Page 1 of 46 02/16 /2017 Washington River Protection Solutions LLC LAWPS Facility Construction EOI-LAWPS-MLM-2017-001 / Prequalification Questionnaire / Expression of Interest Construction Subcontract for the LAWPS Facility (Revision 1) Summary Only those capable Subcontractors who are interested in receiving a Request for Proposal (RFP) should complete the attached Prequalification / EOI questionnaire. The information provided by the Subcontractor’s will be used by Washington River Protection Solutions, LLC (WRPS) to identify Subcontractor’s that will receive an RFP for the construction of the Low Activity Wastes Pretreatment System (LAWPS). Any and all information transmitted by the Subcontractor, up to and including Subcontractor’s response to the RFP, may be used to verify the Subcontractor’s qualifications to perform the work. Failure to meet all requirements, at any time, may deem the Subcontractor ineligible. Subcontractor’s shall submit their response to the attached Prequalification Questionnaire / EOI using Microsoft Word file and pdf file via e-mail to [email protected] no later than Friday, March 17 , 2017. Responses that are unnecessarily excessive may be rejected in their entirety. Responses received after Friday, March 17 , 2017 including mailed sections, might not be considered. Receipt of responses will be acknowledged by e-mail. Name of Participating Firm(s): Point(s) of Contact: Telephone Number(s): Facsimile Number(s): E-mail Address(es): Introduction WRPS is planning to issue a Request for Proposal (RFP) in the third quarter of FY 2017 for construction services that include furnishing the design, materials, equipment, and labor to construct and test the new Low Active Waste Pretreatment System (LAWPS) Facility on the Department of Energy's (DOE) Hanford Site located in southeastern Washington State. This project is governed by DOE Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” with stringent Quality and Earned Value Management System requirements.

Web viewSubcontractor’s shall submit their response to the attached Prequalification Questionnaire / EOI using Microsoft Word file ... AISC Quality Certification ... Manual

  • Upload
    vudiep

  • View
    225

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Web viewSubcontractor’s shall submit their response to the attached Prequalification Questionnaire / EOI using Microsoft Word file ... AISC Quality Certification ... Manual

Page 1 of 3402/16 /2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-001 /

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 1)

Summary

Only those capable Subcontractors who are interested in receiving a Request for Proposal (RFP) should complete the attached Prequalification / EOI questionnaire. The information provided by the Subcontractor’s will be used by Washington River Protection Solutions, LLC (WRPS) to identify Subcontractor’s that will receive an RFP for the construction of the Low Activity Wastes Pretreatment System (LAWPS). Any and all information transmitted by the Subcontractor, up to and including Subcontractor’s response to the RFP, may be used to verify the Subcontractor’s qualifications to perform the work. Failure to meet all requirements, at any time, may deem the Subcontractor ineligible. Subcontractor’s shall submit their response to the attached Prequalification Questionnaire / EOI using Microsoft Word file and pdf file via e-mail to [email protected] no later than Friday, March 17, 2017. Responses that are unnecessarily excessive may be rejected in their entirety. Responses received after Friday, March 17, 2017 including mailed sections, might not be considered. Receipt of responses will be acknowledged by e-mail.

Name of Participating Firm(s):

Point(s) of Contact:

Telephone Number(s):

Facsimile Number(s):

E-mail Address(es):

Introduction

WRPS is planning to issue a Request for Proposal (RFP) in the third quarter of FY 2017 for construction services that include furnishing the design, materials, equipment, and labor to construct and test the new Low Active Waste Pretreatment System (LAWPS) Facility on the Department of Energy's (DOE) Hanford Site located in southeastern Washington State. This project is governed by DOE Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” with stringent Quality and Earned Value Management System requirements.

Project Background

The DOE Office of River Protection (ORP) currently manages approximately 56 million gallons of highly radioactive mixed waste that is stored in underground tanks at the Hanford Site, located in southeastern Washington State. ORP is constructing a set of new facilities, collectively referred to as the Waste Treatment and Immobilization Plant (WTP), which will be used to treat and vitrify these nuclear wastes.

The LAWPS Project will separate High Level Waste (HLW) components from Low Activity Waste (LAW) components by filtration and ion exchange and stage the low activity waste. From the staging system, the waste will be transferred to Waste Treatment Plant (WTP) LAW facility where it will be immobilized through a vitrification process. Construction of the LAWPS Facility will enable the U.S. Department of Energy to treat and immobilize Hanford Tank Waste by 2022.

WRPS has formed an Engineering, Procurement and Construction (EPC) Projects group to execute the design and construction of the LAWPS Project. The construction phase of the project will be isolated

Page 2: Web viewSubcontractor’s shall submit their response to the attached Prequalification Questionnaire / EOI using Microsoft Word file ... AISC Quality Certification ... Manual

Page 2 of 3402/16 /2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-001 /

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 1)

from other existing Hanford Facilities by executing the project within its own construction fence using WRPS EPC procedures specifically tailored to permit efficient (near greenfield) execution of this large complex project, including its design and construction. This Project including the construction is being carried out in accordance with DOE Order 413.3B.

The LAWPS Project has implemented an Integrated Project Team (IPT). WRPS manages and controls activities necessary to execute the Project. Typical examples of integration activities include participating in weekly status meetings, design reviews, risk workshops, Direct Feed LAW (DF LAW) Program strategy development, budget planning, project reviews, variance analysis, and project document development/maintenance. The LAWPS Project has engaged a design agent subcontractor to develop the preliminary and detailed design. The design agent will remain engaged throughout the project execution. WRPS Engineering is acting as the Design Authority for the design, procurement, construction, commissioning, and operation of the LAWPS Facility. WRPS has established the Construction Management Team (CMT), as a subset of the IPT. The selected construction subcontractor awarded the construction subcontract for the facility will be a key member of the CMT. The subcontractor must have experience and ability to engineer, procure and construct complex projects that include safety significant systems. The LAWPS has been evaluated per the methodology in DOE-STD-1027-92, “Hazard Categorization and Accident Analysis Techniques for Compliance with DOE Order 5480.23, Nuclear Safety Analysis Reports,” to be a Hazard Category 2 nuclear facility (i.e., hazard analysis shows the potential to release sufficient quantities of hazardous material and energy during a design basis accident to result in significant consequences to on-site facility workers). The facility documented safety analysis identifies the resulting selected nuclear safety controls that include safety-significant (SS) structures, systems, and components (SSCs) along with technical safety requirements and other defense-in-depth design and administrative features. Assurance that installed SSCs can be relied upon to perform their intended preventive or mitigating functions requires adherence to rigorous acquisition processes. The subcontractor must have an established Quality Assurance Program meeting ASME NQA-1 2008/2009 Parts I and II requirements, an approved Cost Accounting System, and have a certified Earned Value Management System. Additionally, the subcontractor and sub-tier subcontractors must have a Safety Experience Modification Rate (EMR) rating of 1.0 or below for the last three years.

WRPS will direct the commissioning for the project with support provided by the construction subcontractor. The WRPS Test Director will utilize resources provided by the Subcontractor to carry out system testing and acceptance prior to transfer of the facility to operations.

Questionnaire Sections

This prequalification questionnaire / EOI have Sections A through L. Each section must be completed. Failure to complete each section may disqualify potential Subcontractor’s. Each section provides some of the key requirements anticipated to be in the request for proposal (RFP) for this Construction Service Subcontract, and asks related qualification questions. Responses should be limited to a few paragraphs unless directed otherwise. Responses that are unnecessarily excessive may be rejected in their entirety. The included questionnaire is focused on twelve (12) Sections below:

A. Facility Scope DefinitionB. Type of Contract Discussion

Page 3: Web viewSubcontractor’s shall submit their response to the attached Prequalification Questionnaire / EOI using Microsoft Word file ... AISC Quality Certification ... Manual

Page 3 of 3402/16 /2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-001 /

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 1)

C. Cost Accounting SystemD. Earned Value Management SystemE. Small Business QualificationF. Team IdentificationG. Organizational Structure & Staff QualificationsH. Capability and ExperienceI. Property and Material Management PlanningJ. Health and Safety ProgramK. Quality Assurance ProgramL. Labor Agreements

This is an Expression of Interest/Prequalification questionnaire only. This is not a Request for Proposal (RFP) and shall not be construed as a commitment by WRPS to award a contract.

Response to each section is required.

Page 4: Web viewSubcontractor’s shall submit their response to the attached Prequalification Questionnaire / EOI using Microsoft Word file ... AISC Quality Certification ... Manual

Page 4 of 3402/16/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-001 /

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 1)

A.) Facility Scope Definition

Overview

The LAWPS is a Category 2 nuclear facility which will be remotely operated. The project construction will be carried out under the DOE Order 413.3B. The main process vaults have multiple embedment depths with the deepest foundation 47 feet below grade with top of concrete elevation approximately equal to grade. The process vaults are enclosed within a 125 foot by 85 foot by 60 foot tall above grade structural steel building, housing a 30 ton overhead crane and truck airlock. Located immediately adjacent to this are support structures housing electrical, HVAC, and process equipment and spent process resin waste packaging system. Balance of plant equipment is installed on slabs placed on grade. Balance of plant equipment is primarily designed to be fabricated and delivered as sub-assemblies. There are also waste transfer lines that run from the Tank farms to LAWPS and from LAWPS to the Waste Treatment Plant which is currently under construction by others.

The construction site soils have been sampled and are anticipated to be free of any radiologically contaminated materials. The exception to this may be a section of the transfer lines running adjacent to the tank farm which also cross abandoned lines. These crossings will be exposed using a guzzler during the work activities near these lines. The crews performing this piece of work will require additional training.

The scope of this work will not include the introduction of nuclear wastes or chemicals required for the process into the facility, including the waste lines.

The WRPS Design Agent Subcontractor is designing a large percentage of the project on a build to print basis. However there will be certain design elements within the construction scope that will be procured by the Construction Subcontractor that requires design submittal approvals by the WRPS Design Agent. These designs may be executed by the Subcontractor’s NQA1 qualified vendors and/or sub-tiers, and may include a variety of equipment skids, control systems, and other engineered products and commodities.

Below are the anticipated phased construction subcontract scope descriptions based on each Project Critical Decisions CD-2, CD-3A, and CD-3. Each scope will require DOE funding authorizations.

• CD-2 Pre-planning including final estimate and target cost and schedule preparation – This will include final takeoffs using the approved for construction drawings, establishing the construction strategy, establishing ownership of risks, establishing the baseline schedule, preparing a detailed estimate and reaching agreement with WRPS on a final price.

• CD-3A Site Preparation – This is comprised of site preparation activities; fencing, temporary utilities, clearing and grubbing, excavation for the vault construction, procurement of rebar, embeds, and supporting materials, long lead equipment design, and placement of the mud mat. Installation of site infrastructure such as utilities, offices, and a warehouse may also be included in this scope.

• CD-3 Construction– This will be comprised of the completed procurement and construction activities including civil, architectural, mechanical (piping, equipment, HVAC, etc.), utilities, I&C,

Page 5: Web viewSubcontractor’s shall submit their response to the attached Prequalification Questionnaire / EOI using Microsoft Word file ... AISC Quality Certification ... Manual

Page 5 of 3402/16/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-001 /

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 1)electrical and construction acceptance testing. Support for the WRPS start up testing group will also be included in this scope.

CD 2 Scope Pre-Planning

Take off of final quantities from the issued for construction drawings. Development of the target schedule for the Construction Subcontract. Development of the target cost for the Construction Subcontract. Procurement and delivery of the design of critical Subcontractor furnished materials and

equipment as required to support the schedule such as:o Reinforcement fabrication drawings o Embedment fabrication drawings o Other equipment to be procured by the construction subcontractor (HVAC, Electrical

Equipment Building etc.). Submittal and approval of these designs to support the construction schedule. Negotiation of the final target price and schedule.

Note: There are a significant number of procurements that must be undertaken by the Subcontractor. It is critical that the Subcontractor has adequate staffing with procurement professionals including engineers to complete these procurements to the required procurement standards and quality levels to support the schedule.

CD-3A, Site Preparation

• Grading of site to include grubbing and clearing, erection of perimeter fencing, establishment of erosion control and maintenance of dust control/emissions as required +/- 12 acres

• Excavation required to support concrete vault construction. An excavated support system using soldier piles, lagging, and tiebacks will have been designed and provided by WRPS to the subcontractor. ~ 50,000 CY

• Installation of material storage and fabrication facilities ~20,000 sf• Fabrications of embedments, reinforcement and long lead equipment• Procurement of other temporary material require for initial concrete placement• Mobilization of personnel required to support the facility construction• Initial tie-ins and establishment of temporary power and utilities • Office facilities consisting of (trailer complex/temporary structure) for 80+/- work stations,

including meeting & conference rooms, change and lunch areas, storage trailers; estimated to be ~10 temporary structures

CD-3, Procurement, Construction & Installation

Other major equipment and material procurements and construction completion:

• Build to print drawings and specifications will be provided for the valve skids. There are 10 valve skids that the construction subcontractor will procure. See government furnished section for equipment provided by WRPS.

• HVAC exhaust skid including stack, (Safety Significant).

Page 6: Web viewSubcontractor’s shall submit their response to the attached Prequalification Questionnaire / EOI using Microsoft Word file ... AISC Quality Certification ... Manual

Page 6 of 3402/16/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-001 /

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 1)

• HVAC unit, (Safety Significant).

• HVAC unit, general service.

• Electrical control prefabricated building & equipment.

• Tanks – 3 ea. safety significant (SS), D stamped 125,000 Gal –, 1 ea. 30,000 SS filter feed tank, 1 ea. 5,000 Gal SS and other smaller tanks. Tanks are 316L SS (WRPS will provide build to print drawings).

• Control System, (Safety Significant).

• Control system – General Service.

• Piping for the process systems, large and small bore.

• Valve pit lids – 660 Tons.

Estimated Key Quantities for Construction & Installation

• Vault construction (~8500 CY).

• Weather protection building construction above vaults including resin handling, north annex and lag storage buildings (~ 20,000SF), ~600 tons structural steel.

• Electrical installation (site transformer installed by others during or before site prep) o ~50,000 lf conduito ~500 lf underground duct banko ~156,000 lf Cableo ~3,000 lf Cable Trayo includes fiber optic cableo prefabricated electrical equipment building.

• Control systems (Allen Bradley).

• Safety significant control system.

• HVAC general service system – intake skid and duct work (~100 lf).

• HVAC safety significant system – intake skid fan/controls module and ducting.

• HVAC exhaust skid, ducting, stack and CIDs.

• Piping – 316LStainless – ~4,000lf 1.5” and less, ~10,000 >= 2” (Safety Significant).

• Valves ~925

Page 7: Web viewSubcontractor’s shall submit their response to the attached Prequalification Questionnaire / EOI using Microsoft Word file ... AISC Quality Certification ... Manual

Page 7 of 3402/16/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-001 /

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 1)

• REMOTE Connectors/Jumpers – ~46 – 2” and larger fabrication and installation (Purex jumper fittings furnished by WRPS).

• Piping systems general service.

• Mechanical equipment including tanks (must be D stamped).

• Instrumentation – ~2,333 instruments – wiring & terms included in electrical above.

• Fire protection system.

Government furnished equipment and materials (See Section “I”)

• Overhead Crane• Ion Exchange skid• Cross Flow Filter skid• Filter Feed Valve Skid• All Grayloc and Purex connectors will be furnished loose. (Jumper fabrication will be done under

this subcontract) • Xomox valves that are required for the valve skid assembly’s above.

Schedule Objective – The schedule objective is to provide a facility that feeds low active waste (LAW) to the Waste Treatment Plant (WTP) LAW Facility by the target date of FY 2021. The project design is approximately 50% complete. The 60% design review is anticipated to be finalized with comments incorporated FY 2017 mid-year. Design completion is anticipated in early 2018 with DOE approval of Critical Decision 2/3 authorizing construction (CD-2/3) near the end of the third quarter of FY 2018. Early construction funding is being requested in a CD3A package which is targeted for late in the first quarter of FY18.

The construction schedule is very aggressive in order to meet DOE commitments to initiate tank waste treatment and disposal. The current construction schedule assumes working a rolling 4-10’s schedule for the construction in order to support the project completion dates.

The P6 schedule will be resource loaded including labor hours, equipment, and total cost of each activity. Critical path analysis, description of any variances and corrective action will be required as a monthly reporting requirement. Weekly updates to the target schedule will be required.

The current project schedule:

• Receipt of Responses for Expression of Interest 02/17/17• Issue the RFP 03/2017• Submittal of proposals to WRPS 7/2017• Award of the construction Subcontract 11/2017• Authorization for preplanning package 11/2017• Authorization for CD3A scope 12/2017• Authorization for Balance of Facility Construction 11/2018

Page 8: Web viewSubcontractor’s shall submit their response to the attached Prequalification Questionnaire / EOI using Microsoft Word file ... AISC Quality Certification ... Manual

Page 8 of 3402/16/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-001 /

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 1)

• Mechanical Completion 4/2020• Integrated system testing completion (directed by WRPS test director, supported by

subcontractor) 7/2020• Substantial completion 7/2020• Contract Close out 1/2021

A key element of the LAWPS Project will be the fabrication, testing, and installation of pre-fabricated valve, equipment, tanks, and HVAC modules/skids that will be placed inside of below grade vaults. Figures 3 through provide model cut examples of several of these modules/skids. The NQA-1 fabrication of these modules/skids will require close tolerance fabrication, accurate positioning inside the vaults, and detailed as-built information to support installation/removal of remote connectors for maintenance and replacement.

Page 9: Web viewSubcontractor’s shall submit their response to the attached Prequalification Questionnaire / EOI using Microsoft Word file ... AISC Quality Certification ... Manual

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 1)

FIGURE 1 LAWPS PROJECT PLANT VIEW

Page 10: Web viewSubcontractor’s shall submit their response to the attached Prequalification Questionnaire / EOI using Microsoft Word file ... AISC Quality Certification ... Manual

Page 10 of 3402/16/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-001 /

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 1)

FIGURE 2 MAIN PROCESS BUILDING

Page 11: Web viewSubcontractor’s shall submit their response to the attached Prequalification Questionnaire / EOI using Microsoft Word file ... AISC Quality Certification ... Manual

Page 11 of 3402/16/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-001 /

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 1)

FIGURE 3 - PLAN VIEW OF PROCESS VAULTS INSIDE THE WEATHER ENCLOSURE (vault cover plates removed)

Page 12: Web viewSubcontractor’s shall submit their response to the attached Prequalification Questionnaire / EOI using Microsoft Word file ... AISC Quality Certification ... Manual

Page 12 of 3402/16/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-001 /

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 1)

FIGURE 4 ELEVATION VIEW INSIDE THE ION EXHANGE VALVE PIT MODULE/SKID

Page 13: Web viewSubcontractor’s shall submit their response to the attached Prequalification Questionnaire / EOI using Microsoft Word file ... AISC Quality Certification ... Manual

Page 13 of 3402/16/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-001 /

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 1)

FIGURE 5 CESIUM TANK

Page 14: Web viewSubcontractor’s shall submit their response to the attached Prequalification Questionnaire / EOI using Microsoft Word file ... AISC Quality Certification ... Manual

Page 14 of 3402/16/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-001 /

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 1)

FIGURE 6 FILTER FEED TANK

FIGURE 7 – CROSS FLOW FILTER MODULE/SKID

Page 15: Web viewSubcontractor’s shall submit their response to the attached Prequalification Questionnaire / EOI using Microsoft Word file ... AISC Quality Certification ... Manual

Page 15 of 3402/16/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-001 /

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 1)

Page 16: Web viewSubcontractor’s shall submit their response to the attached Prequalification Questionnaire / EOI using Microsoft Word file ... AISC Quality Certification ... Manual

Page 16 of 3402/16/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-001 /

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 1)

B.) Type of Contract Discussion

Cost Range - The Construction Subcontract value is anticipated to be between $150 and $200 Million dollars.

Construction Contracting Strategy

The project anticipates an incentivized cost reimbursable subcontract to execute the facility construction. The Request for Proposal (RFP) will contain the 60% design media. The source selection board will evaluate the bids and recommend award based on the source selection evaluation criteria included in the RFP. The fixed fee will be established at this time. DOE approval will be required prior to awarding the subcontract. A preplanning line item included in the subcontract scope will be authorized upon DOE approval of the subcontract. The preplanning task scope will include the final target cost and schedule development utilizing the 100% design media.

The cost reimbursable contract will include incentives that are designed to ensure safe on time delivery and promote cost efficiencies. The incentives are currently visualized as affording opportunity for the constructor to increase his total fee by earning bonuses for early/on time completion, and for underrunning cost. Conversely, a significant proportion of the subcontractor’s fee established at award will be subject to forfeiture for poor safety, quality, schedule, or cost performance.

The contractor will also be authorized to negotiate and enter into agreements for preparation and submittal of detail design and shop drawings including tanks, embedments, concrete reinforcement drawings, HVAC, etc. as part of the preplanning task. The subcontractor will be authorized to initiate fabrications and other material procurements, mobilize to site, carry out site preparation activities and any other scope included in the CD3A package immediately after its approval by the DOE.

The subcontractor will be authorized to proceed with the balance of the facility construction immediately after approval of the CD2/3 package by the DOE. The WRPS contract currently expires in October of 2018. In the event the WRPS is not successful during the re-competition of the TOC contract, this subcontract for the construction of the LAWPS will be novated to the new TOC operator selected by the DOE.

This contracting strategy has been adopted to:

• Achieve the current completion date imposed by the DOE to meet the commitments to initiate tank waste treatment.

• Provide sufficient schedule for the construction subcontractor to preplan the work concurrent with DOE approval of the design package and Critical Decision Points.

Page 17: Web viewSubcontractor’s shall submit their response to the attached Prequalification Questionnaire / EOI using Microsoft Word file ... AISC Quality Certification ... Manual

Page 17 of 3402/16/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-001 /

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 1)

• Providing time to engage the subcontractor to development an achievable target price and schedule based on finalized design drawings, including the identification and assignment of project risks.

• Provide opportunities to identify and implement earlier construction activities to shorten the project schedule and cost.

Questions:

1. Do you believe a target price cost reimbursable contract with incentives is the most appropriate contract vehicle for this scope of work?

Yes/No (Circle one and explain below) Explanation

2. The milestone commitments established by DOE adds to the importance of safely performing this scope within the stated durations. The contract form above was chosen in part to accommodate change in the most expeditious manner possible within the requirements imposed by federal regulations.

Do you concur, or would you propose an alternate contract format?

Yes/No (Circle one and explain below) Explanation

Page 18: Web viewSubcontractor’s shall submit their response to the attached Prequalification Questionnaire / EOI using Microsoft Word file ... AISC Quality Certification ... Manual

Page 18 of 3402/16/2017Washington River Protection Solutions LLC LAWPS Facility Construction

EOI-LAWPS-MLM-2017-001 / Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 1)

C.) Cost Accounting System

The Subcontractor is required to have a Certified Cost Accounting System (CAS) subject to the requirements of the Cost Accounting Standards Board (48 CFR Chapter 99). The subcontractor shall complete Attachment 1, “Exhibit 2: Cost Accounting Standard Notices and Certification,” and submit as part of the Prequalification Questionnaire / EOI.

Note: The Subcontractor shall also resubmit the Cost Accounting Standard Notices and Certification Form with the solicitation proposal.

Page 19: Web viewSubcontractor’s shall submit their response to the attached Prequalification Questionnaire / EOI using Microsoft Word file ... AISC Quality Certification ... Manual

Page 19 of 3402/16/2017Washington River Protection Solutions LLC LAWPS Facility Construction

EOI-LAWPS-MLM-2017-001 / Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 1)

D.) Earned Value Management System

The subcontractor will be required to develop, implement and manage an Earned Value Management System (EVMS) in compliance with the Electronic Industries Alliance (EIA)-748 “Earned Value Management Systems.” Key aspects of this EVMS are to develop, implement and manage a baseline and forecast schedule with corresponding time-phased budget and forecast resources. The schedule shall include significant external and internal interfaces, be an integrated, logical network-based plan that correlates to the WBS, will be vertically traceable to the EVMS control accounts, and successfully aligned in summary activities to the WRPS schedule. The schedule shall be capable of summarizing from control accounts to higher WBS levels and support earned value reporting. A baseline change control process is also a key aspect. In addition to EIA-748, the DOE O 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” provides further requirements for this size of contract, including but not limited to the certification and on-going surveillance of the subcontractor’s EVMS. WRPS may not require the full EVMS certification, in this event, specific EVMS requirements and controls may be flowed down to assure the subcontractors EVMS reporting, tracking, and controls in place are adequate to meet the overall requirements of the EVMS Program.

Questions:

1. Is your company currently EVMS Certified in accordance with EIA-748?

Yes/No (Circle one and explain below) Explanation

2. If EVMS Certification is required and your company is not EVMS Certified, briefly describe your implementation plan and schedule for getting certified?

3. Provide a description of your companies change control practices. Include a description of baseline cost and schedule management, request for equitable adjustment procedures, and contract and subcontract administration processes.

Page 20: Web viewSubcontractor’s shall submit their response to the attached Prequalification Questionnaire / EOI using Microsoft Word file ... AISC Quality Certification ... Manual

Page 20 of 3402/16/2017Washington River Protection Solutions LLC LAWPS Facility Construction

EOI-LAWPS-MLM-2017-001 / Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 1)

E.) Small Business Information

This procurement is not reserved for a Small Business, however teaming arrangements that provide for a strong organizational structure meeting project requirements (ES&H, Quality, EVMS, CAS, etc.), and meeting the small business size standard of NAICS Code 236210 – "Industrial Building Construction," (Size Standard of $33.5 Million), such as a joint venture team led by a small business concern are encouraged.

Questions:

1. Can you (and/or your team) qualify as a Small Business in accordance with the Code of Federal Regulations, CFR Part 121, "Small Business Size Regulations," (Size Standard of $33.5M) for the entire scope or portions of the scope (See Note 1)?

Yes/No (Circle one and explain below) Explanation

Note 1: Any questions concerning small business partnering relationships or minimum small business participation for this procurement should be addressed to the Small Business Administration.

Page 21: Web viewSubcontractor’s shall submit their response to the attached Prequalification Questionnaire / EOI using Microsoft Word file ... AISC Quality Certification ... Manual

Page 21 of 3402/16/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-001 /

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 1)

F.) Team IdentificationIdentify you Company information and your planned teaming arrangement(s):

1 Company Name:Address:Point of Contact:Title:Phone:Email Address:

2 Company Information:Duns Number -Socioeconomic Status -Potential Team Members -

3 Teaming Partners & Scope:

Company Name:Address:Point of Contact:Title:Phone:Email Address:Scope:Experience/Qualifications

Company Name:Address:Point of Contact:Title:Phone:Email Address:Scope:Experience/Qualifications

Company Name:Address:Point of Contact:Title:Phone:Email Address:Scope:Experience/Qualifications

Notes:1. Include/expand additional sheets for all Key Teaming/Sub-tiers. In particular module and ASME tank fabricators.2. Structural Steel Fabricator(s) minimum 5 years of documented experience. Fabricator shall participate in the AISC Quality Certification Program and shall be designated an AISC Certified Plant, Category BU (formerly STD).3. Structural Steel Erector minimum 5 years of documented experience. Erector shall participate in the AISC Certification Program and shall be designated an AISC Certified Erector, Category ACSE or CSEA.

Page 22: Web viewSubcontractor’s shall submit their response to the attached Prequalification Questionnaire / EOI using Microsoft Word file ... AISC Quality Certification ... Manual

Page 22 of 3402/16/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-001 /

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 1)

G.) Organizational Structure & Staff Qualifications

1. Provide a description of the Project Management/Project Execution procedures utilized by your Company/Team:

2. Describe the availability of qualified personnel and staff for this project:

3. Provide an anticipated organization chart:

4. Provide resumes of the types of qualified personnel and staff available for this project:

Expected Requirements for Key Personnel

Project Manager

Twenty (20) years managing large scale construction projects including experience:• Establishing means and methods• Managing sub-tier subcontractors• Integrating work force with customer’s onsite support personnel• Managing union craft (e.g., pipefitters, iron workers, etc.)• Managing Engineering activities.• Demonstrated ability to complete work while complying with the rigorous environmental, safety

and health, quality, and work management program requirements typical of a DOE facility (minimum 5 years)

• With nuclear facility construction/operation• With earned value management techniques and methods

Project Engineer

Twenty (20) years engineering experience for construction projects including:• Demonstrated ability to engineer solutions to complex problems relevant to this scope.• Licensed Professional Engineer in State of Washington• Mechanical equipment design, procurement, installation, and testing• Demonstrated ability to complete work while complying with the rigorous environmental, safety

and health, quality, and work management program requirements typical of a DOE facility (minimum 5 years).

Site Construction Superintendent (fulltime during on site work activities)

Fifteen (15) years’ experience supervising construction projects, including:

• 2 year in civil operations (excavation, backfill, paving, etc.) experience.• 5 years mechanical equipment and piping fabrication/installation• 3 years concrete placement/finishing

Page 23: Web viewSubcontractor’s shall submit their response to the attached Prequalification Questionnaire / EOI using Microsoft Word file ... AISC Quality Certification ... Manual

Page 23 of 3402/16/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-001 /

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 1)

• Experience working with union workforce labor management associated with bargaining units (building trades)

• Experience integrating work crews with customer support personnel, including union personnel• Demonstrated ability to complete work while complying with the rigorous environmental, safety

and health, quality, and work management program requirements typical of a DOE facility (minimum 3 years)

Safety and Health Manager (Full time on-site position)

Fifteen (15) years construction safety experience including:• 5 years heavy industrial construction• The SUBCONTRACTOR Safety and Health Program shall be supported by either a Certified

Industrial Hygienist (CIH) or Certified Safety Professional (CSP) to ensure the technical and cultural aspects of safety and health are met [10 CFR 851.20]. Persons working on site within the Subcontractor's authority must meet one of the following criteria:

o Construction Health Safety Technician (CHST),o Occupational Health and Safety Technician (OHST),o Associated Safety Professional (ASP),o Industrial Hygienist in Training (IHIT) or Certified Associate Industrialo Hygienist (CAIH),

• 3 years DOE site experience.

Quality Assurance Manager

Twenty (20) years’ experience in quality assurance/control including:• 10 years quality assurance/control experience implementing NQA 1• 5 years DOE site experience• Experience evaluating QA Program compliance for procurement and construction installation

activities• Experience evaluating SUBCONTRACTOR QA programs

Supplier Quality Assurance Manager

Ten (10) years’ experience in supplier quality assurance inspection and control:• 5 years supplier quality assurance/control experience implementing NQA 1• 2 years DOE site experience• Experience inspecting subcontractor products for compliance to procurement and fabrication

requirements• Experience evaluating SUBCONTRACTOR QA programs

Procurement Manager

• Twenty (20) years’ experience in procurement and subcontracting:• Demonstrated ability to issue complex procurement actions relevant to this scope• Certified Procurement Manager• 10 years procurement experience purchasing NQA-1 services, equipment, and commodities • 5 years procurement experience with FAR compliant purchases

Page 24: Web viewSubcontractor’s shall submit their response to the attached Prequalification Questionnaire / EOI using Microsoft Word file ... AISC Quality Certification ... Manual

Page 24 of 3402/16/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-001 /

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 1)

• 5 years procurement experience on DOE or other government agency project

Additional Questions

Potential Subcontractors must be able to propose Key Personnel which meets the following criteria:

1. Can you (and/or your team) deliver a staff that would meet or exceed these requirements?

Yes/No (Circle one and explain below) Explanation

2. Can you (and/or your team) demonstrate a history of process improvements and innovative construction approaches made on projects under their leadership?

Yes/No (Circle one and explain below) Explanation

3. Is your Company / Team have the organizational structure and ability to effectively manage and staff a rolling 4-10 schedule?

Yes/No (Circle one and explain below) Explanation

4. Can you (and/or your team) provide an example an organization structure that was utilized on a similar construction project or the proposed organization for this scope?

Yes/No (Circle one and explain below) Explanation

Page 25: Web viewSubcontractor’s shall submit their response to the attached Prequalification Questionnaire / EOI using Microsoft Word file ... AISC Quality Certification ... Manual

Page 25 of 3402/16/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-001 /

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 1)

H.)[G.)] Capability and Experience

1. Describe your Company/Team Construction capabilities:

2. Describe your Company/Team Procurement capabilities:

3. Describe your Company/Team Engineering capabilities:

4. Describe your Company/Team Materials Management Experience:

It is expected that the Subcontractor’s will be required to show evidence of meeting the following requirements if invited to submit a Proposal. Subcontractor may consist of an individual company, joint venture, or teaming or partnering arrangement. Failure to meet requirements, at any time, may deem Subcontractor ineligible for award. The Subcontractor:

• must have demonstrated capability and a minimum of twenty (20) years’ experience in performing procurement, planning, and installation of scope descriptions identified in Section "A";

• must have twenty (20) years’ experience performing similar construction services;• must be able to post a Miller Act Payment and Performance Bond, or approved equivalent, at

the time of award of Subcontracts having a penal sum equal to the amount of the subcontract contract value.

Questions

Note: In support of answers below, please complete the Relevant Project Experience table at the end of this section. The Subcontractor shall list projects that demonstrate the capability and experience of your company (and team members) in performing work similar to the Scope describe in Section "A." Address the types of work discussed in Section "A" and referenced in the questions below.

1. Can you (and/or your team) demonstrate a successful history of years of executing Construction Subcontracts of this size and complexity?

Yes/No (Circle one and explain below) Explanation

2. Do you (and/or your team) have experience working construction services involving piping, systems installation at DOE sites?

Yes/No (Circle one and explain below) Explanation

4. Do you (and/or your team) have experience fabricating and installing piping and electrical jumpers to very stringent tolerance requirements installed in a remote controlled canyon environment?

Page 26: Web viewSubcontractor’s shall submit their response to the attached Prequalification Questionnaire / EOI using Microsoft Word file ... AISC Quality Certification ... Manual

Page 26 of 3402/16/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-001 /

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 1)

Yes/No (Circle one and explain below) Explanation

5. Can you (and/or your team) demonstrate work experience with major dirt work (excavation, hauling, loading, backfilling, grading, etc.), road construction/paving, and heavy equipment use, and installation of Engineered Shoring Systems?

Yes/No (Circle one and explain below) Explanation

6. Does your company (or team members) have the capability and experience to procure, and install equipment, structures, and components necessary to accomplish all the types of scopes of work identified in Section “A”?

Yes/No (Circle one and explain below) Explanation

7. Can you (and/or your team) demonstrate the depth of corporate support and show a history of being a full service provider of the types of scope described in Section “A,” above?

Yes/No (Circle one and explain below) Explanation

8. Do you (and/or your team) evaluate and document hazardous conditions for the purpose of planning and executing the field work activities safely?

Yes/No (Circle one and explain below) Explanation

9. Is there a component of this scope that you (and/or your team) do not want to provide?

Yes/No (Circle one and explain below) Explanation

10. Can you (and/or your team) demonstrate the depth of a comprehensive Quality Assurance Program (QAP) including those elements as described in Section “K” below?

Yes/No (Circle one and explain below) Explanation

11. Can you (and/or your team) demonstrate the project controls processes for managing and controlling a fully resource loaded project schedule?

Yes/No (Circle one and explain below) Explanation

Relevant Project Experience

Please list specific projects that provide evidence of the capability and experience of your company (including team members) in all the areas of work included in the Scope identified in Section “A.” Please include the following information for each project:

• Year • Duration

Page 27: Web viewSubcontractor’s shall submit their response to the attached Prequalification Questionnaire / EOI using Microsoft Word file ... AISC Quality Certification ... Manual

Page 27 of 3402/16/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-001 /

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 1)

• Company performing the work• Project Description relevant to the Section “A’ Scope of Work and the types of constructions

performed (DOE Experience/NRC Experience)• Contract Type• Contract Total Value• Customer/Contact (Reference)

Relevant Project ExperienceItem Year Duration Company Project Description Type of

ContractInitial Contract Value $

*Final Contract Value $

Customer/Contact Phone Number

1234567891011121314

*Explain and summarize the overall dollar variance from initial award and final subcontract value (i.e. directed changes cost vs.

Page 28: Web viewSubcontractor’s shall submit their response to the attached Prequalification Questionnaire / EOI using Microsoft Word file ... AISC Quality Certification ... Manual

Page 28 of 3402/16/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-001 /

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 1)

I.)[H.)] Property and Material Management Planning

The subcontractor will be required to develop, implement and maintain a Property Management System compliant with Federal Acquisition Requirements (FAR) 52.245-1, Property Management. The subcontractor’s Property Management System Plan will be a submittal requirement for interested Subcontractor’s. WRPS will review the plans and must approve them prior to prospective Subcontractor’s being placed on our approved Subcontractor’s list.

Questions:

1. Summarize your company’s Property/Material Management Plan?

2. Has your Property Management Plan/Program been utilized on previous/other Government contracts?

3. Explain how the material purchases will be received, identified, stored and allocated to specific installation work packages. How will allocation be documented? How material not used will be handled (including bulks)?

4. Explain the process for identifying in storage maintenance requirements and maintaining equipment both in storage and installed?

5. How will equipment/material in storage be segregated and protected from loss/damage? How will loss/damage be reported?

6. Explain process for completion and reporting of physical inventory.

7. Explain process for self-assessment of Property Management Plan/Program?

8. Explain the process for segregation and control of non-conforming equipment and materials.

Page 29: Web viewSubcontractor’s shall submit their response to the attached Prequalification Questionnaire / EOI using Microsoft Word file ... AISC Quality Certification ... Manual

Page 29 of 3402/16/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-001 /

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 1)

J.)[I.)] Health and Safety Program

The Subcontractor will be required to submit a site specific Environmental, Health, and Safety Plan for the project. This specific plan may be tailored from the Subcontractor’s corporate plan, however the site specific plan must be fully compliant with the applicable sections of Title 29 CFR Part 1926 (Construction)– Safety and Health Regulations for Construction and, Title 29 CFR Part 1910 (General Industry) – Occupational Safety and Health Standards. Where applicable, the site specific plan will also reference, due to Title 10 CFR Part 851, Worker Safety and Health Program, the safety standards enumerated in listed codes/regulations, such as the American National Standards Institute (ANSI), National Fire Protection Association (NFPA), and American Conference of Governmental Industrial Hygienists (ACGIH) and applicable DOE Hanford Site Specific Standards (Lock Out/Tag Out, Beryllium, Hoisting & Rigging, Fall Protection, Permit required confined space, etc.).

It is anticipated this project will start on a “Green Field” site, that is clear of any radiological and chemical contaminants, as a precaution, WRPS may provide health physics technicians during excavations to ensure no contamination is encountered within the soils. Recent soils explorations of the intended site boundary have recently been conducted and no contamination was found.

The waste transfer line installations included in the scope will be performed in the area between the existing tank farm fences the temporary construction fence boundary, and the boundary of the Waste Treatment Plant (WTP) site. The crews carrying out the construction and installation associated with portions of these lines that are close to existing facilities will be required to be Radiation Worker trained personnel, and may encounter soils that contain some contamination. This project will not require introduction of waste or chemicals into the systems installed by the subcontractor until after these systems have been transferred to the facility operator.

WRPS anticipates that the Subcontractor will be required to show evidence of meeting the following requirements if invited to submit a proposal. Failure to meet the requirements, at any time, may result in the Subcontractor being ineligible for award.

• Integrated Safety Management Program• Site Specific Health and Safety Plan (Manual)• Work Control Program/Procedure(s)• Safety Experience Factors, other key safety indicators • Subcontractor’s and team members must provide last 5 years of safety data (OSHA Recordable

Injury Rate; OSHA DART rate). WRPS will perform an evaluation of this data as part of the review. Subcontractors with a poor safety track record may not be allowed to participate in the solicitation. The criteria utilized for this evaluation will be similar to the safety performance requirements of the RCCC.

• Subcontractor’s, including team members and sub tiers, must have an Interstate Experience Modification Rate (EMR) and a State EMR of 1.0 or lower for the current and previous two (2) calendar years. Companies with an EMR greater than 1.0 may be considered provided a robust corrective action safety improvement plan is provided.

Page 30: Web viewSubcontractor’s shall submit their response to the attached Prequalification Questionnaire / EOI using Microsoft Word file ... AISC Quality Certification ... Manual

Page 30 of 3402/16/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-001 /

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 1)

Questions

1. Can you (and/or your team) demonstrate a corporate history of safe work including OSHA logs for the last 5 years?

Yes/No (Circle one and explain below) Explanation

2. Please complete Attachment 2, “Exhibit 1. Vendor ESH&Q Questionnaire and provide with your Company’s prequalification response.

3. Provide corrective action plan if EMR is greater than 1.0.

NOTE: Each Subcontractor may be asked to provide a copy of the Health and Safety Manual(s).

Page 31: Web viewSubcontractor’s shall submit their response to the attached Prequalification Questionnaire / EOI using Microsoft Word file ... AISC Quality Certification ... Manual

Page 31 of 3402/16/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-001 /

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 1)

K.)[J.)] Quality Assurance Program

Expected Requirements

Subcontractors must have a Quality Assurance Program (QAP) that conforms to the requirements ASME NQA-1 2008/2009 Parts I and II and the following:

• Uses national/international consensus standards • Applies national standards, as appropriate, to specific work activities• Addresses detection and control of suspect/counterfeit items.

Subcontractors that do not have a robust NQA-1 program or cannot meet the stringent quality assurance requirements likely will not be qualified. The subcontractor(s) that received an award must be evaluated by WRPS and placed on the Evaluated Suppliers List (ESL) based on specific quality requirements specified in a Quality Assurance Requirements document at time of award. The subcontractors who have not had their NQA-1 programs approved prior to requests best and final proposals within the request for proposal process, may be ineligible for final consideration or award of this subcontract.

Subcontractor will be required to have a robust commercial grade dedication process and procedures in place. Experience with commercial grade dedication is essential and will be included in the award criteria.

Subcontractor’s must have experience applying its QAP to the aspects of work to be performed under the Construction Services Subcontract Agreement, including procurement, fabrication, welding, construction, installation, testing services, design services, and software development.

The Subcontractor and their sub tier subcontractors shall flow down the Quality Assurance requirements to each Sub Tier Subcontractor in the form of a QA Implementing Document for the work being performed by the sub tier subcontractor.

Questions

1. Provide your NQA-1 Quality Assurance Program Description?

2. Do you (and your team members) maintain a Quality Assurance Program that satisfies the requirements of ASME NQA-1, Parts I and II?

Yes/No (Circle one and explain below) Explanation

3. Do you (and your team members) have experience applying the QA Program(s) to the full range of services required under the construction services scope in Section "A," above?

Yes/No (Circle one and explain below) Explanation

Page 32: Web viewSubcontractor’s shall submit their response to the attached Prequalification Questionnaire / EOI using Microsoft Word file ... AISC Quality Certification ... Manual

Page 32 of 3402/16/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-001 /

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 1)

4. Does your company (or your team members) have a robust Commercial Grade Dedication program and procedures? Do you plan to use subcontractors to perform the dedication services?

Yes/No (Circle one and explain below) Explanation

5. Does your company have an evaluated supplier program and procedures?

Yes/No (Circle one and explain below) Explanation

NOTE: Each Subcontractor may be asked to provide a copy of the Subcontractors Quality Assurance Manual and asked to allow access for WRPS personnel to perform formal NQA-1 evaluations prior to issuance of the RFP.

Page 33: Web viewSubcontractor’s shall submit their response to the attached Prequalification Questionnaire / EOI using Microsoft Word file ... AISC Quality Certification ... Manual

Page 33 of 3402/16/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-001 /

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 1)

L.)[K.)] Labor Agreements

It is important to WRPS that we team with quality subcontractor to deliver to the government value; therefore, we want any subcontractor to be successful so that we are successful. Toward that end, past experience with labor organizations is an important indicator toward future success. The Subcontractor and their sub-tier subcontractors shall become signatory to the Hanford Site Stabilization Agreement.

Questions

1. Can you (and/or your team) demonstrate a corporate history of working with unionized labor forces?

Yes/No (Circle one and explain below) Explanation

2. Can you (and/or your team) demonstrate a history of union labor dispute resolution?

Yes/No (Circle one and explain below) Explanation

3. Can you (and/or your team) demonstrate corporate experience in establishing and working within labor agreements with local building trade unions?

Yes/No (Circle one and explain below) Explanation

4. Can you (and/or your team) demonstrate corporate experience with executing Capital Line Item Project under United States Davis Bacon Act?

Yes/No (Circle one and explain below) Explanation

Page 34: Web viewSubcontractor’s shall submit their response to the attached Prequalification Questionnaire / EOI using Microsoft Word file ... AISC Quality Certification ... Manual

Page 34 of 3402/16/2017Washington River Protection Solutions LLC

LAWPS Facility ConstructionEOI-LAWPS-MLM-2017-001 /

Pre-qualification / EOI Questionnaire

Prequalification Questionnaire / Expression of InterestConstruction Subcontract for the LAWPS Facility (Revision 1)

ATTACHMENTS:

Section “C,” Attachment, Cost Accounting System Form, (Attachment 1)

Section “J,” Attachment, Health and Safety Program Form, (Attachment 2)