Xenon Delivery. Additional grant 656 kCHF Last 50l subject to negotiation. 575 kCHF granted. 1 MCHF. Japan. PSI Budget ’03 – ’05 kCHF. OK. OK. OK. ~OK. OK. ~OK. 2000+824. 1) External design, BTS power supply 2) He transfer lines. Running costs estimate kCHF / year. Beam - PowerPoint PPT Presentation
Citation preview
Xenon Delivery
0
200
400
600
800
1000
2002 2003 2004 2005 2006
Year
Rec
eive
d X
e [l
]
Japan
1 MCHF
575 kCHFgranted
• Additional grant 656 kCHF
• Last 50l subject to negotiation
PSI Budget ’03 – ’05 kCHF
Granted 2003 2004 2005 Left
R & D annual basis
22 94 97 7
Xenon 1000+575
168 600 526 281
DC 230 0 14 56 159
Beamline 299 0 229 123 -531)
Electronics 201+249
0 0 24 426
Infrastructure 270 25 92 175 -222)
OK
OK
~OK
~OK
2000+824
OK
OK
1) External design, BTS power supply2) He transfer lines
Running costs estimatekCHF / year
• Beam• Electr. Power: 240 • LN2 / LH2• Central computing• Chamber gas: 5• Data storage: 38*) (tapes)• Repairs, extensions…
PSI General Budget
LaboratoryBudget~100
*) 200 GB LTO tape for 75 CHF
Manpower summary [FTE incl. students and some engineers]
Item 2005 2006Cobra 1 1Beamline + Target
2 3 3 3 3
Drift Chamber 5 8 9 9 6Timing Counter 5 5 5 6 6Photon Detector 15 15 11 11 11Trigger 3 3 3 2 3DAQ 2 2 3 2 4MC 3 3 4 5 5Offline 8 8 9 9 10Calibration & Mon.
4 4 4
44 47 51 51 53
COBRA Magnet
2002 2003 2004 2005
Test MilestoneAssemblyDesign Manufactoring
Design Ass. TestWinding & Cryo.Deliv.
PSITest
Platform
Calibration Mapping device
Final fieldmapping during
shutdown
Design Ass. TestWinding & Cryo.Deliv.
PSITest
Platform
Calibration Mapping device
Final fieldmapping during
shutdown
Beam2003 2004 2005 2006
Test MilestoneAssemblyDesign Manufactoring
Solenoid BTS
Triplet I + II
Target
Part 1
New Separator
Beam Line Commissioning
Sep+BTS+COBRACOBRA+Target
GottaPrak.
Pi beam
Solenoid BTS
Triplet I + II
Target
Part 1
New Separator
GottaPrak.
Pi beam
Gotta
2003 2004 2005 2006
Test MilestoneAssemblyDesign Manufacturing
Drift Chamber
outside inside
Full Prototype
FoilFull Detector (18 DC)
Full Size Prototype
outsideinside
Full Prototype
FoilFull Detector (18 DC)
Full Size Prototype
COBRA Test
Timing Counter2003 2004 2005 2006
Test MilestoneAssemblyDesign Manufactoring
Beam Test
Design
PMT Evaluation PMT procur.
Procur & Manuf.
APD Evaluation Test APD procur.
Mechanicalmatching
BGtest
Fullinstallation
APD procur.
New APDs
Frascati
COBRA TestBeam Test
Design
PMT Evaluation PMT procur.
Procur & Manuf.
APD Evaluation Test APD procur.
Mechanicalmatching
BGtest
Fullinstallation
APD procur.
Frascati
Photon Detector
Photon Detector2003 2004 2005 2006
Test MilestoneAssemblyDesign Manufacturing
Large Prototype Beam Test
Cryostat Vessel
PMT
Refrigerator
Liq. Purification
AssemblyTest
Engineering runs
NeutronMeasurements
Large Prototyp Beam Test
Cryostat Vessel
PMT
Refrigerator
Liq. Purification
AssemblyTest
Engineering runs
NeutronShield Tests
Test MilestoneAssemblyDesign Manufactoring
Trigger
2003 2004 2005
Prototype Board
Final Prototype
partialinstallation
fullinstall.
Full system
1st lot of components ordered
2nd lot of components
2006
Prototype Board
Final Prototype
partialinstallation
Full system
DRS (DAQ)2003 2004 2005
Test MilestoneAssemblyDesign Manufactoring
DRS2
DRS2 test board
DRS3
VME boards
Full System
DRS2 production1600 chn
2006
DRS2
DRS2 test board
DRS3
VME boards
4000 chn
Full System
DRS2 production4000 chn
Replacement
2004 2005 2006 2007
Test MilestoneAssemblyDesign Manufactoring
Offline
FrameworkPrototype
Minifarm
Computing Model
DataChallenge
Farm
FrameworkPrototype
½ Minifarm
Computing Model
LPT Analysis
Reconstr.Module
2004J F M A M J J A S O N D
Beam Time MEG
Pra
c MEG Gotta
COBRACalibration
(Wed)
Beam
Line
Commiss.
Part 1
Pla
tf.
Drift
Chamber
Proto
type
Timing Counter TestMechan.
Matching
LPTNeutr.
BGPM + Src Inst
Pi- Beam
Test
Liq.
Purif.
Full Calorimeter
Trigger
DAQ
Te
st
2005J F M A M J J A S O N D
Beam Time Shutdown MEG Gotta MEG
COBRA
Te
sts
Pla
tf.
Beam
Line
BTS
TestsComm. Comm.
Drift
Chamber
Proto
Inst
Te
st?
Timing Counter
Te
st?
LPT PMT Test and Calibration
Full CalorimeterCryogenics
Installation
Trigger
DAQDC
Electr.
TC
Tst
2006J F M A M J J A S O N D
Beam Time Shutdown ? MEG
COBRAField
Map
Beam
LineComm.
Drift
Chamber
Full
Installation
Timing CounterFull
Installation
LPT
Full Calorimeter Installation
Trigger Inst
DAQ Inst