5
www.ist-muse.eu IST MUSE Project leader: [email protected] Presenter: [email protected]

Www.ist-muse.eu IST MUSE Project leader: [email protected]@alcatel-lucent.be Presenter: [email protected][email protected]

Embed Size (px)

Citation preview

www.ist-muse.eu

IST MUSE

Project leader: [email protected]: [email protected]

IST Concertation Meeting 04.10.2006 — 2 www.ist-muse.eu

Consortium

System vendors

SME Aarhus BB society

Operators Research Inst. & UniversitiesIBBTInriaTU EindhovenBudapest University (BUTE)ICCS/NTUAHHILund Institute of Technology (LTH)ACREOUniv. Carlos III de MadridUniversity of Essex

Component vendors

Phase I: 2004-2005Phase II: 2006-200736 partners -100 PY/year

(*) (*)

(*)

(**)

(*) Only in phase I

(**) Only in phase II

IST Concertation Meeting 04.10.2006 — 3 www.ist-muse.eu

Key Results

CustomerPremises

MobileService Provider

Network Service Provider

Internet Service Provider

Application Service Provider

Network Access Provider

Access Node

ResidentialGateway

Edge NodeAggregation network

First Mile

Phase I: 2004-2005 Ethernet/IP access architecture

from end-user terminals to edge Multi-Service capability Open, multi-provider environment Low cost first mile solutions

Phase II: 2006-2007 Access architecture matured +

forwarded to standardisation MM service enablers FMC from fixed network viewpt. Novel first mile concepts

IST Concertation Meeting 04.10.2006 — 4 www.ist-muse.eu

BB Access Lab trials

SPB (Service Plane, MM) at DT Berlin

SPB (Distr. SBC) at TID HuescaVia IST MUPBED

SPC (FMC) at TNO Delft

SPC (FMC) at ACREO Kista

SPD (Distr. content & control ) at PTI Aveiro

SPE (XL-PON) at BT Ipswich

IST Concertation Meeting 04.10.2006 — 5 www.ist-muse.eu

MUSE by numbers (2004-2007)

> 104 Deliverables

> 100 Co-ordinated standard contributions• (DSL Forum, Home Gateway Initiative, ETSI, ITU-T)

> 300 Publications

> 8 MUSE Summer/Winter Schools

> 10 Public demos

> 15 GBytes of working documents

> 300 Different people involved