X-band high RF power testing activity at CERN I .Syratchev. CLIC Project Implementation Plan 2012-16 S. Steinar, https://indico.cern.ch/conferenceDisplay.py?confId=239376. XBOX’es on the CERN map. XBOX3 In reparation. XBOX2 Under installaton. XBOX1 In operation. PS cafeteria . XBOX - PowerPoint PPT Presentation
Citation preview
EnEfficient RF Sources Workshop. June 2014 I. Syratchev
X-band high RF power testing activity at CERNI .Syratchev
EnEfficient RF Sources Workshop. June 2014 I. Syratchev
CLIC Project Implementation Plan 2012-16S. Steinar, https://indico.cern.ch/conferenceDisplay.py?confId=239376
EnEfficient RF Sources Workshop. June 2014 I. Syratchev
XBOX1In operation
XBOX2Under installaton
XBOX3In reparation
PS cafeteria
XBOXRF lab
XBOX’es on the CERN map
EnEfficient RF Sources Workshop. June 2014 I. Syratchev
XBOX1 is up and running for almost 2 years
TD26R05CC
EnEfficient RF Sources Workshop. June 2014 I. Syratchev
XBOX1 operator displays
Automatically controls incident power to structure.Short term: +10kW steps every 6 min and -10kW per BD event.Long Term: Measures BDR (1MPulse moving avg.) and will stop power increase if BDR too high.
Intelligent LLRF control and acquisition system: Automatized structure conditioning protocol provides operation at the
prescribed saturated breakdown trip rate. Online adjustment of the PC individual cavities frequencies to guaranty
low reflection and flat top of the compressed pulse. Logging all breakdown events and other conditioning statuses.
Core XBOX1 gamers:Ben Woolley (PhD. Lancaster)Alberto Degiovanni (Fellow, CERN)Joseph Tagg (Eng. ‘National instruments’/CERN)
Technical support:Luka Timeo (CERN)Stephane Rey (CERN)
EnEfficient RF Sources Workshop. June 2014 I. Syratchev
100 MV/m
Full-fledged CLIC accelerating structure TD26R05CC build by CERN is successfully processed in XBOX1 up to 107 MW/m unloaded accelerating gradient at 250 ns pulses . We have started now study of breakdown rate evolution at the fixed (100 MV/m) gradient.
CLIC
XBOX1
05.12.2013
~7x10-
5 BrD/p
ulse
~2x10-5 BrD/pulse
EnEfficient RF Sources Workshop. June 2014 I. Syratchev
The first commercial (CPI) 50 MW 12 GHz klystron is now in operation in XBOX#1
As it looked like during the commissioning at SLAC…
EnEfficient RF Sources Workshop. June 2014 I. Syratchev
And now at XBOX#1…
EnEfficient RF Sources Workshop. June 2014 I. Syratchev
CPI#1 klystron recent processing history
EnEfficient RF Sources Workshop. June 2014 I. Syratchev
XBOX 2
EnEfficient RF Sources Workshop. June 2014 I. Syratchev
Klystron XL5 RF pulse compressor Inside of the test bunker
EnEfficient RF Sources Workshop. June 2014 I. Syratchev
PXI (LabVIEW) based LLRF fox XBOX2 is validated and available
Glossary: PXI - PCI eXtensions for Instrumentation PCI - Peripheral Component Interconnect
EnEfficient RF Sources Workshop. June 2014 I. Syratchev
XBOX 3…an intelligent way to convert repetition rate into greater number of testing slots…
EnEfficient RF Sources Workshop. June 2014 I. Syratchev
Klystrons commutation using LLRF phase triggers.
By RF phase manipulation of klystrons (each running at 400 Hz) we can established 4 testing slots running at 100 Hz each.
EnEfficient RF Sources Workshop. June 2014 I. Syratchev
EnEfficient RF Sources Workshop. June 2014 I. Syratchev
3.5 µs -> 400 ns
1
2
V1
V2
PhM
AM
PC, Q0=1.77x105
Load
Pow
er
Time, ns
SimulationMeasured Phase
modulation
Phase-to amplitude modulation
Making CLIC pulse shape with two klystrons
Incident phase modulation
Incident amplitude modulation
Compressed pulse
Manipulating the RF pulse using phase modulation of the klystrons pair and Pulse Compression.
EnEfficient RF Sources Workshop. June 2014 I. Syratchev
• 4 turn-key 6 MW, 11.9942 GHz power stations (klystron/modulator) have been ordered from industry.
• The first unit is scheduled to arrive at CERN in October 2014. The full delivery will be completed before July 2015.
Peak power: 6 MWBeam Voltage: 150 kVBeam current: 90 AAverage power: 12.4 kWEfficiency: 47.5%
EnEfficient RF Sources Workshop. June 2014 I. Syratchev
Modified K1 ScandiNova modulator
Modulator parameters (max.) for 6 MW Toshiba klystron
Peak RF power: 8.0 MWPulsed voltage: 175 kVPulse current: 115 AAverage power: 50 kWPulse length (flat): 5secRep. rate: 400 HZ
1.6 m
1.3m
Doubled width oil tank. To facilitate installation of the Toshiba klystron which has rather wide ( 0.7 m) solenoid.
Additional cabinet (comes for free). It can be used for Klystron RF driver amplifier, Solenoid PS, Ion Pump PS etc.
New Control System that will simplify integration of external parts and offer a lot of new features.
Flexible design (klystrons positioning) to minimize the length of RF waveguide circuit:
The illustration of new 2 cabinet concept that will be adopted for 6 MW Toshiba klystrons.
EnEfficient RF Sources Workshop. June 2014 I. Syratchev
3D layout/integration of XBOX3