.08 01.05.08 198840 M/s Royal Ent. 04.08.08 02.09.08 198638
Completed
CIVIL M-I20.06.08 01.05.08 196914 14.11.08 04.12.08 196470
Completed
CIVIL M-I20.06.08 21.04.08 198919 14.07.08 24.09.08 198844
Completed
CIVIL M-I20.06.08 05.05.08 198773 14.07.08 16.10.08 198280
Completed
ELECT E-I
21.07.08 20.05.08 441693 M/s Gyan Ent. 09.11.08 P 379094
In Prog.
CIVIL M-I04.08.08 29.07.08 298490 15.10.08 21.11.08 298030
Completed
CIVIL M-I04.08.08 29.07.08 298266 M/a Arya & Co. 10.10.08 10.12.08 297963
Completed
CIVIL M-I04.08.08 29.07.08 197596 M/s VK Assos. 12.09.08 24.10.08 197366
Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Expenditure
Present Position
1 P/L cc from h.no.A-560 to A-571 in Prem Ngr. C-87/SPZ
154/08.07.08/EE(M)-I
M/s JP Const0.CO
2 P/L cc from h.no.AB-819 to AB-350 in Prem Ngr. C-87/SPZ
163/08.07.08/EE(M)-I
M/s Bijender Pal Singh
3 P/L cc from h.no.A-389 in Amarpuri Katch Rasta in C-87/SPZ
114/08.07.08/EE(M)-I
M/s Ganesh Builders
4 P/L cc from h.no.AB-304 to AB-317 in Amar Puri C-87/SPZ
520/29.08.08/EE(M)-I
M/s Surbhi Const.
5 P/L cc from h.no.AB-311 to h.no.165 in Amar Puri C-87/SPZ
144/08.07.08/EE(M)-I
M/s Amar builders
6 P/L cc from h.no. 100/3 to 7513 in Sidharth ngr.in C-87/SPZ
170/10.07.08/EE(M)-I
7 P/L cc from h.no.A-792 to A-803 in Sidharth ngr.in C-87/SPZ
250/2.07.08/EE(M)-I
8 P/L cc from h.no.6485 to 6499 in gali Hanuman Mandir in C-87/SPZ
156/08.07.08/EE(M)-I
M/s Deepak Const.
9 P/L RMC in Laxmanpuri from h.no.L-67 to h.no.234 and in adj lane in C-87/SPZ
185/10.07.08/EE(M)-I
M/s Bajaj const co.
10 P/L RMC on Katcha Rasta from h.no.BB-334 to h.no.7215 and adj lane in C-87/SPZ
177/10.07.08/EE(M)-I
M/s Arora Const Co.
11
P/O semi high mast light poles with lights near Laxmi Narain Mandir at Faiz Road in C-90/SPZ
98/31.10.08/EE(M)-I
12 P/L RMC in Shyamji Mal lane in gali no.5 in C-88/SPZ
679/03.10.08/EE(M)-I
M/s Deepak Const.
13 P/L RMC from h.no.11008 to 10990 and adj lanes in Motiya Khan in C-88/SPZ
621/10.09.08/EE(M)-I
14 P/L RMC in Qila Kadam Sharif from h.no.6816B to 351 in C-88/SPZ
550/09.09.08/EE(M)-I
CIVIL M-I04.08.08 29.07.08 197859 06.10.08 10.1.08 197501
Completed
CIVIL M-I04.08.08 29.07.08 199860 18.09.08 28.11.08 199705
Completed
CIVIL M-I04.08.08 29.07.08 197848 12.09.08 13.01.09 197402
Completed
CIVIL M-I04.08.08 29.07.08 197168 M/sRP Ent. 19.09.08 01.11.08 196982
Completed
CIVIL M-I08.10.08 07.10.08 297800
CIVIL M-I08.10.08 07.10.08 298900
CIVIL M-I08.10.08 07.10.08 295800
CIVIL M-I08.10.08 07.10.08 296000
CIVIL M-I08.10.08 07.10.08 298000
CIVIL M-I10.10.08 03.10.08 198433 23.10.08 26.12.08 198276
Completed
CIVIL M-I10.10.08 03.10.08 174866 M/s Aditi Const. 22.12.08 19.03.09 174571
Completed
CIVIL M-I
10.10.08 03.10.08 198328 M/s KK Const. 15.12.08 18.03.09 197630
Completed
CIVIL M-I10.10.08 03.10.08 199905 26.12.08 21.01.09 199736
Completed
CIVIL M-I10.10.08 03.10.08 198807 Durga builders 24.10.08 20.12.08 198806
Completed
CIVIL M-I20.06.08 05.05.08 198992 02.09.08 21.10.08 198793
Completed
CIVIL M-I20.06.08 05.05.08 198197 22.07.08 18.10.08 197741
Completed
CIVIL M-I20.06.08 05.05.08 197820 23.08.08 12.1.08 195666
Completed
CIVIL M-I20.06.08 05.05.08 197960 05.08.08 30.08.08 197859
Completed
CIVIL M-I20.06.08 05.05.08 197912 02.09.08 30.06.09 197452
Completed
15 P/L RMC in Quila Kadam Sharif from h.no.6863 to 6879 and adj lanes in C-88/SPZ
602/10.09.08/EE(M)-I
M/s Surender Kr. Jain
16 P/L RMC from h.no.7483 to 7442 in Aram Ngr.in C-88/SPZ
546/09.09.08/EE(M)-I
M/s Essco Traders
17 P/L cc in Motia Khan from h.no.10907 to 11035 and adj lanes in C-88/SPZ
543/09.09.08/EE(M)-I
M/s Vaishali Builders
18 P/L RMC in Motia Khan from h.no.10957 to 10907 and adj lanes in C-88/SPZ
544/09.09.08/EE(M)-I
19 Boring of Tube Well near L-259 in Laxman Puri in C-87/SPZ.
20 Boring of Tube Well in Laxman Puri in C-87/SPZ
21 Boring of Tube Well near old Sanjeevan Arakasha Road in C-87/SPZ.
22 Boring of Tube Well at A-21 in Amar puri in C-87/SPZ.
23 Boring of Tube Well near AB-372 Krishna Basti near Temple in C-87/SPZ.
24 C/o lane by pdg.CC pav.at gali Matke wali at Faiz Road in C-90/SPZ.
762/13.10.08/EE(M)-I
M/s Jatinder Builders
25 C/O Foot path from Faiz Road to Laxmi Narayan Mandir in C-90/SPZ.
809/11.12.08/EE(M)-I
26
C/O side berms and drainage system near Laxmi Narayan Mandir at Faiz Road inC-90/SPZ.
794/11.12.08/EE(M)-I
27 C/O of gali by pdg.CC pav. infront of Park at Faiz Road in C-90/SPZ.
861/17.12.08/EE(M)-I
M/s Narender Singh Dhankar
28 C/O road pdg. MP from Faiz road to Laxmi Narayan Mandir in C-90/SPZ.
763/13.10.08/EE(M)-I
29 P/L cc in Motia Khan from h.no.10323 to jain mandir and Adj lanes in C-88/SPZ
247/22.07.08/EE(M)-I
M/s Malhotra Const Co.
30 P/L cc in gali Ravi Dass from h.no.6112 to h.no.5993 and adj lanes in C-87/SPZ
181/10.07.08/EE(M)-I
M/s Bhatia Const Co.
31 P/L cc in Kabir Basti from h.no.A-334 to h.no.A-312 and adj lanes in C-87/SPZ
175/10.07.08/EE(M)-I
M/s Vardaan builders
32 P/L cc in krishna Basti from h.no.A-485 to h.no.A-501 and adj lanes in C-87/SPZ
162/08.07.08/EE(M)-I
M/s Chaudhary Const.
33 P/L cc in gali Dhunai Wali from h.no.6575 to h.no.6504 and in adj lanes in c-87/SPZ
232/22.07.08/EE(M)-I
M/s Sumit Const Co.
CIVIL M-I
20.06.08 05.05.08 198917 17.07.08 28.08.08 198519
Completed
CIVIL M-I
20.06.08 05.05.08 198325 M/s Islamuddin 11.07.08 05.08.08 198176
Completed
CIVIL M-I20.06.08 05.05.08 196209 M/s SK builders 19.07.08 29.08.08 195790
Completed
CIVIL M-I
20.06.08 05.05.08 197289 16.07.08 01.09.08 197185
Completed
CIVIL M-I20.06.08 05.05.08 198519 25.07.08 10.03.09 198083
Completed
CIVIL M-I20.06.08 05.05.08 199401 M/s Jai Kumar 05.09.08 17.12.08 198679
Completed
CIVIL M-I20.06.08 10.04.08 296033 20.08.08 26.09.08 296028
Completed
CIVIL M-I20.06.08 10.04.08 298951 04.08.08 13.10.08 298593
Completed
CIVIL M-I20.06.08 10.04.08 297029 M/s SK Entp. 18.08.08 27.09.08 296495
Completed
CIVIL M-I20.06.08 21.04.08 198631 03.09.08 06.02.10 198470 Completed
CIVIL M-I20.06.08 21.04.08 199475 19.07.08 27.08.08 199194
Completed
CIVIL M-I20.06.08 21.04.08 199681 M/s RP builders 22.07.08 18.08.08 199307
Completed
CIVIL M-I
20.06.08 21.04.08 197500 22.07.08 18.08.08 197018
Completed
CIVIL M-I20.06.08 21.04.08 198715 01.08.08 17.09.08 198195
Completed
CIVIL M-I20.06.08 21.04.08 199417 M/s Kunal Tehri 24.09.08 21.10.08 198948
Completed
CIVIL M-I20.06.08 21.04.08 197987 M/s VK Assos. 22.07.08 18.08.08 197268
Completed
CIVIL M-I20.05.08 21.04.08 196415 24.07.08 29.09.08 196027
Completed
34
P/L cc in gali Dhunai Wali from h.no.6479 to h.no.6499 and T-490 to T-444 and adj lanes in C-87/SPZ
143/08.07.08/EE(M)-I
M/s Amar builders
35
P/L cc in gali Satya Narayan Mandir Wali from h.no.6068 to h.no. 6417 and adj lanes C-87/SPZ
146/08.07.08/EE(M)-I
36 P/L cc in gali Ravi dass from h.no.6228 to h.no.6085 and adj lanes in C-87/SPZ
153/08.07.08/EE(M)-I
37
P/L cc in gali Satya Narayan Purse Mkt. from shop no.6419 to 5897 and adj lanes in C-87/SPZ
168/10.07.08/EE(M)-I
M/s Sanjeev builders
38 P/L cc in Subhash Basti from h.no.BB-74 to BB-277 and adj lanes in C-87/SPZ
174/10.07.08/EE(M)-I
M/s Sachin builders
39 P/L cc in rishna Basti from h.no.AB-430 to h.no.A-461/2 and adj lanes in C-87/SPZ
271/28.07.08/EE(M)-I
40 P/L RMC on Shanker Marg from shop no.8019,shop no.8013 in C-88/SPZ
327/11.08.08/EE(M)-I
M/s Bansal Const.
41 P/L RMC on Shanker Marg from shop no.8005 to shop no.C-112 in C-88/SPZ
284/28.07.08/EE(M)-I
M/s Bhatia Const co
42 P/L RMC on Shanker Marg from shop no.8013 to shop no.8005 in C-88/SPZ
353/11.08.08/EE(M)-I
43 P/L RMC in Amar Puri from h.no. A-362 to A-287 and in adj. lanes in C-87/SPZ
517/29.08.08/EE-III
M/s Goldy Const. Co.
44 P/L RMC in Amar Puri from h.no. A-287 to A-456 and in adj. lanes in C-87/SPZ
158/08.07.08/EE(M)-I
M/s Krishna builders
45 P/L RMC in Amar Puri from h.no. 7358 to h.no.7329 and in adj. lanes in C-87/SPZ
195/22.07.08/EE(M)-I
46
P/L RMC in back side of Amar Puri school from h.no.AB-05 to h.no.AB-32 and adg.lanes in C-87/SPZ
194/22.07.08/EE(M)-I
M/s Sonu builders
47 P/L RMC in Amar Puri from h.no. AB-45 to AB-67 and in adj. lanes
239/22.07.08/EE(M)-I
M/s Prakash traders
48 P/L RMC in Amar Puri from h.no. AB-01 to h.no.AB-113 and in adj. lanes in C-87/SPZ
214/22.07.08/EE(M)-I
49 P/L RMC in 52 Qtrs. from h.no. 9519 to h.no.9532and adj. lanes in C-87/SPZ
203/22.07.08/EE(M)-I
50 P/L RMC in 52 Qtrs. from h.no. 9532 to h.no.9549/2 and adj. lanes in C-87/SPZ
190/22.07.08/EE(M)-I
M/s Ved pal bhatia
CIVIL M-I20.06.08 21.04.08 197419 M/s DK builders-I 22.07.08 22.09.08 196991
Completed
CIVIL M-I20.06.08 21.04.08 198715 28.07.08 28.08.08 198501
Completed
CIVIL M-I20.06.08 21.04.08 197405 31.07.08 21.09.08 196765
Completed
CIVIL M-I20.06.08 21.04.08 197615 08.08.08 09.09.08 197577
Completed
CIVIL M-I20.06.08 21.04.08 198840 M/s Balaji Const. 07.08.08 28.10.08 197930
Completed
CIVIL M-I20.06.08 21.04.08 197917 19.07.08 29.08.08 197300
Completed
CIVIL M-I
20.06.08 21.04.08 197637 31.07.08 15.01.09 197269
Completed
CIVIL M-I20.06.08 21.04.08 198540 05.08.08 06.10.08 198253
Completed
CIVIL M-I20.06.08 21.04.08 196914 M/s Aditi Const. 18.07.08 20.08.08 196034
Completed
CIVIL M-I20.06.08 21.04.08 199780 M/s Arya & co. 01.08.08 16.09.08 199586
Completed
51 P/L RMC in Amar Puri from h.no.AB-456 to h.no.AB-435 and adj lanes in C-87/SPZ
202/22.07.08/EE(M)-I
52 P/L RMC in Chinnot Basti from h.no. C-201 to h.no. C-184 and adj lanes in C-87/SPZ
187/22.07.08/EE(M)-I
M/s Sanjeev builders
53 P/L RMC in Chinnot Basti from h.no. C-257 to h.no. L-47 and adj lanes in C-87/SPZ
242/22.07.08/EE(M)-I
M/s Sehgal contractor
54 P/l RMC in Nai Basti Arakasha Road from h.no.7922 to 16 Sweepers Qtrs. C-87/SPZ
215/22.07.08/EE(M)-I
M/s Jupiter Const.
55 P/l RMC in gali Sabzi wali from h.no.6312 to 6969 and adj lanes in C-87/SPZ
282/28.07.08/EE(M)-I
56 P/l RMC in Amar Puri from h.no.A-63 to h.no.A-85 and adj lanes in C-87/SPZ
184/10.07.08/EE(M)-I
M/s Deepali builders
57
P/l RMC in Nai Basti Arakasha Road from h.no.7815 to h.no.7880 and adj lanes in C-87/SPZ
278/28.07.08/EE(M)-I
M/s Wadhwa const Co..
58 P/l RMC in Laxman Puri from h.no.L-124 to L-310 and adj lanes in C-87/SPZ
244/22.07.08/EE(M)-I
M/s Durga builders
59 P/l RMC in Aram Ngr. in gali no.1 from h.no.7329 to A-234 in C-87/SPZ
157/08.07.08/EE(M)-I
60 Dev of footpath before Hari Mandir School in w.no.87/SPZ
218/22.07.08/EE(M)-I
Status Report of MLA,Sh. Rajesh LilothiaAC No. 70
S.No.
Name of Work deptt. Div. Name of agency D.O.S D.O.C
CIVIL M-II
27.05.08 14.05.08 193877 04.07.08 29.10.08 190031
Completed
CIVIL M-II
27.05.08 14.05.08 199000 04.07.08 15.10.08 198584
Completed
CIVIL M-II
27.05.08 14.05.08 199921 M/s SP Const. 04.07.08 16.02.09 199830
Completed
CIVIL M-II
27.05.08 14.05.08 198000 04.07.08 15.04.09 198000
Completed
CIVIL M-II27.05.08 14.05.08 186500 25.06.08 15.12.08 186319
Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Expenditure
Present Position
1
Pdg drainage and cc from h.no.1762 to 1766 and adj near Main New Rohtak Road in Than Singh Ngr. C-95/KBZ
72/25.06.08/EE(M)-II
M/s Rakesh Kr. Gupta
2
Pdg cc and drainage system from h.no.725/3 to 723 and adj in gali no.3,Panjabi Basti in Thansingh Ngr C-95/KBZ
98/25.06.08/EE(M)-II
M/s Narender Singh Dhanker
3
Pdg cc and drainage from h.no.713/4 to 713/9,713/10 to 707/13,713/13 to 715/3 and adj in gali no.5 in Panjabi Basti Yhansingh Ngr.C-95/KBZ
66/25.06.08/EE(M)-II
4
Pdg cc and drainage from h.no.721/5 to 721/2 near h.no.720 and adj in gali no.5 Panjabi BAsti Thansingh Ngr C-95/KBZ
67/25.06.08/EE(M)-II
M/s Deepak Const.Co.
5 Pdg cc and drainage from D-124 to 2606 and adj in Baljit ngr C-93/KBZ
93/25.06.08/EE(M)-II
M/s Markanda Const.
CIVIL M-II
27.05.08 14.05.08 198660 M/s Tania Const. 02.07.08 01.12.08 198395
Completed
CIVIL M-II27.05.08 14.05.08 188580 M/s SK Ent. 04.07.08 03.10.08 188270
Completed
CIVIL M-II27.05.08 14.05.08 192000 M/s SP Ent. 04.07.08 22.01.09 191960
Completed
CIVIL M-II27.05.08 14.05.08 196600 04.07.08 15.09.08 196350
Completed
CIVIL M-II
27.05.08 14.05.08 186000 M/s Harish Kr. 04.07.08 02.10.08 186000
Completed
CIVIL M-II
27.05.08 14.05.08 196700 M/s Pappu Seth 04.07.08 26.09.08 196620
Completed
CIVIL M-II
27.05.08 14.05.08 197550 04.07.08 25.09.08 197550
Completed
CIVIL M-II
29.08.08 18.08.09 401500 20.10.08 02.04.09 396919
Completed
CIVIL M-II
29.08.08 18.08.09 410000 23.10.08 30.12.08 406044
Completed
CIVIL M-II
29.08.08 18.08.09 363300 M/s Vikas & Co. 22.10.08 08.01.09 362807
Completed
CIVIL M-II
29.08.08 18.08.09 357900 15.10.08 22.12.08 356857
Completed
CIVIL M-II
29.08.08 20.08.08 462600 15.10.08 05.12.08 462244
Completed
CIVIL M-II
29.08.08 20.08.08 455200 M/s SP Entp. 10.10.08 15.12.08 455053
Completed
6
Pdg cc and drainage from BNB-1083 to T-634/A-7,WT-634/15F and adj gali in B aljit Ngr C-93/KBZ
88/25.06.08/EE(M)-II
7 C/O B/Wall and gate in Sanjay Park in Baljit Ngr In C-93/KBZ
74/25.06.08/EE(M)-II
8 Pdg cc and drainage from h.no.D-101 to D-217 and adj in Baljit Ngr C-93/KBZ
69/25.06.08/EE(M)-II
9 Pdg drainage and cc from T-667,T-556,BNB 2152 and adj lane in Baljit Ngr C-93/KBZ
99/25.06.08/EE(M)-II
M/S Balaji Const.Co.
10
Pdg cc and drainage from h.no.BNB-2694 to BNB-2610 and adj near road no.22 in Baljit Ngr C-93/KBZ
68/25.06.08/EE(M)-II
11
Pdg cc and drainage from h.no.2550,T-650/L4E,T-2606 and T-2591/A-i and adj in Baljit Ngr C-93/KBZ
91/25.06.08/EE(M)-II
12
Pdg cc and drainage from h.no.T-2591/A-1,T-2575/C,T-2564 andT-2574 and adj lane in Baljit Ngr C-93/KBZ
90/25.06.08/EE(M)-II
M/s Harpreet Arora
13
P/L drainage system and cc floring in gali no.5 Panjabi Basti Gulshan Chowk in C-94/KBZ
337/13.10.08/EE(M)-II
M/s Bajaj Const.Co.
14
P/L drainage system and cc floring in gali no.3 Panjabi Basti Gulshan Chowk in C-94/KBZ
333/13.10.08/EE(M)-II
M/s RP Aggarwal
15
P/L drainage system and cc floring in gali no.4 Panjabi Basti near Gulshan Chowk in Baljeet Ngr.in C-94/KBZ
332/13.10.08/EE(M)-II
16
P/L cc and drainage in Gulshan Chowk and near stairs in Panjabi Basti in Baljeet Ngr.in C-94/KBZ
329/13.10.08/EE(M)-II
M/s Markanda Const.
17
P/L drainage system and cc floring from h.no.P-279 along Neelkanth Mandir Panjabi Basti in Baljeet Ngr.in C-94/KBZ
331/13.10.08/EE(M)-II
M/s Pankaj Contractor
18
P/L drainage system and cc floring from h.no. PB-439 to PB-575 and adj lane and along B-93 to B-68/A in gali no.5 Panjabi Basti in Baljeet Ngr.in C-94/KBZ
315/08.10.08/EE(M)-II
CIVIL M-II
29.08.08 20.08.08 293900 M/s Surbhi Const 22.10.08 21.01.09 293078
Completed
CIVIL M-II
29.08.08 20.08.08 405100 15.10.08 22.12.08 405083
Completed
CIVIL M-II
29.08.08 20.08.08 476000 24.10.08 30.12.08 473995
Completed
CIVIL M-II
29.08.08 20.08.08 424500 M/s Pappu Seth 25.10.08 10.12.08 424495
Completed
CIVIL M-II
29.08.08 20.08.08 383700 M/s Tanya Const 17.10.08 05.01.09 383021
Completed
CIVIL M-II08.10.08 06.10.08 423900 M/s Vikas & Co. 25.10.08 11.12.08 423370
Completed
CIVIL M-II08.10.08 06.10.08 497250 15.10.08 30.12.08 496139
Completed
CIVIL M-II
08.10.08 06.10.08 498648 23.11.08 20.03.09 498648
Completed
CIVIL M-II08.10.08 06.10.08 489700 22.10.08 20.01.09 488767
Completed
CIVIL M-II
27.05.08 14.05.08 198000 M/s Amit Gupta 04.07.08 30.09.08 198000
Completed
CIVIL M-II
27.05.08 14.05.08 198000 M/s Surbhi Const 21.07.08 03.10.08 198000
Completed
CIVIL M-II
20.06.08 25.05.08 499400 27.08.08 25.11.08 498136
Completed
CIVIL M-II
20.06.08 25.05.08 460900 10.09.08 27.03.09 460645
Completed
19
P/L drainage system and cc floring from h.no.A-72 to T-22 along A-61 in Panjabi Basti in Baljeet Ngr.in C-94/KBZ
336/13.10.08/EE(M)-II
20
P/L drainage system and cc floring from h.no.B-89 to near Gurudwara in gali no.7 Panjabi Basti in Baljeet Ngr.in C-94/KBZ
334/13.10.08/EE(M)-II
M/s Shah Builders
21
P/L drainage system and cc floring from B-105 to behind Shetla Mata Mandir in Panjabi Basti in Baljeet Ngr.in C-94/KBZ
335/13.10.08/EE(M)-II
M/s Rakesh Kr. Gupta
22
P/L drainage system and cc floring along Ambedkar Park Panjabi Basti in Baljeet Ngr.in C-94/KBZ
338/13.10.08/EE(M)-II
23
P/L drainage system and cc floring from h.no.A-46 to A-100 and adj in gali no.10 Panjabi Basti in Baljeet Ngr.in C-94/KBZ
330/13.10.08/EE(M)-II
24 P/L drainage system and cc flooring in gali no.10 Nehru nagar in C-94/KBZ
373/13.10.08/EE(M)-II
25 Pdg brick work etc. in park and P/L drainage system around park in C-94/KBZ
372/13.10.08/EE(M)-II
M/s Rakesh Kr. Gupta
26
Pdg drainage system near gali Chacha Chakki wali Nehru nagar and Punjabi basti Baljeet nagar in C-94/KBZ
374/13.10.08/EE(M)-II
M/s RP Aggarwal
27 P/L drainage system & cc flooring in gali no.8 Nehru nagar in w.no94/KBZ
371/13.10.08/EE(M)-II
M/s Bajaj Const.Co.
28
Pdg cc and drainage from h.no. 407 to 407/1 and near h.no. 407/1 and adg. near Hanuman MAndir gali no.1 Than singh nagar C-95/KBZ
80/25.06.08/EE(M)-II
29 Pdg cc and drainege from h.no. 407/E-2 to 375 to 407/J-5 in Than Singh nagar C-95/KBZ
82/25.06.08/EE(M)-II
30
C/O lane by pdg. CC pav. and drainage system from h.no.715/5;713/12;722;721 and 721/5 and in Adj. lane in Than Singh Nagar C- 95/KBZ
200/20.08.08/EE(M)-II
M/s Markanda Const.
31
/C/O of lane by pdg. CC pav. and drainage system from h.no.J-5 to T-35 to h.no.553 and adj. lane in Punjabi Basti Than Singh C-95/KBZ
233/01.09.08/EE(M)-II
M/s Nikhil Builders
CIVIL M-II
20.06.08 25.05.08 439700 28.09.08 25.12.08 439666
Completed
CIVIL M-II
20.06.08 25.05.08 384000 01.09.08 08.12.08 383548
Completed
CIVIL M-II
20.06.08 25.05.08 343100 M/s Surbhi Const 09.09.08 02.03.09 342498
Completed
CIVIL M-II
20.06.08 25.05.08 499950 M/s YS Builders 29.08.08 03.11.08 498877
Completed
CIVIL M-II
20.06.08 25.05.08 389950 10.09.08 21.1.08 389950
Completed
CIVIL M-II
27.05.08 14.05.08 192000 M/s Amit builders 04.07.08 02.10.08 189102
Completed
CIVIL M-II
27.05.08 14.05.08 199645 04.07.08 15.12.08 198192
Completed
CIVIL M-II
20.06.08 25.05.08 447850 M/s Amit builders 10.09.08 28.04.09 444542
Completed
CIVIL M-II
20.06.08 25.05.08 495400 10.09.08 09.12.08 493914
Completed
CIVIL M-II
20.06.08 25.05.08 499000 M/s Y.S. builders 04.09.08 03.12.08 496151
Completed
CIVIL M-II
27.05.08 14.05.08 199000 01.09.08 03.10.08 198382
Completed
32
/C/O lane by pdg.CC pav. and drainage system from h.no.720 to716/3 and713/13 and715/1A and adj. lane in Than Singh Nagar C-95/KBZ
311/19.09.08/EE(M)-II
M/s guru Kirpa Const.CO.
33
Pdg. drainage and CC from h.no.271/9 to296; h.no.296 to301 and adg. in Than Singh Nagar C-95/KBZ
231/01.09.08/EE(M)-II
M/s Malhotra Const.Co.
34
C/O lane by pdg. CC pav. and drainage system from h.no.17/62 to Shri Bhagwan Mandir and lane in Than Singh Nagar in C-95/KBZ
236/01.09.08/EE(M)-II
35
C/O lane by pdg. CC nearh.no.194/1; near Kuenwala Mandir 165/7, 101/A,17/74 to 95/7 and adj lane in Than Singh Ngr. C-95/KBZ
214/25.08.08/EE(M)-II
36
C/O lane by pdg. CC and drainage system from h.no.17/69 and adj lane in Than Singh Ngr. C-95/KBZ
232/01.09.08/EE(M)-II
M/S Balaji Const.Co.
37
Pdg cc and drainge from h.no. 406 to 322 to h.no. 322/A in gali no.1 to gali no.2 Than Singh nagar in C-95/KBZ
73/25.06.08/EE(M)-II
38 Pdg cc and draineg from h.no. 406A to 368 to h.no.m 319/1 in Than Singh NAgar C-95/KBZ
102/25.06.08/EE(M)-II
M/s Sunil Kumar gulati
39
C/O lane by pdg cc and drainage from h.no.715/1 to 715/3A and 715/5, h.no.556 to 5/55 and adj lane in Than Singh Ngr. in c-95/KBZ
234/01.09.08/EE(M)-II
40
C/O lane by pdg. CC and drainage system from GH-6 to GH-9 and h.no.208/1A to 197/7E and adj lane in Than Singh Ngr. C-95/KBZ
235/01.09.08/EE(M)-II
M/s Narender Singh Dhanker
41
C/O lane by pdg. CC and drainage system from h.no.723 to 725/3A,5/174 and 5/556 to h.no.443 and adj lane in Than Singh Ngr. C-95/KBZ
213/25.08.08/EE(M)-II
42
pdg cc and drainge from h.no. 389/1 to near h.no. 390/1 and adj in Than Singh nagar C-95/KBZ
76/25.06.08/EE(M)-II
M/s Unique Const.
CIVIL M-II
20.06.08 25.05.08 497500 23.10.08 20.01.09 496922
Completed
CIVIL M-II
20.06.08 26.05.08 482450 13.10.08 14.01.09 481790
Completed
CIVIL M-II
27.05.08 14.05.08 177000 04.07.08 10.09.08 176839
Completed
CIVIL M-II
27.05.08 14.05.08 188902 M/s Vikas & Co. 10.07.08 29.09.08 188636
Completed
CIVIL M-II
20.06.08 26.05.08 498600 14.10.08 12.01.09 498132
Completed
CIVIL M-II
20.06.08 26.05.08 474000 M/s Y.S. builders 23.07.08 15.09.08 473920
Completed
CIVIL M-II
20.06.08 26.05.08 492800 27.07.08 02.01.09 491695
Completed
CIVIL M-II
20.06.08 26.05.08 498400 M/s Y.S. builders 23.07.08 15.09.08 498274
Completed
CIVIL M-II
20.06.08 26.05.08 448000 01.08.08 20.10.08 439255
Completed
CIVIL M-II
20.06.08 26.05.08 424800 27.07.08 15.09.08 422831
Completed
CIVIL M-II
27.05.08 14.05.08 190000 04.07.08 29.12.08 189631
Completed
CIVIL M-II
27.05.08 14.05.08 199871 M/s A&N Bros. 04.07.08 16.01.09 199042
Completed
43
C/O lane by pdg. CC and drainage system from h.no.244/2,242,244/1,257 and 279/A and adj lane in Than Singh Ngr. C-95/KBZ
317/13.10.08/EE(M)-II
M/s Chimmy Const Co.
44
Pdg cc and drainage P.no.KNC/13 to KNC/24 and adj in Vishvakarma Marg Anand Parbat w.no.74/KBZ
322/13.10.08/EE(M)-II
M/s Chimmy Const Co.
45
Pdg drainge system from h.no. 186/8 to h.no. 196/8 and adj and gali no.8 in Than Singh Nagar C-95/KBZ
78/25.06.08/EE(M)-II
M/s Fabcon Engineers
46
Pdg cc and flooring from h.no. 186/8 to h.no. 196/8 to adj in gali no.8 Than Singh nagar C-95/KBZ
83/25.06.08/EE(M)-II
47
Pdg cc and drainage system from P.no. KNB/1 to KNB/13 and adj in Vishvakarma Marg Anand Parbat in C-74/KBZ
320/13.10.08/EE(M)-II
M/s S Gupta Const Co.
48
Pdg cc and drainage system from RA/22 to RA/26 to S/1 to S/9 and adj in Vishvakarma Marg Anand Parbat in C-74/KBZ
117/14.07.08/EE(M)-II
49
Pdg cc flooring from PP-42 to PP-44,PP-51 to PP-55C, PP-52 to PP-45 and adj in gali no.10 Teliwalan side Anand Parbat in C-74/KBZ
148/18.07.08/EE(M)-II
M/s Tajinder Const.Co.
50
Prov. cc and drainage from P.no. P/8A/3 to P/10 and adj in Vishvkarma Marg Anand Parbat C-74/KBZ
118/14.07.08/EE(M)-II
51
Prov. cc flooring from P.no. N-25 to P.no. N-26 and near N-26N and adj lane in middle portion of gali no.9 and gali no.10 indl.area Anand Parbat C-74/KBZ
147/18.07.08/EE(M)-II
M/s Shah Builders
52
Prov. cc flooring from P.no. N-5 to P.no. N-10-22 to P.no. P-4 and adj in gali no.10 near Urinal Block indl.area Anand Parbat C-74/KBZ
154/18.07.08/EE(M)-II
M/s Rakesh Kr. Gupta
53
Pdg cc and draionge from h.no. 196/7, CBR/1 to 17/94 and adj in gali no.7 opp. MC Pry School in Than Singh nagar C-95/KBZ
84/25.06.08/EE(M)-II
M/s Bhardwaj Const Co.
54
Pdg cc and drainge frm h.no. 17/167 oto 95/5A and adj in gali no.6in Than Singh nagar C-95/KBZ
104/25.06.08/EE(M)-II
CIVIL M-II
27.05.08 14.05.08 199000 04.07.08 31.10.08 199000
Completed
CIVIL M-II
27.05.08 14.05.08 199000 04.07.08 25.02.09 198489
Completed
CIVIL M-II
20.06.08 26.05.08 499900 19.09.08 23.12.08 499900
Completed
CIVIL M-II
20.06.08 26.05.08 385400 M/s Surbhi Const 01.08.08 20.11.08 385391
Completed
CIVIL M-II
20.06.08 26.05.08 200200 28.07.08 19.12.09 199836 CompletedCIVIL M-II
20.06.08 16.05.08 460000 28.07.08 18.10.08 459729
Completed
CIVIL M-II20.06.08 16.05.08 472000 14.10.08 02.12.08 471396
Completed
CIVIL M-II20.06.08 16.05.08 350000 27.07.08 24.10.08 349586
Completed
CIVIL M-II
20.06.08 16.05.08 465000 M/s Tanya Const 27.07.08 12.02.08 464794
Completed
CIVIL M-II
20.06.08 16.05.08 470000 27.09.08 12.02.09 469651
Completed
CIVIL M-II
20.06.08 16.05.08 325000 28.07.08 24.10.08 324734
Completed
CIVIL M-II20.06.08 16.05.08 410000 27.08.08 23.10.08 409812
Completed
CIVIL M-II
27.05.08 14.05.08 195940 04.07.08 15.01.09 195940
Completed
CIVIL M-II
27.05.08 14.05.08 192923 04.07.08 03.10.08 192923
Completed
55
Pdg draainge system from h.no. 17/148 to h.no. 76/2 and adj in gali no.5 Than Singh nagar C-95/KBZ
96/25.06.08/EE(M)-II
M/s Naresh Kumar
56
Pdg cc flooring from h.no. 17/148 to 76/2 and adj in gali no. 5 in Than Singh nagar C-95/KBZ
71/25.06.08/EE(M)-II
M/s Tajinder Const.Co.
57
Pdg cc and drainage from KND/11 to KND/19 and adj lane in vishvakarma Marg Anand Parbat C-74/KBZ
297/15.09.08/EE(M)-II
M/s Naresh Kumar
58
Pdg cc flooring from p.no.R-29 to p.no.29Q/9 and adj lane in gali no.4 indl.area Anand Parbat w.no.74/KBZ
150/18.07.08/EE(M)-II
59 C/O Toilet Block near M.C.Pry School in Baljit Ngr C-93/KBZ
140/18.07.08/EE(M)-II
M/s Y.S. Engineers builders
60
Pdg drainage system from main road(road no.89) to road no.22 and adj in Baljit Ngr.C-93/KBZ
126/18.07.08/EE(M)-II
M/s Malhotra Const.Co.
61 Pdg cc flooring from main road(road no.89) to road no.22 and adj in Baljit Ngr.C-93/KBZ
318/13.10.08/EE(M)-II
M/s Fabcon Engineers
62 Pdg cc flooring opp. Ganga Mata Mandir and adj lane in Baljit Ngr. w.no.93/KBZ
133/18.07.08/EE(M)-II
M/s Markanda Const.
63
Pdg drainage system near Dispensary to near Gurudwara Singh Sabha and adj lane in Baljit Ngr. C-93/KBZ
129/18.07.08/EE(M)-II
64
Pdg cc flooring near Dispensary to near Gurudwara Singh Sabha and adj lane in Baljit Ngr.C-93/KBZ
308/19.09.08/EE(M)-II
M/s Kapoor Bros.
65
Pdg drainage and cc flooring from Chachi Mandir to Shani Mandir and adj in Baljit Ngr. C-93/KBZ
127/18.07.08/EE(M)-II
M/s Malhotra Const.Co.
66 Pdg drainage and cc from h.no.T-650/A-4 to T-640/A-4 and adj in Baljit Ngr. w.no.93/KBZ
139/18.07.08/EE(M)-II
M/s Ved pal Bhatia
67
pdg cc and drainage 101/A to 165/17 and adj in cross gali no.5 to gali no.6 in Than Singh nagar C-95/KBZ
94/25.06.08/EE(M)-II
M/s Jasvinder Gulati
68
Pdg cc and drainage from h.no. 17/139 to 142/1 and adj in gali no.5 in Than singh nagar C-95/KBZ
70/25.06.08/EE(M)-II
M/s Naresh Kumar Bansal
CIVIL M-II20.06.08 16.05.08 250000
CIVIL M-II20.06.08 16.05.08 250000
CIVIL M-II
27.05.08 14.05.08 191000 M/s RK Builders 25.06.08 18.08.08 188288
Completed
CIVIL M-II
27.05.08 14.05.08 190920 03.07.08 18.1.08 189733
Completed
CIVIL M-II20.06.08 16.05.08 250000 25.07.08 19.02.09 250000
Completed
CIVIL M-II
20.06.08 16.05.08 490000 M/s A&N Bros. 29.09.08 23.02.09 489502
Completed
CIVIL M-II
20.06.08 16.05.08 345000 M/s SP Entp. 19.07.08 24.08.08 344745
Completed
CIVIL M-II
20.06.08 16.05.08 420000 28.07.08 24.02.09 419207
Completed
CIVIL M-II20.06.08 16.05.08 395000 28.07.08 25.10.08 394983
Completed
CIVIL M-II20.06.08 16.05.08 145000 29.07.08 02.07.09 144774
Completed
CIVIL M-II
23.06.08 28.05.08 199617 09.07.08 22.08.08 199594
Completed
CIVIL M-II
27.05.08 14.05.08 183939 04.07.08 18.02.09 183375
Completed
CIVIL M-II
27.05.08 14.05.08 198773 04.07.08 20.04.09 198699
Completed
CIVIL M-II
27.05.08 14.05.08 183000 M/s Sahil Const. 04.07.08 18.10.08 182492
Completed
69 C/O gate at Ram Swaroop Vidhyarthi Park in Baljit Ngr. w.no.93/KBZ
70 C/O gate at h.no.T-1/A-1,road no. 89 in Baljit Ngr. w.no.93/KBZ
71
Pdg cc and drainge from h.no./ 17/199 to 147/2 and adj in cross galui no.3 and gali no.5 in Than Singh nagar C-95/KBZ
65/25.06.08/EE(M)-II
72
Pdg cc florring from h.no. 17/137 to 102 and adj in gali no. 4 in Than Singh Ngara C-95/KBZ
85/25.06.08/EE(M)-II
M/s Bhatia Const. Co.
73 C/O gate at Amberkar Park in Baljit Ngr. w.no.93/KBZ
138/18.07.08/EE(M)-II
M/s Manchanda Const.
74
Pdg cc flooring from h.no.T-637 behind Baba Ramdev Mandir and adj in Baljit Ngr.w.no.93/KBZ
306/19.09.08/EE(M)-II
75
Pdg drainage and cc from h.no.T-650/EA-1 to T-650/H/5A/IB and adj in Baljit Ngr.w.no.93/KBZ
134/18.07.08/EE(M)-II
76 Pdg drainage and cc from h.no.T-650/H/5A/IB to T-650/2A and adj in Baljit Ngr.w.no.93/KBZ
143/18.07.08/EE(M)-II
M/s Kailash Chander
77 Pdg drainage and cc from h.no.E-91 to T-76 and adj in Baljit Ngr.w.no.93/KBZ
142/18.07.08/EE(M)-II
M/s Bhatia Const. Co.
78 C/O stair case and fixing of MS grills near h.no.T-30/29 in Baljit Ngr.w.no.93/KBZ
137/18.07.08/EE(M)-II
M/s Sunil Kumar gulati
79
P/L cc and drainage system in Amba Bagh from h.no.2/49 to 5/49 and adj lane in Amba Bagh C-75/SPZ
145/18.07.08/EE(M)-II
M/s Mohd. Rashid
80
Pdg drainge system near h.no.95/5a , 76/2 and adj near MC Pry School in Than Singh nagar in C-95/KBZ
87/25.06.08/EE(M)-II
M/s S.Gupta Const. Co.
81
Pdg cc flooring nar h.no 95/5A, 76/2 and adj lanes near MC Pry School Than Singfh Nagar C-95/KBZ
101/25.06.08/EE(M)-II
M/s Sonu Builders
82
Pdg cc and drainge from Atta Chakki to h.no. 17/62 and adj near main new Rohtak road in Than Singh nagar C-95/KBZ
79/25.06.08/EE(M)-II
CIVIL M-II
27.05.08 14.05.08 199717 M/s SK Verma 04.07.08 15.01.09 199717
Completed
CIVIL M-II27.05.08 14.05.08 195000 04.07.08 07.01.09 194078
Completed
CIVIL M-II
27.05.08 14.05.08 183892 26.06.08 23.09.08 183752
Completed
CIVIL M-II
27.05.08 14.05.08 199753 M/s JS Const. 04.07.08 18.02.09 199647
Completed
CIVIL M-II
27.05.08 14.05.08 182000 03.07.08 28.11.08 181563
Completed
CIVIL M-II
27.05.08 14.05.08 199827 04.07.08 18.03.09 199827
Completed
CIVIL M-II
27.05.08 14.05.08 199843 04.07.08 20.10.08 198677
Completed
83
Pdg cc and drainge from H.NO.17/66 TO 17/73 and adj near main new Rohtak road in Than Singh nagar C-95/KBZ
81/25.06.08/EE(M)-II
84 Pdg drainge system from toilet towards Ghati road (LHS)in C-95/KBZ
92/25.06.08/EE(M)-II
M/s ESS GEEConst.
85
Pdg cc and drainage from h.no. 53 to T-36 to App-89 and adj in gali no.6 Punjabi basti in Than singh nagar C-95/KBZ
75/25.06.08/EE(M)-II
M/s Bajaj Const.Co.
86
Pdg cc and drainage from h.no. 656C to 654/3 to 3/71 and adj in gali no.3 Punjabi basti in Than singh nagar C-95/KBZ
103/25.06.08/EE(M)-II
87
Pdg cc and drainage from near h.no. 662/4, 657/3 to 34/3 and adj in gali no.2 Punjabi basti in Than singh nagar C-95/KBZ
95/25.06.08/EE(M)-II
M/s RP Aggarwal
88
Pdg cc and drainage from h.no. 685/1 to 8/228-229 and adj in Punjabi basti in Than Singh nagar C-95/KBZ
97/25.06.08/EE(M)-II
M/s Som Dutt Dwevidi
89
Pdg cc and drainage from h.no. 717/5 to 17/22 and adj lanes in gali no.3 in Punjabi basti in Than Singh nagar C-95/KBZ
86/25.06.08/EE(M)-II
M/s Shah Builders
0.00
0.00
0.00
0.09
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.10
0.00
0.00
0.18
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.92
0.60
0.75
0.00
1.03
1.02
1.00
1.03
0.00
0.00
0.00
0.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.007.07
0.00
0.00
0.00
3.52
0.00
0.00
0.02
0.00
0.00
0.00
0.02
Liabilities Rs.lacs
9.26
2.00
0.00
0.00
5.20
0.10
0.17
0.14
0.06
0.00
0.00
0.00
0.11
0.11
0.00
0.00
0.00
0.00
0.00
20.710.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
41.41
Status Report of MLA, Sh.Shadi RamAC No. 63,2008-09
0
0
0
0
0
0
0
0
0
0
0
Liabilities Rs.lacs
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
000000000000000000000000000000000
00000000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.05
0.00
0.00
0.00
0.00
0.00
0.00
2.58
0.07
0.00
0.00
0.00
0.00
0.00
0.00
0.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
2.94896
0
0
0
0
0
0
0
0
0
0
0
Liabilities Rs.lacs
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
000000000000000000000000000000000000000
0000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0
0
Liabilities Rs.lacs
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0000000000000000000000000000000000000
0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.63
0.00
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
2.98
2.99
2.96
2.96
2.98
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.00
15.49
0.00
0.00
0.00
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.50
2.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.000.005.00